Loading...
HomeMy WebLinkAboutSW4090601_APPROVED PLANS_20090923STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW��/%lO�l DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE DOC DATE � YYYY DD 1. SEE ARCHITECTURAL PLANS FOR PROPOSED BUILDING DIMENSIONS. 11. THE LIMIT OF DEMOLITION OF EXISTING SITE FEATURES ARE SHOWN APPROXIMATELY. Q Z' THE EXACT LIMIT OF DEMOLITION SHOULD BE FIELD VERIFIED WITH THE OWNER �Olk SEE DEMOLITION NOTES REGARDING REMOVAL OF EXISTING SITE FEATURES. OR HIS REPRESENTATIVE. DEMOLITION OF ITEMS SUCH AS CONCRETE WALKS, CURB TO . ALL WWIRINGATER PASNWELL GENERAPIPING SHALL BPHO AND GUTTER ETC. SHOULD EXTEND TO THE EXISTING CONSTRUCTION AND / OR EUTAND COMMRED UNI ATIONSOVE SEWER ANDTELECTRICALOR EXPANSION JOINT. AS FOOTINGS AND FOUNDATION WALLS WITHIN BUILDING CONSTRUCTION AREA. 3' 12. ALL EXISTING PIPE UNDER PROPOSED BUILDINGS SHALL BE COMPLETELY REMOVED. SITE CONSTRUCTION SHALL OCCUR DURING THE SCHOOL YEAR. THE CONTRACTOR SHALL BE REQUIRED TO MAINTAIN SAFE PEDESTRIAN 13. DEMOLITION OF EXISTING FEATURES INDICATED SHALL INCLUDE ALL PORTIONS ACCESS TO EXISTING BUILDINGS. OF THE STRUCTURE LOCATED BELOW GRADE. MEIN ST• 4. CONTRACTOR SHALL COORDINATE REMOVAL OF ALL ELECTRICAL 14. THE CONTRACTOR SHALL REMOVE ALL CONSTRUCTION DEMOLITION DEBRIS FROM POWER POLES WITH POWER COMPANY. ALSO COORDINATE THE JOB SITE TO AN APPROVED DEMOLITION DEBRIS LANDFILL. WITH GAS AND PHONE, COMPANIES DURING ALL PHASES OF CONSTRUCTION. y 15. CONSTRUCTION FENCING SHALL BE LOCKED AFTER CONSTRUCTION ACTIVITIES FOR 5. UNDERGROUND UTILITIES SHOWN ON THIS PLAN WERE TAKEN FROM THE EACH DAY ARE COMPLETED. 2 C: BEST AVAILABLE RECORDS AND ARE APPROXIMATE ONLY. THE kp CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO EXISTING 16. MARGINAL TREES SHALL BE TRIMMED AS NECESSARY TO INSURE EXISTING LIMBS = %U UTILITIES. EXPLORE AHEAD OF ALL WORK TO VERIFY UTILITY LOCATIONS. DO NOT INTERFERE WITH CONSTRUCTION. RUXTON DR. THE CONTRACTOR SHALL LOCATE IRRIGATION PIPING, WATER LINES, do 4" 17. THE SMALL LANDSCAPE TREES WITHIN THE DEMOLITION LIMITS SHALL BE REMOVED FORCE MAIN AND THESE SHALL BE INSPECTED BY SITE ENGINEER PRIOR BY THE CONTRACTOR AND STORED ON SITE. PLANTS SHALL BE STORED IN A TO SITE GRADING, UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE TOPSOIL STOCK PILE AND PERIODICALLY WATERED AND REPLANTED AFTER 9 OLD HOLLOW RID- REPAIRED IMMEDIATELY BY THE CONTRACTOR AT NO ADDITIONAL COST COMPLETION AT AREAS DESIGNATED BY THE OWNER. NC 66 �� TO THE OWNER. 18. CONTRACTOR MUST VERIFY PRIOR TO ABANDONEMENT OR DEMOLITION OF ANY 6. SEE SPECIFICATIONS REGARDING THE SEQUENCING OF VARIOUS UTILITIES THAT ALL NON —VISIBLE CONNECTIONS TO THESE UTILITIES HAVE SEEN �Q DEMOLITION AND BUILDING PHASING DIRECTIVES FOR THE SITE. TRANSFERRED TO NEW UTILITIES AND ARE COMPLETELY FUNCTIONABLE. 7. EXISTING FEATURES SUCH AS CONCRETE WALKS PAVED DRIVES 19• THE EXACT DEMOLITION LIMIT OF ANY UTILITY SERVICE MUST BE FIELD VERIFIED BY LOCATION MAP ETC. WHICH ARE TO REMAIN SHALL BE PROTECTED FROM DAMAGE THE CONTRACTOR UPON DETERMINATION OF ALL SERVICE ENTRANCES TO BUILDINGS N.T.S. DURING CONSTRUCTION. IF DAMAGE OCCURS THESE FEATURES AND THE SEQUENCE OF CONSTRUCTION IS ESTABLISHED. THE GENERAL INTENT OF SHALL BE REPAIRED AND/OR REPLACED AT NO ADDITIONAL THE PROJECT IS TO REMOVE ALL EXISTING UTILITY SERVICES WITHIN THE LIMITS OF COST TO THE OWNER. NEW BUILDING CONSTRUCTION. ALSO PROPER COVER ON ALL UTILITY LINES MUST BE MAINTAINED BASED ON FINAL CONSTRUCTION GRADES. 8. TEMPORARY SAFETY ENCLOSURES, COVERED WALKWAYS AND BARRICADE WALLS TO BE PROVIDED BY GENERAL CONTRACTOR. 20. ANY EXISTING UTILITY REMOVED FROM SERVICE THAT IS NOT LOCATED UNDER A FLOOD CERTIFICATION.• THE SUBJECT PROPERTY IS NOT LOCATED IN A SPECIAL PROPOSED BUILDING, MUST BE PLUGGED. FLOOD HAZARD AREA AS SCALED FROM MAPS FURNISHED BY HU01' IRM, g, CONTRACTOR SHALL BE RESPONSIPLE TO INSURE EMERGENCY ACCESS 21. CONTRACTOR TO TAKE SPECIAL CARE THAT SUITABLE TEMPORARY OR PERMANENT ` VATED (PANEL NOT PRINTED) SUBJECT TO VERIF7CATION BY DETAILED FLOOD TO ALL PARTS OF THE SITE DURING ALL PHASES OF CONSTRUCTION. DRAINAGE OR STORM DIVERSIONS ARE IN PLACE PRIOR TO REMOVAL OF ANY MAP STUDY. SEE COMMUNITY PANEL 37067CD767—H � 10.IMPROVEMENTS AND EXISTING FEATURES SHOWN ON THIS PLAN ARE CEPICTED EXISTING STORM DRAINAGE PIPE OR STRUCTURE. AS FOLLOWS: ij ALL EXISTING SITE FEATURES ARE DEPICTED AS DASHED LIGHT ALL EXISTING SITE FEATURES TO BE REMOVED ARE CROSS HATCH-:E] OR SHOWN AS A DARK SOLID LINE. DEMOLITION NOTES 1. CONTRACTOR SHALL COORDINATE REMOVAL OF ALL ELECTRICAL POWER POLES WITH POWER COMPANY. ALSO COORDINATE WITH GAS AND PHONE COMPANIES DURING ALL PHASES OF CONSTRUCTION. 2. EXISTING FEATURES WHICH ARE TO REMAIN SHALL BE PROTECTED FROM DAMAGE DURING CONSTRUCTION. IF DAMAGE OCCURES THESE FEATURES SHALL BE REPAIRED AND/OR REPLACED AT NO ADDITIONAL ' COST TO TIME OWNER. 3. ALL DEMOLITION MATERIALS MUST BE REMOVED FRON THE JOB SITE AND DISPOSED OF IN AN APPROVED DEMOLITION DEBRIS LANDFILL. i • .r TBM Fti 2Q� SOUTHERN FLANGE BOLT ON FIRE HYDRANT ELEV=983.20' (NAVD88) 1 CONCRETE WALL AROUND GRAVE DEPOT / h Ole ` D AMTEf(zLL « / \ OP LEA . 8 0�' \ AN14ETTE M_ \ PIN No. 6868-04- BLOCK 2152 LOT \ De PG \ ZONING RS20 SALLIE C. JOHNSON \ NANCY MORETZ JOHNSON PIN No. 6$68-04-2512.00 BLOCK 2151 LOT A017D I D6 1591 PG 1102 I ZONING PB & RS20 JEFF'REY N. SCOTT 966 I Tr'ESA . 66 1 68 04-64 0 LO 5171 OT 205G 8 I ' 4 P 4308 LNG RS20 96, k L.A� PQ WOOD FRAMED STORIGE / SHEDS I I H- I FOM 181, OAKI If o' 4 12" ORN NTAL � I / I { 962 ss + APPROXIMATE LOC 4 Z OF WATER M 0 I WAS No MED. 3 R ESTER ONA HE51'ER 0 I a. 680-04-6127.00 h BLOCK 5171 LOT 052J DS PG ZONING RS20 I 0 u TOP ELEVATION OF CLEANOUT=952.10' I APPROXIMATE INVERT ELEVATION OF 1 CLEANOUT=947.8' EXIST. 6` 0A WATER LINE, t EXIST- 2' OJ WATER LINE. g 0 I CITY DRAWING 4p000 J 4t VCP CITY PROD. No. 2268 n ;E MAIN `�oH� I GENERAL NOTES I S I a $ rn N O pn 1-THE LOCATION OF ALL UNDERGROUND UTILITIES ARE APPROXIMATE AND WERE TAKEN FROM 6m I o r RECORDS AND FIELD LOCATIONS PROVIDED BY OTHERS. THE CONTRACTOR SHALL BE *$ I Eo� RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO THE=A�o m�"'N I X00 o -J—$ ` t START OF CONSTRUCTION. ' co to .to ow 00 2.ALL GRADES SHOWN REPRESENT FINAL GRADES WITH NO ADJUSTMENT FOR TOPSOIL, ETC.N° I I0 'o I �$St� ' �I�IIIUI9111111111111111111111elrlll ti A�I`I r 3.PVBLIC WATER AND SEWER SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIRENTS OF THE CITY —COUNTY UTILITIES COMMISSION. 4.SEE ARCHITECTURAL PLANS FOR FOUNDATION, FOOTING AND BUILDING DIMENSIONS. TBM RAILROAD SPIKE SET IN POLE ELEV=981.70' (NAVD88) i sxruar� C2 M W HOLDINGS LLC PIN No. 6868-25-5417.00 BLOCK 5171 LOT 234 08 2644 PG 2472 ZONING RS20 V`- I f / I a� �a KEYSTONE GROUP INC. PIN No. 6868-22-6450.00 BLOCK 5171 LOT EOOOA DO PG ZONING RMB-S ,;a,POLE -4 Guy — p-or-K FENCE LINE FF WATER VALVE ate... UNDERGROUND PIPING i GAS ASSEMBLY APPROX WOODS LNE (TRUNK) TEMP. BENCH MARK G v� WELL GAS LINE MARKlN GS -UT—DE— UNDERGROUND LINE MARKINGS CR WATER METER N — WATER LINE MARING5 LLD CATCH BASIN Q HORIZONTAL CONTROL POINT (�} DRAINAGE STRUCTURE BORE HOLE �D SANITARY MANHOLE I 9 CLEANCUT 50PIEC CABLE MARKER M TELEPHONE PED IF TREES ARE SHOWN, THE TREE SYMBOL HAS REEN .� FIRE HYDRANT SCALED BASED ON THE TRUNK DIAMETER TO PROVIDE SIGN — LARGE SIGN A QUICK, GRAPHIC IDEA OF THE SIZE OF THE FREE. GRAPHIC SCALE YARD INLET W/ GRATE THE SYIA8OLS DO NOT DEPICT DRIP LINE OR CANOPY r[pJ YARD INLET W/ CONC CAP OF INDIVIDUAL TREES. 100 50 O 100 200 HANDICAPPED SPACE NOT[ - ANY UNDERGROUND LINES SHOWN ARE BASED ON SURFACE EVIDENCE. THIS SURVEYOR d PINE TREE, SIZE NOTED CANNOT CERTIFY TO LOCATION OF NON -VISIBLE STRUCTURES. IF UNDERGROUND LOCATION IS MATCH LINE SEE THIS SHEET FOR CONTINUATION Z ELECTRIC APPARATUS CRITICAL, THE LINE SHOULD BE EXPOSED AND 1" = 100 FEET AND VERIFIED. THIS SURVEYOR CANNOT ACCEPT LIABILITY FOR UNDERGROUND STRUCTURE LOCATIDrJ. Suite 301 530 North Trade Street Winston-Salem, NC 27101 Telephone 336-725-1371 Fax 336-725-1465 DAV&MARTIN-POWEil & ASSOC., INC. ENGINEING-HAND PLANNING -SURVEYING 6415 OLD PLANK ROAD HIGH POINT, NORTH CAROLINA 27266 PHONE (336)886-AMI FAX (336)886-0468 LICENSE: F-0245 DMP PROJECT # 000139 *t�4�FSSCFFIR? JY 41 �A fd�I (� e SEAL 1= 033880. €. V i v fRrllir51 F1ie Project: WALKERTOWN HIGH SCHOOL FORSYTH COUNTY Sheet Title: EXISTING SITE DRAINAGE PLAN Issue Date: JU N E 5, 2009 Revisions: 8.4.09 PER STORMWATER REV. StMnw8ter Permit DIDeuments Catstruchon in arc +a r required` nts L5 rules rr Imp ecl plans anct SPecs an 1 4er,Ly _l n}tJ'with4ihet`I the Storrnwatar rules. (15A Nt„t(:,<ii . +OUt;(j}) Ptlrrrtit # S 7 bate &12 09 by NC 6wision of Water QuaMy Sheet`' Revision Date S. �I• °? . - •f k: FJ Fs . I ,�tlntii,,r S�+rn; Rpy;cnal Of!1te Project Plumber: oao - oao Sheet Number: 6; w t*1 f= am As W Uuments of service these dra ''oga and the desip represent- ed ere the property of Walter PA CatleLnn A Piam Architects. PA. Reproduction, or use of these drawings aLber Than for Lbe project intended without mitten aonaent from the architect is pro- hibited. Unauthorised use w& be sabjeei to legal action. 1. SEE ARCHITECTURAL PLANS FOR PROPOSED BUILDING DIMENSIONS. FLfl� 2' SEE DEMOLITION NOTES REGARDING REMOVAL OF EXISTING SITE FEATURES. O GENERAL CONTRACTOR SHALL BE REQUIRED TO REMOVE ALL WATER PIPING, SEWER PIPING ELECTRICAL PHONE AND�yyWRING AS \APNZ AS FOOTINGS A DD FOUNDATION WALLS WITHIN OBUILDINGA TIONS CONSTRUCTION AREAI.L 5 SITE 3. CONSTRUCTION SHALL OCCUR DURING THE SCHOOL YEAR. THE CONTRACTOR SHALL BE REQUIRED TO MAINTAIN SAFE PEDESTRIAN ACCESS TO EXISTING BUILDINGS. IyEW 5T 4. CONTRACTOR SHALL COORDINATE REMOVAL OF ALL ELECTRICAL POWER POLES WITH POWER COMPANY. ALSO COORDINATE WITH GAS AND PHONE COMPANIES DURING ALL PHASES OF CONSTRUCTION. -7 Z 5. UNDERGROUND UTILITIES SHOWN ON THIS PLAN WERE TAKEN FROM THE 2 y C: BEST AVAILABLE RECORDS AND ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO EXISTING RUXTON DR. UTILITIES. EXPLORE AHEAD OF ALL WORK TO VERIFY UTILITY LOCATIONS. THE CONTRACTOR SHALL LOCATE IRRIGATION PIPING, WATER LINES, do 4 J` FORCE MAIN AND THESE SHALL BE INSPECTED BY SITE ENGINEER PRIOR TO SITE GRADING. UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE g OLD HOLLOW RD. REPAIRED IMMEDIATELY BY THE CONTRACTOR AT NO ADDITIONAL COST p NC 66 TO THE OWNER. 6. SEE SPECIFICATIONS REGARDING THE SEQUENCING OF VARIOUS DEMOLITION AND BUILDING PHASING DIRECTIVES FOR THE SITE. 7. EXISTING FEATURES SUCH AS CONCRETE WALKS PAVED DRIVES LOCATION MAP ETC. WHICH ARE TO REMAIN SHALL BE PROTECTED FROM DAMAGE N.T.S. DURING CONSTRUCTION. IF DAMAGE OCCURS THESE FEATURES SHALL BE REPAIRED AND/OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. S. TEMPORARY SAFETY ENCLOSURES, COVERED WALKWAYS AND FLOOD CER77FICA770N.• THE SUBECT PROPERTY IS NOT LOCATED IN A SPECIAL BARRICADE WALLS TO BE PROVIDED BY GENERAL CONTRACTOR. FLOOD HAZARD AREA AS SCALED FROM MAPS FURNISHED BY HUD/FIRM, 9, CONTRACTOR SHALL BE RESPONSIBLE TO INSURE EMERGENCY ACCESS DA TED (PA#VEL NOT PR/N7FD) SU& CT TO VERIRCA77ON BY DETAILED FLOOD TO ALL PARTS OF THE SITE DURING ALL PHASES OF CONSTRUCTION. MAP S77JDY. SEE COMMUNITY PANEL hf 37067CO167-H 10. IMPROVEMENTS AND EXISTING FEATURES SHOWN ON THIS PLAN ARE DEPICTED AS FOLLOWS: ALL EXISTING SITE FEATURES ARE DEPICTED AS DASHED LIGHT LINES. ALL EXISTING SITE FEATURES TO BE REMOVED ARE CROSS HATCHED OR SHOWN AS A DARK SOLID LINE. DEMOLITION NOTES 1. CONTRACTOR SHALL COORDINATE REMOVAL OF ALL ELECTRICAL POWER POLES WITH POWER COMPANY. ALSO COORDINATE WITH GAS AND PHONE COMPANIES DURING ALL PHASES OF CONSTRUCTION. 2. EXISTING FEATURES WHICH ARE TO REMAIN SHALL BE PROTECTED FROM DAMAGE DURING CONSTRUCTION. IF DAMAGE OCURES THESE FEATURES SHALL BE REPAIRED AND/OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. 3. ALL DEMOLITION MATERIALS MUST BE REMOVED FRON THE JOB SITE AND DISPOSED OF IN AN APPROVED DEMOLITION DEBRIS LANDFILL_ DRAINAGE AREAS DA 1 = 42.03 AC EXISTING IMPERVIOUS = 0.00 AC PROPOSED IMPERVIOUS = 19.94 AC % IMPERVIOUS = 47.4 % RATIONAL C FACTOR PRE 0.4 RATIONAL C FACTOR POS) 0.79 DRAINAGE AREAS DA2= 12.8AC EXISTING IMPERVIOUS = 0.00 AC PROPOSED IMPERVIOUS = 0.97 AC % IMPERVIOUS = 7.58rPP-RE RATIONAL C FACTOR }0.4 RATIONAL C FACTOR OSTi 0.44 DRAINAGE AREAS DA3=34.6AC EXISTING IMPERVIOUS = 7.32 AC PROPOSED IMPERVIOUS = 0.32 AC % IMPERVIOUS = 22.0rFRRE) RATIONAL C FACTOR 0.59 RATIONAL C FACTOR OS) 0.60 DRAINAGE AREAS DA4=30.9AC EXISTING IMPERVIOUS = 5.80 AC PROPOSED IMPERVIOUS = 1.29 AC RITLIOUS029RAONAAR PEL 0.58 RATIONAL C FACTOR POST) 0.60 OPT \ ANNETTE M. L PIN No, 6868-04- \ BLOCK2152 LOT 08C ZONING RS20 11. THE LIMIT OF DEMOLITION OF EXISTING SITE FEATURES ARE SHOWN APPROXIMATELY. THE EXACT LIMIT OF DEMOLITION SHOULD BE FIELD VERIFIED WITH THE OWNER OR HIS REPRESENTATIVE. DEMOLITION OF ITEMS SUCH AS CONCRETE WALKS, CURB AND GUTTER ETC. SHOULD EXTEND TO THE EXISTING CONSTRUCTION AND / OR EXPANSION JOINT. 12. ALL EXISTING PIPE UNDER PROPOSED BUILDINGS SHALL BE COMPLETELY REMOVED. 13. DEMOLITION OF EXISTING FEATURES INDICATED SHALL INCLUDE ALL PORTIONS OF THE STRUCTURE LOCATED BELOW GRADE. 14. THE CONTRACTOR SHALL REMOVE ALL CONSTRUCTION DEMOLITION DEBRIE FROM THE JOB SITE TO AN APPROVED DEMOLITION DEBRIS LANDFILL. 15. CONSTRUCTION FENCING SHALL BE LOCKED AFTER CONSTRUCTION ACTIVITIES FOR EACH DAY ARE COMPLETED. 16. MARGINAL TREES SHALL BE TRIMMED AS NECESSARY TO INSURE EXISTING LIMBS DO NOT INTERFERE WITH CONSTRUCTION. 17. THE SMALL LANDSCAPE TREES WITHIN THE DEMOLITION LIMITS SHALL BE REMOVED BY THE CONTRACTOR AND STORED ON SITE. PLANTS SHALL BE STORED IN A TOPSOIL STOCK PILE AND PERIODICALLY WATERED AND REPLANTED AFTER COMPLETION AT AREAS DESIGNATED BY THE OWNER. 18. CONTRACTOR MUST VERIFY PRIOR TO ASANDONEMENT OR DEMOLITION OF ANY UTILITIES THAT ALL NON -VISIBLE CONNECTIONS TO THESE UTILITIES HAVE BEEN TRANSFERRED TO NEW UTILITIES AND ARE COMPLETELY FUNCTIONABLE. 19. THE EXACT DEMOLITION LIMIT OF ANY UTILITY SERVICE MUST BE FIELD VERIFIED BY THE CONTRACTOR UPON DETERMINATION OF ALL SERVICE ENTRANCES TO BUILDINGS AND THE SEQUENCE OF CONSTRUCTION IS ESTABLISHED. THE GENERAL INTENT OF THE PROJECT IS TO REMOVE ALL EXISTING UTILITY SERVICES WITHIN THE LIMITS OF NEW BUILDING CONSTRUCTION. ALSO PROPER COVER ON ALL UTILITY LINES MUST BE MAINTAINED BASED ON FINAL CONSTRUCTION GRADES. 20. ANY EXISTING UTILITY REMOVED FROM SERVICE THAT IS NOT LOCATED UNDER A PROPOSED BUILDING, MUST BE PLUGGED. 21. CONTRACTOR TO TAKE SPECIAL CARE THAT SUITABLE TEMPORARY OR PERMANENT DRAINAGE OR STORM DIVERSIONS ARE IN PLACE PRIOR TO REMOVAL OF ANY EXISTING STORM DRAINAGE PIPE OR STRUCTURE. TBM q,- 0 'P SOUTHERN f 0- FLANGE BOLT ON FIRE HYDRANT �a9� ELEV=983.20' c'o (NAVD88) C CONCRETE WALL AROUND GRAVE DEPOT ST.", SALLIE C. JOHNSON NANCY MORETZ JOHNSON PIN No_ 6868--04-2512.00 BLOCK 2151 LOT A017D + 06 1591 PG 1102 I ZONING PB & RS20 + JEffREY I 6ESA N. SCOTTTT 956� 868 64-6 36 ()4 BLO 5171 OT 205G �s 4 P 4308 ING RS20 96¢ -L-=AG PC WOOD FRAMED STORIGE SHEDS 1 rrasH :� 1$" OAK+ / 0i + m + 12" ORN NTAL J g I s" + ss6 _QSq 9�g + APPROXIMATE L 4 I OP WATER OCID WAS _ ORMED. HESTER DONA HESTER 1 No. 6868-04-6127.00 I nr rfCVAiM^IL HNVL?SI LLLVF SHUN ut CLEANOUT=947.8' EXIST. 6" D. WATER LINE. EXIST, 2" D.1 WATER LINE. + CITY DRAWING 4a000--98 r- A a r- t A-,n- -` 1,Jd RAILROAD SPIKE SET IN POLE ELEV=981.70' (NAVD88) �e mimnwv MATCH LINE SEE THIS SHEET FOR CONTINUATION �1 +I g�oa ! a i11 z mo z Ii6am2ell W zoolzI aimo3�o ==Sm m amo z AaNacr - e DA �IaL N\� nn _1� (10 ILI'_- 1 \\ I Asy 1 PIN 686E S�y \ 1 \ 4 5 V \ \ `/ , i / L 5171 ��`I / �� \ 9 B PG I� s ING R52C POST -DEVELOPMENT DR A, �` s c p / I �� f �+N RANC / PIN No. 68 1,510,285.67 SF = 34.6 11 °� �D f �l DBE 51P ICA�1eN M EXISTING IMPERVIOUS ARE , = \ `SF - 5. AC ` / /' / ZONING RS /; OF WAYTo-cC�tTr LEPt+ar�e---� , \µ PROPOSED IMPERVIOUS = 85 �0.32 COMP Y (DB`zsm-W, a2�ss 1. ; % TOTAL IMPERVIOUS �` �',� °� / T/ DEVEI OPMEN DRAT +NsraN=�A PIN No. sF _ 30.9 AC 6e6s / B171 LOCK 5 _ / 2 + 1 l% 2 � \ � � � � `"� � •� � /// ! � / I I BL � I! 1855 PG 28' � �, �TbPOS D IMPERVIOUS_j�QTAI!/I12112. zoNlNc Rszo �. IMPERV I OU5 WARN ` �J` ` �� •° ,,, 1 / // +ter " - �[ _ ER / _ �\ t\ �� �,`°� 'a s ��/ 14 f • // / // /�� �/� No.51171 LOT OC PG ING RS20 66 JA No. 171 LOT 3-. a1674PG 1Oa60 COMING RS20 CANDICE LYON PIN No. 6868-13-. BLOCK 171 L I ' %�� \�\ i i J® I� 1I / ZONING RS20 TBM I � RAILROAD SPIKE SET IN POLE ELEV.-988.14' (NAVD88) �q1I 4• � � c.o wr n /� f IDL ffi Nil ,� f 1 1111 Not \\ I I I I W HOLDINGS LLC � \\ PIN 6868-25-5417.00 BL 5171 LOT 234 RI, Do PG 2472 �V� z Rs20 SR TON \ T 0 , 200� OI P, �\ `tr J1� sr.c eau' MAIN .� ..., _.. I - ... q ` "� �\�i/' - a GENERAL NOTES- 1.THE LOCATION OF ALL UNDERGROUND UTILITIES ARE APPROXIMATE AND WERE TAKEN FROM S + W,w, + RECORDS AND FIELD LOCATIONS PROVIDED BY OTHERS. THE CONTRACTOR SHALL BE I oho (oar RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO TH c> I Ono xm��CNI o J START OF CONSTRUCTION. S I g 2.ALL GRADES SHOWN REPRESENT FINAL GRADES WITH NO ADJUSTMENT FOR TOPSOIL, ETC. eras Z N rr z z Z 3.PUBLIC WATER AND SEWER SHALL BE INSTALLED IN ACCORDANCE WITH THE REOUIRMENTS OF THE CITY -COUNTY UTILITIES COMMISSION. MATCH LINE SEE THIS SHEET FOR CONTINUATION 4.SEE ARCHITECTURAL PLANS FOR FOUNDATION, FOOTING AND BUILDING DIMENSIONS. 99 7� , 11,11 PIN No. BLOCK 5171 S LOT DOS 4- �J // r � I ZONING RS20 5 % �--� GINIA WARNER BLOCK 5117171 LOT 01 2 O DB 2757 PG 799 " ` ' / ' s>•.. ` t / ZONING RS20 / 7 �X.�all IL f HARaLD WARNER - 1 PIN K 171 LO 2 16W BLOCK s171 LOT m6w `- L7._S D6 2505 PC 288 CA a0` ZONING RS20 sliL.96E.0 SFOM' [ dll /- ICJ -- -,� ' f� J) 1 C 6&651er�uF4rj ��� � / N/I: DOROTHY LANDRETH PIN No. 171 LOT 0r BLOCK 5171 LOT 043C DB 790470 ZONINGNG RSS 20 _,�FC.960.64J� 1 TOAIMY WAGGONER / OF w NE _.moo "&OMN No. 6868-12-WE D8 18a PG 178 I ZONING RS20 mil NL ►\ ..� r. .wr.w a WO O ®� .a )� UxTON DR/VE �4 I �i EaCf Or PAYMENT 0 } SR 2005 64 pU8 LTC R/ NEW 10' CONC. SIDEWALK 10 a C -7, ST. CONC_ n a� �- � 5�•��eLl v C) KEYSTONE GROUP INC. PIN No. 6868-22-6450.00 BLOCK 5171 LOT E000A DS PG ZONING RM8•-S GRAPHIC SCALE 100 50 0 100 200 1" = 100 FEET LEGEND OF STANDARD SYMBOLS fy7 LIGHT POLE 4 FLOOOLIGHT --OH-Or-OE- OVERHEAD UTIUTY LINE 10.E PULE -3 GUY -0-pr-x -- FENCE LINE Yf WATER VALVE UNDERGROUND PIPING FSZi GAS ASSEMBLY ����� APPROX WOODS LINE (FRUNK) TEMP. BENCH MARK G - GAS LINE MARKINGS ® WELL -UT_UE- UNDERGROUND LINE MARKINGS IND WATER METER - W- WATER LINE MARKINGS La CATCH BASIN HORIZONTAL CONTROL POINT 0 DRAINAGE STRUCTURE 8" BORE HOLE d 0 SA.NlTARY MANHOLE CLEANDUT © BURIED CABLE MARKER M TELEPHONE FED IF TREES ARE SHOWN, THE TREE SYM60L HAS BEEN A FIRE HYDRANT SCALED BASED ON THE TRUNK DLAMEFER TO PROVIDE SIGN - LARGE SIGN A QUICK, GRAPHIC IDEA OF THE SIZE Or THE TREE. ER YARD INLET W/ GRATE THE SYW80LS 00 NOT DEPICT DRIP LINE OR CANOPY v YARD INLET w/ CONC CAP OF INONIDUAL TREES. HANi71CAPPEO SPACE NOTE - ANY UNDERGROUND LINES SHOWN ARE BASED ON SURFACE EVIDENCE, THTS SURVEYOR PINE TREE, SfZE NOTED CANNOT CERTIFY 70 LOCATION OF NON -VISIBLE STRUCTURES. IF UNDERGROUND LOCATION IS ® ELECTRIC APPARATUS CRITICAL, THE LINE SHOULD BE EXPOSED AND AND VERIFIED. THIS SURVEYOR CANNOT ACCEPT LIABILITY FOR UNDERGROUND STRUCTURE LOCATION. Suite 301 530 North Trade Street Winston-Salem, NC 27101 Telephone 336-725-1371 Fax 336-725-1465 DAMS-MAON-POWELL & AS=., INC. PL.AWING-4SUR1/IEYM 6415 OLD PLANK ROAD HIGH POINT, NORTH CAML14A 27266 PHONE (336)886- 4821 FAX (336)886-4458 LICENSE: F43245 DMP PROJECT # 000139 CA 4 SEAL r 033880 ', v NG f N E{�•'r -.� .� �frrtrert+tf Project: WALKERTOWN HIGH SCHOOL FORSYTH COUNTY Sheet Title: POST DEVELOPMLNT DRAINAGE PLAN Issue Date: JUNE 5, 2009 Revisions: 8.4.09 PER STORMWATER REV. APproved StOfmwater Permit Documents Construction in accordance w?-1 these documents I3 r8qulred by the stormwaier permit North Carolina Lulea require that the stormwater system designer IPlans and "SP I during cconntruction, certify conformity with tf►8 BtOrrnwater rules. 15A N C r `L"' liacc" wi111 the ( LA[:zIr 1i108(t)) b'ermtt#4?_ o --- Date $.I ,07 Bh"t * sw -��- NC Division of Water Quaky3 ?'' Revision Date Quaky Project Number: OOO - ODD Sheet Number: As Ws4uments of wr► m these dnawuo and the design represent- ed are the propeet7 of fetter Bobby Callahap 8 Plerre ►nehitecLs, PL Reproduction or use or these drawings other than for the pratset mt�ded without written owmt front the mvbaect is pm- hihita tlaeutborixed use wiR be subject to W& aetien. I m �.. III J,I '�'I • � i _ ,l ' _ 44 TI. - is Ift 1 PM 1E� low AN -,s I� �I • ii t I III""` �'-�+'Cr�._����■''' ' ` . 4 J Z • +► _ • / � I. '!� � _ _-ice `. ■.• �'" . 1 I � � � -�_ „,•�/ � ,�+� h �■ \ ,3 a + �, � �� • �• 4 1� � . � • � � _ _ �R�O���pp �\�� ,r it - t� �- � •r 1, �, I , � - . i_ _ �_.,��r„�,��... -..Par;. a1� %\' • �� � ,IMM A MIMI ��_� �� ��••�•�/�rd +�: III � ,,,,,���`�����!� •� i � = � �_ �---� .� i�A�o. �� ems' J • �� 1 \A\ . 1G+ �. \ • Ste\ � f immolmlir OM NX ON VIP r• M-41) rMa"MAR MOO / - Lallm / -� - is . �i ! _ r� �� �, i -fir'� ��S' • �` r/, � �� .S� " ,�'% ZA , �, ••.•• .tom•- \ `� rr � : `\ `� (�, a ����'' �� ,� � , WM SO k • i ,• . ! OFA Njwo, 1414 OR pp 1!4ff • US HWY. 58 0 Q a Q LAKAWANNA DFt. = L) O O Z� Q.Q ' O h Z QZ oLd OP o r2 7-j� N � Z �. `'�� ._ %� r ■`• • 'fir -,�� ;� ♦. . Ell Film a a �, • fir• � � W 0 g O f_7 H OF W W Wm� J_ O O ZZ as o O V) z WwE F rt Qa= FZ W rt z 9 aao � m0� z Q m oFW t ¢ O a a. 0 Z O V a z Q Ww� SS� h Z O aoa o >-o m w Q O Z F zz �o Q _0 Z y�� i mvNi = O 8a.W W -I� W OOZE WOO z z0 O ?a�z a ul a z �0ccP a F a� L o� Q o�ov�i o aZ ZQ p �� U F:<0 w Q ¢ov 3� 8OZ� )oa� "� a W V o< J m W W �a'Ck:u7 Q d V} N M 4 - E - d/NiS - �'^Y OVi/! ✓ yS Vd Oi. iVilVj 1 -.1 l- PpR°y'1 R DRAINAGE AREAS DA 3 — 34.6 AC EXISTING IMPERVIOUS = 7.32 AC �11, PROPOSED IMPERVIOUS = 0.32 AC 11 DO 8-p4 0523 % IMPERVIOUS = 22.0 % 0 6g6 1 L0� RATIONAL C FACTOR PRE 9 I " 51� PG )) D 5 1 gLDgK RATIONAL C FACTOR 0.6D _� \ _ -- i DRAINAGE AREAS -g 0� ` �- — 1 t � _ �\ DA 4 = 30.9 AC EXISTING IMPERVIOUS = 5.80 AC � PROPOSED IMPERVIOUS = 1.29 AC LE�A�jO 1N'JERK g \ No. 3B % IMPERVIOUS = 22.97% I E �E h 1 r / r~ RATIONAL C FACTOR �PRR)0.58�oM ,8 �1N� " i R0 yEc LRATIONAL C FACTOR PO0.60 — 1 �� F �' �� �� o ` s �_ \ + ...� •. �-F- \ \\ \ y� -��l T\ pK80R" 11 � �_ � 68 °� 1 � — --- --- � � -i � � I \ \�. \ �i �//N /� . SNplp1 r5 •Op 1 �� o 1 - __ \RF�E 1 1 P p(' S a l �g7 2 1 G 1 GP _ FLOOD 'CER77FICA7]'ON. THE SUB,.�CT PROPERTY IS NDT LOCATED IN A SPECIAL [j I 6, N z 1 to 1 co — 1 FLOOD HAZARD AREA AS SCALED FROM MAPS FURNISHED BY HUD/!-7'RM, `� 1 `r' p { DA TED PANEL NOT PRYN7L-Dj SUB„cCT TO VERIFICA 7YON BY DETAILED MAP STUDY SEE COMMUNITY PA 7 O167-H �. 4 +!� p r --- ` ~'���� \ 1 / HN RP a6ar1� �5 1 A S7U T PANEL ,� 3 Ob'7C 1 1 Z� J N r o f 1 1 1 0 a 1 0 2 v / `-- -- 5 \l EV. G� 1 1 1 s a 1 � zg 0 o �� ^—� \� 1 J �/ //� 8L0 52 L1 1 o r 1 o m _ / _ __ _ \ I 1NG R P V 1 0 z via Z 1 G' --$,w�\\\ \ I �(, I ��} Za" _- 1 1 0 '`' � tr 1 7 0� c� cn l� �� S1N J j Il o' 1 `� o� 1 „s 0 a- 11 J } �, \► ! mac, I �I pOUG LpS 1 o'r0ED 0 1 0 -' ! 2Z o 0 1 �i� �= 1 I 1 \ f\ 1 I I Rp,1�PN K. D 3..55 1 % II ff - , 1 I ! L• OV g2• 1 m N 0 1 0-Z o N �i� 1 I! f f I (4 -- x ! I 1 I REPM P 6868- o52G 1 1 1 0 ' �-, 1 0, a ' Z v �' Z 1 0 0- 0 \ �� ! i \ 1 f /��� 1 ! 1 �oYQt� o , 70 t9 Na' 0 1 J ZoJtix' co-+ 1 \ F�"nF \ / BLOCK PC' Z811 1 ts7 to 1 1 J N m o 1 , m .,r_ \ �`` ! I 1/ 55 520 _ _ 1 1 1N - 1 ' �O �c�D�aOG WZUNZ I �r'a- / ) I 1 Z o ZO" 0 R 1 �,0 1 �Y� 1 mo0 ipor' w$�N2 1 J� 1 4j o �+ 1 N 1 o a J N ca o cn o r o 1 -► Ilk �g5 31 U! 00 to N Z 1 j �� ��£ °� °� --� \\\ \ \\ \ IJ I `�" 1 I f / / / / \ GK , G + �51 / . / 5Y 1 Y N m .r / A s\ � �\ \ \ _ 5 • / I �CI—p F s A � 6 1 5 \ \ s 1 / / �� ` \\� \\ \�S� � I I!� � 7g�� �v� oUS S 1 � \ % � � \� DK 517 G �060 �\ \ .32 u�o 11 G �M pE� S I I 1 1 /\; / //� / ` / // B 16� Rs20 \ \ \ PM� q..6 _� \ ptAYGRO 111 I I -SIN �M ov I 1 I I \ / / \ CONN� _DEv� F PRE 5 our~p I I I �� °Po ,MPS \ 1 -� -� s s 8 -� f 1 1 I P os g5 6 �1°U \ P�YGR / I I I �\ _ / _ i4� AMP Rv�°-'-��'\ \. I I I j NG 7� \4Ov 9-085 p26`N °�S ol p- \� Rs2o "N\ / �dgy'n.P FF4,967� z��� r � f / �f f ! / / � l ' � \ 0 \ `\ \\\ \\ l \\ / j I f f 111 if / / �% 1 ! / // �/ ' ' f E _5A-7? \ COO? \ \ \\�\ \\ \ \ \s \ \ \ \\ �\ \ \ \� \ — -- - ( I / / // kI � I I I ' 1 1 ERR 6Vi 1005 c \\\ \� \\\ \ 1` �i 1 ' L ! 1 , I I ' 1 p1N " 51J1 5 � (J \ A. X\\ L \\\ \ \ \\\x 1/5.1��`,�� \ � � � 1 \ \ \ 1� 1 1 � �I l / _ —/— � I � l / l / / / � � RNER g6-r .00 X � -� / 111 1 I 1 I I � 1 Gl"I P w 58 oo3w \ / \ c3g \ \ / // s \ 1 + ` 4 i \ / ! J ( I p1N 51�1 g9 'PA V.- Kx c FFE-974.6� 4 °��soL�°p // ` L \ _ JJPG o, \..// /� ��. ' CESS,B�-E \ \ \ °° \ I y !1 �` 2 f\ 1 '- -~/ 4N 956 WA6 r12 � 6W f W. 6$1 L0� -�J- JL \ \ pIN K 51� 2ga (31 \\\� S \ \�C2f PL%YF'RpUNq - " \/ / // / /• �� `_- \\� �-- / . IN 5 O ("� I -� yr- l.f 9,n H �RI I I «FF -A�oaL \ � -A" low k-01 _ - 410 \ ! G FOUMO / / '�1 \\� (17 CJO lqo N� 90 B3 . \\\ ` \ \ \ �1 1 111 \ ' i - — 1 // /' S[g SEMtiN�� Y BRIG i / /� / 1 �L�� • D88i � \\\ � �®� � � � �".'00001 . _ .^-� / `1 `4} / SSOR �- GRAVEL ��. -.sue- �" �\ _"-"- ONE STOR'! v V y � Y ` � \ � \ ` � ONE �R ,+� _--�� � E S,ORY MOOtiLAR � ,rpUUT � 1� // 1� IE STD�y`3 SrygaA i -O�\� -ONE S'�} M 90 \ p R�PNALT PAR3CING ONC CLP"SRDnN' ICK WALL ) \ \ �— •\ ` '°� _ [w, ti I f (l ' � Tom" '~ ----- J \ 1 \f �_ L_'+ -.�`` '�`•x� � � {1 J � l._. �y " I � GENERAL NOES DRNE I.THE LOCATION OF ALL UNDERGROUND UTILITIES ARE APPROXIMATE AND WERE TAKEN FROM s // -� � � RUXTON �aLE �` f g 99q.��� { 1 p �C j / RhE�S q67 I l�\1 `RECORDS AND FIELD LOCATIONS PROVIDED BY OTHERS. THE CONTRACTOR SHALL BE �-� DNA g� I 1 i RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO THE DRIV START OF CONSTRUCTION. \ / E \ ` 2 0 O 2.ALL GRADES SHOWN REPRESENT FINAL GRADES WITH NO ADJUSTMENT FOR TOPSOIL, ETC. SR 2005 Q 5 SIR 3.PUBLIC WATER AND SEWER SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIRMENTS OF J'\\ R THE CITY -COUNTY UTILITIES COMMISSION. s \ ` \ pUBL � �� _ 0 PU13LIC �o 4.SEE ARCHITECTURAL PLANS FOR FOUNDATION, FOOTING AND BUILDING DIMENSIONS. R AN ` \ Y 3 GRAPHIC SCALE 60 30 0 60 120 1" = 60 FEET LEGEND OF STANDARD SYMBOLS 0 L1GHT POLE ( FLOODLIGHT —OH-or--0E— OVERHEAD UTILITY LINE `a, POLE Q GUY ---q--or--x FENCE LINE H WATER VALVE UNDERGROUND PIPING E8 GAS ASSEMBLY t,LA APPROX WOODS LINE (TRUNK) � TEMP. BENCH MARK 0 """-" GAS LINE MARKINGS WELL -UT— UE— UNDERGROUND LINE MARKINGS IN) WATER METER W -- WATER LINE MARKINGS M CATCI BASIN Q HORIZONTAL CONTROL POINT !DRAINAGE STRUCTURE GORE HOLE © SANITARY MANHOLE ® CLEANOUT © BURIED CABLE MARKER j TELEPHONE PED !F TREES ARE SHOWN, THE TREE SYMBOL HAS BEEN PRE HYDRANT SCALED BASED ON THE TRUNK DIAIUETER TO PROVIDE SIGN �a LARGE SIGN a 4UICK, GRAPHfC IDEA OF THE SIZE OF THE TRff. ® YARD INLET W/ GRATE THE SYMBOLS DO NOT DEPICT DRIP LINE OR CANOPY YARD INLET W/ CONG CAP OF INOIVIDUAL TREE5. NOTE - ANY UNDERGROUND LINES SHOWN ARE HANDICAPPED SPACE BASED ON SURFACE EVIDENCE. THIS SURVEYOR PINE TREE, SIZE NOTED CANNOT CERTIFY TO LOCATION OF NON-VISI8LE o STRUCTURES. IF UNDERGROUND LOCA71ON IS ® ELECTRIC APPARATUS CRITICAL, Trf£ LINE SHOULD BE EXPOSED AND FUND VERIFIED. THIS SURVEYOR CANNOT ACCEPT LIAELLITY FOR ONDERGRDUND STRUCTURE LOCATION. Suite 301. 530 North 'i'rade Street Winston-Salem; NC 27101. Telephone 336-725-1371 Fax 336-725-1465 DAV&MA0N4P01NEI1 & A,S=., INC. 94GINURNG-LAND PLANNI 6415 OLD PLANK ROAD HIGH POINT, NORTH CAROUNA 27265 PHONE (336)3864821 FAX (336)886 4458 UC>: NW: F-0246 DMP PROJECT # 000139 . s{S,6 tlr life.. -*I f- • T. GU C`k l"It iltt{1{ Project: WALKERTOWN HIGH SCHOOL FORSYTH COUNTY Sheet Title: POST DEVELOPMENT DRAINAGE PLAN BASINS 3 AND 4 Issue Date: JUNE 5, 2009 Revisions: 8.4.09 PER STORMWATER REV. Apprts�ei Conatructlan in aCCord�riCr wilt tt,e5e documents is required by the stormwater peonit North Carolina Tines require that the stormwater system designer inspect during construction; certify conformity with ft Plans r4.nFi r c StGTrr + t n `!„ire with the Pe I I -Sw 44'3�Ga t Sheet # 3�J - water quality Revision Date Project Number: 000 - 000 Sheet Number: SLU�l P aa- 4 Aa ins 4wenb of terrice these drawiags tad the design repront- ed are the property of Tatter Robbs CaDahaa & Pierce Archited% PA. Reproductka• or ese of these drawing other than for The project intended without written consent from the er-Wtecl v pro - bibited. Unauthorized use will be subject to ko action. N 42" C.A.A.P. BARREL 12 GUAGE -�-- 0 0.51 INV. 917.00 POURED INVERT PROPOSED 66" DIA. 10 GAUGE 3" x 1" CORRUGATED ALUMINUM TRASH RACK, SEE THIS SHEET FOR DETAILS /Axl" OF WE 4" WATER QUALITY RELEASE ORIFICE W/ TRASH GUARD ELEV. 926.00 /'E2 GUAGE 54" C.A.A.P. RISER % FILL W/ 3000 PSI CONCRETE 150 PCF 3000 PSI CONCRETE 150 PCF CONCRETE RISER 8'---0" SQUARE FOOTING TO BE ON UNDISTURBED SOIL RISER PIPE DETAIL NOT TO SCALE F PORARY WATER QUALITY ZONE ELEV. 926.00 .1/2- U-BOLT PERMANENT POOL 7.0' DEEP 6" DRAIN SHEAR GATE LIFT ROD do FRAME ELEV. 919.00 SEDIMENT STORAGE ELEV. 9177 TOP OF RISER 728.50 8" PVC STUBBED INTO RISER 12" 4" WATER QUALITY RELEASE ORIFICE ELEV. 926.00 J TRASH GUARD NTS 8" PVC TEE TEMPORARY POOL 8" PVC TEE PERMANENT POOL 8" PVC CAP WITH 4"0 HOLE DRILLED 6" GRAPHIC SCALE 30 15 0 30 60 1 " = 30 FEET 24" x 1/4" THICK ALUMINUM ANTI -VORTEX PLATES EACH WAY WELD INTERSECTIONS 5/8" DIA. ALUMINUM RODS ® 12" O.C. EACH WAY. TYPICAL / WELD ALL INMRSEC'nONS PROPOSED B4 /3" x 1 " CORR TRASH RACK 24" x 1/4" THICK ALUMINIUM PROPOSED 66" DIA. ANTI -VORTEX PLATES C.A.A.P. RISER WELD INTERSECTIONS ELEVATION 66" C.A.A.P. RISER TRASH RACK DETAILS NOT TO SCALE 1 0+ 00 5/8` DIA. ALUMINUM ROCS 0 12" O.C. EACH WAY, TYPICAL WELD ALL INTERSECTIONS PLAN PURPLE TOP TRIDENS FLA VUS "H" BIG BL UE STEM ANDROPOGON GERARDII "H N RED TOP AGROS77S ALBA ' DUCK POTATO SAGITTARIA LA77FOLIA '"HA' THREE SQUARE BULRUSH SCIRPUS AMERICANUS "H "" " SOFT STEM BULRUSH SCIRPUS VALIDUS "H" AREA TO BE SEEDED = 8, 900ot Sq. fT PLANTS MUST BE PURCHASED FROM A LOCAL SOURCE RA TES PER LANDSCAPING STANDARDS FAMILIAR W1 TH THE REGIONS GROWING CONDITIONS. PLANTING SEQUENCE 1. PLANTINGS WITHIN THE PERMANENT POND SHALL BE DONE AFTER THE POND HAS BEEN RESTORED TO DESIGN DEPTH AND THE POND IS NO LONGER BEING USED AS A SEDIMENT BASIN. 2. PLANTS ARE TO BE PURCHASED FROM A LOCAL SUPPLIER FAMILIAR WITH THE REGIONAL GROWING CONDITIONS. 3. CONTRACTOR SHALL PREPARE PLANTING AREA PER LANDSCAPING SPECIFICATIONS. 4. PLANTS SHALL BE INSTALLED DURING THE APPROPRIATE GROWING SEASON AS ESTABLISHED BY LANDSCAPE INDUSTRY STANDARDS. 5. ALL MEANS TO ENSURE PLANT SURVIVAL SHALL BE IMPLEMENTED. THESE INCLUDE BUT ARE NOT LIMITED TO: INITIAL FERTILIZATION, CONTROL OF INVASIVE WEEDS, ANIMAL AND VANDAL DAMAGE, MULCHING, STAKING AND WATERING. STAKING SHALL BE REMOVED AFTER PLANT ESTABLISHMENT. 6. PLANTS SHALL BE CLUMPED TOGETHER TO FORM LANDSCAPE ISLANDS INSTEAD OF BEING PLANTED IN A STRAIGHT LINE TO ESTABLISH A NATURALISTIC APPEARENCE. 7. SHALLOW WATER PLANTS SHALL BE INSTALLED BETWEEN APRIL 1 AND JULY 15. 8. DAM EMBANKMENT, TOP OF DAM AND INSIDE OF DAM DOWN TO VEGETATED SHELF SHALL BE PLANTED WITH FESCUE GRASS. GRASS SHALL BE MOWED TO A HEIGHT NO LOWER THAN 4". SPILLWAY PIPE SPECIFICATIONS A. CORRUGATED ALUMINUM ALLOY PIPE (C.A.A.P.) 1. THE PIPE SHALL MEET THE APPLICABLE REQUIREMENTS OF CURRENT A.A.S.H.T.O. SPECIFICATIONS M-196, LATEST EDITION. 2. THE PIPE SHALL BE FABRICATED WITH TWO ANNULAR CORRUGATED REROLLED ENDS OR BE FURNISHED WITH FLANGED ENDS TO BE CONNECTED USING STAINLESS STEEL HARDWARE AND CLOSED CELL NEOPRENE GASKETS. WHERE REROLLED ENDS ARE USED, A HUGGER TYPE BAND WITH "0" RING GASKETS WILL BE REQUIRED. 3. THE PIPE SHALL BE FORMED FROM SHEET CONFORMING TO THE REQUIREMENTS OF A.A.S.H.T.O. SPECIFICATION M-197. THE CORE ALLOY SHALL BE 3004-H34, CLAD ON BOTH SIDES WITH ALLOY 7072. STORMWATER LEVELS PREDEVELOPMENT POST DEVELOPMENT BASIN LEVEL 10 YEAR 8.87 cts. 4.26 cts 928.91 100 YEAR 11.21 cts. 33.78 cts 929.3() CONSTRUCTION SPECIFICATIONS 1) Site preparations - Clear, grub, and strip topsoil from areas under the embankment to remove trees, vegetation, roots, and other objectionable material. To facilitate sediment cleanout and restoration, clear the pool area of all brush, trees, and other objectionable materials. Stockpile ail topsoil or sail containing organic matter for use on the outer shelf of the embankment to facilitate vegetative establishment. Place temporary sediment control measures . below the basin as needed. 2) Cut-off trench - Excavate a cut-off trench along the centerline of the earth fill embankment. Cut the trench to BUTTERFL Y WEED ASCLEPIAS TUBEROSA "H"" 10Z OF SEED MIXTURE stable soil material, but in no case make it less than 2 feet deep. The cut-off trench must extend into both abutments to at least the elevation of the riser crest. Make the minimum 3J, ' OF SEED MIXTURE bottom width wide enough to permit operation of excavation and compaction equipment but in no case less than 2 feet. Make 20.E OF SEED MIXTURE side slopes of the trench no steeper than 1:1. Compaction requirements are the same as those for the embankment. Keep the trench dry during backfilling and compaction operations. 17Z OF SEED MIXTURE 3} Embankment - Take fill material from the approved areas shown on the plans. It should be clean mineral soil, free of roots, 150 PLANTS SPACED 240 APART PLANT IN THE FIRST 6- OF WATER LEVEL woody vegetation, rocks, and other objectionable material. Scarify areas on which fill is to be placed before placing fill. The fill material must contain sufficient moisture so 150 PLANTS SPACED 24" APART PLANT IN THE FIRST 6" OF WA TER LEVEL it con be formed by hand into a ball without crumbling. If water can be squeezed out of the ball, it is too wet for 150 PLANTS SPACED 24" APART proper compaction. Place fill material in 6 to 8 inch PLANT IN THE FIRST 6" OF WA TER LEVEL continuous layers over the entire length of the fill area and then compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer is traversed by at least one wheel or tread track of the heavy equipment, or a compactor may be used. Construct the embankment to an elevation 10% higher than the design height to allow for settling. 4) Conduit spillways - Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe or anti -seep collars. Place the fill material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the some density as the adjacent embankment. Care must be taken not to raise the pipe from firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 feet of hand -compacted backfill over the pipe spillway before crossing it with construction equipment. Anchor the riser in place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5) Emergency spillway - Install the emergency Spillway in undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the emergency spillway. 6) inlets -Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment laden water to the upper end of the pool area to PERSPECTIVE improve basin trap efficiency. (References: Runoff Control Measures and Outlet Protection) RIP -RAP GABION FOREBA Y WALL 7} Erosion control -Construct the structure so that the N. T.S. disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all WIRE MESH SHALL BE CONSTRUCTED OF 0.118 (3.00 mm) GAGE WELDED other disturbed areas above the crest of the principal rences: Surface WIRE MESH OF A NOMINAL SIZE 3 x3,(76mmx76mm). ALL WIRE USED spillwayafter immediately aer construction. (R SHALL CONFORM TO ASTM A641 SOFT TENSILE (minimum 60,000 psi), WITH Stabilization) A CLASS 3 GALVANIZED COATING. EACH WELDED CONNECTION SHALL HAVE 8) Safety - Sediment basins may attract children and can be A MINIMUM SHEAR STRENTH IN ACCORDANCE WITH ASTM A185. dangerous. Avoid steep side slopes and fence and mark basins with warning signs if trespassing is likely. Follow all state PROTECTIVE COATING; WHERE ADDITIONAL PROTECTION IS REQUIRED SHALL and local requirements. BEAN EPDXY COATING. MAINTENANCE NOTE: IF POND IS USED AS A TEMPORARY SEDIMENT BASIN Check sediment basins after periods of significant runoff. Remove THE SEDIMENT MUST BE REMOVED BEFORE MAINTENANCE sediment and restore the basin to its original dimensions when RESPONSIBILITY IS TRANSFERRED TO WINSTON SALEM/FORSYTH CO. SCHOOLS. sediment accumulates to one-half the design depth. SEDIMENT REMOVED FROM THE POND WILL BE STORED WITHIN THE CONFINES OF THE PROJECT PERMANENT POOL ELEV.{FT) AREA {SF) AVE AREA (SF) VOLUME (CF) CUMULATIVE VOLUME (CF) 919 34436 35227 35227 920 36018 35227 36825 36825 921 37632 72052 38155.35 38455.35 922 39278 110507 40117.50 40117.50 923 40956 150625 41811.65 41811.65 924 42667 192436 43537.35 43537.35 925 44408 235974 47326,40 47326.40 926 50244 I ___T 283300--- SEDIMENT STORAGE ELEV.(> T) AREA (SF) AVE AREA (SF) VOLUME (CF) CUMULATIV E VOLUME (CF) 917 31368 32127 32127 918 32886 32127 33661 33661 919 34436 65788 11+00 3' FOREBAY AREAS ELEV.{FT) AREA {SF} AVE AREA (SF) VOLUME (CF) CUMULATIVE VOLUME (CF) 919 7369 7807 7807 920 8246 7807 8538 8538 921 8830 16346 9132.25 9132.25 922 9434 25478 9745.20 9745.20 923 10056 35223 10377.10 10377-10 924 10698 45600 11027.45 11027.45 925 11357 56628 TEMPORARY POOL ELEV.(FT) AREA (SF) AVE AREA (SF) VOLUME (CF) CUMULATIVE VOLUME (CF) 926 50244 53587 53587 927 56929 53587 58675 58675 928 60421 112262 61304.40 30625.20 928 62187 142915 1 2+ 00 Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area. , ?OND MA 077ENMWE REQ TIIREMEN'1'S: 1. INSPECT MOWTHL Y, OR AFTER EVERY RUNOFF -PRODUCING RAINFALL EVENT, WHICHEVER COMES FIRST. A. REMOVE DEBRIS FROM THE TRASH RACK. B. CHECK AND CLEAR THE ORIFICE OF ANY COSTRUCTIONS. IF A PUMP IS USED AS THE DRAWDOWN MECHANISM, CHECK FOR PUMP OPERA VaV C. CHECK THE POND SIDE SLOPES; REMOVE TRASH, REPAIR ERODED AREA BEFORE THE NEXT RAINFALL EVENT. D. IF THE POND IS OPERA TED W 7H A VEGETA TED FIL TER, CHECK THE FIL TER FOR SEDIMENT ACCUMULA770N, EROSION AND PROPER OPERA770M OF THE FLOW SPREADER MECHANISM. REPAIR AS NECESSARY. 2. QUAR7ERL Y A. INSPECT THE COLLE07701V SYSTEM (I.E., CATCH BASINS, PIPING, GRASSED SWALES) FOR PROPER FUNC7701VING. CLEAR ACCUMULATED TRASH FROM BASIN GRATES AND BASIN BOTTOMS, AND CHECK PIPING FOR 0857RUC77CWS. B. CHECK POND INLET PIPES FOR UNDERCU777NG, REPLACE RIPRAP, AND REPAIR BROKEN PIPES C. RESEED GRASSED SWALES INCLUDING THE VEGETA TED FIL TER IF APPLICABLE, T WCE A YEAR AS NECESSARY. REPAIR ERODED AREA IMMEDIATEL Y. 3. EVERY 6 MONTHS A. REMOVE ACCUMULATED SEDIMENT FROM THE BOTT77M OF THE OUTLET STRUCTURE. 8. CHECK THE POND DEPTH AT VARIOUS POINTS IN THE POND. IF DEPTH IS REDUCED TO 76X OF ORIGINAL DESIGN DEPTH, SEDIMENT WJLL BE REMOVED TO AT LEAST ORIGINAL DESIGN DEPTH. 4. GENERAL A. MOW THE SIDE SLOPES, NOT INCLUDING NOR44ALL Y SUBMERGED VE6FTATED SHELF, ACCORDING TO ME SEASON. MAXIMUM GRASS HEIGHT WILL BE 6", B. CATTAILS, AND OTHER INDIGENOUS WE77AND PLANTS ARE ENCOURAGED ALONG THE POND PERIMETER, • HOWEVER, THEY MUST BE REMOVED WHEN THEY COVER THE EN77RE SURFACE AREA OF 7HE POND. C THE ORIFICE lS DESIGNED TO DRAW DOWN THE POND IN 2-5 DAYS IF DRAW DOWN IS NOT ACCOMPLISHED IN THAT ME, 7HE SYSTEM MAY BE CLOGGED. THE SOURCE OF 711E CLOGGING MUST BE FOUND AND EUMINA 7ED. D. ALL COMPONENTS OF 7HE DETEN770N POND SYSTEM MUST BE KEPT IN GOOD WORKING ORDER. ATTACH SKIMMER TO DRAIN SHEAR GATE 4" PVC WHILE POND IS BEING USED FOR SEDIMENTATION CONTROL. REMOVE SKIMMER AND INSTALL DRAIN SHEAR GATE AND LIFTING ROD WHEN POND IS TO BE CONVERTED INTO A PERMANENT POND. INSTALL WITH 1' ORIFICE TO CONTROL POND DRAINDOWN R ply HOSE A 1 1 3+00 DETAIL OF SKIMMER 4" PVC v TOP OF DAM 931.00 6" ' - MIN. � 929.50 2 8' WIDE EMERGENCY SPILLWAY N TS 14+00 Winston-Salem, NC 27101 Telephone 336-725-1371 Fax 336-725-1465 DAVIS-MARTIN-POWEL L & AS=., INC. ENGINEERIINGLl4ND PLANNING-VJRVIEYING 6415 OLD PLANK ROAD . HIGH POINT. NORTH CAROLINA 27265 PHONE (336)886.4821 FAX (336)866 4458 LI : F-0245 DNS PROJECT # 080139 441r{➢Y37RjrF'; CAR '"rP S 1 M w SEAS 033880 -il- 4; iV sfF'er+rr rr➢s$vp+.. Project: WALKERTOWN HIGH SCHOOL FORSYTH COUNTY Sheet Title: PERMANENT POND SHEET Issue Date: JUNE 5, 2009 Revisions: 6.15.09 POST DOI REVIEW 7-24-08 PER DENR REVIEW 7-29-08 SHEET REVISED PER STORMWATER REVIEW Approved Stormwater Permit Documents Construction in accordance with these documents is required by the storrnwatef permit North Carolina rules require that the sv rm. water system designer lnspsct during ConStRuction: t;ertifV conformity with the plans and specs-, and carlity compliance with the 8tprrrnxater rules. (15A NCAC 2H 1008 (j) ) lwtmh;0 gu 4a7�a+ by 6L NC Division of Water Qualify Sheet # cE. L Revision pale 7.2i• Project Number. 000-aoo Sheet Number: .� As instruments of service these drawings and %e desiga represent- ed M Ile property of 1101 r tisb6s Cellehaa & Piercc Arrhiteets, PA. Reproduction, or use of khese drawings cEber Eban for the project intended wittout "ttea consent from the ueWteet is pro- NULed. Unmtbwmd ase will be subject to 10gal action. I ti Lu h I 2 a / \ _J col - F M M FId��FN47 E v�l 19 X 00 P \ \ - -A\ \ \ \ �o \0 \ 90 C P P 1 r GRAPHIC SCALE 30 15 0 30 60 1 " = 30 FEET 6" NOTCH TRASH RACK AROUND BARREL vZrwv 36" C.A.A.P. BARREL 12 GUAGE 0 0.51% IN V. 922.00 POURED INVERT PROPOSED 54" DIA. C.A.A.P. RISER PROPOSED 54" DIA. 10 GAUGE 3" x 1" CORRUGATED ALUMINUM TRASH RACK, SEE THIS SHEET FOR DETAILS //A\ OF IS 9 3.5" WATER QUALITY RELEASE ORIFICE W/ TRASH GUARD ELEV. 930.0 / 12 GUAGE /54" C.A.A.P, RISER 7 FILL W/ 3000 PSI CONCRETE 150 PCF 3000 PSI CONCRETE 150 PCF CONCRETE RISER 8'-0' SQUARE FOOTING TO BE ON UNDISTURBED SOIL RISER PIPE DETAIL NOT TO SCALE 1 6" MIN. 1I 933.00 20' WIDE EMERGENCY SPILLWAY MPORARY WATER QUALITY ZONE ELEV. 930.0 1 /2" U-BOLT PERMANENT POOL 6.0' DEEP 6" DRAIN SHEAR GATE ELEV. 924.0 LIFT ROD & FRAME SEDIMENT 24" x 1/4" THICK ALUMINUM ANT! -VORTEX PLATES EACH WAY WELD INTERSECTIONS 5/8" DIA. ALUMINUM RODS O 12' O.C. 5/8" DIA. ALUMINUM RODS O 12' O.C. EACH WAY, TYPICAL WAY, TYPICAL WELD ALL. INTERSECTIONS /EACH WELD ALL INTERSECTIONS PROPOSED 72" DIA. 10 GAUGE /3" x 1' CORRUGATED ALUMINUM TRASH RACK SKIRT 24" x 1/4" THICK AL ANTI -VORTEX PLATES WELD INTERSECTIONS 54" C.A.A.P. RISER NTS 8" PVC TEE SIZE COMMON NAME BOTANICAL NAME CLASSIFICA TION QUANTITY BENT GRASS AGROS77S PERENNANS "H" IOX OF SEED MIXTURE SWAMP SUNFOLWER HELIANTHUS ANGUSTIFOLIUS "H" 10X OF SEED MIXTURE BUTTERFL Y WEED ASCLEPIAS TUBEROSA "H" 10X OF SEED MIXTURE PURPLE TOP TRIDENS FLA VUS "H' 3,3X OF SEED MIXTURE BIG BLUE STEM ANDROPOGON GERARDII '°H" 20X OF SEED MIXTURE RED TOP AGROS77S ALBA "H" 17X OF SEED MIXTURE SAGITTARIA LA 77FOLIA "H. 150 PLANTS SPACED 24" APART DUCK PO TA TO PLANT IN THE FIRST 6" OF WA TER LEVEL SL NHp 150 PLANTS SPACED 24" APART THREE SOURRE BULRUSH SCIRPUS AMERICANUS PLANT IN THE FIRST 6" OF WATER LEVEL 150 PLANTS SPACED 24" APART SOFT STEM BULRUSH SCIRPUS VALIDUS H" PLANT IN THE FIRST 6' OF WA TER LEVEL AREA TO BE SEEDED = 8,900t Sq. fT. PLANTS MUST BE PURCHASED FROM A LOCAL SOURCE RA TES PER LANDSCAPING STANDARDS FAMILIAR WITH THE REGIONS GROWING CONDITIONS PLANTING SEQUENCE 1. PLANTINGS WITHIN THE PERMANENT POND SHALL BE DONE AFTER THE POND HAS BEEN RESTORED TO DESIGN DEPTH AND THE POND IS NO LONGER BEING USED AS A SEDIMENT BASIN. 2. PLANTS ARE TO BE PURCHASED FROM A LOCAL SUPPLIER FAMILIAR WITH THE REGIONAL GROWING CONDITIONS. 3. CONTRACTOR SHALL PREPARE PLANTING AREA PER LANDSCAPING SPECIFICATIONS. 4. PLANTS SHALL BE INSTALLED DURING THE APPROPRIATE GROWING SEASON AS ESTABLISHED BY LANDSCAPE INDUSTRY STANDARDS. 5. ALL MEANS TO ENSURE PLANT SURVIVAL SHALL BE IMPLEMENTED. THESE INCLUDE BUT ARE NOT LIMITED TO: INITIAL FERTILIZATION, CONTROL OF INVASIVE WEEDS, ANIMAL AND VANDAL DAMAGE, MULCHING, STAKING AND WATERING. STAKING SHALL BE REMOVED AFTER PLANT ESTABLISHMENT. 6. PLANTS SHALL BE CLUMPED TOGETHER TO FORM LANDSCAPE ISLANDS INSTEAD OF BEING PLANTED IN A STRAIGHT LINE TO ESTABLISH A NATURALISTIC APPEARENCE. 7. SHALLOW WATER PLANTS SHALL BE INSTALLED BETWEEN APRIL 1 AND JULY 15. 8. DAM EMBANKMENT, TOP OF DAM AND INSIDE OF DAM DOWN TO VEGETATED SHELF SHALL BE PLANTED WITH FESCUE GRASS. GRASS SHALL BE MOWED TO A HEIGHT NO LOWER THAN 4". SPILLWAY PIPE SPECIFICATIONS A. CORRUGATED ALUMINUM ALLOY PIPE (C.A.A_P.) 1. THE PIPE SHALL MEET THE APPLICABLE REQUIREMENTS OF CURRENT A.A.S.H.T.O. SPECIFICATIONS M-196, LATEST EDITION. 2. THE PIPE SHALL BE FABRICATED WITH TWO ANNULAR CORRUGATED REROLLED ENDS OR BE FURNISHED WITH FLANGED ENDS TO BE CONNECTED USING STAINLESS STEEL HARDWARE AND CLOSED CELL NEOPRENE GASKETS, WHERE REROLLED ENDS ARE USED, A HUGGER TYPE BAND WITH "0" RING GASKETS WILL. BE REQUIRED. 3. THE PIPE SHALL BE FORMED FROM SHEET CONFORMING TO THE REQUIREMENTS OF A.A.S.H.T.O. SPECIFICATION M-197. THE CORE ALLOY SHALL BE 3004-H34, CLAD ON BOTH SIDES WITH ALLOY 7072. STORMWATER LEVELS PREDEVELOPMENT POST DEVELOPMENT BASIN LEVEL 10 YEAR 74.70 cts. 47.36 cts 932.00 100 YEAR 94.18 cts. 65.67 cts 932.25 PERMANENT POOL ELEV.(FT) AREA (SF) AVE AREA (SF) VOLUME (CF) CUMULATIVE VOLUME (CF) 924 13932 14757 14757 925 15583 14757 16439 16493 926 17296 31197 18181.20 15181.20 927 19066 49378 19979.10 19979.10 928 20892 69357 3' PERSPECTI VE RIP -RAP GABION FOREBA Y WALL N. T.S. WIRE MESH SHALL BE CONSTRUCTED OF 0.118 (3.00 mm) GAGE WELDED WIRE MESH OF A NOMINAL SIZE 3"x3" (76mmx76mm). ALL WIRE USED SHALL CONFORM TO ASTM A641 SOFT TENSILE (minimum 60,000 psi), WITH A CLASS 3 GALVANIZED COATING. EACH WELDED CONNECTION SHALL HAVE A MINIMUM SHEAR STRENTH IN ACCORDANCE WITHASTM A185. PROTECTIVE COATING; WHERE ADDITIONAL PROTECTION IS REQUIRED SHALL BE AN EPDXY COATING. FOREBAY AREAS ELEV.(FT) AREA (SF) AVE AREA (SF) VOLUME (CF) CUMULATIVE VOLUME (CF) 924 3128 3447 3447 925 3766 3447 4102 4102 926 4438 7549 4790-00 4790.00 927 5141 12339 5507.15 5507.15 928 5873 17$46 SEDIMENT STORAGE ELEV.(FT) AREA (SF) AVE AREA (SF) VOLUME (CF) CUMULATIV E VOLUME (CF) 922 11854 12365 12365 923 12877 12365 13404 13404 924 13932 25770 TEMPORARY POOL ELEV.(FT) AREA (SF) AVE AREA (SF) VOLUME (CF) CUMULATIVE VOLUME (CF) 930 27048 29317 29317 931 31586 29317 32679 32679 932 33771 61996 CONSTRUCTION SPECIFICATIONS 1) Site preparations - Clear, grub, and strip topsoil from areas under the embankment to remove trees, vegetation, roots, and other objectionable material. To facilitate sediment cleanout and restoration, clear the pool area of all brush, trees, and other objectionable materials. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment. Place temporary sediment control measures below the basin as needed. 2) Cut-off trench - Excavate a cut-off trench along the centerline of the earth fill embankment. Cut the trench to stable soil material, but in no case make it less than 2 feet deep. The cut-off trench must extend into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment but in no case less than 2 feet. Make side slopes of the trench no steeper than 1:1. Compaction requirements are the some as those for the embankment. Keep the trench dry during backfilling and compaction operations. 3) Embankment - Take fill material from the approved areas shown on the plans. It should be clean mineral soil, free of roots, woody vegetation, rocks, and other objectionable material. Scarify areas on which fill is to be placed before placing fill. The fill material must contain sufficient moisture so it can be formed by hand into a bail without crumbling. If water can be squeezed out of the ball, it is too wet for proper compaction. Place fill material in 6 to 8 inch continuous layers over the entire length of the fill area and then compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer is traversed by at Least one wheel or tread track of the heavy equipment, or a compactor may be used. Construct the embankment to an elevation 10% higher than the design height to allow for settling. 4) Conduit spillways - Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe or anti -seep collars. Place the fill material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the some density as the adjacent embankment. Care must be taken not to raise the pipe from firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 feet of hand -compacted backfill over the pipe spillway before crossing it with construction equipment. Anchor the riser in place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5) Emergency spillway - Install the emergency spillway in undisturbed soil. The achievement of planned elevations, grade, design width. and entrance and exit channel slopes are critical to the successful operation of the emergency spillway. 6) Inlets - Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency. (References: Runoff Control Measures and Outlet Protection) 7) Erosion control - Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and oil other disturbed areas above the crest of the principal spillway immediately after construction. (References: Surface Stabilization) 8) Safety - Sediment basins may attract children and can be dangerous. Avoid steep side slopes and fence and mark basins with warning signs if trespassing is likely- Follow all state and local requirements. MAINTENANCE Check sediment basins after periods of significant runoff. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one-half the design depth. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area. POND MAINTENANCE REQUIREMENT'S: 1. INSPECT MONTHLY, OR AFTER EVERY RUNOFF -PRODUCING RAINFALL EVENT, WHICHEVER COMES FIRST. A. REMOVE DEBRIS FROU THE TRASH RACK. B. CHECK AND CLEAR THE ORIFICE OF ANY 08S7RUC77CVVS. IF A PUMP IS USED AS THE DRAWOOWN MECHANISM, CHECK FAR PUMP OPERA 77CN. C. CHECI' THE POND SIDE SLOPES, • REMOVE TRASH, REPAIR ERODED AREA BEFORE THE NEXT RAINFALL EVENT. D. IF THE POND IS OPERA TED WITH A VELETA TED FIL TER, CHECK THE nL TER FOR SEDIMENT ACCUSIUL4 77ON EROSION AND PROPER OPERA 7701V OF THE FLOW SPREADER MECHANISV REPAIR AS NECESSARY. 2 QUARTFRL Y A. INSPECT THE COILLECIMN SYSTEM (1 E.., CATCH BASINS, PIPING GRASSED SWALES) FOR PROPER FUNCAOVV/NG CLEAR ACCUMULATED TRASH flkw BASIN GRATES AND BASIN BOTTOMS, AND CHECK P/PINC FAR OBSTRUCRONS. B. cNECA' Paw INLET PIPES FOR UNDERCUTTING,, REPLACE RIPRAP, AND REPAIR BROKEN PIPES. C. RESEED GRASSED SWALES INCLUDING THE VEGETATED RL TER IF APPLICABLE, 7WCE A YEAR AS NECESSARY. REPAIR ERODED AREA IMMEDIA ZR Y. .3: EVERY 6 MaVTHS A. REMOVE ACCUMULATED SEDIMENT FROM 77-IE BOTTOM OF 7T,'E OUTLET STRUCTURE. B. CHECK THE POND DEPTH AT VARIOUS POINTS IN THE- POND. IF DEPTH IS REDUCED TO 75X OF ORIGINAL DES167V DEPTH, SEDIMENT WILL BE REMOVED TO AT LEAST ORIGINAL DESIGN DEPTH. 4. GENERAL A. MOW THE SIDE SLOPES NOT INQLUDtw NARMALL Y SUBMERGED VEGETATED SHELF, ACCORDING TO 7HE SEASON. MAXIMUM GRASS HEIGHT INLL BE 6'_ B. CATTAILS, AND OTHER INDIGENOUS WETLAND PLAN7S ARE ENCOURAGED ALONG THE POND PERIMETER, • HOWEVER, THEY MUST BE REMOVED WHEN THEY COVER THE EN77RE SURFACE AREA OF THE POND. C. THE CONRCE IS DE',9GNED TO DRAW DOWN 1NE POND IN 2-5 DAYS: IF DRAW DO IS NOT ACCOMPLISHED IN THAT 77ME, THE SYSTEM MAY BE CLOGGED. 7HE SOURCE OF THE CYOGGNG MUST BE FOUND AND ELIM/NA TED. D. ALL COUPOIVEEN75 OF 7HE DETENTION POND SYSTEM MUST BE KEPT IN GOOD WORKING ORDER. ATTACH SKIMMER TO DRAIN SHEAR GATE WHILE POND IS BEING USED FOR SEDIMENTATION CONTROL. REMOVE SKIMMER AND INSTALL DRAIN SHEAR GATE AND LIFTING ROD WHEN POND IS TO BE CONVERTED INTO A PERMANENT POND. 4" PVC Suite'301 530 North Trade Street Winston-Salem, NC 27101 Telephone 336 725-1371 Fax 336-725-1465 DAVIS AAAR' W)OINEEI & AMC., INC. ENGMIEERING-WIND PLANNING-4URVEYING 6415 OLD PLANK ROAD HIGH POINT, NORTH CAROUNA 27265 PHONE (336>886A821 FAX (336)8864458 LICENSE. F-0245 DW PROJECr # 080139 9 _ SEAL 033880 X- S ,•�''�rN. GUFF,-' '�,refe[Ott,ter Project: WALKERTOWN HIGH SCHOOL FORSYTH COUNTY Sheet Title_ PERMANENT POND SHEET # 2 Issue Date: JUNE 5, 2009 Revisions: 6.15.09 POST DOI REVIEW 7-29-08 SHEET REVISED PER STORMWATER REVIEW Approved StolmwatPr Permlt ftcuff1!ft Construction in acrordar,a: „•,, , '-I-ents is fequired by the stormwaier peI;rii,; . ,. na rules require that the siormwater system designer Inspect during construction, ceriity contormity with the plans and specs, and certify compliance with the stormwater rules (1 SA NCAC 2H 1008 (j) ) Permit#-__50'Folocbi Date 8111.0 by j�"(. NC Division of Water Quaft $ItBtst G 4 ii _Revision Revision Date >r •Zf ,O Project Number: 000 - 000 Sheet Number: 2" TYP ELEVATION TRASH RACK DETAILS PLAN NOT TO SCALE 10+00 11 + 00 12+00 13+ 00 SCALE: HORIZ. 1 "=40' VERT. 1 "=4' /s instruments of service these Ira - and 11re desido m resent- ed an the property of faker ttabhs Ca11e4so & Preece kddtmis, PL ReproducLom, or we of these dmwuW other than for the project iatmded wAmt written conemt from the architect is pro- hibited. Uawatherimd an wik be mbjwt to III action