Loading...
HomeMy WebLinkAboutSW4080501_HISTORICAL FILE_20080814STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW �/� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE Axzo_Ll_,� i YYYYMMDD Michael P. Easley, Governor o�0F IN A t �9Q� Cc, Mr. Brian Shugart, President Shugart Development, Inc. 983 Mar -Don Drive Winston-Salem, NC 27104 William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources July 15, 2008 Coleen H. Sullins, Director Division of Water Quality RECEIVED N.P. papF. p! Ngt3 Subject: Stormwater Permit No. SW4080501 BUG 1 ��Q$ Mill Creek at Fieldstone High Density Subdivision Wet Pond Project winetvn ,a!! Stokes CountyLRaglenrl;� Dear Mr. Shugart: The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for Mill Creek at Fieldstone on July 14, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008- 248. We are forwarding Permit No. SW4080501, dated July 15, 2008, for the construction of the subject project. This permit shall be effective from the date of issuance until July 14, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (50) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27811- 7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Winston-Salem Regional Office. If you have any questions, or need additional information concerning this matter, please contact Robert Patterson at (919) 807-6375; or robert.patterson@ncmail.net. Sincerely, >;4—� ?A24-4e for Coleen H. Sullins cc: Mike Gunnell, PE, PLS, Shugart Development, Inc, 983 Mar -Don Dr, Winton -Salem, NC, 27104 Winston-Salem Regional Office Central Files SPU Files North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 807-6300 Internet'. +m+yu.ncvv:rterctualilV.ore Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (9t9) 807-2443 Qnc Noi thCard ina ,Nahravily Customer Service 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycledl10% Post Consumer Paper State Stormwater Permit Permit No. SW4080501 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Brian Shugart / Shugart Development, Inc. Mill Creek at Fieldstone Moore Road (SR 1122), King, Stokes County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until July 14, 2018 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been.designed to handle the runoff from 455,638 square feet of impervious area. 3. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 4. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 5. This pond must be operated with a 30' vegetated filter. 6. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 1 of 8 State Stormwater Permit Permit No. SW4080501` Ill The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. a. 191 c d e f. h I m n. o. P. q. r. Drainage Area, acres: Onsite' ft : Offsite, ft2. Total Impervious Surfaces, ft2: Buildings, ft2: Roads/Parking, ft2: Outparcel #4, ft2: Outparcel #5, ft2: Outparcel #6, ft2: Offsite, ft2: Average Pond Design Depth, feet: TSS removal efficiency: Design Storm: Permanent Pool Elevation, FMSL: Permitted Surface Area @PP ft2: Perm itted'Storage Volume, ftj: Storage Elevation, FMSL: Predevelopment 1 year 24 hour: Post development 1 year 24 hour: Controlling. Orifice: Permanent Pool Volume, ft3 Forebay Volume, ft3: Maximum Fountain Horsepower: Receiving Stream 1 River Basin: Stream Index Number. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 19.33 528,818 313,196 455,638 121,960 124,739 40,564 66,523 88,684 0 3.0 85% 1.01, 1,013.30 18,879 39,673 -at temporary pool 1,014.90 13.32 cfs 3.28 cfs 3.0"0 pipe 56,710 12,341 116 HP Muddy Creek 1 Yadkin Pee -Dee 12-94-(0.5) 41C„ No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot.does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is set up by the permittee to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain.compliance with the permitted BUA limit. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in'the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. Page 2 of 8 State Stormwater Permit Permit No. SW4080501 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The permittee shall submit for approval, final site layout and grading plans for any permitted future development areas shown on the approved plans, prior to construction. 8. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans. f. Debris removal and unclogging of structures, orifice,, catch basins and piping. g. Access to all components of the system must be available at all times. 13. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. 14. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall Page 3 of 8 State Stormwater Permit Permit No. SW4080501' summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 15. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 16. Prior to the sale of any lot or outparcel, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW4080501, as issued by the Division of Water Quality under the stormwater rules. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area is 455,638 square feet. This allotted amount includes any built -upon area constructed within Outparcels #4, 5, and 6; and within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into -the system are not required to provide these measures. h. Built -upon area in excess of the permitted amount will require a permit modification. i. Each lot or outparcel within the subdivision whose ownership is not retained by the permittee, must submit a separate Offsite Stormwater Management Permit application package to the Division of Water Quality and receive a permit prior to any construction on the lot. J. If permeable pavement credit is requested, the property owner must submit a request, with supporting documentation, to the permittee and receive approval prior to construction of BUA. 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 18. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 19. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: Page 4of8 State Stormwater Permit Permit No. SW4080501 a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in this pond is 116 HP. 20. If permeable pavement credit is desired, the permittee must submit a request to modify the permit to incorporate such language as required by the Division of Water Quality. The request to modify must include a soils report identifying the type of soil, the Seasonal High Water Table elevation and the infiltration rate. Upon the successful completion of a permit modification, the individual lot owners that request to utilize permeable pavements must'submit,the' -niecessary forms and documentation to the permittee and receive approval prior to construction of the permeable pavement. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 5of8 State Stormwater Permit Permit No_ SW4080501` 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. Permit issued this the' 15 day of July, 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for [;oleen H. Sullins, uirector Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Permit Permit No. SW4080501 Mill Creek at Fieldstone Stormwater Permit No. SW4080501 Stokes County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the .construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 O State Stormwater Permit Permit No. SW4080501' Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. + 9. .Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. Please submit this Designer's Certification to: Winston-Salem Regional Office Division of Water Quality 585 Waughtown Steet Winston-Salem, NC 27107 Cc: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Page 8 -of 8 I\ To: Robert Patterson Company: NCDENR Storm Water Division Phone: 919)733-5083 ext. 360 Fax: Re: BMP Permit LNO- &_ Shugart ,Mann ement ]nc. 221 Jonestown Road Winston-Salem, NC 27104 (336) 795-9661 (336) 765-9768 (fax) E',- 4 .. J EN 'elands & Stormwater branch From: Michael Gunnell, PE, PLS Project/Proposal Number. Mill Creek at Fieldstone Date: 07-11-08 No. of Pages: 1 If there are any problems with this transmittal, please call us at (336) 765-9661. Messages Please find attached: 1. Two sets of revised construction drawings, 2. Two copies of revised Calculations 3. SW401 - Wet Detention Basin Supplement Revised 4. Wet Detention Basin O & M Maintenance Agreement Revised 5. SWU-101 Storm Water Management Permit Application Revised If you need additional information or have any questions, please do not hesitate to call. My mobile number is (336) 345-1914 Coirfrderrtialio, Note The information contained in this transmittal message is confidential information intended ONLY for the use of the individual or entity named above. If the holder of this transmittal is not the intended recipient, you are hereby notified that any dissemination, distribution or copy of this telecopy is strictly prohibited. If you have received this telecopy in error, please immediately notify us by elephone and return this original message to us at the address above, via United States Postal Service. Thank You Re: BMP Submittal Subject: Re: BMP Submittal From: Robert Patterson <Robert.Patterson@ncmai1.net> Date: Tue, 10 Jun 2008 07:56:42 -0400 To: Mike Gunnell <mike@shugartmanagement.com> Mike, That will be fine. Lets say by 7/14/08. Robert Mike Gunnell wrote: How long can I have. Another 30 days? -----Original Message ----- From: Robert Patterson [mailto:Robert.Patterscn@ncmail.net] 2008 9:12 AM To: Mike Gunnell Subject: Re: BMP Submittal Sent: Monday, June 09, Mike, How long do you need? Right now we don't have a backlog of applications, so I can work with you some. Robert Mike Gunnell wrote: Robert, I am in the process of getting the final wetlands map for this project (SW4080501). I should have it tomorrow or Wednesday. I do need an extension of the deadline. I will not be able to get all the comments revised and back to you by June 13. How long of a extension can I have? Thanks Mike Gunnell -----Original Message ----- From; Robert Patterson [mailto:Robert.Patterscn@ncmail.net] Sent: Friday, May 09, 2008 10:07 AM To: Mike Gunnell Cc: Greg Garrett Subject: Re: BMP Submittal Mike, I just got the package. I hope to get to it first part of next week. Robert Mike Gunnell wrote: Robert, I sent the submittal package for the Mill Creek Subdivision BMP pond to your p,M 1 6/10/2008 7:57 AM Re: BMP Submittal attention today by federal express. Please let me know when you receive it. The package should be delivered by Friday. My office phone number is (336) 231-6772 and cell phone number is (336) 345-1914. Thanks, Mike Gunnell -----Original Message ----- From: Robert Patterson[mailto:Robert.Patterson@ncmail.net] Sent: Tuesday, April 29, 2008 9:39 AM To: Mike Gunnell Subject: Re: BMP Submittal Mike, The items required are on the main application form (SWU-101) and the supplement forms. These may be downloaded at: http://h2o.enr.state.nc.us/su/bm2 forms.htm There is a $505.00 fee and two sets of plans required. Robert D. Patterson, PE Environmental Engineer NCDENR I DWQ I Stormwater Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 512 N. Salisbury St, Raleigh, NC 27604 Phone: (919) 733-5083 ext. 360 Fax: (919) 733-9612 Email: robert.patterson@ncmail.net Website: http://h2o.enr.state.nc.uS/su/stormwater.html Robert D. Patterson, PE Environmental.Engineer NCDENR I DWQ I Stormwater Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 512 N. Salisbury St, Raleigh, NC 27604 Phone: (919) 733-5083 ext. 360 Fax: (919) 733-9612 Email: robert.patterson@ncmail.net Website: http://h2o.enr.state.nc.us/su/stormwater.htitil 2 of 3 6/10/2008 7:5 J 1 +DEW, ,Q USE {ONTLY DalEReceived Fee pai4. Permit Number -//>/ '�-i D'b/ 5-6 5 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This farm may he 77hotocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who ov,-ns the project): Shugart Development, Inc. 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Brian Shugart, President 3, Mailing Address for person listed u1 item 2 above: 983 Mar -bon Drive City:lyimton-Salem State:NC Zip:27104 Phone: (336 ) 765-9661 Fax: (336 ) 765-9768 Email: 4, Project Nance (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): .Mill Creek at Fieldstone 5. Location of Project (street address): Moore Road SR 1122 City:King County:Stokes Zip:27021 6. Directions to project (from nearest major intersection): Site is located ap2roximately 1170 feet south from the intersection of SR 1122 and SR_1236 toward SR 1117 7. Latitude:36' 27' 2778" N Longitude:-90° 34' 4722" 111 of project 8, Contact person who can answer questions about the project: Name:Michael Gunnell, PE, PLS Telephone Number: (336 1 231-6772 Email:mike@sl-iu&aTbnanagemei-it.com II. PERMIT INFORMATION: 1. Specify whether project is (check one): ®Ne`v ❑Renewal ❑Modification Form SWU-101 Version 03,27.08 Paee I of 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if knob n) 3. Specify the type of project (check one): []Low Density ®High Density' ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Stormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to Mr o pages) describing stormwater management for the project. Post development runoff will be detained in a proposed -ivet detention basin. The basin will be sized based on the percentage of impervious area for 85% removal of the total suspnded solids for the first phase of development for 2. Stormwater runoff from this project drains to the Yadkin -Pee Dee River basin. 3. Total Property Area: 149.43 acres 4. Total Wetlands Area: 3.1603 acres 5. 100' Wide Strip of Wetland Area: acres (nof applicable if no wetlands exist on site) 6. Total Project Area': 19.33 acres 7. Project Built Upon Area: 54 % S. How many drainage areas does the project have? 1 9. Complete the following information for each drainage area. if there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For hiLrh density Droiects, complete the table Aith one drainage area for each eneineered stormwater device. Basin information Drainage Area 1 Drainage Area 2 Receiving Stream Name Mudd} Creek Stream Class & Index No. C & 12-94-(0.5) Total Drainage Area (sf) 842,014.80 On -sine Drainage Area (sf) 528,818.40 Off -site Drainage Area (so 313,196.40 Existing Im ervious" Area (sf) 0.00 Proposed lmpervious"Area (so 455,637.60 % Impervious" Area (total) 54 % Impervious" Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (sf) 121,959.50 On -site Streets (sf) 90,108.43 On -site Parking (so 34,630,94 On -site Sidewalks (so 13,355.45 Other on -site (sf) 195,583,28 Off -site (so Total (sf): 455,637.60 ' 1777pernious area is defn.ed as the built upon area iTzcinding, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Total Irroject area shall be calculated based on the current policy regarding inclusion of wetlands in the built 141,077 area percentage calculation. T7Tis is the area used to calculate percent project built upon area (BLZA). Form SWU-101 Version 03.27.09 Page 2 of 4 10. Hoiv was the off -site impervious area listed above derived? Based on maximum r�ond size allowable impervious area minus omite impervious area minus Fieldstone Drive impervious area. Then the allowable impervious area for each Ouut parcel was calculated as a percentaie of lot size to total lot combined areas. _ IV. DEED RESTRICTIONS AND PROTECTIVE CONTENAh'T5 One of the follore-ing deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from http:l/ivo erlr.state.nc.uOsufbM_�fo::2-1 -h :, - deed restricti0 s. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments ta-ith Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature belo5w, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they -will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. `l. SUPPLEMENT FORMS The applicable state stormwater Management permit supplement form(s) listed below must be submitted for each BW specified for this project. Contact the Stormwater and General Permits Unit at (919) M-5DS3 for the status and availability of these forms. Forms can be do-%amloaded from forms.htm. Form S11401-Low Density Form S1'%1401-Curb Outlet System Form S11�7401-Off-Site System Form, SlNT401-Net Detention Basin Farm S11401-Infiltration Basin Form Sl1'401-hifiltration Trench Form SW401-Bioretention Cell Form S11J401-Level Spreader Form S11'401-lYetland Form SW401-Grassed Sivale Form SlN1401-Sand Filter Form Sl'11401-Permeable Pavement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Sivale Supplement Sand Filter Supplement Permeable Pavement Supplement Form SWZJ-101 l'ersion 03?7.09 Page 3 of VI. SUBIIUTTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (D`h7Q). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DIYQ Office. (Appropriate office may be found by locating project on the interactive online map at mam,him) 1. Please indicate that you have provided the follonving required information by initialing in the space provided neat to each item. • Original and one copy of the Storm -water Management Permit Application Form • Original and one cofnj of the Deed Restrictions & Protective Covenants Form (if required as prr Part IV abaue) • Original of the applicable Supplement Forni(s) and OM A agreement(s) for each BW ' • Permit application processing fee of $$505 (Empress: $4,000 for HD, $2,000 for LD) payable fo NIMEI\7R i • Calculations & detailed narrative description of storm -water treatment/management % • Copy of any applicable soils report _ • Tivo copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm - Legend - North arro,v - Scale - Revision number k date - Mean high seater line - Dimensioned property / project boundary - Location map Nvith named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and storm"•a ter control measures - lVedands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you -wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):Shugart Development, Inc. Availing Address:983 Agar -Don Drive City*:l'1Tinston-Salem State:NC Zip:27104 Phone: (336 1 765-9661 Fax: (336 3 765-9769 Email: VIII. APPLICANT'S CERTIFICATION 1, (pi nt or type name of person iisfed in General Infornnation, item Z) Brian Shu art President certify that the information included on this permit application form is, to the best of my knowledge, correct and that the prof c be constructed in conformance with the approved plans, that the required deed restrictions and protecti re c enants will be recorded, and that the proposed project complies i,-ith the requirements of 15A N ICAC 211. Signature Date: Fonn SIVU-101 Version 03.27.09 Page 4 of 4 E �oF W A T&,g �O G � Y Mr. Michael Gunnell, PE, PLS Shugart Development, Inc. 983 Mar -Don Drive Winston-Salem, NC 27104 Dear Mr. Gunnell: Dept. of ENR 15 2008 lvitston-salon Regional (7Ptice May 14, 2008 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins Director Division of Water Quality Subject: Request for Additional Information Stormwater Project No. SW4080501 Mill Creek at Fieldstone Stokes County The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on May 9, 2008. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please fully complete page 2 of the application form SWU-101. 'Items left blank in Part III include 2, 3, 4. Also, the impervious surface area for the streets and townhome section must be broken down as in the second part of the table in number 9 (buildings, streets, parking, sidewalks). The future impervious area for the outparcels should be shown in the "other on - site" row. The "off -site" row is for impervious area that is outside the project boundaries that is flowing to the proposed pond. 2. The applicable items in Part VI.1 left blank on SWU-101 page 4 must be initialed. 3. PIans marked preliminary are not acceptable. Plans must be final for construction in order for DWQ to stamp them approved. Any modifications to the plans after approval must be resubmitted for review. 4. Please delineate all wetlands on site, or provide a note on the plans stating there are no wetlands on site. 5. Information on the seasonal high water table (SHWT) need to be provided. If the SHWT is below the permanent pool elevation (PPE), then a liner will need to be provided in order to maintain the permanent pool. If a clay liner is proposed, then a minimum 4-inch layer of topsoil shall be provided on the vegetated shelf for planting. 6. The average depth calculation should not include the 1-foot of sediment depth at the bottom of the pond. A minimum 1-foot of additional depth must be provided for sediment. As submitted, the proposed wet pond does not provide the minimum average depth of 3-feet. This modification may also necessitate the need to modify information on page 3 of the O&MNn°`hcarol;na Agreement. Ulurrt!!J North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-5083 Customer Service Internet: tvww.newaterouality.org Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-9612 1-877-623-6748 An Equal OpporiunitylAffirmative Action Employer— 50% Recycled110% Post Consumer Paper Mr. Michael Gunnell, PE, PLS SW4080501 —Mill Creek at Fieldstone May 14, 2008 7. The permanent pool volume (PPV) should not include the sediment storage volume. So, the PPV reported on the supplement form is incorrect. 8. Please complete the section labeled "Storage Volume: Nan -SR Waters" on the supplement form since Muddy Creek is not a class SR or SA water. This is the minimum volume calculated using the simple method, and the provide volume between the permanent pool elevation (PPE) and the elevation of the next available outlet above the PPE. Also, there is a rounding error in the volume calculation in part I of the hydraulic calculation section. 9. The SA/DA ratio provided on the pond supplement form should match the 2.20 provided in the calculations. 10. Please provide the length of flowpath to width ratio on the pond supplement form. The minimum required ratio is 3:1. 1 E Please provide area and storage tables and calculations that show that the forebay is approximately 20% of the total PPV. 12. The stage storage table provided must show the volume provided between the PPE and the temporary pool elevation (TPE) so that we may verify that the minimum treatment volume of 37,609,99 cf calculated is provided. 13. Orifice drawdown calculations must be provided. The average head to use in the orifice equation is approximately 1/3 of the distance between the PPE and the elevation of the next available outlet abovelhe PPE. The volume used in this calculation is the treatment volume calculated. 14. The drawdown from the pond shown on the level spreader supplement (2.63) does not match the drawdown provided on the pond supplement (3.28). Please correct this inconsistency. This will also effect the design flow and increase the minimum required length. 15. Please provide supporting calculations for the peak velocity and stability of the bypass channel. 16. Please note that a 401 certification may be required for the stream crossings and a stream buffer authorization for the bypass channel that is shown in the stream buffer on the plans. The 401 Unit can be contacted at 919-733-1786. 17. The graphic scale bar on C-6 appears to be incorrect. 18. The planting plan on C-6 is confusing. Although the planting plan for the pond provides a legend with plants for the shelf, the plan view shows that the vegetated shelf is to be planted with grass. Please revise. Also, the typical for the shelf shows a 40-ft shelf instead of 10-ft. 19. The PPE on detail 1 on C-7 is not consistent with the calculations and supplement form. 20. It appears with the outlet baffle wall and 10" outlet to the level spreader that a portion of larger storm events will continue to the level spreader instead of bypassing it. Please explain. Page 2 of 3 Michael Gunnell, PE, PLS S%4080501 — Mill Creek at Fieldstone May 14, 2008 21. Please submit any information regarding turn lanes or road widening as a result of this project that may be required on Moore Road (SR 1122). Any new impervious area to the Moore Road will need to be treated on this site to the maximum extent practicable. 22. Please note that when the owner is planning to move forward with future phases, they should be submitted as modifications to the future permit for this phase of the project. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to June 13, 2008, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 clays from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number SW4080501 on all correspondence. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (919) 733-5083 ext. 360. Sincerely, Robert D. Patterson, P.T. Environmental Engineer Stormwater Permitting Unit CC' Mr. Brian Shugart, 983 Mar -Don Drive, Winston-Salem, NC 27104 Winston-Salem Regional Office DWQ Central Files Stormwater Permitting Unit Files Page 3 of 3 a GCSE I� I DENR - `NATER (5&A T1 Wegands & Stomwater Branch tie.-r �, , ' , I.�,', • y � �', .�:r s".�'.��� fir•'': 00 4 & Shugart 61anagemenl Inc. 221 Jonestown Road Winsion-Salem, NC 27104 (336) 795-9661 (336) 765-9768 (fax) To: Robert Patterson From: Michael Gunnell, PE, PLS Company: NCDENR Storm Water Division Project/Proposal Number. Mill Creek at Fieldstone Phone: 919) 733-5083 ext. 36C Date: 05-01-08 Fax: No. of Pages: 1 Re: BMP Permit If there are any problems with this transmittal, please call us at (336) 765-9661. Messages Please find attached-. 1. Two sets of construction drawings, 2. Two copies of Calculations 3. SW401 - Level Spreader Supplement 4. SW401 -Wet Detention Basin Supplement 5. Check number 8595 in the amount of $505.00 6. Filter Strip and Level Spreader O & M Maintenance Agreement 7. Wet Detention Basin O & M Maintenance Agreement 8. SWU-101 Storm Water Management Permit Application 9. High Density Development with Outparcels. Deed Restrictions & Protective Covenances Agreement If you need additional information or have any questions, please do not hesitate to call. My mobile number is (336) 345-1914. Confidentiality, Note The information contained in this transmittal message is confidential information intended ONLY for the use of the individual or entity named above. If the holder of this transmittal is not the intended recipient, you are hereby notified that any dissemination, distribution or copy of this telecopy is strictly prohibited. If you have received this telecopy in error, please immediately notify us by telephone and return this original message to us at the address above, via United States Postal Service. Thank You 0 Page 2 Application Completeness Review $Y First Submittal ❑ Re -submittal Date Received Development/Project Name: ,/l1 1 LL -- Receiving stream name and classification: Date Reviewed: By R /,--LbS-Fe +vV ): a — fX9A For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-111, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): Latitude and Longitude: _ 346 "2`7 ' Z 7, 78- "IV 1) 2"1.✓ Project Address: rto&,eta PC a, ( 1122) Engineer name and firm: M0C19 4+it-. S�rLsG-#�e i� v✓t�vnntirwrT� S�✓� . ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets eHigh Density ❑ Other 9"' Check for $505.00 included suV3DrVeSr°'� Er'� Original signature on application If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. ❑ For subdivided projects, a signed and notarized deed restriction statement a' Sealed, signed & dated calculations e' Correct supplement provided for each BMP on site (check all that were provided & number of each) ❑ Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench 0' Level Spreader o Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ©''Net Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road ta' Two sets of sealed, signed & dated layout & finish grading plans with' appropriate details �DWetlands delineated or a note on the plans that none exist on site and/or adjacent property 0' Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; ei Dimensions & slopes provided e' Drainage areas delineated; El"Pervious and impervious reported for each v� Inspection and maintenance agreements provided ❑ Application complete Application Incomplete, Returned: (Date) - H tAl bLrt w/ .4 I;V> , MIFO. Explanation: xA .5 s, K(, rva-or 1y Sk/Q-) o 1 p6-, y �- ;Avi-rt-y (_5: a.v 1>6 , t. Mh P foi Cp.(LTt f:y4 �uvrr'iteC Yr_lfA M �d�osS1!{/GS SL 2006-246 Section 9 Post Construction Requirements for Non -Coastal Counties Low -density 'ects ❑ No more than two dwe g-u its per acre o built -upon area; ❑ Vegetated conveyances to the rr�a m extent practicable; ❑ Built -upon areas at least 3 landwar erennial and intermittent surface waters; ❑ Deed restrictions ctive covenants, and/or o F-restrictive language/measures. High density projects ❑ Control and treat runoff from the first one -inch of rain. ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; ❑ Discharge the storage volume at a rate equal to or less than the predevelopment discharge rate for the one-year, 24-hour storm. ❑ Achieve 85% average annual removal of total suspended solids. ❑ For BMPs that require a separation from the seasonal high-water table (SHWT), the separation shall include at least 12 inches of naturally occurring soil above the SHWT. ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c); ❑ All built -upon areas are at least 30 feet landward of perennial and intermittent surface waters; ®' Deed restrictions, protective covenants, and/or other restrictive language/measures ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices Post -Construction Runoff Controls for T&E Species Goose Creek, Six Mile Creek and Waxhaw Creek Watersheds Buffers ❑ 200' undisturbed buffers on perennial streams ❑ 100' undisturbed buffers on intermittent streams Low -density projects ❑ All built upon area shall be limited to 10 percent. ❑ Use of vegetated conveyances to the maximum extent practicable; ❑ Deed restrictions, protective covenants, and/or other restrictive languagelmeasures High -density projects ❑ The stormwater control measures must control and treat the difference between the pre -development and post -development conditions for the 1-year 24-hour storm. ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; ❑ All structural stormwater treatment systems must be designed to achieve 85% average annual removal of total suspended solids; ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c) ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures. ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices MILL CREEK AT FIELDSTONE STORM WATER CALCULATIONS King, North Carolina Prepared by: Michael L. Gunnell, PE, PLS Shugart Management, Inc. 983 Mar -Don Drive Winston-Salem, NC 27104 (336) 231-6772 %0I S 111111 �. o .......,� @RLOWE P JUL 1. 4 20118 DENR - GVATE R QUALITY Wetlands & Stormwater Branch GUI 1 4EZSy°°°° t Fieldstone Project has been approved by the City .of King Town Council. The site is located in the City of King's ETJ, however is not located in a critical watershed area. The first phase of this project mainly consists of the construction of a main street which will serve Phase 1 and the future phases of this development and the construction of a Town Home Subdivision. The Town Home Subdivision will have residential streets sidewalks, and twenty five buildings, each building will consist of two units. At the City of King and the North Carolina Department of Environment and Natural Resources (NCDENR) request, Shugart Management was to design a stone water facility to detain and remove pollutants and to reduce the stone water flow rates to elinunate any impacts to the downstream drainage basin. First, the predeveloped flow rates were determined based on existing site conditions, soil types, and drainage area. Please note that there was minimal offsite flow for this project. Secondly, the volume for the first 1" of rainfall, the volume for the 10 year — 6 hour stone, and the volume for the 25 year — 6 hour stone events were determined to size the pond based on a release rate of 2 to 5 days. The pond was designed to meet current requirements published by the North Carolina Department of Environument and Natural Resources (NCDENR). Next the postdeveloped flow rates were determined and routed through the pond based on the proposed Town Home Subdivision and three future Out Parcels, soil types, and drainage areas. Finally the predeveloped flows rates were compared to the postdeveloped release rates to determined adequate pond size. In order to further remove pollutants fi-om the storm water a flow splitting device was added the riser structure. Low flow will discharge directly to a level spreader and flow through a vegetated filter strip before entering the existing stream. High flow volumes will overtop the splitting device and discharge directly into the stream through a inatted channel bypassing the level spreader. In summary, the calculations attached below show that the pond has adequate storage volume and meets the storm water management requirements imposed by the NCDENR. NCDEINTl2 Stormwater 13MP Manual Chapter Revised 07-02-07 The type of ground cover at a given site greatly affects the volume of runoff. Undisturbed natural areas, such as woods and brush, have high infiltration potentials whereas impervious surfaces, such as parking lots and roofs, will not infiltrate runoff at all. The ground surface can vary extensively, particularly in urban areas, and Table 3-5 lists appropriate curve numbers for most urban land use types according to hydrologic soil group. Land use maps, site plans, and field reconnaissance are all effective methods for determining the ground cover. Table 3-5 Runoff curve numbers in urban areas for the SCS method (SCS, 1986) Cover Description Curve Numbers for Hydrologic Soil Group Fully developed urban areas A B C D Open Space (lawns, parks, golf courses, etc.) Poor condition (< 50% grass cover) 68 79 86 89 Fair condition (50 % to 75 % grass cover) 49 69 79 84 Good condition (> 75% grass cover) 39 61 74 so Impervious areas: Paved parking lots, roofs, driveways, etc. 98 98 98 98 Streets and roads: Paved; curbs and storm se-wers 98 98 98 98 Paved; open ditches 83 89 98 98 Gravel 76 85 89 91 Dirt 72 82 85 88 Developing urban areas Newly graded areas 77 86 91 94 Pasture (< 50 % ground cover or heavily grazed) 68 79 86 89 Pasture (50% to 75% ground cover or not heavily grazed) 49 69 79 84 Pasture (>75 % ground cover or lightly grazed) 39 61 74 so Meadow - continuous grass, protected from grazing and 30 58 71 78 generally mowed for hay Brush (< 50% ground cover) 48 67 77 83 Brush (50% to 75% ground cover) 35 56 70 77 Brash (>75% ground cover) 30 48 65 73 Woods (Forest litter, small bees, and brush destroyed by 45 66 77 83 heavy grazing or regular burning) Woods OAloods are grazed but not burned, and some forest 36 60 73 79 litter covers the soil) broods (Woods are protected from grazi.-tg, and litter and 30 55 70 77 brush adequately cover the soil) Most drainage areas include a combination of land uses. The SCS Curve Dumber Model should be applied separately: once for areas ivhere impervious cover is directly connected to surface water via a swale or pipe and a second time for the remainder of the site. The runoff volumes computed from each of these computations should be added to determine the runoff volume for the entire site. For the portion of the site that is NOT directly connected impervious surface, a composite curve number can be determined to apply in the SCS Curve Number Model. The composite curve number must be area -weighted based on the distribution of land uses at the site. Runoff from impervious areas that is allowed to flow over pervious Stormwater Management and Calculations 3-7 July 2007 North Carolina Waterbodies Listed by County Note: WaterbDdbes are listed in more than one county if they cross count), lines. Report Date: 04/26/08 Records Found: 95 Search Parameters: County: Stokes Class: SpDes: % Name: % Index#: % !Name of Stream Description Curr. Class bate Basin Stream Index # i' StOkS Cdunty' Ji k 1 rr a n Y 4. �'S _.........i.1L 4..�.z`v.�wu—�.......r ... ..!.......`.�:_..:t...�,15:.:__... _S"? .....� _ .. ., .. n.....� _:i... ..�. .1_..."........,. _w ..�_—.�r..e.: Chinquapin Creek From source to Toms WS-II;HQw OB/03/92 Yadkin 12-72-14-3 Creel; Little "Yadkin From source to Yadkin WS-IV 09/01/94 Yadkin 12-77 River River West Prong From source to a point C 06/01/98 Yadkin 5-2-7-7-1- (1) Little Yadkin 0.3 mile upstream of 'River Stoles County SR 1160 West Prong From a point 0.3 mile WS-IV DB/D1/9B Yadkin 12-77-1-(2) Little Yadkin upstream of stokes River County Stokes County SR 1160 to Little Yadkin River Fast Prong From source to a B 08/01/99 Yadkin 12-77-2-(1) Little Yadkin point 0.4 mile 'River uptream of Surry County SR 1136 East Prong From a point 0.4 mile WS-DVI B 08/01/96 Yadkin 12-77-2-(2) Little Yadkin upstream of Surry River County SR 1136 t0 Little Yadkin River Danbury Creel: From source to Kittle Ws -IV 09/01/94 Yadkin 12-77-3 Yadkin River Goff Creek From source to Danbury WS-IV 09/01/94 Yadkin 12-77-3-1 Creek Crooked Run Creek From source to Little Ws -TV 03/01/94 Yadkin 12-77-4 Yadkin River Muddy Creek From source to a point C 09/01/9B Yadkin 12-94-(0.5) 0.8 mile upstream of mouth Tippet Branch From source to Little C Tennessee Riser Tippet Branch From source to-it`_le C Tennessee River DRIQ RIVER (North From North C;Tr Carolina portion) Carolina -Virginia State Line o Big Creek DAN RIVER From a point D.2 mile WS-IV do%,nstream of Town Fork. Creek to a point 0.3 mile upstream of Reed Creek. 07/01/61 Little 2-25 Tennessee 07/01/61 Roanoke 2-25 09/02/57 Roanoke 22-(1) DB/01/90 Roanoke 22-(25.5) Page 1 of 5 Precipitation Frequency Data Server Page 1 of 4 POINT PRECIPITATION ,.. FREQUENCY ESTIMATES � p FROM NOAA ATLAS 14 North Carolina 36.272778 N 80.344722 W 1 ] 02 ]feet from "Precipitation -Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin_ D. Martin, B. Lin, T Parz ,bok, M.Yelaa, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 l xtmcted: Wed Apr 30 2008 Confidence Limits Seasonality Location Maps Other Info. GIS data Maps Help Precilmitation IN reauenev Estimates (inches) AR1 • � 10 1� 30 66 l20 � hr R71 }ears) min min fnin imn min min 7,,Ri da[21111 1114f-,L] I 10.37 0.59 0.74 ].O1 1?6 ].50 ].62 2.0] 2.44 2.92 3.44 3.85 4.38 5.00 6.74 8.35 ]D.53 12.5b 0.44 0.70 0.88 1.22 1.53 1.83 Efl EE EE 3S3 4.15 4.64 5?5 5.97 8.01 9.8b 12.39 14.71 0 0.52 0.83 1.05 1.50 1.92 2.3jj 2. 00 3.07 3.75 Efl 5.22 5.81 6.47 E?E 9.58 11.55 14.31 16.79 10 D.58 0.92 ] . ] 6 1.69 2?0 2.67 2.89 3.57 4.38 5?4 6.08 6.75 7.46 8.31 10.81 12.82 ] 5.76 ] 8.35 25 0.64 1.02 ].30 1. 22 2.56 3.15 3, E2fl EE 6.35 7.28 18.07 8.82 9.75 12.49 E4 17,62 20.34 50 0.69 1.10 1.39 2.09 2.84 3.54 3.84 4.8] 6.DD 7.27 8?6 9.15 9.94 10.90 ]3.80 15.7b 19. 11 21.81 i40 D.73 1.16 1.47 EE 3.10 3.92 4.27 5.39 6.78 8?5 9.30 10.29 11.10 12A9 15.13 17.00 20.36 23.21 200 0.77 1.22 1.54 2.40 337 4.31 4.70 5.99 7.60 9.31 10.40 ] 1.44 12 13.32 16.48 K2] 21.67 24.56 �0Q 0.82 1.29 1.63 2.59 3,72 4.84 530 Eg 8.80 10.85 ] 1.97 13.22 14.07 15.05 18.30 19.83 23.37 26?7 1000 110.85111.34111.69112.73113.98115.26115.76 ii7.51 119.771112.131113?5[1 ] 4.631115.471116.431119.721121.041124.631127.54 "These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Text version of tab �Please refer to the documentation for more information. NOTE: Formatting forces estimates near zero to appear as zero. 1.67 2.00 2.17 2.67 3.24 3.83 4.48 4.98 5.62 6.37 8.49 1 2.09 2.53 2.73 3.36 4.09 4.85 5.63 6.23 6.92 7.75 ] 0.15 12.12 2.39 2.92 3.16 3.90 4.76 5.67 6.54 7.23 7.96 8.86 11.47 13.46 2.79 3.45 3.74 4.65 5.71 6.86 7.83 8.64 9.42 I0.37 li?3 15.21 3.09 3.87 4.20 5?5 b.49 7.85 8.89 9.81 10.61 11.60 14.62 66.55 3.38 4.30 4.67 5.88 7.33 8.90 I lo.61 1]. 44 1].fib 12.87 16.05 17.88 'The upper bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quantile values for a given frequency are greater than. These precipitation frequency estimates are based an a partial duration series. AM is the Average Recurrence Interval. Please refer to the documnjafioIl for more information. NOTE: Formatting prevents estimates near zero to appear as zero. s Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARi 14 l5 30 64 1_0 3 76r F12 4 48 4 7 10 20 30 4560(ears) min min rain min rein min ]rr hr hr day day day day day day day 0.34110.55110.68110.93111.16111.38111,49111.85112 25112.70 #13.20 113,59 114.10 114.69 116.36 117.93 400.051112.03 0 0.41 0.65 0.82 1.13 i.42 1.68 i.�2 2.24 2.73 3.26 3.86 4.33 4.42 5.6] 7.56 9.37 ] 3.8] 14.09 �.J 0.48 0.77 0.97 ].38 ].77 2.12 2?9 2.82 3.44 4.13 4.85 5.42 6.05 6.83 9.03 10.96 13.64 16.05 Docs 11 U.S. Map http://hdsc.l3«js.noaa.goN,/c!zi-biiVbdsc/buildout.perl?type=pf&wiits=us&series=pd&statenanie=NlORTH1C... 4/30/20( ?recipitation Frequency Data Server Pave 2 of 4 0 O.S� 0.86 1.07 1.66 2.02 2.44 ?.66 3?6 4A0 4.83 6.63 6?8 6.96 7.78 10.18 13.]6 15.00 17.54 2� OS9 0.94 1.19 ].76 ?.i4 ?.86 3.11 3.8b 4.77 6.$1 6.71 7.47 8.20 9.Q9 11.71 I3.70 15.73 ]9.40 50 0.63 1.00 1.25 1.90 Efl 3.19 3.46 Lfl E39 6.61 7.68 8.43 9.19 10.12 1?.90 14.86 ] 8.Q? ?0.7b 100 Q.b6 l - 133 ?.03 3.80 3.60 3.8? 4.80 6.0� 7.46 8.45 9.43 10?? 11.18 14.Q9 15.99 19.26 23.04 Z00 0.69 1.]0 138 2.16 3.02 3.83 4.16 5.?7 6.67 8.36 9.43 1Q.46 11?8 1??6 l6?8 ]7.09 20E 23?6 �00 0.7? 1.1 1 T 2?9 3 4.23 4.62 691 7.67 9.62 10.74 11.90 l?.73 13.71 16.84 18.b0 21.93 24.78 1000 Q.75 1.]8 1.48 ?39 3.49 4.64 4.96 6.40 8.37 10.66 I1.79 li.06 13.89 14.86 18.03 1956 2;.Q3 25.89 'The lower hound of the confidence interval at 90%confidence level is the value which 5%of the simulated quantile values for a given frequency are less than. "These precipitation frequency estimates are based on a partial duration maxima series. ARl is the Average Recurrence Interval. Please refer to the documertalion for more information. NOTE: rormatting prevents estimates near zero to appear as zero. a 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 1 0 Partial duration based Point Precipitation Frequency Estimates - Versions 3 36.272770 N 80.344722 W 1102 ft I ! 1 1 i 1 I I r- I I 2-4-`1- I JY I J.--- T f I I 3 I I = I I I I I I i I ! I I-1-1----F . i 1I I- i` I I I 1 _= I i IT 1 i I I i-�- -{ I 1 �1 I I iI ---1 2 3 4 5 6 7 6 910 20 30 40 50 80100 140 200 300 500 700 1000 Average Recurrence Interval (years) Wed Apr 30 15:29:38 2008 Duration 5-min 30-dale -�- -- r3-rai11 -;F- 24-1) 20 ilttp://1idsc.nNvs.noaa.CFov/c-i-Uinlhdsc/buildout.peri?t},pe=pf&units=us&series=pd&siatena3ne=NlORTH+C 4/30/20( Precipitation Frept ncy Data Server Page 3 of a Partial duration based Point Preoipitation Frequency Estimates - Yersion: 3 36.272776 M 80.344722 W 1102 ft 28 I E i i i 27 I ! 1 1 I I I V i I I I I !} } ! I e 25 24 23 r. 22 21 19 i' 18 a I e 15 0 14 13 12 11 10 9 a 8 Iu 7 IZ b 5 4 3 2 1 0 i i I I I I i I I I I —— — •_—:r---�--E—___ — i ��-- � —�— i I V l I I I I C C c 5 L L L L L T T ZI T DI T T T T T - - - I i s s` C$ 0 m M m M m m m M : a e - 8 0 i i r I i I i I i ,— 3 ,. "C 3 I I I I I I (U A " 'D fD N � C` t0 LO I I I I I I I I I I Ir7 lr7 p 0 G -. -� N M V (1 - J, I t9 117 G} G� N -' C.) a m Duration to m v w Wed AK+r 30 15:29:38 20ee Ala 13S - Average Recurrence Intenval (wears) 00 --- I Ci 50c, + 1000 I M-w 11 C)-w 10> -w 9p "w FII'l.w z c a a- 70 "w i hese maps were produced using a direct map requesl from the 0.3, canst:s Bureau IJiaaaino and Ca toaraanic Peso-Irces Tkaer IV,aa Server. Please read discloiwow for more o formarion. Imp. //hdsc.nws. noaa.gov/ccri-bill/hdse/buildout.perl?ty pe=pf&rulvts=us&series=pd&statename=]\7ORTH+C... 4/30/M Precipitation Frequency Data Senler Page 4 of 4 LEGEND State Connector — County [� Stream —(Indian Resv Eja Military Area F&--A Lake# Pandj Ocean - National Park Street Other Park *� Expressway Cj City -- H i ghw+tay o County,, 6 mi Scale 1:228563 a *awera�e--true scale depends on Pionitor resoRuthnn Other Maps/Photographs - View U GS digital ortllo 11oto uadranZie D covering this location from TerraServer; USGS Aerial Photograph may also be available from this site. A DOQ is a computer -generated image of an aerial photograph in which image displacement caused by terrain relief and camera tilts has been removed. It combines the image characteristics of a photograph with the geometric qualities of a map. Visit the USGS for more information. Watershed/Stream Flow Information - Find the Watershed for this location using the U.S. Environmental Protection Agency's site. Climate Data Sources - Precipitation frequenc�) results are based on data from a variety of sources, but largel3r NCDC. The follalm.,ing links provide general information about observing sites in the area, regardless of if their data was used in this stud},. For detailed information about the stations used in this stud}, please refer to our documentation. Using the rational Climatic Data Center's (NCDC) station search engine, locate other climate stations within: +1-30 minutes ...OR... +1-1 degree oftlus location ('6.272778/-80344722). Digital ASCII data can be obtained directly from NCDC. Hy*drorneteorological Design Studies Center DOCINOA-rational Weother Service 1325 East-West HighM'2p Silver Spring. NID 20910 (301) 713.1669 Questions?: hDgC.nue5tinns0moaa,ern Disc k-ittp:llbdsc.nws.noaa.00-,r/cc,i-biiVhdsc/buildout.perl?type=pf&units=us&series=pd&stateiiataie=-NIORTH+C... 4/30/20 Precipitation Frequency Data Sen~ ,r Page 1 of 4 ` POINT PRECIPITATION F FREQUENCY ESTIMATES FROM NOAA ATLAS 14 North Carolina 36.272778 N 90.344722 W 1102 feet from "Precipitation -Frequency Atlas ofthe United States" NOAA Atlas 14, Volume', Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzybol, M.Yckta, and D. Riley NOAA, National Weather Service, Silver Spring, Maniand, 2004 Fa-tracted: W ed Apr 30 2009 Confidence Limits 11 Seasonality ]rotation Maps Other Info. 11 GIS data Maps Help I pots Precipitation Frequency Estimates (inches) _ I 35 �0� 60 1?0 12 � 7 10 20 30 �5 60 ���� 3 ktr 6 hr � .�,4 hr 48 hr �❑����� mtn mm mm mtn hr da day° da�da da�da day 0.74 5.61 1 26 1 I.62 ? ? 44 2.92 3.44 3.85 4.38 5.40 6.74 8.35 1 Q.53 I2.56 O.E8 1?2 E3 1.83 E .9 fl 2.44 2. 77 E3 4.15 4.b4 5_2� I 5.97 8.41 9.86 ]2.39 14.71 1.05 ISO 1.92 2E ?.50 3.07 Efl 4.48 5?2 5.81 6.47 7.28 9.58 11.6b I4.3] 16.79 I.16 1.b9 2.20 2,b7 2.59 3.57 4.38 5.24 6.08 6.73 7.46 831 10. 1] 12.82 ]5.76 18.35 1.36 1.92 2.66 3.15 3.43 4.25 8.07 8.82 9.75 I2.44 14.49 17.6Z 20.34 SQ 0.69 1.10 1.39 ? 09 2.84 3.54 3.84 4.8] 6.00 7?7 8.26 KE 9.94 10.90 13.80 I6.76 99. 11 21.81 100 0.73 1.16 ].47 2.25 3.10 3.9? 4.27 5.39 6.78 8.25 9.30 10.29 11.10 12.09 15.13 I7.00 20.36 23?1 200 0.77 1 1.54 2.40 3.37 4.31 4.70 EE Lo 9.31 14.40 F1-9 12.33 13.32 16.48 18.22 21.67 245 }00 0.82 ].29 1.63 2.59 3.72 4.84 5.34 6.83 8.80 ]O.ES l].97 13.22 14.07 ]5.05 1830 19.83 33.37 2b?7 1000 0.85 I.34 I.69 2.H 3.98 �.26 5.76 7S 1 9.77 12.13 13.25 14.63 15.47 16.43 19.72 2l .44 24.b3 27.54 Text version of table ' These precipitation frequency estimates are teased on a natal duration series. ARI is the Average Recurrence Interval, Please reier to the documentation for more information. NOTE: Formatting forces estimates near zero to appear as zero. 1.34 ] .69 2.63 1.42 1.79 2.85 1.48 1.86 3.01 M These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval, Please refer to the documentation for more information. NOTE: Formatting prevents estimates near zero to appear as zero * Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARj'�x N 101a30 60 120F3r] Fh 12 �4 [141[;2[�j 10 2Q 30 4a 60 min min min min min rhr hr day da}° day day day 0.34 0.55 0.68 0.93 l.lb 1.3E 1.49 1.85 2.26 2.70 3.2E 3,59 4.10 4,69 6.36 7.93 10A5 12.03 �0.41 0.65 0.82 ].13 1.42 1.68 1.82 2?4 2.73 3?6 3.E6 4.33 4.92 5.61 7S6 9.i7 11.81 14.09 �.J 0.48 0.77 0.97 1.38 1,77 2.12 2.29 2.8? 3.44 4.13 4.85 5.42 b.05 6.83 9.03 I0.96 ]3.64 16.45 U.S. Map http://hdso.nNvs.noaa.;oti,/cgi-bin/lidsc/buildout.perl?type=pf&units=us&series=pd&statenanie=NIGRTH+C... 4/3 0/20( Precipitation Frequency Data Server rage 2 of 4 'The lower bound of the confidence interval at 9D%confidence level is the value which 5%of the simulated quantike values for a given frequency are less than. These precipitation trequency estimates are based on a partial duration maxima series ARI is the Average Recurrence Interval. Please refer to the documentation for more information. No i E: Formatting prevents estimates near zero to appear as zero. 2@ 27 26 25 24 23 22 21 .+ 20 19 19 a 17 a 16 15 O 14 13 � 12 30 U 9 a s � 7 6 5 4 3 2 1 0 Partial duration based Point Precipitation Frequency Estimates - Version: 3 36,272776 N $0.344722 W 1102 ft I I I I i l l l l I I I I I I II I l V 11 V I V m i l I I I I IFT I -77- :- I I I ! I I ! 1= - f l! I-!-• -i" I I I I I I I I I 1 I I!--T —, iT l 1 I-1-1 i I I I I i Irr _- 11=� I I I I I I I I i': --i i -I :-' I I I II I _ -_ -- I I I I I I I I I I _y= �i J 1--� _�.� _ '"`���rl L � -�-" I I �-`^I -- — --- i I I �-� }yr -t --I•-T -i - _ -F-l I. I ilI i I I ! I I I l I 1 2 3 4 5 6 7 8 ?30 20 30 40 5e 801eD 140 200 300 500 700 1000 Average Recurrence Interval (years) Lied Apr 30 15:27:22 2008 Duration 5-min -- 4~-1%:- -E 30-dau -"- 10-mir, 4- 1`-min = 7-day 1- n T 1c-!,r .0-roiI-, 24-1,lr = r'-r-4 = bttpJ/lidsc.n«vs.noaa.govlcgi-bin/ idsclbuildout.perl?t},pe=pf&uiiits=us&series=pd&statenalne=NIORTH+C... 4/30/20 Precipitation Frequency Data Server ' Partial duration based Point Preoipitation Frequency Estimates - Version: 3 s6.27277E M 80.34472E W i102 ft Pac,e of 4 ao 27 25 25 24 23 22 21 v 20 19 { 1s m 17 q 16 i5 0 14 13 12 {+ 11 10 9 U $ a 7 a` 6 5 4 3 2 1 Q r i i t i i I i i i t i I i I i I I t i I i I I 1 I I i i I ! I , I I I ! I ! I 1 j I ! I I I I l ! I '� '' !:' I'• 4- I r, I I I I i I I I I I ri ' I ` i�•'��. -- _ _ _— i C C = L L L L i L L T ::Ih M Ok D5 7, T T �_h D1 M i -C f t s ro m m ra m M m m M m s s a i i 'a 75-5 s 3-3 I I I i i i v to 11 w cD ao to ao v •1 . I I I I i I I I i 3 I tta n Ira c: o .~ N M y t*t Q In I a va o o In o ~ ~ M m Q' Duration N cn c 0 Wed Apr 30 15:27:22 2008 Maps - Average Recurrence Interval (wears) 2 100 — Ica 500 -- c l is 0 Ll —5__ 120~w 1 I o'-w i 00-w 90-W 8 0-W 70"W These maps were produced using a direct map request from the UrS. CeTIStls Bureau Mapping and Ca-tWraahic Resources Tioer Map Server. z Please read dtsclaimerfar more information. http://hdsc.nNN,s.noaa. aoN,/ccri-bin/iidsc/buildout.per] ?type=pf&units=us&series=pd&statenaine=N1ORTH+C... 4/3 0/20( 'recipitation Frequency Data Server Nae 4 of 4 LEGEND ---- State — Connector — County M3 Stream r 1 nd i an Flesv L7_'I M i 1 i tary Area [ LakelPondiOcean National Park -- Street Other Park •� Expressway i I C i tit — Highway 0 Cvnty6 g mi Scale 1: 220583 10 4 'b 6 o i,m *average --true scale deperl on monitor resolution Other Maps/Photographs - View USGS digital arthopiloto gtladrallgie CI10�1 covering this location from TelraServer; USGS Aerial Photograph may also be available from this site. A DOQ is a computer -venerated image of an aerial photograph in which image displacement caused by terrain relief and camera tilts has been removed. It combines the image characteristics of a photograph Nvith the geometric qualities of a map. Visit the USGS for more information. Watershed/Stream Flow Information - Find the Waursbed for this location using the U.S. Environmental Protection Agency's site. Climate Data Sources - Precipitation frequency results are based on data from a ivrieo, of sources, but largely ArCDC. The following litsks provide general information about observing sites in the area, regardless of rf their data was used its this stud}. For detailed information about the stations used in this study,, please refer to our documervation. Using the rational Climatic Data Center`s IrCDCI station search engine, locate other climate stations within-, +/-30 minutes j ...OR .. +/-1 degree I of this location (35.272778/-80.344722). Digital ASCII data can be obtained directly from ram. Hydrometeorologicsi Design Studies Center DOCIN0.1Lk/National Weather Sen•ice 1325 East-West Highway Silver Spring, AID 20910 (301) 713-1669 Questions?: i DSC Oues;iorsi-a)naaa.am: Disclaimer http://lidsc.iiNvs.iioaa.gov/cgi-biiiA idsc/buildout.perl?13, pe=pf&uiuts=us&series=pd&statenaiiie=NIORTH+C... 4/30/201 I. DETERMINE STORAGE VOLUME FOR 1 IN RAINFALL EVENT A. 1 INCH — 24 HOUR RAINFALL VOLUME 1. Solve for Runoff Coefficient (Rv) Rv = 0.05 + 0.9(la) la = Impervious Area of Site Ia = 54% or 0.54 Rv = 0.05 + 0.9(0.54) Rv = 0.536 2. Solve for the 1 inch Runoff Volume (V) V=3630*Rd *Rv *A Rd = 1 in Rv = 0.581 A = 19.33 ac V=3630* 1 in. *0.536* 19.33ac. V = 3 7,609.99 cf Use V = 37,607 cf H. DETERMINE REQUIRED SURFACE AREA .FOR BMP Based on the approved site plan by the City of King, the proposed BMP shall be sized for a 54% built upon area. Try a storage depth = 3.0 ft. From the NCDNER Stonnwater BMP manual on page 10-7: 50% Imperv. Coverage, Permanent Pool Surface Area = 2.06% of the Drainage Area 60% Imperv. Coverage, Permanent Pool Surface Area = 2.40% of the Drainage Area Solve for the Percentage of Drainage Area by Interpellation 60 - 50 = 60 - 54 X = 2.40- 6(0.34) X = 2.20% 2.40 - 2.06 2.40 - X 10 As = Surface Area As = 0.0220(19.33 ac)(43,560 sf/ac) As=18,524.33 sf III. DETERMINE STORAGE VOLUME ELEVATION BASED ON POND AREA A. BMP DAM ELEVATIONS ,/ -7o4 Of sL`D. Olt Pond (Bottoini)Elev = 1009.00 ft Sediment Storage Elev = 1010.00 ft Pennanent Pool Elev = 1013.30 ft Top of Dam Elev. = 1018.00 ft B. POND STAGE STORAGE DATA \ IIPZLR� / � 1 1,1 y 1 BMP r� td 1 - 1q9,�ll P POND PLAN VIEW POND STAGE STORAGE TABLE Stage Elevation Contour Area Incremental Storage Total Storage ft ft sf cf cf 0.0 1.008.00 '�T 8,302 0.00 0.00 1.0 1,009.00 9,692 8,997 8,997 2.0 1,010.00 11,167 10,43 0 19.427 4.0 1,012.00 14.385 25,552 44,979 4.8 13012.80 15,777 12,065 57,043 5.3 1,013.30 (PPE) 18,879 8,664 65,707-� 5.8 1.013.80 22.275 10.289 75996 6.0 1,014.00 22,704 4,498 80494 7.0 1,015.00 (TPE) 97693 24,886 105,380 9.0 1,016.00 27,298 27,183 132563 10.0 11018.00 32,558 59,856 192,419 FOREBAY STAGE STORAGE TABLE Stage Elevation Contour Area Incremental Storage Total Storage ft ft sf cf cf 0.0 1,008.00 815 0.00 0.00 1.0 1.009.00 1.315 1,065 1,065 2.0 1,010.00 1,976 1.646 2,711 4.0 1,012.00 3,395 5,371 8,082 4.8 1.012.80 4,000 2958 11,040 FOREBAV VOLUME CALCULATION Required Forebay Storage Volume (FSV) = Approximately 20% of Pond Volume Total Pond Storage Volume @ Elev. 1,012.80 = 57,043 cf Forebay Storage Volume @ Elev. 1,012.80 = 11,040 cf FSV = 11,040 cf / 57,043 cf FSV = 19.35% ,W/0 C. 1 INCH - 24 HOUR RAINFALL Required Storage Volume (RSV) = 37,607 cf Pond Storage Volume @ Permanent Pool Elev. (PPE) = 65,707 cf Pond Storage Volume @ Temporary Pool Elev. (TPE) = 105,380 cf Minimum Treatment Volume (MTV) = TPE - PPE MTV = 105,380 cf-65,707 cf MTV = 39,673 cf MTV > RSV Tlierefore Volume Provided is OK IV. DETERMINE ORIFICE DRAWDOWN TIME Orifice Size = 3" Diameter Permanent Pool Elev = 1013.30 ft Temporary Pool Elev = 1015.00 ft Q = CA(2t, .5 C = 0.60 g = 32.2 ft/sec H = (1015.00 ft-1013.30 ft)/3-" H = 0.57 ft A = (3.14 (0.25)^2)/4 A = 0.049 sf Q = (0.60)(0.049)(2(32.2)0.57)^0.5 Q = 0.178 cfs Td. =MT_V///Q� -P,gio Td ='39,673 cfI0.178 cfs Td = 222,882.02 sec Td = 2.58 days Z , q 5 -,-4rs V. DETERMINE SIZE OF BARREL FOR 100 YR POST DEVELOPED FLOW A. ENTERED DATA: Shape ........................... Circular Number of Barrels ............... 1 Solving for ..................... Headwater Chart Number .................... 1 Scale Number .................... 1 Chart Description ............... Concrete Pipe Culvert; No Beveled Ring Entrance Scale Decsription ............... Square Edge Entrance With Headwall Overtopping ..................... Off Flowrate ........................ 29.7300 cfs Manning's n ..................... 0.0130 Roadway Elevation ............... 10 18. 0000 ft Inlet Elevation ................. 1009.0000 ft Outlet Elevation ................ 1008.1000 ft Diameter ....... 36.0000 in ................. Length .......................... 90.0000 ft Entrance Loss ................... 0.0000 Tailwater ....................... 1.0000 ft B. COMPUTED RESULTS Headwater ....................... 10 11.65 76 ft Inlet Control Slope ........................... 0.0100 ft/ft Velocity ........................ 9.1694 fps VI. BOUY ANCY CALCULATIONS FOR 6' X 6' CONCRETE BOX A. COUNTER BOUYANCY CALCULATIONS: Vslab = 7.0' x 7.0'x 2' =98.0ef Vbox = 10.0'(6' x 6') - 2(5' x 0.5' x 0.5')—10.0'(5' x 5') = 107.5 cf Weill=(5'x5'x).5')=87.5cf Vtop=6'x6'x0.5'=18.0cf Total Volume of Concrete = 311.0 cf Total Weight of Concrete = 150 lb/cf x 311.0 cf = 46,650.0 lbs Total Volume of Soil = (7.0' x 7.0' x 2.5') — (6' x 6' x 2.5') = 32.5 cf Total Weight of Soil = 90 lb/cf x 32.5 cf = 2,925.0 lbs Total Anti -Floatation Weight = 56,580 lbs + 1,631.25 lbs = 49,575.0 lbs B. Bouvancy Calculation Assumption Water Level is at Top of Slab Elevation with all Outlets Clogged. Vslab = 7.0' x 7.0' x 2' =98.0ef Vbox = 10.5'(6' x 6') = 378.0 cf Total Volume of Concrete = 476.0 cf Total Weight of Water Displaced = 62.4 lb/cf x 476.0 cf = 29,702.40 lbs Total Volume of Soil = (7.0' x 7.0' x 2.5') — (6' x 6' x 2.5') = 32.5 cf Total Weight of Soil = 62.4 lb/cf x 32.5 cf = 2,028 lbs Total Anti -Floatation Weight = 29,702.40 lbs + 2,028.0 lbs = 31,730.40 lbs C. Safety Factor SF = 49,575.0 lbs / 31,730.40 lbs = 1.56 l YR - 24 SIR STORM POND ROUTING Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 16-Yr 25-Yr 5D-Yr lDD-Yr 1 SCS Runoff — 13.32 — PreDeveloped Runoff 2 SCS Runoff 38.38 -- - - - ---- ------ PostDeveloped Runoff 3 Reservoir 2 3.2B — -- -- -- BMP No.1 Proj. file: BMP1YR24HR.gpw Thursday, May 1 2008, 12:02 PM Hydrafiow Hydrographs by lntelisofve Hydrograph Summary Report Hyd. No. Hydrograph t}'pe (origin) Peak flow (aft) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 13.32 2 720 35,585 ---- -- — -- PreDeveloped Runoff 2 SCS Runoff 38.38 2 720 57,872 — ----- ----- PostDeveloped Runoff 3 Reservoir 3.28 2 75B 55,815 2 1015.2D 101,358 BMP No.1 BMP1YR24HR.gpw Return Period: 1 Year Thursday, May 1 2008, 12:02 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 3 Hydraflow Hydrographs by intelisolve Thursday, May 1 200B, 12.2 PM Hyd. No. 3 BMP No.1 Hydrograph type = Reservoir Peak discharge = 3.28 cfs Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 1015.20 ft Reservoir name = BMP No.1 Max. Storage = 101,368 cuff Storage Indication method used. Wat pond routing start elevation = 1013.30 ft. Hydrograph Volume = B5,816 tuft Q (cfs) 40.00 30.0D F 0911I 10.00 W 9 17 26 35 Hyd No. 3 Hyd No. 2 BMP No.l Hyd. No. 3 — 1 Yr 43 52 61 69 78 Q (cfs) 40.00 30.00 10.00 i 0.00 87 Time (hrs) Pond Report Hy&aflow Hydrographs by intelisoive Thursday, May 1 2D08, 12:2 PM Pond No. 1 - BMP No.1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (scift) Incr. Storage (cuft) Total storage (cult) 0.00 1009.00 9,692 0 0 1.00 1010,00 11,167 10,430 10,430 3.DO 1012.0D 14,365 25,552 35,982 3.80 1012.80 15,777 12,055 48,046 4.30 1013,30 18,879 8,654 56,710 4.80 1013.80 22,275 10,289 66,999 5.00 1014.40 22,704 4,49E 71,497 7.00 1016.00 27,298 5D,002 121,499 9,D0 1018M 32,558 59,856 1B1,355 Culvert ! Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 36.00 3,00 6.00 D.00 Crest Len (ft) = 24.00 40.00 0,00 D.OD Span (in) = 36.00 3.00 60.00 0. DO Crest El. (ft) = 1016.60 1016.50 0.00 0.00 No. Barrels = 1 1 2 0 Weir Coaff. = 3.00 3.33 0.00 0.00 Invert El. (ft) = 1009.00 1013,31 1015.DD 0.00 Weir Type = Riser Ciplti - - Length (ft) = 90.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 O.00 0.0D N-Value = .013 .013 .013 .013 Orif. Coeff. = 0.50 0.60 0.60 0.50 Multi -Stage = nla Yes Yes No Exfiltration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft Note: CulveruD fine ouitlows have been analyzad undor'Hat and nutlet control. Stage (ft) 10.00 8.00 6.00 4.00 2.00 coo Stage ! Discharge Stage (ft) 10.00 6.00 4.DD 2,0D 0 OD 4 0.00 30.00 60.00 90,00 120.00 150,00 1 B0.00 210.00 240.00 270.00 300.00 330.00 360.00 Total 0 Discharge (cfs) SC`S 6 e HR STORM POND R O UTING Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr SO-Yr 1o0-Yr 1 SCS Runoff — 3.24 — 12.32 19.22 25.52 32.59 PreDeveloped Runoff 2 SCS Runoff ----- 14.66 — 29.54 39.84 48.31) 57.19 PostDeveloped Runoff 3 Reservoir 2 - 2.63 ----- 9.67 18.12 23.25 29.73 BIAP No.1 Proj. file: BMPSCS6HR.gpw Thursday, May 1 2008, 11:44 AM Hydraifow Hydrographs by IntelisolvE Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) inflow hyd(s) maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 3.24 2 154 21,251 — ---- PreDeveloped Runoff 2 SCS Runoff 14.66 2 148 63,141 ---- -- -- PostDeveloped Runoff 3 Reservoir 2,63 2 298 61,791 2 1015.15 10D,299 BMP No.1 BMPSCS6HR.gpw Return Period: 2 Year Thursday, May 1 2008, 11:44 AM Hydraflow Hydrographs by Intelisoive Hydrograph Plot 3 Hydraflow Hydrographs by Intelisolve Hyd. No. 3 BMP No.1 Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 2 Reservoir name = BMP No.1 Storage Indication method used. Wet pond routing start elevation = 1013.30 ft. 12.00 '. 1 9 Om W BMP No.1 Hyd. No. 3 — 2 Yr 7 15 22 29 37 Hyd No. 3 Hyd No. 2 Thursday, May 1 2008, 11:44 AM Peak discharge = 2.63 cfs Time interval = 2 min Max. Elevation = 1015.15 ft Max. Storage = 100,299 cuft Hydrograph Volume = 61,791 cult 44 51 59 66 Q (cfs) 15,00 12.00 •M KCIE ] 0.00 73 Time (hrs) D r% r, r1 Des W% e% 4 Hydraflow Hydrographs by inteEisotve Thursday, May 1 2008, 11:44 AM Pond No. 1 - BMP No.1 Pored Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Eievation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (tuft) 0.00 1 OD9.DO 9,692 0 0 1.OD 1010.00 11.167 10,430 10,430 3.00 1012.00 14,385 25,552 35,9B2 3.80 1012.BO 15,777 12,065 48,D46 4.30 1013.30 18.879 8,664 56,710 4.50 1013.80 22,275 10,289 66,999 5.00 1014.00 22,704 4,498 71,497 7.00 1016.00 27.298 50,002 121,499 9.00 1018.00 32155 B 59,855 181,355 CLtIva rt I Orifte Structures Weir Structures [A] [S] [C] [a] [A] [B] [C] [D] Rise (in) = 35.DO 3.OD 6.00 O.DO Crest Len (ft) = 24.00 40.00 O.OD 0.00 Span (in) = 36,00 3'OD 60.00 0.00 Crest El. (ft) = 1015.60 1016.50 0.00 0.00 No. Barrels = 1 1 2 0 Weir Coeff. = 3.00 3.33 0.00 0.00 Invert Et. (ft) = 1009.00 1013.31 1015.00 0.00 Weir Type = Riser Ciplti - - Length (ft) = 90.DO 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 1,00 0.00 0.00 0.00 N-Value = .013 .013 .013 .013 Orif. Coeff. = 0.60 0.60 0.60 0.60 Multistage = n/a Yes Yes No Erfiltration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft Note! CuiveNOrifice outflows have teen analyzed under inlet and outlet control. Stage (ft) Stage I Discharge Stage (ft) 10.60 8.00 6.00 4.00 2.00 000 10.OD 8.00 6.00 4.00 2.00 0 0D 0,00 30.00 60.00 90.00 120.D0 150.00 180.00 210.00 240.00 270.00 300.00 330.00 360.00 Total Q Discharge (cfs) Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SC5 Runoff 12.32 2 152 58,822 --- - ---- PreDeveloped Runoff 2 SCS Runoff 29.84 2 145 123,874 -- ------ Postl)evelopad Runoff 3 Reservoir 9.67 2 175 122,519 2 1015.43 107,144 BMP No.1 BMPSCS6HR.gpw Return Period: 10 Year Thursday, May 1 2008, 11:44 AM Hydraflow Hydrographs by Intelisom Hydrograph Plot s Hydrafiow Hydrographs by Intelisolve Thursday, May 1 2008, 11:44 AM Hyd. No. 3 BMP No.1 Hydrograph type = Reservoir Peak discharge = 9.67 cfs Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 1015.43 ft Reservoir name = BMP No.1 Max. Storage = 107,144 cult Storage Indication method used. Wet pond routing start elevation = 1013.30 ft. Hydrograph Volume = 122,519 tuft Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 BMP NO.1 Hyd. No. 3 -- 10 Yr Q (Cfs) 30,00 25,00 20.00 15.00 10.00 5.00 0,00 — — — — - — _ 0.00 0 5 11 16 21 27 32 37 43 48 53 59 Time (hrs) Hyd No. 3 Hyd No. 2 Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 1 - BMP No.1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 10D9.130 9,692 0 0 1.00 1010.00 11,167 10,430 10,430 3.00 1012.00 14,385 25,552 35,9B2 3.80 1012.80 15,777 12,065 48,046 4.30 1013.3D 18, 879 8,664 56,710 4.80 1013.80 22,275 10,289 66,999 5.00 1014.00 22,704 4,498 71,497 7.00 1016.00 27,298 50,002 121,499 9.00 1018.00 32, 55B 59,856 1 B 1,355 Culvert! Orifice Structures [A] [B] [C] [D] Rise (in) = 36.00 3.00 6,00 0.00 Span (in) = 35.00 3.00 60.00 0.00 No. Barrels = 1 1 2 D Invert El. (ft) = 1009.00 1013.31 1015.00 0.00 Length (ft) = 90.DD 0.00 0.D0 0.00 Slope (%) = 1.00 0.00 0.00 0,00 N-Value = .013 .013 .013 .013 Qrif. Coeff. = 0.60 0.6D 0.60 D.60 Multi -Stage = nla Yes Yes No Thursday, May 1 2D08, 11:44 AM Weir Structures [A] [B] IC] [D] Crest Len (ft) = 24.00 40.0D 0.00 0.00 Crest El. (ft) = 1016.60 1016.50 0.00 0.00 Weir Coeff. = 3.00 3.33 0.00 0.00 Weir Type = Riser Ciplti - - Multi -Stage = Yes No No No Exfiltration = 0.000 inlhr (Contour) TaiWalter Elev. = 0.0D ft Note: CulverVOrffice outflows have bean analyzed under inlet and outlet control. Stage (ft) Stage 1 Discharge Stage (ft) 10.00 8.00 6.00 4,00 2.00 000 10.00 B.0D 5.00 4.00 2.00 O DO O.DD 3D.DD 60,00 90.00 12D.00 150.OD 180.00 210.00 240.00 270.00 300,00 330.00 350.00 Total 0 Discharge (cfs) Hydrograph Summary Report Hyd. No, Hydrograph type (origin) Peak 1 flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 19.22 2 15D 35,888 — --- PreDeveloped Runoff 2 SCS Runoff 39.84 2 146 163,721 — ------ PostDeveloped Runoff 3 Reservoir 18.12 2 162 162,354 2 1015.80 116,371 BMP No.1 BMPSCS6HR.gpw Return Period: 25 Year Thursday, May 1 2008, 11:44 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot W Hydrafiow Hydrographs by intelisolve Thursday, 102y 1 2008, 11:44 AM Hyd. No. 3 BMP No.1 Hydrograph type = Reservoir Peak discharge = 18.12 cfs Storm frequency = 25 yrs Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 1015.80 ff: Reservoir name = BMP No.1 Max. Storage = 116,371 cult Storage Indication method used. Wet pond routing start elevation = 1013,30 ft Hydrograph Volume = 162,364 cult Q (Cfs) 40. DO 30.00 20.00 10.00 o 4 Hyd No. 3 7 SNIP No.1 Hyd. No. 3 -- 25 Yr 11 15 — Hyd No. 2 18 22 26 29 33 Q (Cfs) 40.00 30. DO 20,00 0.00 37 Tme (hrs) Pored Report Hydraflow Hydrographs by Intelisolve Thursday, May 1 2008, 11:44 AM Pond No. 1 - BMP No.1 Pond Data Pond storage is based on known contour areas. Average and area method used. Stage ! Storage fable Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0,00 1009.00 9,692 0 0 1.00 1010.00 11,167 10,430 10,430 3.DD 1012.00 14,385 25,552 35,982 3.80 1012.80 15,777 12,065 48,046 4.30 1013.30 18,679 8,664 56310 4.80 1013.80 22,275 10.289 56,999 5.00 1014.00 22,704 4,498 71,497 7.00 1016.00 27,298 50,002 121,499 9.DD 1015,00 32,558 59,856 181,355 Culvert ! Orifice Structures Weir Structures [A] [B] [Cl [D] [A] [D] [C] [Dl Rise (in) = 36.DD 3.00 6.00 DAD Crest Len (ft) = 24.0D 40.00 0.00 0,00 Span (in) = 36.00 3.DD 6D.00 0.00 Crest El. (ft) = 1016,60 1016.50 0.0D 0.00 No. Barrels = 1 1 2 0 Weir Coeff. = 3.00 3.33 0.00 0.00 Invert El' (ft) = 1009.00 1013.31 1015.0D D.DD Weir Type = Riser Ciplti - -- Length (ft) = 9D.D0 0.0D 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .013 Orif. Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n1a Yes Yes No ExfiItration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Drifine ocII9ows have been analyzed Linder inlet and outlet control. Stage (ft) Stage 1 Discharge Stage (1t) 10.00 8.00 6.00 4.00 2.00 0 00 10.DD 8.00 6.00 4.00 2.00 0 00 10 0.00 3D.00 50.00 90.DD 120.00 150.00 180.00 210.00 240.00 270.0D 300.00 330.D0 360.00 Total Q Discharge (cfs) 11 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cis) Time interval (min) Time to peak (min) Volume (cuff) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 25.52 2 148 112,234 -- - --- PreDevaloped Runoff 2 SCS Runoff 48.30 2 146 197,735 ---- -- PostDeveloped Runoff 3 Reservoir 23.25 2 160 196,376 2 1016.15 126,105 BMP No.1 BMPSCS6HR.gpw Return Period: 50 Year Thursday, May 1 2008, 11:44 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 12 Hydrafiow Hydrographs by IntePscNe Thursday, May 1 200B, 11 A4 NO Hyd. No. 3 BMP No.1 Hydrograph type = Reservoir Peak discharge = 2 3.2 5 cfs Storm frequency = 50 yrs Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 1016.15 ft Reservoir name = BMP No.1 Max. Storage = 126,105 cuft Storage Indication method used. wet pond routing start elevation = 1013.30 ft. Hydrograph Volume = 196,378 cuft BMP No.1 Pond Report 13 Hydraflow Hydrographs by intelisolve Thursday, May 1 2008, 11:44 AM Pond No. 1 - BMP No.1 Pored Data Pond storage is based on known contour areas. Average end area method used. Stage ! Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 1009.00 9,692 0 0 1,0D 1010.00 11,167 10,430 10,430 3.00 1012.00 14, 385 25,552 35,982 3.80 1012.50 15,777 12,065 48,046 4.30 1013.30 18,879 8,664 55,710 4.80 1013.80 22,275 10,289 65,999 5.00 1014.DD 22,704 4,498 71,497 7.00 1016.O0 27,295 50,002 121,499 9.00 1018.00 32,558 59,855 181,355 Culvert / Orifice Structures [A] [g] [C] [D] Rise (in) = 36.00 3.00 6.00 0.00 Span (in) = 36.00 3.00 60.00 0.00 No. Barrels = 1 1 2 0 Invert El. (ft) = 1009,00 1013.31 1015.00 0.00 Length (ft) = 90.00 0.00 0.00 D.DD Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .013 Orif. Coeff. = 0,60 0.60 0.50 0.60 Multistage = n!a Yes Yes No Weir Structures [A] [B] [C] [D] Crest Len (ft) = 24.D0 40.00 O.DO 0.0D Crest El. (ft) = 1016.6D 1 D16. 5D 0.00 0.00 Weir Coeff. = 3.D0 3.33 0.00 0.00 Weir Type = Riser Ciplti - - Multi -Stage = Yes No No No Erfiltration = 0.000 inlhr (Contour) TaiWater Elev. = 0.D0 ft Note: CulvarVOrrfioe outilows have been analyzed under inlet and outlet control. Stage (ft) Stage 1 Discharge Stage (ft) 10.0D 8.00 6.00 4.00 2.00 000 10.0D 8.0D 6.00 4.00 2.00 000 0.00 30.00 6D.0D 90.00 120.00 150.00 180.00 210.00 240.00 270.00 300.00 330.00 360.00 Total Q Discharge (cfs) 14 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cis) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (Guft) Hydrograph description 1 SCS Runoff 32.59 2 143 140,219 ---- ---- -- PreDeveloped Runoff 2 SCS Runoff 57.19 2 146 233,825 — ---- PostDeveloped Runoff 3 Reservoir 29.73 2 160 232,465 2 1016.51 136,757 BMP No.1 i BMPSCS6HR.gpw Return Period: 100 Year Thursday, May 1 2008, 11:44 AM Hydraflow Hydrographs by intelisolve Hydrograph Plat 15 Hydraflow Hydrographs by IntellSolve Thursday, May 1 2008, 11:" AtO Hyd. No. 3 BMP No.1 Hydrograph type = Reservoir Peak discharge = 29.73 cfs Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 1016.51 ft Reservoir name = BMP No.1 Max. Storage = 136,757 tuft Storage Indication method used. Wet pond routing start elevation = 1013.30 ft. Q (cfs) 60.00 50.00 30.00 20,00 10.00 BMP No.1 Hyd. No. 3 -- 100 Yr Hydrograph Volume = 232,465 tuft Q (cfs) 60. DD 5D.00 30. DD 20.00 10.00 0.00 1 I ' 0.00 0.0 0.7 1.3 2.0 2.7 3.3 4.0 4.7 5.3 6.0 6.7 7.3 8.0 Time (hrs) Hyd No. 3 Hyd No. 2 Pond Report Hydrafiow Hydrographs by intelisolve Thursday, May 1 20DS, 11:44 A10 Pond No. 1 - BMP No.1 Pond Data Pond storage is based on known contour areas, Average end area method used. Stage ! Storage Sable Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 1009.00 9,692 0 0 1.00 1010. DO 11,167 10,430 10,430 3.00 1012,00 14,385 25,552 35,982 3.80 1012.50 15,777 12,065 48, 046 4.30 1013.30 18,879 8,664 56,71 D 4.80 1013.80 22,275 10,289 66,999 5.00 1014.00 22,704 4,498 71,497 TOD 1016.00 27,298 50,002 121,499 9.00 1018,00 32,55B 59,556 181,355 Culvert 1 Orifice Structures Weir Structures [A] CB] [C] [D] [A] [B] [C] [D] Rise (in) = 36.O0 3.00 6.OD 0,00 Crest Len (ft) = 24.00 40.00 0.00 0,00 Span (in) = 36.00 3.0D 6O.OD 0.00 Crest El. (ft) = 1016.50 1016.50 0.00 O.DD No. Barrels = 1 1 2 0 Weir Coeff. = 3.00 3.33 0.00 0.00 Invert El. (ft) = 1009.00 1013.31 1015.00 0,00 Weir Type = Riser Ciplti - - Length (ft) = 90.00 0.00 O.DO 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .013 Orif. Coefi. = 0.60 0.60 0.60 0.60 Multi -Stage = nla Yes Yes No Exfiltration = 0.00D inlhr (Contour) Tailwater Elev. = 0.00 ft Note: Culvartlorlfice outflows have been analyzed under inlet and outlet control Stage (ft) Stage 1 Discharge Stage (ft) 10. DO 8.00 6.00 4.00 2.00 000 10.00 8.00 5.00 4.00 2.00 000 16 O.OD 30.OD 60.00 90.00 120,00 150.00 180.00 210.00 240.00 270.00 300.00 330.00 360.00 Total Q Discharge (cfs) 10" DIAMETER LOWFLOW OUTLET Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cis) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr iD-Yr 25-Yr 5D-Yr 1DD-Yr 1 SCS Runoff 3.24 --- --- PreDeveloped Runoff 2 SCS Runoff --- — 14.63 -- -- ---- -- -- - - PostDeveloped Runoff 3 Reservoir 2 -- 2.63 -_- - - -_-- --- --- ----- $MP No.1 tProj. file: BMPSCS6HR10D1A0UTLET.gpw Thursday, May 1 2008, 12:00 PM Hydratiow Hydrographs by Intelisolva Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuff) inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 3.24 2 154 21,251 — -- - — PreDeveloped Runoff 2 SCS Runoff 14.66 2 14B 63,141 -- -- -- PostDeveloped Runoff 3 Reservoir 2.53 2 298 61,791 2 1015.15 100,299 BMP No.1 BMPSCS6HR10DlAOUTLET.gpw Return Period: 2 Year Thursday, May 1 2008, 12:00 PM Hydraflow Hydrographs by IntelisoM Hydrograph Plot 3 Hydraflow Hydrographs by Intelisolve kyd. No. 3 BMP No.1 Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 2 Reservoir dame = BMP No.1 Storage Indication method used. Wet pond routing start elevation = 1013.30 ft. BMP No.1 Thursday, May 1 20DB, 12:0 PM Peak discharge = 2.63 cfs Time interval = 2 min Max. Elevation = 1015.15 ft Max. Storage = 100,299 cuff Hydrograph Volume = 61,791 tuft Pond Report Hydraflow Hydrographs by Intelisolve Thursday, May 1 2008, 12:0 PM Pond No. 1 - BMP No.1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 1009.00 9,692 0 0 1.00 1010.00 11,167 10,430 10,430 3.00 1012,00 14,385 25,552 35,982 3.80 1012.80 15,777 12,065 48, D46 4.30 1013.30 18,879 8,664 56,710 4.80 1013,80 22,275 10,289 66,999 5.OD 1014.00 22,704 4,498 71,497 7.00 1016.00 27,298 50,002 121,499 9.00 1018.00 32,558 59,855 181,355 Culvert 1 Orifice Structures Weir Structures [A] [EB] [Cl [D] [A] [B] [C] [D] Rise (in) = 10,00 3.OD 6.00 O.OD Crest Len (ft) = 24.00 40.00 0,00 0.00 Span (in) = 10.00 3,00 6D.00 0.00 Crest El. (ft) = 1016.60 1016.50 O.DD 0.00 No. Barrels = 1 1 2 0 Weir Coeff. = 3.00 3.33 0.00 O.OD Invert EL (ft) = 1009.00 1013.31 1015.D0 OLD Weir Type = miser Ciplti - -- Length(ft) = 85.00 0.00 0.00 0.D0 Mufti -Stage = Yes No No No Slope (%) = 1.00 0.00 D•00 D.OD N-Value = .013 .013 .013 .013 Orif. Coeff. = 0.6D 0.6D 0.60 0.60 Multi -Stage = n/a Yes Yes No Ezfiltration = 0.000 inlhr (Contour) Tailwater Elev. = D.DO ft Nota: CulverVOrifice outflows have baan analyzed under inlet end outlet control, Stage (ft) Stage 1 Discharge Stage (ft) 10.00 8.00 6.00 4.00 2.00 000 10.0D 8.00 6.00 4.00 2.OD 0 DO 4 O.DO 30.00 60.00 90.0D 120.00 150.00 180.00 210•DD 240,00 27D.00 Total Q Discharge (cfs) Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (ofs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SOS Runoff ------ — 3.24 12.32 19.22 25.52 32.59 PreDeveloped Runoff 2 SCS Runoff 14.66 ------- — 29.B4 39.B4 48.30 57.19 PostDeveloped Runoff 3 Reservoir 2 — 2.66 -- 9.68 18.00 23.06 29.76 BIAP No.1 Proj. file: BMPSCS6HRES.gpw Thursday, May 1 2008, 11:41 AM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 sCS Runoff 3.24 2 154 21,251 -- - — PreDeveloped Runoff 2 SCS Runoff 14.66 2 148 63,141 — ---- --- PostDeveloped Runoff 3 Reservoir 2.66 2 292 23,352 2 1 D15.18 10D,873 EMP No.1 I i BMPSCS6HRES.gpw Return Period: 2 Year Thursday, May 1 2008, 11:41 AM Hydraflow Hydrographs by Intelisoly 3 Hydrograph Plot Hydraflow Hydrographs by lntelisoive Thursday, May 1 20D5. 11:41 AIA Hyd. No. 3 BMP No.1 Hydrograph type = Reservoir Peale discharge = 2.66 cfs Storm frequency = 2 yrs. Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 1015.18 ft Reservoir name = BMP No.1 Max. Storage = 100,873 cuff Storage lndication method used. Wet pond routing start elevation = 1013.3D #t. Hydrograph Volume = 23,352 tuft Q (cfs) 15.00 12.00 4' 5 9 .M 3.00 BMP No.1 Hyd. No. 3 -- 2 Yr Q (cfs) 15.00 12.00 3.00 0.0 0.7 1.3 2.0 2.7 3.3 4.0 4,7 5.3 6.0 6.7 7.3 8.0 8.7 Time (hrs) Hyd No. 3 Hyd No. 2 Pond Report 4 Hydraflow Hydrographs by Intelisolve Thursday, May 1 2008, 11Al AM Pond No. 1 - BMP No.1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (tuft) 0.00 1009.OD 9,632 0 D 1,00 1010.OD 11,167 10,430 10,430 3.00 1012.00 14,385 25,552 35,982 3.80 1012.BD 15,777 12,065 48,045 4.30 1013.30 18,879 8.664 56,710 4.80 1013.80 22,275 10,289 56,999 5,00 1014.00 22,7D4 4,498 71,497 7.00 1016,D0 27,298 50.002 121,499 9.00 1018.00 32,558 59,856 1B1,355 Culvert I Orifice Structures [A] [B] [C] [D] Rise (in) = 36.OD 0.00 6.00 0,00 Span (in) = 35.00 O.DO 60.00 O.DD No. Barrels = 1 0 2 0 Invert El. (ft) = 1009.D0 0.00 1015.00 O.OD Length (ft) = 9D.00 0.00 0.00 0.00 Slope (%) = 1.00 0.00 O.OD 0.00 N-Value = .013 013 .013 .013 Orif. Coefl. = 0.60 0.60 0.60 0.5D Multi -Stage = nla No Yes No Weir Structures [A] [B] [C] [D] Crest Len (ft) = 24.00 40.00 0.00 0.00 Crest El. (ft) = 1016.60 1016.50 0.00 0.00 Weir Coeff. = 3.00 3.33 0.00 0,00 Weir Type = Riser Ciplti - -- Multi-Stage = Yes No No No ExfiItration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 it Note: Gulvertforifioe cu fiows have been analyzed udder inlet and outlet control. Stage (ft) Stage I Discharge Stage (ft) 1O.D0 B.DO 6.00 4.DO 2.00 0 OD 10.00 8.00 6.00 4.00 2.00 0 0O 0.00 30.00 60,00 90.00 120.00 150.00 180,00 210,00 240.00 270,00 300.00 330.00 360,00 Total Q Discharge (cfs) Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 12.32 2 152 58,822 - - --- ----- PreDeveioped Runoff 2 SCS Runoff 29.84 2 145 123,874 -- --- --- Postl?eveloped Runoff 3 Reservoir 9.68 2 176 84,085 2 1015.44 107,444 BIAP No.1 BMPSCS6HRES.gpw Return Period: 10 Year Thursday, May 1 2008, 11:41 AM Hydraflow Hydrographs by Intelisolv Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, May 1 2008, 11:41 AM Hyd. No. 3 BMP No.1 Hydrograph type = Reservoir Peak discharge = 9.68 cfs Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 1015.44 ft Reservoir name = BMP No.1 Max. Storage = 107,444 cuft Storage Indication method used. Wet pond routing start elevation = 1013.30 ft. Hydrograph Volume = 84,085 cuff Q (cfs) 30,00 25.00 15.00 1 D.DD 0i BMP No.1 Hyd. No. 3 — 10 Yr Q (cfs) 30.00 25.00 20.00 15.00 1 D.00 5.00 0.00 i L I---- I -_ ) I I I _� _X I 0.00 D.0 0.7 1.3 2.0 2.7 3.3 4.0 4.7 5.3 6.0 6.7 7.3 &D Time (hrs) Hyd No. 3 Hyd No. 2 Pond report 7 Hydraflow Hydrographs by Intelisolve Pond No. 1 - BMP No.1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgtt) Incr. Storage (tuft) Total storage (tuft) 0.00 1009.00 9,692 0 0 1.00 1010.00 11,167 1 D,430 10,430 3.00 1012.00 14,355 25,552 35,982 3.80 1 D12.8D 15,777 12,065 48,046 4.30 1013.30 18,879 8,654 56,710 4.80 1013.80 22,275 10,289 66,999 5.D0 1014.00 22,704 4,498 71,497 7.00 1016.00 27,29E 50,O02 121,499 9.D0 1018.00 32,558 59,856 181,355 Culvert/ Orifice Structures [A] [B] [C] [D] Rise (in) = 36.DD 0,01) 6.DO D.DO Span (in) = 36.00 0.00 60.00 O.DO No. Barrels = 1 0 2 0 Invert El. (ft) = 1DD9.00 0,00 1015.00 0.00 Length (ft) = 90.00 0.00 0.00 0.00 Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .013 Orif. Coeff. = 0.60 0,60 0.50 0.60 Multi -Stage = nla No Yes No Thursday, May 1 2008, 11:41 AM Weir Structures [A] [S] [C] [D] Crest Len (ft) = 24.00 40.00 O.OD 0.00 Crest El. (ft) = 1016.50 1016.50 0.00 0.00 Weir Coeff. = 30D 3.33 0,00 O.OD Weir Type = Riser Ciplti - -- Multistage = Yes No No No Ezfiltration = 0.000 inthr (Contour) Tailwater Elev. = 0.00 ft Note: Culveru0rKice outflows have been analyzed under inlet and outlet control. Stage (ft) Stage I Discharge Stage (ft) 10.OD 8.00 6.00 4.00 2.OD 0 DO 10.00 8,00 6.D0 4.00 2.00 D DO 0.00 30.00 60.00 90.D4 120.00 150.OD 180,00 210,00 240.00 270.00 300.00 330.00 360,00 Total Q Discharge (cfs) Hydrograph Summary Report Hyd, No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 19.22 2 150 36,888 — — — PreDeveloped Runoff 2 SCS Runoff 39.64 2 146 153.721 — PostDeveloped Runoff 3 Reservoir 18.0D 2 162 123,932 2 101531 116,739 RAP No.1 BMPSCS6HRES.gpw Return Period: 25 Year Thursday, May 1 2008, 11:41 AM Hydrafiow Hydrographs by Intelisolvi Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 BMP No.1 Hydrograph type = Reservoir Storm frequency = 25 yrs lntiow hyd. No. = 2 Reservoir name = BMP No.1 Storage Indication method used. Wet pond routing start elevation = 1013.30 ft. Q (CfS) 40.00 30. DO 20.00 10.00 BMP No.1 Hyd, No. 3 -- 25 Yr Thursday, May 1 2005, 11:41 AM Peak discharge = 18.00 cfs Time interval = 2 min Max. Elevation = 1015.81 ft Max. Storage = 116,739 tuft Hydrograph Volume = 123,932 tuft Q (Cfs) 40.00 30.00 20.00 0.0 0.7 1.3 2.0 2.7 3.3 4.0 4.7 5.3 6.D 6,7 7.3 8.0 Time (hrs) Hyd No. 3 Hyd No. 2 M ` Pond Report 10 Hydraflow Hydrographs by Intelisolve Thursday, May 1 20D8, 11:41 AM Pond No. 1 - BMP No.1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 1009.00 9,692 0 0 1,00 1010.01) 11,167 10,430 10,430 3.00 1012.00 14,385 25,552 35,982 3.80 1012.80 15,777 12,065 48,045 4.30 1013.30 18,879 B,664 56,710 4.80 1013,80 22,275 10,2B9 66,999 5.00 1014.00 22,704 4,498 71,497 7.OD 1016.00 27,298 50,002 121,499 9.00 101B.D0 32,558 59,856 181,355 Culvert ! Orifice Structures Weir Structures [A] [B] [D] [D] [A] [B] [C] [D] Rise (in) = 36,00 0.00 6.00 0.00 Crest Len (ft) = 24.00 40,00 0.00 0.00 Span (in) = 36.00 O.DD 60.00 0.00 Crest El. (ft) = 1016.50 1016.50 0.00 0.00 No. Barrels = 1 0 2 0 Weir Coeff. = 3.00 3.33 O.DO O.DO Invert El. (ft) = 1009.00 0.0D 1015.00 0.00 Weir Type = Riser Cipiti -- --- Length (ft) = 90.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .013 .013 D13 .013 Qrif. Coeff. = 0.50 0.60 0.60 0.60 Multistage = nla No Yes No Ezfiltration = O.DOD inlhr (Contour) Tailwater Eiev. = 0.00 It Note, Culvert/Orifice outflows have peen analyzed under inlet and outlet control, Stage (ft) Stage 1 Discharge Stage (ft) 10.00 8.00 6.00 4.00 2.00 000 1 O. DO B.DO 6.00 4.00 2,00 000 0.00 30.DO 60.00 90.00 120.00 150.00 180.00 210.00 240.00 270.00 3DO.00 330.DO 360.00 Total Q Discharge (cfs) 11 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 25.52 2 148 112,234 -- - --- PreDeveioped Runoff 2 SGS Runoff 48.30 2 146 197,736 -- --- --- PostDeveloped Runoff 3 Reservoir 23.06 2 160 157,947 2 1016.17 125,555 SMP No.1 I BMPSCS6HRES.gpw Return Period: 50 Year Thursday, May 1 2008, 11:41 AM Hydratlow Hydrographs by Intelisoly( 12 Hydrograph Plot Hydraflow Hydrographs by. intelisoive Thursday, May 1 2006, 11:41 AM Hyd. No. 3 BMP No.1 Hydrograph type = Reservoir Peak discharge = 23.06 cfs Storm frequency = 50 yrs Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 1016.17 ft Reservoir name = BMP No.1 Max. Storage = 126,555 cuft Storage indication method used. wet pond routing start elevation = 1013.30 ft. BMP No.1 Hyd, No. 3 -- 50 Yr 40. DD 30.00 20.00 10.00 Hydrograph Volume = 157,947 cuft Q (cfs) 50.00 30,00 20.00 10.00 0.00 ' . 0.00 0.0 0.7 1.3 2.0 2.7 3.3 4.0 4.7 5.3 6.0 6.7 7.3 8.0 Time (hrs) Hyd No. 3 Hyd No. 2 Pond Report Hydraflow Hydrographs by Intelisolve Thursday, May 1 20D8, 11:41 AM Pond No. 1 - BMP No.9 Pond Data Pond storage is Lased on known contour areas. Average end area method used. Stage I Storage fable Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 1009.00 9,692 0 0 1.00 1010.00 11,167 10,430 10,430 3.00 1012.00 14,385 25,552 35,982 3.80 1012,80 15,777 12,065 48,046 4.30 1013.30 18,879 8,664 56.71 D 4.80 1013.80 22,275 10,289 66,999 5.00 1D14.00 22,704 4,49E 71,497 7.00 1016.00 27,298 50,002 121,499 9.00 1018.00 32,558 59,855 181,355 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [D] [A] [g] [C] [D] Rise (in) = 36.00 0.00 6.00 0.00 Crest Len (ft) = 24.00 40.00 0.00 0.00 Span (in) = 36.00 0,00 60.00 0.00 Crest El. (ft) = 1016.60 1016.50 0.00 0.00 No. Barrels = 1 0 2 0 Weir Coeff. = 3.00 3.33 0.00 0.00 Invert El. (ft) = 1009.00 0.00 1015.00 0.00 Weir Type = Riser Cipiti - -- Length (ft) = 9D.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 1.00 OM 0.00 0.00 N-Value = .013 .013 .013 .013 Orif. Coeff. = 0.60 0.60 0.60 0,60 Mufti -Stage = nfa No Yes No Ezfiltration = 0.000 inlhr (Contour) Tailwater Elev, = 0.0D ft NOW CulverifOrifce outflows have been analyzed under inlet and outlet control. Stage (ft) 10.00 8.00 6.00 4.00 2.00 000 Stage 1 Discharge Stage (ft) 10.00 8.00 6.00 4.00 2.00 0 DO 13 0.00 30.00 60.00 90.00 120.00 150.00 180,00 210.00 240.00 270.00 300.00 330.OD 360.00 ToW Q Discharge (cfs) `El Hydrograph Summary Report Hyd. No, Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (auft) inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 5CS Runoff 32.59 2 148 140,219 — PreDeveloped Runoff 2 SCS Runoff 57.19 2 146 233,825 - w---- PostDeveloped Runoff 3 Reservoir 29.76 2 160 194,036 2 1016.52 137,174 BMP No.1 BMPSCS6HRES.gpw Return Period: 100 Year Thursday, May 1 2008, 11:41 AM Hydraflow Hydrographs by Intefisolv+ 1s Hydrograph Plot Hydrafiiaw Hydrographs by intelisolve Thursday, May 1 200S, 11:41 AhA Hyd. No. 3 BMP No.1 Hydrograph type = Reservoir Peak discharge = 29.76 cfs Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 Max. Elevation = 1016.52 ft Reservoir name = BMP No.1 Max. Storage = 137,174 cuft Storage indication method used. Wet pond routing start elevation = 1013.30 ft. Q (Cfs) 60.00 K2111110 K1111I111 10.00 BMP No.1 Hyd. No. 3 -- 100 Yr Hydrograph Volume = 194,036 tuft Q (Cfs) 60.00 Wallis] F� lr [ONG( IK111I1] 10.00 0.00 ' _I e—, i r 1 1 1 1 _ i l 11 1 ' 0.00 0.0 0.7 1.3 2.0 2.7 3.3 4.0 4.7 5.3 6.0 6.7 7.3 8.0 Time (hrs) Hyd No. 3 Hyd No. 2 Q Pond Report 16 Hydrafiow Hydrographs by lntelisolve Pond No. 1 - BMP No.1 Pond Data Fond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0,00 1009.00 9,692 0 0 1,00 1 D10.00 11,157 10,43D 10,430 3.0D 1012.00 14,385 25,552 35,982 3.80 1012.80 15,777 12,065 48,046 4.30 1013.30 18,879 8,664 56,710 4.80 1013.80 22,275 10,289 66,999 5.00 1014.00 22,704 4.498 71,497 TOD 1015.00 27,298 50,002 121,499 9.00 1018.00 32,558 59,855 181,355 Culvert 1 Orifice Structures [A] [B] [C] [D] Rise (in) = 36.00 0,00 6,00 0,00 Span (in) = 36.00 0.00 60.DD 0.00 No. Barrels = 1 0 2 0 Invert El. (ft) = 1009.OD 0.00 1015.D0 0.00 Length (ft) = 90.00 0.00 O.DO 0.00 Slope (%) = 1.00 O.DO O,OD 0.00 N-Value = .013 .013 .013 .013 Orif. Coeff. = 0.60 0.60 0.60 0,60 Multistage = nla No Yes No Thursday, May 1 2008, 11:41 AM Weir Structures [A] [B] [C] [D] Crest Len (ft) = 24.00 40.00 0.00 0.00 Crest El. (ft) = 1016.60 1016.50 0.00 0.00 Weir Coeff. = 3.00 3.33 0.00 0.00 Weir Type = Riser Ciplti --- - Multi -Stage = Yes No No No ExfiItration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft Note', GulvertJOrlRse outflows have been anair-ed undet inlet and outlet control. Stage (ft) Stage I Discharge Stage (ft) 1 D.DO 8.00 6.D0 4.00 2.00 000 10.00 8.00 6.00 4.00 2.00 0 OQ 0.00 30.00 6D.00 9D.00 120.00 150.00 180.00 210.00 240.00 270.OD 300.00 330.00 360.00 Total Q Discharge (cfs) a PRINCEPAL SPILLWAY DESIGN SUMMARUY To better assure stone water flow management that the 100 year storm `eater flow was routed through the riser box (JB 50) and discharged at ground level to prevent the possibility of dam failure due to eroded embankment from the emergency spillway flow. The principal spillway design was based on the 3 inch diameter orifice in the riser structure being block or clogged. No stony water storage volume was available in the pond and the assumption that the spillway outlets in the top of the junction box were not blocked. In the event that the 6" x 60" orifices become block and stonn water flow is impeded a typical emergency spillway section is also provided and designed to convey the 100 year runoff at a depth to maintain one foot of fi-eeboard between the top of dam and the emergency spillway flow elevation. RELEASE RATE SUMMARY Y 2 yr 10 yr 25 yr 50 yr 100 yr Predeveloped Flows 3.24 cfs Pond Release Flows 2.63 cfs 12.32 cfs 9.67 cfs 19.22 cfs 18.12 cfs 25.52 cfs 23.25 cfs 32.59 cfs 29.73 cfs