Loading...
HomeMy WebLinkAboutSW7030905_HISTORICAL FILE_20040220STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ?I HISTORICAL FILE DOC DATE % YYYYMMDD • . . o RECEIVED ENGINEERING TRANSMITTAL LETTER µ� OL s A,/v� r! G .t 7 y Y 9 We are trans;� fitting: ov'� Attached ❑ Under Separate Cover ❑ Via email / ftp The.following items: w' Plans ❑ Drawings ❑ - Application/Fee CH Engineering, PLLC 4601 lake Boone Trail Raleigh, NC 27607 919.788.0224 919.788.0232 (fax) FEB 2 0 2004 D}!dQ'WARC DATE: �� �i�o y JOB NO: RE: %vK Delivered via: ❑ Courier ❑ Overnight Delivery ❑ Mail ❑ Plats ❑ Specifications ❑ Shop Drawings o Other ❑ Digital Files ❑ Change Orders o Documents COPIES DESCRIPTION .2 e-' le A o f a /,- -&.3 / For Approval ❑ Approved as Submitted iYFor Your Use a Approved As Noted ce"'As Requested ❑ Returned for Revisions o For Distribution ❑ For Review and Comment II 1�,k"I .. '/',. ' JCL...f '5— S �( C-02 �/ L� t � L/t,� / 'n G�,.rI O �n s 1 art[. d ra w w- ' •• O +� / by a ! i A j4 J.C.. - ! �S �r+�...a 3+� l_ �i•� �d 1d L • / Signed RECEIVED NATURE AND PURPOSE OF PROJECT & STORMWATER MANAGEMENT NARRATIVE FEB 2 0 2004 EDENTON ARMORY MOTOR VEHICLE STORAGE COMPOUND DWrq_Wn pO This project consists of upgrading an existing National Guard Armory in Edenton to provide for an expanded Motor Vehicle Storage Facility. The existing facility consists of a brick single story building with a combination of concrete and asphalt parking surrounding the facility. North of the the facility resides the Edenton Municipal Airport. The site which is targeted for the expansion is an existing grassed field west of the ArmoryBuilding . It is bordered on the west and south by asphalt roadways, SR 1134. and NC 94 NCDOT indicated that the area was not an AEC (Area of Environmental Concern) as defined by CAMA. No modifications of the existing building is proposed at this time although two new buildings of approximately 50' x 80' are proposed on the western extreme of the site. The parking surfaces and drives will consist of a combination of concrete and asphalt surfaces. Areas not paved will be grassed. The site drains south under NC 94 and eventually into the Chowan River. According to FEMA mapping on file at the adjacent NCDOT Division of Highways office, the site does not lie with the 100 year floodplain. Drainage ditches surround the east and southern portion of the site routing storm drainage under NC 94. The soil beneath the topsoil consists of low plasticity clays, clayey sand, and clayey silts. Although the site had experienced considerable rainfall prior to the time of soils investigation it appears that the groundwater depth is about 5 feet. The accompanying plan reflects grading the site with a slight increase in grade along the east and southern boundaries of the proposed pavement. The stormwater will be collected and treated in a bioretention basin on the east side of the proposed parking Iot. Total impervious surface includes approximately 1.59 acres comprised of concrete, asphalt paving and building. The bioretention basin is designed to store the 1 inch runoff for the site. Calculated volume requirements for the I inch runoff is 6030 cu. ft. (pg. 4 of calculations), the provided volume in the bioretention basin is 12,770 cu. ft ( pg 5 of calculations). The surface area requirements for the bioretention basin is 4759 s.f. (pg 3 calculations), provided surface area is 9900 s.f. ( pg 10 calculations). The basin therefore, exceeds the requirements for handling the I inch runoff and the surface area requirements for a bioretention basin. The proposed sediment basin will be converted to a bioretention basin after the site is stabilized. The sediment basin will be cleaned out and excavated to elevation 9.75. 50 LF of perforated 6 in. ABS pipe in sock shall be placed at bottom of basin, and #57 stone replaced on face of dam. Place select soil with following soil mixture: sand approx. 70%, clay approx. 10%, and loam approx. 20%. See attached USDA soil triangle for additional assistance in selection of soil suitable for bioretention basin. Geotechnical engineer must approve select soil prior to placement in bioretention basin. Select soil shall be placed to elev. 10.75 ft. Plant basin with water tolerant grasses such as blue joint, tufted hairgrass, and or birdsfoot trefoil or approved equal native brass. Figure 15. Soli Trl uW* of the Back Textural Classes, From Prince George's Co,1993 U.SDA. TEXTURAL TRIANGLE 100% clay 90 10 80 20 70 Clay 30 60 40 0 6 50 Silty 50o's. c cs Cy �f Q 40 5c^dv , 00 cloy A C'ay Silty clay 30 Scr,cy acy iocm loam lour, 70 20 80 - 10 — s.. S��v-� �- �Slit a ram:_ loam 0 =_ - -- - - Silt Sand Y��. 90 ^��BD 70 - ..-60 =—�-• 50 40 30 20 10 100� sand ♦� 100% sift Percent scnd SUITABLE PLANTING SOIL FOR BIORETENTION NATURE AND PURPOSE OF PROJECT & STORiNIWATER MANAGEMENTNARRATAVE EDENTON ARMORY MOTOR VEHICLE STORAGE COMPOUND This project consists of upgrading an existing National Guard Armory in Edenton to provide for an expanded Motor Vehicle Storage facility. The existing facility consists of a brick single story building with a combination of concrete and asphalt parking surrounding the facility. North of the the facility resides the Edenton Municipal Airport. The site which is targeted for the expansion is an existing grassed field west of the Armory Building . It is bordered on the west and south by asphalt roadways, SR l 134 and NC 94 NCDOT indicated that the area was not an AEC (Area of Environmental Concern) as defined by LAMA. No modifications of the existing building is proposed at this time although two new buildings of approximately 50' x 80' are proposed on the western extreme of the site. The parking surfaces and drives will consist of a combination of concrete and asphalt surfaces. Areas not paved will be grassed. Tile site drains south under NC 94 and eventually into the Chowan River. According to FEMA mapping on file at the adjacent NCDOT Division of Highways office, the site does not lie with the 100 year floodplain. Drainage ditches surround the east and southern portion of the site routing storm drainage under NC 94. The soil beneath the topsoil consists of low plasticity clays, clayey sand, and clayey silts. Although the site had experienced considerable rainfall prior to the time of soils investigation it appears that the groundwater depth is about 5 feet. The accompanying plan reflects grading the site with a slight increase in grade along the east and southern boundaries of the proposed pavement. The stormwatcr will be collected and treated in a bioretention basin on the cast side of the proposed parking lot. Total impervious surface includes approximately 1.59 acres comprised of concrete, asphalt paving and building. The bioretention basin is designed to store the 1 inch runoff for the site. Calculated volume requirements for the 1 inch runoff is 6030 cu. ft. (pg. 4 of calculations), the provided volume in the bioretention basin is 12,770 cu. ft ( pg 5 of calculations). The surface area requirements for the bioretention basin is 4759 s.f. (pg 3 calculations), provided surface area is 9900 s.f. ( pg 10 calculations). The basin therefore, exceeds the requirements for handling the I inch runoff and the surface area requirements for a bioretention basin. T,_ q.,. adJ,,— - S-C-LJ-r-& - aw -4 C ENGINEERING -Afth., ___j TRANSMITTAL LETTER TO: We are transmitting: ce� Attached ❑ Under Separate Cover ❑ Via email / ftp The.following items: o . Plans ❑ Drawings ❑ - Application/Fee CH Engineering, PLLC 4601 Lake Boone Trail Raleigh, NC 27607 919.788.0224 919.788,0232 (fax) DATE: / JOB NO: RE: 0Aft z7o Delivered via: ❑ Courier ❑ Overnight Delivery @' Mail ❑ Plats ❑ Specifications ❑ Shop Drawings ❑ Other ❑ Digital Files ❑ Change Orders o Documents COPIES DESCRIPTION r _ �•s a ❑ For Approval ur' For Your Use Q' As Requested ❑ For Distribution r 1 t 4C`�r �R r�C ❑ Approved as Submitted ❑ Approved As Noted ❑ Returned for Revisions ❑ For Review and Comment L� V 'V lr/ � 14 // G O h. � / C,s4 ✓ O V. _ _ ce j /� t // Signed � -- .do CENGINEERING January 6, 2004 Mr. William Moore Environmental Engineer Washington Regional Office 943 Washington Square Mall Washington, North Carolina 27889 Re: Stormwater Review SW7030905 Edenton Armory Storage Compound Dear Mr. Moore: This letter is in response to your letter of November 6, 2003 regarding the referenced project. 1. Site plan includes entire project area including buildings proposed on the west side as requested. 2. Treatment for one -inch runoff is provided in bioretention basin proposed on cast side of property. 3. The drainage /runoff from the area noth of the proposed parking lot, the entrance drive and the proposed parking lot all drain to the proposed bioretention basin. Part of the area at the southwest corner of the site will not be draining to the BMP. However, the proposed 13MP exceeds the requirements for 1 inch runoff and surface area requirements for a bioretention basin 4. Attached are the i inch runoff and the bioretention basin calculations. 5. Attached is the revised stormwater narrative If you have any questions or need additional information, please do not hesitate to contact us. Sincerely, 414-� CJLX Maha Chambliss, PE 0 PO Box 30128, Raleigh, NC 27622 • TEL 919,788.0224 • FAx 919.788.0232 Edenton National Guard �6,Bp9 C - _ -- ............... ♦ _ pis a 2• �.� Tr V _ P Existing Use: Wooded & Railroad corridor I Area 4 62° Ac 12= 5,76: in/br '41 � C���,,_ qq rr y��l�p1y Am I pAreas- Exist' nS:._._...- ____..: SF -AC -T C C x %A -- 1527 ._ i - - 0.04- 0 9_.. 0.01 i ' rds 0 0.00 -0.9 0.00 Aui Ming. 0 0.00 0.9 0.00 -------------- Reil corridor 0 0.0.0 0.30 0.00 Undisturbed,Open_Space 199722.6 4.58 -'„_- 0.20 _- _- _._ 0.20 _-.-_-.- _._. -- - -.._4_62 .._ - - - ..._..... _..: _. ... -. 0.12 -............ - - ---------- . -- -- - --- -- p e "C" 2 Com osit 1 � Q2- =.21_x 5.76. x 4.62.= - -- -_ .... _ W5.6 CFS._..-_. 7.FCFS ------ -- --- ----- -- -- -- - . .._.. Post Development Runoff (entire site)-_.- _.._ _ Area C %A SF AC C x i Areas -Proposed , _ _ .. _..._.:_ AsphaH Parking lBldgs _..__ 69260.4 1,59 0.9 0.31 _. -_ - - _.. - ------_. - _.. - - - - - --- -- - -- - _... - ------ ___`- - --- 0--_ - 0.000 .3- 0,00. - ... 1 e dscapped/grass .__ _ -- _ _ _ .-1785996 t--0.41----- = --- 0.25- -- - 0_02 .. . 1 I Undisturbed Open Spacei 114127.2 _ 2.62• 0.20 0.11 I z &*4, ------------ Edenton- Bioretention ba#!n sizing_ 77"Bio-Retention Calculations LOU! -Basin 1 F C C x A !Asp lty�a lop 69042 0.9 62137.80 _EK Undisturbed Buffer 0 0.2 0.00 M-1, 0 0.9 0.00 W. U7 Grass Areas 132241 0.25 33060.25 ... . ....... .8 Total:: 201283 95198 4.620821 94: Ac Sand Bed _L(5%'ofsum)__ ----------------- 1�95198 X0.06 IMIT --- - :4759.9025 !SF MM Surface area req'd-4759ist Total surface f 2174, USE BIORETENTION BASIN WITH SAND �'A 1 Inch Runoff Volume Calculations Project Name:; :Edenton National Guard Job Number::: AS 002 Designer-Maha Date: 1215/03: Pond Drainage Area Description Total DA = 4.62: acres Impervious Area = 1.59: acres DA % impervious = 34.42%:: Find volume to be controlled from 1 Storm % Impervious 34.4% Rv-.05 +0.0091 NC DENR BMR manual-Rg 6 �Rv-runoff Oefff-storm runq2ffinches )/storm rainfall (inces) If= % imperv:ious- DA (acres / lmpervious portion of DA tRv= 0.05+.009(34.4) I RV= 0.35961! For Volume Yhat must be controlled. 'Vglume= Design rainfall (Rv) DA) 'Volume= Vinch rainfall*Rv*1/12 (ft/in)*4.62 Ac Volume--. ---.0.138:acre-ft Votume= 6030.7078; cu. ft. i 4 2Year Chainsaw Routing Method Project Name: Edenton Project p : As002 Dale: 11.26.03 Operator: MAC Title: 2 Year Storm Routing Hydrograph: Op 12.0 CFS Tp = 20.0 minutes dT ; 1.0 minutes Stage -Storage Ks= 11110.0 b = 1.12 Zo = 10.8 feet Initial Water Level : r = 10.8 feet Computed Results: Normal Surf. Area = 0.000 acres Max. Surf. Area = 0.290 acres Peak Elev. = 11.88 feet Peak Stage = 1.1 leet Peak Outflow = 4.27 CFS �7. Volume Stored = 12770.0 It' CH Engineering P.O. Sox 30128 Raleigh, NC 27622 Riser/Barrel N = 1.00 Dr = 12.p0 inches Cw = 3.30 Zcr = 11.25 feet Db = 15.00 inches Cd = 0.65 Bar. Invert= 7.00 feet Orifice: N = 0.00 D = 0.00 inches Cd = 0.00 invert = 0.00 feet Weir 1: L = 7.00 feet Zcr = 11.75 feet Cw. = 3.00 Weir 2: L = 0.00 feet Zcr = 0.00 feet Cw - 0.00 System Loading and Response 14.0 12,0 ouerow 100 B0 `u 0 6.0 40 2,0 0.0 0.0 10.0 20.0 30.0 40,0 500 60.0 Time (min) Time min Inflow cis Storage ftA3 Stage tt Outflow cis Riser(weir) cis Riser(orif.) cis) Barrel (cfs) Orifice (cis Weir 1 cfs Weir 2 cis 0.0 0.0 0,0 10.8 0.00 0.00 0,00 11.32 0.00 0.00 0.00 1-0 0.1 0.0 10.8 0.00 0.00 0.00 11.32 0.00 0.00 0.00 2.0 0.3 4.4 10.8 0.00 0.00 0.00 11.32 0.00 0.00 0.00 3.0 0.7 22,1 10.8 0.00 0.00 0.00 11.32 0.00 0.00 0.00 4.0 1.1 61.3 10.8 0.00 0,00 0.00 11.33 0.00 0.00 0.00 5.0 1.8 130.0 10.8 0.00 0.00 0.00 11.35 0.00 0.00 0.00 6.0 2.5 235.5 10.8 0.00 0.00 0.00 11.37 0.00 0.00 0.00 7.0 3.3 383.9 to.$ 0.00 0.00 0.00 11.40 0.00 0.00 0.00 8.0 4.1 580.4 10.8 0.00 0.00 0.00 11,44 0,00 0.00 0.00 9.0 5.1 829.2 10.8 0.00 0.00 0.00 11.49 0.00 0.00 0.00 10.0 6.0 1132.9 10.9 0.00 0,00 0.00 11.55 0.00 0.00 0.00 11.0 6.9 1492.9 10.9 0.00 0.00 0.00 11.61 0.00 0.00 0.00 12.0 7.9 1909,2 11.0 0.00 0.00 0.00 11,69 0.00 0,00 0,00 13.0 8.7 2380.4 11.0 0.00 0,00 0.00 11.76 0.00 0.00 0.00 14.0 9.5 2903.9 11.1 0.00 0.00 0.00 11.B5 0.00 0.00 0.00 15.0 10.2 3475.5 11.1 0,00 0,00 0.00 11.94 0.00 0.00 0.00 1&0 10.9 4090,0 11.2 0.00 0.00 0.00 12.03 0,00 0,00 0,00 17.0 11.3 4741.3 11.2 0.00 0.00 0.00 12.13 0.00 0.00 0.00 18.0 11.7 5422.1 11.3 0.05 0.05 0.67 12.23 0.00 0.00 0.00 19.0 11.9 6121.7 11.3 0,27 0,27 1.21 12.33 0.00 0.00 0.00 20, 0 12.0 6821.2 11.4 0.58 0,58 1.57 12.43 0.00 0.00 0.00 21.0 11.9 7506.2 11.5 0,96 0,96 1.85 12.53 0.00 0.00 0.00 22.0 11.7 8164.2 11.5 1.37 1.37 2.09 12.62 0.00 O,W 0,00 23.0 11.3 87134.3 11.6 1.80 1.80 2.28 " 12.70 0.00 0.00 0.00 24.0 10.9 9357.3 11.6 2.22 2,22 2.45 12.77 0.00 0.00 0.00 25.0 10.2 9875.3 11,7 2.59 2.62 2,59 12.84 0.00 0.00 0.00 26.0 9.6 10334.4 11.7 2.71 3.00 2.71 12.90 0.00 0.00 0.00 27.0 9.0 10748.4 11.7 2.81 3.35 2.81 1 Z.95 0.00 0.00 0.00 28.0 8.4 11120.1 11.8 2,90 3.67 2.90 13.00 0.00 0.00 0,00 29.0 r 7.9 11452.4 11.8 3.07 3.97 2.98 13.04 0.00 0.10 0.00 30.0 7.4 11742.6 11.8 3.28 4.24 3.04 13.08 0.00 0.24 0.00 31.0 6.9 11990.4 11.8 3.49 4.47 3.09 13.11 0.00 0.39 0.00 32.0 6.5 12197.7 11.8 3.68 4.66 3.14 13.14 0.00 0.54 0.00 33.0 6.1 12367.5 11.9 3,84 4,82 3.17 13.16 0.00 0.67 0.00 34.0 5.7 12502.7 11.9 3.98 4.95 3.20 13.17 0.00 0.78 0,00 35.0 5,4 12606.6 11.9 4.09 5.05 3,22 13.19 0.00 0.87 0.00 36.0 5.0 12682,3 11.9 4.17 5.13 3.24 13.20 0.00 0.93 0.00 37.0 4.7 12733.0 11.91 4.231 5.18 3.25 13.201 0.00 0.98 0.00 R ETBASIN.XLS S 2YBar Time min) Inflow (cfs) Storage (ft^3 Stage ft) Outflow (cf-5) Riser(weir) (cls Riser(orif.) cls Barrel cfs Orifice cls Weir 1 cfs Weir 2 cfs 38.0 4A 12761.3 11.9 4.26 5.21 3.26 13.21 0.D0 1.00 0.00 39-0 4,1 12770.0 11.9 4.27 5.21 3.26 13,21 0.00 1.D1 0.00 40.0 3,9 12761.6 11.9 4.26 5.21 3.26 13.21 0.00 1.00 0.00 41.0 3,6 12738.0 11.9 4.23 5.18 3.25 t3,20 0.00 0.98 0.00 42.0 3.4 12701.5 11.9 4.19 5.15 3.24 13,20 0.00 0.95 0,00 43.0 3.2 12653.6 11.9 4.14 5.10 3.23 13.19 0.00 0.91 0.00 44.0 3.0 12596.1 11.9 4.08 5.D4 3.22 13.19 0.00 0,86 0,D0 45.0 2.8 12530.3 11.9 4.01 4.98 3.21 13.16 0.00 0.80 0.00 46.0 2.6 12457.3 11.9 3.93 4.91 3,19 13,17 0.00 0.74 0.00 47.0 2.5 12378.4 11.9 3.85 4.83 3.18 13.16 0.00 0.68 0.00 Q 0 2.3 12294.4 11.8 377 4.75 3.16 13.15 0.00 0.61 0.00 R ETBASIN. XLS ledentonldesign\C-04.dgn 01/06/2004 09:22:02 AM /Ir ' l `� d 01 60 nee6mzlrmr�6n6 �y'S�'�Au&saaL+aafaPa NISVQ N IN 1 d- 7 V-7 N f '037i1f 3f .3x1 1111 3d11x1x wrpvr+l]iax.s ma � 33+3 W 03­1e1. 3x015 1T� OW fro 03n313 32 lll..IS+O I V1103S '3115 9x Izf l I WLS x :3La 3asa r3 ,zl� 'A313 tl3li. OlalOm eiff -- 0 -- IJ I i \ OrlLq tlp 7Nllsli3 y _ _ _ _ _ _ _ _ _ _ _ _ _ _ eau _12 7x11T1%3 1 1 � _ 4 J ..moa i)ir '�� i]If5 wl Sa+ �.39 F1, 5+ 30W '3tl3e .9-.0S ,OD2/.S'0 tl0 a35+8 St'0 'xtw • 3dO11 11 S1,6 • "13 1 i3itl dx� ' r r s ao-o • x11+B A eaf 39itlp1S 4'0 1f Sl'01 . 'l3 SLwile 6-x3101 .31 x11. 1--W A3�3 tll 3• l! S!'IL "3 .s S0) 1 b42 �s 04 - s 6-� 10 1 -4 FROM : CH ENGINEERING PHONE N0. : 9198486761 Jain. 06 2004 02:02PM P1 ENGINEERING []I FAX TRANSMISSION DATE: l oa TO: 41:11 ocrc- - CH Engineering, PLLC 4601 Lake Boone Trail Raleigh, NC 27607 919,788.0224 919.788.0232 (fax) s0B NO - FAX: 2 S 2 . `t q 921 FROM: '7n 4- " a L,6 /'S3 PAGES: - (INCLUDjNG COVER PAGE) I I RE:��19/A►or kc v G7 RL c- •L Mi G.-�.... ter Z' LS S `] l ��0 � 4l tirJ u $a �I� JrtG e3 �I �•-'� -�p�A�tlr� ail •� M.-r � � �G�Q L' F•, �Oh rle� �7 Qs-• �V le f14 �G� J�i,-"..fi{K 74"• "1 - _II i fAk _� •� Y n`-�-✓T('•4�tif.'y�p y 1 Y �fL 1 •4 r �^S F�� / I l - 1 elf SIGNED: ory NOTE: THIS FAX IS INTENDED FOR THE ADDRESSEE ONLY_ INFORMATION CONTAINED N AWED IN THIS TRANSMSSION MAY BE PERSONAL OR CONFIDENTIAL. IF YOU HAVE RECEIVED THIS TRANSMISSION IN ERROR, PLEASE CALL CH ENGINEERING AT 786-0224_ CENGINEERING TRANSMITTAL LETTER TO: We are transmitting: Q---'Attached ❑ Under Separate Cover ❑ Via email / ftp The following items: 0' Plans ❑ Drawings ❑ Application/Fee CH Engineering, PLLC 4601 Lake Boone Trail Raleigh, NC 27607 919.788.0224 919.788-0232 (fax) DATE:WHO } JOB NO: RE: Delivered via: ❑ Courier ❑ Overnight Delivery ❑ Mail ❑ Plats ❑ Specifications ❑ Shop Drawings ❑ Other r' RECEIVED OCT - 3 2003 DWQ-WARD ❑ Digital Files ❑ Change Orders ❑ Documents COPIES DESCRIPTION / L 'I d8 ❑ For Approval ca-� For Your Use ❑ As Requested ❑ For Distribution ❑ Approved as Submitted ❑ Approved As Noted ❑ Returned for Revisions ❑ For -Review and Comment a�aIle. Signed O=O� w A r�9QG Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E. Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality DIVISION OF WATER QUALITY November 6, 2003 NC National Guard Attn: Mr. William E. Johnson 4105 Reedy Creek Rd Raleigh, NC 27607 Subject: Stormwater Review SW7030905 Edenton Armory Storage Compound Chowan County Dear Mr. Johnson: This office received your stormwater application and supporting information on September 8, 2003. I discussed the proposed project with Maha Chamblis, CH Engineering, and received a revised site plan on October 3, 2003. On -October 30, 2003, I visited the site to look at existing site conditions and to get a better understanding of possible stormwater treatment alternatives. I plan to discuss treatment alternatives and modifications to the stormwater application with Ms. Chamblis in the next few days. The following information is needed to complete the application package: (1) site plan that includes the entire project (buildings on West side, as well as new parking area) (2) stormwater plan that shows adequate treatment for one -inch runoff from entire project area (3) site plan showing drainage basins, details and specifications for treatment alternative(s) (4) stormwater runoff and design calculations (5) detailed stormwater narrative In addition, I understand that the Division of Land Quality issued an approval for the erosion control plan on September 29, 2003. This plan showed a 2-acre site for a parking lot. Since the scope of the entire project appears to be more than 2-acres, I suggest that you contact Mr. Pat McClain, Land Quality Section, Washington Regional Office, at (252)946-6481, to determine if a revised erosion control plan is needed. N. C. Division of Water Quality 943 Washington Square Mall Washington, N.C. 27889 'telephone (252) 946-6481 NA NL[JENi� FAX (252) 946-9215 NC National Guard Mr. William E. Johnson November 6, 2003 Page Two The above information relating to the stormwater appl.icaton must be submitted within 30 days, or your project will be returned as incomplete. If you have questions, please feel free to contact me at (252) 946-6461, extension 264. Sincerely, l William J ore Environmental Engineer Washington Regional Office cc: CH Engineering Pat McClain, Land Quality C�aowan County Planning & Inspections ashington Regional Office August 2I, 2003 CH Engineering 4601 Lake 13oone Trail Ralcigh, NC 27607 Attw Mr. Torn I-iepler Re: Report of Subsurface Investigation National Guard Armory Additions Edenton, North Carolina GcoTechnologies Project No. 1-43-1167-EA Gentlemen: 3200 Wellington Court, Suite G Raleigh, North Carolina 27615 919-954-1514 fax 919-954-1428 RECEIVED SEA' 8 2003 DWQ-WARD Geofechnologies, Inc. has completed the authorized subsurface investigation to evaluate site grading and subgrade preparation conditions for a proposed expansion of the existing National Guard Armory in Edenton, North Carolina. Subsurface conditions at the site were investigated by performing nine hand auger and dynamic cone penetrometer borings at the locations shown on the attached Figure 1. The locations were staked in the field by survey personnel, and the indicated locations should be considered accurate. The borings were advanced to termination depths of 5 to 9.5 feet below existing site grade using a dynamic hand cone penetrometer at selected intervals to evaluate the consistency and density of the subsurface soils. This report presents the findings of the investigation and our recommendations for preparation of the site and for design and construction of the proposed additions. SITE AND PROJECT DESCRIPTION It is our understanding that an open grassed area adjacent to the existing National Guard Armory in Edenton, North Carolina is under consideration for placement of asphalt and concrete pavement sections for storage of equipment. The area selected for the new construction appears to have been graded at one time for a parade Field and is now covered with a relatively thick stand of mown grass. The site is relatively level, showing no more than a few feet of topographic relief across the areas to be developed. It appears that the area to be developed is slightly higher than the surrounding area and thus It IS reasonably well drained for (lie site proximity. At the time of our investigation, heavy rainfalls had recently fallen, 'Lind the main area represented by test borings HA-1 through FIA-6 was quite wet with isolated areas of standing water, particularly in the vicinity of test boring HA-6. Test boring i-IA-7 is in an area with more topography and was dry as was the area around test borings HA-8 and HA-9. It is our understanding that the proposed construction will include a 6 inch concrete slab underlain by 8 inches of CABC in some areas and 2 inches over 8 inches of CASC in other areas. A small building is planned for the area of borings HA-8 and HA-9. Ge?otoc17f1fcal c.ul<:i Conslarc,`fiOn Nklfofiok, l aliri,� .S< rviee35 (_'II Eligiuccring SUBSURFACE CONDITIONS A generalized subsurface profile prepared from the test boring data is attached to this report as Figure 2 to graphically illustrate subsurface conditions encountered at this site. More detailed descriptions of the conditions encountered at the individual test boring locations are then presented on the attached test boring records. The subsurface profile was found to consist of a surface veneer of topsoil which ranged from only a few inches in thickness at test locations HA-8 and FIA-9 to approximately 6 inches in thickness in other areas. This topsoil veneer was generally underlain by low plasticity clays, clayey sands, or clayey silts which typically probed soft to a depth of 6 to 12 inches below the existing surface. In a few areas, such as at test location HA-6, the probe rod could be extended through soft soils to a depth of 18 inches. With increasing depth, the borings generally encountered near surface clays and silts which were relatively stiff typically exhibiting dynamic ]land cone penetration resistances of 6 to 8 blows per increment and higher in the upper 2 feet. With increasing depth, the soils generally became somewhat softer penetrating into highly plastic clays in several areas. Test borings hIA-I through HA-7 were terminated in silty clays or clayey silts at a depth of 5 feet below grade. Test borings HA-8 and HA-9 were extended to a depth of 9 to 9.5 feet and encountered a stratum of clean tine to coarse sand below a depth of 7 to 7.5 feet. Perched water was present at the interface with the much farmer soils present at a depth of about 6 to 12 inches below grade in virtually all of the borings at the tirne of this investigation due to recent heavy rainfalls. However, it appears that the true groundwater table probably exists at depths of 4 to 5 feet or more. The soils generally were very wet at the surface, became somewhat drier below those surface soils to a depth of 2 to 2.5 feet, and then began to become more moist below that depth. The sands penetrated at test locations HA-8 and HA-9 were extremely wet, and the hand auger borings could not be advanced deeper than 2 feet into the stratum due to the presence of what is believed to be a true groundwater table. RFCONINIENDATIONS Tile fallowing recommendations are made based upon a review of the attached test boring data, our understanding of the proposed construction, and past experience with similar projects and subsurface conditions. Should site grading or structural plans change significantly from those now under consideration, we would appreciate being provided with that information so that these recommendations may be confirmed, extended, or modified as necessary. Additionally, should subsurface conditions adverse to those indicated by this report be encountered during construction, those differences should be reported to us for review and comment. Site Grading Considerations. The near surface soils on this site were extremely wet at the time of this investigation due to the wet weather pattern which has dominated the State over the last six to seven months. If earthwork is instituted during wetter times such as currently exist, it will be necessary to strip the topsoil with tracked equipment wind rowing the material for loading into trucks for removal from the site. The upper 12 inches of soil was very soft in many areas and likely will have to be disced, dried, and reconlpacted in order to provide adequate support. If it is desired to fast track the project, consideration should be given to blading off the topsoil and the upper 8 to 12 inches L' y,�,,,;t:a.: 1AtYi.. ;i hft744 0k-- u ('11 Unt;incrring Altrfl.;l "1, 10111 1 `;fly~ .r of very wet ,Soils and then hrirrging the cite hat:k to grade with it snore select lnutcrial such as a silty sand, clayey sand, or clean sand. If it is desired to use the on -site soils, the contractor will have to repair the near surface conditions by discing, drying, and recompacting. This will necessitate limited undercut to depths of 6 to as much as 12 inches in some areas followed by recompaction. We anticipate that these type repairs would be needed in the area of test borings HA-1 to HA-6 where the surface soils are quite west. We anticipate that minimal surface repair probably would be necessary at test locations HA-8 and FIA-9 due to previous amendment of the near surface soils in that area with gravel. Following stripping of' topsoil, the site should be proofrolled with a partially loaded dump truck or similar piece of equipment in order to identify those areas needing repair. As previously indicated, we anticipate that the upper 12 inches of soil will be soft and will rut under the action of rubber tired equipment in the main area proposed for pavement. Those soils will either have to he undercut or be reworked and properly compacted to provide adequate support for a pavement structure. Ideally, we suggest giving consideration to importing approximately 12 inches of a more select material to use as it sub -base beneath the pavement structure. All new fill placed on the site as well as the finished subgrades should be reworked and compacted to not less than 95% of the standard Proctor maximum dry density except in the final foot beneath the base course stone where this requirement should be increased to 98% of the standard Proctor maximum. Foundation Support. The structure proposed in the area of borings HA-8 and NA-9 may be supported on shallow spread footings or a turned down slab. Foundations should be sized for a contact stress of 2,500 psf subject to the restriction that column and wall footings have least dimensions of 24 and 16 inches, respectively. Figures 3 and 4 provide an indication of settlement potential for it range of column and wall loadings. Individual footings should be inspected at the time 017 construction to evaluate: the need for repair. We anticipate that it may be necessary to neatline overexcavale through some softer soils to a depth of 3.5 to 4 feet and then backfill to design subgrade if individual spread footings will be used. If a turned down slab is used, overexcavation and stone replacement likely will not he needed. We understand that a structure may also be placed in the area of FIA-1 and HA-4. We do not anticipate that any repairs would be required in that area: however, footing bottoms should be inspected at the time of construction to evaluate the need for repairs. Pavement Design Considerations. We understand that the site will be subject to approximately 20 vehicles per clay with live of those being tractor trailers. The on -site soils likely will exhibit a design subgrade CBR value of approximately 5% when properly recompacted to not less than 98% of' the standard Proctor maximum. A C131Z of 5%, with the assumption of five tractor trailers and 15 light trucks per day will result in the need for a pavement structure consisting of 3 inches of asphalt over 8.5 inches of CA13C base course stone, ff 12 inches of more select sandy soils are brought in to improve grading on the site and to provide for slightly better drainage, the design C131Z value will likely increase to 8% which would render a pavement structure consisting of 2 inches of asphalt over 9.5 inches of stone adequate for the anticipated traffic. We support using a nominal section of either 2 over 9 or 3 over 8 depending on the subgrade materials. The subgrade soils will exhibit a design subgrade modulus value on the order of 100 pci which may be used for design of the concrete slab -on -grade elements. If heavy area loads will be supported on the concrete slab -on -grades, we would appreciate being provided with that information iur r, I„r: .lill�u'.I 'I 'I III; I',11�r I '.„ 111;11 'VC 1';01 lilliviili' ';r'111�'lllr'lll r";Illllilll" . A r'rllicn-lv 11;IVr'llli,111 wr'liojl coll5l';1ing 4 6) Inl:hes Ill 4,000 psi concrete over 3 inches of CAI3C will be adequate for the anticipated traffic loadings. SUNIIVIARY In summary, subsurface conditions on this site are somewhat poor at present due to the very wet conditions which have occurred during the early part of the summer. Earthwork on this site Could he greatly facilitated by stripping topsoil with tracked equipment and then waiting for a period ol' dry weather to prepare the site. Even with dry weather, we anticipate that it will be necessary to repair the upper 12 inches of soils in the main fill area before those soils will be suitable for support of the proposed pavement structure. Ifs on -site soils will be used for the pavement structures, we suggest increasing the asphalt section to 3 inches of asphalt over 8 inches of stone. If site grades are raised with a more select sandy material after removal of the topsoil and soft soils, the pavement section Could be reduced to 2 Inches of asphalt over 9 inches of stone. Geo`l'echnologies, Inc:. appreciates the opportunity to be of service on this phase of the project. Please contact us if you have any questions concerning this letter or if we may be of additional service on this or other projects. Sincerely, GeoTechnol ogles, Inc Edward B. Hearn, P.E. NC Registration No. 9520 David L. Israel, P.E. NC Registration No. 14319 EM-1/lam Attachments 031167ea.doc CA401 g zY W.a crNx� : c,r � 91o�f�s, * 45 H A 1�7 HA-9 1V i � k T! 14A -7 .6v \,HA-3 HA4' % H A V Ao- HA-11 - "H Z. HA-6:/ PROJECT: SCALE: Not to Scale V. 1-03-1167-EA National Guard Additions G oTe (46 ol 6 JOB No. Edenton, North Carolina FIGURE No: 1 Depth (Feet) GENERALIZED SUBSURFACE PROFILE LEGEND HA- 1 HA- 2 HA- 3 HA- 4 HA- 5 HA- 6 HA- 7 HA- 8 HA- 9 ® Topsoil o 1�1 III � Low Plasticity kilt I 1 11 9 8 10 10 15+ � 10 13 Low Plasticity C:;ay Low Plasticity C:,ay to Silt Plasticity High y 2 7 12 6 7 i 9 15+ I 9 ty _:.a Silty Sand 3 6 3 4 12 9 8 4 4 ® Low Plasticity S-ilt to Clay /Z High Plasticity Silt 4 6 Moderate Plastl-=ity Clay Silty Gravelly S.;.nd 5 8 15 7 9 8 6 13 Low Plasticity Silt to Silty Sand 6 VAI Clayey Sand ❑ 8 Dynamic Con, Penetration 7 5 8 \� Groundwater a' Time of Boring 8 9 10 10 PROJECT: SCALE: As Shown JOB No:1-03-1167-EA National Guard Additions % - - Edenton, North Carolina FIGURE No:2 ESTIMATED SETTLEMENT vs COLUMN LOAD 1.8 i -- 1.6 1.4 - i k � 1.2 cn �+ 1 ' W 0.8 0.6 i i i 0.4 i I, 0.2 0 0 50 100 150 200 250 300 Column Load (kips) Assumes 2500psf bearing pressure. FIGURE 3 1.4 1.2 s` 0.8 Z (D U) j 0.6 0.4 AIPa M Estimated Settlement of Wall Footing 0 500 1000 1500 2000 2500 3000 3500 Contact Stress (psf) Estimated settlement of wall footing with indicated contact stress. f-2ft Wide Fc _'irr� �3ft Wide F.--._,ti;-.g FIGURE 4 DYNAMIC HAND CONE RECORD Did"I'll DVS(TIPTION 1114NATION 1111'All'A'RATION PFR HLOWS PER (FT.) 0.111.) 1 N C I ? F, N11 V NT 1 3/4" OJ) 0 10 20 40 60 100 0.5 15 4.0 5.0 Topsoil ll 6 Light Gray Clayey Fine Sandy SILT NIL, Uit (irm, Olangc Silty CLAY cj- Light Gray A-, Oninge 4lott[cd Clayey SILT to Silly CLAY Cl- NIL al 5' Perched water at'15'. Probed soft to 12". JOB NUM131CR BORING NUMBER DATE �MIIIIIIIIIIIIIII GeoTe l n 'logies, Inc PAGE 1 OF 1 DYNA N I I C I L k N 1) (A) N F I'VNETIMNIFTER RECORD D11"I"I'll DESCRIPTION ELEVATION PENETRATION PER 13LOWS PER (I"r.) INCH FAM VAT I 3/A 0.0 0 10 20 40 60 100 0.5 2,5 5.0 Topsoil 9 12 3 15 Light GMV &' ONLngc Fines Sand}' CLLYCY SILT NI I Light Gray Silly CLAY CH HWILI Auger To minatcd at 5' Perched water at 2.5'. Probed soft to 12". .1013 NUMBER BORINC NUMBER DATE PACE 1 OF I 1-03-1167-EA HA- 2 8-21-03 v (�L=mi M10 ME ,qr 1-2 10 5.0 Ill'NAN11C HAND C!)NI1 I'VNFTRONI1�:'1TR RKCORD DESCRIPTION ELEVATION PENETRATION PER 13LOWS PER INC'RI?MENT 13/4" fl 1 n 2.0 JO hn 100 TO )Soil SNI x G 4 7 Tan Silty SAND %vlShells light Grav & Change Dine Sandy silly CLAY Cl_ Light Gray Fine Sandy Clayey SILT NIL light Gray &. Orange Silty CLAY Cl l I [and Auger Terminatcd at i' Perched water at 2.0'. Probed firm at 2". JOB NUMBER BORING NUMBER DATE 1-03- l 1 b7-EA \ FIA- 3 .. 8-21-03 L�m �' 1 1 PAGE I OF I 0.0 0.3 IJ 35 50 DYNAMIC HAND CONE PENETROMETER RECORD 1) VISCR I PTI ON VIA NATION PENETRATION PER 13LOWS PER (1.11I..) I N CI I F, Rl V NT 1 3/4" f) 10 21) 41) 60 100 Topsoil 10 7 12 9 Light Gray Claycv Fine Naudy SILT MI. Light Gray X., 01:111L! Siky CLA V Cl. IJUlit Gray S-, Ormi�c Clqcy S111' mi. Hand Augerl'erminatcd at 5' Perched water at 2.0'. Probed soft to 8". .JOB NUMBER BORING NUMBER DATE 1-03-1167-F'A FIA- 4 8-21-03 PAGE- 1 OF I 1.0 2.0 In 5.0 DYNAMICIIAND CONE I'VAETRONIFTER RECORD DFISCRIPTION ELEVATION PENETRATION PER BLOWS PER (VI'.) INCH FNI F' NT 1 31.1 in M 310 611 100 Topsoil 9 9 6 Light Gray k, Orange Silly CLAY to Claycy SILT CL Nil, Light (fray Silly CLAY CH Light Gray k Orange Clayey SAND toSillq CLAY K-1—L Cl- G i ay Clayey SILT Boring Terininaied at 5' Perched water at 2.0'. Probcd SDft to 10". JOB NUMBER BORING NUNIBER DATE 1-03-1167-FA HA- 5 8-21-03 PACE I OF t DYNAMIC IIA1V1) CONE PI:NI TIZOIVII+ rjI ,R RECORD DFTTII D1,SC'RIPTION ELEVATION ITNETRATION PER BLOWS PER (FT.) INCI(F,Mh'NT 1 31111, 0.0 n 1n In an rn inn 0.3 5.0 Topsoil Light Gray & Oratsge Clayey SILT to Silty CLAY CI ML Iland Auger Terminated at 5' Perched watcr tit 1.0'. Probed soft to 18". JOB NUMBER BORING NUMBER DATE 1-03-1167-EA \ IJA- 6 4-21-03 V- PAGE I OF I 2.0 5.0 DYNAMIC HAND CONE PENETRONIETFR RECORD DESCRIPTION ELEvA,PION PENETRATION PER BLOWS PER 0,111',j INCI FA-1ENT 1 31-1" 10 20 40 60 100 Topsoil 15+ 15+ 8 8 'Ian yes Orange Fine Sandy Clayey SILT ML Light Gray & Orange Silty CLAY CI. CI.I I land Auger Terminated at 5` Probed firm at Y and no water encountered. JOB NU1V1BFIZ 13011ING NUMBEIR DATE 1-03 -1 1 67-EA \ .... HA- 7 8-21-03 % - So 1 1'- I'AG E 1 01" 1 0.0 0.? 0.5 0.8 2.0 2.9 5,0 T5 9.5 1)YN:1MIC IfANI) CONK PEN1+TRON-IFTER RECORD DESCRIPTION ELEVATION PENETRATION PER BLOWS PER INCUFAIFNT 13/4" n In if) an (10 100 Topsoil [0 F 6 5 10 Q Black Silty Dine SAND w/Gravel - Tan to Brown Silty Fine to hlediunt SAND SV[ Light Cray Fine Sandy Cfaycy SILT ML CL Light Gray Fine Sandy SILT [vIL SM Light Cara}' & Brown Silty CLAY CL CH Light Gray R Tan Clayey Silty Finc SAND SC Brown Fine to Coarse SAND SP Buring Tenninated at 9.5' Groundwater elICountered at Tat time of boring. Probed firm to 3". JOB NUNIRF-R BORING NUMBER DATE 1-03-1 167-EA \ HA- 8 8-21-03 PAGE 1 OF 1 DEPTH I,1' 1'. ) 0.4 0.2 0.4 0.9 2.0 3.5 5.0 7.0 9.0 DYNAMIC 1IAND CONE P1-;NETR0 NIP',TER RECORD DESCRIPTION ELEVATION PENETRATION PER I3L0NVS PE R (FT.) INCREMENT 13/4" n in in an al 100 Topsoil SNI --- 13 9 t 13 R Black l' me Silly SAND w/Grayd Ian Sill' Dine SAND Lighl Gray Slightly silly Fiuc'San,iy clavey SILT kiL Light Gray Finc sandv Cl;ivcy SILT h1L Light Gray & Grange Silty CLAY Cl. Brown to Orange Clayey Silt}' Dint SANDSC '['till Fine to Coarse SAND SI' raring lerrninnlc;d ;u 9' Groundwater CRC011lltered at Tat time ol'boring. Probed firm to 3" .JOB NUN113EII BORING NUMBER DATE PAC F l OF l 1-03-1167-EA \ HA- 9 8-2 l -03 % - s a CNgr Q F _ 7 OIL •�1 d 77 '7 i% /rl •+r..ww�/wry ....-, CENGINEERING TRANSMITTAL LETTER TO: yU,4 f�f rNGTOni RC6-10.)A L TIM MULLlGAA) WQ (uPtR-VjSoi? (n��Iffrn)tr±�nS; NC 2-73p9 We are transmitting: Attached a,- . Under, Se4awalp,C.aver..,.. ❑ Via email / ftp The owing items: fol Plans ❑ Drawings ❑ Application/Fee ❑ Plats or' Specifications ❑ Shop Drawings ❑ Other CH Engineering, PLLC 4601 Lake Boone Trail Raleigh, NC 27607 919.788.0224 919.788.0232 (tax) DATE: 9-5-- o 3 JOB NO: RE:.II� �ua�Ji ��Cn1jOrJ ,��Mo2r Delivered via: ❑ Courier a . Overnight. Delivery Mail DWQ-WARQ ❑ Digital Files ❑ Change Orders mi-' Documents SEP 8 2003 COPIES DESCRIPTION I 0 i" I (- A iP?L f c.4 i r<)rj 10 p- M ICopy — 4( -+� — 2 A-'S V eE �oS> 2 s POC I rf CA$j eon's 2 S7-01241 �ZkVj^-)A-C,!F CA-L[s . C k --orz 420 , ov ❑ For Approval ❑ Approved as Submitted ❑ For Your Use a Approved As Noted ❑ As Requested ❑ Returned for Revisions ❑ For Distribution ❑ For Review and Comment Signed NATURE AND PURPOSE OF PROJECT & STORMWATER MANAGEMENT NARRATAVE EDENTON ARMORY MOTOR VEHICLE STORAGE COMPOUND RECEIVED SEP 8 2003 DWQ-WARO This project consists of upgrading an existing National Guard Armory in Edenton to provide for an expanded Motor Vehicle Storage Facility. The existing facility consists of a brick single story building with a combination of concrete and asphalt parking surrounding the facility. North of the the facility resides the Edenton Municipal Airport. The site which is targeted for the expansion is an existing grassed field west of the Armory Building. It is bordered on the west and south by asphalt roadways, SR 1134 and NC 94 NCDOT indicated that the area was not an AEC (Area of Environmental Concern) ms �defined•by LAMA: -No is-pmposed at this time although two new buildings of approximately 50' x 80' are proposed on the western extreme of the site. The parking surfaces and drives will consist of a combination of concrete and asphalt surfaces. Areas not paved will be grassed. The site drains south under NC 94 and eventually into the Chowan River. According to FEMA mapping on file at the adjacent NCDOT Division of Highways office, the site does not lie with the 100 year floodplain. Drainage ditches surround the east and southem portion of the site routing storm drainage under NC 94. The soil beneath the topsoil consists of low plasticity clays, clayey sand, and clayey silts. Although the site had experienced considerable rainfall prior to the time of soils investigation it appears that the groundwater depth is about 5 feet. The accompanying plan reflects grading the site with a slight increase in grade along the east and southern boundaries of the proposed pavement. The stormwater will be collected in ditches south and north of the pavement and retained Total impervious surface includes approximately 1.45 acres comprised of concrete, asphalt. paveing and building. Approximately 0.32 acres of impervious surface exists. By retrofitting existing grass -lined ditches a total storage of 3825 cf is provided. This will theoretically contain a 5 minute duration 10 year storm and contain more than'/z inch of rainfall over the impervious surface area. These grass -lined ditches will also serve to contain pollutants from site runoff .