Loading...
HomeMy WebLinkAboutSW1200502_Bioretention O&M Agreement_5/14/2020Permit Number: (to be provided by DWQ) Drainage Area Number:. Bioretention Operation and Maintenance Agreement l will keep a maintenance record. on this BMP. This maintenance record will be kept in a log in a known set: location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced. immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the. BMP. Important operation and maintenance procedures: Immediately after the bioretention cell is established, the plants will bewatered twice weekly if needed until the plants become established (commonly six weeks). Snow, mulch or any other material will NEVER be. piled on the surface of the bioretention cell. -- Heavy equipment will NEVER be driven over the bioretention cell. --- Special care. will be taken to prevent sediment from entering the.bioretention cell. -- Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (:or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known. set location and .will be available upon -request: Inspection activities shall be performed as .Follows.. Any problems. that.are found shall be repaired immediately. BMP element: Potential roblems: How I will remediate.the problem: The entire BMP Trash . debris is present. Remove the trash/ debris. The perimeter of the bioretention cell Areas of bare soil. and/or erosive gullies have formed. Regrade the soil if.,necessary to remove the gully, and then plant a ground cover and water untilit is established. Provide lime. and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge. or.swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is..occurring in the Regrade the Swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such. as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment.(if stone and replace with clean stone. a livable}, Form SW40 1. -Bioretention O&M-Rev.3 Page l of BMP element: Potential roblems: How I will remediate:theproblem: The pretreatment area FIow.is bypassing. Regrade if necessary to route all. pretreatment -area and/or flow to the pretreatment area. flies have formed. Restabilize the area after grading. Sediment has accumulated to Searchfor the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the. pmeatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf mattingor riprap: if needed to prevent future erosion problems, Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: best professional practices. Prune according to.best professional vegetation show that pruning is needed practices.. to maintain optimal plant health. Plants are dead, diseased or Determine the source:of the. dying. problem: soils, hydrology,.disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish .the ground cover .if a soil test indicates it is necessary Tree stakes wares are present Remove tree stake wires (which six months after planting. can kill the tree if not xemoved). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has -floated away. void. areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple:shredded hard wood mulch at. a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged With sediment. - remcsve. and replace either just the top .layers or the entire media as needed. Dispose of the spoil in an: appropriate off -site location. Use triple shredded hard wood mulch at. a maximum depth of three inches. Search for the source of the sediment and remedy the problem if ossible. An annual. soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of .properly and replaced with .new planting media. Form SW401-Bioretention O&M-Rev.3 Page 2. of 4 BMP element The underdrain system Potential,problems- Clogging has: occurred. Howl will remediatf the rolilem: Wash out the underdrain.system... if a licable Thedrop inlet Clogging has Occurred_ Clean out the.drop inlet. Dispose of the sediment off -site. The dro inlet .is c3 azna ed Re .ai..r or re lace. the dro inlet. The receiving water Erosion or other signs of damage have occurred at the. Contact the NC Division. of Water Quality. 401 .Oversight Unit at 91.9- outlet. 733-1786.. Form SW401-Bioretention O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the.maintenance procedures listed above. i agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project`narne:North Carolina Arboretum Parking Exa nsion & Reconfiguration BMP drainage area numher:l Print name:Geox e Briggs Title:Executivr Director Address.100 Frederick Lave Olmstead WE. Asheville NC 28806 Phone: (82n 665-2492 Signature, I Note: The legally responsible party should not be a homeowners association unless more than. 50% of the lots have been sold and a resident of the subdivision has been named the. president. Notary Public for the State of `3 .A,c- , County ofdo hereby certify that _ personally appeared before me this day of n , and acknowledge the due execution of the forgoing bioret tion maintenance requirements. Witness my hand and official seal, i �AOTAp.), "p - M' 1. 2 2_ _ G SEAL My commission expires Form SW401-Rioreterttion ]&M-Rev. 2 Page 4 .of 4