HomeMy WebLinkAboutSW6200204_Add Info Request_20200331ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director George M. Rose, PE P.O. BOX 53441 Fayetteville, NC 28305 NORTH CAROLINA Environmental Quality March 31, 2020 Subject: Request for Additional Information Stormwater Permit No. SW6200204 Midway Plaza Hoke County Dear Mr. Rose: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on February 25, 2020. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Based on the information provided with this submittal, this project meets the definition of "Redevelopment" (15A NCAC 02H .1002(41)). Redevelopment is defined as, "Any land - disturbing activity that does not result in a net increase in built -upon area and that provides greater or equal stormwater control to that of the previous development. " Since the project results in a net decrease in BUA (92,834 sf of total on -site BUA pre - construction per plan sheet SP1 and 69,676 sf of total on -site BUA post -construction per plan sheet SP6, which results in a net decrease of 23,158 sf of BUA) and provides equal or greater stormwater control (Provided through the reduction in on -site BUA and the inclusion of an infiltration basin). Per 15A NCAC 02H .1001(1)(f), State post - construction stormwater management rules do not apply to redevelopment projects and therefore, a post -construction stormwater permit is not required. There are 2 options for how to proceed: a. Option 1 — Rescind the State post -construction stormwater permit application since the permit is not required. NOTE: By law, the $505 permit review fee is non-refundable (15A NCAC 02H .1042(2)). b. Option 2 - Get a State post -construction stormwater permit for the site to treat future BUA associated with Phase 2 of the project. To do this, you will need to provide quantity and location information for the future Phase 2 BUA. Please email me if you would like more information on this option. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH CAROUNA - OaparOneMofEnWromnaMal0ua6ry\ r 919.707.9200 2. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW Project Submittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 30, 2020, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW6200204 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Jim.Farkas@ncdenr.jzov or (919) 707-3646. Sincerely, V- "I Jim Farkas Environmental Engineer Stormwater Program cc: Fayetteville Regional Office