Loading...
HomeMy WebLinkAboutSW3080401_CURRENT PERMIT_20120905STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE Fp CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE �/� /'&5- YYYYMMDD L\ f�A ARIZ=® NCDENR North Carolina Department of Environment and Natural Resources Row3rlu Eaves Perdue 7 Governor Division of Water Quality Charles Wakilrl P.F. Director August 1, 2012 Dee Freeman RECEIVED eCre[ary DIVISION OF WATER OLIALITY Mr. Donald S. Hughes SEP 0 5 2012 Director of Facilities and Construction MOOREsv t��' 201 Venus Street REGIONAL OFFICE Monroe, North Carolina 28110 Subject: Stormwater Permit No. SW3080401 Poplin Elementary School (New "L" School Site on Poplin Road) High Density Commercial Wet Detention Project - Modification Union County vi, Dear Mr. Hughes: The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for a request -to modify the permit for Poplin Elementary School on July 26, 2012 to add additional BUA to the wet detention basin. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2006-246. We are forwarding Permit No. SW3080401, dated August 1, 2012, for the construction, operation and maintenance of the subject project and the stormwater BMPs. This permit shall be effective from the date of issuance until May 15, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, INC 27611-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Mooresville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Brian Lowther at (919) 807-6368; or brian.lowther@ncdenr.gov. Sincerely, fin- Charles Wakild, P.E. cc: Mooresville Regional Office SW3080401 File ec: A. Granseur Dick — Chambers Engineering, PA Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919.807-6494 Internet: www riewatercluality.crg An Equal Qpportunily 1 Affirmative Action Employer One NorthCarolina Naturally State Stormwater Permit Permit No. SM3080401 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Poplin Road "L" School Site Poplin Road Union County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and S.L. 2006-246 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until May 15, 2018, and shall be subject to the following specified conditions and limitations. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 298,280 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 6 State Stormwater Permit Permit No.Sv11308040 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 15.92 OrlSlte, IL?: 706,10d Offsite, ft`: 44,487.40 b. Total Impervious Surfaces, ft2: 298,280 Buildings ft`: 101,680 Roads, ft2: 49,579.73 Parking, ft2 105,515.32 Sidewall s, ft2: 24576.98 Other, ft . 16,928 Offsite, ft': 0 C. Pond Depth, feet: 4.48 d. TSS removal efficiency: 85% e. Design Storm: 3 inch f. Permanent Pool Elevation, FMS�: 625.50 g. Permitted Surface Area @PP, ft : 43,760 h. Temporary Pool Volume, ft3: 43,760 i. Storage Elevation, FMSL: 627.75 j. Controlling Orifice: 12.0" O pipe k. Permanent Pool Volume, ft3: 195,873 I. Forebay Volume, ft3: 38,759 M. Receiving Stream/River Basin: North Fork Crooked Creek n. Stream Index Number: 13-17-20-1 o. Classification of Water Body: "C" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 2 of 6 State Stormwater Permit Permit No.SU43080401 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. if the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 6 State Stormwater Permit Permit No.SW3080401 Ill. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by Roth parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. J. Failure t0 guide uy the conditions and iiiiiitation5 contained in this Nernlit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. Permit issued this the 1 st day of August, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 7<4D, 4,�- .1br Charles Wa ild, PE, Director Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Permit Permit No.SW300nC401 Poplin Road "L" School Site in Union County Stormwater Permit No. SW3080401 Union County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project. Poplin Road "L" School Site in Union County (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Permit Permit Nc.SW3080401 Certification Requirements: i. TIME drainage area tG tilEsySiEi7i CEiltaln3 appruXiifidtciji the pBriilitied acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of.surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: Mooresville Regional Office Surface Water Protection 610 East Center Avenue Mooresville, North Carolina 28115 Page 6 of 6 State Stormwater Permit Permit No.SW3080401 Poplin Road "L" School Site in Union County Stormwater Permit No. SW3080401 Union Countv Designer's Certification I, OrN_j)AfMIr4 �, WkA10as a duly registered ekres, i AL tqj 6 (01 in the State of North Carolina, having been authorized to observe eriodicall 1 eeklyl full time) the construction of the project, Poplin Road "L" School Site in Union County (Project) for , gUFZ :5 (Project Owner) hereby state that, to the best of my abilities, dud care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature` Registratio Number VZq 3 Date b 43 D Lo es;*O • ° a SEAL ma's • 22937 w 4'G1NE1,t' • �i Page 5 of 6 State Stormwater Permit Permit No.SW3080401 Certification Requirements: _/ 1. The drainage area to the system contains approximately the permitted acreage. ✓ 2. The drainage area to the system contains no more than the permitted / amount of built -upon area. y 3. All the built -upon area associated with the project is graded such that the / runoff drains to the system. V 4. All roof drains are located such that the runoff is directed into the system. ✓5. The outlet/bypass structure elevations are per the approved plan. ✓6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. L 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. ✓10. The inlets are located per the approved plans and do not cause short- circuiting of the system. ✓11. The permitted amounts of surface area and/or volume have been provided. 1/ 2. Required drawdown devices are correctly sized per the approved plans. _L�I 3. All required design depths are provided. _Z14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. V 15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: Mooresville Regional Office Surface Water Protection 610 East Center Avenue Mooresville, North Carolina 28115 Page 6 of 6 DWQ USE ONLY Date Received Fee Paid Permit Number c * S -1R7 &0ao-80401 Applicable Rules: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph iI - Post Construction (select all that apply) ❑ Non -Coastal SW- FIQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ NI mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality DIVISION Or 1: SEP U 5 20,iZ STORMWATER MANAGEMENT PERMIT APPLICATION FOF EM E, R�G 'P rION of t tc This form may be photocopier! for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): SW3080401 - Poplin Elementary School ( Formerly "New'L' School Site Plan on Poplin Road") 2. Location of Project (street address): 5627 Poplin Road City:Indian Trail County:UnionLip:28079 3. Directions to project (from nearest major intersection): 4. Latitude:35° 05' 27" N Longitude:80" 35' 31" W of the main entrance to the project. if. PERMIT INFORMATION: 1.a.Specify whether project is (check one): []New ®Modification b. if this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW3080401 , its issue date (if known)5-16-2008 and the status of construction: []Not Started ❑Partially Completed* ® Completed* *provide a designer's certification Specify the type of project (check one): ❑Low Density ®I -sigh Density ❑Drains to an Offsite Stormwater System ❑Other If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CANIA Major ❑Sedimentation/Erosion Control: _ ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts ac of Disturbed Area b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each perniit:N/A Form SWU-101 Version 07Jun2010 Page l of 1.11. CONTACT INFORMATION -1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc, who owns the project): Applicant/ Organ izatiomUnion County Public Schools Signing Official & Title:Donald S. Hughes, Director of Facilities b.Contact information for person listed in item I above: Street Address:201 Venus Street City:Monroe State:NCLip:28110 Mailing Address (if applicable): City: State: Zip: Phone: (704 ) 296-3160 x6755 _ Email:c1on.hughes@ucps.k12.nc.us Fax: (704 _ )_ 296-3.163__ c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (`Phis is the person who owns the property that the project is located on): Property Owner/Organization: N/A Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: { ) Fax: { ) T Email: 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title:N/A b.Contact information for person listed in item 3a above: Mailing Address: City:_ ._ Phone: Email: State: Fax: 4. Local jurisdiction for building permits: No additional permits required Point of Contact: Phone #: Form SWU-101 Version 07Jun2010 Page 2 of l;V. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Runoff will be collected by catch basins and storm piping and conveyed to the existing site storm drainage system. All runoff will be treated by the existing oversized wet detention pond „permitted under_the original_ permit, SW3080401 - 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Yadkin River basin. 4. Total Property Area: 30 acres Total Coastal Wetlands Area: acres Total Surface Water Area: acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 30 acres ' Total project area shall be calculated to exclude the following the tronnal pool of impounded structures, fire area behoeetn the banks of streams and rivers, the area belong the Normal High Water (NHW) litre or Mears High Water (MHLV) lute, and coastal wetlands landward from the NHW (or MHW) like. The resultant project area is used to calculate overall percent built upon area (BI.IA). Nou-coastal zi7etlands landward of the NHW (or MHW) lute tttay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 22.8 % 9. How many drainage areas does the project have?1 (For high density, count I for each proposed engineered stormzoater BMP. For law density and other projects, use I for file whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name North Fork Crooked Creek Stream Class * C Stream Index Number * 13-17-20-1 Total Drainage Area (so 706,108 693,475 Existing On -site Drainage Area (so 661,621 648,988 Existing Off -site Drainage Area (so 44,487 Proposed Impervious Area** sq 298,280 292,280 Existing % Impervious Area** total 43.01 42.16% Existing Im ervious"' Surface Area Drainage Area 1 Drainage Area _ Drainage Area Drainage Area _ On -site Buildings/Lots (so 101,681 On -site Streets (so 49,580 On -site Parking (so 105,515 On -site Sidewalks (so 24,577 Other on -site (so 16,928 10,928 Existing Future (so Off -site (sf) Existing BUA*** (so 292,281 Total (so: 298,281 * Stream Class and Index Number can be determined at: Itttp://portal.xcelei ir.arg oeb/wq&s/csa+/classifcatious Form SWU-101 Version 07Jun20t0 Page 3 of fntppervions Area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sirfc�ivalks, gravel areas, etc. * Report only that amount of existing BUA that will rentain after development. Do not report any existing BUA that is to be removed and which will be replaced by nmy BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Per original permit, off site flow is passed through the pond undetained. Projects in Union County: Contact DWQ Central Ofjrc'e staff to cheek ij•lhe project is located within a Threatened c& Endangered Species watershed that mqv be subject to more stringent stormwater requirements as per NC,1C 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ttcclenr.or/«eb/Suit/s�'s/su/burp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncklenr.org/web/wq/ws/stl/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be Y g project P htt[)://L)ortal.tictleiir.org/��,eb/­wq/tiA'sZsLi/niiiL)s.) found b locating ro ect on the interactive online ma at http://portal.ttcclen „• Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http:/ / portal.ncdenr.org/ 1,veb/ wq / %vs/ suZstateswZ forms clocs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. A&D 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants N/,F Form. (if retlitired as per Part Vll belouy) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M B agreement(s) for each MP. 4 AhF_ OA14 pRo . Foe AL POA p,,LM 464aM6wt 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http:./_/www.envhelp.org/pages/onestopexpress.htntl for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/ managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the'h mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. /'�rov to- 46fi M 46 P 464 _- Form SWU-101 Version 07.1un2010 Page 4 of 6 '..; : .. " - -A - '.! . -,� -j P.f� �� m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify IV�� elevations in addition to depths) as well as a map of the boring locations with the existing Ro- elevations and boring logs. Include an 8.5 x11 copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also poi om include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHVVT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 4788 Page No: 137 A&P 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). 'rhe corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. ht!p://www.secretary.state.nc.us/Corporations/­CSearch.aspx Vll. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncclenr.org/webZkvq/«VS/SLiZstates%v/"forillS does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the Iand, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. Vlll. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:A. Granseur Dick Consulting Firm: Chambers Engineering, PA Mailing Address:129 North First Street City:Albemarle Phone: f 704 1 984-6427 Email:agdick®ce-pa.com State:NC Zip:28001 Fax: (704 ) 984-6428 IX. PROPERTY OWNER AUTHORIZATION (if contact Information, item 2 has been filled out, complete this section) 1, (print or type name of person listen in Contact Information, item 2a) _ , certify that I own the property identified in this permit application, and thus give permission to.(print or type name of person listed in Contact Information, [ten! Ta) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of ' as the legal property owner i acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215,6. Signature: Date: a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or hfpe name of person listen in Contact lxforination, item 1a) Donald S. Hughes, Director of Facilities certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that'the required deed restrictions and protective covenan will be recorded, and that the proposed project complies with the requirements of the applicable stormwater will under 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signatu Date: 7' / U I, Qne 5 i ST, a Notary Public for the State of h1p( ► ee rUhn,-, ,County of LMro+i do hereby certify that �o 1c� .S• fI4ykc- � personally appeared before me this hr day of -Jul4 z4iz , anVc nowledge the due execution of the application for a stormwater permit. Witness my hand and official seal,'' SEAL My commission expires /b �013 Form SWU-101 Version 07Jun2010 Page 6 of 6 Permit No. (to be provided by DWO) ®'� • �. ofwA ���1r�9 G jyy��C NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill} must be printed, filled out and submitted along with all of the required information. I i.PROJECTiINF,ORMATION � `' ` t Project name L School for Union County Public Schools Contact person Steve Whaley at YCH Architects, PA Phone number 704-788-2000 Date 511412008 Drainage area number 1 11:rDESIGN;INF,ORMATION zk :,a,' : , A T Site Characteristics Drainage area 693,475.20 ft2 �� r72 A v Impervious area 292,280.56 ft2 % impervious 42,15 % Design rainfall depth 3.02 in Storage Volume: Non -SR Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SR Waters 1-yr. 24-hr runoff depth 3.02 in Pre -development 1-yr, 24-hr runoff 28,245.00 ft3 Post -development 1-yr, 24-hr runoff 95,167.00 ft3 Minimum volume required 66,922.00 ft3 Volume provided 195,873.00 ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.02 in Rational C, pre -development 0.30 (unitless) Rational C, post -development 0.75 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.13 inthr Pre -development 1-yr, 24-hr peak flow 6.79 ft3lsec Post -development 1-yr, 24-hr peak flow 46.76 ft'/sec PrelPost 1-yr, 24-hr peak flow control 39.97 ft3lsec Basin Elevations Basin bottom elevation 620.00 ft Sediment cleanout elevation 622.50 ft Bottom of shelf elevation 625.00 ft Permanent pool elevation 625.50 ft SHWT elevation 625.50 ft Top of shelf elevation 626,00 ft Temporary pool elevation 627.75 ft Form SW401-Wet Detention Basin-Rev.4 Pans I, & "L Design Summary, Page 1 a12 Permit No. (to be provided by OWO) II.`; DESIGN'INFORMATION ...., Volume and Surface Area Calculations SAIDA ratio 1.42 (unitless) Surface area at the bottom of shelf 48,462.00 ft2 Volurrre at the bottom of shelf 175,116.00 ft' Permanent pool, surface area required 9,847.00 ft2 Permanent pool, surface area provided 43,760.00 ft2 OK Permanent pool volume 195,873,00 ft' Average depth for SAIDA tables 4,48 ft OK Surface area at the top of shelf 43,760.00 ft2 Volume at the top of shelf 195,873.00 ft' Forebay volume 38,759.00 ft' Forebay % of permanent pool volume 19,79 % OK Temporary pool, surface area provided 43,760.00 ft2 Drawdown Calculations Treatment volume drawdown time Treatment volume discharge rate Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Additional Information Diameter of orifice Design TSS removal Basin side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at uttimate build -out? Drain mechanism for maintenance or emergencies 2.29 days 2.87 ft31s 6.79 ft31s 2,87 ft3/s 12 in 85 % 3.00 :1 10.00 :1 10.00 ft 3.00 A 2.00 A y (Y or N) 1.14 ft y (Y or N) n (YorN) y (Y or N) 12" sluice gate OK OK OK OK OK OK OK OK OK OK OK Need a recorded drainage easement OK Form SW401-Wet Detention Basin-Rev.4 Parts I & II. Design Summary, Page 2 of 2 Compliance Inspection Report Permit: SW3080401 Effective:08/01/12 Project: New "L" School Site on Poplin Road Owner: Union County Board of Education County: Union Region: Mooresville Contact Person: Steve Whaley Directions to Project: Expiration: 05/15118 Adress: Poplin Rd City/State/Zip: Indian Trail NC 28079 Title: Phone: 704-788-2000 Type of Project: State Stormwater - HD - Other Drain Areas: 001 - (North Fork Crooked Creek) (03-07-12) ( C) On -Site Representative(s): i Related Permits: Inspection Date: 11/08/2017 Entry Time: 09:20AM Primary Inspector: James D Moore Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: E Compliant ❑ Not Compliant Question Areas: State Stormwater (See attachment summary) Exit Time: 09:50AM Phone: Inspection Type: Compliance Evaluation page: 1 permit: SW3080401 Owner - Project: Union County Board of Education Inspection Date: 1110812017 Inspection Type Compliance Evaluation Reason for Visit: Routine 012eration and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ upon request? Comment: Could not fully inspect, gate was locked. Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: Please scan and email copies of the operation and maintenance agreement and recorded deed restictions to iames.moore(@ncdenr.gov. Yes No NA NE ■ ❑❑❑ ❑ ❑ ❑ ❑ Yes No NA NE ■ ❑❑❑ ■❑❑❑ ■ ❑❑❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ M ❑ ❑ ❑ M 1111 page: 2 State Stormwater Inspection Report (:nnnruml T Project Name: P 1 Pernnit No: SW3'Y$04Q! Expiration Date: Contact Person: Phone Number:. Inspection Type: Inspection Date: l Time In: Cl 0. 2- Q) Time Out: Current Weather: Recent Rain (Date)? Rain — in Location Facility Address / Location: City: Zip: County: Lai: 0" N Long: - 0"W Permit Information Rule Subject to (circle one): 1988 Coastal Rule 1995 Coastal Rule 2008 Coastal Rule Session Law 2006-246 Goose Creels High Quality Waters Outstanding Resource Waters Density (circle one): High (HD) Low (LD) Stormwater Best Management Practices (BMPs) (insert number of each): Wet Ponds Infiltration Basins Infiltration Trenches LD Swales Stormwater Wetlands Dry Ponds Bioretention Permeable Pavement Salad filters (circle one) Open . Closed Cistem Level Spreader/Filter Strip Other (specify): File Review Yes No NIA NIE 1. Is the permit active? 2. Signed Engineer's Certification on file? 3. Signed Operation and Maintenance a Bement on file? 4. Recorded Deed Restrictions an file? ✓ Site Visit: Built Unon Area IBUA1 Yes No NIA NIE 5. BUA is constructed and consistent with the permit requirements? V 6. BUA as ertnitted is graded such that the runoff drains to the system? (high density only)V 7. Drainage area is consistent withpermit? i.e. no un ermitted drainage to the SW BMPs V S. Drainage area is stabilized? (to reduce risk of sedimentation to the SW BMPs) V Site Visit: Stormwater BMPs Yes No NIA NIE 9. Stormwater BMPs are located per the approvedplans? 1/ 10. Stormwater BMPs have dimensions e . length, width, area matching the approvedplans? V 11. Stormwater BMPs are constructed pSr the approvedplans? V Site Visit: Operation and Maintenance Yes No NIA NIE 12. Access oints to the site are clear and well maintained? 13. Trash has been removed as needed? 14. Excessive landscape debris ( ass cIippings, leaves, etc) is controlled? 15. Stormwater BMPs being operated and maintained as er the permit requirements? 16. Inspection and Maintenance records are available for inspection? densiy only, 1995 — present only Yes No NIA NIE [ 17. Is the site compliant with other conditions of the permit? I I 1 1 Site Visit: Other Water Quality Issues Yes No NIA NIE 18. Is the site compliant with other water quality issues as noted. during the inspection? State Stormwater Inspection Report, Version 3.0_3-09 Page I of 2 State Stormwater Inspection Report InS ectlon PECtUreS (some of the pictures taken during the.site.visit) Compkiance Status ❑ Compliant ❑ Non -Compliant Letter Sent (circle one): Yes No Letter type: CEI NOV NOVRE Other Date Sent: Reference number: Inspector Name and Signature: _ _ Date: State Stormwater Inspection Report, Version 3.0_3-09 Page 2 of 2 WET DETENTION O & M Inspection Checklist INLETS and FOREBAY 1. Inlets are located per the approved plans: ❑ ❑ ❑ ❑ 2. Inlet device (swale or pipe) is free of damage, clogs or erosion: ❑ ❑ ❑ ❑ 3. Forebay berm is in place and without erosion: ❑ ❑ ❑ ❑ 4. Forebay is free of excessive sediment: ❑ ❑ ❑ ❑ SIDE SLOPES AND BANKS 5. Vegetated slopes are 3:1 or less: ❑ ❑ ❑ ❑ 6. Banks are stable and free of erosion or bare soil: 15� ❑ ❑ ❑ 7. Slopes or berms are free of woody vegetation: ©, ❑ ❑ ❑ ,Z 8. Free of muskrats or beaver activity: ❑ ❑ ❑ ❑ 9. Grass is being maintained and mowed (not scalped) as required: ❑ ❑ ❑ PERIMETER AND MAIN BAY 10. Vegetated shelf is 6:1 or 10:1 as permitted and properly vegetated: ❑ ❑ ❑ ❑ 11: Algal growth covers less 50% of the area: D-` ❑ ❑ ❑ 12. Cattails, phragmites or other invasive plants cover less than 50% of the basin surface: 19 ❑ ❑ ❑ 13. Main treatment area is free from excess sediment accumulation: ❑ ❑ ❑ OUTLETS 14. Swale or emergency outlet bypass is in the correct place and is in good condition: ❑ ❑ ❑ ❑ 15. Drawdown device is correctly sized free of damage or clogging: U ❑ ❑ ❑ 16. Orifice size matches the approved plans [" ❑ ❑ ❑ 17. Outlet is free of erosion or other signs of damage: ❑ ❑ ❑ ❑ 18. Trash rack is installed ❑ ❑ ❑ ❑ 19. Vegetated filter is in place (if applicable) - )- L' C�VZWA— hi.%JY 3A,4a S tidt ❑ ❑ ❑ ❑ 20. Relative elevations match approved plans ❑ ❑ ❑ ❑ 21. Fountain pump (if permitted) is less than or equal to the maximum allowable size: ❑ ❑ ❑ ❑ V3.3_09