Loading...
HomeMy WebLinkAboutNCC202796_ESC Approval Submitted_20200707Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. soar 788 Statesville, NC 28687 Date: June 261h 2020 LETTER OF APPROVAL WITH MODIFICATIONS Brian Mahoney BBC Sequoia LLC 21000 Torrence Chapel Rd., Ste. I00 Cornelius, NC 28031 RE: Project Name: Sequoia Forest Acres Approved with Modifications: 12 Project ID: MVLLE-2020-066 Project Location: PIN 4658424243.000 Submitted By: Darden Engineering Services, PLLC Date Received: June 23n'2020 PIan Type: Revised Dear Mr. Mahoney: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 413.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. I I3A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is Letter of Approval with Modifications Sequoia Forest June 261h 2020 Page 2 of inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, cal' Jonathan Williams Erosion Control Inspector I Enclosures: Modifications Letter of Approval with Modifications Sequoia Forest June 26`t' 2020 Page 3 of MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Sequoia Forest Project ID: MVLLE-2020-066 County: Iredell Reviewed by: Jonathan Williams Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. 1. Delineate all locations for silt fence stone outlets on the plan. —RC 2. Provide copies of permits from North Carolina Department of Transportation and Town of Mooresville for road right-of-way work and utility work as applicable. --RC, 3. Straw wattles should be installed at a minimum of every 50 feet in diversions. —RC 4. Provide detail for straw wattle installation. —RC 5. Provide a seeding schedule in the detail. —RC 6. Use matting on slopes in Phase 2. Provide detail. -RC