Loading...
HomeMy WebLinkAboutSW7120101_CURRENT PERMIT_20120306STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW l D DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE YYYYMMDD l ii RA NCDENR North Carolina Department of Environment and Natura Division of Water Quality Beverly Eaves Perdue Governor Eastern Pride Inc. Attn: Mr. Barnes Boykin 2405-F Nash Street Wilson, NC 27896 Dear Mr. Boykin: Charles Walkid Director March 6, 2012 Wo--R U Resources Dee Freeman Secretary Subject: Stormwater Permit No.SW7120101 Family Dollar Store - Sunbury High Density Stormwater Project Gates County The Washington Regional Office received your completed application for, a Stormwater Management Permit on February 29, 2012 Staff review of the plans and specifications has determined that the subject project will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7120101 dated March 6, 2012 for the subject project. This permit shall be effective from the date of issuance until March 6, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit and in the submitted application. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. North Carolina Division of Water Quality Internet: www.ncwaterquality,arg 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper NorthCarolina Naturally Page 2 of 9 Eastern Pride, Inc March 6, 2012 Page Two If you have any questions, or need additional information concerning this matter, please contact either Bill Moore, or me at (252) 946-6481. cc: Pamlico Engineering Services, PLLC Gates County Planning/Inspections Washington Regional Office Page 3 of 9 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Eastern Pride, Inc Mr. Barnes Boykin Gates County FOR THE construction, operation and maintenance of a wet detention pond system in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for the Family Dollar Store located at Sunbury, NC. This permit shall be effective from the date of issuance until March 6, 2020 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on page 4 of this permit. 3. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans and permit. 4. The tract will be limited to the amount of built -upon area indicated on page 4 of this permit, and per approved plans. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control system. Page 4 of 9 5. The following design criteria have been provided for the construction of the wet pond system and must be maintained at design condition: a. Total Site Area: 1.53 acres b. Impervious Area: 0.66 acres d. Required Storage Volume: 3663 cf e. Provided Storage Volume: 3920 cf f. Required Surface Area: 2932 sf g. Provided Surface Area: 6329 sf g Design Storm: 1.5-inch Receiving Stream: UT -Raynor Swamp Classification of Water Body: C-NSW II. SCHEDULE OF COMPLIANCE The stormwater management system -shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plans must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, filter media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 5 of 9 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 6 of 9 13. This permit shall be effective from the date of issuance until March 6, 2020. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily; including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project. are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the project. Page 7of9 9. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. Permit issued this the 6th day of March, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ror ynartes wawa;�-Wy uirecror Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7120101 Page 8 of 9 Stormwater Permit No. SW7120101 Wet Pond System Family Dollar - Sunbury, NC Gates County Designer's Certification as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Note: The checklist on the following page must be included with this Certification. Any changes or deviations from the approved plans and specifications must be explained in detail, and may require a permit modification. The certification forms should be submitted to the Division of Water Quality at the appropriate Regional office. SEAL Signature Registration Number Date Page 9 of 9 Complete this checklist for each system and include with Certification: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure elevations are per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. kla(kv ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality September 4, 2019 Attention: Mr. John G. McLeod, General Partner MCE Commercial, LLP 418 First Street Roanoke, VA 24011-1920 Subject: Stormwater Permit Renewal & Ownership Change Stormwater Management Permit SW7120101 Family Dollar Store - Sunbury, NC Gates County Dear Mr. McLeod: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7120101 for a stormwater treatment system consisting of a wet detention pond serving the Family Dollar Store located at 1001 US 158 East in Sunbury, NC expires on March 6, 2020. Permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. The permit was originally issued to Eastern Pride, Inc. It was noted in the Gates County tax records that the property is now owned by MCE Commercial, LLP. Permits are not automatically transferred to new owners without the submittal of an ownership change application and fee. You were notified in 2016 that this permit needed to be transferred. As of this date we have not received a transfer application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal and an ownership change application with an additional $505.00 fee. Application forms for renewal and ownership change can be found on our website at: htt�l_1deq.nc.govJabout/divisions /energy-mi neral-land-resources/energy-mineral -land - rules f stormwater-program/post-construction. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. Failure to submit the required applications will result in this office pursuing an enforcement action. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application forms. You can request a copy of the applications by e-mailing me at roger.thorpe@ncdenr.gov. Sincerely, Roger K. Thorpe Environmental Engineer ®� ��� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Washington Regional Office 1 943 Washington 5quare Mall f Washington, North Carolina 27889 r«\ r 252.946.6481 Page 8 of 9 Stormwater Permit No. SW7120101 Wet Pond System Family Dollar - Sunbury, NC Gates County Designee's Certification RECEIVED h� SEP 1 2 2012 DWQ-WARO tMarie U Peedin , as a duly registered engineer in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, Family Dollar Sunbury (Project) for Eastern Pride, INC (project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Note: The checklist on the following page must be, included with this Certification. Any changes or deviations from the -approved plans and specifications must be explained in detail, and may require a permit modification. The certification forms should be submitted to the Division of Water Quality at the appropriate Regional office. SEAL Signature 20212 Registration Number Date 9/12/12 _ F t'• ' � r :S' -r , r � �1'ti ,r i.1�r1 �' ., 1 -� � • r�.J _ i .1 .. r. .y .lr! _ � - �Jr ^r :A�..�J .,. I.r �� 1 l:�1'� •r. '.lip . _ .. � aar" I i rr.i r Page 9 of 9 Complete this checklist for each system and include with Certification: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. -All roof drains are located such that the runoff is directed into the system. l 5. The bypass structure elevations are per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. --'9. Vegetated slopes are no steeper than 3,1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. ---11. The permitted amounts of surface area and/or volume have been provided. �12. All required design depths are provided. l 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. r��, •3... .0 � ..,� r.r'• � "•f'+ a 1 '�'�` �' [r•�.�f � .n.11li .`fit~• , .. fir• � , ... ..; ems. , .. _,4 +... k• .�;_.. �+� i.J:, .a.' ° 1 ~s I._ �Y'� � �'., i�'��1 �.� i-.'�1 -� � �� it , '�• 3 � ` - DWQ USE ONLY Date Received Fee Paid Permit Number a of el f Applicable Rules: ❑ Coastal SW - 7995 ❑ Coastal SW - 2008 ❑ Ph I1- Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Managem nt Plan ❑ Other WQ M mt Plan: State of North Carolina RECEIVED Department of Environment and Natural Resources Division of Water Quality JAN - 3 2012 STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form rimy be photocopied for rise as air original D n j' �Q— /{, / A/� R O 1. GENERAL INFORMATION j� 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Sunburn - Family Dollar 2. Location of Project (street address): US 158 Hwy City:Sunbury County:Gates Zip: 27979 3. Directions to project (from nearest major intersection): Project is located approximately 600 if west of the intersection of NC 32 and US 158 4. Latitude:.36° 35' 08" N Longitude:76 ° 45' 05" W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Spec ify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: ®Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. if this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 1.5 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-l01 Version 07July2009 Page I of .: - .:. _ - '. :. � c - ` J _. � .- � t. - - - � .. � - � - .� -" �� �- �.. _ � .4 i. ,. ..a � - I h� ` - � � - .. �_ � 4 � 4 .1I1. CONTACT INFORMATION 1, a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the ro'ect : Applicant/Organization: Eastern Pride Inc. Signing Official & Title:Barnes Boykin b.Contact information for person listed in item la above: Street Address:2405-F Nash Street City:Wilson _ _ State:NC Zip:27896 Mailing Address (if applicable): City: Phone: (252 ) 230-0632__ Email: State: Zip: Fax: ( 1 c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ® Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/ Organization:Fank T Cross and MaryAn_n_ Cross Busby___ Signing Official & Title:Owners b.Contact information for person listed in item 2a above: Street Ad City: State: Zip: Mailing Address (if applicable):P O Bx 6564 City:Raleigh State:NC Zip:27628 Phone: (�) Fax: ( _ Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organization: S eld en Taylor - Stock and Taylor Construction Co. Signing Official & Title:Selden Taylor, P.E. President b.Contact information for person listed in item 3a above: Mailing Address:1825 Carolina Ave City:Washington State:NC Zip:27889 Phone: (252 ) 975-5855 Fax: {- ) Email: 4. Local jurisdiction for building permits: Gates County Point of Contact:Edgar Mitchel Phone #: 357-2411 Form SWU-101 Version 07July2009 Page 2 of .IV. ' 'PROJECT INFORMATION 1 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff from the development shall be treated !�y a wet p9nd and then controlled overflow into an existing farm ditch 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Chowan 4. Total Property Area: 1.53 acres River basin. 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':1.53 acres Total project area shall he calculated to exclude thefollowing: the normal pool of impounded stnrctures, the area between the banks of streams and rivers, the area belozo the Nonnal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line rnmy be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / TotaI Project Area) X 100 = 43.29 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered Stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Draina a Area 1 Drainage Area _ Drainage Area _ Drainage Area Receiving Stream Name Trib to Raynor Swam Stream Class * C:NSW Stream Index Number * 25-17-2 Total Drainage Area (so 66646 Y ' On -site Drainage Area (sf) 66646 %, 53 G`, Off -site Drainage Area (sf) 0 Proposed Im ervious Area** (so 28849 % Impervious Area** total 43.29 Impervious- Surface Area Drainage Area 7 Drainage Area Drainage Area Drainage Area _ On -site Buildings/Lots (so 8000 0 On -site Streets (sf) 0 On -site Parking (so 19679 On -site Sidewalks (so 1170 0 Other on -site (so 0 Future (so 0 Off -site (sf) 0 Existing BUA*** (so Total (sf): 28849 Stream Class and Index Number can be determined at: llttp://h2o.eizr.state.irc.rrs/hizzrs/reports/reportsWB.l2tzxl Form SWU-101 Version 07July2009 Page 3 of * bri ervivxts area is drfined as the built upon area including, but not limited to, buildings, roads, parking areas, siYeewalks, gravel areas, etc. ***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. NA Projects in Union County: Contact DWQ Central Office staff to check if 1he project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 01B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http:/Lh2o.enr.state.nc.us/su/bmp_forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http:%/h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hqp://h2o.enr.state.nc.us/su/bmp_forms.htm. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed,_signed _and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to hU://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/ma.nagement 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'/2 mile of the site boundary, include the z/z mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands Iandward of the MHW or NHW lines. + Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/ project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. nit' s nl A fort T Form SWU-101 Version 07July2009 Page 4 of 6 o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verefij the SNWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 201 Page No: 164 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1 a, 2a, and/or 3a per NCAC 21H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http:/ /www.secreta!y-state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any Iot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htmgdeed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Marie U. Peedin, PE Consulting Firm: Pamlico Engineering Services PLLC Mailing Address:128 Abbey Lane City:Washin ton State:NC Zip:27889 Phone: (252 ) 945-2983 Email:pRspllc@embargmaii.coni Fax: (252 ) 974-7618 IX. PROPERTY OWNER AUTHORIZATION (if Con fact Information, item 2 has been filled out, complete this section) 1, (print or type name of person listed in Contact Information, item 2a) FrankT Cross, Mani Any Cross Busby of organization listed in Contact Information, item 1b) Eastern Pride Inc. to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Forth SWU-101 Version 07July2009 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I wiIl be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to$255,0,0/0 per day, pursuant to NfC�GS 14.3-215.b. l Signa re: _ 4 _ R A —(-( K Arn�1� 5�J_}'�i/S Date: I, r r a Notary Public for the State of �t7r�� rp�i na . County of ir10 W8 dohereby certifythat - !I �5 L • i n e r- personally appeared before me this 'day of 1 �C 1�e' ad !1 . and a kn ledge the 'a e a Iication for a stormwater permit. Witness my hand and official seal, SEAL KRISTY L LaLONDE NOTARY PUBLIC CHMAN COUNTY, NC My commission expires. X. APPLICANT'S CERTIFICATION 1. de? / I, (print or type name of person listed in Contact Inf7rmation, item 2) Barnes Rpylan certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. fl - Post Construction) or SL 2008-211. 1 � I, 1 a Notary Public for the d ereby certify that before me Jis J day of 1 { and a knowI a stormwater permit. Witness my hand and official seal, M1�,I sit. Z= dip. ed 14fii; LI�it��' SEAL My commission expires - Date:/-Ui 0h) of I N�d Cph� County of personally appeared due execution of the application for Farm 5WU-101 Version 07July2009 Page 6 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civ' Ities of up to ,000 per day, pyrsuant to NCGS 143-215.6. Signature: Date: IZ - 2- 1 - Zo I / I, - Charlofk F. Wa4res , a Notary Public for the State of tJorl-h earrib a County of G! (Lb ___ . ----...,do hereby certify that Fra „kC ruc-Ler C'r01,-< personally appeared before me this Z1 day of ccm er ZVII and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, _ tJ__..u�Ie T.- — B NCDL '4X7Lifcq vComm. Exp• '_. c la 2-28-2015. G �4 5 k X- APPLICANT'S CERTIFICATION SEAL My commission expires Z- zB-Za1S Y I, (print or type name of person listed in Contact Information, item 2) Barnes Bmrkan certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. it - Post Construction) or SL 2008-211. V I, a Notary Public for the Statp of d ereby certify that ) L�- "- ( before me day of I D l { and artknowlecip t f a stormwater permit. Witness my hand and official seal, J SEAL Date:_ I1.I oh) � PiAAaCountv of '�- personally appeared execution of the application for My commission expires $' la-aw_ le _- Form SWU-101 Version 07July2009 Page 6 of 6 4 Permit Number: (to be provided by DWQ) Drainage Area Number. Wet Detention Basin Operation and Maintenance Agreement I will [seep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is prVVECEIVED This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. Jq N - 3 2012 This system (check one): ® does ❑ does not incorporate pretreatment other than a ebay. w' Important maintenance procedures: -- Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. -- Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential probleirn How I will remediate the roblem: The entire BMP Trash debris is present. Remove the trash debris. 'The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary bo detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Donn SW401-Wet Detention Basin O&M-Rev.4 Page I of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem; The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth, Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to he provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill In the blanks) Q Permanent Pool Elevation 33 Sediment Removal . 31 rSVedime\nt nel ------�--------lumSediment Removal Elevation 27.5 Volume Bottom Elevatio 30 in. ------ Bottom Elevation 26.5 I-ft n. Storage Sedimeni Storage FOREBAV MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project nameTamily Dollar Sunbury BMP drainage area number: I Phone: Signature: <Z;-� Date: Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, _ I �. — __ , a Notary Public for the State of County of , do hereby certify that "kt,' ti. __ ersonally appeared before me this day of j;: 4 �� D 11 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my band and official seal, SEAL l�I 111 `%%Ovr �10�4' .9 • z` My commission expires___ 3- a y - C20J � _ T Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 i rr Permit No. fro be provided by DWOJ ®�� a0F WA7-�c9p � HCDEHR Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, prirRed and submifted. The Required Items Check& (Part 111) must be printed, filled out and submitted abng wdh all of the required information. IL PROJECT INFORMATION Project name Family Dollar- Sunbury Contact person Marie U Peedin, PE Phone number 252-945-2983 Date 1213012011 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 66.646 fe Impervious area, post -development 28,849 fl2 % impervious 43.29 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required 3,663 ft3 , OK Vobane provided 3,920 ft3 OK, volume provided is aqual to or in excess of volume required. Storage Volume: SA Waters 1.5' runoff volume fly Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff Minimum volume required ft3 RE Volume provided ft3 Peak Flow Calculations J A N — 3 2012 Is the pre/post control of the lyr 24hr storm peak flow required? Y (Y or N) 1-yr. 24-hr rainfall depth 3.0 in Rational C, pre -development Rational C, post -development 0.20 (uniUess) 0.60 (unittess) 4 Q'I »' , Rainfall intensity: l-yT, 24-hr storm 0,13 irdhr OK Pre -development 1-yr, 24-hr peak flow 0.07 h31&ec Post -development t-yr, 24-hr peak flow 0.10 R31W PrefPost 1-yr, 24-hr peak flow control 0.03 folsec Elevations Temporary pool elevation 33.50 fmsl Permawt pod elevation 33.00 fmsl SHWT elevation (approx. at the pens. pod elevation) 33.00 W Top of 1 Oft vegetated shelf elevation 33.50 fmsl Bottom of 10ft vegetated shelf elevation 32.50 frnsl Sediment deanout, top elevation (bottom of pond) 27.50 fms! Sediment deanout, bottom elevation 26,50 imsl Sediment storage provided 1.00 ft Is there additional volume stored above the state -required temp. pod? Y (Y or N) Elevation of the top of the additional volume 33.5 fmsl OK Form SW401-Wei Detention 8asin-Rev.e-9117W Parts 1. 8 II, Design Summary, Page 1 of 2 r Y • it „: '�' .� N Permit No. (to be provided by DM) Surface Areas Area, temporary pool Area REQUIRED, permanent pool —SAIDA ratio Area PROVIDED, permanent pool, A ._,,d Area, bottom of 10fl vegetated shelf, Ab., dr Area, sediment deanout, top elevation (bottom of pond), Atm_pc d Volumes Volume, temporary pod Volume, permanent pod. VP--P d Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pod volume SAlDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vp,,,pw Area provided, permanent pod, Aw,,,_xd Average depth calculated Average depth used in SAIDA, d. (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pod, Apm_xd Area, bottom of 10ft vegetated shelf, Am w m Area, sediment deanout, top elevation (bottom of pond), Air w„ d "Depth' (distance bhv bottom of 10ft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d. (Round to nearest MR) Drawdown Calculations Drawdown through orifice? Ilame ter of orifice (If circular) Area of orifice (it -non -circular) Coefficient of discharge (Co) Driving head (H.) Drawdown through weir? Weir type Coefficierd of discharge (Cw) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post-developmerd 1-yr, 24-hr peak Bow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional tnforoation Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: 9,345 ft 2,932 ft7 4.40 (unitless) 6,329 fen 4,704 ft` 2,054 3,920 ft3 OK 18,584 to 3,350 ft' 18.0% % OK r90%, Y (Y or N) N (Y or N) 4.40 (unittess) N (Y or N) 18,584 ft' 6,329 ft` 2.07 ft 4.0 ft y (Y or N) 6,329 ft` 4,704 ft 2,054 5.00 ft 4.00 ft 4.0 ft Y . (Y or N) 2.00 in in' 0.60 (unilless) 0.17 it N (Y or N) (unitless) (unitless) ft it 0.07 ft3lsec 0.10 ft3lsec 0.02 felsec 2.00 days 3 :1 10 :1 1 a.0 ft 3 :1 2.0 :1 Y (Y or N) Yft N (Y or N) n (Y or N) Y (Y or N) Sump pump Need 3 ft min, Insufficient. Check calculation. OK OK OK, draws down in 25 days. OK OK OK OK OK OK OK OK Insufficient. Recorded drainage easement required. OK Form SW401-Wet Detention Basin-Rev.8-9117l09 Parts 1. & R. Design Summary, Page 2 of 2 JI Permit No. (to be provided by DWQ) III. REQUIRED !ITEMS CHECKLIST Please indicate the page or plan street numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Paget Plan Initials Sheet No. -U° 1. Plants (1' - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. C _G c 7 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, - Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and - Filter strip. -003 3. Section view of the wet detention basin (1" = 20' or larger) showing: -Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. C - D b3 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. —4 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. N IV 9. A copy of the deed restrictions (if required). 10, A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9l17l09 Part III, Required Items Checklist, Page 1 of 1 r rn 4. ,r , d • Ie. v lid 1. � � , _ f!'..- 11 t .. y,q .t yji. •1?i . r. S4 I ' .� ~!.. C�i'. Ilc , n �." ' _'t,r 11 ._ __ Compliance Inspection Report Permit: SW7120101 Effective:03/06112 Expiration: 03/06/20 Project: Family Dollar - Sunbury Owner: Eastern Pride Inc County: Gates Adress: US Hwy 158 Region: Washington City/State/Zip: Sunbury NC 27979 Contact Person: Barnes Boykin Title: Directions to Project: Project is located approx 600 ft west of the intersect of NC 32 8 US 158 Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Duke Swamp) (03-01-01 } ( C:NS11V) On -Site Representative(s): Related Permits: Inspection Date: 1010512018 Entry Time: 01:OOPM Primary Inspector: William J Moore Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ® Not Compliant Question Areas: State Stormwater (See attachment summary) Ke r;- 4Te /Ct)41� c%ed ,�•, ��r� sus 34., q- - C' Phone: 252-230-0632 Exit Time: 01:30PM Phone: 252-946-6481 Ext.264 Inspection Type: Compliance Evaluation page: 1 Permit: SW7120101 Owner - Project: Eastern Pride Inc Inspection Date: 10/0512018 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: Site inspection 10/05/2018 at Family Dollar Store located adjacent to US Hw 158 in Sunbury, NC. Site is 1.53 acres with 0.66 acres impervious area. Project appears to be constructed according to plans. The following observations/comments are provided: Interior banks/slopes of wet pond are overgrown with small trees; predominately pines & river birch; some 10-15 ft tall. Dominant vegetation in forebay & at perimeter aquatic shelf is cattails. These conditions indicate a lack of maintenance. Need to remove trees, cattails & restore slopes as need. Inlet & Outlet are overgrown with cattails. Remove vegetation from around structures; check for stability; repair any erosion PE Certification submitted 9/12/12. Signed O&M in files. Review of file indicates ownership change but no apparent response from new owner. Needs follow-up to get permit issued in current owners name. Built U12on Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ® ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ® ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ® ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ® ❑ ❑ ❑ Are the inlets located per the approved plans? ® ❑ ❑ ❑ Are the outlet structures located per the approved plans? ® ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ❑ ®❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ ❑ DWQ upon request? Comment: see summary comments /ac* o -jr `�o 4d.5 /ern ! t,c/P 7114 N4r,e�o�ne+-s�C36C"-45e -;Io A(CF C7,— —erC_,•.W_Q - X. Al r r C 7eI-e rc� _,4Q Leh page: 2