Loading...
HomeMy WebLinkAboutNCC201327_ESC Approval Submitted (3)_20200409Wake County Environmental Services Department Water Quality Division, Watershed Management Section WAKEWAKE�� 336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602 TEL 919 856-7400 • FAX 919 743-4772 — COU -9.1 ��Z�] �I►� ill »_1► I_ ' ' t O1%11 Pam McLean Project Name Minor Subdivision Watershed Moccasin Creek Jurisdiction Wake County 3/16/2020, Date Processing Project Dates Received 2/14/2020 Initiated 1/3/20 Number SWF-018173-2019 Drainage Area (ac) 245 Flood Study Fee $1,000 Paid (Major) Applicant: Name Pam McLean ------------------------------------------------------------------------ 2901 Homegrown Place Address: Zebulon, NC 27597 ------------------------------------------------------------------------ Phone: 919-418-5859 ------------------------------------------------------------------------ Email: ------------------------------------------------------------------------ pbsoc3@aol.com Plan Date/Revision Date: 3/14/2020 Engineer: Name: CSD Engineering/John F. Oglesby, PE, CPESC ---------- --------- Address: 3 N. Main St., Suite D, Wendell, NC 27591 ------ ------------ Phone: 910-791-4441 ----------------------------------------------------------------------------------------------- Email: iohn@csd-engineering.com ----------------------------------------------------------------------------------------------- Approval Date: Construction Plan Approved with the following Conditions of Approval and Applicable Standards 3/23/20 The five (5) 36" RCP culverts are conditionally approved as designed and in accordance with the approved 401 and 404 permits. Conditions of Approval All conditions of approval must be completed and approved by Wake County prior to final plat approval or signoff of the Certificate of Occupancy (C.O.) for future building permits. Items required prior to final plat or building permit approval are checked and listed below. Unless otherwise noted, all references shown in brackets are for the Wake County Unified Development Ordinance (UDO), adopted 04/17/06. A mandatory preconstruction meeting is required between the owner, contractor, and Wake County prior to issuance of the grading or storm water permit or building permit. [10-30-7] The flood requirements will be ® 1. discussed at this meeting. Please call to schedule this meeting at your convenience. Please contact Karyn Pageau at 919-796-8769 to schedule the preconstruction meeting and provide five (5) full size plan sets prior to the meeting. ® 2. Velocity Dissipation / Pipe Placement -Armor the stream bank below the channel allowing for the passage of water at base flow and consistent with Corps of Engineers requirements. [10-21-2] ® 3. Obtain Building Permits for Jot Nos. 1A, 16, 2 and 3_. As -Built Plans — Please submit an engineer's certification that the pipe has been installed per the plan including ® 4. a survey drawing of the installed culvert. If design changes are made, the applicant shall resubmit the flood study for approval. [14-15-3, 14-15-4, 14-15-5] ® 5. Record Plat ® a. Location of Crossing (s) with pipe size and materials ® b. Backwater easement boundary and BFE ® C. Minimum finished floor elevations for impacted lots 1 APPROVAL FloodConstructionPIan ReviewChecklist-V.1 WM Wake County Environmental Services Department Water Quality Division, Watershed Management Section WAKEWAKE�� 336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602 TEL 919 856-7400 • FAX 919 743-4772 — COU FSPA - FLOOD STUDY PLAN APPROVAL ❑ 6. Other: Other Applicable Standards ❑ 7. FEMA Approval / NC Dept of Public Safety ❑ a. No Rise ❑ b. CLOMR ® 8. PCN Application and 401/404 Approval or Exemption Letter Wake County Watershed Management Section is not responsible for subject approvals of other Local, State or Federal Agencies. The subject approvals are (but not limited to) Federal Emergency Management Area Flood regulations/requirements, Division of Water Quality under stormwater or other water quality regulations/requirements, U.S. Army Corps of Engineers under Article 404/401 (Wetlands/Streams) jurisdiction/requirements, and/or any Federal, State, County and Local municipal regulations or permit requirements. The approval issued in this letter cannot supersede any other required permit or approval. Environmental Karyn Pageau, CPESC Contact Info: karyn.pageau@wakegov.com Consultant: 919-796-8769 barney.blackburn@wakegov.com � Wake County PE: Contact Info: 919-418-3791 Barney Blackburn, PE 2 APPROVAL FloodConstructionPIan ReviewChecklist-V.1 WM