Loading...
HomeMy WebLinkAboutSW4200703_Hawbridge School_SE_20200708 Tai and Associates, PLLC P.O. Box 90067 Raleigh, NC 27675 (919) 782-9525 www.taiandassociates.com SUBSURFACE EXPLORATION REPORT Conducted On: Hawbridge School Saxapahaw, North Carolina Tai Job No. 18-196-1 For: The Hawbridge School 1735 Saxapahaw-Bethlehem Church Road Saxapahaw, North Carolina March 20, 2019 Prepared By: Tai and Associates, PLLC NC Firm License No. P-0370 _________________________________ Matthew T. Ryan, PE Tai and Associates, PLLC P.O. Box 90067 Raleigh, NC 27675 (919) 782-9525 www.taiandassociates.com March 20, 2019 Ms. Mya Ciccotti Geiss Interim Executive Director The Hawbridge School 1735 Saxapahaw-Bethlehem Church Road Saxapahaw, North Carolina 27340 Re: Subsurface Exploration Report Hawbridge School Saxapahaw, North Carolina Tai Job No.: 18-196-1 Dear Ms. Ciccotti Geiss: In accordance with your authorization, we have completed a subsurface exploration program for the referenced project. This program consisted of the drilling of twenty-three (23) soil borings, visual classification of soil samples recovered, site visit, engineering services, analyses of subsurface conditions, and the preparation of this written report. FIELD EXPLORATION The field exploration program consisted of the drilling of twenty-three (23) soil borings (B-1 through B-23) advanced to a maximum depth of 42.0 feet below the existing ground surface. The drilling was performed by a CME 550 drill rig using 2-¼” inside diameter hollow stem augers to advance the soil borings. Standard Penetration Tests (ASTM D-1586) were performed at every 2.5-foot interval to 10.0 feet below ground surface, followed by one at every 5.0-foot interval utilizing an auto-hammer. The approximate locations and logs of the soil borings are shown on the attached “Boring Location Plan” and “Boring Logs”. The boring locations were staked by measuring from existing site features and should be considered approximate. Boring elevations were interpolated from an Existing Conditions and Demolition Plan prepared by Little, dated December 12, 2018, and should also be considered approximate. LABORATORY TESTING The laboratory-testing program consisted of the visual classification of all soil samples recovered (ASTM D-2488). The descriptions of the subsurface materials as represented by the soil samples recovered are indicated on the “Boring Logs.” All samples will be discarded in 60 days unless otherwise instructed. SITE OBSERVATION The site is predominantly cleared and vegetated with grass. The site topography is lowest at the eastern part of the site, at an elevation of approximately 454.0, and highest at the western part of the site, at an elevation of approximately 515.0. Ms. Mya Ciccotti Geiss Tai Job No. 18-196-1 March 20, 2019 Page 2 of 8 SUBSURFACE CONDITIONS Based on the results of the field exploration program, the subsurface materials of the project site can be described as consisting of the following units of soil: 1. Topsoil: Topsoil, encountered in sixteen (16) soil borings at the site, was 1.0 to 2.0 inches thick. At boring B-15, 6.0 inches of topsoil was encountered. 2. Possible Fill Soil: Possible fill soil was encountered in borings B-15 and B-17 to a depth of about 5.5 feet below the ground surface. This unit of soil consists of soft to firm, clayey silt with gravel, roots and variable amounts of sand. This unit of soil is of poor engineering quality. 3. Residual Soil: Below the topsoil and fill soil is natural, residual soil derived from the in- place weathering of the parent rock. This is the predominant subsurface material found at the site and it is found in all of the soil borings. It generally comprises silty clays, clayey silts, and sandy silts. a. The shallower portions of the residuum consist mostly of red silty clays and clayey silts to a depth of 3.0 to 32.0 feet, but mostly 5.0 to 10.0 feet below ground surface. SPT N- Values for this soil were 5 to 33 (firm to hard). This soil is of a moderate engineering quality. b. The residual soils become less cohesive with depth. Silts and sandy silts were encountered below the clayey soils. Generally tan, orange, brown, gray in color, this unit of soil was stiff to very hard (SPT N-Values of 14 to 55). This soil is of a moderate engineering quality. 4. Possible Boulder Material: Possible boulder material was encountered in borings B-1 through B-3 at depths of 17.0 to 22.0 feet below ground surface. Shallow rock ledges, boulders, and boulder clusters probably exist elsewhere on site between borings. 5. Weathered Rock: Defined by material having a SPT N-Value of 50 blows per foot (bpf) or more, weathered rock was encountered from 12.0 to 15.0 feet below ground surface at boring B-8, 17.0 to 25.0 feet at borings B-16 and B-22, and from 32.0 to 35.0 feet at boring B-2. This unit of soil is of good engineering quality, and the depth to this material is sporadic based on previous experience. 6. Partially Weathered Rock: Some of the weathered rock becomes much harder with depth and is classified as partially weathered rock (PWR). For this project, PWR is defined as very hard, rock-like material having a N-Value of 50 blows over two inches or less. PWR was encountered in boring B-2 at a depth of 37.0 feet below ground surface. Ms. Mya Ciccotti Geiss Tai Job No. 18-196-1 March 20, 2019 Page 3 of 8 7. Auger Refusal: Auger refusal was encountered at a depth of 42.0 feet below ground surface at boring location B-2. 8. Groundwater: Groundwater was encountered in borings B-2, B-15 and B-22 at depths ranging from 8.0 to 25.4 feet below the ground surface and likely exists elsewhere between the borings at varying elevations. PROPOSED PROJECT Based on correspondence with the design team, we understand that the proposed project consists of the design and construction of a two-story school building, stormwater detention ponds, above-ground parking areas, and the related infrastructure. The preliminary finish floor elevation for the upper level of the new building is 484.0 (near borings B-5, B-6, and B-9) and for the lower level is 472.0. Foundation loading is unknown, but for preliminary planning purposes we anticipate maximum column loads to be in the order of 200 kips. Up to 20.0 feet of cut and 7.0 feet of fill will be required to reach proposed grade at the site. RECOMMENDATIONS Foundations We recommend the proposed building be supported on single, combined, or continuous footings designed for the net allowable bearing pressure (net contact pressure) shown below. The net allowable bearing pressure refers to the pressure which may be transmitted to the foundation bearing material in excess of the final surrounding overburden pressure. All footings shall be supported on firm or stiff residual soils, new controlled fill, or an improved subgrade. The estimated maximum total and differential post- construction settlement is 1.0 and 0.5 inches, respectively. Building Net Allowable Bearing Capacity Soil Bearing Condition 1 to 2-Story 3,000 psf Up to 250-kip column loads If it proves beneficial, a higher bearing capacity of 4,000 psf can be achieved in the areas at the project site with at least 4.0 feet of cut to reach proposed finish floor elevation. All footing subgrades must be inspected for the design bearing capacity by a professional engineer or their representative utilizing field engineering judgment. Expansion joints should be provided on the exterior walls at regular intervals and at every building break. There should be at least 12.0 inches of cover on all exterior footings to prevent frost penetration. All foundation systems should be designed at an elevation that no utility lines, utility line excavation, and any other footings are located within a 1:1 zone of influence of the subject footing edge. See attachment for estimated settlement calculation. Ms. Mya Ciccotti Geiss Tai Job No. 18-196-1 March 20, 2019 Page 4 of 8 Excavation All normal size earth-moving equipment can easily move the materials encountered above the boulder material and weathered rock layer. Normally, slow excavation with a large hydraulic excavator such as a CAT 330 track-mounted hydraulic excavator, or equal, should be able to excavate any hard or dense soils. Weathered rock cannot be excavated with a rubber-tire backhoe or a small track-mounted excavator such as a mini-excavator. Rock excavation should be defined as material that cannot be excavated with a track-mounted hydraulic excavator, equipped with rock teeth, equivalent to a CAT 330. Boulders exceeding 1.0 cy in mass excavations and 0.75 cy in trench excavations should also be classified as rock. The contract should include definitions for mass rock and trench rock. Some rock excavation in the form of boulders in deep cut areas are common for the geology, and are present in one boring near proposed grades (B-1). When a grading plan becomes available, we would be pleased to provide an estimated volume of rock excavation. Cut and Fill It appears that up to 20.0 of cut and 7.0 feet of fill will be required to reach proposed grades for the proposed building, roads and parking areas at the site. A two (2) horizontal to one (1) vertical cut or fill, temporary or permanent slope should offer sufficient margin of safety for global stability in any area not protected by a shoring system. Cut and fill slopes not confined by retaining walls should start a minimum of 8.0 feet from the edge of the building and 5.0 feet from paved areas. Most of the natural, non-plastic residual soils in the cut areas should provide suitable regular backfill material, except for any clay pockets or boulders larger than 6.0 inches in any dimension. The existing on- site fill soils are not considered suitable for reuse as fill. All fill and any backfill should be placed on cleared, natural soil. Fill and backfill soils should consist of clean, sandy, silty natural residual soil, or approved off- site borrow, placed in 8.0-inch loose lifts, and compacted to 98% of the Standard Proctor Density (ASTM D- 698). The moisture content of the fill during placement should be maintained to within ±2% of the optimum value. In-place density tests should be performed at a rate of one test per 2,500 sf, per lift, per day (ASTM D-1556). Retaining wall backfills in excess of 12.0 feet in depth are difficult or impossible to accomplish without settlement of the backfill relative to the building foundation or pavement areas. The design should take this into account. This settlement can be substantially reduced by utilizing select granular borrow such as quarry screenings with less than 15% passing the #200 sieve. Seismic Classification The project site subsoil belongs to seismic Site Class D, as determined in accordance with equation 16-41 of the 2012 North Carolina Building Code. Ms. Mya Ciccotti Geiss Tai Job No. 18-196-1 March 20, 2019 Page 5 of 8 Retaining Walls We recommend that either a layer of prefabricated drainage material such as Enkadrain or 2-foot wide layer of free-draining, granular material (such as #57 washed stone) be used as backfill for the entire, below-grade face of site concrete retaining walls. Filter fabric (Mirafi 140N or equal) should be used to separate the #57 stone from the regular soil backfill to avoid losing fines into the void spaces. The retaining walls with top support should be designed against an at-rest equivalent fluid pressure. The retaining walls without top support, if any, should be designed against an active equivalent fluid pressure. Perimeter foundation drains should be installed behind the walls and connected to the storm drain system by gravity or by pump. All other soil backfill must be placed in 8.0-inch thick loose layers and compacted to 98% of the maximum Standard Proctor Density (ASTM D-698), within ±2% of the optimum moisture content. The following soil parameters should be used in analyzing the stability of the wall and footing: (φ) Friction angle 28 deg. (γ) Unit weight 105 pcf ka (Active earth pressure coefficient) 0.361 ko (At-rest earth pressure coefficient) 0.531 kp (Passive earth pressure coefficient) 2.770 ka (Equivalent active earth pressure) 38 pcf ko (Equivalent at-rest earth pressure) 56 pcf kp (Equivalent passive earth pressure) 291 pcf Sliding Friction of Coefficient at Base 0.45 Segmental Retaining Walls If segmental retaining walls are utilized as part of this project, these walls would normally be designed on a design-build basis after the general contract has been awarded. As such, the reinforced backfill zone cannot be specified until after the contract has been awarded. For planning purposes, we recommend budgeting for import of all reinforced backfill soils because most or all of the on-site soils will contain more than 50% fines, and will not consist of free-draining material. Slabs The building floor slabs can be designed as slab-on-grade over a well-prepared subgrade. The slabs should be constructed over 4.0 inches of compacted NCDOT ABC stone or #57 stone. The slabs should be isolated from the walls and columns. ACI 301.2 indicates that a contraction joint spacing of 24 to 36 times the slab thickness up to a maximum spacing of 18.0 feet have produced acceptable results for unreinforced, plain concrete slabs. Ms. Mya Ciccotti Geiss Tai Job No. 18-196-1 March 20, 2019 Page 6 of 8 Groundwater Groundwater was encountered in three soil borings at depths ranging from 8.0 to 25.4 feet below ground surface (elevation 459.0 to 453.0). Perched or trapped groundwater will likely be present at the site, particularly during/following heavy rainfall periods. The site subgrade will be nearly impermeable. The design of the building and development of the site must take this into account. The site should be graded to divert surface water away from the building and a foundation drain tied to the storm drain system should be installed around the entire building perimeter and behind all below-grade retaining walls. Waterproofing and drain board should be installed behind all below-grade walls. Utilities All utility pipes should be supported on top of at least 6.0 inches of free-draining granular material. The backfill should consist of clean natural soil, or suitable fill, and should be compacted to 98% of the Standard Proctor Density (ASTM D-698), within 2% of the optimum moisture content. Pavement The pavement system should be supported on a carefully prepared site subgrade. Based on the NC DOT Interim Pavement Design Procedure, and assumed soaked CBR Value of 6.0, the pavement system should be as outlined below. The subgrade and the ABC stone base course should be inspected, tested and proofrolled prior to placement of the subsequent lift. ABC Stone I-19.0B Asphalt S-9.5B Asphalt Eq. 18,000 lb. Axle Trips / Day Light Duty 8 2.0 Cars only Intermediate Duty 8 3.0 3.7 Heavy Duty 8 2.5 1.5 9.9 CONSTRUCTION CONSIDERATIONS Engineering Behavior of Soils The on-site silty-clayey soils are sensitive to surface water damage. Grading operations performed in the wet winter months of November through March will be difficult, time consuming and expensive. Stiff natural silty soils, if kept dry, will provide an adequate subgrade to placement of additional fill. However, upon excavation even some of these soils can become unsuitable if they become wet. Grading The project site should be cleared of all the existing surface features such as topsoil, trees and other vegetation, debris, etc. Most of the natural, non-plastic residual soil excavated can be reused as structural fill Ms. Mya Ciccotti Geiss Tai Job No. 18-196-1 March 20, 2019 Page 7 of 8 if the moisture content is maintained with 2% of the optimum moisture content. Any existing fill, plastic clays, wet clays, or soft soils will not likely be suitable for re-use as structural fill. Surface water control measures must be placed prior to any grading and earthwork activity. The cleared site should be carefully proofrolled and inspected to identify any soft soil, existing fill soil, plastic soils, or other unsuitable soil that requires undercutting. Should plastic soils be encountered, these may require undercut and/or placement of separation geofabric (Mirafi 500X, or equal). The on-site soils are difficult to work with. The low density, clayey-silty soil can be difficult to maintain near the optimum moisture, and some pumping is occasionally observed during fill placement and compaction, even when achieving the desired compaction density. Field engineering judgement will be required by the geotechnical engineer to verify the suitability of the on-site soils for re-use as structural fill during grading. Shallow Foundations The foundation excavation not poured immediately should be covered by a 3.0-inch thick mud slab to protect from surface water damage. All footing subgrades must be inspected and approved for the required bearing capacity by a representative of this firm utilizing field engineering judgment. Footing undercut should be backfilled with lean concrete or other material approved by the geotechnical engineer. Pavement and Slab Subgrades Inspection of the asphalt pavement system subgrade and ABC stone subbase will be required. Some additional improvement may be required including undercutting and/or placement of Mirafi 500X geofabric due to existing fill, soft soils, plastic clays, or areas damaged by surface water and construction traffic. ADDITIONAL SERVICES Based on our experience working on projects similar to the Hawbridge School project, revisions and modifications may be necessary as the design progresses. The foundation and earthwork design recommendations presented in this report are based not only on our field and laboratory test results, but also on the limited preliminary project information currently available to us. As the design progresses and revisions are made, or when the final design becomes available, we would be pleased to have the opportunity to review the plans and specifications, or to provide any additional consultation services. FIELD SERVICES All earthwork, foundation, slab, pavement, and utility construction activities should be observed by one of our experienced engineers or geotechnicians to ensure that the actual subsurface conditions encountered during construction are consistent with the design intent, and that the intended design considerations are met in every phase of the earthwork and foundation construction. Some modification of the design recommendations presented in this report may be required and any such changes must be verified Ms. Mya Ciccotti Geiss Tai Job No. 18-196-1 March 20, 2019 Page 8 of 8 by this firm. We cannot be held for the conditions stated above and the post-construction performance of the foundation and pavement systems unless we are authorized to perform the field services required. CLOSURE It has been a pleasure to work with you and your design team on the preliminary phase of this project. If you have any questions, or if we can offer any additional information or services during the design phase of this project, please feel free to call us at your convenience. Very Truly Yours, Tai and Associates, PLLC Firm License No. P-0370 Matthew T. Ryan, PE Attachments: 1. Boring Location Plan (1) 2. Boring Log Symbols and Nomenclature Legend (1) 3. Boring Logs (23) TAI JOB NO.: 18-196-1 MARCH, 2019 B-1 B-8 B-9 B-7 B-3 B-4 B-5 B-6 B-2 B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-19 B-20 B-21 B-22 BORING LOCATION PLAN HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA B-23 Symbols and Nomenclature Penetration Resistance Results - Sands Undisturbed Sample (UD) ●25 Standard penetration resistance (ASTM D-1586) , with SPT N-Value 50/0.2 Number of blows (50) to drive the spoon a measured distance (0.2 feet) AX,BX,NX Core barrel sizes for rock cores 65% Percentage of rock core recovered RQD Rock quality designation - % of core 4 or more inches long ▼ Water table at least 24 hours after drilling ∇ Water table one hour or less after drilling ∆ Loss of drilling water A Atterberg Limits test performed C Consolidation test performed GS Grain size test performed T Triaxial shear test performed P Proctor compaction test performed M=18 Natural moisture content (percent) Number of blows, N Relative Density 0-4 very loose 5-10 loose 11-20 firm 21-30 very firm 31-50 dense over 50 very dense or weathered rock 50/0.2' Partially weathered rock Penetration Resistance Results - Silts and Clays Number of blows, N Approx. consistency 0-1 very soft 2-4 soft 5-8 firm 9-15 stiff 16-30 very stiff 31-50 hard over 50 very hard or weathered rock 50/0.2' Partially weathered rock DRILLING PROCEDURES Soil sampling and standard penetration testing performed in accordance with ASTM D-1586. The standard penetration resistance is the number of blows of a 140 pound hammer falling 30 inches to drive a 2 inch O.D., 1.4 inch I.D. split spoon sampler one foot. Core drilling performed in accordance with ASTM D-2113. Undisturbed sampling (shelby tube) performed in accordance with ASTM D-1587. Soil classification performed in accordance with ASTM D2487/D-2488. ABBREVIATIONS SOIL MOISTURE - CORRELATION OF TERMS AR - AUGER REFUSAL BOF – BOTTOM OF FOOTING BT - BORING TERMINATED DCP Nc – DYNAMIC CONE PENT. TEST e - VOID RATIO FFE – FINISHED FLOOR ELEVATION HI. – HIGHLY HP – HIGH PLASTICITY INV – INVERT LP – LOW PLASTICITY MP – MEDIUM PLASTICITY MED. - MEDIUM MICA. - MICACEOUS MOD. – MODERATELY N – STANDARD PENETRATION TEST NP. - NON PLASTIC PFG – PROPOSED FINAL GRADE TCR - TRICONE REFUSAL TOF – TOP OF FOOTING w - MOISTURE CONTENT V – VERY γ - UNIT WEIGHT γd - DRY UNIT WEIGHT SAMPLE ABBREVIATIONS S - BULK SS - SPLIT SPOON ST - SHELBY TUBE RS - ROCK RT - RECOMP. TRIAXIAL CBR - CAILFORNIA BEARING RATIO FIELD MOISTURE DESCRIPTION SATURATED - (SAT.) WET - (W) MOIST - (M) DRY - (D) GUIDE-FIELD MOISTURE DESC. USUALLY LIQUID, VERY WET, USUALLY FROM THE BELOW GROUND WATER TABLE SEMISOLID: REQUIRES DRYING TO ATTAIN OPTIMUM MOISTURE SOLID: AT OR NEAR OPTIMUM MOISTURE REQUIRES ADDITIONAL WATER TO ATTAIN OPTIMUM MOISTURE EQUIPMENT USED ON SUBJECT PROJECT DRILL UNITS □ CMESS □ CMESS ATV □ __________ □ __________ CORE SIZE □-B_________ □-N_________ □-H_________ ADVANCING TOOLS: □ CLAY BITS □ 6"CONT. FLIGHT AUGER □ 8" HOLLOW AUGER □ CASING □ W/ADVANCER □ TRICONE___STEEL TEETH □ TRICONE___TUNG.CARB. □ CORE BIT □ ______________________ PERCENTAGE OF MATERIAL ORGANIC MATERIAL GRANULAR SOILS SILT-CLAY SOILS TRACE OF ORGANIC MATTER 2-3% 3-5% LITTLE ORGANIC MATTER 3-5% 5-12% MODERATELY ORGANIC 5-10% 12-20% HIGHLY ORGANIC >10% >20% OTHER MATERIAL TRACE 1-10% LITTLE 10-20% SOME 20-35 % HIGHLY 35% AND ABOVE PLASTICITY HAMMER TYPE: PLASTICITY INDEX (PI) NONPLASTIC 0-5 LOW PLASTICITY 6-15 MEDIUM PLASTICITY 16-25 HIGH PLASTICITY 26 OR MORE DRY STRENGTH VERY LOW SLIGHT MEDIUM HIGH □ AUTOMATIC □ CAT HEAD HAND TOOLS: □ POST HOLE DIGGER □ ______________________ □ HAND AUGER □ ______________________ □ SOUNDING ROD □ ______________________ □ VANE SHEAR TEST Tai and Associates, PLLC P.O. Box 90067 Raleigh, NC 27675 (919) 782-9525 www.taiandassociates.com 0.2 5.5 17.0 22.0 35.0 TOPSOIL (2'') Red, brown, moist, stiff, silty CLAY, with roots Red, brown, tan, orange, gray, moist, firm to stiff, clayey SILT POSSIBLE BOULDERS - Tan, brown, dry, sandy SILT Tan, brown, orange, gray, dry to moist, very stiff to hard, clayey, sandy SILT Boring Terminated at 35.0 Feet 9 13 12 10 7 0.5 35 41 30 490 485 480 475 470 465 460 455 450 445 TAI JOB NO. 18-196-1 B-1 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED 50 FFE 472.0 BOF 469.0 DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.2 5.5 17.0 22.0 32.0 37.0 42.0 TOPSOIL (2'') Red, brown, moist, firm to stiff, silty CLAY, with roots Red, brown, tan, orange, black, moist, stiff, clayey SILT POSSIBLE BOULDERS - Tan, brown, gray, dry, sandy SILT Tan, brown, orange, gray, moist, very stiff to hard, clayey SILT WEATHERED ROCK - Tan, brown, orange, gray, gravelly, clayey SILT PARTIALLY WEATHERED ROCK - Tan, gray, SILT Boring Terminated at 42.0 Feet Auger Refusal at 42.0 Feet 5 13 13 9 13 57 29 33 0.5 0.1 485 480 475 470 465 460 455 450 445 440 TAI JOB NO. 18-196-1 B-2 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 25.4 CAVED 50 50 FFE 472.0 BOF 469.0 DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.2 8.0 17.0 20.0 TOPSOIL (2'') Red, brown, moist, firm to stiff, silty CLAY, with roots Tan, orange, brown, moist, stiff, clayey SILT, with roots POSSIBLE BOULDERS - Tan, brown, gray, moist, sandy SILT Boring Terminated at 20.0 Feet 9 10 8 9 13 73 475 470 465 460 455 450 445 440 435 430 TAI JOB NO. 18-196-1 B-3 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED FFE 472.0 BOF 469.0 DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.1 8.0 15.0 TOPSOIL (1'') Red, brown, orange, moist, firm to stiff, silty CLAY Tan, brown, gray, moist, firm, clayey SILT Boring Terminated at 15.0 Feet 7 12 8 8 6 469 464 459 454 449 444 439 434 429 424 TAI JOB NO. 18-196-1 B-4 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY BOF 469.0 DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.2 17.0 20.0 TOPSOIL (2'') Red, brown, moist, firm to very stiff, silty CLAY / clayey SILT Red, brown, moist, very stiff, clayey SILT Boring Terminated at 20.0 Feet 7 17 20 21 26 21 489 484 479 474 469 464 459 454 449 444 TAI JOB NO. 18-196-1 B-5 FEBRUARY 13, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED FFE 484.0 BOF 481.0 DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.2 5.5 22.0 25.0 TOPSOIL (2'') Red, brown, moist, firm to stiff, silty CLAY, with roots Red, brown, orange, black, gray, moist, stiff, clayey SILT, gravelly from 12.0' - 17.0' Gray, orange, brown, dry, very stiff, SILT Boring Terminated at 25.0 Feet 6 10 14 10 12 12 26 482 477 472 467 462 457 452 447 442 437 TAI JOB NO. 18-196-1 B-6 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED FFE 472.0 BOF 469.0 DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.1 3.0 12.0 15.0 TOPSOIL (1'') Red, orange, brown, moist, firm, silty CLAY Tan, brown, moist, firm, slightly clayey SILT Gray, brown, black, moist, stiff, silty CLAY Boring Terminated at 15.0 Feet 8 8 9 7 9 468 463 458 453 448 443 438 433 428 423 TAI JOB NO. 18-196-1 B-7 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 5.5 8.0 12.0 15.0 Red, brown, orange, black, moist, stiff, silty CLAY Brown, orange, black, moist, firm, SILT Gray speckled white, stained orange, dry to moist, stiff, fine sandy SILT WEATHERED ROCK - Gray speckled white, stained orange, sandy SILT Boring Terminated at 15.0 Feet 13 9 7 14 0.4 465 460 455 450 445 440 435 430 425 420 TAI JOB NO. 18-196-1 B-8 FEBRUARY 12, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED 50 DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.1 17.0 20.0 TOPSOIL (1'') Red, brown, moist, firm to very stiff, silty CLAY / clayey SILT Red, brown, moist, very stiff, clayey SILT Boring Terminated at 20.0 Feet 7 11 14 19 26 22 485 480 475 470 465 460 455 450 445 440 TAI JOB NO. 18-196-1 B-9 FEBRUARY 13, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED FFE 484.0 BOF 481.0 DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.1 12.0 15.0 TOPSOIL (1'') Red, brown, orange, moist, firm to stiff, silty CLAY Tan, gray, moist, firm, clayey SILT Boring Terminated at 15.0 Feet 8 13 13 10 7 470 465 460 455 450 445 440 435 430 425 TAI JOB NO. 18-196-1 B-10 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED BOF 469.0 DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 12.0 15.0 Red, brown, orange, black, moist, firm to stiff, clayey SILT Gray speckled white, stained orange, moist, very hard, sandy SILT Boring Terminated at 15.0 Feet 8 9 7 12 55 465 460 455 450 445 440 435 430 425 420 TAI JOB NO. 18-196-1 B-11 FEBRUARY 12, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.2 8.0 10.0 TOPSOIL (2'') Red, brown, moist, stiff to very stiff, silty CLAY Gray, tan, orange, moist to wet, firm, gravelly, slightly clayey SILT Boring Terminated at 10.0 Feet 9 14 16 8 468 463 458 453 448 443 438 433 428 423 TAI JOB NO. 18-196-1 B-12 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.1 10.0 TOPSOIL (1'') Red, brown, orange, tan, moist, firm to stiff, silty CLAY Boring Terminated at 10.0 Feet 8 12 9 11 468 463 458 453 448 443 438 433 428 423 TAI JOB NO. 18-196-1 B-13 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.2 3.0 17.0 25.0 TOPSOIL (2'') Red, brown, moist, firm, silty CLAY, with roots Red, brown, tan, orange, moist, firm to stiff, slightly clayey SILT Gray speckled white, stained orange, moist, stiff to very stiff, slightly clayey, sandy SILT, with trace gravel Boring Terminated at 25.0 Feet 5 12 15 5 8 14 18 483 478 473 468 463 458 453 448 443 438 TAI JOB NO. 18-196-1 B-14 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.5 3.0 5.5 8.0 10.0 TOPSOIL (6'') POSSIBLE FILL - Red, brown, moist, firm, clayey SILT, with roots and gravel POSSIBLE FILL - Brown, moist to wet, soft, clayey, sandy SILT Gray, brown, moist, firm, CLAY, with trace gravel Blue, gray, moist, firm, SILT Boring Terminated at 10.0 Feet 6 2 7 8 461 456 451 446 441 436 431 426 421 416 TAI JOB NO. 18-196-1 B-15 FEBRUARY 13, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 8.0 CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.2 8.0 12.0 17.0 25.0 TOPSOIL - (2'') Red, brown, moist, firm to stiff, silty CLAY Tan, gray, orange, moist, stiff, clayey SILT Tan, gray, orange, brown, dry, hard, clayey, sandy SILT WEATHERED ROCK - Tan, gray, orange, brown, fine sandy SILT Boring Terminated at 25.0 Feet 8 12 12 13 36 0.5 0.4 480 475 470 465 460 455 450 445 440 435 TAI JOB NO. 18-196-1 B-16 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED 50 50 DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 3.0 5.5 10.0 POSSIBLE FILL - Red, brown, moist, firm, clayey SILT, with gravel and roots POSSIBLE FILL - Brown, moist, soft, clayey SILT Tan, gray, orange, brown, moist, firm to stiff, slightly clayey SILT Boring Terminated at 10.0 Feet 7 3 6 12 461 456 451 446 441 436 431 426 421 416 TAI JOB NO. 18-196-1 B-17 FEBRUARY 13, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 3.0 10.0 Red, brown, orange, moist, firm, silty CLAY Orange, brown, black, tan, moist, stiff to very stiff, slightly clayey, fine sandy SILT Boring Terminated at 10.0 Feet 8 12 14 18 461 456 451 446 441 436 431 426 421 416 TAI JOB NO. 18-196-1 B-18 FEBRUARY 12, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 3.0 10.0 Red, brown, moist, stiff, silty CLAY Orange, brown, black, dry to moist, stiff to very stiff, clayey, fine sandy SILT Boring Terminated at 10.0 Feet 14 13 15 22 467 462 457 452 447 442 437 432 427 422 TAI JOB NO. 18-196-1 B-19 FEBRUARY 12, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.1 10.0 TOPSOIL (1'') Red, brown, orange, tan, black, moist, firm to very stiff, SILT, with varying amounts of clay Boring Terminated at 10.0 Feet 12 8 10 17 465 460 455 450 445 440 435 430 425 420 TAI JOB NO. 18-196-1 B-20 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 12.0 20.0 Red, brown, moist, firm to very stiff, silty CLAY Orange, brown, moist, stiff to very stiff, clayey SILT Boring Terminated at 20.0 Feet 6 10 15 20 16 15 480 475 470 465 460 455 450 445 440 435 TAI JOB NO. 18-196-1 B-21 FEBRUARY 13, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 0.1 8.0 12.0 17.0 25.0 TOPSOIL (1'') Red, brown, moist, firm to stiff, silty CLAY Tan, gray, dry, very stiff, SILT Tan, gray, black, moist, firm, clayey SILT WEATHERED ROCK - Brown, gray, sandy SILT Boring Terminated at 25.0 Feet 7 9 9 28 7 0.3 0.3 480 475 470 465 460 455 450 445 440 435 TAI JOB NO. 18-196-1 B-22 FEBRUARY 14, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 22.0 CAVED 50 50 DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586) 3.0 10.0 Red, brown, moist, stiff, silty CLAY Orange, brown, tan, moist, firm to stiff, SILT, with varying amounts of clay Boring Terminated at 10.0 Feet 9 12 5 7 465 460 455 450 445 440 435 430 425 420 TAI JOB NO. 18-196-1 B-23 FEBRUARY 12, 2019 THE HAWBRIDGE SCHOOL SAXAPAHAW, NORTH CAROLINA THE HAWBRIDGE SCHOOL PAGE 1 OF 1 DRY CAVED DEPTH DESCRIPTION GW ELEV 10 50 90 TAI and ASSOCIATES, PLLC PO BOX 90067 RALEIGH, NC 27675 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. DATE: N-VALUE (ASTM D-1586)