Loading...
HomeMy WebLinkAboutSW5200601_2- Supplement-EZ_20200605SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORMS PROJECT INFORMATION 1 Project Name _ Charter Fumiture Parking and Building 2 Project Area ac 22.17 3 Coastal Wetland Area Jac)p 4 Surface Water Area ac 0 5 Is this project High or Low Density? Low 6 Does this project use an off -site SCM? No COMPLIAMPE. WITH 02H.1003(4) 7 Width of vegetated setbacks provided feet 30+ 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003(4)(_c-d) out of the setback? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF 8CIIAa: 11 Infiltration System 0 p 0 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland p 15 Permeable Pavement p 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 1 23 StormFilter p 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 ress: 32 l Email; LOAD SUPPLEMENT FORMS Mack SurnMg, PE immey Engineering Associates, PLL 150 South Fayettevllle St. Asheboro, NC 27203 336-328-0902 mack®summeyengineering.com Cerlirnalign 51a lemenm I certify, under penally of low that this Supplement-Fl form and all supporting Information were prepared under my direction or supervision; that the Information provided In the forth Is, to the best of my Imrmowledge and belled, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting Information are consistent whh the Information provided here. •` Q�� Essig<r'•, SEAL 26447 �''•�Ck sUMM��'`�' rh�9asr uli+L" Smgn tureof0esigner 13/2oZ� e� UKAINAUt: AKtAS 1 Is this a h h densi ro ect? _ _ No 2 If so, number of drainage areas/SCMs 1 Is all/part of this project subject to previous rule 3 versions? No FORMS LOADED iRAINAGE AREA INFORMATION Entire Site _Drypond_ 466268 sf f 4 T peof SCM Total BUA inprjoect (sgft)_ _ New BUA on subdivided lots (subject to permitting) s 5 6 sf 96580 sf 7 New BUA outside of subdivided lots (subject to ermitting) (so 8 Offsite - total area (sq ft 0.0 sf 9 Offsite BUA (sq ft) 0.0 sf 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft 96580 sf Sidewalk (sq ft sf Roof (sq ft sf Roadway s ft 0.0 sf _ Future (sq ft 0.0 sf Other, please specify in the comment box below (sq. ft 0.0 sf 11 New infiltrating permeable pavement on subdivided lots s ..ft 0.0 sf 12 New infiltrating permeable pavement outside of subdivided lots s 0.0 sf 13 Exisitng BUA that will remain (not subject to permittin )_(sq ft 369688 sf 0.0 sf 0.0 sf 14 Existing BUA that is already permitted (sq ft 15 Existing BUA that will be removed (sg ft 16 Percent BUA 74% 17 Design storm inches 18 Desi n volume of SCM cu ft 19 Calculation method for design volume kDDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drains a area(s): iRAINAGE AREA INFORMATION Entire Site 1 4 T e of SCM N/A 5 Total BUA from project (sq ft) 6 1995 rules SL 2006-246 2008 rules 2017 rules New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 7 2008 rules 2017 rules 8 New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules SL 2006-246 2008 rules 2017 rules 9 Offsite - total area (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) 1995 rules 2017 rules 11 Design storm (Inches) 1995 rules SL 2006-246 2008 rules 2017 rules 12 Breakdown of new BUA: Parking (sq ft Sidewalk (sq ft Roof (sq ft) Roadway s ft Future (sq ft) Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement outside of subdivided lots s ft 15permitting) Exisitng BUA that will remain (not subject to s ft 1.6 Existing BUA that is already ermitted (sq ft t7 Existing BUA that will be removed s 18 Percent BUA 19 Design volume of SCM cu ft 10 Calculation method for design volume DDITICNAL INFORMATION 21 Please use this space to provide any additional Infa.rmatlon about the drainage area(s): LOW DENSITY DESIGN RE UIREIVIENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Does project maximize dispersed flow and minimize channelization of flow? Yes 2 Yes 3 Has the use of,p)ping been minimized .er.1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 3:1 Slope 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (%) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 1 Please use this space to provide any additional information about this low density project: �����—Vdm Flow depth Jft)