Loading...
HomeMy WebLinkAboutSW1200502_NC Arboretum EX Spreadsheet_5/14/20201.00 1.39 1.88 2.22 2.66 3.79 4.48 5.03 5.58 Highlighted Storm is Design Storm 6.52 acres 1.27 acres 0.00 acres 59% 0.00 acres Complete the breakdown of impervious area for the project Yes NOTE: Please use the Storm-EZ calculation sheets to document the stormwater design and create the O&M Agreement. Discrete SCS Method, Pre - PostCalculation Method Entire Site Impervious Surface Area Offsite Drainage Area (sf) Stream Index Number Stream Class Receiving Stream name Basin Information Future (sf) Off-site (sf) Existing BUA (sf) 55,321Total Other On-Site (sf) 53,521 1,800 On-Site Parking (sf) On-Site Sidewalks (sf) On-Site Buildings/Lots (sf) On-Site Streets (sf) 0 0 Proposed Impervious Area (sf) % Impervious Area (total) 0 55,321 59% Total Drainage Area On-Site Drainage Area (sf) 6-67-10 93,668 93,668 Data in italics is derived from application forms and land use data worksheets and cannot be changed by user. Wesley Creek B Use Worksheet Data? Total Property Area Total Coastal Wetlands Area Total Surface Water Area Depth (inches) P90 First Flush / WQV P90 P95 50-yr, 24-hr Design Storm: Asheville 1-yr, 24-hr The North Carolina Arboretum Parking Reconfiguration & Expansion Asheville, NC BUNCOMBE County French Broad River Basin RAINFALL & CALCULATION DATA Rainfall Source: Project County: Project City: BUNCOMBE Asheville Asheville 100-yr, 24-hr PROJECT INFORMATION Total Impervious Area Project % impervious area ALL AREAS ARE IN SQUARE FEET Entire Site 2-yr, 24-hr Storm Event 10-yr, 24-hr 25-yr, 24-hr(Minimum Design Storm = P90 for non-SA, 1-yr, 24-hr for SA) Loaded Rainfall: STORM-EZ Version 1.4 Project Data 5/14/2020 Page 5 of 14 1 of 1 Pre-Development Land Use: HSG CN % B 98 7.23% B 61 92.77% Note: Enter BUA Draining to Permeable Pavement Below HSG Select HSG 0.00 21.66% 0.00% Select HSG 0.00 0.00% Select HSG 0.00 0.00% 2.15 7.23% Existing Permeable Pavement (Infiltration): Pavement Area Additional BUA Soil Infiltratio n Rate Gravel Void Space Total Gravel Depth Orifice Dia. Orifice Height (sf) (sf) (in/hr) (%) (in) (in) (in) 100 DSD PAW Dgr (in) (%) (in) (sf) (acres) 150 1.39 0.00 2.15 acres 0.00 acres 0.00 acres 0.00 acres 0.00 acres 2.15 acres Pre-Development SCMs: Imp. Open (sf) (sf) (cf) HSG 6775 86893 200 Rainfall Volume =2.99 cf Natural Infiltration & ET =-2.80 cf Disconnected Impervious Surfaces =0.00 cf SCM Infiltration =0.00 cf Permeable Pavement Infiltration =0.00 cf Green Roof ET =0.00 cf Post Filtration Discharge =0.00 cf Total Runoff Reduction =-2.80 cf Treated SCM Outflow =0.00 cf Untreated Surface Runoff =0.19 cf D.S. BMP SCM Type Has Synthetic Liner? Permeable Pavement + Additional BUA: Green Roofs : 0 Existing Green Roofs: HSG SCM # Area DS SCM # 0 Downstream SCM Description Total Site Area: Land Use Summary: Description Preserved Coastal Wetlands : Notes Drainage Area 93,668 2.15 % Imp Area (sf.) WQ Volume Provided Area (ac.)Area (sf.) Subtotal: User Defined Drainage Areas:Comp. CNDescription Area 0.16Impervious 6,775 86,893 Asheville, NC BUNCOMBE County French Broad River Basin PRE-DEVELOPMENT LAND USE CALCULATIONS Drainage Area # (sf)Land-use (acres) 1.99Pasture or Open Space e North Carolina Arboretum Parking Reconfiguration & Expans Subtotal: 93,668 acre-inches = Design Storm Runoff Fate Summary: Runoff Reduction Components: acre-inches = 10,850acre-inches = SCM # SCM # From Land Use Tables: 93,668 Preserved Surface Waters & Non-Coastal Wetlands : BUA % acre-inches = acre-inches = acre-inches = acre-inches = acre-inches = acre-inches = SCM Treatment: acre-inches =675 The Pre-Development project area contains 6775 sf of built upon area, resulting in an overall density of 7.23%. 0 0 0 -10,174 -10,174 0 0 0 93,668 STORM-EZ Version 1.4 Pre-Development 5/14/2020 Page 6 of 14 1 of 1 Permeable Pavement: Infiltration Rate Void Space Total Gravel Depth Orifice Dia. Orifice Height (sf) (acres) (sf) (acres) (in/hr) (%) (in) (in) (in) 500 0.00 0.00 NO DSD PAW Dgr (in) (%) (in) (sf) (acres) 600 1.39 0.00 No Residential Lot CN Calculator (Excluding R/W and dedicated open spaces): Max Imp / Lot Woods / Lot (ac.) (sf) (sf) 0.00 Remaining Land Use: HSG CN (sf) (acres) % B 98.0 54,784 1.26 58.49% B 61.0 38,884 0.89 41.51% N/A 0 0.00 0.00% N/A 0 0.00 0.00% 93,668 2.15 100.00% Land Excluded, or Partially Excluded, from Volume Calculations:(sf.) (ac.) 00.00 00.00 93,668 2.15 Rainfall Volume =2.99 cf Natural Infiltration & ET =-1.51 cf Disconnected Impervious Surfaces =0.00 cf SCM Infiltration =-1.30 cf Permeable Pavement Infiltration =0.00 cf Green Roof ET =0.00 cf Post Filtration Discharge =-0.17 cf Total Runoff Reduction =-2.99 cf Area Open Space / Lot (sf) 10,850 acre-inches = 0 acre-inches = -630 acre-inches = acre-inches = acre-inches = acre-inches = -5,494 acre-inches = 0 Area Runoff Reduction Components: Design Storm Runoff Fate Summary: The North Carolina Arboretum Parking Reconfiguration & Expansion Asheville, NC BUNCOMBE County French Broad River Basin Detention Check Has Synthetic Liner? Infiltration Check POST-DEVELOPMENT LAND USE CALCULATIONS Pvmt Type SCM # -4,726 0 -10,850 acre-inches = Total Site Area: Surface Waters & Non-Coastal Wetlands : Green Roofs : Coastal Wetlands : Lot Area Impervious Green Roofs: # of Lots Land-Use Open Space (Managed Open Space) Permeable Pavement + BUA: Sub-Total: HSG Avg Lot Size Pavement Area % Imp.(sf.) Down- stream SCM Additional BUA SCM # Downstream SCM # Drainage Area # Retrofit? Comments STORM-EZ Version 1.4 Post Development 5/14/2020 Page 7 of 14 1 of 1 The North Carolina Arboretum Parking Reconfiguration & Expansion Asheville, NC BUNCOMBE County French Broad River Basin POST-DEVELOPMENT LAND USE CALCULATIONS Drainage Area # Treated SCM Outflow =0.00 cf Untreated Surface Runoff =0.00 cf Pre-Development Runoff =0.19 cf Difference =-0.19 cfacre-inches =-675 acre-inches =675 The Post-Development project area contains 54784 sf of built upon area, resulting in an overall density of 58.49%. acre-inches = acre-inches =0 SCM Treatment: 0 STORM-EZ Version 1.4 Post Development 5/14/2020 Page 8 of 14 1 of 1 Impervious (sf) 54,784 (cf) (cf) (cf) (cf) (cf) (cf) 700 1S Bioretention w/ IWS B 27,147 50% 39%2123 2654 2654 2341 312 0 74% 701 2S Bioretention w/ IWS B 27,637 50% 61%1606 2703 2703 2385 318 0 99% Rainfall Volume =2.99 acre-inches =cf Natural Infiltration & ET =-1.51 acre-inches = cf Disconnected Impervious Area =0.00 acre-inches = cf SCM Infiltration =-1.30 acre-inches = cf Permeable Pavement Infiltration =0.00 acre-inches = cf Green Roof ET =0.00 acre-inches = cf Post Filtration Discharge =-0.17 acre-inches = cf Total Runoff Reduction =-2.99 acre-inches =cf SCM Treatment: Treated SCM Outflow =0.00 acre-inches =cf Untreated Surface Runoff =0.00 acre-inches =cf 0.19 acre-inches =cf -0.19 acre-inches =cf Down- stream SCM # Drainage Area Inflow Volume -675 -10,850 -4,726 0 10,850 Pre-Development Runoff = 0 0 100% of total impervious area. 100% of total pervious area. Runoff Reduction Components: -5,494 54784 sf impervious area entered compared to 54784 sf total impervious. 675 Warnings: Design Storm Runoff Fate Summary: The Post-Development project area contains 54784 sf of built upon area, resulting in an overall density of 58.49%. 0 -630 **VOLUME MATCHING ACHIEVED** Difference = 0 38881 sf open space entered compared to 38884 sf total open space. Pervious (sf) 38,884 The North Carolina Arboretum Parking Reconfiguration & Expansion Asheville, NC BUNCOMBE County French Broad River Basin Enter only runoff volume below that will be infiltrated or drawn down over 2 to 5 days. Additional volume provided in devices should not be entered in this worksheet. Drawdown time requirement applies to all storm events. Drainage Area # PROPOSED SIPs & STRUCTURAL RUNOFF VOLUME CONTROLS Offsite Impervious Area Treated Infiltration & ET 0 sf Total Inflow Volume 14,976 % of Total Impervious Area % of Total Pervious Area Storage Volume 23,905 Warning: Per Session Law 2012-200, Conventional BMPs which promote standing water are discouraged within 5 miles of public airports. Conventional BMPs should be replaced with alternative SIPs or underground structures. Contact NCDWQ Regional Office for additional guidance. Name / Location Contributing Area HSG STORMWATER CONTROL MEASURES % of SCM Volume Utilized Post Filtration Outflow Treated Outflow Type of Device SCM # STORM-EZ Version 1.4 Stormwater Controls 5/14/2020 Page 9 of 14 1 of 1 P90 Storm - Rainfall Depth = 1.39 inches The"Fate of Rainfall" charts display the hydrologic processes to which rainfall volumes are subjected based on the combinations of land use, soil type, and stormwater controls entered by the user. The charts are designed to display the stormwater plan in a form which illustrates changes to the hydrologic cycle which result from urbanization and various stormwater management strategies. Asheville, NC BUNCOMBE County French Broad River Basin P90 The North Carolina Arboretum Parking Reconfiguration & Expansion Compliance Storm = P90 Storm - Rainfall Depth = 1.39 inches Drainage Area # FATE OF RAINFALL Select Storm: VOLUME MATCHING SCALE Volume Matching Threshold Basic Treatment Threshold BASIC TREATMENT SCALE 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Infiltration and ET ‐ 10220 cf Treated Outflow from BMPs ‐ 0 cf Untreated Surface Runoff ‐ 0 cf% of Total Rainfall VolumePost Development Fates Infiltration and ET ‐ 5494 cf Green Roof Evapotranspiration ‐ 0 cf Disconnected Impervious Infiltration ‐ 0 cf Permeable Pavement Infiltration ‐ 0 cf Infiltration by BMPs ‐ 4726 cf Other Post Filtration Outflow ‐ 630 cf 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Infiltration and ET ‐ 10174 cf Treated Outflow from BMPs ‐ 0 cf Untreated Surface Runoff ‐ 675 cf% of Total Rainfall VolumePre Development Fates Infiltration and ET ‐ 10174 cf Green Roof Evapotranspiration ‐ 0 cf Disconnected Impervious Infiltration ‐ 0 cf Permeable Pavement Infiltration ‐ 0 cf Infiltration by BMPs ‐ 0 cf Other Post Filtration Outflow ‐ 0 cf FATE OF RAINFALL GRAPHS STORM-EZ Version 1.4 Rainfall Fate Graph 5/14/2020 Page 10 of 14 1 of 1 TIME OF CONCENTRATION CALCULATIONS: Pre-Development Length (ft) Slope (ft/ft)Tt (hrs) Length (ft) Slope (ft/ft) n-value Flow Area (ft2)Tt (hrs) Channel Flow: Channel Flow: Pre-development Tc =5.00 min (Minimum 5 minutes) Post Development Length (ft) Slope (ft/ft)Tt (hrs) Length (ft) Slope (ft/ft) n-value Flow Area (ft2)Tt (hrs) Channel Flow: Channel Flow: Post-development Tc =5.00 min (Minimum 5 minutes) ADJUSTED CURVE NUMBER CALCULATIONS: Pre-Development F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Rainfall (in) = 1.00 1.39 1.88 2.22 2.66 3.79 4.48 5.03 5.58 Q*(in) =0.06 0.09 0.17 0.26 0.40 0.91 1.30 1.63 1.99 CNadj =78 72 69 67 66 65 65 64 64 Post Development F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Rainfall (in) = 1.00 1.39 1.88 2.22 2.66 3.79 4.48 5.03 5.58 Q*(in) =0.00 0.00 0.18 0.40 0.71 1.56 2.11 2.57 3.03 CNadj =67 59 69 72 74 76 76 76 76 PEAK FLOW CALCULATIONS: F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Pre-Development Q* (in) 0.06 0.09 0.17 0.26 0.40 0.91 1.30 1.63 1.99 qu (csm/in)385.00 385.00 385.00 512.90 809.52 931.69 931.69 931.69 931.69 Q (cfs) 0.07 0.11 0.22 0.44 1.10 2.86 4.06 5.11 6.23 Post Development Q* (in) 0.00 0.00 0.18 0.40 0.71 1.56 2.11 2.57 3.03 qu (csm/in)385.00 385.00 385.00 809.52 931.69 1165.98 1165.98 1165.98 1165.98 Q (cfs) 0.00 0.00 0.23 1.10 2.23 6.12 8.28 10.06 11.87 -100.0% -100.0% 4.5% 150.0% 102.8% 113.8% 103.8% 96.7% 90.5% French Broad River Basin ADDITIONAL CALCULATIONS The North Carolina Arboretum Parking Reconfiguration & Expansion Asheville, NC BUNCOMBE County Shallow Flow: Drainage Area # Surface Cover Wetted Perimeter (ft) Sheet Flow: Surface Cover Analysis Area = 2.15 Acres (0.003 sq. miles) Wetted Perimeter (ft) Sheet Flow: Shallow Flow: **Note: To decrease Post-development peak flows - increase storage volume being drawdown or infiltrated or lengthen post- development time of concentration. See LID HELP for more information. Analysis Area = 2.15 Acres (0.003 sq. miles) Sheet Flow: Shallow Flow: Sheet Flow: Shallow Flow: STORM-EZ Version 1.4 Peak Flow Calcs 5/14/2020 Page 11 of 14