Loading...
HomeMy WebLinkAboutSW6120202_CURRENT PERMIT_20120416STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW���O� DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE 9t'& YYYYMMDD �� ia WDER North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Gvakild, P.E. Dee Freeman Governor Director Secretary March 13, 2012 Mr. David Heins RECEIVED Fort Bragg DPW 2175 Reilly Rd. Stop A APR 16 2012 Fort Bragg, NC 28310-5000 DEHR-FAYETTEVILLE REGIONAL OFFICE Subject: Stormwater Permit No. SW6120202 Chicken Road Access Control Point High Density Commercial Wet Pond Project Cumberland County Dear Mr. Heins: The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for Chicken Road ACP on March 9, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 1SA NCAC 2HA 000 and Session Law 2006-246, We are forwarding Permit No. SW6120202, dated March 13, 2012, for the construction, operation and maintenance of the subject project and the stormwater BM P(s). This permit shall be effective from the date of issuance until March 13, 2020 and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to follow the procedures for transfer of the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 2761.1.- 7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Robert Patterson at (919) 807-6375, or robert.patterson@ncdenr.gov. Sincerely, for Charles Wakild, P.E. Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-6494 InterneL www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer cc: SW6120202 File ec: K. Joshua Hurst, PE - Clark Nexsen Mike Lawyer - Fayetteville Regional Office Lee Ward - Fort Bragg DPW-WMB Nne orthCarolina Natumllt, State Stormwater Permit Permit No.SW6120202 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Fort Bragg Directorate of Public Works (DPW) Chicken Road Access Control Point Chicken Rd. (-0. 75 mi. west of Morganton Rd.), Fort Bragg, Cumberland County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and S.L. 2006-246 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file'with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 13, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The stormwater control has been designed to handle the runoff from 263,157 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 6 Stake Stormwater Permit Permit No.SW6120202 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, ayes- 9.04 Onsite, ft : 393,642 Offsite, ft2: 0 b. Totai Impervioys Surfaces, ft2: 263,157 Buildings ft : 15,084 Roads/Parking, ft2: 237,179 Other, ft2. 3,499 (sidewalks) Future, ft2: 7,395 (truck queue expansion) C. Pond Depth, feet: 5.5 d. TSS removal efficiency: 90% e. Design Storm: 1.0 inch f. Permanent Pool Elevation, FMS�: 234.50 g. Permitted Surface Area @PP ft : 18,181 h. Permitted Storage Volume, ft�: 26,233 at temporary pool i. Storage Elevation, FMSL: 235.75 j. Controlling Orifice: 2.5°0 pipe k. Permanent Pool Volume, ft3: 79,242 I. Forebay Volume, ft3: 15,286 m. Receiving Stream/River Basin: Bones Creek 1 Cape Fear n. Stream Index Number: 18-31-24-2 o. Classification of Water Body: "C" 11. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The stormwater treatment system shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and with other supporting data. Page 2 of 6 State Stormwater Permit Permit No.SW6120202 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at ali times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Page 3 of 6 State Stormwater Permit Permit No.SW6120202 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10.The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11.The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12.The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 13Eh day of March, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Permit Permit No.SW6120202 Chicken Road Access Control Point Stormwater Permit No. SW6120202 Cumberland County Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Permit Permit No.SW6120202 Certification Requirements: .1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. . All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: Fayetteville Regional Office Surface Water Protection 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 Page 6 of 6 % CLARK*NExSrN 333 Fayetteville Street, Suite 1000 Raleigh, NC 27601 P. 919.828,1876 F. 919.828.1877 www.clarknexsen.com transmittal We transmit the following: DATE: ❑ Drawings ❑ Specifications June 27, 2014 ❑ Change Order ❑Shop Drawings PROJECT: Chicken Road Access Control ❑ Computer File(s) ❑ Samples Point Ammo Pointe Boulevard, ❑ Product Literature ® Certification Fort Bragg, NC Copies Description TO: Mike Lawyer 1 Designer Certification for Stormwater Permit NCDENR #SW6120202 Fayetteville Regional Office 1 Designer Certification for Stormwater Permit Surface water Protection #SW6120502 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 J U L 1 2014 910-433-3300 FROM: Remarks: Josh Hurst SUBJECT, Stormwater Certifications Attached are the Designer Certifications for Stormwater Permits COMMISSION NUMBER: SW6120202 and SW6120502 at Fort Bragg, NC. Please let us 3818 know if you have any questions or need anything else. VIA: ROUTE TO: CC: Page 1of1 i State Stormwater Permit Permit No.SW6120202 Chicken Road Access Control Point Stormwater Permit No. SW6120202 Cumberland County Designer's Certification �)2-5 , as a duly registered i�Oi= ,S000)L in the State of North Carolina, having been authorized to observe periodically weekly/ full time) the construction of the project, (Project) for /kr2-y Cam= J ''I (Project Owner) hereby state that, to the best of my abilities, due care` -and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: ltrlrfI? _ :o SEAL 033514 /i /`kUA, HJ�`��� SEAL Signature 1LJ- Registration 4ber Date 6 I Z 7 )' `1 Page 5 of 6 V State Stormwater Permit Permit No.SW6120202 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage, ✓ 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. ✓ 5. The outlet/bypass structure elevations are per the approved plan. ✓ 6. The outlet structure is located per the approved plans. ✓ 7. Trash rack is provided on the outlet/bypass structure. ✓ 8. All slopes are grassed with permanent vegetation. ✓ 9. Vegetated slopes are no steeper than 3:1. ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 112. Required drawdown devices are correctly sized per the approved plans, ✓ 1I All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: Fayetteville Regional Office Surface Water Protection 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 Page 6 of 6 m DWQ USE ONLY Dat V Received Fee Paid Permit Number 2231Z 1 43665 T, 111fla > I D p;), Applicable Rules: (select all that apply) ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 1!rPh II - Post Construction ❑ Non -Coastal SW- I-IQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This f win xiay he photocopied fir use as an orightal I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, Ietters, operation and maintenance agreements, etc.): Chicken Road Access Control Point 2. Location of Project (street address): Southern end of Fort Bragg between Plank Road and MacRidge Road City:Fort Bragg County:Cumberland Zip:28310 3. Directions to project (from nearest major intersection): From the Longstreet MacRidge Road intersection head east on MacRidge Road. Turn right on Chicken Road. After crossing the wetlands area, the project site will be ahead. 4. Latitude:35° 04' 58.83" N IL PERMIT INFORMATION: Longitude:79° 02' 55.74" W of the main entrance to the project. ].a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Law Density ®High Density ❑Drains to an OFfsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 28.37 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-101 Version 07Jun2010 Page 1 of 6 FEB 2 3 2012 DENR WATER QUALITY W�RMDSANI) STQRMWATER BRANCH III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Ft. Bragg Directorate of Public Works (DPW) Signing Official & Title: Mr. David Heins, Environmental Division Chief (DPW} b.Contact information for person listed in item I above: Street Address:2175 Reilly Road Stop A City:Fort Bragg State:NC Zip:28310-5000 Mailing Address (if applicable):2175 Reilly Road Stop A City:Fort Bragg State:NC Zip:28310-5000 Phone: (910 ) 396-8207 Fax: (910 ) 907-2420 I; maiLdavid.a.heins.civOO mail.mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. ('Phis is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Mr. Lee Ward Signing Official & Title:Ft. Bragg DPW/Water Management Branch b.Contact information for person listed in item 3a above: Mailing Address:Bldg 0-9125, McKellars Road CityTort Brae State:NC Zip:28310-5000 Phone: (910 } 396-2301 Fax: (910 ) 907-2420 F, ma& lee.p.ward.civ« maiLmil 4. Local jurisdiction for building permits: N/A Point of Contact: Phone #: { } horrn SWU-101 Version 07Jun2010 Page 2 of IV. PROJECT INFORMATION 1. In the space provided below, hr._ iefly summarize how the stormwater runoff will be treated. The stormwater runoff will be treated by one (1) wet pond, located southeast of the search area. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.lf claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph It - Post Construction 3. Stormwater runoff from this project drains to the Cal2e Fear River basin. 4. Total Property Area: 16.5$ acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:17.70 acres Total project area sliall be calculated to exclude the followin the normal pool of irnpounded structures, the area between the banks of streams and rivers, the area below the N ormal High Water (NHW) lime or Mean High Water (MHW) line, and coastal wetlands landward from the N14W (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MH{M line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 37.40 9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stormwater BMP. For low densihj and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Draina e Area _ Drainage Area _ Receiving Stream Name Bones Creek Bones Creek Stream Class * C C Stream Index Number * 18-31-24-2 18-31-24-2 Total Drainage Area (so 393,642 377,230 On -site Drainage Area (sf) 393,642 377,230 Off -site Drainage Area (sf) 0 0 Proposed Impervious Area** (so 263,157 14,728 Proposed 10,562 Existing % Impervious Area** total 66.9 1 6.70 Impervious- Surface Area Drainage Area 1 Drainage Area 2 Drainage Area _ Drainage Area On -site Buildings/ Lots (so 15,084 0 On -site Streets (so 226,49 R5 14,728 t 1111 On -site Parkin (so 10,681 0 On -site Sidewalks (so 3,499 0 .' ASS Other on -site (sf) 0 0 Future (sf) 7,395 1 RS 0 Off -site (so 0 0 Existing BUA*** (so 0 10,562 Total (so: 263,157 25,290 Stream Class and Index Number can be deter-rnined at: http://portal.lpcdenr.org/rlpeb/ruq/ps/csn/classi�rcati�iSS� Inr}}pervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 07Jun2010 Page 3 of 6 RI: Revision 1 2-28-12 1 i �i' R'1 « i .�a as���,� ,��, 'Report only that amount Ofexisting BUA that will remain after development. Do not report any existing BUA that is to be removed and znluch will be replaced by new BLIA. 11. How was the off -site impervious area listed above determined? Provide documentation. Detailed drainage area calculations were completed in AutoCAD. Projects in Union County: Contact UfI"Q Central O1jice staff to check if the prnjecl is located ss,ithin a 1 hreatened & EndanKered .Species watershed that may he suhjecl to more stringent stormwuter requirements as per NCAC 02B . 0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from htt ): ?ortal.nedenr.or > web we /ws1sii f bm-p-manual. VI, SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.tic(ienr.org/web/wd/ws/su/statesw/forms does. blitials 1. Original and are copy of the Storm water Management Permit Application Form. 2. Original and are copy of the signed and notarized Deed Restrictions & Protective Covenants NIA Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed si ned and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (I -or an Express review, refer to http://www.envhel�).org/pageslotiestoL)express.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'/z mile of the site boundary, include the'/z mile radius on the map. - C At-cs1 Ae,,,l;z G 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MI-IW or NI-IW line of tidal waters, and any coastal wetlands landward of the MHW or NI-IW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MI-1W (or Ni-IW) of tidal waters. i. Dimensioned property/ project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. Form SWU-101 Version 07Jun2010 Page 4 of 6 o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify �_ elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SNWT prior to submittal, (970) 796-7378.) 10. A copy of the most current property deed. Deed book: N/A Page No: N/A 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http: / / www.secretary.sta te.nc.us/Corporations/CSearcii.aspx VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS N1A For all subdivisions, outparCls, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed 13UA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http:/LportaLncdenr.org/weblwgf ws/su/statesw/forms flocs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and Iisted on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you.wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:K. Joshua Hurst, PE Consulting Firm: Clark Nexsen Architecture & Engineering Mailing Address:4000 Westchase Boulevard, Suite 280 City:Raleigh State:NC Zip:27607 Phone: (919 ) 576-2120 Email:ihurs @clarknexsen.com Fax: (919 ) 828-1877 1X. PROPERTY OWNER AUTHORIZATION (if Contact htformation, itent 2 has been filled oi(t, complete this section) I, (print or type mine of person listed in Contact Information, 'itent 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item Ira) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and summit a completed Name/Ownership Change Form.within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, a Notary Public for the State of , do hereby certify that County of personally appeared before me this — day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL. My commission X. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in Contact Information, item 1a) David Heins certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicab water r s 15A NCAC 2I-1 .1000, SL 2006-246 (Ph. IL - Post Construction) or SSL 2008-21-1. Signature: Date: I, a Notary Public for the State of , County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL. My commission expires Form SWU-101 Version 07Jun2010 Page 6 of 6 Permit No. 5 $I/C f 2, 0 ?—b1_ (to be ,provided by DWO) �pF W A 7'4g0 NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be rifted out, printed and submitted. The Required items Checklist (Part 111) must be printed, filled out and submitted ajong with all of the required information. I.k,P,RaJECTdINF,ORMATION l Project name CHICKEN ROAD ACCESS CONTROL POINT Contact person JOSH HURST, PE Phone number 9SG28-1876 Date 212212012 Drainage area number 1 Site Characteristics Drainage area 393,642 ftz Impervious area, post -development 263,157 e % impervious 66.85 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required 21,377 ff3 OK Volume provided 26,233 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume ff3 Pre -development 1-yr, 24-hr runoff ff3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required ff3 Volume provided ft3 Peak Flow Calculations Is the prelpost control of the lyr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.1 in Rational C. pre -development 0.41 (unitless) Rational C. post -development 0.75 (unitless) Rainfall intensity: 1-yr, 24-hr stone 3.04 infhr OK Pre -development 1-yr, 24-hr peak flow 17.75 ft lsec ,11� \��t H CaRo(� Post -development 1-yr, 24-hr peak flow 35.02 ft3lsec �NN��� •�/� PrelPost 1-yr, 24-hr peak flow control 17.27 ft'lsec Elevations x. Temporary pool elevation 235.75 fmsl n $ g 5 74 ' Permanent pool elevation 234.50 frlsl '• Z 1 t�OQ,�' SHWI- elevation (approx. at the perm. pool elevation) >101t fmsl Z Top of 1Oft vegetated shelf elevation 235.00 fmsl . �i�?• •::IQj�CS,�e•Q� ��� Bottom of 1 Oft vegetated shelf Sediment c eanout, op elevation (bottom of pond) 225.0 fmsl j4jNVA `1\\����`\ Sediment deanout, bottom elevation 224.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state -required temp. pool? Y (Y or N) Elevation of the top of the additional volume 235.8 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9117tog Parts I, & 11 Design Summary, Page 1 of 2 Permit No. (to be prov ded by t7wo) II? DE:SIGNiiNFORMATION '..s: ., 7 7 , y 'r 1 ' k :WROPSM Surface Areas Area, temporary pool 22,578 ft2 Area REQUIRED, permanent pool 17,714 ft2 SAMA ratio 4.50 (unitless) Area PROVIDED, permanent pool, A,,_,,, 18,181 ft` Area, bottom of 10ft vegetated shelf, Ate, ,ha 15,352 ft Area, sediment deanout, top elevation (bottom of pond), Aca.xnd 1,936 ft' Volumes Volume, temporary pool 26,233 ft3 Volume, permanent pool, V.,,,-Pw 79,242 ft3 Volume, forebay (sum of forebays if more than one forebay) 15,286 ft3 Forebay °% of permanent pool volume 19.3°% % SAIDA Table Data Design TSS removal 90 °% Coastal SAIDA Table Used? Y (Y or N) MountairL[Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 4,50 {unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vp,-,,,, 79,242 ft' Area provided, permanent pool, A. ,,,,_, 18,181 ft` Average depth calculated It Average depth used in SAIDA, d., (Round to nearest 0.5ft) h Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, A, _pw 18,181 e Area, bottom of 10ft vegetated shelf, Ab,,_,,,a, 15,352 If Area, sediment cleanout, top elevation (bottom of pond), A,a_ d 1,936 ft2 "Depth" (distance blw bottom of 14ft shelf and top of sediment) 9.00 ft Average depth calculated 5.53 ft Average depth used in SAIDA, dN, (Round to nearest 0.5ft) 5.5 ft Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (HP) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post-devetopment 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freebaard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Y (Y or N) 2.50 in tn2 0.60 (unitless) 0.38 ft N (Y or N) (unitless) (unitless) ft It 17.75 ft3lsec 35.02 ft'/sec 0.10 ft3lsec 2.40 days An. OK OK Need 3 ft min OK OK OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10A it OK 3 :1 OK 3.0 :1 OK Y (Y or N) OK 5.8 h OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Pump Out or Emergency Spillway Respectively Form SW401 Met Detention Basin-Rev.8-9117/09 Parts 1. & II. Design Summary, Page 2 of 2 Permit No. 111. REQUIRED ITEMS CHECKLIST (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page! Plan Sheet No. Oa b 1 1. Plans (1" - 50' or larger) of the entire site showing: Cc,IU";/ - Design at ultimate build -out, �(7 5of Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and Boundaries of drainage easement. C 501 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: C6lo. Ouflel structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. CC7 O f 3. Section view of the wet detention basin (1" = 20' or larger) showing: CC103 Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and Inlet and outlet structures. 1� Cir5yt 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified d -06 1 C 1 on the plans prior to use as a wet detention basin. 00d0- A 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. L��tcj 7. The supporting calculations, 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. /44 9. A copy of the deed restrictions (if required). CC'-(o 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County ;�? f� soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9117109 Part III. Required Items Checklist, Page 1 of 1 v � 1 Permit Number: ,SW 61 ZoZo "L (to be provided by DH'Q) Drainage Area Number: I Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — ImmediateIy after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). -- No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP 'Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximatel six inches. Form SW40I-Wet Detention Basin O&M-Rev.4 Page I o t 4 Permit Number: (to he provided by DfVQ) Drainage Area Number: BMP element: Potentialproblem: How 1 will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Lrosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Rest professional practices Prune according; to best professional show that pruning is needed practices to maintain optimal plant hea lth. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the.problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. if pesticide is used, wipe it on the.plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a IOCation where it will not cause impacts to streams or the BMP. Alga] growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Dorm SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 s Permit Number: (to he provider! btu D6VQ) Drainage Area Number: BMP element: Potentialproblem: How 1 will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device, The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 9.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 8.5 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom E. BASIN DIAGRAM (Jill in the hlanks) 226.0 I Pe manen� •----------------- Volume - 7�5.0 -ft Min. Sediment Storage FOREBAV Pool Permanent Pool Elevation 234.5 Sediment Removal Elevation 225.0- Volume ---------- ------ Bottom Elevation MAIN POND II n. sediment Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: I`tVZ 1 Zo Zo ?— (to be provided by DIVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ ofany problems with the system or prior to any changes to the system or responsible party. Prnjecl naine:Chicken Road Access Control Point BN1P drainage area nuniber:I Print name: Mr. David Heins Title: —Ft. Bragg Directorate of Public Works (DPW) /Chief -Environmental Division Address:2175 Reilly Road Stop A, Dort Brag_,, NC 28310-5000 _ Phone:910- Signature: Date: I -Tnl,�,_lZ-- c Note: The legally responsible party should not he a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 o f 4