Loading...
HomeMy WebLinkAboutSW4100602_APPROVED PLANS_20100702STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE DOC DATE 6�9:alOi% in� YYYYMMDD N 0 L a o VSW �G KN•S )� 30 38 O V� PERVI U � 1� )DITIO�I NAG.E ZONE 6WPP R P I T / A gl20 9) f / �C{ C Approved Stormwater Permit Documents Construction in accordance with these documents is required by the stormwater permit. North Carolina rules require that the stormwater system designer Inspect during construction; certify conformity with the plans and specs; and certify compliance with the stormwater rules. (15A NCAC 2H .1008 (j) ) Pe-rrm-yii,t,,,# 40 Datez/� � by./!! _ NC Division of Water Quality Sheet #�. / Revision pate ZD O 0 ol j y6 r �� jj—/jam\��j�y_r LG 44/AC E o / / I BUILDIIaiG EXPANSION IN DRA / /ZQI E # 1/( E, FX, S�PP,�MR CLOV44 E G �J!I R� UII G/5 DEW / -DRIVF E . -NI SAL L� 0 EI ETC. fo ;NDING ASP VA7� VG WMPERM , A-N INS AL/L VA E�N/TT AR*E} (p I Z # ] ). •� 4 \ W BMP Iu �p OF E S S / . -a SEAL r: 023450 _ kt v I N �P�•�� /0 I4f- "SITE MAP" 1 "=400' Allied Design, Inc. TURBOCARE ADDITION — STORMWATER MANAGEMENT PLAN CIVIL ENGENEPRINGOI.AND SURVEYING 4720 TURB CARE INC. WINS'I'TO' ER MILL ROAD N O W[NN-SA1.EiM, NORTH CAROLINA 27107 I'huatc: (376 ) 765 -23 77 ax: 336) 63050 WESTINGHOUSE ROAD tp://www.allieticngsurv .com PROJ —011 RURAL HALL, INC. DATE: NO.: APRIL92010. SKETCH NO.: SWM 01.1 I'l 1-1 1.1 II LE W �1 Approved Stonnwater Permit Documents Construction in accordance with these documents is / required by the stormwater permit, North Carolina rules require that the stormwater system designer Inspect during construction: certify conformity with the / plans and specs: and certify compliance with the stormwater rules. (15A NCAC 21-1.1008 (j)) j Permit # SK1yt 0 Date // / by � NC Division of Water Quality Sheet # Z Revision Date-V—J�Z&/4 k 1 � \ G 1 - � � a If ►A e u i 0 . Si=iGC i�"JN�t?�3.1 �d �i � • �• SEAL r' _ e 023450 .w "Sheet Index" 1 "=400' Allied Design, Inc. TURBOCARE ADDITION - STORMWATE.R MANAGEMENT PLAN CIVIL ENGINEERING4LANnSURVF,YING TURBOT 7 (''� INC.4720 KESTER MILL, ROAD CARE, CWINSTON-SALPM, NORTH CAKOLINA 27103 Phone: (336)765-2377 3050 WESTINGHOUSE ROAD Paz: (33 wall- d-cG h llP:l/www.a I I icd-cngsurv,cutn RURAL HALL, INC. DATE: PROJECT NO.: APRILL�20110 SKETCH NO.: SWM 01.2 1-1 1"i I'l I'l I'l 1-1 E5 00 E1 0 00 Ada 36`;OOO:.sf of impervious ' - _ -___ --- §TGRAGE PAD GRID rnto Zone #1 lt;will be collected ; JF BUILDING �NORTH ; DING G by an exisfng pipe network. f �•, sT. kA Total impervious for the Zone = 23.7%',` I i THE ENTIRE INDUSTRIAL AREA DRAINS i STORM WATER THROUGH DRAINAGE ZONE NO. 1 TO OUTFALL N0. 1. I I DUNE POWER (FROM THE RETENTION PONDS AND i CQELEE. I OVERLAND RUNOFF TO MUDDY CREEK). I I SUBSTATON ---------- ST---- —--- -------- --- -�--_ N15 00 OU TFALL NO. 1 LATITUOE 36'14'09' LONGITUDE 80' 19'41" 3 RFTENTCN POrN05 IN ZONE NO-1 I I S7 �Tpre s na w.eu T.xc c D A 1 AJ751 • AJ -2. — � L _ ZONE NO. 3 - I 9 NOTE -. a I DRAINAGE FROM LANDSCAPED AREA 5T BETWEEN SERVICE ROAD AND BERM 'd AT TOP OF BANK FLOWS FROM ZONES 3 AND 4. (SHEET FLOW i 1% OVERLAND RUNOFF TO MUDDY CREEK). No�Change5' ! ZONE NO. 4 >- -0 J I BERM AT TOP OF BANK j I N10 0--—-—- — - — - —' - — - — -— — - — - —- i I �1NCange ZONE NO. 5 4 o�----- MAIN PLANT ENTRANCE ROAD, COURTYARD PARKING I tOT, COURTYARD LANDSCAPED LAWN AREA AND ROOF DRAINS FROM BUILDING A ET BUILDING B DRAINS 1 I STORM WATER THROUGH DRAINAGE ZONE NO.5. I {FROM A FLARED END SECTION AT BOTTOM OF BANK TO MUDDY CREEK THROVGH AN OPEN DRAINAGE DITCH) I I I I 1 I into Zone #2 as sheetflow ' N5 00 -'—'—'—'—'—'—' _ not -into e-network i-' —' ( pipe -network-). — - f ;- This is the only hard surface within the Zone E Total impervious for the Zone = 0 7% ' - - - tZzl ZONE NO. 2 F RIPRAP £CHANNEL " BRICK HEADWALL r I NOTE' OUTALL i ENTIRE LANDSCAPED LAWN AREA BETWEEN MAIN PLANT NO. 2 ENTRANCE AND U.S. HIGHWAY 52 DRAINS STORM WATERTHROU- ?�QO LATITUDE 36.14.02.1 (FROM rA SERIES OF NDRAINAGE �R ONNECTTEDOuTFALL CATCH ASS S LONGITUDE BO'19*49" THRQUGHT THE LANDSCAPED AREA TO MUDDY CREEK). I II 1 NO VO — _ —�—_ I U4S HIGHWAY 52 R/W --- -- -- • E15 00 5T AGE PAO ♦s-2 BUL,MNG C FL 0- 89&W ® •_= I �r I ® x o-' ® I I R. a DI W ---- ------fir ------ a COURTYARD PARKING LOT E20 00 E25 00 I I I I BERM AT TOP OF BANK I I I I I I I I EMPLOYEE I PARKING LOT I I I I�� I I BERM AT TOP OF BANK YNN PLANT ENTRANCE E30 00 / ' — — ' — — — - - N20 00 / I I I o I! / T7 L E O m CO GI 0 N / �y00CUb W c I / zm�.aQQ:° / Q7 y. _ » 0 -C +-q r�' ILL �s EM o ! ! "@o L EI U U 2 I m@ 4 0 m Z TO ! IoL����`°# ! CL��yncE E a O 4. 0 �— y A STORAGE AREAS Q 0 12 2= CL y a- ! 0 5-1 MAIN MANUFACTURING AND ASSEMBLY BUILDING STORAGE AREAS ! S-2 ELIMINATED FEB. 2010 t� ! S-3 SALVAGE YARD b7 1 5-4 BERMED WASTE OIL AST S-5 BERMED WASTE COOLANT AST F S-6 OIL AND COOLANT PRODUCT STORAGE AREA S-7 AIR COMPRESSOR AND 13ACKUP GENERATOR BUILDING 5-8 N/A -COOLANT EVAPORATORS REMOVED JULY, 2009 S-9 COOLING TOWERS ! i 5_10 GENERATOR BUILDING DIESEL FUEL AST r 5-11 FIRE WATER TANK S-12 FORGING BUILDING STORAGE AREAS — 5-13 NITROGEN TANKS I S-14 ACID NEUTRALIZATION PLANT AND FILTER PRESS 5-15 GENERAL STORAGE BUILDING AND BAR STOCK SAW AREA i S-16 EQUIPMENT SHED r $-17 REMOVED OCT. 2009 S-18 COMPRESSED GAS STORAGE AREA 5-19 REMOVED 5-20 BAR STOCK STORAGE AREA I I DRAINAGE ■ LOADING jUNLOADING AREAS I I DISTRIBUTION A BOX ON ST. ' HWY. R/W L-1 BULK OIL UNLOADING AREA L-2 BULK DIESEL FUEL LOADING AREA - GENERATOR BUILDING 1 L-3 REMOVED eN I L-4 BULK LIQUID NITROGEN LOADING AREA i 4 4 Q 14I BUI� A 2 D_ acne? I ± rl I r i I 1 1 — —' —' — — +' r,r — — } + 1 I I IM I---- - 1rr - - �.1 I KtE� �i T I r JON�U.S. HWY. NACE T52 R/WI I hiss d swings takenPfirorn tlesStormrWater Polfutron{ P ventronPfan forTurboCare �- prepared in March,' 2008. `It is iritend"to show fhe fi\&-oreviously`delineateddrain- agezon&§ `, yr. This drawing has been re -scaled from its original format. .w, I EscHIPTCN DATE I • PRODUCTION AREAS I P-1 MAIN MANUFACTURING AND ASSEMBLY BUILDING PRODUCTION AREAS P-2 FORCING BUILDING PRODUCTION AREAS x OUST/PARTICULATE GENERATING/CONTROL AREAS �- 0-1 HVAC UNITS AND OTHER AIR HANDLING UNITS } D-2 BAGHOUSES IN THE MAIN MANUFACTURING BUILDING 1 D-3 EAGHOUSES IN THE FORCING BUILDING _• WASTE HANDLING AREAS ti W-I ROLLOFTS CONTAINING SCRAP METAL, CARDBOARD, FILTER CAKE, AND METAL CHIPS 5 W-2 CAFETERIA WASTE DUMPSTER } } DRAINAGE SYMBOLS 0 STORM DRAIN MANHOLE ` }} O STORM DRAIN CATCH BASIN ' r FLARED END SECTION . L ---- DRAINAGE PIPE } ONSVllM ' x. Zones, \ I '~ - -� . `- . - . - Nat To Scale ENaNEEiT's gx 7111; f WjkA%^'M Me c. f §Wf AFV\kViW f JW 3osoQWVMSM�1are,In SLYEBT[1FxlS[E ROAD A SiF ms CampaRy RURAL HALL, NC nM U0 110N: PLANT SM NO 00 - N20 DO; EO DD - ESO DD nTLE: STORM WATER DRAINAGE PLAN AND WDUSTRAL AREAS --- F=RE. 2 PLANT FAaums DEPARTMENT DRAM ND NUMBER REV. .� r A sTuc c. wa icux - r0° S WP P P — 201 Q 1.0 .1.sam - o.rz am d' Fl L led1 f f 1 ! 1 1 i ok 862.7 X I r X 63.4 , ! i/ — X 860.E e64.5 0683 i 1 r 864. — �\ — �esls �� ,' j -,INtFILTRATION JR dVCJ4. I�R*� Ep BMP FOR/ZO E/# 1./ SEE SWM104 SERIES 017,p-F±-TS. 861.4 Q t t I X B63 r ! A 860.9 / 865\ EX; t'r9>ziy SC%YEMPr'FICS / X / r +� FROM QWNER'SJ2EgORDS. 871.1 12, 00 SF INCREASEI TO 1MP Ry1OU$ C/OVERAGE WITHitV1 DRAINAGE �ONEi#2 ( WPPP / y DESIbNATI N}. TH S IS `�'H I ONLY HARD `S\UR#AC E D II IN II�TQ z r4� . THE r E(-�UTI�G P1PED ICONVEYAN ES1 WITHIN\ZONE #2, BRAIN V2GETAT8D AREAS ONLY. EE §MEET k SWM 02 FOR SU-BAiSINIINI�ORyMAiIC)tIV. SEE �� x 0,1F SHEET SW �VI 63.2 ADR QREATEIR DETAIL WIT�IN t 893 ;:. �-:. _ TqIS\V\lCkNI \TY. � HANNE r l 61 -500 LF TO NEARES�SS FINER) \ r \ y r DVERL ND FLOW • Illlellf APpcvyeti SttatRnwate r Pr rmit Documents ! y G 4truction In ay.aordangQ w�.h there documents is - SEAL _ required by the sjormwater peNnit North Carolina = 023450 es require tha� the stormwater system designer inspect during ct nstfucticn: certify conformity with the +; Olans and sper�; and certify compliance with the EX. HANNEL FLOW- - ~ '! RCA �stormwater ry(Q. (15A NCAC 2H .10080)) i r _ _� �\ — Permit # ,��ll!Slf G G (j_Q Date ? fd �, kCV ( N pp,.' • f 80 LF/'ISO MUQDY CREEK. /4 /f 1i 111111y1 '� �� \ by ��]� NC Division of Water Quality �•r _ _ _ _ _ \ Sheet # Revision Date6/-t//z0/p "Zone 2 Summaryrr Scale: 1 "=100' Allied Design, Inc. TURBOCARE ADDITION - STORMWATER MANAGEMENT PLAN CIVIL ENGINEERINGOLAND SURVEYING T�7('� 4720 KESTER MILL ROAD TURBOCARE, INC. WINSTON-SALEM, NORTH CAROLINA 27103 Phone: (336)765-2377 3050 WESTING17IOUSE ROAD Fax: (33 888G http:llwww,alli.ullscd-cngsurv,camPRO . RURAL HALL, INC. DATE: NO.: APRIL0 9-011 2010 SKETCH NO.: SWM 03.1 I'l 1-1 1-1 1-1 I'l iu 11 ❑C A 1.1 C \ i Po i l I� � r f •� e�S 893.1 1 �plf \ ;� Gr , 6 J Js• 'G! f `\ NEW ASPHALT, IlMeMm� \ 141 o 1 l 1 g f, 4 4 1 NE GRAVEL f,,1 ry r Nvt l� n N'' 4` / � J CqR Ess�'� � roved stormwater Permit Documents F � ' •'� I 1 Cons � ction in a,r:cordanre with these documents le 1 1 required the stormwater permit. North Carolina :a SEAL r' 1 rules require t the stormwater system designer = 023450 rl 1 Inspect during c -Gtrurtlon: c9rtify conformity with the _ I / 1 plans and specs; an -erlify C 2H compliance with the stormwater rules. 15A .1008 (j )} IB ��. Plerm-S it # W � % Data , ...... • •' P.j �: r / by NC Division of I _Wat)aty Sheet 7ZA"tRevision Date?o fV"I" N wx, 1 r "Building A Parking Expansion" + 1 Scale: 1 "=30" Allied Design, Inc. TURBOCARE ADDITION •- STORMWATER MANAGEMENT PLAN CI VILENGINEERING0LAN DSURVEY INC, 4720 TURBOCARE INC. WINSTONS A1.Erv1, MILLNOA17 [NON-SNORTH CAROLINA 27103 7 T`hunc: (336) 765-2317 3050 WESTINGHOUSE ROAD Pax: G(b688G h u p; /jw w www, w, n 1I i c d -cn gsu rv. c um RURAL HALL, INC. DATE: No.: APRIL02010 SKETCH NO.: SWM 03.2 0 s R 91,61 \� 1 1 \ \\ 1 \ PROPOSED 13-MR ` (INFILTRATION TRENCH) ,'h'OR ZONE # 1. SEE/9HEET SWM 04.3./ ,� /� I �� ��� •\ `\ }1 r\\r/r/ \\�yr '' \\\`�\ \\�\���_ S CHEMATICS �A,6\\ \R� \\'SRECORDS. \\ ag 00 /o il- i \ 1 44,800 SF INCREASE (NET) TO IMPERVIOUS COVERAGE WITH DRAINAGE ZONE #1 (SWPPP DESIGNATION). THIS INCLUDES OVER 60,000 SF OF BUILDING EXPANSION, AND ADDITIONAL DRIVES, SIDEWALKS AND MECHANICAL PADS, BUT SEVERAL PORTIONS OF THE EXPANSION ARE OCCURRING WHERE PREVIOUS IMPERVIOUS SLABS EXISTED FOR MATERIAL HANDLING. WHILE THE OVERALL DENSITY WILL BE RIGHT AT 24.0%, MOST OF ZONE # 1 IS CURRENTLY PIPED INTO EXISTING STORMWATER PONDS PER THE EX. INDUSTRIAL NPDES COVERAGE, QUALIFYING AS HIGH DENSITY DEVELOPMENT. SEE SHEET SWM 02 FOR SUB -BASIN INFORMATION. SEE SHEET SWM 04.2 FOR GREATER 111111111111�1/ DETAIL WITHIN THIS VICINI C A R0'.,, :a SEAL r 02345 '•� KEV I N � P ,`� ',l/111111111y5� 7 ' "Zone 1 Summary" Scale: 1"=100' a A KV A PORTION OF THE PARKING LOTS \ URRENTLY PROPOSED FOR REMOVAL\ TO BALANCE IMPERVIOUS ADDTIONS. APPROVAL OF THE PROPOSED BMP WILL ALLOW THIS TO REMAIN.\ Approved 6i0FiiiWatar ftMij Documents rules require that the stormwater system designer Allied Design, Inc. TURBOCARE ADDITION - STORMWATER�r 1&11 "? , , with CIVIL ENGINfiER[NGOLAND SURVEY[NG stormwater rules. (15A NCAC 2H .1008 (j)) 4720 KESTER MILL ROAD TURBOCARE, INC. Permit Date / Z - WINSTON-SALEM, NORTH CAROLINA 27103 y���j' �� Phone: (336) 765-2377 3050 WESTINGHOUSE �� Division of water Qua i�l Fax: (336) 760-8886 ��� �/� �Q hllp:!lwww.allicd-cngsurv.cum ee 3 Revision Dat � � PROJECT NO.: 09-011 RURAL HALL, INC. DATE: APRIL 2010 SKETCH NO.: SWM 04A 8 J u PROP G Rll-MA5 - - PIY RhldSlS PN OUT-enz CONCRETE tune BUILDMG C THE EXISTING WALKS & SLABS WITHIN THE - HATCHED BUILDING EXPANSION INDICATE PREVIOUS IMPERVIOUS COVERAGE THAT WAS USED TO CALCULATE THE NET EXPANSION OF 44,800 SF, NOTE - THIS VALUE INCLUDES POTENTIAL FUTURE CONCRETE (NOT SHOWN) BETWEEN THE NORTHERN SIDE OF THE BUILDING AND THE EXSTING DRIVE. oaf el A. >w „p,•� { .c• g'1�- I a ,.. :i Idyll Rosso Rosso 1111111111,! l ,� CARD �.,�Aimprovea 8 OFfflWarer ra-11 uuuu111a111Y .` 0, ;:lstruction in accordance w;th these ti Y .:l li I l i Is :� •' S$ �'.Ilired b the stormwater permit. North Carolina t` Q F. / O . 2 - y Pe o) Ia . _;'� �'•, y require that the stormwater system designer -7%i 3sl.-_,ct during constructlon; certify conformity with the . ' j • .r a SEAL r' ' `" and specs: and certify compliance with the 02345 "-water rules. (15A NCAC 2H .1008 (j)) Date 7�Zf�0/ r `: hy� NC Division of Water Quality 1eet�;{ • _uJm D L Revision Date z � 1 "Zone 1 Improvements - Coverage Details" - Scale: 1 "=50' ° TURBOCARE ADDITION - STORMWATER MANAGEMENT PLAN TURBOCARE, INC. 3050 WESTINGHOUSE ROAD RURAL HALL, INC. / FO 1111111111,! l ,� CARD �.,�Aimprovea 8 OFfflWarer ra-11 uuuu111a111Y .` 0, ;:lstruction in accordance w;th these ti Y .:l li I l i Is :� •' S$ �'.Ilired b the stormwater permit. North Carolina t` Q F. / O . 2 - y Pe o) Ia . _;'� �'•, y require that the stormwater system designer -7%i 3sl.-_,ct during constructlon; certify conformity with the . ' j • .r a SEAL r' ' `" and specs: and certify compliance with the 02345 "-water rules. (15A NCAC 2H .1008 (j)) Date 7�Zf�0/ r `: hy� NC Division of Water Quality 1eet�;{ • _uJm D L Revision Date z � 1 "Zone 1 Improvements - Coverage Details" - Scale: 1 "=50' ° TURBOCARE ADDITION - STORMWATER MANAGEMENT PLAN TURBOCARE, INC. 3050 WESTINGHOUSE ROAD RURAL HALL, INC. / FO C Allied Design, Inc. CIVIE, ENGINE£R[NGOLAND SURVEYING 4720 KEiSTEiR MILL ROAD WINSTON-SALEM, NORI]I CAROLINA 27103 Phunc: (336)765-2377 Fax: (336)760-8886 h n p:1lw ww. a I 1 i c drug su m e om PROJECT NO.: 09-011 DATE: APRIL 2010 SKETCH NO.: SWM 04.2 6e160.o,& RETENTION PONDS N CJ d ID r oyztj n 0,, Q O n�0 � O x� w� O z. 8190��1� g m11. ,>JJ 6'" co I t/ iii Z ~ Z > o Qn� 00 [z I nw-3 goµ>° xj C . p ��y J H 0 Z O� dX O U% 1 r H Itfi1'. z Cn C) U) CJ -o.�� O ,t��lllllrrrr,� '00 C.AR z O Cn Ess �o'ti'': p�'F Appravad Starmwater Permit Documents Cnnetr Don In documents Is I SEAL accordance with these required by the stormwater'permil. North Carolina EX. STORM SCHEMATICS = 023450 - _ rules require that the stormwater syatem designer Inspect during construction: certify conformity with the FROM OWNER'S RECORDS. plans and specs; and certify compliance with the HORIZONTAL LOCATIONS ARE L ' I NE•. �.`' p stormwater rules. (15A NCAC 2H .1008 (1)) Permit # �SL(j—'�DD_6.DZ� Date7�ZlZ0l1� 10-15' OFF FIELD SURVEY. �J a�+� r/1111111551� by *;i�)e� NC Division of Water Quality K Sheet # uJM ;5' M Revision Date i ����� "Zone 1 Infiltration Trench" Scale: 1 "=40' Allied Design, Inc. TURBOCARE ADDITION - STORMWATER MANAGEMENT PLAN CIVIL RNG[NEER]NGOIAND SURVEYING T j (''� 4720 KI;STER MILL ROAD T 1J"OCINC.RE I WINSTON-SALEM, NORTH CAROIANA 27103 Phan: (330)765.2377 3050 WESTINGHOUSE ROAD Fax: (336)760-8886 h u p:1lw ww, a I1 i c d cn ssu rv. c um 09-011 RURAL HALL, INC. DATE: NO.: APRILL 2010 SKETCH NO.: SWM 04.3 ® � � r® '® i � © �` i�u © � ® ire a � � i r• � � } 7 ."� !♦ e TOPSOIL LAYER, 'I AS NEEDED TO MATCH EXISTING TOPOGRAPHY. FILTER FABRIC OVERFLOW WILL 'BACK-UP' INTO THE INFLOW PIPE AND CONTINUE DOWN THE EXISTING STORM PIPE NETWORK TO THE EXISTING DETENTION PONDS. TRENCH 4 FEET IDLER (6" ABOVE AND BELOW PIPE) 5-2.5 INCH WASHED STONE. DO NOT COMPACT. =111=III =1 II III-1 lIIJIEIW II! =III -11f- -"� -III PROVIDE GEOTEXTILE WRAP BETWEEN THE SOIL AND WASHED STONE. TOP SURFACE SHALL BE 6" ABOVE TOP OF PIPE. ® WATER QUALITY VOLUME 3' DIA. HDPE PERFORATED PIPE, 2 LINES AT 210 LF EA., AT 0% SLOPE. (DESIGN NOTE: THE TOTAL LENGTH OF SYSTEM, INCLUDING BOXES, WILL BE GREATER THAN THE REQUIRED 425 LF) INFILTRATION TRENCH NOT TO SCALE NOTE; GROUNDWATER WAS NOT ENCOUNTERED DURING THE SITE SOILS INVESTIGATION (3 TEST BORINGS & 2 HAND AUGERS WITH FALLING HEAD INFILTRATION TESTS) - SEE PROJECT SOILS REPORT. BORINGS EXTENDED 5' BELOW THE EXISTING GRADE. IF CONTRACTOR ENCOUNTERS GROUNDWATER DURING CONSTRUCTION, NOTIFY ENGINEER. I�lll -111 -1 CONTRACTOR MAY USE COMPACTED EARTHEN FILL ON FAR SIDE AND OVER SOLID PIPE. MAINTAIN 15" FILL OVER TOP OF PIPE. SAND FILTER 4" DEEP DURING EXCAVATION, RAKE TRENCH BOTTOM WITH BUCKET TEETH AND LEAVE IN A ROUGHENED CONDITION TO PROMOTE INFILTRATION. (I.E. DO NOT SEAL SOIL BY SMOOTHING WITH THE BACK SIDE OF THE BUCKET.) APPLY SAND LAYER ACROSS THE BOTTOM AND USE IT TO FILL IN THE UNEVEN ROWS AND TO PREPARE A SMOOTHER BEARING SURFACE FOR THE PIPE. FILTER FABRIC SHALL BE APPLIED ON TOP OF THE SAND, BEFORE INSTALLING THE PIPE AND STONE. TOTAL DEPTH OF THE STONE AND SAND BENEATH THE PIPE SHALL BE 6" (MIN.) BUT THE SAND LAYER AND THE STONE LAYER DO NOT HAVE ,TO BE A UNIFORM THICKNESS. "Infiltration Trench Details" Scale: NTS 0 y9 SEAL r' 023450 ID REV l Ell till►�`, 4. ;zo't 0 oQ� G I N O z � � or� o �N ~ z a }-1 _u E .4.1 �4 g F, j 000 E In v C z ' L•J - 4 C) .. z O z U = o�w Qin(A 0 0 M Lj i4