Loading...
HomeMy WebLinkAboutNCG140436_COMPLETE FILE - HISTORICAL_20140710w;R D STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE o -7 r � YYYYMMDD Permit Number NCG140437 Program Category NPDES SW Permit Type Ready Mix Concrete Stormwater/Wastewater Discharge COC Primary Reviewer RECEIVED larry.wade Coastal SWRule JUL 10 &.4 CENTRAL FILES Permitted Flow DWQ180G' Facility Central Files: APS _._- SWP 7/2/2014 Permit Tracking Slip Status Project Type Active New Project Version Permit Classification 1.00 COC Permit Contact Affiliation Facility Name Major/Minor Region Concrete Supply Co - Mebane Minor Raleigh Location Address County 3802 E Washington St Orange Faculty Contact Aff illation Mebane NC 27302 Johnie Alexander 3823 Raleigh St Owner Charlotte NC 28206 Owner Name Owner Type Concrete Supply Co Non -Government Owner Affiliation Henry R. Batton Executive VP 3823 Raleigh St Dates/Events Charlotte NC 28206 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 7/1/2014 5/15/2014 6/30/2014 7/112014 7/1/2014 6/30/2016 Regulated Activities Requested !Received Events Ready mixed concrete production RO staff report received RO staff report requested 5128114 Outfall 100 Waterbody Name Streamindex Number Current Class Subbasin Haw Creek (including the proposed reservoir below normal reservoir 16-20-(1) WS-V;NSW 03-06-02 i NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Mr. Henry Batten Concrete Supply Company, LLC 3823 Raleigh Street Charlotte, NC 28206 Dear Mr. Batten: John E. Skvarla, Ili Secretary July 1, 2014 Subject: General Permit No. NCG 140000 Concrete Supply Co. Ready Mix Plant - Mebane COC No. 1NCG140437 Orange County In accordance with your application for a discharge permit received on May 15, 2014, we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please note that NCG 140000 contains effluent limitations for process wastewater discharges (see Part IV, Section D). Wastewater discharges must meet the requirements of these effluent limitations. An exceedence of any of these limitations is a violation of permit conditions. Per the requirements of the Jordan Lake Nutrient Strategy Buffer Rule, all stormwater drainage to stream buffers, from portions of this site that have been constructed after August 11, 2009, must be discharged through a correctly designed level spreader or another device that meets diffuse flow requirements per 15A NCAC 2B .0267. Diffuse flow requirements are described in Chapter 8 of the North Carolina Stormwater BMP Manual, available at: http://portal.ncdenr.orWweb/wq/ws/su/bmp-manual. Please note that permit requirements in Part 1I, Section A, numbers 1-5, and Part II, Section B, number 1 are no longer valid per NC Session Law 2011-394. However, note that Part I1, Section A, number 6, and Part 11, Section B, numbers 2-10 are unaffected by this Session Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-9200 I FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http://Portal.ncdenr,org/web/Ir/ An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper Law. Those sections will remain in effect for the duration of this permit term. Please be reminded that your facility must notify the appropriate DWQ Regional Office at least 72 hours in advance of operation of your wastewater treatment facility. This certificate of coverage is not transferable except upon approval of the Division of Energy, Mineral; and Land Resources (DEMLR). If the facility changes ownership or is closed, DEMLR may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DEMLR, or permits required by other federal state or local authorities. If you have any questions concerning this permit, please contact Larry Wade PE at telephone number (919) 807-6375, or email at I any.wade ncdenr. gov .. Sincerely, for Tracy E. Davis. P.E., CPM cc: Raleigh Regional Office Central Files Stormwater Permitting Program Files STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG140437 f ►� I I i�li u hay/:1 I I h 1:� h I H� :ZIIM � 6` I►��a�/:T.� i I f� 1►J/:1 I I I 1:� �] f ►YM : 11:ie I� L� NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Concrete Supply Company, LLC is hereby authorized to discharge stormwater and process wastewater from a facility located at Concrete Supply Company Ready Mix Plant - Mebane 6802 East Washington Street Mebane Orange County to receiving waters designated as Haw Creek, a class WS-IV;NSW water in the Cape Fear River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG140000 as attached. This certificate of coverage shall become effective July 1, 2014. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 1, 2014. for Tracy E. Davis, P.E., CPM Director, Division of Energy, Mineral and Land Resources By the Authority of the Environmental Management Commission Wade, Larry From: Wade, Larry Sent: Wednesday, May 28, 2014 12:37 PM To: Parnell, David Cc: Holley, John Subject: NCG140437 Concrete Supply Co., Mebane Attachments: NCG140437 NOI.pdf Hello David, Please review the attached N01 for the subject proposed facility and let me know if you have any concerns with issuing a permit. I am sending you a set of construction plans through inter office mail. Thanks, Larry W. Wade PE Telephone: (919) 807-6375 Fax: (919) 807-6494 Stormwater Permitting Program North Carolina Department of Environment & Natural Resources Division of Energy Mineral and Land Resources 1612 Mail Service Physical Address - 512 N. Salisbury St. Room 9425 Raleigh, NC 27699-1612 Raleigh, NC 27604 ************************This is a government E-mail address**************************** *********E-mails sent and received from this address can be disclosed to third parties************ En'incrs I'EannC.rs S:urry C�'4tS Horurn, Wade and Associates, 1'. A. May 14, 2014 NCDENR Stormwater Permitting Program Division of Energy, Mineral and Land Resources Att_n_: Ken Pickie 512 N. Salisbury Street Raleigh, NC 27604 Phone: (919) 807-6376 Regarding: Concrete Supply Company Ready Mix Plant — Mebane 6802 E. Washington Street Mebane, NC Dear Ken; As per our conversation, I am remitting the following items for your review: 1. NPDES - NCG140000 Permit Application NOI 2. 2 Sets of Site Plans 3. Concrete Supply Co, LLC Annual Report (from Secretary of State website) 4. USGS Quad Site Vicinity Map 5. $100 Review Fee 6, Erosion Control Plan Approval from Orange County Please expedite the review of this NOI package. Concrete Supply_Company_is-working.to-have-t6i-s7 tplant completed for operation -before the end of June.if possible. If you have any questions, or need additional information, please do not hesitate to contact my office; or, you can also contact Johnie Alexander @ 704-309-8738. ry Truly Yours, ne tin, P. . Enclosures 621 Eugene Court, Suite loo, Greensboro, NC 27401-2711 • PO Box 21882, Greensboro, NC 2742'0-1882 Phone 336-975-0471 • Fax 336-275-3719 Website: wwiv.borum-wade.corn NC License #: C-068 _ .�.. ..rim - ►. Daft • Division of Water Quality i Surface Water Protection NCDENR National Pollutant Discharge Elimination System Np TH C—OLIHI D—TME17 or C'—oHNENT n D NnT AL Rr90VF%GEC NCG140000 NOTICE OF INTENT I Cenificalc o1 Covera¢e I National Pollutant Discharge Elimination System application for coverage under General Permit NCG140000: STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code: 3273 and like activities - Ready Mixed Concrete This NOI may be an application to discharge process wastewater. NCG140000 contains effluent limitations for process wastewater discharges. Wastewater discharges must meet the requirements of these effluent limitations. An exceedence of any of these limitations will result in a violation of the permit conditions. For questions, please contact the DWQ Central Office or Regional Office in your area. (See page 6) (Please print or type) 1) Mailing address of ownerloperator (official address to which all permit correspondence will be mailed): (Please print or type all entries in this application form.) Legal Owner Name Concrete Supply Company, LLC (Please attach the most recent Annual Report to the NC Secretary of State showing the current legal name. Alternatively this permit can be given to an individual.) Signee's Name (as signed for in question 29 below) Henry Batten Street Address 3823 Raleigh Street City Charlotte State NC _ ZIP Code 28206 Telephone No. (704) 372-2930 Email t4 cWn�ACa ConcfetesUeelv�rv.co,... Alternate Contact Name _Johnie Alexander Email (if different) `johnie.alexander@ Alternate Contact Telephone (if different)_(704) 372-2930 concretesupplyco.com 2) Location of facility producing discharge: Facility Name Facility Contact Street Address City County Telephone No. Concrete Supply Company Ready Mix Plant - Mebane Johnie Alexander _6802 E. Washington Street cQ I - Mebane_ State —NC _ ZIP Code Orange County _(704) 372-2930 3) Physical location information: Fax: (704) 334-8650 Please provide narrative directions to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). Take 1_-4011-85 to far western side of Orange County, exit towards the North (a) exit #157 (Buckhorn Rd), ao north on Buckhorn for +1-0.4 mi, turn left onto E. Washinaton St. co west on E. Washinaton St. for +1-0.65 mi. and the site is located on the left hand side of the road (A copy of a county map or USGS quad sheet with facility clearly located on the map is a required part of this application.) 4) Latitude 361105'12" Longitude 79°14'14" (deg, min, sec) 5) This NPDES Permit Application applies to the following (check all that apply): XR New or Proposed Facility ❑ Existing Facility Permit # Date operation is to begin July 2014 SWU-229-11032011 Page 1 of 7 NCG140000 N.O.I. 6) Consultant's application information: Consultant: Gene Mustin Consulting Firm: `Borum Wade and Associates, P Mailing Address: _PO Box21882 City: Green State: NC Phone: (336_) 275-0471 Zip Code: _27420 Fax. (_336_) _275-3719 Email: genemustin@borum-wade.com (Optional) Staple Business Card Here: 7) Provide the 4 digit Standard industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility: SIC Code: 3 2 7 3 8) Provide a brief description of the types of industrial activities and products produced at this facility: (Attach a site diagram showing the process areas present at this facility.) Ready Mix Concrete Plant Stormwater Discharge, Wastewater Treatment & Discharge and Permittinq Information 9) Discharge points 1 Receiving waters: Number of discharge points (ditches, pipes, channels, etc.) that convey stormwater and/or wastewater from the property: Stormwater-only., Wastewater -only: Wastewater Commingled with Storm water., _7— For new facilities: Expected date of commencement of discharge: July 2014 What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges end up in? _Haw Creek—into_Haw River, into Jordan Lake Receiving water classification(s), if known: WS-V; NSW If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). Will this facility discharge wastewater to SA (Sheilfishing) waters? ❑ Yes 'R No Note: Discharge of process wastewater to receiving waters classified as WS-II to WS-V or SA must be approved by the N.C. Division of Water Resources, Public Water Supply Section. If DWR does not approve, coverage under NCG140000 cannot be granted. No new discharges of process wastewater are permitted in receiving waters classified as WS-I or freshwater ORW. 10) Each applicant shall provide the following information (attach additional sheets as necessary): • Two (2) site plans depicting the facility or site with numbered outfalls which indicate stormwater and wastewater outfalls. The plans shall legibly show. at a minimum, (existing or proposed): o Outline of drainage areas with topographical lines and features o Storm waterlwastewa ter treatment structures - o Location of numbered stormwater/wastewater outfalls (corresponding to which drainage areas) o Runoff conveyance structures o Areas and acreage where materials are stored o Impervious area acreages o Location(s) of streams and/or wetlands the site is draining to, and any applicable buffers a Site property lines, North Arrow, and bar scale Page 2 of 7 SWU-229-07122011 NCG140000 N.O.L o If applicable, the 100-year floodplain line o Acreage of each stormwater and wastewater topographical area o Each of the facilities' wastewater or stormwater source and discharge structures and each of its hazardous waste treatment, storage, or disposal facilities o Site location (insert) Site plans shall be 24" x 36" in size. • Line drawing and description: A line drawing of the water flow through the facility. A pictorial description of the nature and amount of any sources of water and any collection and treatment measures. • A narrative description and identification of each type of process, operation, or production area which contributes wastewater to the effluent for each outfall, and a description of the treatment the wastewater receives (or. will receive), including the ultimate disposal of any solid or fluid wastes other than by discharge. Processes, operations, or production areas may be described in general terms (e.g. "ash silo"). 11) Does the applicant have any unresolved Notice of Violations (NOVs)? © No ❑ Yes Wastewater., 12) What types of wastewater does your facility generate or discharge? Type of Authorized Wastewater `� Generatef N> �4 g blschar a Sent to WW ;A5 4 {4$ ,iV � fir, t N ' � 1 1 3 � t �� � � �v t C � �� Treatment R ""System;" Vehicle and equipment cleaning (VE) X ❑ ❑ Wetting of raw material stockpiles (RM) X ❑ ❑ Mixing drum cleaning MD X ❑ ❑ Further explanation, if necessary: 13) Will your facility spray -down or actively wet aggregate piles? ❑ No PX Yes 14) Does the facility use any of the following on site? �X Phosphorus -containing Detergents ❑ Non -Phosphorus -containing Detergents �X Brighteners ❑ Other Cleaning Agents ❑ Other: 15) Are wastewater treatment facilities planned in the 100-year flood plain? XD No ❑ Yes 16) Does your facility use or plan to use a recycle system, or recycle components in your treatment system? ❑Yes R No If yes, what size storm event is the system designed to hold before overflowing? (for example, 10-yr, 24-hr) year, 24-hr rainfall event Page 3 of 7 SWU-229-07122011 NCG140000 N.0-I. w 02) 17) Will your facility build a closed -loop recycle system that meets design requirements in 15A NCAC 02T .1000 and hold your facilities' working volume'? ❑ Yes W No Will your facility discharge wastewater to surface waters? L^_l Yes ❑ No If the facility's treatment system meets the design requirements of 15A NCACO2T .1000 (including holding the 25-year, 24-hour storm plus one foot of freeboard), holds the working volume of your site, and does not discharge wastewater to surface waters, you may not be required to obtain an NPDES permit for wastewater discharges. If you believe this is the case, please contact DWQ's Aquifer Protection Section Land Application Unit Central Office Supervisor or staff (1636 Mail Service Center, Raleigh, NC 27699-1636) for more information on obtaining the necessary permits or approvals. If you will discharge wastewater or stormwater to surface waters, please continue to apply for a permit to discharge associated with ready -mixed concrete or like operations under NCG140000. For further questions, please contact DWQ's Stormwater Pemtifting Unit Staff. 18) A wastewater treatment alternatives review is required by 15A NCAC 2H.0105 (c)(2) for any new or expanding water pollution control facility's discharge in North Carolina. You may attach additional sheets. a) What wastewaters were considered for this alternatives review? RX VE R RM aX MD b) Connection to a Municipal or Regional Sewer Collection System: Are there existing sewer lines within a one -mile radius? ..................................... XX Yes ❑ No (1) If Yes, will the wastewater treatment plant (WWTP) accept the wastewater? .,., � Yes El No (a) If No, please attach a letter documenting that the WWTP will not accept the wastewater. (b) If Yes, is it feasible to connect to the WWTP? Why or why not?* It is not feasible to connect to the Municipal System because off -site easements crossing private land would have to be purchased and secured. There is no guarantee that the off -site property owners will offer to agree to the easement purchases. c) Closed -loop Recycle System (must meet design requirements of 15A NCAC 2T .1000): i) Are you already proposing a closed -loop recycle system (CLRS)? ❑ Yes n No (1) If Yes, contact DWQ's Aquifer Protection Section's Land Application Unit (2) If No, is this option technologically feasible (possible)? Why or why not?* This option is technologically possible (3) If No, is it feasible to build a CLRS on your site? Why or why not?* It is not financially feasible to construct a CLRS on the site T_ (4) What is the feasibility of building a CLRS compared to direct surface water discharge?* A CLRS is too expensive for this site d) Surface or Subsurface Disposal System (e.g., spray irrigation): i) Is a surface or subsurface disposal technologically feasible (possible)? ......... ........... ❑ Yes Ox No 1 See DWQ's Aquifer Protection Section Land Application Unit's Water Balance Calculation Policy for more information, on DWQ LAU's website hitp;tlaortal.ncdenr.org/web/wgtaps/laulpolicies for more information. Page 4of7 SWU-229-07122011 NCG140000 N.O.I. Why or Why not? This is a completely wooded site — spray irrigation not cost effective ii) Is a surface or subsurface disposal system feasible to implement?*.....,.. ............ 0 Yes � No Why or Why not? iii) What is the feasibility of employing a subsurface or surface discharge as compared to a direct discharge to surface waters?* e) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound alternative of all reasonably cost-effective options of the wastewaters being considered?*... X Yes © No i) If No, contact DWQ's Land Application Unit to determine permitting requirements_ f) If this review included all wastewater discharge types, would excluding some types (e.g. raw stockpile wetting) make any of the above non -discharge options feasible? .............. ❑ Yes XX No You may be asked to provide further information to support your answers to these questions after the initial review - Feasibility should take into account initial and recurring costs. Stormwater: 19) Does this facility employ any best management practices for Stormwater control? XX No ❑ Yes If yes, please briefly describe: _Dry detention area at the rear of the site to control runoff from process water and storm water 20) Does this facility have a Stormwater Pollution Prevention Plan? P No ❑ Yes If yes, when was it implemented? 21) Are vehicle maintenance activities (VMA) occurring or planned at this facility? RX No ❑Yes If yes, does your VMA area discharge into your wastewater treatment device? ❑ No ❑ Yes Other/Permitting: 22) Does this facility have a Division of Land Resources Erosion & Sedimentation Control (B&SC) Permit? No @d Yes (The permit application has been submitted to Orange County) s� If yes, list the permit numbers for all current E&SC permits for this facility: 5G —b4Z'% ojC � 23) Is your facility subject to Phase Il Post -Construction Area? X Yes ❑ No Couu-4-1 If yes, who is the permitting authority? City of Mebane INC low density option permit — no BMP required) 24) Is your facility located in one of the 20 Coastal Counties? ❑ Yes X No Is your facility adding more than 10,000 ftz of built -upon area or CAMA Major Permit? X Yes ❑ No Page 5 of 7 SW U-229-07122011 NCG140000 N.O.I. 25) Is your facility discharging wastewater (treated or untreated) such as water from wetting of aggregate piles, drum rinse -out, or vehicle and equipment cleaning to a stormwater BMP? rX No I]Yes If yes, please attach your approval from the permitting authority to do so. 26) Does this facility have any other NPDES permits? No R Yes If yes, list the permit numbers for all current NPDES permits for this facility: _NCG01 Applied For 27) Does this facility have any Non -Discharge permits (ex: recycle permits)? Xn No ❑Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 28) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? FX No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? XWNo ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? X No ❑ Yes d) Type(s) of waste: NIA Flow is material stored: Where is material stored: How many disposal shipments per year: Name of transport 1 disposal vendor: Vendor address: Final Checklist This application will be returned as incomplete unless all of the following items have been included: Ld Check for $100 made payable to NCDENR. �s r i This completed application and all supporting documentation. See Question 10. -' 01"'� if an Erosion & Sedimentation Control (E&SC) Plan is required from Division of Land Resources (DLR) or local designee: documentation verifying applicant has developed and submitted that Plan to the ��overning agency (required per 15A NCAC 02H .0138). 9 Two 2 site plans depicting the site Ian with numbered outfalls which indicate stormwater and wastewater I () p p� 9 p Y Croutfalls. See Question 10. A county map or USGS quad sheet with location of facility clearly marked. 29) Signatory Requirements (per 40 CFR 122.22) All applications, reports, or information submitted to the Director shall be signed and certified. a. All notices of intent to be covered under this General Permit shall be signed as follows: (i) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. Page 6 of 7 SWU-229-07122011 NCG140000 N.O.I, Certification: North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand doilars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Naof Person Signing: Henry Batten m Title: Manager A S-C) -H- (Date Signed) Notice of Intent mulct be accompanied by a check or money order for $100,00 made payable to: NCDENR Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DWQ Regional Office for your area. DWQ Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ... (252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office ......... (919) 807-6300 Page 7 of 7 SWU-229-07122011 LIMITED LIABILITY COMPANY ANNUAL R NAMEOF LIMITED LIABILITY COMPANY: Concrete Supply Co., LLC SECRETARY OF STATE ID NUMBER: 1301341 STATE OF FORMATION: NC REPORT FOR THE YEAR: 2013 SECTION A: REGISTERED AGENT' INFORMATION 1. NAME OF REGISTERED AGENT: H Vaughn Ramsey 2. SIGNATURE OF THE NEW REGISTERED AGENT: 3. REGISTERED OFFICE STREET ADDRESS & COUNTY 100 N. Greene St., Suite 600 Greensboro, NC 27401 Guilford SECTION B: PRINCIPAL OFFICE INFORMATION SOSI D: 13111341 Date 1, ilefl: 12119/2013 4:32:00 PNI Elaine F. INIar'shall North Carolina Secuctarr ol'Statc 13 240 00168 Filing Ofte Use Only ® Changes SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 4. REGISTERED OFFICE MAILING ADDRESS 1. DESCRIPTION OF NATURE OF BUSINESS: ready mix concrete P.O. Box 2888 Greensboro, NC 27402 2. PRINCIPAL OFFICE PHONE NUMBER: (704) 372-2930 3. PRINCIPAL OFFICE EMAIL: 4. PRINCIPAL OFFICE STREET ADDRESS & COUNTY 5. PRINCIPAL OFFICE MAILING ADDRESS 3823 Raleigh St. PO Box 5247 Charlotte, NC 28206 Mecklenburg Charlotte, NC 28299 SECTION C: MANAGERSIMEMBERSIORGANIZERS (Enter additional Man agerslMembers/Organizers in Section E) NAME: Henry Batten NAME: NAME: TITLE: Mananer ADDRESS: 3823 Raleigh St. Charlotte, NC 28206 TITLE: ADDRESS: TITLE: ADDRESS: SECTION D: CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business entity. /� #---E� /Z• 7- 7013 SIGNATURE DATE Form must be s/ged Manager/Member listed under Section C of this form. Henry Batten Manager Print or Type Name of ManagerlMember TITLE aUf3M1T TH .ANNi AL RE-POR r WI H THE REQUIRE)-EIL.NO-FF OF �200 MAIL TO: Secretary of State, Corporations Division, Post Office Box 29525, Ralelgh, NC 27626-0525 ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT' Craig N. Benedict, AfCP, Director Administration 245-2575 Erosion Control Division 131 W. Margaret Lane, (919 ) 245-2586 �:.i�. � Suite 200 (919) 644-3002 (FAX) P O Box 8181 till,' www.co.orange.nc.us \ Hillsborough, NC 27278 Letter of Approval Wednesday, May 07, 2014 Mr. Alan Roebuck Concrete Supply Co.,LLC 3823 Raleigh St. Charlotte, NC 28206 Re: Erosion Control Plan Approval for Land -Disturbing Activity in Orange County, NC Permit Number: EC14-0027 Project Name: Concrete Plant Parcel ID Number: 9834090845 To Person(s) Conducting Land Disturbing Activity: Approval of the Erosion Control Plan for this site is hereby granted. This letter and its attached conditions, approvals, comments and statements becomes part of the approved Erosion Control Plan for this land -disturbing activity. The land -disturbing permit (Erasion Control Permit) will be issued at the Pre -Construction Conference. No timbering, radin or other land-digturbina activities may occur -Prior to this conference. Please read the attached Conditions nfApproval carefully in order to undcrstand your responsibilities and liabilities. After reading the Conditions of Approval, please sign and return the Letter of'Acknowleclgcnient provided. Failure to comply with the erosion control requirements of the Orange County Unified Development Ordinance may result in a stop Nvork order, lines and/or penalties. Sincerely, Reynolds J. (Ren) Ivins Orange County Erosion Control Supervisor rivins cr co.orange.nc.us S:\5,_1irosion Control and Water Quality\l'rosion Control and V%Iater Quality\jobs by year\Netiti Work -1'1\Mcb w\Concrete Plant\COA.docx ] ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AiCP, Director Administration 245-2575 Erosion Control Division 131 W. Margaret Lane, (919) 245-2586 Suite 200 (919) 644-3002 (FAX) . - = U 1. P O Box 8181 www.co.orange.nc.us Hillsborough, NC 27278 Conditions of Approval Permit Number: EC14-0027 Jurisdiction: Mebane Project Name: Concrete Plant PIN or TMBL: 9834090845 Permit Date: May 7, 201.4 Concrete Supply Co.,LlcC is listed as the entity responsible on the Statement of Ownership and Financial Responsibility form submitted for this site. (If you are not the owner/developer or other responsible person, please take this opportunity to correct this error as soon as possible; otherwise, you will be considered responsible.) Although you will probably contract someone (a general contractor, grading contractor, subcontractor, etc.) to actually implement and maintain the erosion control plan, it is your responsibility, according to the Orange County Unified Development Ordinance, to see that the requirements of the Ordinance and approved plan are achieved. It is also your responsibility to ensure the approved plan is successful in containing sediment on -site and that all permanent erosion control measures are successful. if these responsibilities are not fulfilled and enforcement and/or legal actions are taken, it will be against Concrete Supply Co.,LI.C, not the grading contractor or other contractor, unless they are the same person or firm. Erosion Control personnel will cooperate with you and your designer and contractor to implement the approved plan and meet the Ordinance requirements, To accomplish this, both you and your agents must take the initiative in contacts with Erosion Control personnel. However, this interaction must not be interpreted as relieving you of any responsibilities and transferring it to the contractor or Erosion Control personnel. Neither should it be conStl'Lled that Erosion Control personnel are acting as liaison between you and your designer, contractors, or other agents. If problems arise, Erosion Control personnel will suggest solutions; however these are only suggestions, since Erosion Control personnel will not act as your engineer. If necessary you must employ your engineer or architect to design a solution. We will continue to work with you, your contractor, and designer, and we will contact personnel at the site whenever possible to keep the site in compliance (as long as all of you are responsive). If this approach fails, and you do not take the initiative in respondirig to rocluc?sts for compliance, you Will be given Written notices of violation and enforcement action will be taken should you fail to respond by the specified deadlines_ It is hoped, and is our commitment, S!\5_l7srosion Control and Wter Quality,\I I'ocion Control anct Water Quality\Jobs by near\Nc%v Work 14\Mebane\C1ncrutE2 Plant\COA.cloc. 2 Conditions of Approval Rcn,iced 3/06/12 that the first approach to inspections and compliance will be successful and that a good working relationship can be established and maintained. In undertaking this land -disturbing activity, be aware of and observe the following requirements of the Ordinance. • PRIORITIES: Erosion and sediment control must be given equal, or greater if necessary, priority with grading, construction, and other efforts to develop the site. At certain times (for example, during initial construction and when repairs and maintenance are required) erosion and sediment control will require more effort to ensure success. • EXPIRATION: Erosion control plan approval expires if work does not begin within 18 months of the date of this letter. The land -disturbing permit expires with the plan approval or two years after work begins. • THE WEATHER: Assume that this site will get at least one 6-hour, 10-year storm event (0.67 inches/hour for 6 hours) and be prepared to handle the resulting runoff and control the erosion it will cause on the site. If your site is located within the Neuse River Basin, then erosion control measures must be designed to withstand the 25-year storm. • INITIATIVE: Concrete Supply CO.,LLC must take the initiative in implementing the erosion control plan, This includes seeing that the construction sequence is followed, inspecting the installed devices, performing maintenance and installing additional devices when necessary. Do not wait for Erosion Control personnel to discover problems; their function is not to act as your construction inspector but to spot-check the site for compliance with the approved plan. When Erosion Control personnel discover problems and there has been no initiative on your part to make corrections, you will be expected to make corrections immediately, usually within one or two days. • OTHER APPROVALS AND PERMITS: This project must comply with all local, State, and Federal environmental laws. You must have all necessary applicable approvals (i.e., zoning compliance, Department of Transportation, US Army Corps of Engineers, NC Division of Water Quality, sewer and water, etc.) required to begin this project so that work can continue uninterrupted to completion and there are no delays that will increase erosion and sediment generation. If these approvals are not obtained and work is suspended while waiting for them, the site will have to be stabilized until work resumes. If a Land -disturbing permit has not been obtained, it is your responsibility to ensure that it is purchased before work begins. • PROPERTY LINES, CLEARING LIMITS, ETC.: concrete sul)ply Co.,U-c is responsible for determining where the property lines and clearing limits are, and for staying within those bounclaries. You are also responsible for locating, and protecting such things as setbacks, Watei' ClUallty buffers, absorption field sites, flood plains, protected wetlands, undisturbed areas, trees to be saved, etc. 5:\5_Erosion Control and Watc:r Quality\Erosion Control and Water Quality\Jobs by ~•ear\New Work i4\MQbmv\Concrete ['lent\CDA.docx 3 Conditions of Approval Revised 3/06/12 • PERFORMANCE: The Ordinance is performance oriented. If it is determined that sediment damage (sediment lost off site or into streams, water bodies, or buffers) is occurring despite proper implementation and maintenance of the approved plan, it is your responsibility to provide additional sediment trapping and/or erosion control rneasw'es. Although the plan has been carefully reviewed, unexpected difficulties may be inevitable, and you must resolve them. • RESTORATION OF AREAS DAMAGED BY SEDIMENT: You will be required to restore waters and land affected if you fail to prevent sediment damage resulting from this activity. This is in addition to any other penalty or injunctive relief. • CHANGES TO THE PLANS OR IN OWNERSHIP: if significant changes are required to the approved plan, then you must have your designer make revisions and submit copies to the Division upon request. if the site plan is revised in any way that affects erosion and sediment control, you must inform us and submit revised plans. If ownership of this project changes and responsibility is transferred to another person, you or the new owner must inform us in writing with pertinent, information such as contact name, address, telephone and fax numbers. Otherwise, Concrete Supply Co.,I_I.0 will be considered responsible. If you did not supply this office with the names and addresses of all members of your partnership you are responsible for supplying them with copies of this letter and any other correspondence from this office related to this project. • COMPLETION OF DISTURBANCE IN AS SHORT A TIME AS POSSIBLE: Sediment -trapping devices are not 100% effective in removing soil particles from runoff. Therefore, the Ordinance requires that all land -disturbing activities be planned and conducted to limit exposure to the shortest feasible time. To accomplish this requirement construction must be continuous and uninterrupted until completion and permanent stabilization. If construction is interrupted or delayed or the project is abandoned, the site must be stabilized with adequate ground cover. • PROVIDE YOUR CONTRACTORS WITH A COPY OF THE APPROVED PLAN: Make sure your contractor has a copy of the approved erosion control plan, has considered it in their bid, and is prepared to proactively implement the plan. If phases of the plan ►,,ill Lie conducted by different subcontractors, Concrete Supply C0J.LC must ensure that their efforts are coordinated so that the approved plan is followed. For example: if the clearing and installation of the sediment trapping devices will be done by different contractors, the clearing must not get ahead of construction of the devices. As stated in the approved plan, the initial clearing must be limited to only that area necessary to gain access to and install the erosion and sediment control devices. SA5_i rasion Control anti Water QUO Iit.V\Nrosinn Control ML] Water Quality\Jobs by y0ar\NQI%, W(Irk 1=}\Rlei��t7�\Conci-ei�� Pl��i�t\C:Oi�,iloa-� �l Conditions of Approval Revised 3/06/12 • COORDINATION BF17WEEN CONTRACTORS AND SUBCONTRACTORS: You must ensure that sediment and erosion control is coordinated during timbering, clearing, grading, and construction so that controls and devices are maintained and not removed or damaged. If this site is subject to NCG0I0000, logbook maintenance should also be coordinated. • KEEP A COPY OF THE APPROVED PLAN ON THE SITE: The plan must be available to the contractor and inspection personnel. Failure to do so is a violation. • DISPOSAL OF CLEARING AND DEMOLITION DEBRIS AND CONSTRUCTION WASTE: All debris and waste resulting from development of the site (stumps, brush, demolished structures, construction waste, etc.) must be properly disposed of in accordance with Iocal and State regulations. Open burning of trees, limbs, stumps, and construction debris is prohibited. Concrete, stumps and other clearing debris and construction waste must be carried to appropriately permitted landfills. • SITE INSPECTIONS: The Ordinance authorizes Erosion Control personnel to enter the site for the purpose of investigation and inspection. Erosion Control personnel will periodically inspect the site to determine if the approved plan is being implemented and if it is successful. If problems or violations are found, the Erosion Control personnel will attempt to contact site personnel to discuss with them and arrange corrections within a specified time. Also, a written site inspection report will be left with site personnel, in the mailbox on -site, or transmitted in another manner. If you, or your contractor, have questions about the inspection report, contact the Erosion Control personnel immediately - do not wait until the deadline to start asking questions. • COMMUNICATIONS: In addition to leaving inspection reports on -site, a copy will be mailed and/or faxed to Concrete Supply Co.,l_I_C. As the entity responsible for the land -disturbing activity, you should ensure compliance with the approved erosion control plan and see that your contractor corrects violations by the given deadline. Erosion Control personnel are generally in their offices and available by phone between 8:00 and 9:00 a.m. and 4:30 and 5:00 p.m,, and have mobile phones as well. Feel free to contact them with any questions or concerns. • PERSONNEL, EQUIPMENT, AND MATERIALS MUST BE AVAILABLE FOR MAINTENANCE AND REPAIRS AT ALL TIMES: Maintenance is a critical element of the erosion control plan needed to ensure that devices continue to operate effectively. You must be prepared to work on the devices when the need arises. In order to do this, you may consider stockpiling certain materials such as stone, sediment fence and wire, etc. • PREPARING FOR WORK: Before beginning the project be certain that all necessary materials, such as skimmers, riser structures, pipes, etc., are available and really for delivery or already on site. S:\5_1"rosion Control and Water Quality\Erosion Control aril L-Vater QuaiikAjohs by year\Nety Work '14\Mt:bcu1Q\CLA1Crkte Plant\C:OA.docx 5 Conditions of Approval Revised 3/06/12 • ENFORCEMENT ACTIONS: If there is inadequate response to a verbal request or Notice of Violation, or you fail to properly implement the approved plan, enforcement action will be taken against the Concrete S�ipply Co-LLC to bring the site into compliance. Actions may include: Stop Work Orders: All work not directly related to erosion and sediment control and bringing the site into compliance, including building construction, must cease until the site is brought into compliance. Revocation of the Land -disturbing Permit: All work not directly related to erosion and sediment control and bringing die site into compliance, including building and home construction, must cease until the site is brought into compliance and another permit is purchased at the current rate. The Permit fee is $3036.00. Pines: $5000 per day may be assessed per violation. Payment of fines or for another permit is the responsibility of Concrete Supply Co.,I.LC, not your contractor. Injunctive Relief: Legal action will be initiated in Superior Court to restrain the violation and bring the site into compliance. • STABILIZATION: Disturbed areas must be stabilized within 7 or 14 calendar days of termination / completion of any phase of grading per the following guidelines by a temporary / permanent ground cover sufficient to restrain erosion. Perimeter dikes, swales, ditches, and slopes - 7 days High Quality Water Zones - 7 days Slopes 2:1 or steeper - 7 days Slopes between 2:1 and 3:1 greater than 1.0' in length - 7 days Slopes between 2:1 and 3:1 less than 10' in length -14 days Slopes between 3:1 and 4:1 less than 50' in length -14 days Slopes between Y1 and 4:1 greater than 50' in length - 7 days Slopes flatter than 4:1 -14 days As long as grading is not suspended more than the specified time period, the disturbed areas do not have to be stabilized until final grade is reached. However, if work is delayed or suspended for more than the specified time period and you are given a written notice to stabilize it, grading the area again does not allow you to disregard the notice. If an area is to be worked again, it must be graded and stabilized by the given deadline. When construction is completed, all disturbed areas must have a permanent, stabilizing ground cover applied within the specified time period. The intent of this requirement is to limit erosion by completing the disturbance and stabilizing disturbed areas in as short a time as possible. To avoid stabilizing; the Sallie area several times, schedule: work so that grading and other construction are S:\5_Hrosion Control and VNIater Quality\Erosion Control anti Water Quality\jobs by Dear\NLnv bVork '1'1\Mebane:\Cun6rcte P1an)\C0A.drx:x 6 Conditions of Approval Revised 3/06/12 coordinated. When a particular area is finished, permanently stabilize it immediately instead of waiting until the end of the project to stabilize the entire site at once. • SUCCESS OF PERMANENT MEASURES: "These meaSUres (vegetation, other types of stabilization, channel linings, energy dissipaters, etc.) must be successful in restraining erosion. For example: If an annual plant (such as annual ryegrass) is used instead of a perennial for permanent stabilization, it is the responsibility of the owner to reseed and establish a permanent vegetative cover when the annual fails after one season. If vegetation in a ditch or channel fails to survive and establish a permanent cover so that erosion is restrained, then some other type of lining, such as matting or stone, must be provided by the owner. • MAINTENANCE OF PERMANENT MEASURES: Maintenance is the responsibility of the owner except those measures in a street or utility right-of-way accepted by a government agency. • APPEALS: You have the right to appeal the following: disapproval of the erosion control plan; modifications to the erosion control plan; any conditions of approval; and enforcement actions. Procedures are outlined in Section 2.24 of the Ordinance. Hearings are conducted by the North Carolina Office of Administrative Hearings. Conditions of Approval Particular to this Site Several conditions specific to this project must be met as conditions of approval for the erosion control plan, before any work may begin. These are discussed below. -1. BEFORE any land -disturbing activity can be,,in you must aci<notivledJ;e in writing; that vote have mail tl1is letter, tlnderstrmd its requirttiienis and implications, and are ,prepared to elisure that you, ycxrr contractors, agents, etc. will observe these requirements. A letter of ackiiow1ed�,m(-,0 is included. 2. Since the kind disturbance %\J11 be „reams` than one (I) acre, the Self -Inspection r!,quiremuits pursuant to t#ie North Carolina Scdimentatioll 1'011ulion Control Act applies to this site. Citpies of a rti>tita' Ineniir ilislatssin; the reclllirenlents are attadied with an inst,ec:tion form fir your revicw. Tie in tlie-� gilt feI]J[Ii', into the ponds c{iwcrsi( in berms. I1)11'1 block spillcwaw fence. I- I:Ivc� urtdisluncWd clean WlW.r LIISdtar c olIISiLit' i,l 1CIICU 11'c:,t. -l. Contact 5teVir Killlenbach at 919-2-I-5-25titi to schc.'liulc' the pr�� �ruI�.lr.11ition il.tnfertnil� 1�1_l?I�al att�_'ll�ll_'CS dre' the 0%l:I ,'I_�11111��'t�l' I\ClJr�'ti�'llt�llEy'C`_ lal��llll'L'I: (_�i'fii_'r,l� Cl�IItI��.1Ct,�r�lllll l_.il'111.IIIII_'�,�1_l�llfl'al�il,l�, 5-\5_Erosion Control and 1Naler QLJ'1lit%,\ li.rosion Control -,md Water l)lralitt'\labs b \'ear\New Wort: l4V'vlebanc\C01)C1'0tt f'I�int\COA.tlocs 7 Conditions of Approval Revised 3/06/12 We look forward to working with you toward the successful completion of this project. If you have questions about this letter or project, do not hesitate to contact Erosion Control personnel at the telephone nuchhber in the letterhead. Failure to appeal these conditions in writing within 15 days after receipt of this letter, or initiation of land -disturbing activity, signifies your acceptance of these conditions of approval of the erosion control plan and your intention to observe and implement the conditions. S:\5_Er05ion Control anil bl'ater-Quality\] rosion Control and Miler Qualify\Jobs by gear\Nettv kNork 14\,MLbane\Concrete Planl\COA.docl 8 Conditions of Approvai Revised 3/06/12 Letter of Acknowledgement Erosion Control Division Orange County Planning and Inspections Post Office Box 8181 Hillsborough, NC 27278 Re: Acknowledgment of Receipt and heading of Letter of Erosion Control flan Approval for: Project Name: Concrete Plant Permit Number: EC14-0027 Parcel Number: 9834090845 To whom it may concern.- 1, a person with authority to execute instruments for Concrete Plant, acknowledge that I have received this letter and the Conditions of Approval attachment, have read them, understand the requirements, and am prepared to ensure that my contractors, agents, etc. will observe these requirements and the approved erosion control plan. I also acknowledge that I am ultimately responsible for compliance with the approved erosion control plan and the Ordinance, and for ensuring that the plan is successfully implemented. Please note that this site may have additional requirements regarding stormwater runoff during construction as noted below: Land disturbance at this site will be less than one (1) acre: therefore it does not require an NPDES stormwater discharge permit for construction, nor does it require setf inspection pursuant to the North Carolina Sedimentation Pollution Control Act. Land Disturbance at this site will be one (1) acre or more; therefore the following additional requirements apply to this site: 1. SeIf-Inspection pursuant to the North Carolina Sedimentation Pollution Control Act. I acknowledge that I have received a copy of the self -inspection documentation. 2. NPDES general stormwater discharge permit for construction activities (NCG01.0000). I acknowledge that I have received a copy of the permit, read the permit and understand that it is my responsibility to comply with the permit requirements. This includes but is not Iimited to, maintaining a rain gauge on -site, keeping precipitation records, and conducting required monitoring and inspections. Date Please Print Name and Title Legibly 5:\5_Erosion Control and Water Quality\ Erosion Control and Water Quality\ jobs by year\New Work 14\Mebane\Concrete Plant\COA.docx 9 Permit Number NCG140436 Central Files: APS _ SWP 5/22/2014 Permit Tracking Slip Program Category Status Project Type NPDES SW Active New Project Permit Type Version Permit Classification Ready Mix Concrete StormwaterlWasiewater Discharge COC 1.00 COC Primary Reviewer � j �� ® RECEIVED Permit Contact Affiliation larry.wade ' f Coastal SWRule MAY 2 8 2014 CENTRAL FILESDWQIBOG Permitted Flow Facility Facility Name Major/Minor Region Red's Redimix LLC Minor Wilmington " Location Address County 116 Church Rd Duplin Facility Contact Affiliation Pink Hill NC 28572 Tammy Kennedy 116 Church Rd Owner Pink Hill NC 28572 Owner Name Owner Type Red's Redi Mix LLC Non -Government Owner Affiliation Tammy Kennedy 116 Church Rd Dates/Events Pink Hill NC 28572 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 5/22/2014 4/28/2014 5/22/2014 5/22/2014 5/2212014 6/30/2016 Regulated Activities Requested /Received Events Ready mixed concrete production 'D S�J�c�ro� /ram%d��/r 2p19 Outfall 100 Waterbody Name Streamindex Number Current Class Subbasin Little Limestone Creek 18-74-23-0.5 C:Sw D3-06-22 AT. -A HCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Ms. Tammy Kennedy Red's Redi Mix< LLC 116 Church Rd. Pink Hill, NC 28572 Dear Ms. Kennedy: John E. Skvarla, III Secretary May 22, 2014 Subject: General Permit No. NCG140000 Red's Redi Mix, LLC COC No. NCG140436 Duplin County In accordance with your application for a discharge permit received on April 28, 2014, we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please note that NCG140000 contains effluent limitations for process wastewater discharges (see Part IV, Section D). Wastewater discharges must meet the requirements of these effluent limitations. An exceedence of any of these limitations is a violation of permit conditions. Please note that permit requirements in Part II, Section A, numbers 1-5, and Part II, Section B, number 1 are no longer valid per NC Session Law 2011-394. However, note that Part II, Section A, number 6, and Part II, Section B, numbers 2-10 are unaffected by this Session Law. Those sections will remain in effect for the duration of this permit term. Please be reminded that your facility must notify the appropriate DWQ Regional Office at least 72 hours in advance of operation of your wastewater treatment facility. This certificate of coverage is not transferable except upon approval of the Division of Energy, Mineral, and Land Resources (DEMLR). If the facility changes ownership or is closed,DEM LR may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-9200 I FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http:l/portal,ncdenr.orglwebllrl An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper which may be required by DEMLR, or permits required by other federal state or local authorities. If you have any questions concerning this permit, please contact Larry Wade PE at telephone number (919) 807-6375, or email at larry.wade@ncdenr.gov.. Sincerely, for Tracy E. Davis, P.E., CPM cc: Wilmington Regional Office _ Central Piles Stormwater Permitting Program Files STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG140436 STORMWATER AND PROCESS WASTEWATER D[SCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Red's Redi Mix, LLC is hereby authorized to discharge stormwater and process wastewater from a facility located at Red's Redi Mix, LLC 116 Church Rd. Pink Hill Duplin County to receiving waters designated as Little Limestone Creek, a class C;Sw water in the Cape Fear River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, 111, IV, V, and VI of General Permit No. NCG140000 as attached. This certificate of coverage shall become effective May 22, 2014. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day May 22, 2014. for Tracy E. Davis, P.E., CPM Director, Division of Energy, Mineral and Land Resources By the Authority of the Environmental Management Commission Site Inspection Report Site Number: WT001815 Site Name: Red's Redi Mix Concrete Site Address: 116 Church Rd County: Duplin Directions: Latitude: Site Owner Name: Kennedy, Earnest R. Inspection Date: 03/20/14 Reason for Inspection: Complaint Inspection Type: Site Inspection (non -DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Brian P Lambe Zb-_--z Secondary Inspector(s): J Facility compliance Status: 0 Compliant Program Area: NPDES SW - Industrial Question Areas: Failure to Secure NPDES SW Permit Region: Wilmington Longitude: Not Compliant Phone: Phone: Inspection Summary: Discussed permit requirements for ready mixed concrete facilities with Tammy Kennedy. Provided NOI and fact sheet. Inspected site for point source discharge. Approximitely 213 of drainage of site runs off to road front ditch. 113 runs off into back but may infiltrate prior to reaching stream. No channelization of back flow could be found. Failure to Secure NPDES SW Permit Does the site have a NPDES Industrial Stormwater Permit? Comment: No permit for site. Discussed permit conditions with Tammy Kennedy, ANR 2 0 2014 BENR . VgAT-cR QUALI3Y WETLANDS AND SYORIAAZERBRANQN Page: 1 Akn.lill;WA f Division of Water Quality / Surface Water Protection rw NCDENRNational Pollutant Discharge Elimination System Na - Cwo - DEn -e- o, EMVIRONNfIR ww0 NImJRI RCSp,RCL` NCG140000 NOTICE OF INTENT FOR AGENCY USE ONLY Dais Received Year I Month I Dav V, CertificatcofCowra c Check # Amount Lf I Ud Permit Assi ned to e. National Pollutant Discharge Elimination System application for coverage under General Permit NCG140000: STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code: 3273 and like activities - Ready Mixed Concrete 1) This NQI maybe an application to discharge process wastewater. NCG140000 contains effluent limitations for process wastewater discharges. Wastewater discharges must meet the requirements of these effluent limitations. An exceedence of any of these limitations will result in.a violation of the permit conditions. For questions, please contact the DWO Central Office or Regional Office in your area. (See page 6) (Please print or type) Mailing address of owner/operator (official address to which all permit correspondence will be mailed): (Please print or type all entries in this application form.) Legal Owner Name Reds Reds Mix j_ L e Farm oil an4TZ;nPxy ke►'t,y edQ (Please attach the most recent Annual Reporf to the NC Secretary of State showing fhe current legal e. Alternatively thil permit can be given to an individual.) Signee's Name (as signed for in question 29 beio`y) An Street Address 14-Aurd, Rd City Telephone No. Alternate Contact Name Alternate Contact Telephone (if different) ' 2) Location of facility producing discharge: Facility Name Facility Contact Street Address City County Telephone No. 3) Physical location information: 69 Please provide narrative directions to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). (A copy of a county map or USGS quad sheet with facility clearly located on the map is a required part of this application.) ` 1 4) Latitude 3Sf, 0O 03" Longitude -17" 4&' 12 (deg, min, sec) .CoM 5) This NPDES Permit Application applies to the following (check all that apply): ❑ New or Proposed Facility Date operation is to begin A to i ❑ Existing Facility Permit # p p,PR � a 2p1� SWU-229-11032011 Page 1 of 7 aU�L 6��, osl�os�OR� NCG140000 N.O.i. 6) Consultant's application information: Consultant: Consulting Firm: Mailing Address: City: State: Zip Code: Phone: ( ) Fax: (� Email: (Optional) Staple Business Card Here: 7) Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility: SIC Code: 3- )� 7 S) Provide a brief description of the types of industrial activities and products,produced•at this facility: (Attach a site diagram showin the process areas present at this facility.) M476 Stormwater Discharge, Wastewater Treatment & Discharge and Permitting Information 9) Discharge points / Receiving waters: Number of discharge points (ditches, pipes, channels, etc.) that convey stormwater and/or wastewater from the property: _.Stormwater-grily: Wastewater=only: Wastewater Com'miinglad,with Stormwater: For new facilities! Expected date of commencement of discharge: r a p— What is the name of the body or bodies of. water_4creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges end up in? ewer Dam ' .Receiving water classifications)„it known: If the site stormwater discharges to a separate storm sewer system; name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer).' ' Will this facility discharge wastewaterto SA (Shellfishing) waters? ElYes N0 . . .. . , Note: Discharge of process wastewater to redeiving-waters classified as WS-II to WS-V or SA must be approved by the N.C. Division of Water Resources, Public Water Supply Section. If DWR does not approve, cor erage under NCG140000 cannot, be granted. No new discharges of process wastewater are permitted in receiving waters classified as WS-I or freshwater ORW. 10) Each applicant shall provide the fallowing information (attach additional sheets as necessary): Two (2) site plans depicting the facility or site with numbered outfalls which indicate stormwater and wastewater outtalls. The plans shall legibly show. at a minimum, (existing or proposed): o Outline of drainage areas with topographical lines and features o Stormwater/wastewater treatment structures o Location of numbered stormwater/wastewater outfalls (corresponding to which drainage areas) o Runoff conveyance structures o Areas and acreage where materials are stored o Impervious area acreages o Location(s) of streams and/or wetlands the site is draining to, and any applicable buffers o Site property lines, North Arrow, and bar scale Page 2of7 SW U-229-07-122011 NCG140000 N.O.I. o If applicable, the 100-year floodplain line o Acreage of each stormwater and wastewater topographical area o Each of the facilities' wastewater or stormwater source and discharge structure's and each of its hazardous waste treatment, storage, or disposal facilities o Site location (insert) Site plans shall be 24" x 36" in size. • Line drawing and description: A line drawing of the water flow through the facility. A pictorial description of the nature and amount of any sources of water and any collection and treatment measures. • A narrative description and identification of each type of process, operation, or production area which contributes wastewater to the effluent for each outfall, and a description of the treatment the wastewater receives (or will receive), including the ultimate disposal of any solid or fluid wastes other than by discharge. Processes, operations, or production areas may be described in general terms (e.g. "ash silo"). 11) Does the applicant have any unresolved Notice of Violations (NOVs)? No ❑ Yes Wastewater: 12) What types of wastewater does your facility generate or discharge? Type of'Authai•ized Wastewater r �' Generate Discharge Sent -to WW3" tr W :Treatment; SyMem Vehicle and equipment cleaning VE ❑ ❑ Wetting of raw material stockpiles (RM) ❑ ❑ Mixing drum cleaning MD ❑ ❑ Further explanation, if necessary: 13) Will your facility spray -down or actively wet aggregate piles? ❑ No Yes 14) Does the facility use any of the following on site? N JA ❑ Phosphorus -containing Detergents ❑ Non -Phosphorus -containing Detergents ❑ Brighteners ❑ Other Cleaning Agents ❑ Other: 15) re wastewater treatment facilities planned in the 100-year flood plain? No ❑ Yes 16) Does your facility use or plan to use a recycle system, or recycle components in your treatment system? ❑ Yes XNo If yes, what size storm event is the system designed to hold before overflowing? (for example, 10-yr, 24-hr) year, 24-hr rainfall event Page 3 of 7 SW U-229-0712201 1 NCG140000 N.O.I. 17) Will your facility build a closed -loop recycle system that meets design requirements in 15A NCAC 02T A000 and hold your facilities' working volume' ? ❑ Yes f No Will your facility discharge wastewater to surface waters? )kYes ❑ No If the facility's treatment system meets the design requirements of 15A NCACO2T .1000 (including holding the 25-year, 24-hour storm plus one foot of freeboard), holds the working volume of your site, and does not discharge wastewater to surface waters, you may not be required to obtain an NPDES permit for wastewater discharges. If you believe this is the case, please contact DWO's Aquifer Protection Section Land Application Unit Central. Office Supervisor or staff (1636 Mail Service Center, Raleigh, NC 27699-1636) for more information on obtaining the necessary permits or approvals. If you will discharge wastewater or stormwater to surface waters, please continue to apply for a permit to discharge associated with ready -mixed concrete or like * operations under NCG i 40000. For further questions, please contact DWQ's Stormwater Permitting Unit Staff. 18) A wastewater treatment alternatives review is required by 15A NCAC 2H.0105 (c)(2) for any new or expanding water pollution control facility's discharge in North Carolina. You may attach additional sheets. a) What wastewaters were considered for this alternatives review? til* VE ❑ RM ❑ MD b) Connection to a Municipal or Regional Sewer Collection System: i) Are there existing sewer lines within a one -mile radius? ..................................... ❑ Yes X No (1) If Yes, will the wastewater treatment plant (WWTP) accept the wastewater? .... ElYes ElNo (a) If No, piease attach a letter documenting that the WWTP will not accept the wastewater. (b) 11 Yes, is it feasible to connect to the WWTP? Why or why not?" c) Closed -loop Recycle System (must meet design requirements of 15A NCAC 2T .1000): i) Are you already proposing a closed -loop recycle system (CLRS)? ❑ Yes Il No (1) If Yes, contact DWQ's Aquifer Protection Section's Land Application Unit (2) If No, is this option technologica ft feasible (possible)? Why or why not?" (3) If No, is it feasible to build a CLRS on your site? Why or why not?* (4) What is the feasibility of building a CLRS compared to direct surface water discharge?" d) Surface or Subsurface Disposal System (e.g., spray irrigation): Is a surface or subsurface disposal technologically feasible (possible)? ....................❑ Yes jk,,No See DWQ's Aquifer Protection Section Land Application Unit's Water Balance Calculation Policy for more information, on DWQ LAU's website http://portal.nedenr.org/webtwolal)s/lau/policies for more information. Page 4of7 5W U-229-07122011 NCG140000 N.O.I. Why or Why not? S M.0.t 1 F a(-1. 1 11 ii) Is a surface or subsurface disposal system feasible to implement?* .................. Why or Why not? ...❑ Yes X No iii) What is the feasibility of employing a subs rfac or surfa1 )ischarge as compared to a direct 4 discharge to surface waters?' NO - P_ 9 P_ e) Direct Discharge to Surface Waters. Is discharge to surface waters the most environmentally sound alternative of all reasonably cost-effective options of the wastewaters being considered?*...f�Yes ❑ No i) If No, contact D WQ's Land Application Unit to determine permitting requirements. f) If this review included all wastewater discharge types, would excluding some types (e.g. raw stockpile wetting) make any of the above non -discharge options feasible? ....... ....... ❑ Yes XNo You may be asked to provide further information to support your answers to these questions after the initial review. Feasibility should take into account initial and recurring costs. Stormwater., 19) Does this facility employ any best m eme tpractices for Stormwater control? ❑ No Xyes If yes, please briefly describe: �'C f� 0 1On 20) Does this facility have a Stormwater Pollution Prevention Plan? [XNo ❑ Yes If yes, when was it implemented? 21) Are vehicle maintenance activities (VMA) occurring or planned at this facility? No ❑Yes If yes, does your VMA area discharge into your wastewater treatment device? ❑ No ❑ Yes Other/Permitting: 22) Does this facility have a Division of Land Resources Erosion & Sedimentation Control (E&SC) Permit? XNo El Yes If y s, list the permit numbers for all current E&SC permits for this facility: 23) Is your facility subject to Phase II Post -Construction Area? ❑ Yes XNo If yes, who is the permitting authority? 24) Is your facility located in one of the 20 Coastal Counties? ❑ Yes X No Is your facility adding more than 10,000 ftz of built -upon area or CAMA Major Permit? ❑ Yes ❑ No Page 5of7 SW U-229-07122011 NCG140000 N.O.I. 25) Is your facility discharging wastewater (treated or untreated) such as water from wetting of aggregate piles, drum rinse -out, or vehicle and equipment cleaning to a stormwater BMP? )(No ❑ Yes If yes, please attach your approval from the permitting authority to do so. 26) Does this facility have any other NPDES permits?'ANo ❑ Yes If yes, list the permit number's for all current NPDES permits for this facility: 27) Does this facility have any Non -Discharge permits (ex: recycle permits)?XNo If yes, list the permit numbers for all current Non -Discharge permits for this facility: _ 28) Hazardous Waste: ❑ Yes a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal facility? lsNo ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? �Wo ❑ Yes cp Is this tacility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? l No ❑ Yes d) Type(s) of waste: How is material stored:_ Where is material stored: How many disposal shipments per year: Name of transport / disposal vendor: Vendor address: Final Checklist This application will be returned as incomplete unless all of the following items have been included: ❑ Check for $100*made payable to NCDENR. ❑ This completed application and all supporting documentation. See Question 10. ❑ If an Erosion & Sedimentation Control (E&SC) Plan is required from Division of Land Resources (DLR) or local designee: documentation verifying applicant has developed and submitted that Plan to the governing agency (required per 15A NCAC 02H .0138). ❑ Two (2) 'site plans depicting the site plan with numbered outfalls which indicate stormwater and wastewater t outfalls. See Question 10. ❑ A county map or USGS quad sheet with location of facility clearly marked. 29) Signatory Requirements (per 40 CFR 122.22) All applications, reports, or information submitted to the Director shall be signed and certified. a. All notices of intent to be covered under this General Permit shall be signed as follows: (1) Fora corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. Page 6 of 7 SW U-229-0712201 1 NCG140000 N.O.I. Certification: North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Title: A n It) n er of WiLlhq (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDENR Mail the entire package to: Stormwate Per itting Unit Division ofQuality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DWQ Regional Office for your area. DWQ Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Page 7of7 SW U-229-07122011 NCG 140437 Map Scale I: 24, 000 Concrete Supply Company, LLC Ready Mix Plant - Mebane Latitude: 360 05' 12" N Longitude: 790 14' 14" W County: Orange Receiving Stream: Haw Creek Stream Class: WS-V;NSW Sub -basin: 03-06-02 (Cape Fear River Basin) IF n Facility Location M E BANE 0 of it Hiles �r1 SrR££r F4 ERAZIER R C INDUSTRIAL OR i -00 ell GOGNGREM SPPPLY GO., LLG 6bO2 E. KASHINGTON 5TREET 19$ANE, NORTH GA aINA B�Vl�1T( � $.ugme.rro BOrum, Wady and Associates, P.A. ? I•1 n n r r r 621 bre c urt, Suitr 100, Greens},, NC 27401-2711 U A D M A P Nov:336-775.0471 Fax:336-2751719 5GALIE' I`■�0' VATEI MAY 12, 2014 0 of it Hiles �r1 SrR££r F4 ERAZIER R C INDUSTRIAL OR i -00 ell GOGNGREM SPPPLY GO., LLG 6bO2 E. KASHINGTON 5TREET 19$ANE, NORTH GA aINA B�Vl�1T( � $.ugme.rro BOrum, Wady and Associates, P.A. ? I•1 n n r r r 621 bre c urt, Suitr 100, Greens},, NC 27401-2711 U A D M A P Nov:336-775.0471 Fax:336-2751719 5GALIE' I`■�0' VATEI MAY 12, 2014 caurn T: At k- it 91 Reds Redi Mix J�g -�'�� `�' Spy , /' I Ihi � NCG140436 N w E S Map Scale 1:24,000 ♦ Dupin Red's Redi Mix, LLC Latitude: 350 00' 03" N Longitude: -770 45' 12" W County: Duplin Receiving Stream: UT to Little Limestone Creek Stream Class: C;Sw Sub -basin: 03-06-22 (Cape Fear River Basin) Facility Location