Loading...
HomeMy WebLinkAboutNCS000325_COMPLETE FILE - HISTORICAL_20191119FEHRGR-`t" M ENGINEERING & ENVIRONMENTAL Certified Mail No. 70190140000060593881 Return Receipt Requested November 4, 2019 Division of Water Quality Attention: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RECEIVED NOV 19 Z019 &r TRAL FILES 60IRF SECTION RE: Stormwater Discharge Outfall (SDO) Monitoring Report - October 2019 Patch Rubber Company 100 Patch Rubber Road Weldon, NC 27870 NCS000325 Dear Sir/Madam: Please find enclosed the Stormwater Discharge Outfall (SDO) Monitoring Report for storm water discharge from the above -referenced facility for October 2019. Please note the following: • The facility was not able to collect the required samples from a "Representative Storm Event" for the month of October 2019. • The facility will continue monthly collection of stormwater samples for analysis. If you have any questions regarding these documents, please do not hesitate to contact this office. Sincerely, 9,1-et To, Amy L. Trimble, CHMM Environmental Scientist ALT: dep Enclosure cc: Mr. Marto Carter, Patch Rubber Company 0:1Patch Rubber Company\19-1051PA Finat119-105 - Patch Rubber Co. - 2019.11,04 - Stormwater SDO October 2019 tetter.docx 221 E. Main Street I Suite 200 I Freeport, IL 61032 I p:815.235,7643 I f:815.235.4632 I Fehr-graham.com Insight. Experience. Results. STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS 000325 FACILITYNAME Patch Rubber_ Company PERSON COLLECTING SAMPLE(S) Not applicable CERTIFIED LABORATORY(S) Lab # Lab # Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Halifax PHONENO. 2( 52)536-25-/4 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED Old' PAGE 2. Outfall No. Date Sample Collected 50050 Total Flow ifa Total Rainfall pH COD Zinc mo/dd/yr MG inches Mg L mg =L 001 N/A 002 N/A Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes X no (if yes, complete Part B) Part B. Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date: Sample Collected 50050' 0U556 ..:..... N 665A0'. '- `00400. Total Flow ►f a licable ( pp. ) Total Rainfall T Oil &`:Grease. (if.appl:) Non -polar O&GfI PH (Metli 1664` appl. Total: ` ' . Suspended Solids ply:. -°New Mo"for Oil Usage: mo/dd/yr MG inches m " I m `/l unit' gaumG Form SWU-247, last remised 21212012 Page I of 2 STORM EVENT CHARACTEIUSTICS: Date Total Event Precipitation (inches): N/A E%rent Duration (hours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Hail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my kno vied a and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the p ility of fines and imprisonment for knowing violations." (Siggature of Permittee) f t f �r g (Date) The Facility was unable to collect the required samples from a "Representative Storm Event" for the month of October 2019 "No Flow" Form SWU-247, last revised 21212012 Page 2 of 2