Loading...
HomeMy WebLinkAboutSWA000022__06 MDC Forms - West Pond - Signed_5/19/2020Project Name Cj> S A-� (FMe'2A1.b LAX6 Permit # SW8 A 0000z z AS -BUILT DESIGNER'S CERTIFICATION FOR GENERAL MDC WEST 2) I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the below listed General MDC found in 15A NCAC 02H.1050, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. ❑ Check here if this is a partial certification. Section/phase/SCM #_(5m-6T G5 4� ❑ Check here if this is part of a Fast -Track As -Built Package Submittal per 15A NCAC 02H .1044(3). Check here if the Designer did not observe the construction but is certifying the project. [ Check here if pictures of the SCMs are provided. Printed Name ap,t� , 12�ss1 _ Signature NC Registration Number 0g55ZCg SEAL: `,���\,I 111 CA Roe",, E' = SISAL. 045526GIN _ Date 05101 12o2 o Consultant's Mailing Address: 301 cCucLou" PaJW r�r City: (>PaLQT_TJ� State: N(_ Zip: 297,fdZ Phone:) 353-qqq$ Consultant's Email address: )QM15i @ e-A► 4.(0FA O Circle N if the as -built value differs from the Plan/permit. If N is circled, provide an explanation on page 3. OO N/E = Not Evaluated (provide explanation on page 2). OO N/A = Not Applicable to this project or SCM. Consultant's Certification 15A NCAC 02H .1003(3) & General MDC 15A NCAC 02H .1050 TREATMENT REQUIREMENTSOAs-built ON/E I OO N/A 1. The SCM achieves runoff treatment. U or N 2. The SCM achieves runoff volume match. Y or N N IA 3. Runoff from offsite areas and/or existing BUA is bypassed. Y or N NIA' 4. Runoff from offsite areas and/or existing BUA is directed into or N the permitted SCM and is accounted for at the full build -out 5. The project controls runoff through an offsite permitted SCM Y or N that meets the requirements of the MDC. NIA 6. The net area of new BUA increase for an existing project has or N been accounted for at the appropriate design storm level. NCDEQ 2/9/2018 Project Name QKZ" t-,5 AJOWgLp CAl46 Permit # 5W000�-zz- 7. The SCM(s) meets all the specific minimum design criteria. 01 or N VEGETATED SETBACKS / BUAOAs-built OO N/E OO N/A 1. The width of the vegetated setback has been measured from or N the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other or N vegetation. Y or N 3. BUA that meets the requirements of NCGS 143-214.7 (b2)(2) is located in the setback. N A 4. BUA that does not meet the requirements of NCGS 143-214.7 Y or N (b2)(2) is located within the setback and is limited to: • Publicly funded linear projects (road, greenway sidewalk) • Water -dependent structures (l1 A I • Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at the Y or N edge of the setback and allowed to flow through the setback as dispersed flow. ON/E ON/A STORMWATER OUTLETS OAs-built 1. the outlet handles the peak flow from the 10-year storm with no downslope erosion. or N 0 VARIATIONS OAs-built ON/E ON/A 1. A variation (alternative) from the stormwater rule provisions Y or N has been implemented. I� 2. The variation provides equal or better stormwater control and Y N equal or better protection of surface waters. or NIA COMPLIANCE WITH OTHER REGULATORY PROGRAMSOAs-built ON/E OO N/A 1. The project is compliant with other applicable regulatory programs. �J�' N SIZINGOAs-built OO N/E OO N/A 1. The volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required storm depth. (N N CONTAMINATED SOILSOAs-built ON/E OO N/A 1. Infiltrating SCM's are not located in or on areas with Y or N NIA contaminated soils. SIDE SLOPESOAs-built OO N/E OO N/A 1. Vegetated side slopes are no steeper than 3H:1 V. 1' or N NCDEQ 2/9/2018 Project Name rWaVAMs _ &MAW �UE Permit # SW8 a dZ 2. Side slopes include retaining walls, gabion walls, or other surfaces that are steeper than 3H:IV. Y or N MIA 3. Vegetated side slopes are steeper than 3H:1 V (provide supporting documents for soils and vegetation). Y or N MIA EROSION PROTECTIONOAs-built ON/E OO N/A 1. The inlets do not cause erosion in the SCM. or N 2. The outlet does not cause erosion downslope of the discharge point during the peak flow from the 10-year storm. &or N EXCESS FLOWSOAs-built ON/E (IN/A 1. An overflow / bypass has been provided. 3 or N OAs-built ON/E ON/A DEWATERING 1. A method to drawdown standing water has been provided to facilitate maintenance and inspection. Oor N CLEANOUT AFTER CONSTRUCTION OAs-built ON/E ON/A 1. The SCM has been cleaned out and converted to its approved design state. or N MAINTENANCE ACCESS OAs-built ON/E ON/A 1. The SCM is accessible for maintenance and repair. or N 2. The access does not include lateral or incline slopes >3:1. or N OAs-built ON/E ON/A DESIGNER QUALIFICATIONS (FAST -TRACK PERMIT) 1. The designer is licensed under Chapters 89A, 89C, 89E, or Ior 89F of the General Statutes. I a N Provide an explanation below for every MDC that was not met, and for every item marked "NIA" or "N/E." Attach additional pages as needed. uNO F 4tin,' E r 01M IM95S r- tp LV NCDEQ 2/9/2018 Project Name LvmmenAt-0LAU Permit # SW8gl�oo2 2 AS -BUILT DESIGNER'S CERTIFICATION FOR WET DETENTION POND PROJECT Cw,,, -0 I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in 15A NCAC 02H.1053, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. ❑ Check here if this is a partial certification. Section/phase/SCM #_ S E l C5.:� ❑ Check here if this is part of a Fast -Track As -Built Package Submittal per 15A NCAC 02H .1044(3). ® Check here if the Designer did not observe the construction but is certifying the project. ® Check here if pictures of the SCM are provided. Printed Name IXc►AN 9 &SM Signature &0Y, NC Registration Number 0155ZL* Date 0510-4Z,-Z SEAL:�\A CA r SEAL 045526 -,,f,�,�,�� • �: • Rosh•', mm�inn Consultant's Mailing Address: Sol A uW&f') l+ �VJTr~ 101 City: Ct�UTM State: NC Zip: Z82UZ Phone: (- LN) 353-9w 8 Consultant's Email address- C eM 0M O Circle N if the as -built value differs from the Plan/permit. If N is circled, provide an explanation on page 2. O N/E = Not Evaluated (provide explanation on page 2). OO N/A = Not Applicable to this project or SCM. This Certification must be completed in conjunction with the General MDC certification under 15A NCAC 02H.1050. Consultant's Certification (MDC 15A NCAC 02H .1053) Forebay / Depths / FountainOAs-built I OO N/E I OO N/A 1. The available Sediment storage is consistent with the approved plan and is a minimum of 6 in. or N 2. Water flow over the forebay berm into the main pond occurs at a� non -erosive velocity. or N lJ 3. The provided Forebay Volume is 15%-20% of the main pool volume. Dy or N 4. The Forebay entrance elevation is deeper than the exit elevation into the pond. or N 5. The Average Design Depth of the main pond below the permanent pool elevation is consistent with the permitted value? (D or N 6. Fountain documentation is provided. 0or N NCDEQ 2/9/2018 Project Name (INEn mgs AT &anAto LAm Permit # SW8 oaao 22 Side slopes / Banks / Vegetated Shelf OAs-built 1. The width of the Vegetated Shelf is consistent with the approved oor N plans and is a minimum of 6 feet. 2. The slope of the Vegetated Shelf is consistent with the approved plans and is no steeper than 6:1. As -built Main Pool / Areas / Volumes / Elevations 1. The permanent pool surface area provided is consistent with the permitted value. 2. The Temporary Pool Volume provided is consistent with the permitted value. 3. The permanent pool elevation is consistent with the permitted value. 4. The temporary pool elevation is consistent with the permitted value. Inlets / Outlet / Drawdown 1. The design volume draws down in 2-5 days. 2. The size of the Orifice is consistent with the permitted value 3. A trash rack is provided on the outlet structure 4. Hydrologic impacts to the receiving channel are minimized from the 1 yr 24-hr storm discharge? 5. The inlets and the outlet location are situated per the approved plan and avoid short-circuiting. YDor N OO N/E ON/A OAs-built I ON/E I ON/A Y or N Y or Y or N Y or o OO As -built zON/E ON/A O or N kV or N Y or(D (S)or N by or N Vegetation OAs-built OO N/E OO N/A 1. The vegetated shelf has been planted with a minimum of 3 or N diverse species. (2) 2. The vegetated shelf plant density is consistent with the approved plans and is no less than 50 plants per 200 sf or no (2)or N less than 24 inches on center. Provide an explanation below for every MDC that was not met, and for every item marked "N/A" or "N/E." Attach additional pages as needed. tiVT MAW 004POOL -4Ot* f APOOL aqL ELGVWnw4 T M rn As Sut 4IS Q Tft57 JAU9M(4&- WAem-R OyAt-tTY VOLurnir ont NCDEQ 2/9/2018 Courtyards at Emerald lake Wet Pond#2 - Photos T. W- mown r-4