HomeMy WebLinkAboutSW6191002_PLANS_10/30/2019IV U1 2 3 4 UNCLASSIFIEDHFOR OFFICIAL USE ONLY 7 8 9 10 5 1 6 LAND DEVELOPMENT PLANS FOR EROSION CONTROL NARRATIVE: THE PURPOSE OF THIS LAND DISTURBANCE IS TO CONSTRUCT A MILITARY OPERATIONS SUPPORT FACILITY. THE FACILITY WILL INCLUDE A 17,000 SQUARE FOOT BUILDING, APPROXIMATELY 100 PARKING SPACES, AND STORMWATER FTE BRAIGG QUALITY AND QUANTITY CONTROL MEASURES. EROSION CONTROL FOR THE PROJECT WILL BE SEPARATED INTO THREE PHASES. THROUGHOUT EACH PHASE, AND THEREFORE THE DURATION OF CONSTRUCTION, EROSION AND SEDIMENT CONTROL DEVICES AND MEASURES WILL BE IMPLEMENTED AND SOF OPERATIONS FACILITY MAINTAINED ACCORDING TO THE EROSION AND SEDIMENT CONTROL PLAN TO ENSURE THAT POLLUTANTS TO DOWNSTREAM WATERS WILL BE MINIMIZED TO THE GREATEST POSSIBLE EXTENT. Popv Army r� PRKS Cvrvers Creek v�ss r? V 5ondhf7ls 5t Pork 5lflcamb Pope Arl, Sp lake Pope Arany 87 A&AvW r Fort Bragg Mill piste Rd BnnesFord Beare APPROXIMATE SITE LOCATION Bennie ❑Gone Myrtle Hill ���� p � 9roada�res BR Cliidale Murray Hills Ra a 5k1ba r�ettlevitle � � � � d01 ik,aef«d fxd 16vuens - - - 17o4emn §r � � Raeford Rd Fenix Vander � -•._,_ Exergreen Estates Wkeaafe F Tr4 aA° pR� Dr � � a o� 34l Cumberland aLdson ' d SCR a i pRd Foy"ttewme l fir} Rockfish •, t Iregi�nQL +' Airport f r yis5 � o '�drdrsfj Rd 162 BR 4k 4 l ��f I * LazyAcres Hope M01F. � Ground:.----' Ardulusa 9 VICINITY MAP NOT TO SCALE MALVESTI ST, POPE FIELD, NC 28308 CAPE FEAR RIVER BASIN TOTAL DISTURBED ACREAGE: 2.59 EXISTING PERVIOUS AREA: 2.56 EXISTING IMPERVIOUS AREA: 0.03 INDEX OF SHEETS SHEET # TITLE C-000 COVER SHEET VF100 SURVEY AND NOTES VF101 EXISTING TOPOGRAPHICAL PLAN B-101 BORING LOCATION PLAN BB601 SOIL TEST BORING LOGS, SOIL CLASSIFICATION & NOTES 1 BB602 SOIL TEST BORING LOGS, SOIL CLASSIFICATION & NOTES 2 BB603 SOIL TEST BORING LOGS, SOIL CLASSIFICATION & NOTES 3 CD101 SITE DEMOLITION PLAN C-101 SITE LAYOUT PLAN CS501 SITE DETAILS CG101 SITE GRADING PLAN CG102 STORM DRAINAGE PLAN CG103 EROSION CONTROL PHASE I PLAN CG104 EROSION CONTROL PHASE II PLAN CG105 EROSION CONTROL PHASE III PLAN CG201 STORM DRAINAGE PROFILES CG501 STORM DRAINAGE DETAILS CG502 N.P.D.E.S. CHECKLIST 1 CG503 N.P.D.E.S. CHECKLIST 2 CG504 EROSION CONTROL DETAILS & NOTES 1 CG505 EROSION CONTROL DETAILS & NOTES 2 CG506 EROSION CONTROL DETAILS & NOTES 3 CG507 EROSION CONTROL DETAILS & NOTES 4 CG508 EROSION CONTROL DETAILS & NOTES 5 CG509 EROSION CONTROL DETAILS & NOTES 6 CG510 EROSION CONTROL DETAILS & NOTES 7 CG511 EROSION CONTROL DETAILS & NOTES 8 CG512 EROSION CONTROL DETAILS & NOTES 9 CG513 EROSION CONTROL DETAILS & NOTES 10 CG514 EROSION CONTROL DETAILS & NOTES 11 CG515 ADDITIONAL NOTES CU201 SITE UTILITIES PLAN CU202 SANITARY SEWER PROFILE CU501 SANITARY SEWER DETAILS 1 CU502 SANITARY SEWER DETAILS 2 CU503 WATER DETAILS L-101 LANDSCAPING PLAN START DATE OCT. 2019 THIS SCHEDULE IS TO BE USED FOR PERMITTING PURPOSES ONLY. REFER END DATE APR. 2021 TO APPROVED PROJECT SCHEDULE FOR EXACT CONSTRUCTION SEQUENCING. • DESCRIPTION PHASE I EROSION• -• • ♦♦♦♦♦♦♦tii♦111111111111111111111111111111111111111111�1111111�111111111111111111 SEVEN DAY EC INSPECTION- ♦♦♦♦♦♦♦♦♦♦it♦1111111111111111111111111111111111111111111111111111111111111111111 CLEARING,- "ING, GRADING♦♦♦♦♦♦♦♦♦♦♦iiiiit♦11111111111111111111111111111111111111111111111111111111111111 TEMPORARY GRASSING 11111111111111111::11::11::11::11::11::11::11::11::11::11::11::11::11::11::11111 FINAL PAVING♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦t1111111111111111111111111♦i DISPOSITION OF 111111111111111111111111111111111111111111111111111111111111111111111111111�11�: BUILDING• • CLEARINGOF •- DRAINS111111111111111111111111111111■■11111111111111111111■■11111111111111111111■■1111 FINAL LANDSCAPING 1111111111111111111111111111111111111111111111111111111111111111111111111111:::: .0DA•HARVESTING PERIODACTIVITY ■■■■■■■■111111111111111111111111111111111111111111111�1111111�111111111111111111 SCHEDULE Know what's below. Call before you dig IF YOU DIG NORTH CAROLINA... CALL US FIRST! UTILITIES PROTECTION CENTER IT'S THE LAW l 'sue � .�,� �'� -•'�j � �,..� - '',. ` ' _ FLOODPLAIN �.�, k,� EXTENTS AIR .11f:'.! 11 old olio4. ,J r APPROXIMATE SITE LOCATION -, r 1P _'►t 1 tv H Ilk rAlllarr'1R) Y-'+1 It : �l 1123N. ', •�...• ;- tAk vu tit T FLOOD MAP NOT TO SCALE 24-HOUR CONTACT: LEE WARD PHONE: (910) 908-5286 EMAIL: LEE. P.WARD.CIV@MAIL.MIL ENGINEER: LOWE ENGINEERS 990 HAMMOND DRIVE SUITE 900 ATLANTA, GA 30328 CONTACT: GERALD F. OBERHOLTZER, PE PHONE: 770-731-3135 FAX: 770-857-8401 UTILITY CONTACT INFO: OLD NORTH UTILITY SERVICES (WATER/SANITARY) ADDRESS: 2941 LOGISTICS ST., BLDG N-6307, FT BRAGG, NC 28307 PHONE: (910) 495-1311 SANDHILLS UTILITIES (ELECTRICAL) ADDRESS: 6503 BUTNER RD #2, FORT BRAGG, NC 28307 PHONE: (910) 497-7399 I l 11�11 US Army Corps of Engineers° 10-09-19 II��II� Ill ZZ 0Z U cr O 0 Q U Of o W U < 0 w N CV J Z W co W = �cn C5cn �� W WU Z W Lu 0 M c coo m J Z � o m o Z c� Z Y H 0 co¢Q�wQm�w� W 2 2 D 2 N Z 20 CnU =rAH to Q C rp r U o Z_ W N � ui U) g U 1- Z W Z J 0 Ur U� LULU O� W Uj = 0� W Y 0UwZZ 0 a 0OZ Q-,0 0Z 0 fY U ? O 2i } U J 11 Q Z J >- 0� Q U =WLU L0 W CfzQ = U0z ZP:0- cr- C� LU OfN > O afL} Ir0W U mW �o c-e to 0 LL SHEET ID C-000 UNCLASSIFIEDHFOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 :V L 10 G F E C C W SURVEY NOTES 1. SURVEY PERFORMED BY: LOWE ENGINEERS, LLC N.C. FIRM LICENSE #P-1582 990 HAMMOND DRIVE, SUITE 900 ATLANTA, GA 30328 770-857-8400 2. HORIZONTAL CONTROL: THE HORIZONTAL POSITIONS FOR THIS PROJECT ARE BASED UPON GPS OBSERVATIONS USING THE NORTH CAROLINA GRID COORDINATE SYSTEM NAD83 IN U.S. SURVEY FEET. 3. VERTICAL CONTROL: THE ELEVATIONS ARE BASED UPON GPS OBSERVATIONS USING THE NORTH CAROLINA VERTICAL DATUM (NAVD88), GEOID 12B, IN U.S. SURVEY FEET. 4. THE LOCATION OF UNDERGROUND UTILITIES IS BASED UPON THE FIELD SURVEYS OF ABOVE GROUND FEATURES. THE SURVEYOR DOES NOT GUARANTEE THAT ALL UNDERGROUND STRUCTURES SUCH AS UTILITIES, TANKS, PIPE, ETC. ARE LOCATED HEREON, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES ARE IN THE EXACT LOCATION INDICATED. IF MARKED BY OTHERS, NO EXCAVATIONS WERE MADE DURING THIS SURVEY TO LOCATE ANY BURIED UTILITIES OR STRUCTURES. UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE LOCATIONS AND ARE BASED ON ABOVE GROUND FEATURES, PHYSICAL EVIDENCE, PAINT MARKINGS, AND BASE UTILITY PLANS. 5. LOCATION OF UNDERGROUND UTILITIES SHOULD BE FIELD VERIFIED BY CONTACTING THE NC ONE CALL CENTER AT 1-800-632-4949 OR THE BASE UTILITY LOCATOR SERVICE AT 1-910-396-0325. 6. NO DETERMINATION HAS BEEN MADE BY THE SURVEYOR AS TO THE FOLLOWING: 6.1. 100-YEAR FLOOD LIMITS 6.2. WETLANDS 6.3. UNDERGROUND STORAGE FACILITIES 6.4. GRAVES, CEMETERIES, OR BURIAL GROUNDS 6.5. HAZARDOUS WASTE 7. ALL DISTANCES ARE HORIZONTAL GROUND DISTANCES, NOT GRID DISTANCES, IN U.S. SURVEY FEET. 8. DATE OF FIELD SURVEY: 01JAN2019. 9. CONTOUR INTERVALS ARE ONE FOOT. 10. THE CONTRACTOR SHALL OBTAIN ANY ADDITIONAL SURVEY NECESSARY TO COMPLETE THE CONSTRUCTION OF THIS PROJECT. ADDITIONAL SURVEYS ARE AT CONTRACTOR'S EXPENSE AND WILL NOT BE REIMBURSED BY THE GOVERNMENT. LEGEND STREET SIGN EXISTING WATER VALVE EXISTING FIRE HYDRANT CB CATCH BASIN CO O SANITARY CLEAN -OUT DI DROP INLET RCP REINFORCED CONCRETE PIPE BL BOLLARD MH MANHOLE ✓B JUNCTION BOX LP * LIGHT POLE - - - 281- - - EXISTING CONTOUR 282 X SPOT ELEVATION - UGT UGT - UNDERGROUND TELECOMM 8-SS 8" SANITARY SEWER PIPING G- NATURAL GAS PIPING W - WATER MAIN = _ = = = = EXISTING DRAINAGE PIPING ® EXISTING DROP INLET EXISTING TREE LINE I a EXISTING CONCRETE . G . EXISTING ASPHALT i EXISTING BUILDING MATCHLINE MATCHLINE SURVEYOR'S NOTES 0 � = = � = = � = = � = = � = = � a s ° � OR . � = = � = = � z SEE PARTIAL PLAN THIS SHEET ° ` . ° : SEE THIS SHEET 1. NO UNDERGROUND INSTALLATION OR IMPROVEMENTS 00 c) BUILDING 3352 . =Z' HAVE BEEN LOCATED EXCEPT THOSE SHOWN HEREON. �Ni. � / � \ I z I .:�.::, ...* 2. THIS DRAWING NOT VALID WITHOUT THE SIGNATURE AND P- o o °.. 1. / ORIGINAL SEAL OF A NORTH CAROLINA REGISTERED - 811DW 6 - - ® WM `�' . '... _ /0 / 11 °n .wI .�. c, / SURVEYOR & MAPPER. 6„ C I.E.IN:228. 5' .TLC LP /� I I I.E.IN:2 8 0' $_,s-$-- " u - n / / ° ... .a .., - 9 ,, a .: W':...:. /�I I 1 3. AS USED ON THIS DRAWING, CERTIFY MEANS TO STATE OR C.O. - r, � 232. CANOPY - ,� �u� �'� �4 ' .. WE, BOX . J / °O I I r� DECLARE A PROFESSIONAL OPINION OF CONDITIONS I BL �BLL .. e moo\ \ ° o - . � - .. '�- -� T � Q' "i REGARDING THOSE FACTS OR FINDINGS WHICH ARE THE .:x...:� I I / * .. BL GATE S ° s: L - - c� SUBJECT OF THE CERTIFICATION AND DOES NOT p Z ~ I I CONSTITUTE A WARRANTY OR GUARANTEE EITHER \ LP �'' W \'.. . ' .... p4 I I s ` \ , �.. W W' :.: \ m \ a / ~ I EXPRESSED OR IMPLIED. THIS CERTIFICATION IS ONLY ASPHALT EXISTING PARKIN "' FH c� - : FOR THE LANDS AS DESCRIBED. IT IS NOT A CERTIFICATE - .. " ,..:. . <.. :. A�.::' :.::.. :... ':'...: . ,..: ,\\..: \ :...,.:. - .. OF TITLE, ZONING, EASEMENTS OR FREEDOM OF `�....., ...:.: G / ENCUMBRANCES. rn , :. \ \, :c; ':.../,: .. �-- - - - - - - - B M .. 2 .. :. :' ::\.;.:'. T UGT' ....: G ...t�/. = cb- T \ - _r' UGT. -�---..UGT.. : UG..: -� �'C M.:' ./... ` . : , .... a. -' IJGfi: .,:.:..:.. UGT. UG .: v' 1GT H ::. C/L .. `% .:: . 4. NO INSTRUMENTS OF RECORD REFLECTING EASEMENTS, r'.. 1 I- .. :. ' .. . RIGHTS -OF -WAY AND/OR OWNERSHIP WERE FURNISHED cq.: \ .' �. THIS SURVEYOR EXCEPT AS SHOWN HEREON. I - -... / � - ELEC. c I i f '. \ ... �''.' /� / / )BOX II/ 5. LOWE ENGINEERS ACCEPTS NO RESPONSIBILITY FOR I :W _ / __ / / I �.. �.::.:. / ,, / / III IDENTIFICATION OF TREE SPECIES SHOWN HEREON. I 5 : . / / / - __ / ~ EVERY EFFORT HAS BEEN MADE TO PROPERLY IDENTIFY I ~ Q / / / _ I I I I .� : I / / / / � _ _ - -236- - -_ / III I THE TREES SHOWN HEREON; HOWEVER, TREE 1 - IDENTIFICATION IS OUTSIDE THE AREA OF EXPERTISE OF A BUILDING 3352 I I I. / / / / / __ � _ � : J ' .. ' '" III I / / / / I CD v '...I PROFESSIONAL LAND SURVEYOR. THE TREE TYPES \ I / / I I N LP I SHOWN HEREON ARE FOR INFORMATIONAL PURPOSES / I LP : ':1 ICk / � / / ca- 0 /1 + + .: I III ' BUILDING ONLY AND SHOULD ONLY BE USED AFTER CONFIRMATION I / '. : 1: '. /... ,, . J I / / `.' . BY A CERTIFIED ARBORIST OR OTHER SUCH l ° ��. l / l ~ : �::' 3050 �....... ..: .. 1 // / 13. III � ,. PROFESSIONAL. \ a I I N / / / I I /`'...:.I `:% I I \ U �....::.: I I / -11� 6. SURVEY STANDARDS USED: NAD83 NORTH CAROLINA p ': I I / / - - - - - - MH I ° I I I / STATE PLANE, US FOOT; NAVD88 VERTICAL GEOID 12B MATCHLINE � EXISTINGASPHALT I / � / I ` I)_\ LAST DAY OF SURVEY, 1-11-2019. = = = 1 PARKING LOT o I I I / / � / c Uc�T + . Grl I GT SEE THIS SHEET � I I / / K / 7. UNDERGROUND POWER LINE AND EAST -WEST WATER LINE - c _ I / j I \ WERE IMPORTED AND SCALED FROM A DRAWING W 1 I I I I / I :Q I -.:.:. I RECEIVED BY JSOC ON 12-20-2018 (DWG "AREA 3 BASE MAP v I I I / c I , $ i+.. 16"). SURVEY PARTIAL PLAN I is< .:.-- SCALE: 1' = 30' z ". I / • ...:.. ... I I 1 ? C/ I..I... ...TOP EL:: z^327' 1 I W / - I ( O . l: ,� -�. FULL OF UVAT RJ :' � :.::. : + I I I I \ \ \ � EX l f { EXISTING I I \ \ I TOP 237.15 PARKING LOT Y : .:. . �. I c I I 1. E l=233.55 I f. / I 222, lEO T 23147 : -... � 1 I . . ...., .. . _ .....:. I \\ Q TOP: 237.15 \ .... .....: s I.:I :. �o « . 'I. E. lN: 233.55 III c0'.:.... '.:.. >.. I - --->cP I I I�:..:.'.:: tP1 I I 1 \ \ c z ":.: :.::.' ti:. E EC. •: '..: I I I 1 I I. ... ....:.I.EOUT. 231.47 III I >.. 1 / _ - 226 J /.. I 1 I LP o...:....: I I \ I II .:. .. . I .. 00/.. ' . CO:.....::. /.. J .....: I 24'RCP II - - - -- -.... :........ ; : Q /. :. + 4> EXISTI ASPHALT 6 '' . I i " / I - - - - JB I I . III p �' ' I RC ...:...: .. P.; N N TL.... O I NI / I ..�V' ++ :... i.. ': P RKINGLOT c NNN ::.. ti... / ^� I 1 I y� I / + 1 I N - /�' /C� �: I F .. /.... / I / /, !: .'.. AZEBO 77\ I I / > > cn I\ ,.. ':... EX -DI I :. I I / I TOP: I I I I \\ - ./.. / . /. .. ..:.....:......: ' / / I /..............': �e I , ' ..,......;.: /. l.EIN 18":235. CO .. C{7.......:... .. `.. I I I I /. I /., C?: @�..... . ' /:. ::.:...:,::...:. /.. � / / // I.EIN24":234.83 III ::..:....:..,. ~ ,. I.,. I //I / I / � I I I : '.: / .. / � - I / / / / • ...:.. ...: I I I I I CQ:..:.:.: / c'0 / I i , / / \ - / / l E OUT 234 82 I I I , ... :.'...:: ' . o `6 .':.'.... ':. :. '~.. ..... ..:..:.:... ' . - UGT T UGT / \ // � "1: - o eA%, . .. 1 /: ... \ I III I I \ \ \ I UGT _UGT c / // / ' 2 LP UGT \ I .. ..':..:: '.. ': �-¢ I I \ LP 1 U/ ' l I I I I I I \ \ T �� cr / I I I I I I .:. \ - --- \ \,\ \\ uGT� / \ \ Ucr // \ j I:.:.'.:: III %�./7777 o EXDI __ -_ �, _ _�G \ \ \ �_ \ \ I I I I I I .:. is :N: : :. ~ ..:., .:.. '...:..... ; / (FULL OF WA TER) - - - \ \ - _ / \ I %' .. 1 UGT �� U�� \\ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ � UC \ UCT /�/\ � \ \\ � I 1. I BUILDING // / / I I \ / C-BNlV ING PIPES JB \ \ �1_ \ \ \ \ \ \ � \ \ \ �, __ \ iIGT \ \ �'7 , I I , .. 3046 / / / / :... �� . f � UNDET � INED O � - UG \ \ \ \ \ ��� \ \ \ \ \ \ � \ 236 GQ/ // - U�T ,\ �D / / /III co'.` ::: , I \ \ �Q ���. \ - \ - _ - �230 \ \ \ \ \ , , 0 // \ �\ c l 1.: + \ _ __ _ ; _ \ \\ I 1 l ( \ / L,1- 1 _ \ \ \ \ \ \ / \ CONC. WALK I v \ \L \I \t� \ / \ 3 ,.. \ \ I I S �, 1_� - __ 1-1 1_� // ) 1 i�3: 1 .�� +:+ + I + + + ++ ;++; \ CR TE ,-�� - - - _ \ \ \ \ // 23s \ IL 1\ Iti AI F I 1 \ 22p � , - / �� -� 1 \ \ \ - � \ \ \ / I /' \\ " \ \, \,) C, '1�1 t� �,, I 1-1 1-1 '__�, __ -, \ \ _11A, I I I + + +/++�+++�+ ++ ccj)) ++I+ ++ +++�+++++++.+ + 4 + . + + + + �+ + +++ ++ � � \ \ \ - \ \ \ - \ I I °a ,G( I I \ \ \ \ \ \ \ \ _ /� \ \ \ \�� //_ \ I I �) W \(FULL OFWA� R) / \ \ -1--- \ \ - - - \ 1 I �// \ \ CO NECTINGPIP / \ \ --- \ \\ \ \ - -_� \ \ \ \ \\ \ \��/_ "I -------- ��Q \\ I I I �// \ \ \ \ \ \ \ I \ NDETERMINE�\ \ /\ ��\\ \\ \\ \�\ \\ \\\\ \� \ \ `\��\ /� \\\� ` \ \\ \ ��� I I�' I (� //N / - \\ \� \\ \ \ \1 � �\\ / \\ \ -_ / ��� 3C EX I\ -232---\ \\ \ \ 1 L // \ �o`� / \ \ 21 \ \ \ \ / \ \ // _ , \ \ MSINGIQ� _ _ \ \ 1 I i / / �116, \ 8� \ � \ 22p \ \ / � ✓ \ -_ %/ - ` \ \ \TOP: 33.16 - - -6 TLAN S \\ 1 I 1 � c I ~ I I \ k U / I \ \ \ \ \ \ \ \ \ \ I \ \ \ \ \ �/ \ \ � � \ \ \ A\%D 2�9.76\ BUFFER \ \ \� 1 . I �' - � (ZI I V - ': I � / / J ) C1,1 \ \ ---- \ \/', � G '� S \ \ \ \ \ \ \ �'I 1 z =W:.. �- N I / \ \ \ \ \ -- '� // 224-_ \ \ \ \\1-1 1-1- \ \ \ \ 1 I � ;.:� 5 // � \ \\ \---_ \ % -�"41 \\\ ///\\\ \N \ \\\ \\ \\ -\ \ \ \ I I I II1 �. �I ':. .;:Q.::- ..." / I/ // \ \\ \ I \ �, I i "I "I \\ \ \\ \\\ 1 1 I I 1 1 p I I 1 I l/ BUILDING 11 \ �\ / / \\-- \ \ \ \\ \ \ \ I 1 I I I II / ` 3042 / - \ \ \ 1 1 III I I \ 1-11 l- \ /i\ ` \ \ \ \ 1 III :, I II -/ � // �----- \ \\ \ \ \\ \\ \ \ 1 1 1 �I�I IDI C) I III I \ ,'� \ ���, \ ��� 1 \ \ \ \ 1 1 1 I I I N,� � III I 1 / -220 \ \ \ I II I I I SURVEY &NOTES /, _ _ _ \ , \ \ \ \ \ 1 I I I ��I I ICI I II �®" SCALE: 1 = 30 / // , -WETLANDS - \ \ 1 I I I I �I III ��� .' b 11 I // I I iLa n.: II // L _ _ 11 inn // _ - WETLANDS BDY // IIV - - -7-k #0 M-MML-Any M M 0 11 ADWALL TOP.- 6.70' // / �(\ PN�S�� -00 - - - - -� 41,# - _ - - - _ _# N JB INV.' 213.28' / // = - _ _ _ _ _ _ _ - _ WETLANDS = _vo _ ' / - _ - �- -00 - _ __WETLANDS _ _ _ _ __ wo -�i 1----_ - - -_ ----.0000 LP :1,�: = = = = = _ / 30 0 30 60 90 1 GRAPHIC SCALE: 1 INCH = 30 FEET i i iiffili 11 I US Army Corps of Engineers 10-09-19 , 'k �111111� O w 0 O O .. C) z 0 � 2 U < � O rn W � U N F-- W U)Q =z �_= z W Q 00 Z 00 0 w0 m } cop m 00 E_= w m � o � 2 � u)j U g W 2i =�mU=c��cnQ 0 o= m= U = o Z W N tr U)C/)g U �Z z W J C� Ur Z U � � z of �Q W W > � � Ld W �j = LL o �_ 2 Y O LL Oagaoz � o f rr b O z o U z O � O :E �� z _E Q 2 J_ Z) � 11 z} J �_ J 'It U Q H LL N O ofza' z OOZ 06 Zia } C� of N LJJ Q� O � � o o � LL SHEET ID UNCLASSIFIED//FOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC. REG. #: P-1582 VF100 CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 I 4 I UNCLASSIFIEDHFORIOFFICIAL USE ONLY I 7 I 8 I 9 I 10 F E LEGEND BL BOLLARD LPO LIGHT POLE — — — - 281- — — — EXISTING CONTOUR EXISTING CONCRETE EXISTING ASPHALT TREE LINE LIMITS OF CONSTRUCTION 8-SS 8" SANITARY SEWER PIPING C i EXISTING TOPOGRAPHICAL PLAN SCALE: 1" = 30' N 30 0 30 60 90 GRAPHIC SCALE: 1 INCH = 30 FEET LOWE ENGINEERS, LLC. REG. #: P-1582 US Army Corps of Engineers 10-09-19 �111111� o w 0 O o O W c) U � W c U N W N J = z H cl) U 4 z .. Q W0- Q 00 z 00 0 0 m } m coW p o0 IL C� z Y U) U ~ W Of U) 2 ::) N Z � = 0 m U = (f) U) 0 o� o� U�o Z W N tr z C6 C/)g W �Z w U c C� Z U 0 z Of � 0 W w > U)c/) Ld W �j = W o F- 2 Y O LL O z 0 w wQ a �Oz a�0 rr (� z O o ? U OF- � O 00 Q J_ 00 z Q Q z J 0- J } J Q 0 J U UQ� 2 =w� D_ N of Z rn Q OO�-a C� Of N O 0- W' O LL CO LL (� O Z LL O U) X w SHEET ID VF101 UNCLASSIFIEDHFOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 1 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 9 1 10 Ct F E I I* IV RAI DI TOP 238.aD• I ELECTRIC a CANOPY POWER BOX — —w+� BOX a I z BL BL ASP T „„� 337�04' " u P. E CTRI BO o 1 T w B u 1 LO1NG ATS-02 N y � �� DI . 236A V �-4` , ATS-04 TOP �_ �•n' �• m I% I n I + �pF/, ATS-01 ��, 227.87 I (NO UD) + � �� ,o TOP ELEV. 4, 40.58' Xf••^• DI TOP ELEV. 237AV 4 pl TOP yd F;�� �� ASPH 239.99, 01 pEV P 9.as' ® ATS 03 8.62' ryk — BUILDING CONC. WALK \ I� DI TOP III ELEV. 239.89• �10 D 3.16' ni i BUILDING �4' LEGEND: N ATS-01 APPROXIMATE BORING LOCATION SOF OPERATIONS FACILITY AECM FORT BRAGG, NORTH CAROLINA SCALE: FIGURE: AECOM TECHNICAL SERVICES, INC. Boring Location Plan N.T.S. 12420 Milestone Center Dr, Suite 150 Germantown, MD 20876 Tel: (301) 820-3000 DATE: CHECKED BY: PROJECT NO.: 02/01/2019 MG 60584960 LEGEND BORING LOCATION C/ CURB INLET CB CATCH BASIN CO O SANITARY CLEAN -OUT D/ DROP INLET ✓e JUNCTION BOX RCP REINFORCED CONCRETE PIPE BL BOLLARD MH MANHOLE LP LIGHT POLE �— ROADWAY SIGN DROP INLET c — 232 BL `' BL O °.6 ° \ BL GATE s BUILDING 3352 CAAI�OPY \ II e-1' ° . ' . \ . 'I a° LP Wj 236 Q w \EL EC. BOX / < N � I I N 142 4 1 I I a. ASPHALT .. \ • ' .... , FHA 2 EXISTING PARKING W. v' A. GSA � ;�.,�.. . . : .... T vT.. U BUG'.. /:: UGT;---�-'�'' ' �`' ....: '. ..� C/L Q .. j 98 RCP - — — — UGT; .::;.. :.,.. UGT.' G\ r' UGI': UST ....\....: ':..: .....:.. ... ....: \x .:..'.. / <. �k L �ELEC. S BOX __---236 L. ILP / BUILDING 3050 cV / ATS-01 \ ATS-02 .5 6.3 III I / / E:1996966.50 — N:514280.31 MH EXISTING ASPHAL T I , / — I \ PARKING LOT p I I / i EL:235.93 E:1997050.34 U(�T UGT �TIJ— GT // EL: 240.56 I U\ o \ P... r C jj z I / C/ �.'I...':.. cDz3. 27' W D I l �.. . rn / " :{{ .:. b� .: • �. It` FULL OF IN4RJ W 1 / �......... l' l 0 EX I I� EXISTING I \ \ I TOP r237.15 PARKING LOT I I I I \ \\ \ 1. E l=233.55 ll _ I /.EO T 23947 I 1 \ TOP: 237.95 I I _ _ Q \ LP — — — LP �: iPl I I I 1 1 \ v. ..:.: I''I ��:. 'l.EIN:233.55 > I I z I ' I'..... ',::' `�'. ; .I E.OUT.- 231.47 ca - co ATS-03 I / J .....: 24'RCP ,........;:"'A-.. /.::''.. .. ....:...... :. ... ... •. ... :..:,..:... ,�':..°, .:•..:::'. EXISTI ASPHALT NT�14�51.91 I — — JB p .. ' ..... " , . I E. 1 7 ;RCP.: o� ti .: N 5991086 86 I J �..:.:. i� PARKING LOT �O E: 1997004.70 I / T �. / 1 - / 1 ti : I 'l •.: .., . / . .. .. .:..... ' /,' ...; ..:.> : f `' . ': , .. ' / :.... � . :: '� .: � ' / 233 50 EL 238 35 ".. , / - \ E. AZEBO 1 I EX -DI TOP: 239.99 c' \\-o • 235. I. EI. E.OUT 234.82 UGTTU��\ �\ \ \ \ \ I GUGT LP G�\ l \ x� / I (IV \ LP UT UGT I i � GTl \� 0 C l CD EX DI — =UGT \ \ \ \ \ \ \ \ GT \ / / \ I ----- �� �� vG� \ \ — \ \ \ \ /77777 UGT / \ / / (FULL OF WATER)— — , GT �� \ \ \ \ \ \ \ \ \ \ \ \ \ \ U �/ \ \ I \ I s I BUILDING E6N>\T ING PIPES JB �� U \ \ \ \ \ \ \ GT �/ \ \ W / j/UNDETEgMRINED O \ UGT \ \ \ \ \ \�� \ \ \ \ \ \ \ ��, \ \ \23 GQ UGT U T —\ \ `�I a.. 3046 1 GL�/ \ \ �\ \ \ \ \ \ \ \ 6 \ \ � �/ // ! GTCD \ 230\ 1 / . CONC. WALK If i \ CR TE ,-— — \ \ \ \ \ \ // 23S \ `�1y H I CD I0, I � i� A / \ \ \ \ \ \\ \ \ \ \ I / \\/��\\ 30 EX-691 —232--�\ \\ \ \ cl I ICc L \ \ \ \ \ �� \ 2�8\ \ 2 \ \ \ ✓ \ \ \ %//\ \ M SING-L-ID,L -� TLA\N s\ P. 3.96 --,TO \\ \ \A71)` ,920 6\ BU F\ER C)I I I I o > r ZIlr / J cl v •...'... I'r / / p �I BUILDING 3042 III I I \ �i cI -220 — ETLANDS — II \MH W BORING LOCATION PLAN " 30 0 30 60 90 SCALE: I" = 30' GRAPHIC SCALE: 1 INCH = 30 FEET LOWE ENGINEERS, LLC REG. #: P-1582 I � US Army Corps of Engineers 10-09-19 o LJ O O W O CD 0 U O 0-) W0UNF_ 1­-2< W� C� N J = Z I.- (� z wa 20- Q °° z 00 (D 0 m} coW 00 o m LLI � C2 � U)U g (n QQ a W Qm UJCn W 2irr <n2 2i= N Z 0 o� �� U o Z W N Cn Z Cn CnQ Z U W J (n Ur Z U ZO> �Q LU 1---= cwco W Ld LL OF- Y OLLO O Z0 UL�WQ L O0 Z ¢ �0 (7 Z O O U zo � z Q J U) z} J Z Q tz J � a UQ't Z LL ML0 O z0 Oz 0- U � N O W O �O � Z m LL m po LL SHEET ID B-101 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 n. 9 10 X_ F E A i Log of Boring ATS-0 PROJECT: SOF Operations Facility-PN 92594-FY20 .AAECIOM PROJECT LOCATION: Fort Bragg, North Carolina PROJECT NUMBER: 60584960 DATE STARTED: 1/15/2019 DRILL METHOD: Mud Rotary//HSA Groundwater Observations DATE COMPLETED: 1/15/2019 HAMMER TYPEMEIGHT: Auto Hammer/140lbs Event Date Time Depth Cave in LOGGED BY: M. Gravina CASING TYPE: HSA ft De th ft CHECKED BY: M. Tomeo CASING SIZE: 3-1/4" Encountered 01-15-2019 10:05 AM 10.0 DRILLING CONTRA Completion 01-15-2019 3:30 PM 9.5 11.4 DRILL RIG: CME-5 100.0 FT DRILLER: Tim Fos C�M : 238.35 FT After 01-16-2019 8:20 AM 6.8 9.0 Drillin SAMPLES -� ,. LL _ _ E3 _ W W z y� � aa) a) REMARKS w w g a BLOWS U o AND TESTS 0 _ Wes. 0 a a Z 0.0 - 0.2 ft: Topsoil (2 inches) S_1 4-4-3-4 24 0.2 - 2.0 ft: (FILL) Moist, loose, dark brown,X (N=7) (100%) fine to medium, Silty Sand Fill 4-3-4-5 2.0 -13.0 ft: Moist, loose to medium dense, S-2 (N_7) 24 light brown, fine to medium, CLAYEY SAND 6 (100%) S-3 (N=12) 24 16.7 36 22 (100%) S-4 6- 14j5 24 17.3 2 SC (100%) S� 5- 5- 5- 45 24 10 (N=10) F10 13.0 - 14.0 ft: Moist, hard, light gray, low CL S� 6- 14- 20- 23 plasticity, SANDY LEAN CLAY (N=) 24 18.8 39 20 3.3fl 4 14.0 - 18.0 ft: Moist, dense, light gray and (100%) .0 purplish gray, fine to medium, POORLY SP- GRADED SAND WITH SILT SM r 220 18.0 - 28.0 ft: Moist, medium dense to very 6_ g_ 12- `I1 - 20 dense, purple and gray, fine to medium, S-7 (N=21) 24 18.6 a CLAYEY SAND (100%) Z SC K S-g 16- 26- 34- 4 24 a (N=60) j (100%) Y 1 J L 21 28.0 - 38.0 ft: Moist, hard, gray, low plasticity, 12- 22- 40- 3 30 LEAN CLAY WITH SAND S 9 (N=62) (1024 0%) 16.8 36 17 �4.5 0 a CL 6- 12- 22- 21 S-10 (N=) 24 3.50 g (100%) i JJ 201L 38.0 - 58.0 ft: Moist, loose to dense, gray, fine to medium, CLAYEY SAND, estimated 5 - 5-9-8-8 10%fine gravel S-11 (N=17) (100%) SC M V V 5-12 6- 6- 9- 11 24 V (N=15) Lanni 1 r4-5-5-5 50 S-13 (N=10) -24 J AECOM TECHNICAL SERVICES, INC. B = Bulk Sample S = Split Spoon Sample P = Pitcher Sample a 12420 Milestone Center Drive, Suite 150 G = Geoprobe T = Shelby Tube Sample RC = Rock Core u Phone:Germa01.8 MD 20876 PS = Piston Sample H = Hand Auger Sample SC = Sonic Core � Phone: 307.820.3000 Fax: 301.820.3009 SHEET 1 of 2 Log of Boring PROJECT: SOF Operations Facility-PN 92594-FY20 PROJECT LOCATION: Fort Bragg, North Carolina PROJECT NUMBER: 60584960 SAMPLES --. Cn Z J a N L DESCRIPTION N ...� M a °0 BLOWS a 2 CL 0 Cr Z W o H N Z lY a 5-14 5- 8- 23- 31 24 : . SC (N=31) (100% 1 58.0 - 63.0 ft: Moist, medium dense, gray, 6-7-8-10 60 fine to medium, SILTY SAND S-15 (N=15) 24 (100% 63.0 - 83.0 ft: Moist, hard, gray and brown,. S 10 11- 22- 31- 3 24 high plasticity, FAT CLAY WITH SANDrA (N=53) (100% 70 17 S- t 7 21- 59 - 3 24 ( ) 1000% CH S- t Q ' '° 13- 2'1- 31- 3s 24 � i (N=52) 0 /o (100 W 160 LD 80 S.e19 12- 25- 27- 3 (N=52) 24 Z (100% 3 0 W o _ H w 16- 15-14-1 83.0 - 88.0 ft: Moist, medium dense, dark o gray, fine to coarse, SILTY SAND S-2o (N=29) 24 (100% SM .::._.: Lu 1 88.0 - 98.0 ft: Moist, very stiff to hard, dark '�f 10- 17- 16-1 q 90 gray, high plasticity, SANDY FAT CLAY S-�1 `. (N=33) 24 (100% CH S-22 (N=29) 27 g (113% W w 1 98.0 - 100.0 ft: Moist, very dense, dark gray, 23- 0/5 44- 100 CLAYEY SAND N 77 6 Boring completed at 100.0 FT on 1/15/2019 at ° v 3:17 PM HOURS. W D Baring backfilled with drill cuttings. 9 L) il 54 AECOM TECHNICAL SERVICES, INC. B = Bulk Sample S = Split Spoon Sample P = Pitcher Sample D 12420 Milestone Center Drive, Suite 150 G = Geoprobe T = Shelby Tube Sample RC = Rock Core v GermaPhone: 01.8 MD 20876 PS = Piston Sample H = Hand Auger Sample SC = Sonic Core a Phone: 307.820.3000 Fax: 301.820.3009 SOIL TEST BORING LOGS, SOIL CLASSIFICATION & NOTES 2 SCALE: NONE ATS-0 REMARKS AND TESTS SHEET 2 of 2 i I US Army Corps of Engineers 10-09-19 0 w OCDO 0 W 0 H 2 U < 0 M W � U = I—N 0 Uj C� 0 J z (� _ �C5U) U� Q wW 20 ¢CO z00 m } m 0 0 -im W m m p LLI IiT Z Z Y H (D (n Q Q W Q M _ W Cn W 2il Y 2 2 D N Z p =p cnU 2cq� f�Q 0 o� o� U�o Z W N U)Cn � Z U g _ Z U Z U � � Z°� W iY Q W > � W LL � j= 2 Y 0LL0 O Z 0 W W Q �° ¢�° 0 ° U z o U z0 � Q _j Z J 11 N Q _W Z U) z 0 J O Q U J oZS _ � N z Z �z6' Q_'� ° ° z 0 Z� m Q U �0� 00 w(n W 0 J J o O U 0 LL U) J_ U) A I I I SHEET ID UNCLASSIFIED//FOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC. REG. #: P-1582 CORRECTED FINAL - NOT FOR CONSTRUCTION UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 10 G F LEGEND LP* LIGHT POLE CB CATCH BASIN CO O SANITARY CLEAN -OUT D/ DROP INLET JB JUNCTION BOX RCP REINFORCED CONCRETE PIPE BL BOLLARD MH MANHOLE 8-SS- 8" SANITARY SEWER PIPING C N U ::D ingL o 60 LLI ♦ 8"DIP 6 C I.E.IN:228. 5' LEJN2 8 0'-ss-$-ss 0. MATCHLINE SEE PARTIAL PLAN THIS SHEET c — 232 BL ° BL _�_d BL GATE � o " s C BUILDING 3352 d a.. a 6d' a' 14 o. W �— W \ W. W: .' SAW CUT, REMOVE a d W` d CAA`OPY \41 XXX EXISTING ASPHAL T ' z PARKING LOT coMATCHLINE / o / �— C) REMOVE AND DISPOSE OF N MATCHLINE SEE THIS SHEET oU- �. CIO T v� rL C7 CUT, REMOVE, AND -� W Op ". I I REPLACE EXISTING CURB & GUTTER CD D W ... II CIL _ D �I�, I� I � :. Ill o Q � II N ~ F ' . EX NT OF/ BUILDING DE OLITIO� 3050 SEE THIS SHEET w I EXISTING LIGHT POLES x x x x x PIPE &CABLE DEMOLITION SITE DEMOLITION PARTIAL PLAN `� `� U z SCALE: 1" = 30' O II ' . '� Lu c) DEMOLITION AND REMOVAL NOTES z 61 D 1 6. C "TA rl EXPENSE. II \ I I \ \ ��� ♦ _� UGT UGT I ` ` UGT/ \ PROTECT AND RETAIN EXISTING 0 ' ��� \ j� UGT / \ \ UGT \\ STRUCTURE & PIPING. MODIFY I I " ---- J UGT \ SIDEWALKS AND CURBS AND GUTTERS TO BE REMOVED SHALL BE SAW CUT AT I I - - _ - _ - - - �� �� \ \� \ EXISTING TOP TO MATCH THAT — — \ I I — _ uGT \ THE NEAREST JOINT TO PROVIDE A SMOOTH TIE IN TO NEW SIDEWALKS AND I I \ I �::: ': 'O . - _ - - - _ _ _ - �/ \ \ \ U - SHOWN IN GRADING PLAN �3 I CURBS AND GUTTERS. SAW CUT EDGES ARE TO BE PROTECTED BY THE I I i, .:. '. �. " / �� \ I � BUILDING % •. _ UGT � �� � �/ � � \ �u CONTRACTOR; DAMAGED EDGES SHALL BE RESAWED TO PROVIDE ONE / / I I �� / - JB \ UGT �� \ \ \ \ \ \ / 4'jGT \ \ r' ° 3046 UNIFORM EDGE AND THE ADDITIONAL COST SHALL BE BORNE BY THE / \ \ \ �' / U T I J l \ �� \ �� \ \ �� \ \ \ CLEAR AND GRUB ALL // UGT r- CONTRACTOR. SIDEWALKS AND CURBS AND GUTTERS SHALL BE STOCKPILED / I \ `� ���� \ - _ \2 TREES WITHIN LIMITS OF \ SEPARATELY IN THE DISPOSAL AREA FOR RECYCLING. LOCATION SHALL BE CONSTRUCTION /j \ COORDINATED WITH THE CONTRACTING OFFICER. I %. \ \ \ _ \ \ (AREA = 1.04 AC.) CURB AND SIDEWALK TO I \ I �` .' .:. REMOVE AND DISPOSE OF _ - \ \ \ // I CONC. WALK BE CUT AND REMOVED TREES OUTSIDE THE LIMITS OF CONSTRUCTION SHALL BE PROTECTED AS I I /� ,/ i _ \ \ \ // EXISTING LIGHT POLE I f FOR NEW ROAD SHOWN OR AS NECESSARY TO BE RETAINED AND SHALL NOT BE DISTURBED BY REMOVE AND RELOCATE CONCRETE \, j 3 / DINATE CONSTRUCTION EQUIPMENT. I \ ®( .::. ', G� / / i BARRIERS. CONTRACTOR TO COOR \\ \22 i / / i WITH CONTRACTING OFFICER REGARDING THE LIMITS OF CONSTRUCTION ARE SHOWN ON THE CIVIL PLANS AND SHALL ALTERNATE ON -BASE LOCATION. NOT BE ADJUSTED WITHOUT PRIOR APPROVAL FROM THE CONTRACTING \♦ } I / Q \ \ OFFICER AND FT. BRAGG DPW. \ \ UG ` _ \ - - _ I (� 6 - - - - \ \ / LIMITS OF CONSTRUCTION TEMPORARY STOCKPILE LOCATIONS OF EXCAVATED MATERIALS FROM THE INSTALLATION OF UTILITIES SHALL BE COORDINATED WITH THE CONTRACTING G-) OFFICER. \ - - \ _ ♦ // _ _ l � \ \ / \ -♦�� \ PROTECT AND 7/� - - \ II F- c \ NO UTILITY LINES SHALL BE ABANDONED IN PLACE. I �\ �\ �\ \ \ \ \ RETAIN EXISTING - - j STRUCTURE &PIPING 230 - 232- - 12. THE FOLLOWING UTILITIES HAVE BEEN PRIVATIZED; WATER & SANITARY SEWER I -_ �-_ / ^ \-_// --, \ --, \ \ \ \ 8l I w I I ( �'� / / - (OLD NORTH UTILITIES SYSTEMS),ELECTRICAL SANDHILLS UTILITY SYSTEMS, / ' - - -t4 TLANL\S I SUS), AND GAS (PIEDMONT NATURAL GAS, PNG). THE CONTRACTOR SHALL COORDINATE REMOVAL AND CAPPING OF UTILITY LINES WITH THE I \ ♦ ♦ \ i`/� \ BU F\ER _64 RESPONSIBLE UTILITIES FOR SPECIFIC DEMOLITION AND CAPPING 2 226 \ \ \ \ I c �I N REQUIREMENTS. CONTRACTOR SHALL COORDINATE ALL PIPE INSTALLATION ACTIVITIES WITH PNG AND SHALL MEET PNG'S SPECIFICATIONS. PNG MAY I \ \ \ �� PERFORM QUALITY ASSURANCE INSPECTIONS TO ENSURE MATERIAL AND � \ - - - _ S\�G \ � \ � \ WORKMANSHIP MEET THEIR REQUIREMENTS. I ♦ \ �' - \ I I \ cc� \ \ \ \ I I I I I I I BUILDING 12.1. CONTRACTOR SHALL COORDINATE WITH ALL PRIVATE UTILITIES FOR THE / \ pF _ // \ \ \ \ \ \ \ I I I I ° I I / 3042 LOCATION OF EXISTING UTILITIES IN THE FIELD PRIOR TO BEGINNING �\�� // - - - \ \ \ \ \ \ \ 1 1 c I I I I III I CONSTRUCTION. 12.2. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER \ // - - - \ \ \ \ \ \ \ \ \ \ \ I �I I? I II J' I III I REGARDING ALL FT. BRAGG COMMUNICATION AND TELEPHONE UTILITIES - - \ ��� \ ��Q \ \ \ \ \ \ \ I I 5I -220 \ \ \ I II I I PRIOR TO BEGINNING CONSTRUCTION. cl I I I I _ \ \ \ \ I I -I I II MH 13. SITE UTILITY REMOVALS, RELOCATIONS, DESIGNS, AND CONSTRUCTION ARE \ I I I I c�I I ;. \O WETLANDS ULTIMATELY THE CONTRACTOR'S RESPONSIBILITY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH THE PRIVATIZED UTILITY COMPANIES. - - ` I a I l i I 14. TREE HARVESTING: THE CONTRACTOR SHALL MARK THE TREES TO BE SITE DEMOLITION PLAN REMOVED AND NOTIFY THE CONTRACTING OFFICER WHEN THE MARKING HAS BEEN COMPLETED. THE GOVERNMENT SHALL BE ALLOWED SIXTY (60) DAYS SCALE: 1" = 30' FROM THE DATE OF NOTIFICATION TO HARVEST AND REMOVE THE TREES FROM THE PROJECT SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING THE REMAINING TREES, STUMPS, LIMBS, AND DEBRIS AS WELL AS BACKFILLING N 30 0 30 60 90 AND COMPACTING DEPRESSIONS. CONTRACTOR SHALL ALSO REMOVE ANY TREES OR SHRUBS NOT SHOWN ON THE DEMOLITION PLANS. GRAPHIC SCALE: 1 INCH = 30 FEET 15. CONTRACTOR SHALL ENSURE THAT ADEQUATE ACCESS AND EGRESS IS LOWE ENGINEERS, LLC PROVIDED FOR SURROUNDING BUILDINGS THROUGHOUT DURATION OF REG. #: P-1582 CONSTRUCTION. I I US Army Corps of Engineers 10-09-19 O w OCDO O w 0 H 2<a. U O M uj of W DCO2NF N J Z H S2oU3OU c) z ..Q Lu_j Qo0 zoo 0 0 m } m m p woo ILA z z Y U) o U ~ U) W 2ily _ 2i::) N Z 0 _0 CO _cnH (f)Q 0 o� o� U=o Z W N � u)Q U �Z z W J (n Z U ZOO Q W cwU> Ld W j= 2 Y LL O z� OwQ U) O0z 0 ¢3CE ry- (D z O o z O C)F- �O Q J -8 of Z� J Z J U < � z O (f) N ~ 0 0 Z z P: J O O' N 2E �O � mLL w �o O LL Of SHEET ID CD101 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL — NOT FOR CONSTRUCTION 1 Old �3 4 I UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 10 W F LEGEND BL BOLLARD LIMITS OF CONSTRUCTION SECURE CONSTRUCTION ZONE ° A:: EXISTING CONCRETE 4.4 . EXISTING ASPHALT a a a a NEW CONCRETE a a a NEW ASPHALT (SEE CS501) ii EXISTING BUILDING NEW BUILDING ILEV PARKING OHIC EI TING FUEL -EFFICIENT I PARKING NOTES THERE ARE 99 9'x18' PARKING SPACES SHOWN (INCLUDING 2 HANDICAP). SITE NOTES E 1. ALL DIMENSIONS ARE FROM FACE OF CURB TO FACE OF CURB (FOC) OR FACE OF STRUCTURE TO FACE OF STRUCTURE. 2. CONTRACTOR SHALL USE THE HEAVY DUTY ROADWAY DETAIL ON SHEET CS501 FOR ALL AREAS SHOWN TO BE PAVED, SIDEWALK AND CURB AND GUTTER. 3. ALL CURB AND GUTTER SHALL BE 30" AS SHOWN ON DETAIL SHEET CS501. 4. CONTRACTOR TO MAKE EVERY EFFORT TO REUSE ASPHALT AND CONCRETE REMOVED DURING DEMOLITION. 5. CONCRETE PADS - CONTRACTOR SHALL VERIFY THE SIZE NEEDED AS SHOWN ON THESE DRAWINGS PER THE MANUFACTURER'S RECOMMENDED SIZE AND THICKNESS. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES. SURVEY NOTES D 1. HORIZONTAL CONTROL: THE HORIZONTAL POSITIONS FOR THIS PROJECT ARE BASED UPON GPS OBSERVATIONS USING THE NORTH CAROLINA GRID COORDINATE SYSTEM NAD83 IN U.S. SURVEY FEET. 2. VERTICAL CONTROL: THE ELEVATIONS ARE BASED UPON GPS OBSERVATIONS USING THE NORTH CAROLINA VERTICAL DATUM (NAVD88), GEOID 12B, IN U.S. SURVEY FEET. CONTRACTOR STAGING AREA STAGING AREA SHALL BE WITHIN THE LIMITS OF CONSTRUCTION. ACCESS DURING CONSTRUCTION IN IV THE CONTRACTOR SHALL ENSURE EMERGENCY VEHICLES HAVE ACCESS TO MALVESTI STREET AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. THIS PLAN ASSUMES THAT PN76376 WILL BE COMPLETE WHEN THIS CONTRACT RECEIVES NTP. ADDITIONALLY, THIS CONTRACT ASSUMES THAT PN79437 WILL BE UNDER CONSTRUCTION WHEN THIS CONTRACT RECEIVES NTP. CONTRACTOR MUST COORDINATE ACCESS AND TRAFFIC CONTROL (VEHICULAR, EMERGENCY, AND PEDESTRIAN) THROUGHOUT THE CAMPUS WITH THE CORPS IF THE PREVIOUS CONTRACTS ARE NOT COMPLETED AT NTP. OPEN SPACE CALCULATION: SUSTAINABILITY BOUNDARY AREA = 112,729 SF OPEN SPACE AREA = 34,058 SF GREEN SPACE AREA = 29,979 SF OPEN SPACE % = OPEN SPACE AREA I SUSTAINABILITY 0- S BOUNDARY AREA = 34,058 SF / 112,729 SF = 30.2% v GREEN SPACE % = GREEN SPACE AREA I SUSTAINABILITY BOUNDARY = 29,979 SF / 112729 SF = 26.6% Z U :... 0 � cl) W J BUILDING 3352 ' U ,L a J z MATCHLINE I Z Q o SEE THIS SHEET SITE LAYOUT PARTIAL PLAN SCALE: 1" = 30' CONTRACTOR SHALL UTILIZE ONLY THE AREAS SHOWN WITHIN THE SECURE CONSTRUCTION AREA AS LAYDOWN AREAS. ALL EXISTING FEATURES, STRUCTURES AND UTILITIES WITHIN THESE LAYDOWN AREAS SHALL BE PROTECTED AND RETURNED TO THE SAME OR BETTER CONDITION. CONTRACTOR SHALL VERIFY EXACT LOCATION WITH OWNER. MATCHLINE 7m m PARTIAL PLAN THIS SHEET EXISTINC PROPOSED . PARK 9' x 18' PARKING SPACES (TYP) I V X 12' CONC. PAD FOR TRANSFORMER. REFER TO ELEC. DWGS. PROPOSED :....::.. :' ASPHALT AND C&G l REFERENCE LIST J PROPOSED 9' x 18' PARKING SPACES (TYP) / R POND TOP OF BANK 10 EXISTING r PROPOSED CONC. FLUME \- Q BUILDING 3352 8 LEV LEV LEV PARKING PARKING PARKING RIPRAP ,erg ( ASPHALT AND C&G EXTEND BOTTOM OF CURB �Q�� R5' 1 FT. LOWER ALONG TOP PF OF BANK IN THIS AREA — 9' ; R5' SF \ BIORETENTION POND R38.5' A o SOP OF. vP� � 1oF 0 r TOPOGRAPHIC SURVEY PROVIDED BY LOWE ENGINEERS REFERENCE IS MADE TO THE FT. BRAGG DIRECTORATE OF PUBLIC WORKS INSTALLATION DESIGN GUIDELINES AS RECOMMENDED FOR A GUIDE IN THE DESIGN OF THE PROJECT SITE. 44- PROPOSED ASPHALT AND C&G STORMWATER Q MANAGEMENT POND / fi QONO / CTTF= I AVnI IT DI AM - WETLANDS t___A —LIMITS OF CONSTRUCTION 100' WETLAND BUFFER MATCHLINE 1 SEE THIS SHEET a e - J FOCw.015..'. CO d 1 SECURE CONSTRUCTION FENCING PROPOSED 9' x 18' PARKING SPACES (TYP) BUILDING 3050 BUILDING 3046 :.:..�.:.:...' CONC. WALK STOP BAR AND STOP SIGN 2 GATES: (1) PERSONNEL (2) CONSTRUCTION TRAFFIC MATCH PROPOSED SIDEWALK TO EXISTING SIDEWALK N 30 0 30 60 90 GRAPHIC SCALE: 1 INCH = 30 FEET LOWE ENGINEERS, LLC. 69 REG. #: P-1582 i I US Army Corps of Engineers 10-09-19 O w 0 OCDO O w 0 H 2< U O M w 0 U N F W N J = z H z ui Q °° z 00 0 0 m } m woo (z� z Y U) o U ~ 2 U)_ W 2i of 2i::) N Z _0 CO _U) (f)Q 0 o� o� U�o Z w N � z uS U) g w z_ w 7i U C� Z U > ZO> Q W w > U) Ld W j= 2 Y OLLo O z0 uUJwQ I O O ¢ U) CE ry- (D z O o U z O 5�O J z} O~ 0-1 J z U � Q a zN rn Ooz z�-O_ 0 } O' N Q J w Lu 0-1O 00 U) O O� LL SHEET ID C-101 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 L-*j 10 G F E i RAI EXIST. — GROUND — GROUND 1' 5' SIDEWALK 30" REFERENCE — CENTER LINE 12' TYP. * LAYOUT AND/OR GRADES PER PLAN HEAVY DUTY ROADWAY TYPICAL PAVEMENT SCHEDULE NOT TO SCALE B1 PROPOSED 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.513 B2 PROPOSED 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.513 D1 PROPOSED 4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 119.013 E1 PROPOSED 6" AGGREGATE BASE COURSE R1 PROPOSED 2'-6" CONCRETE CURB & GUTTER O 4" THICK PORTLAND CEMENT CONCRETE SIDEWALK 0 BORROW MATERIAL U0 COMPACTED SUBGRADE I SOURCE: FT. BRAGG DIRECTORATE OF PUBLIC WORKS LOW -EMITTING FUEL -EFFICIENT VEHICLE PARKING ONLY 8'-0" PREFERRED PARKING NOT TO SCALE x2 48" CHARGING STATION MARKING NOT TO SCALE *EV CHARGING DETAILS AS PROVIDED BY AMERICAN PARKING & FIELD STENCILS OR EQUIVALENT T 3:1 MAX. (CUT OR FILL) EXIST. _ GROUND LAW STATUTE (GS 20-37.6) ENABLING ENFORCEMENT MUST BE INCLUDED ON SIGN A BCD— E F G H J K L M 24 0.5 1.5 7.T5 4 E(m) 1.75 3 2 20.5 1.5 7.25 2.814 30 O.TS 1.875 9.625 5 E m 2 4 2.5 25.625 1.875 9.063 3.518 D9-11 b (Alternate) Issued 4/1/2011 SIGN B K L Li cl DI �—M N F LJ P }+0 F � t � IGI H 1 A D9-11 b (Alternate) Electric Vehicle Charging (Alternate Symbol) * See page IA-1 3-2 for symbol design COLORS: LEGEND, BACKGROUND — BLUE (RETROREFLECTIVE) SYMBOL, BORDER — WHITE (RETROREFLECTIVE) IA-1 3-1 N P O 0.148 3.174 0.507 0.185 3.968 0.635 RESERVED PARKING] MAXIMUM PENALTY $250 %GS 20-37 6 VAN ACCESSIBLE REQUIRED ADA SIGNAGE FOR BOTH ADA PARKING SPACES NOT TO SCALE NCDOT STANDARD ADA SIGN R7-8E FEDERAL MUTCD STANDARD ADA SIGN R7-8a FIBER OR PVC WASHER SIGN B C E I C I A R1-1 STOP 'Reduce spacing 40% 0 COLORS: LEGEND — WHITE (RETROREFLECTIVE) BACKGROUND — RED (RETROREFLECTIVE) 1-1 A B C D E F 18 .375 6 6 C 3 775 24 .625 8 8 C 4 10 30 .75 10 10 C 5 12.5 36 .875 12 12 C 6 15 48 1.25 16 16 C 8 20 6" 2'-0" .Q, VV�L ^fig � d d O d n a 2'-6" 2'-6" CURB AND GUTTER NOT TO SCALE SOURCE: FT. BRAGG DIRECTORATE OF PUBLIC WORKS 3/8" DIA. PAN HEAD MACHINE SCREW W/HEX NUT & WASHERS STANDARD DOT METAL SIGN POST FIN. GRADE— 3/8" STEEL ROD (MIN) 6" LONG SIGN ATTACHMENT CONCRETE- GN POST N.T.S. o o o o o o o o o o o o o o o o o o ro o o o o o o (p o o o _12. (MIN) US Army Corps of Engineers - 10-09-19 O W �CDz OU w 0 H U 00 rn W 7 2< U 1—N W U J- z O S2oU)�OU _ U- Q i— LLjw Q00 z°0 0 0 m } co m p J00 co o � z C� Z Y in¢ a wam�win w 2i of Y 2 2i D 2 N Z p =p cnU =cnH �Q 0 o� O � U�o Z W N U) Offz (n in Q W �z W 7 U U) CD Z U w ZO> > W �¢ W U)U) Ld W w (j = o� 2 Y OU-O O z0 LUIJwQ 0- �� ¢U0 Off O O U zO 0 2 O 00 Q U) 11 a z_} J >- O L _tz U L J N Z rn Z OQw LU 0 USCD- N LU 0w> H �o � m �0 O� LL SHEET ID UNCLASSIFIED//FOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC. REG. #: P-1582 CS501 CORRECTED FINAL - NOT FOR CONSTRUCTION 1 1 2 GRADING & STORM DRAINAGE NOTES: 1. CONTRACTOR SHALL GRADE THE SITE AS SHOWN AND REPORT ANY ISSUES TO THE CONTRACTING OFFICER. G 2. CONTRACTOR SHALL GRADE ALL AREAS TO TRANSITION APPROPRIATELY AND TIE IN TO THE EXISTING GRADE. 3. ALL EXCAVATION SHALL BE PERFORMED SO THAT THE SITE AND THE AREA IMMEDIATELY SURROUNDING THE SITE WHICH AFFECT OPERATIONS SHALL BE CONTINUALLY AND EFFECTIVELY DRAINED DURING ALL PHASES OF CONSTRUCTION. 4. ALL STORM DRAINAGE PIPES SHALL HAVE THEIR JOINTS WRAPPED WITH FILTER FABRIC. FILTER FABRIC SHALL EXTEND 1 FOOT PAST THE JOINT. FILTER FABRIC SHALL HAVE AN OVERLAP OF 18 INCHES. 5. ALL EXISTING MANHOLES WITHIN THE LIMITS OF CONSTRUCTION SHALL BE RAISED OR LOWERED TO MATCH THE NEW FINISHED GRADES. F 6. TRENCH BOXES SHALL BE USED TO INSTALL STORM DRAINAGE LINES AROUND EXISTING TREES TO REMAIN. NO FILL FROM THE EXCAVATIONS SHALL BE STOCKPILED WITHIN THE DRIP LINE OF THE TREES TO REMAIN. 7. EXISTING STORM DRAINAGE PIPE TO BE KEPT SEPARATE FROM NEW STORM DRAINAGE NETWORK. 8. THE SITE SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AWAY FROM ALL NEW BUILDINGS AND SITE STRUCTURES. 9. ROOF/FOUNDATION DRAIN COLLECTORS SHALL BE SIZED AS SHOWN ON CG PLANS. ALL ROOF/FOUNDATION DRAINS AND COLLECTORS SHALL HAVE A MINIMUM 1.00% SLOPE. ROOF DRAINS SHALL HAVE A MINIMUM 1.0 FT OF COVER AND FOUNDATION DRAINS SHALL HAVE A MINIMUM OF 2.42 FT OF COVER. E 10. CLEANOUTS SHALL BE PROVIDED ON ALL ROOF DRAINS WHERE THE PIPE MAKES A TURN OF 45 DEGREES OR SHARPER. I* IV n LEGEND CB CATCH BASIN COO SANITARY CLEAN -OUT DI DROP INLET FFE FINISHED FLOOR ELEVATION ✓e JUNCTION BOX 280 PROPOSED CONTOUR -------281 ------ EXISTING CONTOUR 280.00 PROPOSED SPOT ELEVATION PVMT. MATCH LINE EXISTING DRAINAGE PIPING ® EXISTING DROP INLET PROPOSED DRAINAGE PIPING ® PROPOSED DROP INLET - - LIMITS OF CONSTRUCTION ° a PROPOSED CONCRETE / EXISTING BUILDING PROPOSED BUILDING TREE NOTE BASED ON DISCUSSION WITH USACE ON 5/6/19, THE OWNER WILL PROVIDE INSTRUCTIONS FOR THE GC TO SUPPLY AND PLANT 70 TREES OFFSITE WITHIN A 20 MILE RADIUS OF THE PROJECT LOCATION IN ACCORDANCE WITH THE DD1391, 50 DECIDUOUS TREES AND 20 CONIFERS; SITE TO BE DETERMINED BY CONTRACTING OFFICER. ADDITIONAL NOTES SURVEY STANDARDS USED: NAD83 NORTH AROLINA STATE PLANE US FOOT; NAVD 88 VERTICAL GEOID12B LAST DAY OF SURVEY, 1-11-2019. 3 1 4 MATCHLINE SEE THIS SHEET SITE GRADING PARTIAL PLAN SCALE: 1" = 30' UNCLASSIFIED//FOR OFFICIAL USE ONLY 7 8 5 1 6 MATCHLINE SEE PARTIAL PLAN THIS SHEET BUILDING 3352 \236 1 c - 232 BL BL CANOPY \ OC O � a \ BL GATE BL - \ EXISTING PARKING \ \ ASPHALT ^� 231.95 \ LIMITS OF CONSTRUCTION ' 2.80% EXISTING um 231.50� 71- IVA SECURITY FENCE IIII I I o L I I I O O // ,II N I N p O � ��Cp / 228.75 6 N / II II II I I O O O III I I I / O d / I / MATCH LL 0 55 234.70 s 231.65 237.00 I / / / � � / • s 235.50 / 231 75 1/ 35.65 235 50 237.65 9 1 10 MATCHLINE SEE THIS SHEET I \ I N J II / II \ P / MATCH - 237.00 / EXISTING EXISTING III ELEC. BOX I / / MATCH I I �o EXISTING I i N I BUILDING I 3050 238.30 \ III I \II ° 5.00% \i \ -3.0:1 Is 238.80 r�l rn N N. II J I / Al-D1 I J II EXISTING co N N = I I PARKING LOT CL II / I II � 8 I I I I / I / EXISTING 235.00 0 240.50 J -MATCH o G 1 �_ .3231.70 2.5% EXISTING 229 236.20 2385230 1 233.95 240.00 32v .\ 238.00 240.50 O 231 231.40 - � \ 232.00 236.00 235.95 // MATCH I \ \ 230 229.5 0�� \ \ 233.45 / \ ` EXISTING I BUILDING \ ONC. PAD FOR \ -GENE-BA O W 3046 240.65 Q FFE:231.5'-- o., 236 \ 5 \\ 231.60 2.61 /o ' \\ �, 2.88% I I I o \ I I \ / _ \ \ \ I `BLRET TION -' � \ A5-HW \ \ \ 232.55 / 3.0:1 \ / \ 239.00 I / CONC. WALK 22\ \ I2I385I5 I I -MATCH 0 C1-OCS 232.95 2.98% / EXISTING \ \ ��\ \ OF CONSTRUCTION cc) I -VA \ SECURITY FENCE \\ \ STORMWATER I \ 1 D1-OCS MANAGEMENT POND I � � ID2-HW \ \ 224 \ 222 G OF G 220 218 216 1 Cl 238.2 IIf -- EXISTING ASPHAL T PARKING LOT p I I I • � I � W w "' l ti c 5 I JSOC OPS o SUPPORT BUILDING - N N I f 17,090 S.F. II I I a \ 2-STORY \ °I FIFE: 236.00 \ (SEE ARCH. PLANS) 2.22% I \ \ o� I CONC. PAD FOR \ \ (h cl / I TRANSFORMER \ I I FFE: 234.0' \ / I I I -3.0:1 /I EXIS TING A SPHA L T I PARKING LOT �� `ti I I I I 235.50 3 CON PADS FOR CH4LLER 235.50 / 230.70 1 FFE:2*5' ° 1 s ° A3-DI A2-N -LIMITS OF CONSTRUCTION 231.00 ° s / 231.85 235.50 235.5 // 231.60 IN 232 230 - - _ 100WETLANDS BUFFER Lu BUILDING N I III 3042 G d B -220� SITE GRADING PLAN SCALE: 1" = 30' / WETLANDS BDY QQQ-GPI_ - - _ - // _ _ - _*00; JB LOWE ENGINEERS, LLC. 100- 10 Ali I► �--_---- ----_- _ ---ice 30 0 30 60 90 GRAPHIC SCALE: 1 INCH = 30 FEET US Army Corps of Engineers ° 10-09-19 0 z Q w 0 U) o OU w O � z w o< U � 0 0 N J z H _ �oU�OU U� Z o 20 ¢°° z0o 0 Lu 0 00 0 ILA 0 m H Z C� Z Y W 2i tr Y 2 2i::) N Z 0 = p cn U T_ U) ct) Q 0 o� Z w N U U) Z COUQ U _�Z W Z J (n U �z Of U� w > W W LL (j = 2 Y LL 0 O ZM wwQ � z ¢'0 LL O 0 z _� U O ? _j0 J a z_} J Z J ULL� D_ CD (/) 04 z OOz Z 0- 0 D_' (V Q LL W m°0 O U) O LL UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 Old 9 rd G F E I IN IV n DRAINAGE INFORMATION DRAIN # STRUCTURE DRAINAGE 10-YR PEAK NAME AREA (AC.) FLOW (CFS) O Al -D1 0.69 4.64 O A3-DI 0.04 0.27 O A4-DI 0.21 1.58 O4 * * C1-OCS 1.30 0.72 O5 * * D1-OCS 1.49 0.08 GRADING & STORM DRAINAGE NOTES: 1. TOTAL DISTURBED AREA = 2.59 AC. 2. REFER TO CG501 AND CG512 FOR STORM DRAINAGE STRUCTURES DETAILS. 3. 10-YR PEAK FLOW RATES WERE CALCULATED USING THE RATIONAL METHOD. 4. CONTRACTOR SHALL GRADE THE SITE AS SHOWN AND REPORT ANY ISSUES TO THE SITE ENGINEER. 5. CONTRACTOR SHALL GRADE ALL AREAS TO TRANSITION APPROPRIATELY AND TIE IN TO THE EXISTING GRADE. 6. ALL EXCAVATION SHALL BE PERFORMED SO THAT THE SITE AND THE AREA IMMEDIATELY SURROUNDING THE SITE WHICH AFFECT OPERATIONS SHALL BE CONTINUALLY AND EFFECTIVELY DRAINED DURING ALL PHASES OF CONSTRUCTION. 7. ALL STORM DRAINAGE PIPES SHALL HAVE THEIR JOINTS WRAPPED WITH FILTER FABRIC. FILTER FABRIC SHALL EXTEND 1 FOOT PAST THE JOINT. FILTER FABRIC SHALL HAVE AN OVERLAP OF 18 INCHES. 8. ALL EXISTING MANHOLES WITHIN THE LIMITS OF CONSTRUCTION SHALL BE RAISED OR LOWERED TO MATCH THE NEW FINISHED GRADES. 9. TRENCH BOXES SHALL BE USED TO INSTALL STORM DRAINAGE LINES AROUND EXISTING TREES TO REMAIN. NO FILL FROM THE EXCAVATIONS SHALL BE STOCKPILED WITHIN THE DRIP LINE OF THE TREES TO REMAIN. 10. EXISTING STORM DRAINAGE PIPE TO BE KEPT SEPARATE FROM NEW STORM DRAINAGE NETWORK. 11. THE SITE SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AWAY FROM ALL NEW BUILDINGS AND SITE STRUCTURES. 12. ROOF/FOUNDATION DRAIN COLLECTORS SHALL BE SIZED AS SHOWN ON CG PLANS. ALL ROOF/FOUNDATION DRAINS AND COLLECTORS SHALL HAVE A MINIMUM 1.00% SLOPE. ROOF DRAINS SHALL HAVE A MINIMUM 1.0 FT OF COVER AND FOUNDATION DRAINS SHALL HAVE A MINIMUM OF 2.42 FT OF COVER. 13. CLEANOUTS SHALL BE PROVIDED ON ALL ROOF DRAINS WHERE THE PIPE MAKES A TURN OF 45 DEGREES OR SHARPER. *SEE HYDROLOGY REPORT FOR DETAILED CALCULATIONS. **SCS METHOD USED FOR TOTAL AREA TO BE DIRECTED TO AND DRAINED FROM BIORETENTION CELL AND DETENTION POND. SEE HYDROLOGY REPORT FOR MORE DETAILS. LEGEND CB CATCH BASIN COO SANITARY CLEAN -OUT DI DROP INLET FFE FINISHED FLOOR ELEVATION ✓e JUNCTION BOX 280 NEW CONTOUR -------281 ------ EXISTING CONTOUR 282 X SPOT ELEVATION PVMT. MATCH LINE EXISTING DRAINAGE PIPING EXISTING DROP INLET NEW DRAINAGE PIPING ® NEW DROP INLET LIMITS OF CONSTRUCTION - - - - - - - - - CATCHMENT AREAS a NEW CONCRETE I EX -DI 2j (FULL OF WATER) CONNECTING PIPES UNDETERMINED D2-HW /E RIPRAP INFORMATION RIPRAP ID APRON WIDTH @ PIPE OUTLET (FT) APRON WIDTH AT OUTLET END (FT) MAX. STONE DIAMETER (FT) APRON THICKNESS (FT) 4.5 4.7 0.75 1.125 © 4.5 15.5 0.75 1.125 © 6.0 5.6 0.75 1.125 UNCLASSIFIED//FOR OFFICIAL USE ONLY 7 s 9 10 5 6 MATCHLINE MATCHLINE SEE THIS SHEET SEE THIS SHEET ,.1" s 222 L2 1100 00 S ' 00 BUILDING 3352 Z O \ U ® wM s I C0I- n C/)US II /\0- STUDY Pl. \ \ II \\-----100'WETL_ AND \\\\\ I I I �a. w... ♦ �' \ \ \ \ BUFFER \ I �I I I ° I J / l BUILDING 22� U I I ` 3042 N 220 �\���� bI �� I III 218G d B ICI I I I 216 25' x 16' DETENTION POND ✓, / - - - \ �� \ \ \��Q \ \ \ \ \ I I I I I I I ; .:: I I i1i I 1 \ EMERGENCY OVERFLOW, SEE DETAIL CG501 _220 `II® H STUDY PT. #1 IISTORM DRAINAGE PLAN CI M SCALE: 1" = 30' �_ _ _� III P UG� IJ♦1GP / WETLANDS BDY HEADWALL �g6 TOP: 21.' // = -00- _ - _ _ 100 00; B INV.' 213.2828' // �r 100-100 -♦ N c� LOWREG #FENGINEERS, LLC. � 100 , Nor- 30 0 30 60 90 (1) =06====� GRAPHIC SCALE: 1 INCH = 30 FEET M US Army Corps of Engineers 10-09-19 0 z Q O w cn OU O CD z w U � 00 0 0-)U 2< 0 N J = Z � (� U)OUS2o�U ZQ 20 <00 z00 0 0 m } 00 CO p 100 Lim Lu m o Lu � Z Z Y t (n Q Q W Q 00 w Cn w 2i 0_ 2 2 2i D 2i N Z p = 0 cn U = cn H CO Q 0 o� U�o Z w N o' z COU) g w z_ w 7i U C� Z U0 >z of 0> W �Q w U)� W Ld LL �j = 2 2 OLLO O Z 0 w wQ IL 00Z ¢�0 � O O z U O ? _jO 00 Q 2 J a Q z O J z Q D_ UQ't 0)U' W LL Z rn z z Oow Q 0� CV 0 �Ow m LL � O 00 LL SHEET ID CG102 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 CLEARING PHASE NOTES: 2 3 4 UNCLASSIFIEDHFOR OFFICIAL USE ONLY 7 8 5 6 MATCHLINE 9 1 10 MATCHLINE G F E C I_1 PRIOR TO LAND DISTURBING ACTIVITY, THE CONTRACTOR SHALL SCHEDULE A PRE -CONSTRUCTION MEETING WITH THE AREA SITE DEVELOPMENT INSPECTOR. THE CONTRACTOR SHALL OBSERVE THE PROJECT SEQUENCE SHOWN ON THE PLANS. THE CONTRACTOR SHALL MAINTAIN CAREFUL SCHEDULING AND PERFORMANCE TO ENSURE THAT LAND STRIPPED OF ITS NATURAL COVER IS EXPOSED ONLY IN SMALL QUANTITIES. THE OWNER AGREES TO PROVIDE AND MAINTAIN OFF-STREET PARKING ON THE SUBJECT PROPERTY DURING THE ENTIRE CONSTRUCTION PERIOD. NO STAGING AREAS, MATERIAL STORAGE, CONCRETE WASH OUT AREAS, OR DEBRIS BURNING AND BURIAL HOLES SHALL BE LOCATED WITHIN 500 FEET OF DESIGNATED TREE PROTECTION AREAS. A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE AT ALL TIMES. PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY, LIMITS OF LAND DISTURBANCE SHALL CLEARLY AND ACCURATELY BE DEMARCATED WITH STAKES, RIBBONS, OR OTHER APPROPRIATE MEANS, AND SHALL BE DEMARCATED FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE SHALL OCCUR OUTSIDE THE LIMITS INDICATED ON THE APPROVED PLANS. PRIOR TO ANY OTHER CONSTRUCTION, A STABILIZED CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED AT EACH POINT OF ENTRY TO OR EXIT FROM THE SITE OR ONTO ANY PUBLIC ROADWAY. rl�a�7i7�[i�rp/l�[e11�11�19i�:Z�><9[�7►[K�]�I�:Z�7�►�I�_6��J:7��ya9�i l�l►�I,��►�1��1���7�:7[�]:iri79►1Yi��:I�:ZK�7►1,9�:Z�li�[�7►I_Zi��D11�'/I 1. THE CONSTRUCTION EXIT SHALL BE PLACED AS SHOWN ON THE PLANS. 2. IMMEDIATELY AFTER THE ESTABLISHMENT OF CONSTRUCTION EXIT, ALL PERIMETER EROSION CONTROL AND STORMWATER MANAGEMENT DEVICES SHALL BE INSTALLED AS SHOWN ON THE CLEARING PHASE EROSION CONTROL PLAN. 3. WITHIN SEVEN (7) DAYS AFTER INSTALLATION OF INITIAL EROSION CONTROL MEASURES, THE SITE CONTRACTOR SHALL SCHEDULE AN INSPECTION BY THE PROJECT DESIGN PROFESSIONAL. NO OTHER CONSTRUCTION ACTIVITIES SHALL OCCUR UNTIL THE PROJECT PROFESSIONAL APPROVES THE INSTALLATION OF SAID EROSION CONTROL MEASURES. IF UNFORESEEN CONDITIONS EXIST IN THE FIELD THAT WARRANT ADDITIONAL EROSION CONTROL MEASURES, THE CONTRACTOR MUST CONSTRUCT ANY ADDITIONAL EROSION CONTROL DEVICES DEEMED NECESSARY BY THE PROJECT PROFESSIONAL DURING THE SITE INSPECTION. 4. AFTER APPROVAL OF INITIAL EROSION CONTROL INSTALLATION, THE CONTRACTOR MAY PROCEED WITH CLEARING AND GRUBBING ACTIVITIES. AS CLEARING PERMITS, THE CONTRACTOR SHALL CONSTRUCT THE SKIMMER SEDIMENT BASIN AS SHOWN ON PLANS. 5. THE CONTRACTOR CAN UTILIZE CLEARED TREES AS BARRIER BRUSH SEDIMENT CONTROL WHERE INITIAL GRADING ACTIVITIES WILL NOT OCCUR. 6. MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN 7 DAYS OF LAND DISTURBANCE. ALL DISTURBED AREAS LEFT MULCHED MORE THAN 30 DAYS SHALL BE STABILIZED WITH TEMPORARY VEGETATION. NO BURN OR BURY PITS SHALL BE PERMITTED ON THE CONSTRUCTION SITE WITHOUT WRITTEN PERMISSION BY THE OWNER AND/OR THE ENGINEER OF RECORD. ALL SILT FENCES MUST MEET THE REQUIREMENTS OF SECTION 6.62 - SEDIMENT FENCE OF THE MOST RECENT VERSION OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. SEDIMENT AND EROSION CONTROL MEASURES MUST BE CHECKED AFTER EACH RAIN EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED HALF THE CAPACITY OF THE DEVICE. ADDITIONAL DEVICES SHALL BE INSTALLED IF NEW CHANNELS HAVE DEVELOPED. THE CONSTRUCTION EXIT SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACK OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1"-3" OF STONE, AS CONDITIONS DEMAND. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM A VEHICLE ONTO PUBLIC ROADWAY OR INTO STORM DRAIN MUST BE REMOVED IMMEDIATELY. CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE PROPER FUNCTIONING. FAILURE TO INSTALL, OPERATE, OR MAINTAIN ALL EROSION CONTROL MEASURES WILL RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE SITE UNTIL SUCH MEASURES ARE CORRECTED ACCORDING TO THE APPROVED PLANS. EROSION CONTROL NOTES: 1. EROSION CONTROL MEASURES SHALL BE INCLUDED WITH ANY STOCKPILED MATERIAL, TOPSOIL, NEW UTILITY INSTALLATION ROUTES, UTILITY TIE-IN POINTS, ETC. 2. UTILITY WORK (TIE-IN AND ROUTING) SHALL INCLUDE EROSION CONTROL MEASURES. 3. PRIVATIZED UTILITY COMPANIES ARE RESPONSIBLE FOR PERMITTING LIMITS OF WORK OUTSIDE OF THE PERMITTED LIMITS SHOWN ON THESE DRAWINGS. EROSION CONTROL LEGEND SKIMMER SEDIMENT BASIN ® FABRIC DROP INLET PROTECTION (TEMPORARY) ❑--�❑ SEDIMENT FENCE (SILT FENCE) CONSTRUCTION EXIT POROUS BAFFLES LEGEND CB CATCH BASIN COO SANITARY CLEAN -OUT DI DROP INLET FFE FINISHED FLOOR ELEVATION BL BOLLARD RCP REINFORCED CONCRETE PIPE ✓e JUNCTION BOX ------ 28� ------ EXISTING CONTOUR EXISTING DRAINAGE PIPING ® EXISTING DROP INLET — — LIMITS OF CONSTRUCTION ., EXISTING CONCRETE EXISTING ASPHALT r. SEDIMENT FENCE INFORMATION SILT FENCE ID LENGTH (FT) SLOPE (%) DRAINAGE AREA (FT2) 1 100 <2% 10,000 2 100 <2% 10,000 3 100 <2% 9,075 4 100 <2% 5,269 5 100 <2% 2,773 6 75 2-5% 2,909 7 75 2-5% 3,756 8 100 <2% 1,933 9 100 <2% 1,792 10 100 <2% 1,955 11 47 2-5% 1,949 12 100 <2% 8,864 13 100 <2% 4,305 14 100 <2% 4,982 15 100 <2% 7,640 16 190 2-5% 6,610 17 75 <2% 1,555 18 106 5-10% 1,658 19 100 <2% 4,062 OF WATER) E7CTING PIPES rERMINED _ f 1 SPILLWAY EX -DI \ 27 (FULL OF WATER) CONNECTING PIPES LP UNDETERMINED SPLASH PAD 17 SKIMMER SEDIMENT TRAP CALCULATIONS: VOLUME LIMITS OF CONSTRUCTION (LOC) = 2.59 AC. REQ. VOL. = 3,600 CF * LOC = 3,600 * 2.59 = 9,324 CF VOL. PROVIDED = 10,385 CF 10,385 CF > 9,324 CF. VOLUME PROVIDED EXCEEDS REQUIRED MIN. SURFACE AREA (SA) Q­ = 5.35 CFS*, SA PROVIDED = 2,433 SF SA REQUIRED = 325 SF * 5.35 CFS = 1,739 SF 2,433 SF > 1,739 SF. AREA PROVIDED EXCEEDS REQUIRED SKIMMER RISER ul STING (EPA NG LOT 3 \ <, 1 I N I IIII \ \ \ I`JEX D1 / .' ............'.:. / . ..• -` :' .:....: ;..:. °�... '.'' � :'.:: . .... I 2 I I TOP: 237. 15 15 I.EIN: 233.55 .:. IJ I OUT.239.47 RCP EXISTING ASPHALT '. I I 1 / / 1 I_ -..' — — — q1E ,.... PARKING LOT I - / r \ �'c� LIMITS OF CONSTRUCTION co z EX-Dl :.:'.:.. '... TOP: 239.99 \\ 1 10 / / _ / / 1 I / / ` // / / / ' U- .. ..: I.EIN(18'): 23539 \\ .:...:...:... 1. E IN(24')- 234.83 / I o'.: I.EOUT.-234.82 1 r—� �' �� �� l \ /l CONSTRUCTION EXIT / ENTRANCE EX -DI LONGITUDE:-79.003404 TOP=237.95 / I LATITUDE:35.094570 I.EIN=233.55 ® 1 I RELOCATE AS NECESSARY ��6, \ \ � \ \ \ \ \ \ \ \ \\ \ \ // / �\ I.EOUT 231.47 TO ACCOMMODATE CONSTRUCTION '/ CONC. WALK a \ \ \ \ ice\ \ \ \ \ i� /\ \ — LIICAT�'�-CbN�'fR!?l;TI61+!•� I I I / "�, // .' I ` \ OROUS BAFFLES \ \ ♦ \ \\ \\ \\ \ \ \ \ \ \ // \ — — _ (MISSING LID) \ \ \ ♦_�a5 \ \ \ 7/\ \ \ \ TOP: 233.16 INV- 229.76 I I � —232- �230 --_ 100'WETLANDS ♦ \ \ �.\ \/�\ \\ �� �� \ BUFFER \\ \ I I I a JJ) ) \ lb BUILDING 5 � _ .� � �---� \ \\ � \\ \\ \\ \\ \\ 1 \ \ i I I I � I III I c 3042 a /i -220� 1 11 j _—� SKIMMER: (SEE CG513 FOR CALCULATIONS) EROSION CONTROL PHASE I P LA N —_ DEWATERING TIME: 3 DAYS 1_ SCALE: " - 30' SKIMMER SIZE: 1.5" - ORIFICE DIAMETER: 1.5" --_— STAKE CLEAN -OUT ELEVATION: I - I--- _ _ __ WETLANDS B= _ [(TOP ELEV. - INV. ELEV.) (11)] + INV. ELEVATION HEADWALL _ [(224-220)/2]+220 = 222.00 TOP: 216.70' // �E��PN00 _� — _= ii JB INV.- 213.28' // _100 SPILLWAY // _ _ _ .� ♦ LOWE ENGINEERS, LLC. 25' WIDTH @ELEV. 223.00' _ _ _ _ _ _ _ N REG. #: P-1582 100 30 0 30 60 90 GRAPHIC SCALE: 1 INCH = 30 FEET I I US Army Corps of Engineers 10-09-19 0 z a O W 0 U) OU ui O CD Z > w o H 2< U O rn W � co U 1 041 O W O ~ U)co N 00 J cp Z H U) _ U� Z o a ¢°° z0o 0 0 m } 00 00 p J00 lip o m oLu Z C� Z Y Unaa W 2i 0_ Y wam�wcn 2 2i D 2 N Z p = p cn U = co co a 0 o� o� U o Z W N Z vi U) g UZ W Z J U) ZOO U �a U) W U) W �j = WY OLLO O Oz a�0 a' ° z o U z0 _jO 00 J � 11 Z Q a J a z_ J w J U _ w � Z rn J Z Oow N z c�W} O �Ow U Z Ow O 0 (/) W SHEET ID CG103 UNCLASSIFIEDHFOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 r� 10 G F E C n GRADING PHASE NOTES: DURING CONSTRUCTION, THE CONTRACTOR SHALL MAINTAIN CAREFUL SCHEDULING AND PERFORMANCE TO ENSURE THAT LAND STRIPPED OF ITS NATURAL GROUND COVER IS EXPOSED ONLY IN SMALL QUANTITIES, AND THEREFORE LIMITED DURATIONS, BEFORE PERMANENT EROSION PROTECTION IS ESTABLISHED. EARTHWORK OPERATIONS IN THE VICINITY OF STREAM BUFFERS SHALL BE CAREFULLY CONTROLLED TO AVOID DUMPING OR SLOUGHING INTO THE BUFFER AREAS. EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ESTABLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION, AND ALTER THE LOCATION OF EROSION CONTROL DEVICES ACCORDINGLY. ANY DIFFICULTY IN CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION SHALL BE REPORTED TO THE DESIGN PROFESSIONAL IMMEDIATELY. THE CONTRACTOR SHALL ESTABLISH BARRIERS AT THE TOP OF ALL SLOPES UNDER CONSTRUCTION. CUT AND FILL SLOPES SHALL NOT EXCEED 3:1. STORM DRAIN OUTLET PROTECTION SHALL BE PLACED AT ALL OUTLET HEADWALLS IMMEDIATELY FOLLOWING HEADWALL CONSTRUCTION. ALL DRAINAGE SWALES AND GRADED AREAS SHALL BE APPLIED WITH VEGETATIVE COVER AS SOON AS FINAL GRADE IS ACHIEVED. MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN 7 DAYS OF LAND DISTURBANCE. ALL DISTURBED AREAS LEFT MULCHED FOR MORE THAN 14 DAYS SHALL BE STABILIZED WITH TEMPORARY GRASSING. THE CONTRACTOR SHALL MAINTAIN THE SKIMMER SEDIMENT TRAP UNTIL PERMANENT GROUNDCOVER IS ESTABLISHED. SEDIMENT SHALL BE CLEANED OUT OF THE TRAP WHEN IT REACHES ONE HALF OF THE TRAP DEPTH. MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN 7 DAYS OF LAND DISTURBANCE. ALL DISTURBED AREAS LEFT MULCHED FOR MORE THAN 14 DAYS SHALL BE STABILIZED WITH TEMPORARY GRASSING. SEDIMENT AND EROSION CONTROL MEASURES MUST BE CHECKED AFTER EACH RAIN EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED HALF OF THE CAPACITY OF THE DEVICE. ADDITIONAL DEVICES MUST BE INSTALLED IF NEW CHANNELS HAVE DEVELOPED. CONTRACTOR SHALL INSPECT CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE MEASURES ARE FUNCTIONING PROPERLY. THE CONSTRUCTION EXIT SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACK OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1"-3" OF STONE, AS CONDITIONS DEMAND. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM A VEHICLE ONTO PUBLIC ROADWAY OR INTO STORM DRAIN MUST BE REMOVED IMMEDIATELY. FAILURE TO INSTALL, OPERATE OR MAINTAIN ALL EROSION CONTROL MEASURES WILL RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB UNTIL SUCH MEASURES ARE CORRECTED BACK TO THE APPROVED EROSION CONTROL PLANS. ALL CONSTRUCTED SLOPES SHALL HAVE SOIL STABILIZATION APPLIED WITHIN 7 DAYS OF CONSTRUCTION. EROSION CONTROL NOTES: 2 3 ERU61UN GUN I RUL MI=ASURES SHALL BE INCLUDED WI I H ANY S 1 UCKHILED MATERIAL, TOPSOIL, NEW UTILITY INSTALLATION ROUTES, UTILITY TIE-IN POINTS, ETC. ` JB: UTILITY WORK (TIE-IN AND ROUTING) SHALL INCLUDE EROSION CONTROL MEASURES. L PRIVATIZED UTILITY COMPANIES ARE RESPONSIBLE FOR PERMITTING LIMITS OF 0 WORK OUTSIDE OF THE PERMITTED LIMITS SHOWN ON THESE DRAWINGS. CB CO O DI FFE BL RCP JB 280 ------28� ------ 282 x CATCH BASIN SANITARY CLEAN -OUT DROP INLET FINISHED FLOOR ELEVATION BOLLARD REINFORCED CONCRETE PIPE JUNCTION BOX NEW CONTOUR EXISTING CONTOUR SPOT ELEVATION EXISTING DRAINAGE PIPING ® EXISTING DROP INLET LIMITS OF CONSTRUCTION EXISTING CONCRETE EXISTING ASPHALT a$ NEW CONCRETE NEW ASPHALT i SEDIMENT FENCE INFORMATION SILT FENCE ID LENGTH (FT) SLOPE (%) DRAINAGE AREA (FT2) 1 106 5-10% 1,658 2 100 <2% 2,279 3 190 2-5% 6,610 4 100 <2% 1,712 5 100 <2% 5,897 6 100 <2% 4,635 7 100 <2% 3,055 8 75 2-5% 4,385 9 100 <2% 2,310 10 100 <2% 1,792 11 50 5-10% 804 12 122 <2% 2,055 13 25 >20% 426 14 60 5-10% 3,135 SPILLWAY - EX -DI \ 2� (FULL OF WATER) CONNECTING PIPES 2 UNDETERMINED D2-HW SPLASH PAD RR SKIMMER SEDIMENT TRAP CALCULATIONS: VOLUME LIMITS OF CONSTRUCTION (LOC) = 2.59 AC. REQ. VOL. = 3,600 CF * LOC = 3,600 * 2.59 = 9,324 CF VOL. PROVIDED = 10,385 CF 10,385 CF > 9,324 CF. VOLUME PROVIDED EXCEEDS REQUIRED MIN. SURFACE AREA (SA) Q­ = 5.35 CFS*, SA PROVIDED = 2,433 SF SA REQUIRED = 325 SF * 5.35 CFS = 1,739 SF 2,433 SF > 1,739 SF. AREA PROVIDED EXCEEDS REQUIRED C2-HW SKIMMER RISER SKIMMER: (SEE CG513 FOR CALCULATIONS) DEWATERING TIME: 3 DAYS SKIMMER SIZE: 1.5" ORIFICE DIAMETER: 1.5" STAKE CLEAN -OUT ELEVATION: [(TOP ELEV. - INV. ELEV.)*(2)] + INV. ELEVATION _ [(224-220)/2]+220 = 222.00 SPILLWAY 25' WIDTH @ ELEV. 223.00' MATCHLINE MATCHLINE SEE THIS SHEET SEE THIS SHEET BUILDING 3352 z Z' U ' MATIVTPnIANlrF rONITArT F-7--­1 I LA I I I Wt=.Uy40 W 230 229 5 RELOCATE AS NECESSARY LEOUT 23 47 I TO ACCOMMODATE \ - \ CQ/ / \ CONSTRUCTION I/ _ \ A5-HW \ \ \ \ \ \ 1 CONC. WALK \ \ \ A4-DI cl-Ocs A�_CTS C V .. TS LIIEATSCr'C9N�'fRi�LTMBf�� (MISSING LID) POROUS BAFFLES 226 ♦ �Og 14 \ \ \ \ \ �� \ \ \ \ - TOP: 233.16 P \ \ \ \ \ INV.' 229.76 232— TS \ / \ \ \\\ �\ \\ \2`30 _---100'WETLAND ♦ \ /�\ \\ \\ �/\\2 \\ \\ \\ BUFFER \ \ I I I J l NI I I j::..: BUILDING 3042 ' —220 EROSION CONTROL PHASE II PLAN SCALE: 1" - 30' WETLANDS BDY HEADWALL // S��� _� — — — — Q�(3I- TOP:216.70'= — — _ — _ pQ — — _ __; JB INV.'213.28' / 100—�— — _ _ — — _ _ — ��� _ _ _ j LOWE ENGINEERS, LLC. N REG. #: P-1582 30 0 30 60 90 GRAPHIC SCALE: 1 INCH = 30 FEET I I US Army Corps of Engineers 10-09-19 0 z < O w 0 cn OU Iii o CD z w o H 2< U O M W 7 00 U w = Z O O cn N J (� _ o < wq� 20 <00 z00 0 0 m } m m p J00 l= o m o Lu Z c? Z Y - W 2i O Y 2 2i D N Z 0 =p cn0 T_U) co < 0 o� o� U�o Z w N _� z uS U) < w z_ W Z 7i U C� ��� U� �< W > W �U) Ld W LL �j = Y OLLO O LU QU) 0 Oz O U z O _jO J z < z a J � J U) U U_ It Q _ L 0- N 0� Z Z J O0w O N ~ z w L` O m O U LL z 0o O LL W SHEET ID CG104 UNCLASSIFIEDHFOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 FINAL PHASE NOTES: Old THE CONTRACTOR SHALL MAINTAIN ALL SEDIMENT CONTROL MEASURES UNTIL PERMANENT GROUNDCOVER IS ESTABLISHED. SEDIMENT SHALL BE CLEANED OUT ONCE/WEEK. ALL ROADWAY AND PARKING SHOULDERS SHOULD BE GRASSED AS SOON G AS FINAL GRADE IS ACHIEVED. SEDIMENT AND EROSION CONTROL MEASURES SHALL BE CHECKED AFTER EACH RAIN EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ONE HALF THE CAPACITY OF THE DEVICE. ADDITIONAL DEVICES MUST BE INSTALLED IF NEW CHANNELS HAVE DEVELOPED. FAILURE TO INSTALL, OPERATE, OR MAINTAIN ALL EROSION CONTROL MEASURES WILL RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB UNTIL SUCH MEASURES ARE CORRECTED BACK TO THE APPROVED EROSION CONTROL PLANS. UPON COMPLETION OF THE PROJECT AND RECEIPT OF THE CERTIFICATE OF COMPLETION, THE CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND DISPOSE OF THEM UNLESS NOTED OTHERWISE ON PLANS. F EROSION CONTROL NOTES: 1. EROSION CONTROL MEASURES SHALL BE INCLUDED WITH ANY STOCKPILED MATERIAL, TOPSOIL, NEW UTILITY INSTALLATION ROUTES, UTILITY TIE-IN POINTS, ETC. 2. UTILITY WORK (TIE-IN AND ROUTING) SHALL INCLUDE EROSION CONTROL MEASURES. 3. PRIVATIZED UTILITY COMPANIES ARE RESPONSIBLE FOR PERMITTING LIMITS OF WORK OUTSIDE OF THE PERMITTED LIMITS SHOWN ON THESE DRAWINGS. MAINTENANCE CONTACT NAME: LEE WARD E PHONE: (910) 908-5286 EMAIL: LEE.P.WARD.CIV@MAIL.MIL I A IV EROSION CONTROL LEGEND RIPRAP (SEE SHEETS CG510 & CG511 FOR R R CONSTRUCTION DETAILS & MAINTENANCE REQUIREMENTS) OSODDING (HYBRID BERMUDA) LEGEND CB CATCH BASIN COO SANITARY CLEAN -OUT DI DROP INLET FFE FINISHED FLOOR ELEVATION BL BOLLARD RCP REINFORCED CONCRETE PIPE JB JUNCTION BOX 280 NEW CONTOUR - - - - 28� -- --- -- EXISTING CONTOUR 282 X SPOT ELEVATION EXISTING DRAINAGE PIPING ® EXISTING DROP INLET LIMITS OF CONSTRUCTION ' EXISTING CONCRETE EXISTING ASPHALT NEW CONCRETE NEW ASPHALT BIORETENTION POND RUNOFF RETENTION CALCULATIONS: 1-YR EVENT VOLUME W/ NO INFILTRATION (A) = 5,503 FT 1-YR EVENT EVENT VOLUME�21N/HR INFILTRATION (B) = 2,363 FT3IN/HR INFILTRATION (B) = 2,363 FT3 TOTAL INFILTRATED VOLUME @ 2 IN/HR (C) = A - B = 3,140 FT 5-YR EVENT* VOLUME @ 2 IN/HR INFILTRATION (D) = 5,710 FT3 TOTAL 5-YR EVENT* RETAINED VOLUME = C + D = 8,850 FT 98% RETENTION VOLUME = 6,878 FT TOTAL RETAINED VOLUME > 98% REQUIRED RETENTION VOLUME A I *THE 5-YR EVENT VOLUME 0 2 IN/HR INFILTRATION WAS USED BECAUSE IT IS THE LARGEST RAIN EVENT AT THE SPECIFIED INFILTRATION RATE THAT DOES NOT FLOW INTO THE BIORETENTION POND OUTLET CONTROL STRUCTURE (OCS). THE VOLUMES OF RAIN EVENTS WITH ELEVATIONS GREATER THAN THE OCS OVERFLOW ELEVATION ARE NOT AS ACCURATE FOR THESE CALCULATIONS DUE TO THEIR RELATIVELY HIGH RATE OF DISCHARGE. 9 -1 (FULL OF WATER) CONNECTING PIPES UNDETERMINED BUILDING 3352 4 UNCLASSIFIED//FOR OFFICIAL USE ONLY 7 8 5 6 MATCHLINE SEE THIS SHEET BUILDING 3352 e d u) '. P: w: Q �a d MATCHLINE SEE THIS SHEET EXISTING ASPHAL T PARKING LOT Cr) r1CTf-%K1 r)U A Cr- TTT nI A KI SCALE: 1" = 30' ASPHALT 9 I 10 MATCHLINE SEE THIS SHEET � I � I cr)CO WETLANDS BDY n� a 46, 18'RCP / / I 1 � � � III Ill o I I _ N BUILDING �I I rn 3050 IIIU� \ � III \II a Rc'? 1 II / II / a / III J III J II EXISTING PARKING LOT � II II � II �o II EX -DI TOP: 237.15 1. E IN: 233.55 I.E OUT.- 231.47 zz 24'RCP 24'RCP H \\ 1�,q EX -DI \\ U) TOP:239.99 \\ o LEIN(18'):235.39 U- 1. E IN(24'): 234.83 1. E OUT.- 234.82 U) II I I I � / CONC. WALK / co I J i 1 III / BUILDING � ( 3042 I \ I I I I LOWE ENGINEERS, LLC. N REG. #: P-1582 30 0 30 60 90 GRAPHIC SCALE: 1 INCH = 30 FEET M US Army Corps of Engineers 10-09-19 0 z Q O w u) OU O CD z w 0 2< U � 00 0-)U = Z O N i (� U)00 _ U� Z o 20 <00 z00 0 0 m } m m p J00 ILA o m o LLI Z C� Z Y w 2i of Y m 2i::) N Z p = p U) T_ U) ct) Q 0 o� U�o Z w N � z CO g viz w 7i (n ��� Z U0 EEQ w > U) W � Ld W LL (j = 2 Y OLLO O I Oz QUO fr- O (D 2 � C).) z O F Q _jO 2 J a z Q z_ a J } W 0 U Q w Q = w L _ (n N J OOZ z�-w O � CD- w' 04 ~ IL Z O O U m w Z �° O LL O o Lu SHEET ID CG105 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 9 10 G F E I A IV F1 GROUT FRAME 3 HOOP IN PLACE .a. •t. AST C76-63T CLASS EI R.C. P.-----, PIPE SIZE d D MIN. 24' 4811 27„ 54" 5 30" 60" 10" FOR D = 48" 11 " FOR D = 54" 12" FOR D = 60" CAST IRON FRAME a COVER - DESIGN FOR (NO TRAFFIC) OR (H20 TRAFFIC) AS REQUIRED GRADE I I MONOLITHIC CONSTRUCTION OR FABRICATE AS. DESCRIBED: CUT HOLE IN MANHOLE PIPE. WELD REINF. IN MAIN LINE __--_ ..j PIPE TO THE MANHOLE 1 I CONNECTION. I APPLY A RICH CEMENT D 1 MORTAR COATING. I - E � I #6 AT 12" EW CAST - IN - PLACE CONC. SLAB PRE -CAST MANHOLE FOR INFORMATION ONLY: Coordinate use w/Site Development Engr. EXHIBIT A-2--72 V. 25.0' -inn I Ir.irn STORMWATER MANAGEMENT POND CONCRETE SPILLWAY NOT TO SCALE C . 1. FRAME & GRATE DESIGN FOR H 20 #4AT12" O.C.EW. WHEEL LOAD - I `74 2- # 7,4 SIDES OF OPENING I MORTAR JT. Ar R.C.P. 611 31_ 0 11 6 �, BREAK OUT TOP OF -:.�- PIPE AND FORM Ar in 7,— STORM DRAIN N CONC. CAST IN PLACE 5-2 FOR INFORMATION ONLY - Coordi- nate use En Developmentnt Engr. PRECAST SURFACE INLET DETAIL H2O WHEEL LOAD EXHIBIT A-2-77 . cm.) M nM%= SILT ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER _ rw.) FOR INFORMATION ONLY: Coordinate use w/Site Develop- ment Engr. A C.I. MANHOLE I—� FRAME AND COVER i CAST - IRON 3 ( SURFACE INLET FRAME AND GRATE EXTRA 04 BARS P L A N EA. SIDE OF OPENING A* -A" SQUARE (MIN) EXTRA ' - 4 BARS EA. SIDE OF OPE N I N G *" 4 a 1211 E.W. d► CENTER (TYP.) 6"(TYP.) 3 - 01/ SQ. - CONST. JT. TYP, ". OPTIONAL CONST. JT. NOTE I -USE 3000 psi CONC. 2. HOOP ONE 04 BAR AROUND ALL PIPE OPENINGS 3. ALL LAPS 8 EXTENSIONS OF REINF TO BE 30 .. DIAM. 4.STO. PRECAST MAN- ' HOLES AND SURFACE INLETS MAY BE USED INSTEAD WHERE ECONOMICAL. SECTION A -- A STANDARD MANHOLE & ' SURFACE INLET DETAIL BUILDING AREAS NOT SUBJECT TO TRAFFIC EXHIBIT A-2--70 �Z�� \ FI 1 I 1 {. A 111? �7 ilr v��yrl' 13 T - - 1 1 ]- 7 r7 , 1• h l h I h / :. l] 1 111 CLEMY �]i YI 1 Y l ] ] ] _ h l F � I I C h 1 I h l h 1 27�11111113 ] 7 Tw LMIIII ANLIM gnus 7 1 7 11I1111 I- 111111Ih ? 1 IM ? =11111 h 1 IM . 1 CAPACITY 1 '. 1 I 7" CAPACITY.1 CAPACITY :1 A h ? I ] ] 1 ,I F I F 1 - ] 7 1 CUM MIIAIIr 1IM11111 Ih ► 1 ► wAw6w 3 7 1 cuum 117111 =1111111111111t 1 h GRADE t i I US Army Corps of Engineers 10-09-19 0 w 0 �CDOz O w 0 U < IY 00 0-)H W 7 U (If � LLI (D 0 N CO J= z F- _ Q F- wW 20 <00 z00 O O m } m m o —im �r LU m o LU � Z Z QwWQ Y � am w� W 2r)f Y m 2 D 2 N Z 20 U)U 2(gF- CO Q 0 o� o� U�o Z N Ir z UW Q w z_ W 7i U C� Z C) > � � W �Q w > U)U) Ld W LL �j = F- 2 Y OLLO O Z0 wwQ IL Pz ¢U)CE Ir O (D z _o U zO � � Q Z J -8 Q Z71 } J J W U Q 0 LL L0 W z rn U Oz Q Z Z LZ' CV t� w <OLL tYl o° o LL (n SHEET ID CG501 UNCLASSIFIEDHFOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC. REG. #: P-1582 -10 CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 N. 10 G F E C 0 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGOl CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10'or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilisation shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization 9 'Temporary grass seed covered with stra,w,� or r Per_rnanent grass deed covered with straw or other rnulches and tac'kifiers other mulches and tackiifiaeirs * Hydroseeding * Geotextile fabrics such as permanent soil * Rolled erosion control products with or reinforcement imatting without temporary grass seed Hydroseeding # Approprifately' aP!Rlied straw or other mulch a Shrubs or other parmanent planlings covere d * Plastic sheeting iwith mulch Uniform and evenly distributed ground cover surlfFiclient to restrain eroslion * Stru ctu ra I methods such ;as concrete, asp ha I f o r retaining walls i Rolled erosion control products with grass: seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAM►S/Flocculonts. Z. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. Z. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER,, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. Z. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE I. Do not dump paint and other liquid waste into storm drains, streams or wetlands. Z. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. Z. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. Z. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. := f NORTH CAROLI NAi En vir- - nm en tdif"Q crli - w■`•■■•�'K 11 ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER _ folk ii� �NMU �M��11X 610111111.1111. ,-1111�� W7K87111111111111� BE[ nu GRABE WWIT STRUCTURE am or111�1116 ABOVE fdt% VAS 1 rr SM IrTl RE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. Z. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. g. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. Z. Place hazardous waste containers under cover or in secondary containment. 3. ❑o not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO I GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 M US Army Corps of Engineers -- 10-09-19 IIIIII� o w 0 O CD Z 0 W F- o�¢a� o N Z � J _ �oU�3U C5 Q LULU :�im Q00 Z00 0 0 m } m m 0 0 co 0 LU W Z � Z Y - W of Y= 2E Z N Z 0 20 U)U 2UnH Un Q 0 o� U�o Z W N Un z U Un Q W �Z W J U UA U' Z U 0> � w~ Q U W �_ W Y o �� oILL wo U) 0° ate° a z Z U O Q 00 >J Q z�J J Un <� U Y = U �zrn w ooZ = ZPa U C/i (Do`L` uw m L a o° zILL SHEET ID UNCLASSIFIED//FOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC. REG. #: P-1582 CG502 CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 rn 9 10 G F E I IN IV RAI PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good woriting holiday periods, and no Individual -days rainfall Information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring duce approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, iUleasures 7 calendar days 2. Date and time of the Inspection, and wkhin 24 3. Name of the person performing the Inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 Inch in properly, 24 hours 5. Description of maintenance needs for the measure, P. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls Inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (S130s) and within 34 3. dame of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event 11.0 inch In sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, S. Description, evidence and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limier, then a record site 7 calendar days of the fbllowing shall be made: and within 24 1. Actions taken to cleanup or stabilize the sediment that has left hours of a rain the site limits, event> 1.0 Inch In 2. description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetiand has Increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible Increased turbidity from the construction or offslte and within 24 activity, then a record of the following shall be made (where hours of a rain 1. description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch In 2. Records of the required report to the appropriate Division 24 hours Regional office per Bart III, Section C. Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation ,of storm measures drainage f'acillties, completion of all land -disturbing activity, construction or redevelopments, permanent ground corner). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an Inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site in addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. :7,1►i1111 SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: ■ They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or a They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Ti frames [After Discovery) and Baer Requirements (a) Visible sediment a Wft Wn 24 hours, an oral or electronic notification. deposition in a 9 WMWo 7 calendar dap, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. ■ If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. M 0711 spills and ■ Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item IM-W above (c) Anticipated ■ A report at lewt ten days before the date of the bypass, #poWbie. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • i (thin 24 hours, an oral or electronic notification. bypasses [40 CFR • YWt fin 7cdendarrdays, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance a Wthin 24 hours, an oral or electronic notification. with the conditions • ffltN r 7 calendar d,, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environmert[40 continue; and steps taken or planned to reduce, eliminate,, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122Al(I)(6). e Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING NOR7H CAROLINA r T I Aftuaut EFFECTIVE: 04/01/19 i r US Army Corps of Engineers 10-09-19 I���I I o w 0 oCDz o W H C) � OU rn W � U � W= CD 0 �NJ�Z �= o � C) C) U � � LULU 20 Q0o Z00 0 0 m } m m o J00 o m o LLI Z c� Z Y cna¢ wam�LU W 2 Of Y 2 2E� N Z 0 o� U�o Z W N � Z �UQ Wiz W 7i U U) C� Z C) > � of > W �Q W �U) Ld W LL �j = 2 Y LU o z� °wQ 0- 0Z ¢U& fr- o o z U zo � QU) _J Z J � 11 Q Z } J N 0 J (n U LL 0 Y Zz0) w 0 Q Z 2 Z�-0- U U` Q� N U) < o `}` w m a oLU ° z LU SHEET ID UNCLASSIFIED//FOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC REG. #: P-1582 CG503 CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 K3 4 I UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 n. 9 1 10 EROSION CONTROL NARRATIVE: THE PURPOSE OF THIS LAND DISTURBANCE IS TO CONSTRUCT A MILITARY OPERATIONS SUPPORT FACILITY. THE FACILITY WILL INCLUDE A 17,000 SQUARE FOOT BUILDING, APPROXIMATELY 100 PARKING SPACES, AND STORMWATER G QUALITY AND QUANTITY CONTROL MEASURES. EROSION CONTROL FOR THE PROJECT WILL BE SEPARATED INTO THREE PHASES. THROUGHOUT EACH PHASE, AND THEREFORE THE DURATION OF CONSTRUCTION, EROSION AND SEDIMENT CONTROL DEVICES AND MEASURES WILL BE IMPLEMENTED AND MAINTAINED ACCORDING TO THE EROSION AND SEDIMENT CONTROL PLAN TO ENSURE THAT POLLUTANTS TO DOWNSTREAM WATERS WILL BE MINIMIZED TO THE GREATEST POSSIBLE EXTENT. F E I IN IV n STARTDATE OCT. THIS SCHEDULE IS TO BE USED FOR PERMITTING PURPOSES ONLY. REFER END DATE APR. 2021 TO APPROVED PROJECT SCHEDULE FOR EXACT CONSTRUCTION SEQUENCING. DESCRIPTION SEVEN DAY EC INSPECTION & LETTER CLEARING, GRUBBING, GRADING 1,,,,,,11„■ ■■■■ 1„11„11„11„11„11„11„11„11„11„11„11„11„11„11„11„1 TEMPORARY - 111111111■■ 1:01■01■01■01■01■01■01■■11■■11■■1=11■01■01■01111 MAINT. OF EROSION CONTROL DEVICES 1,,,,,,11„11„11„11„11„11„11„11„11„11„11„11„11„11„11„11„11„11„■ DISPOSITIONBUILDING CONSTRUCTION CLEARING OF STORM DRAINS FINAL LANDSCAPING . HARVESTING PERIOD EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST The following items shall be incorporated with respect to specific site conditions, in an erosion & sedimentation control plan: NPDES Construction Stormwater General Permit NCG010000 Designation on the plans where the 7 or 14 day ground stabilization requirements apply per Section II.B.2 of the permit. _ Design of basins with one acre or more of drainage area for surface withdrawal as per Section II.B.4 of the permit. LOCATION INFORMATION r _ Project location & labeled vicinity map (roads, streets, landmarks) North arrow and scale Identify River Basin. Provide a copy of site located on applicable USGS quadrangle and NRCS Soils maps if it is in a River Basin with Riparian Buffer requirements. GENERAL SITE FEATURES (Plan elements) N1A Property lines & ownership ID for adjoining properties Existing contours (topographic lines) Proposed contours Limits of disturbed area (provide acreage total, delineate limits, and label). Be sure to include all access to measures, lots that will be disturbed, and utilities that may extend offsite. Planned and existing building locations and elevations Planned & existing road locations & elevations, including temporary access roads r Lot and/or building numbers Hydrogeologic features: rock outcrops, seeps, springs, wetland and their limits, streams, lakes, ponds, dams, etc. (include all required local or state buffer zones and any DWQ Riparian Buffer determinations) VA Easements and drainageways, particularly required for offsite affected areas. Include copies of any recorded easements and/or agreements with adjoining property owners. Profiles of streets, utilities, ditch lines, etc. N A Stockpiled topsoil or subsoil locations N If the same person conducts the land -disturbing activity & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land -disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person, they shall be considered separate land -disturbing activities and must be permitted either through the Sedimentation Pollution Control Act as a one -use borrow site or through the Mining Act. N/A Location and details associated with any onsite stone crushing or other processing of material excavated. If the affected area associated with excavation, processing, stockpiles and transport of such materials will comprise 1 or more acres, and materials will be leaving the development tract, a mining permit will be required. NSA_ Required Army Corps 404 permit and Water Quality 401 certification (e.g. stream disturbances over 150 linear feet) EROSION & SEDIMENT CONTROL MEASURES (on plan) Legend (provide appropriate symbols for all measures and reference them to the construction details) Location of temporary measures _ Location of permanent measures _ Construction drawings and details for temporary and permanent measures. Show measures to scale on plan and include proposed contours where necessary. Ensure design storage requirements are maintained through all phases of construction. Maintenance requirements for measures Contact person responsible for maintenance SITE DRAINAGE FEATURES Existing and planned drainage patterns (include off -site areas that drain through project and address temporary and permanent conveyance of stormwater over graded slopes) Method used to determine acreage of land being disturbed and drainage areas to all proposed measures (e.g. delineation map) Size, pipe material and location of culverts and sewers Soil information: type, special characteristics Soil information below culvert storm outlets Name and classification of receiving water course or name of municipal operator (only where stormwater discharges are to occur) STORMWATER CALCULATIONS Pre -construction runoff calculations for each outlet from the site (at peak discharge points). Be sure to provide all supporting data for the computation methods used (rainfall data for required storm events, time of concentration/storm duration, and runoff coefficients). Design calculations for peak discharges of runoff (including the construction phase & the final runoff coefficients for the site) Design calcs for culverts and storm sewers (include HW, TW and outlet velocities) N_/A Discharge and velocity calculations for open channel and ditch flows (easement & rights -of -way) /A Design calcs for cross sections and method of stabilization for existing and planned channels (include temporary linings). Include appropriate permissible velocity and/or shear stress data. Design calcs and construction details for energy dissipaters below culvert and storm sewer outlets (include stone/material specs & apron dimensions). Avoid discharges on fill slopes. Design calcs and dimension of sediment basins (note current surface area and dewatering standards as well as diversion of runoff to the basins). Be sure that all surface drains, including ditches and berms, will have positive drainage to the basins. VEGETATIVE STABILIZATION Area & acreage to be stabilized with vegetation _ Method of soil preparation Seed type & rates (temporary & permanent) Fertilizer type and rates Mulch type and rates (include mulch anchoring methods) NOTE: Plan should include provisions for groundcover in accordance with NPDES Construction Stormwater General Permit NCG010000. FINANCIAL RESPONSIBILITY/OWNERSHIP FORM Completed, signed & notarized FR/O Form Accurate application fee payable to NCDEQ ($65.00 per acre rounded up the next acre with no ceiling amount) N/A Certificate of assumed name, if the owner is a partnership N/A Name of Registered Agent (if applicable) N/A Copy of the most current Deed for the site. Please make sure the deed(s) and ownership information are consistent between the plan sheets, local records and this form. Provide latitude & longitude (in decimal degrees) at the project entrance. Two hard -copies of the plans (some regional offices require additional plans or multiple sizes; please contact the regional coordinator prior to such submittal.) NOTE: For the Express Permitting Option, inquire at the local Regional Office for availability. Express Reviews are performed by appointment only. NARRATIVE AND CONSTRUCTION SEQUENCE Narrative describing the nature & purpose of the construction activity. Construction sequence related to erosion and sediment control (including installation of critical measures prior to the initiation of the land -disturbing activity & removal of measures after areas they serve are permanently stabilized). Address all phases of construction and necessary practices associated with temporary stream bypasses and/or crossings. N /A Bid specifications related only to erosion control rev. 02222018 Practice Standards and Specifications A graveled area or ad located at points where vehicles enter and leave a Definition � p construction site. Purpose To provide a buffer area where vehicles can drop their mud and sediment to avoid transporting it onto public roads, to control erosion from surface runoff, and to help control dust. Conditions Where Wherever traffic will be leaving a construction site and moving directly onto a Practice Applies public road or other paved off -site area. Construction plans should limit traffic to properly constructed entrances. Design Criteria Aggregate Size —Use 2-3 inch washed stone. Dimensions of gravel pad — Thickness: 6 inches minimum Width: 12-feet minimum or full width at all points of the vehicular entrance and exit area, whichever is greater Length: 50-feet minimum Location —Locate construction entrances and exits to limit sediment from leaving the site and to provide for maximum utility by all construction vehicles (Figure 6.06a). Avoid steep grades, and entrances at curves in public roads. 2-3 " coarse aggregate Figure 6.06a Gravel entrance/exit keeps sediment from leaving the construction site (modified from Va SWCC). 0 6.06.1 Washing —If conditions at the site are such that most of the mud and sediment are not removed by vehicles traveling over the gravel, the tires should be washed. Washing should be done on an area stabilized with crushed stone that drains into a sediment trap or other suitable disposal area. A wash rack may also be used to make washing more convenient and effective. Construction 1. Clear the entrance and exit area of all vegetation, roots, and other Specifications objectionable material and properly grade it. 2. Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2- inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. References Runoff Conveyance Measures 6.30, Grass -lined Channels Sediment Traps and Barriers 6.60, Temporary Sediment Trap LOWE ENGINEERS, LLC REG. #: P-1582 r r US Army Corps of Engineers 10-09-19 o w 0 oCDz o w 0 _ U 00 rn W 7 00 2 U - < C� N J z �� o _ Q ww 20 Q00 z0o 0 0 m } 00 m p J00 IiT o m o LU LLI Z U' Z Y (n Q Q� W Q 00 w V1 W 2 0_ Y m 2 D 2 N Z 0 20 WU =0q -wQ 0 o� U�o Z W N o' z uS U g w � z w J U � C� Z U � � 0Z of 5; W � � > W �j = o� 2 Y OLLO o oz LLI 0- Quo o' ° z o U z0 � o- Q _Jz _ J Z) -8 w I— OZ z °6 O ~ L J J _�L �z0) o OOZ Z 0- J N O Q a-L Z m° O �o U O� Z LL O U) w SHEET ID CG504 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 I 2 I 3 I 4 I UNCLASSIFIEDHFORIOFFICIAL USE ONLY I 7 I 8 I 9 I 10 Practice Standards and Specifications • Practice Standards and Specifications Practice Standards and Specifications G F E JS Definition Planting rapid -growing annual grasses, small grains, or legumes to provide initial, temporary cover for erosion control on disturbed areas. Purpose To temporarily stabilize denuded areas that will not be brought to final grade for a period of more than 21 calendar days. Temporary seeding controls runoff and erosion until permanent vegetation or other erosion control measures can be established. In addition, it provides residue for soil protection and seedbed preparation, and reduces problems of mud and dust production from bare soil surfaces during construction. Conditions Where On any cleared, unvegetated, or sparsely vegetated soil surface where Practice Applies vegetative cover is needed for less than 1 year. Applications of this practice include diversions, dams, temporary sediment basins, temporary road banks, and topsoil stockpiles. Planning Annual plants, which sprout and grow rapidly and survive for only one season, Considerations are suitable for establishing initial or temporary vegetative cover. Temporary seeding preserves the integrity of earthen sediment control structures such as dikes, diversions, and the banks of dams and sediment basins. It can also reduce the amount of maintenance associated with these devices. For example, the frequency of sediment basin cleanouts will be reduced if watershed areas, outside the active construction zone, are stabilized. Proper seedbed preparation, selection of appropriate species, and use of quality seed are as important in this Practice as in Practice 6.11, Permanent Seeding. Failure to follow established guidelines and recommendations carefully may result in an inadequate or short-lived stand of vegetation that will not control erosion. Temporary seeding provides protection for no more than 1 year, during which time permanent stabilization should be initiated. Specifications Complete grading before preparing seedbeds, and install all necessary erosion control practices such as, dikes, waterways, and basins. Minimize steep slopes because they make seedbed preparation difficult and increase the erosion hazard. If soils become compacted during grading, loosen them to a depth of 6-8 inches using a ripper, harrow, or chisel plow. SEEDBED PREPARATION Good seedbed preparation is essential to successful plant establishment. A good seedbed is well -pulverized, loose, and uniform. Where hydroseeding methods are used, the surface may be left with a more irregular surface of large clods and stones. Liming —Apply lime according to soil test recommendations. Ifthe pH (acidity) of the soil is not known, an application of ground agricultural limestone at the P Definition Controlling runoff and erosion on disturbed areas by establishing perennial vegetative cover with seed. Purpose To reduce erosion and decrease sediment yield from disturbed areas, to permanently stabilize such areas in a manner that is economical, adapts to site conditions, and allows selection of the most appropriate plant materials. C Conditions Where Fine -graded areas on which permanent, long-lived vegetative cover is the Practice Applies most practical or most effective method of stabilizing the soil. Permanent seeding may also be used on rough -graded areas that will not be brought to final grade for a year or more. Areas to be stabilized with permanent vegetation must be seeded or planted within 15 working days or 90 calendar days after final grade is reached, unless temporary stabilization is applied. Introduction Duringthe initial phase ofall land disturbing projects, the protective layer, either natural or man-made, is removed from the earth's surface. As the protective layer is removed, the resulting bare areas are exposed to the natural forces of rainfall, freezing, thawing, and wind. The result is soil erosion that leads to sediment pollution of North Carolina streams, rivers, lakes, and estuaries. This design manual presents many alternative strategies for preventing erosion and reducing sediment loss during the construction process. Establishment B of protective vegetative cover during the construction project, however, is the crucial step in achieving soil stabilization, controlling soil erosion, and preventing sedimentation ofwaterways. Without a sufficient amount ofroot mat and leaf cover to protect and hold the soil in place, large volumes of soil will be lost and waterways will be degraded long afterprojects are considered complete. Sections of this practice standard address many of these various situations and set forth selection criteria for the appropriate cover based on purpose and adaptability. Some sediment and erosion control practices recommended in earlier editions of the manual may no longer be applicable. For example, many popular and commonly used seed and plant varieties have been identified as invasive. Invasive plants are defined as species that aggressively compete with, and displace, locally adapted native plant communities. In select cases where no practical alternative is available, these plants may be considered on a limited basis for soil stabilization, understanding that the goal is to eliminate the use of all invasive plants in favor of non-invasive native and/or introduced A species that will provide an equally acceptable vegetative cover. Where there is no alternative to the use of invasive species, measures need to be incorporated in the installation and maintenance of these plants to limit their impacts. rate of 1 to 1 1/2 tons/acre on coarse -textured soils and 2-3 tons/acre on fine - textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed. Fertilizer —Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700-1,000 lb/acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening —If recent tillage operations have resulted in a loose surface, additional roughening may not be required, except to break up large clods. If rainfall causes the surface to become sealed or crusted, loosen it just prior to seeding by disking, raking, harrowing, or other suitable methods. Groove or furrow slopes steeper than 3:1 on the contour before seeding (Practice 6.03, Surface Roughening). PLANT SELECTION Select an appropriate species or species mixture from Table 6.1Oa for seeding in late winter and early spring, Table 6.1Ob for summer, and Table 6.1 Oc for fall. In the Mountains, December and January seedings have poor chances of success. When it is necessary to plant at these times, use recommendations for fall and a securely tacked mulch. SEEDING Evenly apply seed using a cyclone seeder (broadcast), drill, cultipacker seeder, or hydroseeder. Use seeding rates given in Tables 6.1Oa-6.1Oc. Broadcast seeding and hydroseeding are appropriate for steep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty in achieving a uniform distribution. Small grains should be planted no more than 1 inch deep, and grasses and legumes no more than 1/2 inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a roller or cultipacker. Hydroseeded mixtures should include a wood fiber (cellulose) mulch. MULCHING The use of an appropriate mulch will help ensure establishment under normal conditions, and is essential to seeding success under harsh site conditions (Practice 6.14, Mulching). Harsh site conditions include: • seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use), • slopes steeper than 3: 1, • excessively hot or dry weather, • adverse soils (shallow, rocky, or high in clay or sand), and • areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as in channels, anchor mulch with netting (Practice 6.14, Mulching). It is imperative that disturbed soils be totally protected from erosion and sediment loss during construction and before a project is considered complete and acceptable. Installing appropriate vegetation in an immediate and timely fashion is the optimal means of achieving this stabilization. Vegetative specifications for most exposed soil conditions across North Carolina are provided in this section of the manual. It should be noted however, that no two sites in the State are exactly alike; therefore the protective vegetative cover for individual sites should be carefully selected. Each requires its own investigation, analysis, design and vegetative prescription as set forth in this section of the manual. This practice standard describes three stages of vegetative cover; immediate, primary and long term. Effective and acceptable stabilization can be provided only when the optimum combination of immediate, primary, and long term vegetative practices are applied. The vegetative measures presented in this chapter include application of seed, sod and sprigs. Use of field and container grown plants are not addressed in this manual. Planting of these types of vegetation is typically at spacing and intervals that will not provide the required protective cover. However, the design professional is encouraged to utilize these larger plants to compliment the required protective cover, particularly where these types of plants will provide seed for continued long term cover and wildlife habitat. PLANNING CONSIDERATIONS SOILS Test and analyze the type(s) and quality of the existing soils on a site, their pH ranges, and their nutrient levels. Taking soil samples from the different areas of the project site and having them tested at a state or independent lab will provide a baseline for determining the pH modifiers and additional nutrients required for the selected plant varieties. Disturbed conditions on a site may produce a variety of soil communities. Nutrient and pH levels in deeply cut soils will be quite different from those soils found on the original surface. When sites are highly disturbed through mechanical means such as grading, the soils become mixed together in many different ratios. These areas should be identified and tested. Results from soil tests will usually include recommended application rates of soil modifiers such as lime and fertilizer for the selected plant species in the particular soils. Application rates will be itemized in the report. The texture of the soil on a site, which is the proportion of sand, silt, and clay in the soil, is an important physical indicator of the site's ability to support vegetation. In heavy clay soils amendments may be necessary to provide an adequately drained planting medium. Conversely, in extremely sandy soils, amendments may be required to provide for moisture and nutrient retention. Maintenance Reseed and mulch areas where seedling emergence is poor, or where erosion occurs, as soon as possible. Do not mow. Protect from traffic as much as possible. References Site Preparation 6.03, Surface Roughening 6.04, Topsoiling Surface Stabilization 6.11, Permanent Seeding 6.14, Mulching Table 6.10a Temporary Seeding Recommendations for Late Winter and Early Spring Appendix 8.02, Vegetation Tables Seeding mixture Species Rate (lb/acre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. Seeding dates Mountains —Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont —Jan. 1 - May 1 Coastal Plain —Dec. 1 -Apr. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Ib/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Soil tests will indicate the texture of the given soil but will not provide recommendations for amendments that will improve the soil texture. Generally, the addition of organic materials will improve the porosity of heavy clay soils and improve the water holding capacity of extremely sandy soils. On sites where these different soil conditions exist, it is recommended that a design professional with experience in soil modification be employed to recommend the proper amendments. For more information visit the NCDA Agronomic Services Soil Testing web page http://www.agr.state.nc.us/agronomic/sthome.htm SOIL PREPARATION Proper soil preparation is necessary for successful seed germination and root establishment. It is also necessary for establishment of rooted sprigs, sod and wood plants. Heavily compacted soils prevent air, nutrients and moisture woody Y p from reaching roots thereby retarding or preventing plant growth. The success of site stabilization and reduction of future maintenance are dependent on an adequately prepared soil bed. Following are the requirements for preparation of areas to be vegetated by grassing, sprigging, sodding, and/or planting of woody plants: General Requirements: • Preparation for primary/permanent stabilization shall not begin until all construction and utility work within the preparation area is complete. However, it may be necessary to prepare for nurse crops prior to completion of construction and installation of utilities. • A North Carolina Department of Agriculture Soils Test (or equal) shall be obtained for all areas to be seeded, sprigged, sodded or planted. Recommended fertilizer and pH adjusting products shall be incorporated into the prepared areas and backfill material per the test. • All areas to be seeded or planted shall be tilled or ripped to a depth specified on the approved plans, construction sequence and/or construction bid list. Ripping consists of creating fissures in a criss-cross pattern over the entire surface area, utilizing an implement that will not glaze the side walls of the fissures. Site preparation that does not comply with these documents shall not be acceptable. The depth of soil preparation may be established as a range based on the approval of the reviewing state or local agency. Once tilled or ripped according to the approved plan, all areas are to be returned to the approved final grade. pH modifiers and/or other soil amendments specified in the soil tests can be added during the soil preparation procedure or as described below. • All stones larger than three (3) inches on any side, sticks, roots, and other extraneous materials that surface during the bed preparation shall be removed. Table 6.10b Temporary Seeding Recommendations for Summer Table 6.10c Temporary Seeding Recommendations for Fall Seeding mixture Species German millet Rate (Ib/acre) 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 lb/acre. Seeding dates Mountains —May 15 -Aug. 15 Piedmont —May 1 -Aug. 15 Coastal Plain —Apr. 15 -Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Seeding mixture Species Rate (lb/acre) Rye (grain) 120 Seeding dates Mountains —Aug. 15 - Dec. 15 Coastal Plain and Piedmont —Aug. 15 - Dec. 30 Soil amendments Follow soil tests or apply 2,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can he used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. Areas to be Seeded: • Till or disc the prepared areas to be seeded to a minimum depth of four (4) inches. Remove stones larger than three (3) inches on any side, sticks, roots and other extraneous materials that surface. If not incorporated during the soil preparation process, add pH modifier and fertilizers at the rate specified in the soil test report. • Re -compact the area utilizing a cultipacker roller. The finished grade shall be a smooth even soil surface with a loose, uniformly fine texture. All ridges and depressions shall be removed and filled to provide the approved surface drainage. Seeding of graded areas is to be done immediately after finished grades are obtained and seedbed preparation is completed. Areas to be Sprigged, Sodded, and/or Planted: • At the time of planting till or disc the prepared areas to a depth of four (4) to six (6) inches below the approved finished grade. Remove all stones larger than three (3) inches on any side, sticks, roots and other extraneous materials that surface. If not incorporated in the ripping process, add pH modifier, fertilizer, and other recommended soil amendments. • Re -compact the area utilizing a cultipacker roller and prepare final grades as described above. Install sprigs, sod and plants as directed immediately after fine grading is complete. Mulch, mat and/or tack as specified. VEGETATION Availability of seed and plant materials is an important consideration of any construction stabilization effort. Throughout North Carolina, climate, economics, construction schedule delays and accelerations, and other factors present difficult challenges in specifying the different vegetation needed for site stabilization. To help resolve this issue, vegetative stabilization requires consideration in three categories: ■ Immediate Stabilization — nurse crop varieties (Note: temporary mulching may be utilized for immediate stabilization if outlined on the approved plans and construction sequence.) ■ Primary Stabilization — plant varieties providing cover up to 3 years with a specified maintenance program ■ Long Term Stabilization — plant varieties providing protective cover with maintenance levels selected by the owner An adequate job in one of these areas does not guarantee success in the later phases. Horticultural maintenance must be included in the plans. Immediate vegetative cover will always require additional fertilization, soil amendments, soil tests, overseeding and/or other horticultural maintenance until primary vegetative cover is established. i 1 US Army Corps of Engineers 10-09-19 I���II o w 0 �CDz OU w 0 U 0� 00 0-)H W 7 2< U W U �N�NZ co o OU (fl S2 _ U)� U � Q ww 20 ¢C0 Z00 0 0 m } m m o JC0 �� o m o LLI Z Z Y t (n Q Q W Q 00 W V1 W 0 Y 2 D N Z cn< 0 o� (.0� U=o Z W N � _ Cn Er_z uS (n g w z_ W 7i U (nC� Z U0 >Z of 0> W irQ w U) U) Ld W w �j = E 2 Y OU_O O U) Z G_ W W Q 0Oz ¢�0 o' O O Z_ U ?O � < Q �z g J � N U7 w Oz z 06 O ~ 0 J J =wL �zM Lu OOZ Z�w J O� CV �O w Z m ,L O �O U OU) Z w O_ 0 O u1 SHEET ID LOWE ENGINEERS, LLC REG. #: P-1582 CG505 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 Practice Standards and Specifications 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY I 7 10 Where provisions are made for regular maintenance, primary vegetative cover may be the end result. An example of primary vegetative cover being acceptable as an end use would be lawns in residential and commercial developments that are established, monitored and complimented with regular G and approved horticultural maintenance practices. (See Example 6.11.a.) In projects where continual maintenance will not be provided or scheduled following the primary stabilization of a project, long-term stabilization will be necessary. Maintenance of initial and long-term stabilization can cease only after the long-term cover has established and hardened to local climatic conditions. Maintenance of long-term vegetation must be included in the project construction sequence and on the approved plans. Examples of areas suitable for long term vegetation include roadsides, reforestation areas, restored flood plains, restored riparian areas, phased closing of landfills, and mining reclamations. Complete stabilization requires using at least two, and most times, all three vegetative phases. The design professional must clearly communicate this point in their specifications, construction sequence, and in direct communications to owners and installers. The charts in tables 6.1 La through 6.1 Ld provide information to assist the design professional in this task. The tables are not F inclusive and are presented only as alternatives. The professional is expected and required to provide design and specifications that combine the information in the manual with knowledge of the particular sites and their constraints. pH AND NUTRIENT AMENDMENTS Determining the nutrients that enable seed and container plants to grow, flourish, and become established after planting are critical elements of the design and stabilization process. The soils tests previously described will provide a recipe for amendments based on particular plants and particular soils. The test results will recommend the amounts of base elements (nitrogen, phosphorous, potassium), pH modifiers and other trace elements that should to be added to the soil for selected species of seeds and plants. The acid/base characteristic of the soil is a primary component of soil fertility. If the soil acidity is not in the proper range, other nutrients will be ineffective, resulting in less productive plant growth. Most plants grow best in a pH range of 6.5 — 7.0 (slightly acidic to neutral). The soil tests will recommend the ( � Y ) E specific amendments and application rates required to achieve this range. These amendments must be incorporated into the soil (not applied on the surface) to be effective. (See the General Requirements for soil preparation specifications and timing for incorporation of soil amendments.) The base elements are easily found in bulk quantities. Lime can also be obtained in large quantities. They all must be thoroughly incorporated into the soil through appropriate mechanical means. Ground surface applications without proper soil mixing will result in poor results. In addition to the base fertilizers, other trace elements are needed to produce healthy and vigorous growth. These include but may not be limited to sulfur, manganese, zinc, boron, chlorine and molybdenum. If not already included with bulk mixes of the base elements, they can be obtained from commercial suppliers. I Practice Standards and Specifications D Native Seed and Plant Selection for Stabilization of Wetlands, Riparian Areas, and Floodplains Upon the completion of the land disturbing activity, vegetative cover must be established on all areas not stabilized by other means. If work in these areas stops for more than 15 working days, temporary vegetative cover and/ or matting must be applied to all disturbed areas. The goal is to protect these areas from erosion and to prevent sedimentation of adjacent streams, wetlands, lakes, and other water bodies. Planning considerations for wetlands, riparian areas and floodplains will require additional research, detail and specifications. Native grasses are usually required as a condition of a 401 Water Quality Certification or a trout buffer variance. Native vegetative species are plant species that naturally occur in the region in C which they evolved. These plants are adapted to local soil types and climatic variations. Because most native species do not germinate and establish as p readily as some introduced species, it is necessary to provide a non-native nurse crop or matting to stabilize the soil until the native crop can become established as the dominant cover. Once established, the native plants will produce an extensive root structure that, if properly maintained, will stabilize soils and reduce erosive forces of rainfall and overland stormwater flow. Many of these plants also possess characteristics that, when established, allow them not only to survive, but also to thrive under local conditions. Seeding a mixture of perennial native grasses, rushes, and sedges is a way to establish permanent ground cover within wetlands, riparian areas and floodplains. The use of propagated plants is another method of reestablishing natives in these environments. Selecting a seed mixture and/or propagated plants of different species with complimentary characteristics will provide vegetation to fill select niches on sites with varying physical conditions. The design professional should note that because most native species do not B germinate and establish as readily as some introduced species, it is necessary to provide a non-native nurse crop or matting to stabilize the soil until the native crop can become established as the dominant cover. For additional information about acceptable nurse crop varieties, consult the planting list in Appendix 8.02, local seed and plant suppliers, the North Carolina Cooperative Extension Service or a qualified design professional to assure the proper selection and plant mix. • Practice Standards and Specifications Provisions for soils test during and/or after initial grading is complete shall be included on the approved plan, in the approved construction sequence, and on the bid item list utilized for the project. If you did not obtain a soil test: Follow these recommendations for all grasses except centipedegrass. 1. Apply 75 pounds of ground limestone per 1,000 sq. ft. 2. Apply a starter type fertilizer (one that is high in phosphorus) based on the type of grass and planting method. Fertilizer bags have a three -number system indicating the primary nutrients, such as 8-8-8 or 5-10-10. These numbers denote the N-P-K ratio —the percentage of each nutrient in a fertilizer. The percentages are always noted in the following order: N Nitrogen for green color and growth. P205 Phosphorus for good establishment and rooting. K20 Potassium to enhance pest and environmental stress tolerance. Some common examples of starter type fertilizers required for a 1,000 sq. ft. area include 40 pounds of 5-10-10, 20 pounds of 10-20-20, or 16 pounds of 18-24-6. For sandy soils, typical to coastal plain and sandhills of North Carolina, fertilizer rates should be increased by 20 percent. Where available, it is recommended that the design professional specify organic compounds that meet the fertilization requirements, pH and other element requirements. Initial studies have indicated that these compounds have a more positive effect on the environment than some of the synthetic compounds used to manufacture inorganic fertilizers. These materials are readily available in the commercial trade as well as found in recycled yard waste debris, sewerage sludge, lime -stabilized sludge and animal manures. Materials proposed for use must be industry certified and/or privately tested and certified to be acceptable for proposed areas of use and application prior to approval. MULCHES AND TACKING AGENTS Mulches and tacking agents may be required or necessary to protect a seedbed's disturbed surface until the seed can germinate and provide the required protection from erosion. Selection of the materials used in this application should be based on their ability to hold moisture in the soil, as well as protect exposed soil from rainfall, storm water runoff, and wind. The availability of the selected material and the means to apply it are critical factors to consider when planning for the stabilization of an disturbed area. The mulch must p g Y cover a minimum of eighty (80) percent of the soil surface and must be secured by a tacking agent, crimping, or protective biodegradable netting. Netting that incorporates plastic mesh and/or plastic twine should not be used in wetlands, riparian buffers or floodplains due to the potential of small animal mortality. See Section 6.14 for detailed specifications and product applications. SOIL BLANKETS Soil blankets can be an acceptable and effective method of temporary sediment and erosion control in lieu of nurse crops. See Section 6.17 of the manual for descriptions of this product and how it can be used in conjunction with this section. In absence of mulches and tracking agents other means of protection may be necessary and required. PROTECTIVE MATTING Protective matting consists of an impervious cover secured to the soil surface in lieu of vegetative cover. It is used to protect and stabilize the surface where the process of seeding or planting forms of vegetation may cause more erosion and off -site sedimentation than application of the mat. It is also used where a disturbed area is intended to lay fallow for a period of time before additional construction or land disturbance takes place. If a pervious matting is selected, a combination of vegetation and matting is required. Seeds can be applied prior to installation of the matting only after proper seedbed preparation has been provided. Also, live stakes, dormant sprigs, and other vegetation forms can be inserted in the pervious matting once it has been installed. Pre - seeded pervious matting may be used for quicker root establishment and stabilization only if certified dating and germination guarantees are provided. The reviewing agency must approve all pre -seeded matting on site prior to installation. Matting that incorporates plastic mesh and/or plastic twine should not be used in wetlands, riparian buffers or floodplains due to the potential of small animal mortality. See Section 6.17 for detailed specifications and recommended product applications. STABILIZATION IN WETLANDS, RIPARIAN BUFFERS, AND FLOODPLAINS Land disturbing activity involving streams, wetlands or other waterbodies may also require permitting by the U.S. Army Corps of Engineers or the N.C. Division of Water Quality. Approval of an erosion and sedimentation control plan is conditioned upon the applicant's compliance with federal and State water quality laws, regulations, and rules. Additionally, a draft plan should be disapproved if implementation of the plan would result in a violation of rules adopted by the Environmental Management Commission to protect riparian buffers along surface waters. Care should be taken in selecting vegetative stabilization of wetlands and riparian buffers to comply with permitting requirements of other agencies, as well as provide adequate ground cover. Planning Considerations for Land Disturbing Activities Within Wetland, Riparian, and Floodplain Areas Wetlands, riparian areas, floodplains, and/or terrestrial areas between streams and uplands, serve to buffer surface water and provide habitat for aquatic and P p terrestrial flora and fauna. When cleared and disturbed, these sensitive areas are difficult to protect. Because of their proximity to water courses, relatively high ground water tables, and flooding potential, detailed analysis and design is necessary to determine the appropriate erosion control measures during construction. Determining the appropriate and most expeditious means of permanent vegetative stabilization in these areas requires equally detailed analysis and design. The following considerations for erosion control and stabilization should be taken into account during the design phase of the land disturbing project where sensitive areas are involved: • Obtain soil tests to determine the soil type, pH, texture and available nutrients. • Based on the soil tests provide a schedule of nutrients and other soil amendments that will be required. Practice Standards and Specifications • Permanent native seed species within the seed mixture should be selected based on natural occurrence of each species in the project site area. Climate, soils, topography, and aspect are major factors affecting the suitability ofplants for a particular site and these factors vary widely across North Carolina, with the most significant contrasts occurring among the three major physiographic regions of the state — Mountains, Piedmont, and Coastal Plain. Sub -regions of the state should also be considered. For example, the Triassic Basin in the Piedmont region may have characteristics that call for special soil treatment, limited plant selection, and special maintenance. Even within the riparian area, there may be need for different species depending on site conditions (i.e., dry sandy alluvial floodplains with wet pockets). Therefore, thoughtful planning is required when selecting species for individual sites in order to maximize successful vegetation establishment. Native seed and plant species are included on the plant list in Appendix 8.02 of this manual. The design professional should note that regardless of the benefits and advantages of native seeds and plants, there are potential issues if proper planning, installation and maintenance do not occur. These may include: • Potential for erosion or washout during the establishment stage; • Seasonal limitation on suitable seeding dates and availability of seed and plants; • Adaptability of species at specific sites; • Availability of water and appropriate temperatures during germination and early growth; and • Lack of maintenance to control invasive plants and undesirable competition. PLANTING • Seed — Prepare the seed bed as described above in soil preparation. Apply seed at rates specified on the plans, and/or as recommended in Tables 6.11a-c of this manual, with a cyclone seeder, prop type spreader, drill, or hydroseeder on and/or into the prepared bed. Incorporate the seed into the seed bed as specified. Provide finished grades as specified on the approved plan and carefully culti-pack the seedbed as terrain allows. If terrain does not allow for the use of a cultipacker, the approved plans and construction sequence must provide an alternative method of lightly compacting the soil. Mulch immediately. • Sprigs and Sod — Install onto the prepared seed bed per the most current guidance in Carolina Lawns, NCSU Extension Bulletin AG-69, or Practice 6.12 Sodding. • Woody plants (liners, container, B&B) — These materials are typically used to complement an herbaceous protective cover. They eventually are major components of long-term, permanent stabilization and should be chosen and planned in conjunction with immediate and long-term maintenance. The plants should be selected and specified by the design professional for each individual project. See Practice 6.13 Trees, Shrubs, Vines, and Ground Covers. MAINTENANCE The absence of or an incomplete landscape management specification and/ or complete maintenance schedule shall constitute grounds for disapproval of the plans. Proper maintenance is critical for the continued stabilization once vegetative cover is established. Although maintenance strategies for different sites may be similar, no two construction sites in North Carolina have been or will be able to be controlled or protected in identical ways. Variations in climate, topography, soils, available moisture, size and many other conditions will dictate the maintenance methodology to be used. A detailed schedule of maintenance will be required on the plans. This schedule will illustrate how the initial planting will be maintained to assure immediate, short term and permanent protection. The schedule will address topics such as appropriate irrigation of plants during the early establishment phase, drought conditions, excessive rainfall, mulch replacement, supplemental seeding, supplemental soils tests, application of nutrients and amendments, control of competitive and invasive species, disease and insect control, and corrective maintenance, measures to address failure of vegetation to become established. Contractual responsibility for maintenance after initial establishment of vegetative cover will be provided on the plans, in the construction sequence and on the bid list for the project. Maintenance bonds and/or warranty guarantee may be required of the responsible party, especially for areas in or adjacent to environmentally sensitive sites such as wetlands, riparian buffers, floodplains, and waters of the State. See Example 6.11a for a sample maintenance specification and a minimum maintenance check list that shall be provided on all plans. RECOMMENDED BID LIST (These items should be itemized on documents utilized to obtain pricing for planting pertaining to vegetative stabilization of land disturbing projects in North Carolina.) • Soil test prior to grading (price per each test). • Soil test during grading operations (price per each test). • Soil test at completion of grading and/or prior to seeding, sprigging, sodding and application of fertilizer, lime, and other soil amendments (price per each test). • Ripping/subsoiling to a depth of six (6) inches. (Provide an alternate for ripping to a depth greater than six (6) inches.) (price per acre) • Tilling/discing ripped area to a depth of four (4) inches and re -compacting with a cultipacker roller (include in seeding price). • Select a seeding mix of non-invasive species that will provide immediate stabilization (a short-term environment that will support and compliment permanent vegetative stabilization) and include a selective native species mix that will eventually provide a permanent cover (a long-term environment that, with minimal maintenance, will provide adequate root and leaf cover). • Invasive species are to be avoided. If native species and introduced non- invasive seed sources are not available, protective matting that will hold and foster the development of native cover from adjacent seed sources should be used. Continuous maintenance must be employed until the selected species have matured and are no longer susceptible to competition from invasive plants. If no alternative to the use of invasive seeds and plants is available, invasives approved on the plans may be utilized only with strict containment measures outlined in detail on the plans, in the construction sequence and in the maintenance specifications. • Aquickly germinating nurse crop ofnon-invasive, non-competitive annual grass species can be used along with native seeding and/or matting. These temporary systems should be planted at minimal density so that they do not inhibit the growth and establishment of the permanent, native species. (See the plant chart in Table 6.1 La for recommended native and nurse crop species.) • Seedbed preparation is key to successful establishment of seeds. Particular care should be taken, however, when working in wetlands, riparian areas, or floodplains due to their sensitive nature. Careful consideration should be given to the types and placement of large equipment working in these areas. This process must be outlined in detail on the plan's construction sequence. • Installation techniques vary and should be planned for accordingly. • A maintenance plan must be established for optimal plant establishment, submitted with the plans and included in the bid list for the project. Like all construction sites, wetlands, riparian areas, and floodplains will vary widely in physical makeup across North Carolina. Different conditions will dictate specific treatment, design and plant selection within the Mountains, Piedmont, and Coastal Plain regions. Soil tests, seedbed preparation, mulching, matting, and maintenance will be critical for successful vegetative establishment and long-term protection of these environmentally sensitive areas. Unavoidable impacts to these areas during land disturbing activities need to be addressed in detail on the plan sheets and construction sequence. • Seeding (price per square foot). • Mulching (price per square foot). • Repair seeding (price per square foot). • Repair mulching (price per square foot). • Matting (price per square yard). • Watering (price per thousand gallons). • Mowing (price per square foot). SEEDING RECOMMENDATIONS The following tables list herbaceous plants recommended for use as nurse crops for immediate stabilization and primary crops for initial and long-term stabilization. Nurse crops are expected to develop in two to five weeks and, with adequate maintenance, be an effective method of soil stabilization for a period of six months to one year. Nurse crops are not effective as primary long-term cover, however if properly maintained they can be an adequate cover and protection for the development of primary crops. The goal for a primary crop is for it to develop over a three-week to one-year period and be effective up to three years with a well-defined maintenance program. The long-term goal for a primary crop is the initial step toward a sustainable protective cover without the need of maintenance. Where the primary crop is intended for a managed lawn and landscape aesthetics, the effective period can be extended by a more intense maintenance program. Where native species are utilized and become established during the planned maintenance program, a permanent cover that will support future succession species should exist and require little or no additional maintenance or management. In uses of both nurse and primary crops, the development periods listed on the tables are optimal based on normal climatic conditions for the planting dates listed. The sediment and erosion control maintenance program must recognize that optimum temperatures and rainfall are the exception rather than the rule. The design professional needs to provide flexibility in the stabilization plan to address the potential ranges of temperature and moisture conditions we experience in North Carolina. Information is provided for seeding rates, optimum planting dates in the state's three regions, sun and shade tolerance, invasive characteristics, compatibility in wetlands and riparian buffers, and installation maintenance considerations. By going through the lists the design professional can select the nurse and primary seed varieties and maintenance characteristics they feel are best suited for their site conditions, vegetation management expertise and maintenance capabilities. To use the information in the seeding charts the plan preparer must: • Determine what nurse crop best fits their site, soil conditions, and permanent seed mix. • Obtain soil tests for all areas to be seeded. • Know the site's region: mountains, piedmont, or coastal plain. • Know if the areas to be seeded are sunny, part shade, or full shade. • Know if the areas are well or poorly drained. • Know if wetlands or riparian buffers are included in the areas to be seeded. Rev. 5/08 • Know if a chosen crop is invasive and if so, what potential impacts it will have on the site and adjacent properties. With this knowledge the plan preparation may proceed utilizing the charts provided to provide the several seed mixes that vKi WEa��WEE qR#icl_LC different areas requiring stabilization. REG. #: P-1582 i 1 US Army Corps of Engineers 10-09-19 O w 0 �CDz OU w 0 H U 00 M w 7 2< U wc� U �NJ�Z OU S2 o _ U)� U � Q ww 20 Qao Z00 0 0 co} m m p JC0 1- 0 m 0 Z (D Z Y i5<< LU<M­3Lu w h o Y 2 2i D 2i N Z 0 =0 cnU = CUD) H co< 0 o� �� Uo Z w N � _ � z CO U) g w z w 7 UU)3 Z U� UJZO O W w > W �j = 2 Y U_O z� OwQ 00Z ¢�� O O z U z O } Q�2 2F J -8 co U) w Oz z 06 O ~ L J J =11L 0� Z M LU OOZ Z�w J D_' CV �O w Z m ,_ O �O U OU) Z w O 0 O 0� w SHEET ID CG506 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY I 7 10 G F E Practice Standards and Specifications Table 6.11.d Seed Mixes for Native Species (Ibs/ac) When Mixed with 3, 4, or 5 Other Native Species (See Table 6.11.a for nurse crop species to be added to these mixes) 3 Other (total 4 species) 4 Other (total 5 species) 5 Other (total 6 species) Switch Grasses (A) 3.5 lbs. 3.0 lbs. 2.5 lbs. Indian Grasses (B) 7.0 lbs. 6.0 lbs. 5.0 lbs. Deertongue (C) 6.0 lbs. 5.0 lbs. 4.0 lbs. Big Bluestem (D) 7.0 lbs. 6.0 lbs. 5.0 lbs. Little Bluestem (E) 7.0 lbs. 6.0 lbs. 5.0 lbs. Sweet Woodreed (F) 2.5 lbs. 2.0 lbs. 1.5 lbs. Rice Cutgrass (G) 6.0 lbs. 5.0 lbs. 4.0 lbs. Indian Woodoats (H) 2.5 lbs. 2.0 lbs. 1.5 lbs. Virginia Wild Rye (1) 6.0 lbs. 5.0 lbs. 4.0 lbs. Eastern Bottlebrush Grass (J) 2.5 lbs. 2.0 lbs. 1.5 lbs. Soft Rush (K) 2.5 lbs. 2.0 lbs. 1.5 lbs. Sedges (L) 2.5 lbs. 2.0 lbs. 1.5 lbs. NOTE: With the native varieties, the seed mix should be in the range of 15 pounds per acre. Depending on availability of native seeds adaptable to North Carolina, the percentage of a particular variety used may be reduced or increased accordingly. Although diversity is desirable, it is imperative that the primary crop develop and become an effective protective cover. In addition to the native species mix, additional nurse crop species must be included to provide immediate stabilization and an adequate ground cover. Practice Standards and Specifications M Definition Application of a protective blanket of straw or other plant residue, gravel, or synthetic material to the soil surface. Purpose To protect the soil surface from the forces of raindrop impact and overland flow. Mulch fosters the growth of vegetation, reduces evaporation, insulates the soil, and suppresses weed growth. Mulch is frequently used to accent landscape plantings. C Conditions Where Mulch temporary or permanent seedings immediately. Areas that cannot be seeded because of the season should be mulched to provide temporary Practice Applies protection of the soil surface. Use an organic mulch in this case (but not wood fiber), and seed the area as soon as possible. Mulch around plantings of trees, shrubs, or ground covers to stabilize the soil between plants. Planning A surface mulch is the most effective, practical means of controlling runoff Considerations and erosion on disturbed land prior to vegetation establishment. Mulch reduces soil moisture loss by evaporation, prevents crusting and sealing of the soil surface, moderates soil temperatures, provides a suitable microclimate for seed germination, and may increase the infiltration rate of the soil. Organic mulches such as straw, wood chips, and shredded bark have been found to be the most effective. Do not use materials which may be sources of competing weed and grass seeds. Decomposition of some wood products can tie up significant amounts of soil nitrogen, making it necessary to modify fertilization rates, or add fertilizer with the mulch (Table 6.14a). B A variety of mats and fabrics have been developed in recent years for use as mulch, particularly in critical areas such as waterways and channels. Various types of netting materials are also available to anchor organic mulches. Chemical soil stabilizers or soil binders, when used alone, are less effective than other types of mulches. These products are primarily useful for tacking wood fiber mulches. The choice of materials for mulching should be based on soil conditions, season, type of vegetation, and size of the area. A properly applied and tacked mulch is always beneficial. It is especially important when conditions for germination are not optimum, such as midsummer and early winter, and on difficult areas such as cut slopes and slopes with southern exposures. ORGANIC MULCHES Straw is the mulch most commonly used in conjunction with seeding. The A straw should come from wheat or oats ("small grains"), and may be spread by hand or with a mulch blower. Straw may be lost to wind, and must be tacked down. • Practice Standards and Specifications Example 6.1 La GUIDELINES FOR WRITING MINIMUM LANDSCAPE MANAGEMENT SPECIFICATIONS Following is an outline that demonstrates what should be included in specifications that will insure the long term stabilization of disturbed sites in North Carolina. As noted before in this manual, each construction site in the state is unique and has features that will require special provisions for revegetation and stabilization. The outline provided below cannot address these individual sites. It is the responsibility of the design professional and the financially responsible party to see that the specifications are edited to fit their site and to assure that permanent stabilization is achieved. General Provisions A. Intent: 1. These specifications are prepared with the intent of promoting outstanding performance in long- term stabilization. They are to be used as guidelines in establishing sediment control and vegetative standards for the sites. Final technical decisions such as herbicides, fertilizer ratios, times of application and schedules are to be determined by the Contractor, who has the responsibility to obtain soil test and to manage the vegetation to achieve the desired results. The maintenance specifications must address maintenance for sediment and erosion control vegetation during construction and for permanent/long-term stabilization. B. Description of Work: 1. Perform all work necessary and required for the (insert period of contract) maintenance of the project as indicated on the drawings, in the project manual, and specified herein. 2. Licensing: a) Contractor shall provide verification of current, applicable pesticide applicator licensing for each applicator that will handle pesticides on the contracted sites. 3. Contract Administration a) Staffing: The Contractor shall provide adequate staffing, with the appropriate expertise, to perform all required work. b) Monthly Site Review meetings will be held. Attendees will include the Contractor's Project Manager and Site Foreman and the property manager or other representative designated by the financially responsible party. Result of site reviews will be documented and circulated to the attendees and the owner by the contractor. c) The Contractor will communicate with the proper person on a monthly basis to summarize work performed and immediately notify the project manager of any failure of the site to remain stabilized. II. Materials A. Soil Additives: Additives are to be applied per soils test taken prior to, during and after construction. (Use this section to provide the types and quantities of fertilizers, lime, and other soil amendments called for in the soils report. Include all soils test reports in the specifications document. This narrative or list should include quantities, rates, mixes, organic information, manufacturer, sources, and other information suggested in the soils test.) A. Pesticides: 1. Establish an Integrated Pest Management (IPM) program for the site that relies on targeted insect and disease control coupled with sound stabilization management and water management practices. 2. These specifications do not include pesticide treatments for infestations of Southern Pine Beetle, Gypsy Moth, or Fire Ants. The contractor shall notify the Owner if these pests are observed on site. 3. All pesticides shall be applied by a North Carolina licensed applicator in accordance with all State and Federal regulations and per manufacturer's recommendations. B. Mulches: Mulch for areas not subject to erosion and over wash by storm water should be called out in this section addressing its maintenance, replacement, removal and conversion to other uses. Those subject to erosion and over wash by storm water must be addressed on the plans and in the calculations. III. Execution A. General: 1. Good long term stabilization is based on the proper maintenance, management and balance of nutrients, soil moisture and general cultural practices. It is recognized that fewer fungicide and pesticide treatments as well as lower fertility rates are required with a well managed, balanced landscape. The following section is meant to promote this balance and therefore do not highlight specific quantitative standards. (Quantitative standards should be addressed as site specific by the design professional in conjunction with the owner and contractor.) Calendar references are general and are to be used only as a guide. Weather and soil conditions that are most appropriate for a given process, procedure and/or area of the state shall be the determining factor in scheduling work. B. Soil Tests: 1. After the soil test prior to stabilization, tests shall be made yearly in the fall to determine the required soil additives for all stabilized areas. If known nitrogen requirements are not specified by previous test, they need to be determined by the subsequent soils test and the proper applications made. Fertilizer ratios may be determined through analysis of the soil tests coupled with the contractor's experience and knowledge of the site. C. Mowing 1. Mowing for maintained turf/lawns a. Mow areas intended for "groomed appearance" on a schedule during the growing season and as required throughout the year to provide the desired appearance. (Establish a mowing frequency here that addresses the specific plant species used and their growing habits.) This frequency will be a minimum standard. Particular properties and their peculiar characteristics as well as individual plant species may require mowing more often than the stated minimum may be required. This should be noted in this section. b. The range of turf species suggested for lawns in the three growing regions of North Carolina vary as to optimum maintained height. The selected species should be maintained at a height recommended by the seed producer. Do not cut too short and do not allow the turf to attain a height that will cause the crop to decline or die. Consult individual seed producers and/or packaging for recommended mowing heights. C. Mow with a mulching mower to limit the amount of clippings removed, or mow and blow in such a manner that clippings are not evident and not to adversely effect the growing capacity Practice Standards and Specifications • Table 6.14a Mulching Materials and Application Rates Material Rate Per Acre Quality Organic Mulches Straw 1-2 tons Dry, unchopped, unweathered; avoid weeds. Wood chips 5-6 tons Air dry Wood fiber Bark Corn stalks Sericea lespedeza seed -bearing stems Nets and Mats' Jute net Fiberglass net Excelsior (wood fiber) mat Fiberglass roving Chemical Stabilizers2 0.5-1 tons 35 cubic yards Air dry, shredded or hammer -milled, or chips 4-6 tons Cut or shredded in 4-6 in. lengths. 1-3 tons Green or dry; should contain mature seed. Notes Should come from wheat or oats; spread by hand or machine; must be tacked down. Treat with 12 lbs nitrogen/ton. Apply with mulch blower, chip handler, or by hand. Not for use in fine turf. Also referred to as wood cellulose. May be hydroseeded. Do not use in hot, dry weather. Apply with mulch blower, chip handler, or by hand. Do not use asphalt tack. Apply with mulch blower or by hand. Not for use in fine turf. Cover area Heavy, uniform; woven Withstands waterflow. Best when of single jute yarn. used with organic mulch. Cover area Withstands waterflow. Best when used with organic mulch. Cover area Withstands waterflow. 0.5-1 tons Continuous fibers of Apply with a compressed air ejector. drawn glass bound Tack with emulsified asphalt at a together with a non -toxic rate of 25-35 gal/1,000 sq ft. agent. Aquatain follow Aerospray manufacturer's Curasol AK specifications Petroset SB Terra Tack Crust 500 Genaqua 743 M-145 'Refer to Practice No. 6.30, Grass Lined Channels. 2Use of trade names does not imply endorsement of product. Not beneficial to plant growth. nutrient deficiency in plants. This can be an inexpensive mulch if chips are obtained from trees cleared on the site. Bark chips and shredded bark are by-products of timber processing often used in landscape plantings. Bark is also a suitable mulch for areas planted to grasses and not closely mowed. It may be applied by hand or with a mulch blower. Unlike wood chips, the use of bark does not require additional nitrogen fertilizer. Wood fiber refers to short cellulose fibers applied as a slurry in hydroseeding operations. Wood fiber does not require tacking, although tacking agents or soil binders can easily be added to the slurry. Wood fiber hydroseeder slurries may be used to tack straw mulch on steep slopes, critical areas, and where harsh climatic conditions exist. Wood fiber mulch does not provide sufficient erosion protection to be used alone. There are other organic materials that make excellent mulches, but may only be available locally or seasonally, for example: dried sewage sludge, corn stalks, animal manure, pine boughs, cotton burs, peanut hulls, and hay. Creative use of these materials can reduce costs. CHEMICAL MULCHES AND SOIL BINDERS A wide range of synthetic mulching compounds is available to stabilize and protect the soil surface. These include emulsions or dispersions of vinyl compounds, asphalt, or rubber mixed with water. They may be used alone, or may be used to tack wood fiber hydromulches. When used alone, chemical mulches do not insulate the soil or retain moisture, and therefore do little to aid seedling establishment. They are easily damaged by traffic, are usually more expensive than organic mulches, and they decompose in 60-90 days. Check labels on chemical mulches and binders for environmental concerns. Take precautions to avoid damage to fish, wildlife, and water resources. NETS, MATS, AND ROVING Netting is very effective in holding mulch in place on waterways and slopes before grasses become established. Mats promote seedling growth in the same way as organic mulches. They are very useful in establishing grass in channels and waterways. A wide variety of synthetic and organic materials are available. "Excelsior" is a wood fiber mat, and should not be confused with wood fiber slurry. When installing nets and mats, it is critical to obtain a firm, continuous contact between the material and the soil. Without such contact, the material is useless, and erosion will occur underneath. Fiberglass roving consists of continuous strands of fiberglass which, when blown onto the soil surface from a special compressed air ejector, form a mat of glass fibers. This mat must then be tacked down with asphalt. and/or health of the existing vegetation turf. It is important clippings are allowed to remain spread throughout the lawn area, to the extent possible, so that they might aid in building a more productive soil profile and root zone. 2. Mowing other stabilized areas to promote continued growth. Include mowing specification here for other stabilized areas which require maintenance but not a "groomed" appearance. Also include specifications for mowing areas where it is desirable for woody native volunteer vegetation to become established. This should include attention to mowing stakes or other way of protecting the desired woody natives from the mowing operation. D. Watering 1. Irrigation System Maintenance and Monitoring: If stabilized areas are to be irrigated the design professional should include specifications for the system, its maintenance and its operation in this section. 2. In the absence of an automatic or manual irrigation system, provisions for providing adequate water to stabilized areas should be addressed in this section. 3. (Provisions should be made in this section for adjustments to application rates of water during times of regulated droughts and/or periods of excessive rainfall.) E. CONTROL OF INVASIVES: Competition from invasive species can be detrimental to the establishment of the permanent vegetative cover. Left unchecked, these invasives can undermine a revegetation process in a short period of time and eventually lead to unprotected soil and sediment damage. Make site observations monthly to check for the presence of such species and, if found, treat them immediately with the appropriate cultural practices and/or by the use of seasonally -appropriate and site appropriate herbicides. F. Maintenance items including fertilization, mowing, continued soils testing, repair, mulching, matting and soil preparation are to be addressed in the approved construction sequence and on the project bid list. Construction Select a material based on site and practice requirements, availability of Specifications material, labor, and equipment. Table 6.14a lists commonly used mulches and some alternatives. Before mulching, complete the required grading, install sediment control practices, and prepare the seedbed. Apply seed before mulching except in the following cases: • Seed is applied as part of a hydroseeder slurry containing wood fiber mulch. • A hydroseeder slurry is applied over straw. APPLICATION OF ORGANIC MULCH Organic mulches are effective where they can be tacked securely to the surface. Material and specifications are given in Table 6.14a. Spread mulch uniformly by hand, or with a mulch blower. When spreading straw mulch by hand, divide the area to be mulched into sections of approximately 1,000 ft2, and place 70-90 lb of straw ( 1 1/2 to 2 bales) in each section to facilitate uniform distribution. After spreading mulch, no more than 25% of the ground surface should be visible. In hydroseeding operations a green dye, added to the slurry, assures a uniform application. ANCHORING ORGANIC MULCH Straw mulch must be anchored immediately after spreading. The following methods of anchoring mulch may be used: Mulch anchoring tool -A tractor -drawn implement designed to punch mulch into the soil, a mulch anchoring tool provides maximum erosion control with straw. A regular farm disk, weighted and set nearly straight, may substitute, but will not do a job comparable to the mulch anchoring tool. The disk should not be sharp enough to cut the straw. These methods are limited to slopes no steeper than 3: 1, where equipment can operate safely. Operate machinery on the contour. Liquid mulch binders -Application of liquid mulch binders and tackifiers should be heaviest at the edges of areas and at crests of ridges and banks, to resist wind. Binder should be applied uniformly to the rest of the area. Binders may be applied after mulch is spread, or may be sprayed into the mulch as it is being blown onto the soil. Applying straw and binder together is the most effective method. Liquid binders include asphalt and an array of commercially available synthetic binders. Emulsified asphalt is the most commonly used mulch binder. Any type thin enough to be blown from spray equipment is satisfactory. Asphalt is classified according to the time it takes to cure. Rapid setting (RS or CRS designation) is formulated for curing in less than 24 hours, even during periods of high humidity; it is best used in spring and fall. Medium setting (MS or CMS) is formulated for curing within 24 to 48 hours, and slow setting (SS or CSS) is formulated for use during hot, dry weather, requiring 48 hours or more curing time. i 1 US Army Corps of Engineers 10-09-19 O w 0 �CDz OU w 0 U 00 0-)H 7)7 2< N wZ� (Dw N co J Z 0 U)oU _ U� � a ww 20 <00 z0o 0 0 m } m m p J00 LLB 0 m UJ Z 2 Z Y - cnaa wam wi-n w ()f Y 2 2i D 2i N Z 0 =0 cnU =cnH cn< 0 o� co U =o Z w N � z uS U) g wiz w U (DZ U0 ZOO W ir< w > U)� W w �j = 2 Y OU_O U) o UJ 0z Quo fr_ O �z o U z O _z < Q �g J � -8 w H Oz z 06 O~ L J W =wL � Z rn LU OOz Z 0_ J D_' CV moo" Z m ,_ O �O U OU) Z w O O w SHEET ID Wood chips are suitable for areas that will not be closely mowed, and around ornamental plantings. Chips do not require tacking. Because they decompose slowly, they must be treated with 12 pounds of nitrogen per ton to prevent UNCLASSIFIED//FOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC REG. #: P-1582 CG508 CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY Practice Standards and Specifications 0 7 1 8 1 9 1 10 Practice Standards and Specifications Practice Standards and Specifications G F E Apply asphalt at 0.10 gallons per square yard (10 gal/1,000 ft2). Heavier applications cause straw to "perch" over rills. In traffic areas, uncured asphalt can be picked up on shoes and cause damage to rugs, clothing etc. Use types RS or CRS to minimize such problems. Synthetic binders such as Petroset, Terratack, and Aerospray may be used, as recommended by the manufacturer, to anchor mulch. These are expensive, and therefore usually used in small areas or in residential areas where asphalt may be a problem (Use of trade names does not constitute an endorsement). Mulch nettings—Lightweight plastic, cotton, jute, wire, or paper nets may be stapled over the mulch according to the manufacturer's recommendations (see "Nets and Mats" below). Peg and twine —Because it is labor-intensive, this method is feasible only in small areas where other methods cannot be used. Drive 8-10 inch wooden pegs to within 3 inches of the soil surface, every 4 feet in all directions. Stakes may be driven before or after straw is spread. Secure mulch by stretching twine between pegs in a criss-cross-within-a-square pattern. Turn twine two or more times around each peg. Twine may be tightened over the mulch by driving pegs further into the ground. Vegetation —Rye (grain) may be used to anchor mulch in fall plantings, and German millet in spring. Broadcast at 15 lb/acre before applying mulch. CHEMICAL MULCHES Chemical mulches may be effective for soil stabilization if used between May 1 and June 15, or Sept. 15 and Oct. 15, provided that they are used on slopes no steeper than 4: 1, and that proper seedbed preparation has been accomplished, including surface roughening where required. Chemical mulches may be used to bind other mulches, or with wood fiber in a hydroseeded slurry at any time. Follow the manufacturer's recommendations for application. FIBERGLASS ROVING Fiberglass roving ("roving") is wound into a cylindrical package so that it can be continuously withdrawn from the center using a compressed air ejector. Roving expands into a mat of glass fibers as it contacts the soil surface. It is often used over a straw mulch, but must still be tacked with asphalt. Spread roving uniformly over the area at a rate of 0.25 to 0.35 lb/yd2. Anchor with asphalt immediately after application, at a rate of 0.25 to 0.35 gal/yd2. As a channel lining, and at other sites of concentrated flow, the roving mat must be further anchored to prevent undermining. It may be secured with stakes placed at intervals no greater than 10 feet along the drainageway, and randomly throughout its width, but not more than 10 feet apart. As an option to staking, the roving can be buried to a depth of 5 inches at the upgrade end and at intervals of 50 feet along the length of the channel. NETS AND MATS Nets alone generally provide little moisture conservation benefits and only NMOT #5 or washed stogy i NMOT #5 or #57 washed stone - Figure 6.51a Hardware cloth and gravel inlet protection 4W reax K� filtered limited erosion protection. Therefore, they are usually used in conjunction with an organic mulch such as straw. Except when wood fiber slurry is used, netting should always be installed over the mulch. Wood fiber may be sprayed on top of an installed net. Mats, including "excelsior" (wood fiber) blankets, are considered protective mulches and may be used alone, on erodible soils, and during all times of the year. Place the matting in firm contact with the soil, and staple securely. INSTALLATION OF NETTING AND MATTING Products designed to control erosion should be installed in accordance with manufacturer's instructions. Any mat or blanket -type product used as a protective mulch should provide cover of at least 30% of the surface where it is applied. Installation is illustrated in Figure 6.14a. 1. Apply lime, fertilizer, and seed before laying the net or mat. In channels, roll out strips of netting parallel to the direction of flow and over the protective mulch. Anchor netting in a 12-inch trench Figure 6.14a Installation of netting and matting (modified from Va. Div. of Forestry). 19-guage hardware cloth 6.55 ( mesh openings) -- T Construction 1. Uniformly grade a shallow depression approaching the inlet. Specifications 2. Drive 5-foot steel posts 2 feet into the ground surrounding the inlet. Space posts evenly around the perimeter of the inlet, a maximum of 4 feet apart. 3. Surround the posts with wire mesh hardware cloth. Secure the wire mesh to the steel posts at the top, middle, and bottom. Placing a 2-foot flap of the wire mesh under the gravel for anchoring is recommended. 4. Place clean gravel (NC DOT #5 or #57 stone) on a 2:1 slope with a height of 16 inches around the wire, and smooth to an even grade. 5. Once the contributing drainage area has been stabilized, remove accumulated sediment, and establish final grading elevations. 6. Compact the area properly and stabilized it with groundcover. Maintenance Inspect inlets at least weekly and after each significant (% inch or greater) rainfall event. Clear the mesh wire of any debris or other objects to provide adequate flow for subsequent rains. Take care not to damage or undercut the wire mesh during sediment removal. Replace stone as needed. A References Inlet Protection 6.52, Block and Gravel Inlet Protection 6.54, Rock Doughnut Inlet Protection North Carolina Department of Transportation Standard Specifications for Roads and Structures 12-inch overlap Join strips by anchoring and overlapping. Practice Standards and Specifications Definition A horseshoe shaped rock dam structure at a pipe inlet with a sediment storage area around the outside perimeter of the structure. To prevent sediment from entering, accumulating in and being transferred Purpose by a culvert or storm drainage system prior to stabilization of the disturbed drainage area. This practice allows early use of the storm drainage system. Conditions Where Rock pipe inlet protection may be used at pipes with a maximum diameter Practice Applies of 36 inches. This inlet protection may be used to supplement additional sediment traps or basins at the pipe outlet, or used in combination with an excavated sediment storage area to serve as a temporary sediment trap. Pipe inlet protection should be provided to protect the storm drainage system and downstream areas from sedimentation until permanent stabilization of the disturbed drainage area. Do not install this measure in an intermittent or perennial stream. Planning When construction on a project reaches a stage where culverts and other storm Considerations drainage structures are installed and many areas are brought to the desired grade, there is a need to protect the points where runoff can leave the site through culverts or storm drains. Similar to drop and curb inlets, culverts receiving runoff from disturbed areas can convey large amounts of sediment to lakes or streams. Even if the pipe discharges into a sediment trap or basin, the pipe or pipe system itself may clog with sediment. Design Criteria When used in combination with an excavated sediment storage area to serve as a temporary sediment trap, the design criteria for temporary sediment traps must be satisfied. The maximum drainage area should be 5 acres, and 3600 cubic feet of sediment storage per acre of disturbed drainage area should be provided. The minimum stone height should be 2 feet, with side slopes no steeper than 2: 1. The stone "horseshoe" around the pipe inlet should be constructed of Class B or Class I riprap, with a minimum crest width of 3 feet. The outside face of the riprap should be coved with a 12-inch thick layer of #5 or #57 washed stone. In preparing plans for rock pipe inlet protection, it is important to protect the embankment over the pipe from overtopping. The top of the stone should be a minimum of 1 foot below the top of the fill over the pipe. The stone should tie into the fill on both sides of the pipe. The inside toe of the stone should be no closer than 2 feet from the culvert opening to allow passage of high flows. The sediment storage area should be excavated upstream of the rock pipe inlet protection, with a minimum depth of 18 inches below grade. Flow 2. Start laying the net from the top of the channel or slope, and unroll it down the grade. Allow netting to lay loosely on the soil or mulch cover but without wrinkles —do not stretch. 3. To secure the net, bury the upslope end in a slot or trench no less than 6 inches deep, cover with soil, and tamp firmly as shown in Figure 6.14a. Staple the net every 12 inches across the top end and every 3 ft around the edges and bottom. Where 2 strips of net are laid side by side, the adjacent edges should be overlapped 3 inches and stapled together. Each strip of netting should also be stapled down the center, every 3 ft. Do not stretch the net when applying staples. 4. To join two strips, cut a trench to anchor the end of the new net. Overlap the end of the previous roll 18 inches, as shown in Figure 6.14a, and staple every 12 inches just below the anchor slot. Maintenance Inspect all mulches periodically, and after rainstorms to check for rill erosion, dislocation or failure. Where erosion is observed, apply additional mulch. If washout occurs, repair the slope grade, reseed and reinstall mulch. Continue inspections until vegetation is firmly established. References Surface Stabilization 6.11, Permanent Seeding Appendix 8.02, Vegetation Tables 0 Figure 6.55a Rock pipe inlet protection plan view and cross-section view Natural Ground 6.51 Definition A temporary measure of wire -mesh hardware cloth around steel posts supporting washed stone placed around the opening of a drop inlet. Purpose To prevent sediment from entering yard inlets, grated storm drains or drop inlets during construction. This practice allows early use of the storm drain system. Conditions Where To be placed around a catch basin or a drop inlet and where the flow is light to Practice Applies moderate. If heavy flow is anticipated, use the rock doughnut inlet protection method (Practice 6.54, Rock Doughnut Inlet Protection). It is also used where storm drain inlets are to be made operational before permanent stabilization of the disturbed drainage area. This method of inlet protection is effective where the inlet is expected to drain shallow sheet flow. The immediate land area around the inlet should be relatively flat (less than 1 percent) and located so that accumulated sediment can be easily removed. This practice must not be used near the edge of fill material and must not divert water over cut or fill slopes. Design Criteria Ensure that drainage areas do not exceed 1 acre per inlet. For securing the wire mesh hardware cloth barriers, use steel T posts. The posts need to be 1.25 lb/linear ft steel with a minimum length of 5 feet. Make sure the posts have projections to facilitate fastening the hardware cloth. Securely drive each stake into the ground to a minimum depth of 2 feet. The maximum spacing for the posts is 4 feet. The wire mesh should be at least a 19-gauge hardware cloth with a 1/4 inch mesh opening. The total height should be a minimum of 2 feet. Providing a flap of hardware cloth on the ground projecting away from the inlet can aid in removal of the stone at the project's completion. The sediment control stone, with a height of 16 inches, should have a outside slope of 2: 1. The top elevation of the structure must be at least 12 inches lower than the ground elevation downslope from the inlet. It is important that all storm flows pass over the structure into the storm drain and not bypass the structure. Temporary dikes below the structure may be necessary to prevent bypass flow. Soil excavated when constructing the sediment pool may be used for this purpose (Figure 6.51a). Practice Standards and Specifications Construction 1. Clear the area of all debris that might hinder excavation and disposal of Specifications spoil. 2. Install the Class B or Class I riprap in a semi -circle around the pipe inlet. The stone should be built up higher on each end where it ties into the embankment. The minimum crest width of the riprap should be 3 feet, with a minimum bottom width of 11 feet. The minimum height should be 2 feet, but also 1 foot lower than the shoulder of the embankment or diversions. 3. A 1 foot thick layer of NC DOT #5 or #57 stone should be placed on the outside slope of the riprap. 4. The sediment storage area should be excavated around the outside of the stone horseshoe 18 inches below natural grade. 5. When the contributing drainage area has been stabilized, fill depression and establish final grading elevations, compact area properly, and stabilize with ground cover. Maintenance Inspect rock pipe inlet protection at least weekly and after each significant (% inch or greater) rainfall event and repair immediately. Remove sediment and restore the sediment storage area to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage. Any riprap displaced from the stone horseshoe must be replaced immediately. After all the sediment -producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and provide permanent ground cover (Surface Stabilization). References Inletprotection 6.52, Block and Gravel Inlet Protection (Temporary) Sediment Trap and Barriers 6.60, Temporary Sediment Trap Surface Stabilization 6.15, Riprap North Carolina Department of Transportation Erosion & Sedimentation Guidelines for Division Maintenance Operation, 1993. Virginia Erosion and Sediment Control Handbook. 1992. STD & SPEC 3.08, Culvert Inlet Protection. pages III-46 - III-51 (Culvert Inlets Sediment Trap). LOWE ENGINEERS, LLC REG. #: P-1582 i 1 i���i US Army Corps of Engineers 10-09-19 O Li 0 ZCDz OU w 0 U 00 0-)H Lu7 2< U � LU U 00 J Z (� _ Q ww 20 Q00 Z°0 0 0 m } m m p J00 LLB 0 m Lu ui Z U Z Y H b cn QQ Lu Qm� _ Lu LU ofY 2 2i D N Z 0 =p wo T_U) co < 0 o� U o Z Lu N CO U) g w z_ w z 7i U o7 CD Z U� �� W Q u U) Lu W �j = 2 Y O z� owQ Cn 0Oz ¢�0 fr_ o O z _0 U z0 :—E } 2 2F J 8 Z 11 w I— Oz z 06 O~ 0 J J _�° Q� Z M LU OOZ Z0- J O� CV �O � Z m ,L O �O U O� Z U_ O U) O 0Y u1 SHEET ID CG509 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 1 2 1 3 Practice Standards and Specifications • 4 I UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 Practice Standards and Specifications 10 6.62 G F E C 0 Definition A temporary sediment control measure consisting of fabric buried at the bottom, stretched, and supported by posts. Purpose To retain sediment from small disturbed areas by reducing the velocity of sheet flows to allow sediment deposition. Conditions Where Below small -disturbed areas that are less then'/4 acre per 100 feet of fence. Practice Applies Where runoff can be stored behind the sediment fence without damaging the fence or the submerged area behind the fence. Do not install sediment fences across streams, ditches, or waterways, or other areas of concentrated flow. Sediment fence should be placed along topographic elevation contours, where it can intercept stormwater runoff that is in dispersed sheet flow. Sediment fence should not be used alone below graded slopes greater than 10 feet in height. Planning A sediment fence is a system to retain sediment on the construction site. The fence retains sediment primarily by retarding flow and promoting deposition. Considerations In operation, generally the fence becomes clogged with fine particles, which reduce the flow rate. This causes a pond to develop behind the fence. The designer should anticipate ponding and provide sufficient storage areas and overflow outlets to prevent flows from overtopping the fence. Since sediment fences are not designed to withstand high water levels, locate them so that only shallow pools can form. Tie the ends of a sediment fence into higher ground to prevent flow around the end of the fence before the pool reaches design level. Curling each end of the fence uphill in a "J" pattern may be appropriate to prevent end flow. Provide stabilized outlets to protect the fence system and release storm flows that exceed the design storm. Deposition occurs as the storage pool forms behind the fence. The designer can direct flows to specified deposition areas through appropriate positioning of the fence or by providing an excavated area behind the fence. Plan deposition areas at accessible points to promote routine cleanout and maintenance. Show deposition areas in the erosion and sedimentation control plan. A sediment fence acts as a diversion if placed slightly off the contour. A maximum slope of 2 percent is recommended. This technique may be used to control shallow, uniform flows from small disturbed areas and to deliver sediment -laden water to deposition areas. The anchoring of the toe of the fence should be reinforced with 12 inches of NC DOT #5 or #57 washed stone when flow will run parallel to the toe of the fence. Sediment fences serve no function along ridges or near drainage divides where there is little movement of water. Confining or diverting runoff unnecessarily with a sediment fence may create erosion and sedimentation problems that would not otherwise occur. Practice Standards and Specifications 8' max. standard strength fabric with wire fence 6' max. extra strength fabric without wire fence Steel post Plastic or ties /wire 18-24 Wire fence Natural ground --_------- _ _ - s.r... ----_ -- 8" down 4" forward along 24" the trench Filter fabric Wire fence Cross -Section View Filter Steel fabric Backfill trench Natural post and compact ground thoroughly m mm., m m mm. m o ms mm® •mm m o m o ° 04'0 ° • • ,m•. min ° °°m mmmmmmmm m mmm m m m m• 8° m m• m°.:.mmm min °O0.• .m mmm • •mmm•mmmmmm Figure 6.62a Installation detail of a sediment fence. Straw barriers have only a 0-20% trapping efficiency and are inadequate. Straw bales may not be used in place of sediment fence. Prefabricated sediment fence with the fabric already stapled to thin wooden posts does not meet minimum standards specified later in this section. Anchoring of sediment fence is critical. The toe of the fabric must be anchored in a trench backfilled with compacted earth. Mechanical compaction must be provided in order for the fence to effectively pond runoff. Design Criteria Ensure that drainage area is no greater than'/4 acre per 100 feet of fence. This is the maximum drainage area when the slope is less than 2 percent. Where all runoff is to be stored behind the fence, ensure that the maximum slope length behind a sediment fence does not exceed the specifications shown in Table 6.62a. The shorter slope length allowed for steeper slopes will greatly reduce the maximum drainage area. For example, a 10-20 % slope may have a maximum slope length of 25 feet. For a 100-foot length of sediment fence, the drainage area would be 25ft X 100ft = 2500sq.ft., or 0.06 acres. Table 6.62a Maximum Slope Length and Slope for which Sediment Fence is Applicable Slope Slope Length (ft) Maximum Area (ft2) <2% 100 10,000 2 to 5% 75 7,500 5 to 10% 50 5,000 10 to 20% 25 2,500 >20% 15 1,500 Make the fence stable for the 10-year peak storm runoff. Ensure that the depth of impounded water does not exceed 1.5 feet at any point along the fence. If non -erosive outlets are provided, slope length may be increased beyond that shown in Table 6.62a, but runoff from the area should be determined and bypass capacity and erosion potential along the fence must be checked. The velocity of the flow at the outlet or along the fence should be in keeping with Table 8.05d, Appendix 8.05. Provide a riprap splash pad or other outlet protection device for any point where flow may overtop the sediment fence, such as natural depressions or swales. Ensure that the maximum height of the fence at aprotected, reinforced g outlet does not exceed 2 feet and that support post spacing does not exceed 4 feet. The design life of a synthetic sediment fence should be 6 months. Construction MATERIALS Specifications 1. Use a synthetic filter fabric of at least 95% by weight of polyolefins or polyester, which is certified by the manufacturer or supplier as conforming to the requirements in ASTM D 6461, which is shown in part in Table 6.62b. Synthetic filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120' F. F6] The Slicing Method �Icndrrrg 1leicl-r* a05T SI'id:ItdG: rmx . 21'rr0A On 008n runs 4' rmi( On paring O e,1,. A•.rryi h fck�rir- ra upstream side cP pat ;LOW ---r 7rfve avar each side of FR Wi1GT rffl"I device exerting 60 p -s.i- or 2 Peet greater compacted soil cotrPrfa S%,M No more than 24" ofa 36' fabric is allowed above ground. Arr40"Ni DRAILS, • Gather tohric of post. h needed- • Uslize three ties por port, as within top 8' of tobric. • PoOw each le, dio9molly, punetudng holes verlicaly a rNnhwm of 1' apart. • Hang each le ona pool ripple and tighten aeoumN . use cable tes r0txl or son wie. 2uii of s I fcnco Fcrtxic ♦ I graur d :il- F �-i�:: J Horizontal chisel point SIICiw bldeie I 3., wridth 0.7' Pcsl Instead Omer cnmprx.WA Completed lin stolloWn Vibratory plow is not acceptob+o because of horizonta compacton Figure 6.62b Schematics for using the slicing method to install a sediment fence. Adapted from Silt Fence that Works 2. Ensure that posts for sediment fences are 1.25 lb/linear ft minimum steel with a minimum length of 5 feet. Make sure that steel posts have projections to facilitate fastening the fabric. 3. For reinforcement of standard strength filter fabric, use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches. Table 6.62b Specifications For Sediment Fence Fabric Temporary Silt Fence Material Property Requirements Supported' Un-Supported' Type of Test Material Units Silt Fence Silt Fence Value Grab Strength ASTM D 4632 N (lbs) Machine Direction 400 550 MARV (90) (90) X-Machine Direction 400 450 MARV (90) (90) Permittivityz ASTM D 4491 sec-1 0.05 0.05 MARV Apparent Opening Size2 ASTM D 4751 mm 0.60 0.60 Max. ARV3 (US Sieve #) (30) (30) % 70% after Ultraviolet Stability ASTM D 4355 Retained 500h of exposure 70% after 500h of exposure Typical Strength ' Silt Fence support shall consist of 14 gage steel wire with a mesh spacing of 150 mm (6 inches), or prefabricated poylmer mesh of equivalent strength. 2 These default values are based on empirical evidence with a variety of sediment. For environmentally sensitive areas, a review of previous experience and/or site or regionally specific geotextile tests in accordance with Test Method D 5141 should be performed by the agency to confirm suitability of these requirements. 3 As measured in accordance with Test Method D 4632. CONSTRUCTION 1. Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2. Ensure that the height of the sediment fence does not exceed 24 inches above the ground surface. (Higher fences may impound volumes of water sufficient to cause failure of the structure.) 3. Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next post. 4. Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence post. Wire or plastic zip ties should have minimum 50 pound tensile strength. 5. When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Support posts should be driven securely into the ground a minimum of 24 inches. 6. Extra strength filter fabric with 6 feet post spacing does not require wire mesh support fence. Securely fasten the filter fabric directly to posts. Wire or plastic zip ties should have minimum 50 pound tensile strength. Practice Standards and Specifications Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose or become ineffective, replace it promptly. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. References ASTM D 6461- 99. "Standard Specification for Silt Fence Materials" ASTM International. For referenced ASTM standards, visit the ASTM website, www.astm.org, or contactASTM Customer Service at service@astm.org. For Annual Book ofASTM Standards volume information, refer to the standard's Document Summary page on the ASTM website. ASTM D 6462 - 03. "Standard Practice for Silt Fence Installation" ASTM International. For referenced ASTM standards, visit the ASTM website, www.astm.org, or contactASTM Customer Service at service@astm.org. For Annual Book ofASTM Standards volume information, refer to the standard's Document Summary page on the ASTM website. C. Joel Sprague, PE, Silt Fence Performance Limits and Installation Requirements. Sprague and Sprague Consulting Engineers and TRU Environmental, Inc. Carpenter Erosion Control. http://www.tommy-sfin.com/ Kentucky Erosion Prevention and Sediment Control Field Manual, 2004. Runoff Control Measures 6.20, Temporary Diversions Outlet Protection 6.41, Outlet Stabilization Structure Appendix 8.03, Estimating Runoff 7. Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed line of posts and upslope from the barrier (Figure 6.62a). 8. Place 12 inches of the fabric along the bottom and side of the trench. 9. Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance. 10. Do not attach filter fabric to existing trees. SEDIMENT FENCE INSTALLATION USING THE SLICING METHOD Instead of excavating a trench, placing fabric and then backfilling trench, sediment fence may be installed using specially designed equipment that inserts the fabric into a cut sliced in the ground with a disc (Figure 6.62b). Installation 1. The base of both end posts should be at least one foot higher than the middle of the fence. Check with a level if necessary. Specifications 2. Install posts 4 feet apart in critical areas and 6 feet apart on standard applications. 3. Install posts 2 feet deep on the downstream side of the silt fence, and as close as possible to the fabric, enabling posts to support the fabric from upstream water pressure. 4. Install posts with the nipples facing away from the silt fabric. 5. Attach the fabric to each post with three ties, all spaced within the top 8 inches of the fabric. Attach each fie diagonally 45 degrees through the fabric, with each puncture at least 1 inch vertically apart. Also, each tie should be positioned to hang on a post nipple when tightened to prevent sagging. 6. Wrap approximately 6 inches of fabric around the end posts and secure with 3 ties. 7. No more than 24 inches of a 36 inch fabric is allowed above ground level. 8. The installation should be checked and corrected for any deviations before compaction. 9. Compaction is vitally important for effective results. Compact the soil immediately next to the silt fence fabric with the front wheel of the tractor, skid steer, or roller exerting at least 60 pounds per square inch. Compact the upstream side first, and then each side twice for a total of 4 trips. Practice Standards and Specifications Definition A layer of stone designed to protect and stabilize areas subject to erosion. Purpose To protect the soil surface from erosive forces and/or improve stability of soil slopes that are subject to seepage or have poor soil structure. Conditions Where Riprap is used for the following applications: Practice Applies m cut -and -fill slopes subject to seepage or weathering, particularly where conditions prohibit establishment of vegetation, • channel side slopes and bottoms, • inlets and outlets for culverts, bridges, slope drains, grade stabilization structures, and storm drains • streambank and stream grades, • shorelines subject to wave action. Planning Riprap is a versatile, highly erosion -resistant material that can be used Considerations effectively in many locations and in a variety of ways to control erosion on construction sites. GRADED VERSUS UNIFORM RIPRAP Riprap is classed as either graded or uniform. Graded riprap includes a wide mixture of stone sizes. Uniform riprap consists of stones nearly all the same size. Graded riprap is preferred to uniform riprap in most applications because it forms a dense, flexible cover. Uniform riprap is more open, and cannot adjust as effectively to movement of the stones. Graded riprap is also cheaper to install requiring less hand work for installation than uniform riprap, which must be placed in a uniform pattern. Uniform riprap may give a more pleasing appearance. Riprap sizes are designated by either the mean diameter or the weight of the stones. The diameter specification is often misleading since the stones are usually angular. However, common practice is to specify stone size by the diameter of an equivalent size of spherical stone. Table 6.15a lists some typical stones by weight, spherical diameter, and the corresponding rectangular dimensions. These stone sizes are based upon an assumed specific weight of 165 lb/ft. A method commonly used for specifying the range of stone sizes in graded riprap is to designate a diameter for which some percentage, by weight, will be smaller. For example, "d85" specifies a mixture of stones in which 85% of the stone by weight would be smaller than the diameter specified. Most designs are based on "d50", or median size stones. Riprap and gravel are often designated by N.C. Department of Transportation specifications (Table 6.15b). LOWE ENGINEERS, LLC REG. #: P-1582 1 1 US Army Corps L of Engineers J 10-09-19 O w oC)0 o 0 w < U � rn Q 0Lu Z)N a< Z (D ro U J SQ0U) r U- � ww :;im Ica <°o Z00 0 0 } m m p Jo0 E:- 0 m 0 H Z (D Z Y cn<Q w< Lu w F Y I 2i N Z o =p cnU T_U) cn < CD U�o Z w N co � z �U)Q w z_ w U u) O Z U � ZU- z < ~ U Lu LuV> wY w = 2 O �� u- �w0 d O0 Z < 0 O z z U O _JO Q 2 >J UJ F- O z Z 06 O 0� J J _"L Xz� 0 O O z J &OC-4 O0w z mu O �O U O ZO 0 w SHEET ID CG51 0 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 1 8 1 9 1 10 0 Table 6.15a Size or Riprap Stones G Mean Spherical Length Rectangular Shape Weight (lb) Diameter (ft) (ft) Width/Height (ft) 50 0.8 1.4 0.5 100 1.1 1.8 0.6 150 1.3 2.0 0.7 300 1.6 2.6 0.9 500 1.9 3.0 1.0 1000 2.2 3.7 1.3 1500 2.6 4.7 1.5 2000 2.8 5.4 1.8 4000 3.6 6.0 2.0 6000 4.0 6.9 2.3 8000 4.5 7.6 2.5 20000 6.1 10.0 3.3 source: Va SWCC When considering riprap for surface stabilization, it is important to anticipate visual impacts, including weed control, hazards from snakes and other animals, F danger of slides and hazards to areas below steep riprap slopes, damage and possible slides from children moving stones, and general safety. Proper slope selection and surface preparation are essential for successful long-term functioning of riprap. Adequate compaction of fill areas and proper use of filter blankets are necessary. Sequence of construction -Schedule disturbance of areas that require riprap protection so that the placement of riprap can follow immediately after grading. When riprap is used for outlet protection, place the riprap before or in conjunction with the installation of the structure so that it is in place before the first runoff event. Design Criteria Gradation-Riprap should be a well -graded mixture with 50% by weight larger than the specified design size. The diameter of the largest stone size in such a mixture should be 1.5 times the d50 size with smaller sizes grading down to 1 inch. E The designer should determine the riprap size that will be stable for design conditions. Having determined the design stone size, the designer should select the size or sizes that equal or exceed that minimum size based on riprap gradations commercially available in the area. Thickness -Construction techniques, dimensions of the area to be protected, size and gradation of the riprap, the frequency and duration of flow, difficulty and cost of maintenance, and consequences of failure should be considered when determining the thickness of riprap linings. The minimum thickness should be 1.5 times the maximum stone diameter, but in no case less than 6 inches. Quality of stone -Stone for riprap may consist of field stone or quarry stone. The stone should be hard, angular, of such quality that it will not break down IV 0 Figure 6.15b Riprap slope protection (modified from VDH&T). 6„ filb Table 6.15b Sizes for Riprap and Erosion Control Stone Specified by the N.C. Department of Transportation Take care not to damage the cloth when placing riprap. If damage occurs 6.12 remove the riprap, and repair the sheet by adding another layer of filter material with a minimum overlap of 12 inches around the damaged area. If extensive damage is suspected, remove and replace the entire sheet. S Where large stones are used or machine placement is difficult, a 4-inch layer of fine gravel or sand may be needed to protect the filter cloth. Stone placement -Placement of riprap should follow immediately after placement of the filter. Place riprap so that it forms a dense, well -graded mass of stone with a minimum of voids. The desired distribution of stones throughout the mass may be obtained by selective loading at the quarry, and controlled dumping during final placement. Place riprap to its full thickness in one operation. Do not place riprap by dumping through chutes or other methods that cause segregation of stone sizes. Take care not to dislodge the underlying base or filter when placing the stones. The toe of the riprap slope should be keyed to a stable foundation at its base as shown in Figure 6.15b. The toe should be excavated to a depth about 1.5 times the design thickness of the riprap, and should extend horizontally from the slope. The finished slope should be free of pockets of small stone or clusters of large stones. Hand placing may be necessary to achieve the proper distribution of stone sizes to produce a relatively smooth, uniform surface. The finished grade of the riprap should blend with the surrounding area. No overfall or protrusion of riprap should be apparent. �T in Maintenance In general, once a riprap installation has been properly designed and installed it requires very little maintenance. Riprap should be inspected periodically for scour or dislodged stones. Control of weed and brush growth may be needed A in some locations. References Runoff Conveyance Measures 6.31, Riprap-lined and Paved Channels Practice Standards and Specifications Riprap Erosion Control Class Class Class Class 1 2 A B 5 to 200 lb 25 to 250 lb 2" to 6" 5" to 15" 30% shall 60% shall weigh a weigh a minimum of 60 minimum of 100 Ibs each lb each No more than No more than 10% tolerance 10% shall 5% shall weigh top and bottom weigh less than less than 50 lb sizes 15 lb each each Equally Equally distributed, distributed, no gradation no gradation specified specified source: North Carolina Aggregates Association on exposure to water or weathering, and suitable in all other respects for the purpose intended. The specific gravity of the individual stones should be at least 2.5. Size of stone -The sizes of stones used for riprap protection are determined by purpose and specific site conditions. • Slope stabilization-Riprap stone for slope stabilization, not subject to flowing water or wave action, should be sized for stability for the proposed grade. The gradient of the slope to be stabilized should be less than the natural angle of repose of the stone selected. Angle of repose of riprap stones may be estimated from Figure 6.15a. Riprap used for surface stabilization of slopes does not add significant resistance to sliding or slope failure, and should not be considered a retaining wall. The inherent stability of the soil must be satisfactory before riprap is used for surface stabilization. Slopes approaching 1.5:1 may require special stability analysis. • Outlet protection -Design criteria for sizing stone, and determining the dimensions of riprap pads at channel or conduit outlets are presented in Practice 6.41, Outlet Stabilization Structure. • Channel stabilization and streambank protection -Design criteria for sizing stone for stability of channels are contained in Appendix 8.05. Filter blanket -A filter blanket is a layer of material placed between the riprap and the underlying soil to prevent soil movement into or through the riprap. Practice Standards and Specifications Definition Permanently stabilizing areas by laying a continuous cover of grass sod. Purpose To prevent erosion and damage from sediment and runoff by stabilizing the soil surface with permanent vegetation where specific goals might be: • to provide immediate vegetative cover of critical areas, • to stabilize disturbed areas with a suitable plant material that cannot be established by seed, or • to stabilize drainageways, channels, and other areas of concentrated flow where flow velocities will not exceed that specified for a grass lining (Appendix 8.05). Conditions Where Disturbed areas which require immediate and permanent vegetative cover, or Practice Applies where sodding is preferred to other means of grass establishment. Locations p P particularly suited to stabilization with sod are: • waterways and channels carrying intermittent flow at acceptable velocities (Appendix 6.05), • areas around drop inlets, when the drainage area has been stabilized (Practice 6.53, Sod Drop Inlet Protection), • residential or commercial lawns and golf courses where prompt use and aesthetics are important, and • steep critical areas. Planning Quality turf can be established with either seed or sod; site preparation for the Considerations two methods is similar. The practice of sodding for soil stabilization eliminates both the seeding and mulching operations, and is a much more reliable method of producing adequate cover and sediment control. However, compared to seed, sod is more difficult to obtain, transport, and store. Advantages of properly installed sod include: • immediate erosion and dust control, • nearly year-round establishment capability, • less chance of failure than with seedings, • freedom from weeds, and • rapid stabilization of surfaces for traffic areas, channel linings, or critical areas. Sod can be laid during times ofthe year when seeded grasses may fail, provided there is adequate water available for irrigation in the early weeks. Irrigation is essential, at all times of the year, to install sod. It is initially more costly to install sod than to plant seed. However, the higher cost may be justified for specific applications where sod performs better than seed. Mean Stone Size d5o, ft 1 43 ooti oo� 3 o01 41 39 m W aai 37 0 35 (D 0) Q 33 31 Emilmim-M.=00111 �iil■%�s�II�■ MEMO .1"M �00 11111111111111101111 MIC-Ass� IN � RTI . Mean Stone Size, d50, mm Figure 6.15a Angle of repose for different rock shapes and sizes. Adapted from: FH WA, HEC-15, pg. 49 - April 1988 X A suitable filter may consist of a well -graded gravel or sand -gravel layer or a synthetic filter fabric manufactured for this express purpose. The design of a gravel filter blanket is based on the ratio of particle size in the overlying filter material to that of the base material in accordance with the criteria below. The designed gravel filter blanket may consist of several layers of increasingly large particles from sand to erosion control stone. A gravel filter blanket should have the following relationship for a stable design: d15 filter 8� <_5 d15 filter 5 1lJ 5 Uase <_ 40 d50 filter 5d� <_ 40 In these relationships, filter refers to the overlying material, and base refers to the underlying material. These relationships must hold between the filter material and the base material (soil foundation), and between the riprap and the filter. More than one layer of filter material may be needed. Each layer of filter material should be at least 6 inches thick. In waterways and channels that carry concentrated flow, properly pegged sod is preferable to seed because it provides immediate protection. Drop inlets placed in areas to be grassed can be protected from sediment by placing permanent sod strips around the inlet (Practice 6.53, Sod Drop Inlet Protection). Sod also maintains the necessary grade around the inlet. Because sod is composed of living plants that must receive adequate care, final grading and soil preparation should be completed before sod is delivered. If left rolled or stacked, heat can build up inside the sod, causing severe damage and loss of costly plant material. Specifications Choosing appropriate types of sod -The type of sod selected should be composed of plants adapted to both the site and the intended purpose. In North Carolina these are limited to Kentucky bluegrass, tall fescue, bluegrass - tall fescue blends, fine -turf (hybrid) Bermudagrass, St. Augustinegrass, centi ede rass and zo sia ass. Species selection is primarily determined P g � Y >�' P p Y by region, availability, and intended use (Table 6.12a). Availability varies across the state and from year to year. New varieties are continually being developed and tested. A complete and current listing of sod recommendations can be obtained from suppliers or the State Agricultural Extension office. Sod composed of a mixture of varieties may be preferred becuuse of its broader range of adaptability. Table 6.12a Types of sod Available in North Carolina Region of Varieties Adaptation Cool Season Grasses: Kentucky blugrass blend' Mountains Tali fescue blend Adventure, Brookston, Mountains Falcon, Finelawn, and Piedmont Galway, Houndog, Jaguar, Olympic, Rebel Tall fescue/Kentucky Mountains bluegrass and Piedmont Warm Season Grasses: Hybrid Bermudagrass Vamont, Tifway, Tifway Piedmont and II & Tifgreen Coastal Plain Zoysiagrass Emerald, Meyer Piedmont and Coastal Plain Centipedegrass No improved varieties Piedmont and Coastal Plain St. Augustinegrass Raleigh Piedmont and Coastal Plain 'A large number of varieties exist -consult suppliers and your local Agricultural Extension office for recommendations. Practice Standards and Specifications A synthetic filter fabric may be used with or in place of gravel filters. The following particle size relationships should exist: • Filter fabric covering a base with granular particles containing 50% or less (by weight) of fine particles (less than U.S. Standard Sieve no. 200 [0.074mm]): a• d85 base (mm) >1 EOS* filter fabric (mm) b. total open area of filter should not exceed 36%. • Filter fabric covering other soils: a. EOS is no larger than U.S. Standard Sieve no. 70 (0.21mm), b. total open area of filter should not exceed 10%. *EOS - Equivalent opening size compared to a U.S. standard sieve size. No filter fabric should have less than 4% open area, or an EOS less than U.S. Standard Sieve No. 100 (0.15mm). The permeability of the fabric must be greater than that of the soil. The fabric may be made of woven or nonwoven monofilament yarns, and should meet the following minimum requirements: • thickness 20 - 60 mils, • grab strength 90 - 120 lb, and • conform to ASTM D-1682 or ASTM D-177. Filter blankets should always be provided where seepage is significant, or where flow velocity and duration of flow or turbulence may cause the underlying soil particles to move through the riprap. Construction Subgrade preparation -Prepare the subgrade for riprap and filter to the Specifications required lines and grades shown on the plans. Compact any fill required in the subgrade to a density approximating that of the surrounding undisturbed material or overfill depressions with riprap. Remove brush, trees, stumps, and other objectionable material. Cut the subgrade sufficiently deep that the finished grade of the riprap will be at the elevation of the surrounding area. Channels should be excavated sufficiently to allow placement of the riprap in a manner such that the finished inside dimensions and grade of the riprap meet design specifications. Sand and gravel filter blanket -Place the filter blanket immediately after the ground foundation is prepared. For gravel, spread filter stone in a uniform layer to the specified depth. Where more than one layer of filter material is used, spread the layers with minimal mixing. Synthetic filter fabric -Place the cloth filter directly on the prepared foundation. Overlap the edges by at least 12 inches, and space anchor pins every 3 ft along the overlap. Bury the upstream end of the cloth a minimum of 12 inches below ground and where necessary, bury the lower end of the cloth or over lap with the next section as required. See Figure 6.14a Page 6.14.6. Practice Standards and Specifications Quality of sod -Use only high -quality sod of known genetic origin, free of noxious weeds, disease, and insect problems. It should appear healthy and vigorous, and conform to the following specifications: • Sod should be machine cut at a uniform depth of 1/2 - 2 inches (excluding shoot growth and thatch). • Sod should not have been cut in excessively wet or dry weather. • Sections of sod should be a standard size as determined by the supplier, uniform, and untorn. • Sections of sod should be strong enough to support their own weight, and retain their size and shape when lifted by one end. • Harvest, delivery, and installation of sod should take place within a period of 36 hours. Soil preparation -Test soil to determine the exact requirements for lime and fertilizer. Soil tests may be conducted by the State soil testing lab or a reputable commercial laboratory. Information on free soil testing is available from the Agronomic Division of the North Carolina Department of Agriculture or the Agricultural Extension Service. Where sodding must be planned without soil tests the following soil amendments may be sufficient: • Pulverized agricultural limestone at a rate of 2 tons/acre (100 lb/1,000 ftz) • Fertilizer at a rate of 1,000 lb/acre (25 lb/1,000 ftz) of 10-10-10 in fall or 5-10-10 in spring. Equivalent nutrients may be applied with other fertilizer formulations. These amendments should be spread evenly over the area, and incorporated into the top 4-8 inches of soil by disking, harrowing, or other effective means. If topsoil is applied, follow specifications given in Practice 6.04, Topsoiling. Prior to laying sod, clear the soil surface of trash, debris, roots, branches, stones, and clods larger than 2 inches in diameter. Fill or level low spots in order to avoid standing water. Rake or harrow the site to achieve a smooth and level final grade. Complete soil preparation by rolling or cultipacking to firm the soil. Avoid using heavy equipment on the area, particularly when the soil is wet, as this may cause excessive compaction, and make it difficult for the sod to take root. Sod installation -A step-by-step procedure for installing sod is illustrated in Figure 6.12a and described below. 1. Moistening the sod after it is unrolled helps maintain its viability. Store it in the shade during installation. 2. Rake the soil surface to break the crust just before laying sod. During the summer, lightly irrigate the soil, immediately before laying the sod to cool the soil, reduce root burning, and dieback. LOWE ENGINEERS, LLC REG. #: P-1582 M US Army Corps of Engineers 10-09-19 I���II O w 0 �CDz OU w H U � 00 rn W 7 U < CD 0 N J Zco (� _ Q wW 20 Qa0 Z00 0 0 m } m m Q J00 �� 0 m UJ Z c� Z Y - cnaa3:wam wi-n W 2 Of Y_ 2 D N Z 0 _ 0 cn U _ U) co < 0 o� U�o Z W N � _ CO U) g W z_ W z 7i U U) CD Z U0 Z Of �0> W EEQ w U)� W w �j = 2 Y OLLO O U) Z 0 w W Q 0Oz ¢�0 O O z _0 U ?O < _F z g J -8 00 U) w OZ z 06 O ~ 0 J J _wL H � Z M 0 OOZ Zw J O� CV � O U_Z 00 w O 0�O U OU) Z w O U) O Of w SHEET ID CG511 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION G F E 1 0 2 Lay sod in a staggered i pattern with strips butted tightly against each other. A �• ~'' t t,. ' `" �_ " sharpened mason's trowel can • be used to tuck down the ends and trim pieces. Kati[ �—�Mw.�w �[��w►i�� Correct Butting —angled ends caused by the automatic ML Incorrect sod cutting must be matched correctly. I � L�i I 11 Roll sod immediately to Water to a depth of 4 " Mow when the sod is es - achieve firm contact as soon as the sod is tablished (2-3 wks). Set with the soil. laid, and continue the mower high (2-3"). watering as needed. Figure 6.12a Proper installation of grass sod (modified from Va SWCC). EL. 220.00' 3. Do not sod on gravel, frozen soils, or soils that have been treated recently with sterilants or herbicides. 4. Lay the first row of sod in a straight line with subsequent rows placed paralled to and butting tightly against each other. Stagger strips in a brick -like pattern. Be sure that the sod is not streached or overlapped and that all joints are butted tightly to prevent voids. Use a knife or sharp spade to trim and fit irregularly shaped areas. 5. Install strips of sod with their longest dimension perpendicular to the slope. On slopes 3:1 or greater, or wherever erosion may be a problem, secure sod with pegs or staples. 6. As sodding of clearly defined areas is completed, roll sod to provide firm contact between roots and soil. 7. After rolling, irrigate until the soil is wet 4 inches below the sod. STORMWATER MANAGEMENT POND SCALE: NTS VEGETATED SIDE SLOPES PLANT WITH NON -CLUMPING TURF GRASS: TREES AND WOODY SHELVES NOT ALLOWED- FRONT AND SACK EMBANKMENT SLOPES REQUIRED TO BE VEGETATED. PRE-TREATMENT GRAVEL VERGES, FILTER STRIPS, GRASSED SWALES OR FOREBAYS REQUIRED TO SETTLE SEDIMENT AND PREVENT EROSION. RISER PROTECTION TRASH RACIVSCREEN OR OTHER DEVICE REQUIRED ----------TEMPORARYPOOL rd UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 5 6 Practice Standards and Specifications 8. Keep sodded areas moist to a depth of 4 inches until the grass takes root. This can be determined by gently tugging on the sod —resistance indicates that rooting has occurred. 9. Mowing should not be attempted until the sod is firmly rooted, usually 2-3 weeks. Sodded waterways —Sod provides a resilient channel lining, providing immediate protection from concentrated runoff and eliminating the need for installing mats or mulch. The following points apply to the use of sod in waterways: 1. Prepare the soil as described in Practice 6.30, Grass -lined Channels. The sod type must be able to withstand the velocity of flow specified in the channel design (Appendix 8.05). 2. Lay sod strips perpendicular to the direction of flow, with the lateral joints staggered in a brick -like pattern. Edges should butt tightly together (Figure 6.12b). Flow Lay sod across the '�-w,,,•• direction of flow. T Use pegs or stables to fasten sod firmly at the 6-1 0 ends of strips and in the center, or every 3-4' if the strips are long. When ready to mow, drive pegs or staples flush with the ground.Pe" or f i f staple ,i U,.._ M M •ya -... „A- At —. . In critical areas, secure ..,. `""`` •�� sod with netting and staples. Figure 6.12b Installation of sod in waterways (modified from Va SWCC). Practice Standards and Specifications 6.65I =10 EMBANKMENT MINIMUM WIDTH:10 FT FOR MAI NTENANCE ACCESS Definition Porous barriers installed inside a temporary sediment trap, skimmer basin, or sediment basin to reduce the velocity and turbulence of the water flowing EMERGENCY SPILLWAY through the measure, and to facilitate the settling of sediment from the water before discharge. EL. 224.00' Purpose Sediment traps and basins are designed to temporarily pool runoff water to EL. 223.00' allow sediment to settle before the water is discharged. Unfortunately, they are usually not very efficient due to high turbulence and "short-circuiting" EL. 222.92' flows which take runoff quickly to the outlet with little interaction with most of the basin. Porous baffles improve the rate of sediment retention by distributing \ the flow and reducing turbulence. This process can improve sediment retention. Conditions Where This practice should be used in any temporary sediment trap, skimmer basin, Practice Applies or temporary sediment basin. Planning Porous baffles effectively spread the flow across the entire width of a sediment Considerations basin or trap. Water flows through the baffle material, but is slowed sufficiently to back up the flow, causing it to spread across the entire width of the baffle (Figure 6.65a). ST RO M W AT E R MANAGEMENT POND RISER Spreading the flow in this manner utilizes the full cross section of the basin SCALE: NTS 3.0' SQUARE TRASH RACK (REQUIRED) 1114 \\\ 3" X 1" ORIFICE EL. 220.00' SMALL PERMANENT POOL TO REDUCE CLOGGING OF THE ORIFICE 2.0' i OUTLET PIPE EL. 219.50' — — ANTI -SEEP MEASURES ARE r.. RECOMMENDED EL. 222.92' 18" RCP which in turn reduces flow rates or velocity as much as possible. In addition, the turbulence is also greatly reduced. This combination increases sediment deposition and retention and also decreases the particle size of sediment captured. The installation should be similar to a sediment fence (Figure 6.65b). The fabric should be 700 g/mz coir erosion blanket (Figure 6.65c) or equal. A support wire across the top will help prevent excessive sagging if the material is attached to it with appropriate ties. 7 Table 6.12b Characteristics of the Principal Lawn Grasses Grown as Sod in North Carolina Species or Mixture Adaptation Maintenance Annual Mowing Mowing Shade Heat Cold Drought Wear Fertilizer Height Frequency z (lb N/1000 ft) (in.) Kentucky bluegrass good fair good good good 2.5-4 2 med. Kentucky bluegrass/ good good good good good 2.5-3 3 high Tall fescue Tall fescue good good good good good 2.5-3.5 3 high Hybrid Bermudagrass poor good poor excel. excel. 5-6 1 high Centipedegrass fair good poor good poor 0.5 1 low St. Augustinegrass good good poor good poor 2.5 2-3 med. Zoysiagrass fair good fair excel. good 1.5 1 high Adapted from Carolina Lawns, NCAES Bulletin no. AG-69. c� a E U L %A c 0 a Ln Ln ri U � i 4 LZ Ln sv Ln 3. After rolling or tamping to create a firm contact, peg or staple individual sod strips to resist washout during establishment. Jute or other netting material may be pegged over the sod for extra protection on critical areas. Maintenance After the first week, water as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod. Do not remove more than one-third of the shoot in any mowing. Grass height should be maintained between 2 and 3 inches unless otherwise specified. After the first growing season, established sod requires fertilization, and may also require lime. Follow soil test recommendations when possible, or use the rates in Table 6.12b. References Site Preparation 6.04, Topsoiling Surface Stabilization 6.11, Permanent Seeding Runoff Conveyance Measures 6.30, Grass -lined Channels Inlet Protection 6.53, Sod Drop Inlet Protection Appendices 8.02, Vegetation Tables 8.05, Design of Stable Channels and Diversions a aV d Q Ln ri r� Practice Standards and Specifications � 'ra L \ cu a ar - a -0 o ❑ Lu -{3 N � � 0 En Q] N N 0 U N 7 o 3 0 F_ t c� CD �C: E rn C os ay 0 co En o Cc a `� ♦� L L[7 7 C w� 0 as w L CID _0 8 I 9 I 10 BIO RETENTION CELL SCALE: NTS all •al ro ' Af -7 21NI'HR - SAND MEDIA SHOULD BE ASTM C33, AASHTO M 6/M 80, ASTM C330, AASHTO M195, OR EQUIVALENT SOIL MEDIA SHOULD BE SENT TO AN NC DEPT. OF AGRICULTURE LAB (OR ANOTHER REPUTABLE LAB) FOR ANALYSIS OF THE PHOSPHORUS INDEX (P-INDEX). SOIL MEDIA WITH P-INDICES EXCEEDING 50 ARE NOT TO BE USED. TOP/EMBANKMENT EL. 231.0' 3.0' SQUARE WEIR EL. 230.33' TWO "OPEN" SIDES "Y FOR TOTAL WEIR LENGTH OF 4' INV. EL. 226.50' 18" RCP 'TH, 1 9 eW THEPLUMNIG ilkowl S1lR�AGE le��:>�P13J1�1Fs�l�Tfl£ �f�f�ETEi�I.�l[ildl^�1`lr Practice Standards and Specifications Baffles need to be installed correctly in order to fully provide their benefits. Refer to Figure 6.65b and the following key points: • The baffle material needs to be secured at the bottom and sides using staples. • Most of the sediment will accumulate in the first bay, so this should be readily accessible for maintenance. Drape baft rmaUrial overvAre strand and securewith pias icties at plum and on wire awry 12w 9 Gauge miff High _.OAK - Tens WlreStrand UTNr Shall MSecurel To PostTo Spy Baffle Material Bale Trial I'the temporary sediment basin will be :onv rted to a permanent sstormwater basin e!f ,greater depth, the baffle height should be >ased on the pool depth during use as a arnporary sedinvint base Ae:Install three (3) coir fiber battles in basins drainage outlets with a spadingof 114 the isin lengft Twra (2)coirfibei baftlescan be italled In the basins less than 20 ft- In kmg1h th a spring of V3 the buln length. Extend 9 gauge wkete (basin side or insItalIT-postto andwr baffieto side of basin and secure to vertical Most 4' Max, rR�•wdy P•4 ii aiiii ii •i ........ i••a ii iii in'K[." r'i �! !�nn.nnu.[mu.....NN mii; 51 19 Gauge: Landmong apl+e I I I I I I I "'% 4 Sty Past 2 -( Depth I_ � 8aMel �rialshoul-d securedto hebottom Af)d :idu of-ba si a using '12B landse" staples Figure 6.65b Coir Fiber Baffle Detail Cross section of a porous baffle in a sediment basin. US Army Corps of Engineers' 10-09-19 O LU 0 0CDz OU w H U � 00 rn W N < LU U D N J Z OU (� S2 o _ U)� U � Q ww 20 Q00 Z°0 0 0 m } m m 0 J00 lip 0 m C LUc� ILL] Z Z - W 2i O Y 2 2i::) N Z 0 =0 cnU =cnH co< 0 o� U�o Z W N zILL] U)Q z_ W 7 U O7 CD Z U� ZOO W Q cwU)> W U_ �j = Y OLLO o 0- OZ QtnO 0_ o z o U z0 Q J rn U) LU OZ z - °6 o L J J _�L 0� Z M LU OOZ Z�w J D' CV 0� �o L` z m ,� O �O U' U o z LL 0 l//••�� a/ J O LU SHEET ID UNCLASSIFIED//FOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC. REG. #: P-1582 CG512 CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 I UNCLASSIFIEDHFOR�OFFICIAL USE ONLY 7 1 8 1 9 1 10 G F E Practice Standards and Specifications Practice Standards and Specifications r t Figure 6.65d Close-up of a porous baffle. Figure 6.65c Example of porous baffles made of 700 g/m2 coir erosion blanket as viewed from the outlet. Design Criteria The temporary sedimenttrap ortemporary sedimentbasin should be sized using the appropriate design criteria. The percent of surface area for each section of the baffle is as follows: • inlet zone: 25% • first cell: 25% • second cell: 25% • outlet zone: 25% Baffle spacing in future permanent stormwater basins is beyond forebay. Be sure to construct baffles up the sides of the trap or basin banks so water does not flow around the structures. Most of the sediment will be captured in the inlet zone. Smaller particle size sediments are captured in the latter cells. Be sure to maintain access to the trap for maintenance and sediment removal. The design life of the fabric is 6-12 months, but may need to be replaced more often if damaged or clogged. 0 PVC End Cap v � 4 PVC Tee u The costs of using a skimmer system are similar, or occasionally less, than a conventional rock outlet or perforated riser. However, the basin is more efficient in removing sediment. Another advantage of the skimmer is that it can be reused on future projects. The main disadvantage of the skimmer is that it does require frequent maintenance, primarily in removing debris from the inlet. A skimmer must dewater the basin from the top of the water surface. The rate of dewatering must be controlled. A dewatering time of 2-5 days is required. Any skimmer design that dewaters from the surface at a controlled rate is acceptable. Arm Assembly PVC Elbow l PVC End Cap PVC Pipe _Ho Holes --in Underside Flexible Hose END VIEW "C' Enclosure Water Entry Unit PVC Vent Pipe Schedule 40� PVC Pipe 4 r� a v b _ . Schedule 40 PVC Pipe PVC Tee Orifice Plate Bottom Surface FRONT VIEW Figure 6.64a Schematic of a skimmer, from Pennsylvania Erosion and Sediment Pollution Control Manual, March, 2000. Construction MATERIALS Specifications 1. Use matting made of 100% coconut fiber (coir) twine woven into high strength matrix with the properties shown in Table 6.65a. 2. Staples should be made of 0.125 inch diameter new steel wire formed into a `U' shape not less than 12 inches in length with a throat of 1 inch in width. The staples anchor the porous baffles into the sides and bottom of the basin. 3. Ensure that steel posts for porous baffles are of a sufficient height to support baffles at desired height. Posts should be approximately 1-3/8" wide measured parallel to the fence, and have a minimum weight of 1.25 lb/linear ft. The posts must be equipped with an anchor plate having a minimum area of 14.0 square inches and be of the self -fastener angle steel type to have a means of retaining wire and coir fiber mat in the desired position without displacement. 4. Use 9-gauge high tension wire for support wire. Table 6.65a Specifications for Porous Baffle Material Coir Fiber Baffle Material Property Requirements Thickness 0.30 in. minimum Tensile Strength (Wet) 900 x 680 lb/ft minimum Elongation (Wet) 69% x 34% maximum Flow Velocity 10-12 ft/sec Weight 20 oz/SY 680 /m2 minimum Minimum Width 6.5 feet Open Area 50% maximum CONSTRUCTION 1. Grade the basin so that the bottom is level front to back and side to side. 2. Install the coir fiber baffles immediately upon excavation of the basins. 3. Install posts across the width of the sediment trap (Practice 6.62, Sediment Fence). 4. Steel posts should be driven to a depth of 24 inches and spaced a maximum of 4 feet apart. The top of the fabric should be a minimum of 6 inches higher than the invert of the spillway. Tops of baffles should be a minimum of 2 inches lower than the top of the earthen embankment. 5. Install at least three rows of baffles between the inlet and outlet discharge point. Basins less than 20 feet in length may use 2 baffles. 6. Attach a 9 gauge high tension wire strand to the steel posts at a height of 6 inches above the spillway elevation with plastic ties or wire fasteners to prevent sagging. If the temporary sediment basin will be converted to a permanent stormwater basin of a greater depth, the baffle height should be based on the pool depth during use as a temporary sediment basin. Practice Standards and Specifications SKIMMER ORIFICE DIAMETER The orifice of a skimmer should be selected in order to achieve the desired dewatering time. Three days is probably the optimal length of time for temporary sediment controls. It allows longer settling time for suspended solids remaining in the basin after a storm event, while dewatering the basin in less time than the average interval between rainfall events. Design criteria for permanent stormwater detention basins in the Division of Water Quality Stormwater BMP Manual require 2-5 days for dewatering. Procedure First determine the desired dewatering time in days (td) and the volume (V) of water to be released in that time period. Dividing the volume in cubic feet by the dewatering time in days gives a flow rate Qd in cubic feet per day. Qd = V / td (ft3/day) Next determine the head on the skimmer orifice. Table 6.64a has the values for various sizes of the Faircloth skimmer. Table 6.64a Head on orifice of various skimmer sizes Skimmer Size (in.) Head on Orifice (ft.) 1.5 0.125 2 0.167 2.5 0.208 3 0.25 4 0.333 5 0.333 6 1 0.417 8 0.5 The desired orifice diameter (D) in inches can now be calculated using the equation D = Qd /(2310 * V H) (inches) Example: Select a skimmer that will dewater a 20,000 ft' skimmer basin in 3 days. 1. Qd = V / td (ft3/day) = 20,000 ft3 / 3 days = 6670 (ft3/day). 2. Try a 4 inch skimmer, with H = 0.333 ft. (Table 6.64a) 3. D = Qd /(2310 * N H) (in.) = 6670 ft'/day /(2310 * OV 333 ft.) (in.) = 2.24 inches (Use 2'/4 inches) Maintenance References Practice Standards and Specifications Practice Standards and Specifications 7. Extend 9 gauge minimum high tension wire strand to side of basin or install steel T-posts to anchor baffle to side of basin and secure to vertical end posts as shown in Figure 6.65b. 8. Drape the coin fiber mat over the wire strand mounted at a height of 6 inches above the spillway elevation. Secure the coir fiber mat to the wire strand with plastic ties or wire fasteners. Anchor the matting to the sides and floor of the basin with 12 inch wire staples, approximately 1 ft apart, along the bottom and side slopes of the basin. 9. Do not splice the fabric, but use a continuous piece across the basin 10. Adjustments may be required in the stapling requirements to fit individual site conditions. Inspect baffles at least once a week and after each rainfall. Make any required repairs immediately. Be sure to maintain access to the baffles. Should the fabric of a baffle collapse, tear, decompose, or become ineffective, replace it promptly. Remove sediment deposits when it reaches half full, to provide adequate storage volume for the next rain and to reduce pressure on the baffles. Take care to avoid damaging the baffles during cleanout, and replace if damaged during cleanout operations. Sediment depth should never exceed half the designed storage depth. After the contributing drainage area has been properly stabilized, remove all baffle materials and unstable sediment deposits, bring the area to grade, and stabilize it. Sediment Traps and Barriers 6.60, Temporary Sediment Trap 6.61, Sediment Basins 6.62, Sediment Fence 6.64, Skimmer Sediment Basin McLaughlin, Richard, "Soil Facts: Baffles to Improve Sediment Basins." N.C. State University Cooperative Extension Service Fact Sheet AGW- 439-59, 2005. North Carolina Department of Transportation Erosion and Sedimentation Control Special Provisions Sullivan, Brian. City of High Point Erosion Control Specifications. Thaxton, C. S., J. Calantoni, and R. A. McLaughlin. 2004. Hydrodynamic assessment of various types of baffles in a sediment detention pond. Transactions of the ASAE. Vol. 47(3): 741-749. The desired dewatering time can also be achieved by adjusting the skimmer size and orifice diameter using the spreadsheet entitled "Sediment Control Measures", which is available at http://portal.ncdenr.org/web/Ir/links Figure 6.64b Example Excel Spreadsheet Skimmer Size (inches) Head on Skimmer (feet) Orifice Size (1/4 in increment) Dewatering Time (days) Skimincr Size Bead un Skimine {Inelics) (Feet) l.5 0.125 2 0.167 2.5 0.208 3 0.25 4 0.333 5 0.33:3 6 0.417 8 0.1 Adapted from training materials developed by Albert IL Jarrett, Ph.D. for Erosion and Sediment Control/Stormwater Certification for NC DOT Projects Level IIIA and IIIB, N.C. State University, Department of Biological and Agricultural Engineering, 2007. 6.64 N&I =1 1 -.10 Definition An earthen embankment suitably located to capture runoff, with a trapezoidal spillway lined with an impermeable geotextile or laminated plastic membrane, and equipped with a floating skimmer for dewatering. Purpose Sediment basins are designed to provide an area for runoff to pool and settle out a portion of the sediment carried down gradient. Past designs used a perforated riser for dewatering, which allowed water to leave the basin from all depths. One way to improve the sediment capture rate is to have an outlet which dewaters the basin from the top of the water column where the water is cleanest. A skimmer is probably the most common method to dewater a sediment basin from the surface. The basic concept is that the skimmer does not dewater the basin as fast as runoff enters it, but instead allows the basin to fill and then slowly drain over hours or days. This process has two effects. First, the sediment in the runoff has more time to settle out prior to discharge. Second, a pool of water forms early in a storm event and this further increases sedimentation rates in the basin. Many of the storms will produce more volume than the typical sediment basin capacity and flow rates in excess of the skimmer capability, resulting in flow over the emergency spillway. This water is also coming from the top of the water column and has thereby been "treated" to remove sediment as much as possible. (Adapted from SoilFacts: Dewatering Sediment Basins Using Surface Outlets. N. C. State University, Soil Science Department.) Conditions Where Skimmer sediment basins are needed where drainage areas are too large Practice Applies for temporary sediment traps. Do not locate the skimmer sediment basin in intermittent or perennial streams. Planning Select locations for skimmer basins during initial site evaluation. Install Considerations skimmer sediment basins before any site grading takes place within the drainage area. Select skimmer sediment basin sites to capture sediment from all areas that are not treated adequately by other sediment control measures. Always consider access for cleanout and disposal of the trapped sediment. Locations where a pond can be formed by constructing a low dam across a natural swale are generally preferred to sites that require excavation. Where practical, divert sediment -free runoff away from the basin. A skimmer is a sedimentation basin dewatering control device that withdraws water from the basin's water surface, thus removing the highest quality water for delivery to the uncontrolled environment. A skimmer is shown in Figure 6.64a. By properly sizing the skimmer's control orifice, the skimmer can be made to dewater a design hydrologic event in a prescribed period. Because the spillway is actually used relatively frequently, it should be carefully stabilized using geotextiles, or rock if necessary, that can withstand the expected flows. The spillway should be placed as far from the inlet of the basin as possible to maximize sedimentation before discharge. The spillway should be located in natural groundcover to the greatest extent possible Calculate Skimmer Size for Faircloth SkimmeroD Basin Volume in Cubic Feet �Cuf-t Skimmer Size 1.5 Inch Days to Drain' �Dae� crititie lka, iu5 0.7 Incttjes} 00ve Olafmtef 1r6 Inr.N(P i) ' rl4� 3'.- mmav n�c- ak-it i1r¢eskrareifc . 11"cisar7Ya►J-wtwiwrbesup i i Practice Standards and Specifications Design Criteria Summary: Skimmer Sediment Basin Primary Spillway: Trapezoidal spillway with impermeable membrane Maximum Drainage Area: 10 acres Minimum Volume: 1800 cubic feet per acre of disturbed area Minimum Surface Area: 325 square feet per cfs of Qlo peak inflow Minimum L/W Ratio: 2:1 Maximum L/W Ratio: 6:1 Minimum Depth: 2 feet Dewatering Mechanism: Skimmer Minimum Dewatering Time: 2 days Baffles Required: 3 baffles* (*Note: Basins less than 20 feet in length may use 2 baffles.) Drainage areas -Limit drainage areas to 10 acres. Design basin life -Ensure a design basin life of 3 years or less. Dam height -Limit dam height to 5 feet. Basin locations -Select areas that: • Provide capacity for storage of sediment from as much of the planned disturbed area as practical; • Exclude runoff from undisturbed areas where practical; • Provide access for sediment removal throughout the life of the project; • Interfere minimally with construction activities. Basin shape -Ensure that the flow length to basin width ratio is at least 2:1 to improve trapping efficiency. Length is measured at the elevation of the principal spillway. Storage volume -Ensure that the sediment storage volume of the basin, as measured to the elevation of the crest of the principal spillway, is at least 1,800 cubic feet per acre for the disturbed area draining into the basin (1,800 cubic feet is equivalent to half an inch of sediment per acre of basin disturbed area). Remove sediment from the basin when approximately one-half of the storage volume has been filled. Spillway capacity -The spillway system must carry the peak runoff from the 10-year storm with a minimum 1 foot of freeboard in the spillway. Base runoff computations on the disturbed soil cover conditions expected during the effective life of the structure. Sediment cleanout elevation -Determine the elevation at which the invert of the basin would be half -full. This elevation should also be marked in the field with a permanent stake set at this ground elevation (not the top of the stake). M US Army Corps of Engineers 10-09-19 I���II o w Q OU Li�CDz U � 00 0 0-) w � 1.- 7) 2< 04 w U N -0 J Z Q _ S Q ww 20 <Co Z00 0 0 m } m J00 Lu m Q Lu UJ Z c� Z Y H - cnQ¢ wam Lu w o of Y 2 2i D 2i NZ Q =Q cnU =cnH co< 0 o� U�o Z w N o' z COU) g w z_ w - U � C� Z U � ZOO W irQ w > o7� W u- �j = �� 2 Y OLLO O U) Z 0 w wQ 00Z ¢�0 O O z _0 C) ?O F Q J -8 .110 T_ W H z O } Z O ~ °6 0 J U Q 0 J cn N 0")0QZ �p Z o- J OWN O �O w Z �o O OU) U Z U_ O 0 O 0Y u1 SHEET ID UNCLASSIFIED//FOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC REG. #: P-1582 CG513 CORRECTED FINAL - NOT FOR CONSTRUCTION UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIED/FORIOFFICIAL USE ONLY 7 1 8 1 9 10 G F E I 10 IV F1 FORT BRAGG TRAFF THE CONTRACTOR SHALL MAINTAIN TRAFFIC DURING CONSTRUCTION AND PROVIDE, INSTALL, AND MAINTAIN ALL TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH THESE PROJECT GUIDELINES. THE PROJECT SPECIAL PROVISIONS, NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD DRAWINGS, STANDA d SPECIFIC TIDNS FOR ROADS ANd S.TRU=LIRFS 20_ 1=1ffi0N, AND THE CURRENT EDITION OF THE MANUAI OF UNIFORM TRAFFIC CONTROL-DEMGES (MUTCD). THE CONTRACTOR SHALL UTILIZE COMPLETE AND PROPER TRAFFIC CONTROLS AND TRAFFIC CONTROL DEVICES DURING ALL OPERATIONS. ALL TRAFFIC CONTROL AND TRAFFIC CONTROL DEVICES REQUIRED FOR ANY OPERATION SHALL BE FUNCTIONAL AND IN PLACE PRIOR TO THE COMMENCEMENT OF THAT OPERATION, SIGNS FOR TEMPORARY OPERATIONS SHALL BE REMOVED DURING PERIODS OF INACTIVITY, THE CONTRACTOR IS REQUIRED TO LEAVE THE PROJECT IN A MANNER THAT WILL BE SAFE TO THE TRAVELING PUBLIC AND WHICH WILL NOT IMPEDE MOTORISTS.TRAFFIC MOVEMENTS THROUGH LANE CLOSURES ON ROADS WITH TWO WAY TRAFFIC SHALL BE CONTROLLED BY FLAGGERS STATIONED AT EACH END OF THE WORK ZONE, IN SITUATIONS WHERE SIGHT DISTANCE IS LIMITED, THE CONTRACTOR SHALL PROVIDE ADDITIONAL MEANS OF CONTROLLING TRAFFIC, INCLUDING, BUT NOT LIMITED TO, TWO-WAY RADIOS, PILOT VEHICLES, OR ADDITIONAL FLAGGERS, FLAGGERS SHALL BE COMPETENT PERSONNEL, ADEQUATELY TRAINED IN FLAGGING PROCEDURES, AND FURNISHED WITH PROPER SAFETY DEVICES AND EQUIPMENT, INCLUDING, BUT NOT LIMITED TO, SAFETY VESTS AND STOP/SLOW PADDLES, ALL PERSONNEL WHEN WORKING IN TRAFFIC AREAS OR AREAS IN CLOSE PROXIMITY TO TRAFFIC SHALL WEAR AN APPROVED SAFETY VEST, OR SHIRT OR JACKET WHICH MEETS THE COLOR REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES {MUTCD},THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS, ORDINANCES, AND REGULATIONS GOVERNING SAFETY, HEALTH, AND SANITATION, AND SHALL PROVIDE ALL SAFEGUARDS, SAFETY DEVICES, AND PROTECTIVE EQUIPMENT. AND SHALL TAKE ANY OTHER NEEDED ACTIONS, ON THEIR OWN RESPONSIBILITY THAT ARE REASONABLY NECESSARY TO PROTECT THE LIFE AND HEALTH OF EMPLOYEES ON THE JOB AND THE SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF THE WORK COVERED BY THE CONTRACT, WORK ON ANY ROADWAY, PARKING LOT OR EXPOSED TRAFFIC MOVEMENT AREA MAY REQUIRE A TRAFFIC CONTROL PLAN, THE PLAN SHALL INCORPORATE THE APPLICABLE MUTCD AND NCDOT STANDARDS AND SEALED BY A PROFESSIONAL TRAFFIC ENGINEER LICENSED IN THE STATE OF NORTH CAROLINA. A DEVIATION FROM THIS DIRECTIVE. REQUIRING A SEALED TRAFFIC CONTROL PLAN CAN BE MADE BASED ON EMERGENCY, SAFETY AND ROADWAY CONDITIONS BY THE FORT BRAGG - DPW CIVIL AND OR TRAFFIC ENGINEER. DEPENDING ON THE STREET AFFECTED, THE FORT BRAGG CIVIL AND OR TRAFFIC ENGINEERS AT DPW REQUIRE A THIRTY. FOURTEEN, OR TEN DAY (WORKING DAYS) NOTICE TO BEGIN WORK FOR SECURITY AND INTER -AGENCY APPROVALS (SEE GI102 FOR NOTICE REQUIREMENTS), EXCEPTIONS TO THE SCHEDULE MAY BE GRANTED FOR EMERGENCY SITUATIONS. AN APPROVED TRAFFIC CONTROL PLAN BY DPW BUT NOT SUBMITTED FOR AN APPROVED WORK START DATE MAY BE CONSIDERED NULL AND VOID AFTER SIXTY CALENDAR DAYS OF THE PLAN APPROVAL DATE IF NO ACTION IS TAKEN TO INITIATE THE WORK.THE CONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO THE FORT BRAGG CIVIL AND OR TRAFFIC ENGINEER AT THE START AND PROJECTED COMPLETION DATE TO THIS WORK_ ANY DEVIATION FOR THIS SCHEDULE SHALL BE APPROVED BY THE FORT BRAGG CIVIL AND OR TRAFFIC ENGINEER, OPEN CUTS ON ASPHALT ROADWAYS WILL REQUIRE FULL DEPTH PATCHING WITH APPLICABLE BASE, FULL DEPTH PATCHING WITH ASPHALT CONCRETE SURFACE COURSE TYPE SF9.5A IN 2 INCH LIFTS IF APPLICABLE, THE SAME DAY, THE WORK SHALL ALSO COMPLY WITH NCDOT STANDARD ROADWAY REPAIR AND PATCHING POLICIES AND TECHNIQUES. NO MATERIAL STORAGE SHALL BE ALLOWED ALONG THE SHOULDERS OF THE ROADWAY, PARKING LOTS OR AREAS WITH ACTIVE TRAFFIC DURING NON -WORKING HOURS. EQUIPMENT SHALL BE PARKED AWAY FROM ACTIVE TRAFFIC AREAS AND SHALL BE PROPERLY BARRICADED TO PREVENT EQUIPMENT OBSTRUCTION WITHIN THE CLEAR RECOVERY AREA. THE CONTRACTOR SHALL COMPLY WITH ALL OSHA REQUIREMENTS AND PROVIDE A COMPETENT PERSON ON SITE TO SUPERVISE ALL PHASES OF THIS TYPE OF 11VORK.THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, Si ATE, AN FORT BRAGG ENVIRONMENTAL REGULATIONS AND SHALL OBTAIN ALL NECESSARY FEDERAL, STATE, AND FORT BRAGG ENVIRONMENTAL PERMITS, INCLUDING BUT NOT LIMITED TO, THOSE RELATED TO SEDIMENT CONTROL, STORM WATER, WETLAND. STREAMS, ENDANGERED SPECIES AND HISTORICAL SITES.THE FORT BRAGG DIRECTORATE OF PUBLIC WORKS SHALL BE NOTIFIED PRIOR TO BEGINNING WORK THAT AFFECTS PERMANENT TRAFFIC CONTROL DEVICES. THE CONTRACTOR SHALL BE RESPONSIBLE TO RELOCATE, MODIFY, REPAIR OR REPLACE TRAFFIC SIGNALS AND COMPONENT EQUIPMENT, TRAFFIC SIGNS AND PAVEMENT MARKINGS IN COMPLIANCE NTH NCOOT CURRENT EQUIPMENT AND STANDARDS WHERE APPLICABLE. THE CONTRACTOR MAY BE REQUIRED TO INSTALL TEMPORARY TRAFFIC SIGNALS, PAVEMENT MARKINGS, RAISED PAVEMENT MARKERS AND SIGNING TO ACCOMPLISH THE WORK, THESE TASKS SHALL BE NOTED IN THE APPROVED TRAFFIC CONTROL PLAN,IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE LOCATION OF THE OTHER UTILITIES WITHIN THE WORK ZONE AREA. THIS SHALL ALSO INCLUDE THE LOCATION OF THE WATER. SEINER AND DRAINAGE SYSTEMS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING OTHER UTILITY OWNERS AND PROVIDING PROTECTION AND SAFEGUARDS TO PREVENT DAMAGE OR INTERRUPTIONS TO EXISTING FACILITIES AND TO MAINTAIN ACCESSIBILITY TO THE EXISTING UTILITIES, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OR REPLACEMENT OF THESE UTILITIES BECAUSE OF HIS WORK. ALL PIPE REPAIR WORK SHALL BE IN COMPLIANCE WITH THE NCDOT STANDARD DRAWINGS AND SPECIFICATIONS, CURRENT EDITION, EXCAVATED AREA ADJACENT TO PAVEMENT OR ACTIVE TRAFFIC AREAS HAVING MORE THAN A 2 INCH DROP SHALL BE SHAPED UP AT A 6:1 OR FLATTER SLOPE AND DESIGNATED BY APPROPRIATE DELINEATION DURING PERIODS OF INACTIVITY, INCLUDING, BUT NOT LIMITED TO, NIGHT AND WEEKEND HOURS. PRE --CAST CONCRETE MANHOLES, CATCH BASINS; OR DRAINAGE STRUCTURES SHALL BE THE TYPE PRE -APPROVED BY NCDOT, MANHOLE RINGS AND COVERS, VALVE COVERS AND STORM DRAINAGE GRATES AND FRAMES SHALL BE OF THE TRAFFIC BEARING TYPE APPROVED BY NCDOT. ALL WORK PERFORMED UNDER THIS POLICY SHALL BE CONTRACTED TO AN NCDOT LICENSED OR CERTIFIED CONTRACTOR (BONDED IN THE STATE OF NORTH CAROLINA) DIRECTORATE OF PUBLIC WORKS TRAFFIC ENGINEERING INSTALLATION DESIGN GUIDELINES 6,3.4 PARKING PARKING- ALL PARKING LOT DESIGNS SHALL BE IN COMPLIANCE WITH ALL ADA (AMERICAN DISABILITIES ACT) POLICIES, THE PARKING DESIGN CAN VARY FROM PERPENDICULAR TO ANGULAR DEPENDING ON THE GEOMETRICS. THE PROJECT SHALL SPECIFY THE USE OF THERMO PLASTIC (EXTRUDED MATERIAL) OR HEATED IN PLACE THERMO PLASTIC MATERIAL, IN COMPLIANCE WITH NCDOT STANDARD SPECIFICATIONS AND ON THE NCDOT APPROVED QUALIFIED PRODUCT LIST (QPL) FOR ASPHALT SURFACES. POLUREA MATERIAL SHALL BE USED ON CONCRETE SURFACES PER NCDOT SPECIFICATION AND ON THE APPROVED QPL (QUALIFIED PRODUCTS LIST). A PAVEMENT MARKING CONTRACTOR ASSIGNED THIS TYPE WORK SHALL BE CERTIFIED BY NCDOT TO DO THIS TYPE WORK. 6.3.9 TRAFFIC SIGNALS, ROADWAY MARKING AND SIGNAGE 6.3.9.1 ALL TRAFFIC SIGNAL DESIGNS FOR FORT BRAGG, NORTH CAROLINA SHALL BE PREPARED BY A PROFESSIONAL TRAFFIC ENGINEER (PE) LICENSED AND BONDED TO WORK IN THE STATE OF NORTH CAROLINA, TO PERFORM THIS TYPE OF WORK, ALL TRAFFIC SIGNAL WORK ( NEW AND MAINTENANCE) SHALL BE PERFORMED BY AN APPROVED TRAFFIC SIGNAL. CONTRACTOR BY NCDOT AND WORK INSTALLED AND INSPECTED BY A CERTIFIED IMSA LEVEL 2 TRAFFIC SIGNAL TECHNICIAN IN THE STATE OF NORTH CAROLINA. THESE TECHNICIANS SHALL BE BONDED EITHER INDIVIDUALLY OR THRU THEIR COMPANY TO CERTIFY COMPLIANT WORK PERFORMANCE ASSOCIATED WITH ALL POLICIES AND STANDARDS. THE CONTRACTOR ASSUMES RESPONSIBILITY FOR THE OPERATION OF THE TRAFFIC SIGNAL AT THE POINT WHEN HE ENGAGES ANY PORTION OF WORK THAT AFFECTS THE FUNCTION OF THE SIGNAL EQUIPMENT AND EXPOSED TRAFFIC, THE CONTRACTOR SHALL NOTIFY THE RESPONSIBLE GOVERNMENTAL AGENT OF HIS INTENT TO BEGIN WORK THE CONTRACTOR IS RESPONSIBLE TO RESPOND TO EMERGENCY OR MAINTENANCE CALLS WITHIN A TWO HOUR CALL --RESPONSE PER100 DURING CONSTRUCTION AND OR THE WARRANTY PERIOD. UNLESS DICTATED BY THE DPW CIVIL OR TRAFFIC ENGINEER ALL TRAFFIC SIGNAL WORK IS WARRANTED FOR A PERIOD OF ONE YEAR BEYOND THE FINAL INSPECTION APPROVAL DATE. ALL SIGNAL EQUIPMENT TO BE USED SHALL COMPLY WITH THE NCDOT PROJECT SPECIAL PROVISIONS (VERSION 06.6) AND INTELLIGENT TRANSPORTATION SYSTEMS. THE PLANS SHALL SPECIFY THAT ALL EQUIPMENT USED SHALL BE LISTED ON THE CURRENT NCDOT APPROVED QPL (QUALIFIED PRODUCTS LIST). THE PLANS SHALL SPECIFY THE USE OF A 2070L TYPE SIGNAL CONTROLLER LISTED ON THE NCDOT QPL OR CURRENT APPROVED TYPE NO DEVIATION FROM THIS POLICY SHALL OCCUR UNLESS APPROVED BY THE FORT BRAGG CIVIL OR TRAFFIC ENGINEER. THE DESIGN SHALL COMPLY WITH ALL POLICIES AND GUIDELINES RELATIVE TO THE DESIGN LISTED IN THE FOLLOWING MANUALS: 1,MANUAL OF UNIFORM TRAFFIC CONTROL (MUTCD) 2,FHWA RAILROAD- HIGHWAY GRADE CROSSING HANDBOOK AND THE UNIFIED FACILITIES CRITERIA (UFC) RAILROAD TRACK MAINTENANCE & SAFETY STANDARDS, 3,NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) SIGNALS AND GEOMETRIC DESIGN MANUAL. *NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) ROADWAY STANDARD DRAWINGS (THE ITE AND ASTM STANDARDS). 5. NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) ROADWAY DESIGN MANUAL SECTION 1 AND 2. 6, NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) HIGHWAY GUIDELINES CONSULTANTS, 7, SIGNAL AND GEOMETRICS SECTION DESIGN MANUAL 11 8, TRAFFIC SIGNAL OPERATIONS AND MAINTENANCE PRACTICES REPORT, 9. PROJECT SPECIAL PROVISIONS FOR TRAFFIC SIGNALS (VERSION 06.6). 10- NATIONAL ELECTRIC SAFETY CODE THE FORT BRAGG INSTALLATION CIVIL ENGINEER SHALL HAVE THE FINAL APPROVAL OF THE DESIGN. 6,3,9,2 ALL PAVEMENT MARKING SHALL BE DESIGNED IN COMPLIANCE WITH MUTCD AND THE CURRENT NCDOT STANDARD DRAWING S AND SPECIFICATIONS. THE PROJECT SHALL SPECIFIC THERMO PLASTIC (EXTRUDED) MATERIAL OR HEATED IN PLACE THERMO PLASTIC MATERIAL IN COMPLIANCE WITH NCDOT STANDARD SPECIFICATIONS. THE PRODUCT MUST BE ON THE NCDOT QPL LIST FOR ASPHALT SURFACE COURSES, POLUREA MATERIAL SHALL, BE USED ON CONCRETE BRIDGE OR ROADWAYS PER NCDOT STANDARD SPECIFICATIONS AND ON THE NCDOT APPROVED QPL. 6.3.9 3 THE CONTRACTOR SHALL COMPLY WITH THE NCDOT TIME LIMITIATIONS FOR PLACEMENT AND REPLACEMENT OF PAVEMENT MARKINGS, 6.3,9 4 ALL PAVEMENT MARKERS SHALL BE IN CONFORMANCE WITH MUTCD AND THE CURRENT NCDOT STANDARD DRAWING S AND SPECIFICATIONS, UNLESS OTHERWISE CHANGED BY THE INSTALLATION CIVIL ENGINEER AND OR TRAFFIC ENGINEER. THE PROJECT SHALL SPECIFY THE USE OF SNOW PLOWABLE PAVEMENT MARKERS OF A TYPE APPROVED ON THE NCDOT QPL. THE FORT BRAGG INSTALLATION CIVIL ENGINEER AND OR TRAFFIC ENGINEER SHALL HAVE THE FINAL APPROVAL OF THE DESIGN. ALL PAVEMENT MARKING --MARKERS TYPE WORK SHALL HAVE A CONTRACTOR CERTIFIED AND LICENSED BY THE NCDOT TO PERFORM THIS TYPE WORK, 6,3.9,5 THE INSTALLATION OF THIS MATERIAL AND ASSOCIATED WORK SHALL BE IN COMPLIANCE WITH EITHER THE MUTCD OR NCDOT DESIGN POLICIES OR PRACTICES, ALL WORK SHALL BE CONTRACTED TO A LICENSED OR CERTIFIED NCDOT CONTRACTOR (BONDED IN THE STATE OF NORTH CAROLINA). IF APPLICABLE, THE CONTRACTOR MAY BE REQUIRED TO PROVIDE A TRAFFIC CONTROL PLAN SIGNED AND SEALED BY A LICENSED PROFESSIONAL TRAFFIC ENGINEER IN THE STATE OF NORTH CAROLINA AT THE DISCRETION OF THE FORT BRAGG INSTALLATION CIVIL ENGINEER SHALL HAVE THE FINAL APPROVAL OF THE DESIGN. 6.3.9.6 ALL ROADWAY SIGNING USED ON FORT BRAGG SHALL BE IN COMPLIANCE WITH MUTCD AND CURRENT NCDOT STANDARDS DRAWINGS AND SPECIFICATIONS. ALL MATERIAL MUST BE ON THE NCDOT APPROVED QPL (QUALIFIED PRODUCTS LIST). ALL WORK SHALL BE CONTRACTED TO A LICENSED OR CERTIFIED NCDOT CONTRACTOR (BONDED IN THE STATE OF NORTH CAROLINA) I, REGULATORY, WARNING AND GUIDE SIGNS: ALL REGULATORY AND GUIDE SIGNS SHALL BE FABRICATED WITH TYPE III HIGH INTENSITY SHEETING. ALL WARNING SIGNS, EXCEPT FOR SCHOOL ZONES, BICYCLE, PEDESTRIAN, AND HIGHWAY -RAIL GRADE CROSSING WARNING SIGNS SHALL BE FABRICATED WITH TYPE Ili HIGH INTENSITY SHEETING, THE COLOR OF THE SHEETING SHALL, BE AS SPECIFIED IN THE MUTCD 2.SCHOOL ZONE, BICYCLE PEDESTRIAN AND HIGHWAY RAIL GRADE CROSSING WARNING SIGNS; IT IS STANDARD PRACTICE OF NCDOT TO INSTALL AND MAINTAIN ALL SCHOOL ZONE, BICYCLE, PEDESTRIAN, AND HIGHWAY -RAIL GRADE CROSSING WARNING SIGNS USING TYPE IX HIGH INTENSITY SHEETING. ALL SCHOOL ZONES, BICYCLE, AND PEDESTRIAN WARNING SIGNS SHALL BE HIGH INTENSITY FLUORESCENT YELLOW -GREEN, ALL HIGHWAY -RAIL CROSSING ADVANCE WARNING SIGNS SHALL BE HIGH INTENSITY FLUORESCENT YELLOW. 33EMPORARY TRAFFIC CONTROL WORK ZONE WARNING SIGNS; IT IS STANDARD PRACTICE OF THE NCDOT, AND FOR ALL AGENCIES THAT WORK BY CONTRACT FOR THE NCDOT, TO INSTALL. AND MAINTAIN ALL TRAFFIC CONTROL. WORK ZONE WARNING SIGNS BOTH STATIONARY AND PORTABLE WORK ZONES SIGNS USING TYPE VII, VIII, OR IX HIGH INTENSITY FLUORESCENT ORANGE SHEETING, A PORTABLE ROLL UP SIGN (WITHOUT ADHESIVE BACKING) SHALL HAVE THE RETRO-REFLECTIVE VALUE OF TYPE VII, VIII, OR IX HIGH INTENSITY FLUORESCENT ORANGE SHEETING, AGAIN, THE FORT BRAGG CIVIL AND OR TRAFFIC ENGINEER SHALL REQUIRE A TRAFFIC CONTROL PLAN PREPARED AND SEALED BY A PROFESSIONAL TRAFFIC ENGINEER LICENSED IN THE STATE OF NORTH CAROLINA TO PERFORM THIS DESIGN, THE FORT BRAGG INSTALLATION CIVIL ENGINEER AND OR TRAFFIC ENGINEER SHALL HAVE THE FINAL APPROVAL OF THE DESIGN. i l US Army Corps of Engineers 10-09-19 o w 0 oCDoz o w H U OU rn < C� NCO U)oU�UU U� wW 20 ¢°c) z00 0 0 m } m J00 o m o LLI Z Z Y W Q Q W Q m W Cn W 2 ofY m 2 D 2 N Z 0 2 0 w U = wq - w Q 0 o� U�o Z W N � v� u) g w z_ W z 7i U C� Z C) > � of W �Q w > U)U) Ld W LL �j = 2 Y oLLo O wQZow ILP z ¢U)CE fr- o o z U zo Q J -8 z_ J } 0 W Q U U 0 LL z N rn o�z zw Z � N O � o w 0 mL o Q �o `� o w SHEET ID UNCLASSIFIED//FOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC REG. #: P-1582 CG515 CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 n. 9 10 G F UTILITIES NOTES 1. UTILITY CONTRACTOR TO COORDINATE WITH BLDG CONTRACTOR. REFER TO ARCHITECTURAL AND PLUMBING PLANS FOR UTILITY CONNECTIONS. 2. WATER SUPPLY WILL BE PROVIDED BY OLD NORTH UTILITY SERVICES (ONUS). ONUS IS RESPONSIBLE FOR PERMITTING, DEMOLITION, DESIGN, AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING CONSTRUCTION WITH ONUS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STUB OUT FROM THE BUILDING TO THE 5 FT LINE. 3. ALL OVERHEAD ELECTRICAL LINES AND EQUIPMENT ARE OWNED AND OPERATED BY SANDHILL UTILITIES (SUS). SUS IS RESPONSIBLE FOR DEMOLITION, DESIGN, AND CONSTRUCTION OF EXTERIOR ELECTRICAL LINES FROM FORT BRAGG SUBSTATIONS TO PRIMARY SIDE OF THE BUILDING TRANSFORMER (POINT OF DEMARCATION). 4. SANITARY SEWER WILL BE PROVIDED BY OLD NORTH UTILITY SERVICES (ONUS). ONUS IS RESPONSIBLE FOR PERMITTING, DEMOLITION, DESIGN, AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING CONSTRUCTION WITH ONUS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STUB OUT FROM THE BUILDING TO THE 10 FT LINE. 5. ONUS AND SANDHILL UTILITIES WILL BE UPGRADING THE UTILITIES ON OR NEAR THE PROJECT SITE AS PART OF PROJECTS 76376 (SOF LANGUAGE AND CULTURAL CENTER) AND 79437 (TRAINING COMMAND BUILDING). CONTRACTOR SHALL COORDINATE WITH THE CHANGE IN FIELD CONDITIONS. 6. CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATION PRIOR TO CONSTRUCTION. 7. UNDERGROUND POWER LINE AND EAST -WEST WATER LINE WERE IMPORTED AND SCALED FROM A DRAWING RECEIVED BY JSOC ON 12-20-2018 (DWG "AREA 3 BASE MAP 16"). 8. CONCRETE PADS - CONTRACTOR SHALL VERIFY THE SIZE NEEDED AS SHOWN ON THESE DRAWINGS PER THE MANUFACTURER'S RECOMMENDED SIZE AND THICKNESS. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES. 9. CONTRACTOR SHALL COORDINATE WITH ALL PRIVATE UTILITIES FOR THE LOCATION OF EXISTING UTILITIES IN THE FIELD PRIOR TO BEGINNING E CONSTRUCTION. 10. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER REGARDING ALL FT. BRAGG COMMUNICATION AND TELEPHONE UTILITIES PRIOR TO BEGINNING CONSTRUCTION. IN C W LEGEND SSMH-X1 I.E. S.SMH-Xl STA:0+00.00 TOP ELEV: 234.60 .E.IN (8"PVC): 228.95 Z LEIN (8"DIP): 228.85.E.IN (8"SDR): 228.95 LEIN (6"PVC): 228.90 EMT:228.70 28 t II z0 ID U W z 0 U c 11 D 1 0 z 1 � II J � I I � I D I z I I I II c � z l z MATCHLINE , I SEE THIS SHEET SITE UTILITIES PARTIAL PLAN BUILDING 3352 SSM H-2 SCALE: 1" = 30' CO JB CO CO CO CO 0 0 CO0 Co L UGC v EX -DI (FULL OF WATER) CONNECTING PIPES UNDETERMINED C00 C00 v CB CATCH BASIN GPO GUY POLE COO SANITARY CLEAN -OUT JB JUNCTION BOX D/ DROP INLET LP LIGHT POLE EM ELECTRIC METER PVC POLYVINYL CHLORIDE PIPE EMH ELECTRIC MANHOLE P/vA POST INDICATOR VALVE FFE FINISHED FLOOR ELEVATION PPO POWER POLE FH EXISTING FIRE HYDRANT SIGN FH PROPOSED FIRE HYDRANT ------- --- EXISTING SANITARY SEWER PIPING c GAS LINE — sAN SAN — PROP. SANITARY SEWER PIPING — UGT U EXISTING UNDERGROUND TELECOM GV ® GAS VALVE GM GAS METER — UGT UGT — PROP. UNDERGROUND TELECOM W EXISTING WATER LINE RCP REINFORCED CONCRETE PIPE W PROPOSED WATER LINE BL BOLLARD WV M EXISTING WATER VALVE WM WATER METER WV H PROPOSED WATER VALVE • PROPOSED SANITARY SEWER MANHOLE PROPOSED DROP INLET EXISTING DRAINAGE PIPING PROPOSED DRAINAGE PIPING ® EXISTING DROP INLET LIMITS OF CONSTRUCTION MATCHLINE SEE PARTIAL PLAN THIS SHEET / BUILDING 3352 I ~ U 0 WM CO z OWT - f BL BL CANOPY �— �— �— �— -) �_ O o � � oco BL GA TE BL w w- - W W w-- s We 4SPHALT EXISTING PARKING FHA j I NCDOT-APPROVED THERMOPLASTIC MARKING MATERIAL TO BE G USED FOR ALL PARKING LINES AND HANDICAPPED SYMBOLS —UGT C/L UGT UGT uc-o\, - UGT - — UGT UGT4GT UGT MH LIMITS OF CONSTRUCTION— — I u 15 z c) l D D I � Z PROP. ELEC. CONNECTION TO EXISTING ELEC. BOX. (SEE ELECTRICAL PLANS) i co L4"v z CONNECT T SERVICE @ 1'0% MH EXIS TING A SPHA L T CONNECTION FROM BLDG. n PARKING LOT o zz I.E. OUT: 231.70 inn C.O. v� 0 PROP. ELEC. DUCT BAN �� ��� SSMH 3 (SEE ELECTRICAL PLANS) o / Cf) c z LL.o / y�� JSOC OPS z A -D1 � SUPPORT BUILDING I V X 12' CONC. PAD FOR TRANSFORMER. ' 2-STORY c REFER TO ELEC. DWGS. ±17,090 S.F. c/) (SEE ARCH. PLANS) z I I c FFE=236.0 c ROOF DRAIN CONNECTION GENERATOR ELEC. XFMR / (SEE PLUMBING PLAN) SVC TO BLDG, (TYP.) = I PAD D I c SEE ELEC. PLANS (3) 8.5' X 20' CONC. PADS FOR CHILLER z FOR CONTINUATION Q I (TYP.). REFER TO ELEC. AND MECH. DWGS. SSMH-4 CONNECT TO SSWR SVC 13' X 24' CONC. PAD FOR PROPOSED GAS CONNECTION FROM BLDG. D GENERATOR. REFER TO ELEC. DWGS. METER, SEE I.E. OUT: 232.33 C.O. EXIS TING A SPHA L T PLUMBING DWGS 10 LF 4" PVC/A -MH A3DI PARKING LOT I FOR CONTINUA,t% -p0 1.0% c % c FD / CO CO O -LIMITS OF CONSTRUCTION GM RPZ w/ BFP // 1/ ' GA]S LIN 0 0 I I I — IMVn� 4rb�— - _ _ G -= , ER METER C0 I 10 UGT 4" STEEL 6 -- // VC DOM ATER r _ w --� UG UGT UGT T SLEEVE 6" DIP FIRE'NAT RUG P ���G�— GEN. 7-W W i UGT POND TOP OF BANK UG 6" STEEL EX -DI ' \ $ SLEEV / B�P 15 (FULL OF WATER) 00� CONC. FLUME I VIF I CONNECTING PIPES O JB UGT CT UNDETERMINED �i0, ` Q`GQ /UGT UGT � UGT - - BIORETENTION POND A4-DI PROP. ELEC. DUCT BANK ) CONTRACTOR TO INSTALL // INSTALL 6" 8 MATCHLINE SEE THIS SHEET Cl w III J III �II II I II EXISTING ELEC. BOX — —_�— 181RCP — M I I II II I I I II � II BUILDING II 3050 -IIN U II / UGT GT1i- UGT � P �O a`RGi / I I TOP EL. 239.27' U I I (FULL OF WATER) EX I II EXISTING q TOP 237.15 I PARKING LOT a I. E ffi f=233.55 00 L E O T-231.47 EX -DI GENERATOR ELEC. SVC TO 15 41 BLDG, (TYP.) SEE ELEC. i5 PLANS FOR CONTINUATION 17 0 CONNECTTO EXISTING GAS LINE — — 24'RCP = == Q,/B RCP INSTALL 4" GATE VALVE ~ TOP: 239.99\ �%�'� CONNECT TO EXISTING 8" DIP w/ 8"x8N4" TEE FITTING _ CONNECT TO EXISTING 8" DIP w/ 8"x8"x6" TEE FITTING uG C2-HW o (SEE ELECTRICAL PLANS) DUCTBANK BENEATH / 2O GATE VALVE N � o PROPOSED STORM PIPE iI AINSTALL FIRE HYDRANT MHO pON / A5wo -HW / _ �� /LIMITS OF CONSTRUCTION I c U e� 00 o STORMWATER � � Q MANAGEMENT POND D / ♦ // EX -DI ` W ♦ // (MISSING LID) 900' WETLANDS I c D1-OCS / / / INNV.V- 229.76 BUFFER 6 233.16 / ♦ ' 2.7o Q ' 0 c o CONTINUATION OF v / ��G���� ELECTRICAL SERVICE TO D2-HW GO�c,C BE COORDINATED BY SUS WETLANDS SITE UTILITIES PLAN SCALE: 1" = 30' c I I c 0 0 D J D C I M 0 C) INSTALL 6"x6"x6" W TEE FITTING U CONC. WALK co �' II 11 III J III s II II I I I I I I I II MH MH II BUILDING 3046 BUILDING 3042 N 30 0 30 60 90 GRAPHIC SCALE: 1 INCH = 30 FEET LOWE ENGINEERS, LLC. REG. #: P-1582 US Army Corps of Engineers 10-09-19 O W 0 �CDz OU w 0 H 2<O U M W CU N W N7;= z cfCO U) � z ui-j <00 z00 0 m } m m p J00 lip UJ CD z Y 3:C5 U ~ W 2iof cn2 2iD2i N Z 0 o� m� U= o Z W N r� Lu Z U) g Lu W J U�Z (n Z C) > � � �Q W cwU) Ld W Lj = 2 Y o z� °wQ � IL z 0 ¢�CE C)'- (D z O z O U F- �O _j Q J � -� z_} J Z J ULL� D_ z rn W OOZ Z W U O� CV J LLI aa_L OW w m O U O LL SHEET ID CU201 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 �7 10 G F E C C IT 1. CONTRACTOR SHALL REPAIR ALL SEWER LATERALS AND MAINS DAMAGED DURING CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY REPORT ALL SEWER MAIN AND LATERAL BREAKS TO THE FAYPWC PROJECT COORDINATOR. THE CONTRACTOR SHALL INITIATE IMMEDIATE REPAIRS IN ACCORDANCE WITH FAYPWC STANDARDS. 2. SEWER MAINS, LATERALS, AND MANHOLES SHALL BE INSTALLED UTILIZING A FAYPWC APPROVED CUT -SHEET, INDICATING INSTALLATION DEPTH. 3. TRANSFER OF SEWER SERVICES SHALL BE ACCOMPLISHED AS FOLLOWS: A. INSTALL AND TEST NEW MAINS, MANHOLES, AND LATERALS. CLEANOUTS SHALL BE INSTALLED 18" INSIDE R/W UNLESS OTHERWISE DIRECTED BY FAYPWC. B. CONNECT EXISTING PLUMBING TO NEW LATERAL UTILIZING THE NECESSARY FITTINGS AS DIRECTED BY FAYPWC. C. AFTER ALL SERVICES HAVE BEEN TRANSFERRED TO THE NEW MAIN, THE EXISTING SEWER SYSTEM SHALL BE ABANDONED IN ACCORDANCE WITH FAYPWC REQUIREMENTS. 4. WHEN THE EXISTING MAIN IS NOT TO BE ABANDONED, THE CONTRACTOR SHALL UNCOVER THE EXISTING LATERAL AT THE MAIN, CUT AND PLUG BOTH ENDS, REMOVE THE EXISTING CLEANOUT AND COMBINATION, AND PLUG THE LATERAL TO ABANDON THE OLD SERVICE. 5. CONTRACTOR SHALL ABANDON ("KILL -OUT") ANY EXISTING SEWER SERVICES THAT WILL NOT BE UTILIZED BY UNCOVERING THE EXISTING LATERAL AT THE MAIN, CUT AND PLUG AT BOTH ENDS, REMOVE THE EXISTING CLEANOUT AND COMBINATION, AND PLUG THE TAP OR TEE AT THE MAIN. FOR LATERALS THAT CONNECT TO A MANHOLE AND ARE TO BE ABANDONED ("KILLED -OUT"), THE LATERAL SHALL BE REMOVED FROM THE MANHOLE AND THE REMAINING VOID IN THE MANHOLE SHALL BE FILLED WITH BLOCK AND MORTAR. 6. SEWER PLUGS SHALL BE INSTALLED TO ELIMINATE ANY DEBRIS OR OTHER MATERIAL FROM ENTERING THE ACTIVE SEWER SYSTEM. UPON ACCEPTANCE OF THE NEW SEWER SYSTEM, THE CONTRACTOR SHALL CLEAN THE NEW MAINS, REMOVE ALL DEBRIS, AND THEN REMOVE THE PLUG. 7. ALL EXISTING UTILITIES IMPACTED BY CONSTRUCTION SHALL BE ADJUSTED TO FINISHED GRADE, IN ACCORDANCE WITH FAYPWC REQUIREMENTS. GENERAL NOTES SANITARY SEWER UTILITY SHEET NO. DWG. NO. S• DWG. BY: FAYPWC 1 OF 1 DATE: JAN. 01, 2019. APPROVED BY: J.E.G. 8. ALL WORK ON FAYPWC SEWER UTILITIES (MAINS, LATERALS, ETC) SHALL BE PERFORMED BY A LICENSED UTILITY CONTRACTOR. THE FAYETTEVILLE PUBLIC WORKS COMMISSION SHALL OBSERVE AND APPROVE ALL WORK ON FAYPWC SEWER UTILITIES_ ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH FAYPWC REQUIREMENTS. 9. SEPARATION REQUIREMENTS: A. LATERAL SEPARATION OF SEWERS AND WATER MAINS: WATER MAINS SHALL BE LAID AT LEAST 10 FEET LATERALLY FROM EXISTING OR PROPOSED SEWER MAIN/LATERAL, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10-FOOT LATERAL SEPARATION - IN WHICH CASE: i. THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER MAIN/LATERAL; OR ii. THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER MAIN/LATERAL WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER MAIN/LATERAL B. CROSSING A WATER MAIN OVER A SEWER: WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS OVER ASEWER MAIN/LATERAL, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER MAIN/LATERAL, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN 18 INCH VERTICAL SEPARATION - IN WHICH CASE BOTH THE WATER MAIN AND SEWER MAIN/LATERAL SHALL BE CONSTRUCTED OF FERROUS MATERIAL AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. C. CROSSING WATER MAIN UNDER A SEWER: WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER SEWER MAIN/LATERAL, BOTH THE WATER MAIN AND THE SEWER MAIN/LATERAL SHALL BE CONSTRUCTED OF DUCTILE IRON MATERIAL AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FORA DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROS& NG. D. CROSSING STORM DRAINAGE LINES: A MINIMUM OF 24-INCHES OF VERTICAL CLEARANCE SHALL BE MAINTAINED BETWEEN A SEWER MAIN/LATERAL CROSSING UNDER A STORM DRAINAGE LINE UNLESS DUCTILE IRON PIPE IS USED. IF DUCTILE IRON PIPE IS USED, A MINIMUM OF SIX(6) INCHES OF SEPARATION SHALL BE MAINTAINED, UNLESS OTHERWISE APPROVED BY FAYPWC. FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, N.C. WATER RESOURCES ENGINEERING DEPARTMENT PIPE SIZES MANHOLE SIZE MIN. WALL THICKNESS MIN. REINF. STEEL MIN. BASE THICKNESS 21" AND LESS 48" DIAMETER 5" ASTM A-1064 0.12 SQ./IN. 6" 24" - 36" 60" DIAMETER 6" ASTM A-1064 0.15 SQ./IN. 8" 42" 72" DIAMETER 7" ASTM A-1064 0.15 SQ./IN. 8" MANHOLE DIAMETER SIZES MAY BE ADJUSTED ON THE PLANS TO REFLECT SPECIAL CIRCUMSTA REDUCING SLABS ARE NOT ACCEPTABLE ON MANHOLES LESS THAN 6' DIAMETER. CAST IRON FRAME AND-:,,. COVER SEE DETAIL MAX. (3) 4", (2) 6", OR FLEXIBLE BUTYL RESIN X (1) 2" GRA MANUFACTURE a SEALANT OR RUBBER GASKET 2 SEE JOINT. INSTALLED POL N � U Z W UZ w N4 W 8 �w NO. DATE REVISION 1 07/16 ADDED NOTE 6 2 01/18 ADDED NOTES 5,8 S1-SEWER-NOTES.dwg WC RING AND COVER. )ETAIL (2 TYPES OF RING OVER APPV'D) -GRADE RING MAX. (3) 6" OR (1) 2". SEE NOTE W//__SMOOTH PROPYLENE COATED STEP OVER INVERT I o JOINTSEAL INSIDE AND OUTSIDE OF OUT SEE STEP DETAIL. ECCENTRIC REDUCER SEALERIITFINISH T SET MORTAR / � [I LIFT HOLES THAT EXTEND THRU THE WALL SHALL BE SEALED WITH Z NON -SHRINK GROUT. LIFT HOLES THAT g HAVE PVC CAPS THAT DO NOT EXTEND o Z 48" MIN. THRU THE WALL SHALL NOT REQUIRE SEE CHART GROUT SEALANT. r SEE NOTE 5 FOR FLEX. BOOT CONNECTOR U) CONC. BRICK AND MORTAR INVERT PLACED IN FIELD TO 3/4 HEIGHT OF OUTLET PIPE. SEE SHELF DETAIL. REINFORCING. SEE CHART A13OVE SEE CHART,SEE NOTE 3 co 6" MIN. COMPACTED NO. 57 I� STONE D11I c [1[ IIIII ISEAL ANNULUS AROUND PIPE AT UNDISTURBED SUBGRADE ENTRANCE WITH NON -SHRINK GROUT. STANDARD MANHOLE N.T.S. DWG. NO. S 2 DWG. BY: FAYPWC SHEET NO. 1 OF 2 DATE: JAN. 01, 2019 APPROVED BY: J.E.G. FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, N.C. WATER RESOURCES ENGINEERING DEPARTMENT F SEALER LIFT HOLES F SEALER AROUND PIPE iHELF DETAIL BILE EPDM RUBBER NITARY SEWER (OUT) 17 STONE NO. DATE REVISION 1 02/07 CREATED S.2A ADDED NOTES 13-17 2 07/13 ADDED SHEET 2 OF 2 S2-STANDARD-MAN HOLE.dwg (2) CAM LOCKS WITH (2) NOTES: (2) CAM LOCKS (2) CAM LOCKS STAINLESS STEEL ROLL 1. MANHOLE FRAME AND COVER TO BE MADE OF SEE DETAIL PINS (1/2" DIA. x 1-3/4") GRAY CAST IRON CONFORMING TO ASTM SPEC. 1" LETTERING OR (2) WEDGE CAM A48-83, CLASS 35, MANUFACTURED BY SAME ID LOCKS MANUFACTURER. ALL CASTINGS SHALL CONFORM TO THE SHAPE AND DIMENSIONS " SEE TAILCK SHOWN. ALL CASTINGS SHALL BE CLEAN AND COVER FACE co T 00M M � r N N.T.S �26" DIA. COVER SECTION N.T.S. 00 M 27-3/8"-27-7/16" DIA. 26-1/8"-26-1/4" DIA. � CV ao24-1/2" DIA - LO 26"-26-1/8" DIA. Y�� Y 34" DIA. FRAME SECTION N.T.S FREE FROM DEFECTS. 2. CASTINGS SHALL BE UNPAINTED AND SHALL O O HAVE THE LETTERS "PWC-FAY-NC" AND "SANITARY SEWER" CAST INTO COVER. LETTERS SHALL BE RAISED AND CLEARLY VISIBLE. 3. MANHOLE RING AND COVER SHALL WITHSTAND H-20 VEHICULAR TRAFFIC. 4. MINIMUM AVERAGE WEIGHT: PLUS OR MINUS 5% RING 155LBS., COVER 160LBS., UNIT 315LBS. 5. PERFORATED COVERS WILL NOT BE ALLOWED. 6. SUPPLY SOCKET FOR TURNING CAM LOCK [--*-1-1/4"DIA. MECHANISM. ONE SOCKET PER PROJECT. r 7. USE OF CONCRETE GRADE RINGS ARE NOT ALLOWED, UNLESS APPROVED BY THE FAYPWC 111 RUBBER PROJECT COORDINATOR. FOR MANHOLES OUTSIDE OF YARD OR LANDSCAPE AREAS, THE GASKET CAM LOCK USE OF GRADE RINGS ARE NOT ALLOWED. 8. FOR MANHOLES IN YARD OR LANDSCAPED CAM LOCK DETAIL AREAS, THE RING AND COVER SHALL BE SET TO N.T.S. io FINISHED GRADE. THE USE OF GRADE RINGS ARE ALLOWED TO SET THE MANHOLE TO �3-13/16"� °' FINISHED GRADE. FOR GRADE RINGS 4" OR LESS, _ THE RING AND COVER SHALL BE ANCHORED TO ;B THE CONE USING 5/8" DIAMETER STAINLESS �........... r I� r STEEL BOLTS WITH WEDGE ANCHORS. FOR GRADE RINGS OVER 4", THE RING AND COVER 5/8" DIA. SS ROD SHALL BE ANCHORED TO THE GRADE RING, ._._-_._._.-__._.___.__ USING 5/8" DIAMETER x 5-1/2" STAINLESS STEEL PICK BAR AND GASKET BOLTS WITH WEDGE ANCHORS. 9. FOR OUTFALL AREAS, THE RING AND COVER GROOVE DETAIL SHALL BE SET A MINIMUM OF 18" ABOVE FINISHED N.T.S. GRADE, UNLESS OTHERWISE APPROVED. APPROVED GASKET ' ' r COVER 10. THIS DETAIL IS TO BE USED ON ALL MANHOLES MATERIAL N.T.S. LOCATED OUTSIDE OF PAVED AREAS, UNLESS OTHERWISE APPROVED. (4) EACH 5/8"0 x5-1/2" 11. REFER TO FAYPWC STANDARD DETAIL S.17 FOR STAINLESS STEEL BOLTS INSTALLATION OF VENT STACK. WITH WEDGE ANCHORS. (SCORE THREADS TO PREVENT REMOVAL) e e FRAME N.T.S. MANHOLE RING AND COVER WITH WIPER GASKET AND CAM LOCK N.T.S. DWG. NO. S.6 DWG. BY: FAYPWC SHEET NO. 1 OF 1 DATE: JAN. 01, 2019 APPROVED BY: J.E.G. FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, N.C. WATER RESOURCES ENGINEERING DEPARTMENT NO. DATE REVISION 1 07/09 REVISED NOTES ON FRAME SECTION/REVISED NOTE 3 2 07/17 ADDED NOTE ON WEDGE CAM LOCKS 3 01/18 UPDATED NOTES 7 AND 8 S6-RING-COVER.dwg NOTES: 1. PRECAST REINFORCED CONCRETE MANHOLES SHALL BE IN 14. THE MINIMUM SLOPE ACROSS THE INVERT OF THE MANHOLE ACCORDANCE WITH ASTM C-478. SHALL BE 1%, UNLESS OTHERWISE APPROVED BY FAYPWC. STANDING WATER IN INVERT OF MANHOLE IS NOT ACCEPTABLE. 2. MINIMUM CONCRETE COMPRESSIVE STRENGTH SHALL BE 4,000PSI. 15. THE EXTERIOR MANHOLE RISER JOINTS, INCLUDING THE JOINT AT 3. MANHOLES GREATER THAN 12' DEPTH SHALL HAVE MINIMUM 6" EXTENDED THE CONE, SHALL BE SEALED ON THE OUTSIDE BY AN APPROVED JOINT BASE. WRAP. THE WRAP SHALL BE IN ACCORDANCE WITH FAYPWC SPECIFICATIONS. 4. FLEXIBLE BUTYL RESIN JOINT SEALANT SHALL BE IN ACCORDANCE WITH ASTM C990. RUBBER GASKET JOINTS SHALL BE IN ACCORDANCE WITH 16. MANHOLE BOOT FOR 4-INCH LATERALS. SHOULD IT BE ASTM C-443. NECESSARY TO INSTALL A 4-INCH LATERAL INTO A MANHOLE, THE RUBBER BOOT THAT THE LATERAL IS INSERTED INTO SHALL BE SECURELY 5. FLEXIBLE EPDM RUBBER BOOT CONNECTORS SHALL BE IN ACCORDANCE FASTENED TO THE CORE HOLE BY UTILIZING A STAINLESS STEEL BAND WITH ASTM C923, INSTALLED BY MANUFACTURER WITH STAINLESS STEEL THAT IS TIGHTENED USING A JACK OR A TORQUE WRENCH (DIRECT DRIVE). COMPRESSION RING AND TAKE-UP CLAMP. CONNECTION TO MAIN SHALL BOTH STANDARD SIZE AND STEP DOWN BOOTS ARE ALLOWED. THE BE BY CONTRACTOR WITH STAINLESS STEEL PIPE CLAMP. TORQUE WRENCH SHALL BE SUPPLIED BY THE MANUFACTURER. NO OTHER TYPE BANDS OR METHOD OF SECURING THE BOOT TO THE 6. CONNECTIONS TO EXISTING MANHOLES SHALL BE BY CORING MANHOLE MANHOLE SHALL BE ACCEPTED. AND FIELD INSTALLING A FLEXIBLE EPDM RUBBER BOOT CONNECTOR. DO NOT ALLOW DEBRIS TO ENTER SYSTEM. FOR FOUR (4) INCH SDR 26 LATERALS, THE PIPE OUTSIDE DIAMETER RANGE OF THE BOOT SHALL BE 3.5 INCHES TO 4.25 7. MORTAR SHALL BE QUICK SETTING, NON -SHRINK GROUT MIXED IN INCHES. ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. FOR FOUR (4) INCH DUCTILE IRON LATERALS, THE PIPE OUTSIDE 8. MANHOLE STEPS SHALL BE IN ACCORDANCE WITH ASTM C478 AND OSHA DIAMETER RANGE OF THE BOOT SHALL EITHER BE AS FOR VC OR REGULATIONS. ALIGN STEPS WITH INVERT OUT. 4.25 INCHES TO 4.81 INCHES. 9. PRECAST INVERTS ARE NOT ALLOWED. IN ALL CASES, THE BOOT SHALL BE TIGHTENED ON THE LATERAL BY MEANS OF A SINGLE STAINLESS STEEL STRAP. 10. VERTICAL DROPS BETWEEN THE INFLOW PIPES AND OUTFLOW PIPES THE LATERAL INVERT SHALL BE AT THE TOP OF THE SHELF. SHALL REQUIRE THE FOLLOWING: A. GREATER THAN 2.5' SEE DROP STRUCTURE 17. NO MORE THAN 4, FOUR INCH LATERALS OR 3, SIX INCH LATERALS SHALL DETAIL (MIN. 5' DIAMETER MH REQUIRED). ENTER A 4' DIAMETER TERMINAL MANHOLE. NO MORE THAN 2 LATERALS B. LESS THAN 2.5' SEE PIPE SLIDE DETAIL. (REGARDLESS OF SIZE) SHALL ENTER ALL OTHER 4' DIAMETER MANHOLES. ALL LATERALS SHALL HAVE AN INDIVIDUAL TROUGH. 5' DIAMETER 11. AN ECCENTRIC CONE SHALL BE UTILIZED ON ALL MANHOLES, UNLESS MANHOLES SHALL BE USED IF THE ABOVE CONDITIONS ARE NOT MET. OTHERWISE APPROVED BY FAYPWC. 18. NO MORE THAN 5 LATERALS SHALL ENTER A 5' DIAMETER MANHOLE. 12. INVERT ON PLANS IS TO MANHOLE CENTERLINE. 19. USE OF TEE-WYES ON LATERALS IS NOT ALLOWED. 13. CONCRETE GRADE RINGS SHALL NOT BE USED FOR ABOVE GRADE ADJUSTMENTS (IE: OUTFALL AREAS). USE OF GRADE RINGS ARE 20. ALL MANHOLES SHALL BE VACUUM TESTED IN ACCORDANCE ALLOWABLE IN YARD AREAS AND PAVEMENT, WHERE THE RING AND WITH FAYPWC STANDARDS. COVER ARE AT GROUND LEVEL. FAYETTEVILLE NO. DATE REVISION STANDARD MANHOLE PUBLIC WORKS COMMISSION FAYETTEVILLE, N.C. 1 01/08 CREATED DETAIL, ADDED NOTES 14-20 SHEET NO. DWG. NO. S.2 DWG. BY: FAYPWC WATER RESOURCES 2 I 07/13 I REVISED NOTES 9, 10, 11, 15. ICONVERTED TO S.2 SHEET 2 OF 2 DATE: JAN. 01, 2019 APPROVED BY: J.E.G. 3 01/01/19 REVISED NOTES 10, 18 2 OF 2 ENGINEERING DEPARTMENT S2-STANDARD-MAN HOLE.dwg I � US Army Corps of Engineers 10-09-19 O W �CDz OU w o U < � 0-) W a5 U_ N ° W cD � N J � Z H � 0 cooC�OU U� wW 20 <00 z00 0 0 m } 00 m Q J00 LLT Lu m Lu Z Z Y (n Q Q W Q W 2 rrY 2 2 D 2 N Z 0 20 c9U 2cq�- co< 0 o� o� U�o Z W N _� � z CO U) g W z_ W U U) C� Z U0 z of �0> W EEQ w U) U) W w cj = 2 Y OLLO O Z 0 w W Q 0- 0z ¢�0 o O cD z U z O } Q 2 C-- U) z J } J_ Q 0 J H U U- 0 W 0 N W O O z z�w W U 0� N U) Qa-U- � m O w < U) Z w < SHEET ID CU501 UNCLASSIFIED//FOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC REG. #: P-1582 CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 �7 10 G F E 10 MIN. PVC SDR-26 OR DI TEE SEE NOTES 7 AND 8 ON DETAIL S.11 STANDARD TEE CONNECTION THREADED SLOTTED CAST IRON PLUG 0 TRAFFIC CAP SINGLE WIDE TAPPING SADDLE WITH STRAP STAINLESS ALIGNMENT FLANGE STEELSTRA[AND (GENCO OR APPROVED EQUAL) SEE TABLE ON S.11 TAPPING SADDLE CAP SHALL HAVE 2" COVER (OPTIONAL) NON -TRAFFIC AREAS AND NOTE: TAP SHALL BE 4-1/2" SHALL BE SET AT GRADE IN FOR 4" LATERAL, AND PAVED AREAS. / SHALL BE 6-1/2" FOR 6" PERMANENT ASSEMBLY SEED LATERAL. STONE SHALL BE EXTENDED TO BED LATERAL CONNECTION FROM UNDISTURBED SOIL + Moccc) 1 1 1----1 1 THREADED CAST •=I 15 IRON HUB I, ; ,I I II IN. STAINLESS STEEL HOSE CLAMPS 4" AC/DI TO 4" Cl/PLASTIC MIN. 1/4" THICK EPDM COUPLING CLEANOLIT CAP ASSEMBLY SEWER LATERAL (4-INCH AND 6-INCH) N.T.S. DWG. NO. S.10 DWG. BY: FAYPWC SHEET NO. 1 OF 1 DATE: JAN. 01, 2019 APPROVED BY: JEG 0 CLEANOUT CAP ASSEMBLY RISER SHALL BE 4" SDR-26 PVC EXCEPT IT SHALL BE 4" DI IF THE FOR S, LATERAL ITSELF IS DUCTILE IRON �� 1% 2°/0 FOR 4 MAN. SLOPS uejP+�N's 11 SEE N�_i l l_j I I I I I I UNDISTURBED SOIL *REFER TO FAYPWC DETAIL S.12 REGARDING BENDS IN LATERAL.* FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, N.C. WATER RESOURCES ENGINEERING DEPARTMENT TO FIND "E" ENTER CHART AT LEFT WITH EFFLUENT PIPE SIZE AND ENTER PIPE AT TOP WITH INFLUENT PIPE SIZE. "E" DISTANCE IS POINT OF CONVERGENCE OF COLUMN AND R/W. D2 4" 6" 8" 12" 15" 181I 24" 8 9.00 9.50 10.00 - - - - 12 11.00 11.50 12.00 13.00 - - - 15 14.25 14.75 15.25 16.25 17.00 - - 18 16.50 17.00 17.50 18.50 19.25 20.00 - 241 21.00 1 21.50 1 22.00 1 23.00 1 23.75 1 24.50" 1 26.00 WHERE 5' MANHOLE IS REQUIRED ADD 1/2" TO "E" DISTANCE TO ACCOUNT FOR THE ADDITIONAL 6" OF SHELF SLOPE. MH CONNECTION DESIGN GUIDE N.T.S. SHEET NO. DWG. NO. S. 18 DWG. BY: FAYPWC 1 OF 1 DATE: JAN. 01, 2019 APPROVED BY: J.E.G. FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, N.C. WATER RESOURCES ENGINEERING DEPARTMENT PVC SDR-26 GASKETED COMBINATION (SEE NOTE 18 ON S.11) OR MECHANICAL JOINT FITTINGS, IF DI LATERAL. EXTEND STACK 18" MIN. ABOVE GRADE WITH GLUE CAP FOR TESTING. AFTER TESTS ARE ACCEPTED ADJUST STACK TO PROPER GRADE AND INSTALL PERMANENT CLEANOUT CAP ASSEMBLY. an -6` W (TYP.) (SEE NOTE 22 DETAIL, W w a O d D �i GLUE CAP FOR AIR TESTING (TO REMAIN) 1 u O w 0im� °' 0Z� K m00 z D m rn O cn I o-1 1 1-1 `45° BEND. Fl I I= FOR PVC I �=I I 1=I LATERALS, UTILIZE SDR-26 GASKETED FITTINGS. lot I I- FOR DI LATERALS, LIZE MJ FITTING WITH IM I II- TRANSITION I �I l= GASKET OR I IIo FI- PUSH ON DI x PVC FITTING. EXTEND SS TO R/W OR PROPERTY LINE (DI OR PVC, DEPENDING ON LATERAL MATERIAL) FOR SEWER LATERAL NOTES SEE FAYPWC DETAIL S.11 NO. DATE REVISION 2 01/14 ADDED TAILPIECE, NOTES 3 01/15 REVISED NOTES RE: TAILPIECE 4 07/18 REVISED NOTE RE: LATERAL DEPTH S 10-RESS LAT. dwg NOTES: 1. SEE FAYPWC STANDARD MANHOLE AND PIPE SLIDE, MORTAR SLIDE, AND SHELF DETAILS FOR ADDITIONAL INFORMATION. 2. THE "E" DISTANCES INDICATED ARE FOR CONNECTION TO AN EXISTING OUTFALL AND ARE THE MINIMUM DISTANCE ALLOWABLE. 3. WHERE SANITARY SEWER OUTFALLS AND MAINS ARE BEING CONSTRUCTED THE TOP OF THE EFFLUENT PIPE AND THE TOP OF THE INFLUENT PIPE SHALL BEAT THE SAME ELEVATION UNLESS CONDITIONS ARE PROHIBITIVE TO THIS PRACTICE. MAIN OR LATERAL MIN. SLOPE 4" @ 2.00% MIN. 6" @ 0.67% MIN./MAIN 6" @ 2.00% MIN./LATERAL 8" @ 0.40% MIN. 12" @ 0.22% MIN. 15" @ 0.15% MIN. 18" @ 0.12% MIN. NO. DATE I REVISION SEWER LATERAL NOTES 1. HOLE IN SANITARY SEWER MAIN MUST BE CUT WITH SHELL CUTTER NO HAMMER TAPS ALLOWED. 2. LATERAL SHALL CONFORM TO ASTM SPECS. D-3034 SDR-26 UNLESS OTHERWISE INDICATED AS DI. 3. ALL PIPE AND FITTINGS SHALL BE 4" OR 6" UNLESS OTHERWISE SPECIFIED. 4. ALL DI PIPE SHALL HAVE AN INTERIOR LINING OF CERAMIC EPDXY (PROTECTO 401). THE ENTIRE DI LATERAL SHALL BE COMPRISED OF DI PIPE AND MECHANICAL JOINT FITTINGS. 5. ALL CONNECTIONS SHALL HAVE RUBBER GASKET SEALS INSTALLED. 6. SANITARY SEWER LATERAL CLEANOUT STACK SHALL BE LOCATED 18" FROM WATER LATERAL LOCK VALVE WHEN IN THE SAME DITCH. 7. INSTALLATION OTHER THAN AS SHOWN MUST BE APPROVED BY THE FAYPWC. 8. CONNECTIONS TO THE TOP OF MAIN SHALL NOT BE ALLOWED, UNLESS OTHERWISE APPROVED BY THE FAYPWC PROJECT COORDINATOR. 9. THE DESIGN ENGINEER SHALL DETERMINE THE SLOPE AND DEPTH OF THE LATERAL BASED ON THE TOPOGRAPHY OF THE LOT. 10. LATERAL SHALL CONFORM TO 2% MINIMUM SLOPE FOR 4" OR 1 % MINIMUM SLOPE FOR 6". THE MAXIMUM LENGTH OF A SEWER LATERAL SHALL BE 60 FEET, UNLESS OTHERWISE APPROVED BY FAYPWC. 11. SEE INTERIOR DROP STRUCTURE OR SLIDE, MORTAR SLIDE AND SHELF DETAIL FOR VERTICAL DROPS OF MAINS AND LATERALS. 12. LATERALS LESS THAN TIN DEPTH OR GREATER THAN 20' DEPTH SHALL UTILIZE DUCTILE IRON PIPE AND FITTINGS WITH CERAMIC EPDXY (PROTECTO 401), OR WHEN SEPARATION REQUIREMENTS CANNOT BE MET. 13. ENTIRE SEWER LATERAL ASSEMBLY SHALL BE AIR TESTED CONCURRENTLY WITH SEWER MAIN. 14. INDIVIDUAL LATERALS SHALL BE CLEANED AND FLUSHED PRIOR TO FLUSHING SANITARY SEWER MAINS. 15. LATERAL SHALL NOT BE BACK -FILLED UNTIL INSPECTED BY THE FAYPWC PROJECT COORDINATOR. 16. WYE CONNECTIONS SHALL NOT BE USED TO TIE LATERALS INTO A MANHOLE. 17. IF BENDS ARE APPROVED BY THE PROJECT COORDINATOR, STONE BEDDING IS REQUIRED TO BE INSTALLED FROM UNDISTURBED (SEE DETAIL S.12) SOIL TO BOTTOM OF BEND. 18. PVC COMBINATION SHALL BE A MOLDED WYE AND BEND, GASKETED, SDR-26, AS MANUFACTURED BY HARCO, GPK OR APPROVED EQUAL. 19. NO MORE THAN 4, FOUR INCH LATERALS OR 3, SIX INCH LATERALS SHALL ENTER A 4' DIAMETER TERMINAL MANHOLE. NO MORE THAN 2 LATERALS (REGARDLESS OF SIZE) SHALL ENTER ALL OTHER 4' DIAMETER MANHOLES. ALL LATERALS SHALL HAVE AN INDIVIDUAL TROUGH. 5' DIAMETER MANHOLES SHALL BE USED IF THE ABOVE CONDITIONS ARE NOT MET. 20. ALL LATERALS (4" AND 6") SHALL UTILIZE A 4" RISER (STACK). 21. REFER TO DETAIL S.12 FOR SEPARATION REQUIREMENTS. 22. FOR SINGLE FAMILY RESIDENTIAL LOTS, CLEANOUT SHALL BE LOCATED 18" FROM RIGHT-OF-WAY OR EASEMENT. FOR ALL NON -SINGLE FAMILY LOTS, CLEANOUT SHALL BE NO CLOSER THAN 10' TO FRONT OF BUILDING, UNLESS OTHERWISE APPROVED BY FAYPWC. THE FOLLOWING TABLE SUMMARIZES THE MATERIALS TO BE UTILIZED FOR SEWER MAIN TO LATERAL CONNECTIONS: PVC Main DI Main DI Lateral DI fitting or approved saddle MJ fitting or approved saddle PVC Lateral PVC fitting or approved saddle MJ fitting with transition gasket or approved saddle NOTE: REFER TO FAYPWC TECHNICAL SPECIFICATIONS FOR ADDITIONAL INFORMATION. SEWER LATERAL NOTES (4-INCH AND 6-INCH) DWG. NO. S.11 DWG. BY: FAYPWC SHEET NO. 1 OF 1 DATE: JAN. 01, 2019 APPROVED BY: JEG UNDISTURBED SOIL SELECT BEDDIN (V LL IYV I L I� T � I SUBBASE SHALL BE UNDISTURBED LPIPE DIAJ SOIL. WHERE SOIL IS DEEMED UNSUITABLE BY THE FAYPWC PROJECT COORDINATOR AUTHORIZED AREA SHALL BE UNDERCUT AND BACKFILLED WITH SELECT BEDDING MATERIAL. GRAVITY PIPING FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, N.C. WATER RESOURCES ENGINEERING DEPARTMENT NOTES: 1. THE SELECT BEDDING MATERIAL SHALL BE WELL GRADED CRUSHED ROCK (NO. 5 OR NO. 57 STONE) FOR THE FULL WIDTH OF THE TRENCH. 2. SELECT BEDDING MATERIAL SHALL EXTEND TO UNDISTURBED TRENCH WALLS. 3. SELECT BEDDING MATERIAL SHALL BE PROPERLY PLACED TO THE SPRING LINE OF THE PIPE FOR ITS ENTIRE LENGTH. rA SEWER BEDDING N.T.S. SHEET NO. DWG. NO. S.13 DWG. BY: FAYPWC 1 OF 1 DATE: JAN. 01, 2019 APPROVED BY: J.E.G. NO. DATE 3 01/13 4 01/15 5 07/18 REVISION SED NOTES AND ADDED TABLE SED NOTE 22, TABLE SED NOTES 6, 9 S1 1 -RESSLAT-NOTES.dwg 4. SUITABLE SOIL BEDDING IS DEFINED AS "NATIVE" SOIL EXCAVATED FROM THE TRENCH, FREE OF ROCKS, FOREIGN MATERIAL, AND FROZEN EARTH. 5. SUITABLE BEDDING MATERIAL SHALL EXTEND TO UNDISTURBED TRENCH WALLS. 6. IF GROUND CONDITIONS WARRANT, IT MAY BE NECESSARY TO BED DUCTILE IRON FORCE MAINS IN SELECT BEDDING MATERIAL (NO. 5 OR NO. 57 STONE) TO THE SPRINGLINE OF THE PIPE. SUCH INSTALLATION SHALL BE AS DIRECTED BY THE FAYPWC PROJECT COORDINATOR. 8" MIN CONTINUOUS 12 GA. SINGLE STRAND COATED COPPER WIRE OR COPPER CLAD STEEL TRACING WIRE REQUIRED FOR ALL NON-FERROUS PIPE (REFER TO FORCE MAIN SPECIFICATION, AND/OR AS DIRECTED BY FAYPWC PROJECT COORDINATOR) FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, N.C. WATER RESOURCES ENGINEERING DEPARTMENT UNDISTURBED SOIL 8" 'Il�uuu MIN. I -I 4" MIN SUITABLE SOIL BEDDING FROM TRENCH 11 I�I EXCAVATION 1°1 Qe (SEE NOTE 4) FORCE MAIN PIPING SUBBASE SHALL BE UNDISTURBED SOIL. WHERE SOIL IS DEEMED UNSUITABLE BY THE FAYPWC PROJECT COORDINATOR AUTHORIZED AREA SHALL BE UNDERCUT AND BACKFILLED WITH SELECT BEDDING MATERIAL (SEE NOTE 6). NO. I DATE REVISION 1 01/01/05 REVISED NOTES 2 01/01/16 REVISED NOTES I I US Army Corps of Engineers L i 10-09-19 O W 0 OCDO O W 0 H U 00 M W 7 CO U_ 2 N < W C� � J Z H � 0 _ �c)U) U� Q LW 20 <00 z0o m } m 0 0 wao W m p W ILT z 0}0 Z Y H (n Q Q3: W Q 00 W Cn W 2 of Y 2 2 D N Z 0 o� �� U�o Z W N z vi U) g W _z W 7i U �o C� Z U � 0z5 Q w > U) Ld W W W j= 2 Y OLLO O z0 WWQ 00 z ¢ W0 ry- O O z U z O � U Q �z g J N J } J_ Q � J QUA U W 0 LL N W 0 z Z W w U' W' N U) Q a- U- � m O W < Z W < SHEET ID S18-PENETRATION-DETAIL.dwg UNCLASSIFIED//FOR OFFICIAL USE ONLY S13-SEWER-BEDDING.dwg LOWE ENGINEERS, LLC REG. #: P-1582 CU502 CORRECTED FINAL - NOT FOR CONSTRUCTION 1 2 3 4 UNCLASSIFIEDHFORIOFFICIAL USE ONLY 7 �7 10 G F E C FINAL GRADE FIRE HYDRANT AND VALVE INSTALLATION N.T.S. DWG. NO. W.13 DWG. BY: FAYPWC SHEET NO. 1 OF 2 DATE: JAN. 01, 2019 APPROVED BY: J.E.G. FAYPWC STANDARD PENTAGONAL OPERATING NUT OPEN COUNTER CLOCKWISE. (2) 2-1/2" NOZZLES AND (1) 4-1/2" NOZZLE WITH FIRE HOSE COUPLING THREAD IN ACCORDANCE WITH FAYPWC STANDARD. NOZZLE CAPS SHALL BE SECURELY CHAINED TO THE HYDRANTS BODY. VALVE x-\ ,• 4-1/2" p •. BARREL d '' 6" GATE VALVE 6" RJDI PIPE I�ld II IJ1.L� I ICI I �I I I-1 �_UNDISTURBED SOIL VARIES 7CU FT NO. 57 STONE PLACED TO A LEVEL 4" ABOVE DRAIN OPENING FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, N.C. WATER RESOURCES ENGINEERING DEPARTMENT NOTES: 1. FIRE HYDRANT SHALL BE MODELS MANUFACTURED BY MUELLER CO. (CENTURIAN), AMERICAN VALVE AND HYDRANT CO. (MODEL MARK 73), CLOW MEDALLION OR APPROVED EQUAL. 2. ALL VALVES AND HYDRANTS SHALL HAVE M.J. CONNECTIONS WITH IRON RETAINING GLAND M.J. RESTRAINT. 3. HYDRANT VALVE SHALL BE PLACED AS CLOSE AS POSSIBLE TO THE MAIN, BUT DO NOT PLACE VALVE IN PROPOSED OR EXISTING CURB AND GUTTER. IF THE STREET IS SOIL AND NO PAVING IS TO BE DONE AT THIS TIME, THE LOCATION OF THE VALVE IS TO BE DETERMINED BY THE FAYPWC PROJECT COORDINATOR. 4. HYDRANT BRANCH SHALL NOT BE BACK FILLED UNTIL INSPECTED AND APPROVED BY FAYPWC PROJECT COORDINATOR. 5. GATE VALVE AND BOX SHALL BE IN ACCORDANCE WITH FAYPWC STANDARD DETAIL. 6. HYDRANT EXTENSIONS AND/OR OFFSETS SHALL BE APPROVED BY FAYPWC PROJECT COORDINATOR. 7. FIRE HYDRANT CONNECTIONS TO EXISTING WATER MAINS SHALL BE MADE USING A TAPPING SLEEVE AND VALVE BY WET TAP CONNECTION. THE TAPPING SLEEVE AND VALVE SHALL BE HYDROSTATICALLY TESTED PRIOR TO STARTING THE TAP IN THE PRESENCE OF THE FAYPWC PROJECT COORDINATOR. 8. THE PROPOSED LOCATION MAY BE RELOCATED BY THE FAYPWC PROJECT COORDINATOR IF CONFLICTS EXIST (IE: GAS SERVICES, UGE, TELEPHONE, ETC.). 9. THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING WATER MAIN MATERIAL, SIZE, AND DEPTH FOR EACH FIRE HYDRANT LOCATION PRIOR TO ORDERING MATERIALS. THE CONTRACTOR WILL BE REQUIRED TO SUPPLY VARIOUS LENGTHS OF BARRELS AND HYDRANT EXTENSIONS (NO MORE THAN ONE HYDRANT EXTENSION MAY BE USED PER HYDRANT). ADDITIONAL FITTINGS AND/OR HYDRANT EXTENSIONS OR OFFSET CONNECTORS MAY BE REQUIRED TO MAINTAIN PROPER COVER AS APPROVED BY THE FAYPWC PROJECT COORDINATOR. FIRE HYDRANT AND VALVE INSTALLATION N.T.S. DWG. NO. W.13 DWG. BY: FAYPWC SHEET NO. 2 OF 2 DATE: JAN. 01, 2019 APPROVED BY: J.E.G. O RICK m LnIz p,� SEE CONCRETE THRUST BLOCK DETAIL - ;:�-� •.soap I... I �I I - I I- I ., -i I• SEE NOTE NO. 4 DI TEE, HYDRANT TEE OR TAPPING SLEEVE AS REQUIRED. (SEE TAPPING DETAIL) M.J. CONNECTION WITH IRON RETAINING GLAND M.J. RESTRAINT SEE NOTE 2 AND FAYPWC STANDARD RESTRAINING DETAIL. NO. DATE 1 10/23/03 2 07/01 /09 3 07/01/16 REVISION ISED NOTE NO.4 ISED NOTE NO. 2, REMOVED NOTE 3 AND ALTERED RESTRAINT DETAI ISED NOTES W13-FHCC.dwg 10. CONTRACTOR SHALL NOTIFY THE APPROPRIATE FIRE DEPARTMENT OF OUT OF SERVICE FIRE HYDRANTS PRIOR TO CONSTRUCTION. 11. FIRE HYDRANT SHALL BE FIELD PAINTED IN ACCORDANCE WITH FAYPWC STANDARDS, BEFORE PROJECT IS ACCEPTED. HYDRANTS SHALL BE PAINTED WITH A GREEN BONNET AND YELLOW BODY. PAINT SHALL BE IN ACCORDANCE WITH FAYPWC REQUIREMENTS. THE CONTRACTOR SHALL PAINT ALL EXPOSED EXTERIOR FIRE HYDRANT SURFACES PRIOR TO FINAL ACCEPTANCE BY FAYPWC. ALL PAINTING SHALL BE DONE IN STRICT ACCORDANCE WITH THE PAINT MANUFACTURER'S RECOMMENDATIONS AND SHALL BE SATISFACTORY TO THE FAYPWC. 12. PROTECTIVE COVERING SHALL BE UTILIZED, AS NECESSARY FOR PROTECTION OF ADJACENT AREAS, EQUIPMENT, SHRUBBERY, OR OTHER ITEMS. AFTER PAINTING IS COMPLETE, THE ENTIRE AREA SHALL BE THOROUGHLY CLEANED UP. 13. ALL PAINT MATERIALS SHALL BE IN THE ORIGINAL SEALED CONTAINERS BEARING THE MANUFACTURER'S NAME. 14. WHERE NECESSARY, THINNING SHALL BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS, AND AS APPROVED BY FAYPWC. 15. ALL SURFACES TO BE PAINTED SHALL BE CLEAN AND DRY. 16. THE BONNET OF THE FIRE HYDRANT SHALL BE PAINTED A DARK GREEN, UTILIZING AN ALKYD OR POLYURETHANE ENAMEL, WITH A FINAL DRY MIL THICKNESS OF 4 TO 6 MILS. MULTIPLE COATS MAY BE NECESSARY TO ACHIEVE THE FINAL REQUIRED DRY MIL THICKNESS. THE PAINT SHALL BE FOREST GREEN, AS MANUFACTURED BY THE SHERWIN-WILLIAMS COMPANY, PART NUMBER 822918, OR APPROVED EQUAL. SAMPLES SHALL BE SUBMITTED IN ORDER FOR FAYPWC TO CONSIDER ALTERNATIVE PAINT MANUFACTURERS. 17. THE REMAINDER OF THE FIRE HYDRANT SHALL BE PAINTED SAFETY YELLOW, UTILIZING AN ALKYD OR POLYURETHANE ENAMEL, WITH A FINAL DRY MIL THICKNESS OF 4 TO 6 MILS. MULTIPLE COATS MAY BE NECESSARY TO ACHIEVE THE FINAL REQUIRED DRY MIL THICKNESS. THE PAINT SHALL BE YELLOW, AS MANUFACTURED BY THE SHERWIN-WILLIAMS COMPANY, PART NUMBER 3186, OR APPROVED EQUAL. SAMPLES SHALL BE SUBMITTED IN ORDER FOR FAYPWC TO CONSIDER ALTERNATE PAINT MANUFACTURERS. FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, N.C. WATER RESOURCES ENGINEERING DEPARTMENT NO. DATE 1 10/23/03 2 07/01 /09 3 07/01/16 REVISION ISED NOTE NO.4 ISED NOTE NO. 2, REMOVED NOTE 3 AND ALTERED RESTRAINT DETAIL ISED NOTES W 13-FHCC.dwg NCD BRICK SECTION A -A GROUND LEVEL ANGLE BALL VALVE SOLDER BUSHING TEE\12"x2"DIA MALE BRASS NIPPLE 2" LATERAL, INSTALLED IN ACCORDANCE WITH FAYPWC DETAIL W.30. TRACING-` WIRE 2" BRASS F.I.P x PACK JOINT FOR PVC ADAPTOR CONTINUOUS NCDOT--/ CONCRETE BRICK SUPPORT BASE FOR ROD EL ✓IA STEEL ROD 2" F.I.P. CONTINUOUS NCDOT INLET/OUTLET CONCRETE BRICK SUPPORT FOR ROD 2" COPPERSETTER WITH BY-PASS 23-1/2" METER SPACING N.T.S. DWG. NO. �/ rj DWG. BY: FAYPWC SHEET NO. 1 OF 2 DATE: JAN. 01, 2019 APPROVED BY: J.E.G. C== WATER OSKID RESI 7- 37-5/8"- i -0 46 /2" BOX PLAN VIEW BALL VALVE TO PROVIDE SUPPORT FOR TIGHTENING OF FITTINGS A 20"x3/4" DIAMETER STEEL ROD SHALL BE PLACED THRU SUPPORT BAR HOLE. ROD SHALL BE TIGHTENED TO "SUPPORT BAR HOLE" WITH STEEL NUTS AND WASHER. ROD SHALL BE PAINTED WITH 2 COATS BITUMINOUS PAINT, STAINLESS STEEL, OR GALVANIZED. FOR BOX SEE FAYPWC DETAIL W.5 SHEET 2 OF 2 STEEL ROD -12"x2"DIA BRASS NIPPLE WITH CAP `­12" GRAVEL FLOOR COMPACTED SUBGRADE FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, N.C. WATER RESOURCES ENGINEERING DEPARTMENT 00 N M 35-5/8" .t ih c 46-1/2" - BOX & COVER SECTION (2) 7/8"DIA THRU HOLE WITH 3/8"x5/8"DIA DEEP ' COUNTERBORE 4"x5/8" PULL SLOT WITH 1/4"DIA CENTER PIN (2 PLACES) N WATER � O SKID RESISTANT SURFACE Y 35-5/8" 1-15/16"x2-5/8" SLOT COVER WITH (4) 1/2"x5/8"DIA DEEP COUNTERBORE 26" 34-7/8" END VIEW 26"------------------•{ NOTES: 1. ALL MATERIALS SHALL BE APPROVED BY FAYPWC. 2. LOCATION OF BOX SHALL BE AS DETERMINED BY FAYPWC PROJECT COORDINATOR. IN NO CASE SHALL BOX BE INSTALLED CLOSER THAN 5' TO BUILDING. 3. LATERAL SHALL BE INSPECTED AND APPROVED BY FAYPWC PROJECT COORDINATOR PRIOR TO BACKFILL. 4. CONTRACTOR TO INSTALL TRACING WIRE INTO BOX. A MINIMUM 2' OF WIRE SHALL BE IN BOX. 5. FOR METER BOX SEE FAYPWC DETAIL W.5 SHEET 2 OF 2. OTHERS NO. DATE REVISION 1 07/13 REVISED, UPDATED NOTES 2 07/17 UPDATED NOTES W5-2-METER-SETTE R.dwg NOTES: 1. ALL MATERIALS SHALL BE APPROVED BY FAYPWC. SEE FAYPWC DETAIL W.5 SHEET 1 OF 2 FOR ADDITIONAL INFORMATION. 2. METER BOX BASE SHALL BE FIBERGLASS. METER BOX LID SHALL BE COMBINED POLYMER CONCRETE AND FIBER REINFORCED POLYESTER. 3. METER BOX SHALL NOT BE LOCATED WHERE H-20 LOAD CAN IMPACT BOX OR COVER. 4. FOR 1-1/2" METER WITHOUT BYPASS SEE FAYPWC DETAIL W.29. COVER STAINLESS STEEL CAPTIVE BOLT SELF -CENTERING CORROSION RESISTANT NUT i COVER BOLT DOWN COMPOSITE BOX V�V-;awwm co MOUSEHOLE (ONE CENTERED 0 BOTTOM EACH END) OL 001 ,--L PENING r� 46-5/8" 34-7/8" 30-1/2"x42-1/8" EXTENSION SECTION END VIEW ISOMETRIC VIEW 1-1/2" AND 2" BY-PASS METER BOX FAYETTEVILLE NO. DATE REVISION PUBLIC WORKS COMMISSION N.T.S. FAYETTEVILLE, N.C. 1 12/15 REVISED LID SHEET NO. DWG. NO. W.5 DWG. BY: FAYPWC WATER RESOURCES 2 OF 2 DATE: JAN. 01, 2019 APPROVED BY: J.E.G. ENGINEERING DEPARTMENT W5-2-METER-SETTER.dwg US Army Corps of Engineers 10-09-19 O W 0 �CDz OU w � � o�U W 7 �< U 04 1—D ° W cD co N J Z o �c)U) - U� Q ww 20 <00 z0o 0 0 m } m m Q E:- LL w m w z Z Y (n QQ 3: W Qm­3 wCn w 2 ofY 2 2 D 2 N Z 0 o� o� U�o Z W N � z uS U) g W �z W 7i U C� Z U� �ZO- W Q w > U) Ld W W �j = 2 Y OLLO O 0- Oz QUO O Oz o U z O < _z g J 88Q Q z} J >- O L - (n U J LL 0 Q N wQ 0QZ z�-m (If C! � CD- N Lu SOW m O O� W SHEET ID UNCLASSIFIED//FOR OFFICIAL USE ONLY LOWE ENGINEERS, LLC REG. #: P-1582 CU503 CORRECTED FINAL - NOT FOR CONSTRUCTION W-1 F E A 1 LEGEND 2 CB CATCH BASIN COO SANITARY CLEAN -OUT DI DROP INLET FFE FINISHED FLOOR ELEVATION BL BOLLARD RCP REINFORCED CONCRETE PIPE ✓e JUNCTION BOX 280 NEW CONTOUR -- - - - - 28� ------ EXISTING CONTOUR 282 X SPOT ELEVATION EXISTING DRAINAGE PIPING ® EXISTING DROP INLET — — LIMITS OF CONSTRUCTION EXISTING CONCRETE EXISTING ASPHALT NEW CONCRETE NEW ASPHALT LANDSCAPING W v B I TREE NOTE BASED ON DISCUSSION WITH USACE ON 5/6/19, THE OWNER WILL PROVIDE INSTRUCTIONS FOR THE GC TO SUPPLY AND PLANT 70 TREES OFFSITE WITHIN A 20 MILE RADIUS OF THE PROJECT LOCATION IN ACCORDANCE WITH THE DD1391, 50 DECIDUOUS TREES AND 20 CONIFERS; SITE TO BE DETERMINED BY CONTRACTING OFFICER. RAI �3 BUILDING 3352 4 UNCLASSIFIED//FOR OFFICIAL USE ONLY 7 8 5 6 MATCHLINE SEE THIS SHEET BUILDING 3352 (FULL OF WATER) CONNECTING PIPES UNDETERMINED D2-HW S oS l EXISTING ASPHAL T PARKING LOT MATCHLINE SEE THIS SHEET LANDSCAPING PLAN SCALE: 1" = 30' \ ASPHALT n\- WETLANDS BDY ■46, 9 1 1 1 1 I I I I I Illllli 10 MATCHLINE SEE THIS SHEET � I � I cr)co N w III � / 18'RCP / / I 1 � � 1 E a EXISTING PA ING LOTX-DI TOP: \ 2\� \3 7 1 E IN: 233.55 24'RCP I.EOUT-231.47 z24'RCP EX -DI \1, U) TOP: 239.99 o I.EIN(18'):23539 U- 1E IN(24'): 234.83 1.EOUT-234.82 U) II � I II I / CONC. WALK / lr (BUILDING � II � II I I I I I co j J 9 LOWE ENGINEERS, LLC. N REG. #: P-1582 30 0 30 60 90 GRAPHIC SCALE: 1 INCH = 30 FEET \ 5 I I US Army Corps of Engineers 10-09-19 A�n ULIG00 J I TOP: \ 2\� \3 7 1 E IN: 233.55 24'RCP I.EOUT-231.47 z24'RCP EX -DI \1, U) TOP: 239.99 o I.EIN(18'):23539 U- 1E IN(24'): 234.83 1.EOUT-234.82 U) II � I II I / CONC. WALK / lr (BUILDING � II � II I I I I I co j J 9 LOWE ENGINEERS, LLC. N REG. #: P-1582 30 0 30 60 90 GRAPHIC SCALE: 1 INCH = 30 FEET \ 5 I I US Army Corps of Engineers 10-09-19 A�n ULIG00 J I J I 0 z Q O w cn OU ui O CD Z w o H 2< U � O rn w 7 U w 0 Z (D � O ~ U) N co J (� _ �oU�OU U� Z o Q 20 <00 z00 0 0 m } m m Q J00 o m o LLI Z C� Z Y ina¢ w 2i Y wam 2 2i D Lu N Z p = p U) U = cn H CO Q 0 o� U�o Z w N � Z cog Lu w J U)Z ZOO U0 �Q w > W U)U) Ld WY w Ln= 2 OLLO O 0- O z O Q,CE fr- O Uz U z O Q _jO 2 00 J Q z_} J� Z J ULL� D_ H (/) rn 0- OOZ z�-w a Q CD- 0� N U �Ow Z LL m Q O U) o LL SHEET ID L-101 UNCLASSIFIED//FOR OFFICIAL USE ONLY CORRECTED FINAL - NOT FOR CONSTRUCTION