HomeMy WebLinkAboutSW4200703_17-101-SuppEZ-_20200708SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
(PROJECT INFORMATION
1
JProject Name
Project Area (ac)
Hawbrid a School - New Upper School
2
7.56
3
Coastal Wetland Area (ac)
0
4
Surface Water Area (ac)
0.21
5
Is this project High or Low Density?
High
6
Does this project use an off -site SCM?
No
�OOMPLIANCE WITH 02H .11003(4)
7
'Width of vegetated setbacks 2rovided (feet)
50
8
Will the vegetated setback remain vegetated?
Yes
9
Is BUA other that as listed in .1003(4)(c-d) out of the setback?
Yes
10
Is streambank stabilization proposed on this project?
No
INUMBER AND TYPE OF SCMs:
11
Infiltration System
0
1
12
Bioretention Cell
13
Wet Pond
0
14
Stormwater Wetland
1
15
Permeable Pavement
0
16
Sand Filter
0
17
1 Rainwater Harvesting (RWH)
0
18
(Green Roof
0
2
19
ILevel Spreader -Filter Strip (LS-FS)
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23 iStormFilter
0
24
Silva Cell
0
25
_
Bayfilter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Kenneth A Loring PE,PLS
28
Organization:
CLH Design PA
29
;Street address:
400 Regency Forest Dr, Suite 120
30
City, State, Zip:
Cary, NC 27518
31
iPhone number(s):
919-319-6716
32
(Email:
kloring@clhdesignpa.com
r ifi t:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is. to [he best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here
r�
SEAL _
23953
'''H�i A.1.••.
Seal
Signature of Designer
7--
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
2
3
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
2
4
Type of SCM
SCM 1 Wetland
SCM 2 Bio-Ret
5
Total BUA in project (sq ft
118701 sf
63735 sf
54966 sf
6
New BUA on subdivided lots (subject to
permitting) (sq ft)
N/A
N/A
N/A
7permitting)
New BUA outside of subdivided lots (subject to
sf
118701 sf
63735 sf
54966 sf
8
Offsite - total area (sq ft)
sf
sf
16457 sf
9
Offsite BUA (sq ft
sf
sf
16457 sf
10
Breakdown of new BUA outside subdivided lots:
Parking (sq ft
49137 sf
25251 sf
23886 sf
Sidewalk (sq ft)
9322 sf
5396 sf
3926 sf
Roof (sq ft
30204 sf
22331 sf
7872 sf
Roadway (sq ft)
sf
sf
sf
Future (sq ft
10855 sf
8242 sf
2613 sf
Other, please specify in the comment box
below (sq ft)
2727 sf
2515 sf
212 sf
11
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
sf
sf
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft)
sf
sf
sf
13
Exisitng BUA that will remain (not subject to
ermitting) (sq ft
sf
sf
sf
14
Existing BUA that is already permitted (sq ft)
sf
sf
sf
15
Existing BUA that will be removed (sq ft
sf
sf
sf
16
Percent BUA
35%
51%
76%
17
Design storm inches
N/A
1 in
1 in
18
Design volume of SCM (cu ft)
N/A
5300 cf
4408 cf
19
Calculation method for design volume
N/A
SIMPLE
SIMPLE
ADDITIONAL INFORMATION
20
Please use this space to provide any additional information about the
ldrainage area(s):
"Other" BUA includes pavement pads for mechanical equipment and
dumpsters; in -lieu of aquiring an agreement with offsite parcels for future
BUA, we have allotted 100% of the offsite (0.38 ac - 16457 sf) to be
impervious, this area has been added to the 'offsite" BUA section of the Bio-
BIORETENTION CELL
1 1Drainage area number 2
2 IDesign volume of SCM (cu ft) 4408 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered side
slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion (10-
year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the design
volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
No
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensed professional?
Yes
BIORETENTION
CELL MDC FROM 02H .1052
18
SHWT elevation (fmsl)
458.00
19
Bottom of the bioretention cell (fmsl)
466.50
20
Ponding depth of the design storm (inches)
12 in
21
Surface area of the bioretention cell (square feet)
4430 sf
22
Design volume of the bioretention cell (cubic feet)
4408 cf
23
Is the bioretention cell used for peak attenuation?
Yes
24
Depth of peak attenuation over planting surface (in)
13 in
25
Height of peak attenuation outlet above the planting surface (in)
12 in
26
Infiltration rate of the in situ soil (inch/hour)
1 in/hr
27
Diameter of the underdrain pipes (if applicable)
4 in
28
Does the design include Internal Water Storage (IWS)?
Yes
29
if so, elevation of the top of the IWS (fmsl)
468.5
30
Elevation of the planting surface (fmsl)
470
31
jWhat type of vegetation will be planted? (grass, trees/shrubs, other)?
Grass
32
Media depth (inches)
42 in
33
Percentage of medium to coarse washed sand by volume
75-85
34
Percentage of fines (silt and clay) by volume
8%-10%
35
Percentage of organic matter by volume
5%-10%
36
Type of organic material
Sod
37
Phosphorus Index (P-Index) of media (unitless)
30
38
Will compaction be avoided during construction?
Yes
39
Will cell be maintained to a one inch/hour standard?
Yes
40
Depth of mulch, if applicable (inches)
N/A
41
Type of mulch, if applicable
N/A
42
How many clean out pipes are being installed?
6
43 Type of pretreatment that will be used:
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
44 bioretention cell(s):
Forebay
�J
Bioretention 3 1:35 PM 6/30/2020
STORMWATER WETLAND
1 1Drainage area number 1
2 IDesign volume of SCM (cu ft) 5300 cf
GENERAL MDC FROM 02H .1050
3 1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes
4 Is the SCM located away from contaminated soils? Yes
5 What are the side slopes of the SCM (H:V)? 3:1
Does the SCM have retaining walls, gabion walls or other engineered side
6 slopes? No
Are the inlets, outlets, and receiving stream protected from erosion (10-year
7 storm)? Yes
Is there an overflow or bypass for inflow volume in excess of the design
8 volume? Yes
out
11
1 Does the maintenance access comply with General MUG (ay?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
If the SCM is on a single family lot, does (will?) the plat comply with General
13
MDC (10)?
No
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensed professional?
Yes
STORMWATFR
WETLAND MDC FROM 02H .1054
18
Are the inlet(s) and outlet located in a manner that avoids short-circuiting?
Yes
19
Are berms or baffles provided to improve the flow path?
Yes
20
Does the orifice drawdown from below the top surface of the permanent pool?
Yes
21
Does the wetland minimize impacts to the receiving channel from the 1-yr, 24-hr
storm?
Yes
22
Is a trash rack or other device provided to protect the outlet system?
Yes
Elevations
23
24
25
26
27
28
29
Elevation, peak attenuation above temporary pool (if applicable) (fmsl)
465.24
Elevation, temporary pool (top of the temporary inundation zone) (fmsl)
464.98
Elevation, permanent pool (top of the shallow water zone) (fmsl)
464.00
Elevation, bottom of shallow water zone (fmsl)
463.25
Elevation, bottom of forebay deep pool at deepest point (at forebay entrance)
(fmsl)
460.00
Elevation, bottom of forebay deep pool at shallowest point (at forebay exit)
(fmsl)
460.50
Elevation, bottom of non-forebay deep pool at deepest point (fmsl)
461.00
pinnr:nn 7nnnc
30
Area, total surface area of the SW wetland at temporary pool elev. (sq ft)
6,323.00
31
Area, temporary inundation zone at temporary pool elev. (sq ft)
2,743.00
32
Area, shallow water zone at temporary pool elev. (sq ft)
2,312.00
33
Area, forebayat temporary ool elev. (sq ft
765.00
34
Area, non-forebay deep pool at temporary ool elev .(sq ft
503.00
35
Percent area provided, temporary inundation zone should be 30-45 %
43%
36
Percent area provided, shallow water zone should be 35-45 %
37%
37
Percent areaprovided, deeppool (forebay)should be 10-15%
12%
38
Percent area provided, deep pool(non-forebay) should be 5-15 %
8%
Depths and Outlet
39
40
41
42
43
44
45
46
47
48
Peak attenuation depth above temporary inundation zone (inches)
3 in
�Temporary inundation zone depth (temporary ool to permanentpool) inches
12 in
Shallow water one depth(permanent pool to bottom of wetland inches
9 in
Depth, forebay at entrance (permanent pool to bottom of forebay entrance)
inches
48 in
Depth, forebay at exit(permanent pool to bottom of forebay exit inches
42 in
Depth, non-forebay deep pools(permanent pool to deep pool bottom inches
36 in
If there is an orifice, diameter inches
1 in
If there is a weir, weir height inches
N/A
If there is a weir, weir length inches
N/A
Drawdown time for the temporary pool (days)
4.2
Snil end plenrc
49
Soil amendment depth (inches)
12 in
50
Has a soil amendment specification been provided?
Yes
51
Has a landscaping plan that meets SW Wetland MDC (12) been provided?
Yes
52
Number of plants per 200 square feet (#) in the shallow water zone:
50
53
Does the temporary inundation zone planting comply with SW Wetland MDC
(14)?
Yes
54
Are the dam structure and temporary fill slopes planted in non -clumping
turfgrass?
Yes
55
1 Will cattails be planted in the wetland.
o
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
56 stormwater wetland(s):
Wetland 4 1:35 PM 6/30/2020
LEVEL SPREADER - FILTER STRIP (LS-FS
1 1 Drainage area number A B
2 IDesign volume of SCM (cu ft) N/A N/A
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
Yes
4
Is the SCM located away from contaminated soils?
Yes
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
Idesign volume?
Yes
Yes
9
What is the method for dewatering the SCM for maintenance?
Other
Other
10
If applicable, will the SCM be cleaned out after construction?
Yes
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
No
No
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
16
Does the SCM follow the device specific MDC?
Yes
Yes
17
Was the SCM designedy an NC lic—e—ns-ed-p-rotessionalY
Yes
Yes
JLS-FS MDC FROM 02H .1059
18
Length of level spreader (feet)
14 ft
16 ft
19
Does the LS-FS receive flow from the drainage area or another
SCM?
Drainage Area
Drainage Area
20
Flow rate to LS-FS during design storm (cfs)
1.38 cfs
1.54 cfs
21
Is a bypass device provided?
No
No
22
If yes, what is the bypass device?
N/A
N/A
23
Is this LS-FS designed to receive flow from the drainage area
during the 10-year storm?
Yes
Yes
24
Has a blind swale been provided?
Yes
Yes
25
Does the blind swale provide for uniform overtopping of the level
spreader?
Yes
Yes
26
What material will be used for the level spreader?
Concrete
Concrete
27
Will the construction tolerance be < 0.25 inch along the level
spreader length?
Yes
Yes
28
Will the level spreader be straight or convex in plan view?
Straight
Straight
29
Height of the drop from the level spreader to the transition zone
(inches)
3 in
3 in
30
Width of the transition zone (inches)
72 in
72 in
31
Protection for the transition zone
Other
Other
32
Width of the filter strip (feet)
30 ft
30 ft
33
Is the filter strip free of draws and channels?
Yes
Yes
34
Has this been verified in the field?
Yes
Yes
35
Slope of the filter strip (%)
5%
5%
36
Is this slope uniform across the entire filter strip?
Yes
Yes
37
Will the first 12" of soil be adjusted if needed to promote plant
growth?
Yes
Yes
38
Will the filter strip and side slopes be planted with non -clumping,
deep-rooted sod?
Yes
Yes
39
Species of sod that will be used
Bermuda
Bermuda
40
Will soil be temporarily stabilized until permanent vegetation is
established?
Yes
Yes
ADDITIONAL INFORMATION
41
Please use this space to provide any additional information about
the level spreader -filter strip(s):
Line 31: Protection of the Transition Zone is 6" Thick Stone on Filter
Fabric. - Line 2, LS-FS B design volume not coming from SCM.
LS-FS 1 1:35 PM 6/30/2020