Loading...
HomeMy WebLinkAboutSW4191201_17-116 - SuppEZ_combined_3/26/2020SUPPLEMENT-EZ COVER PAGE FORMSLOADED (PROJECT INFORMATION 1 'Project Name Project Area ac Lewisville Middle School 2 66.21 3 Coastal Wetland Area (ac) 0 4 Surface Water Area ac 1.P8 5 Is this project High or Low Density? Hi h 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 'Width of vegetated setbacks provided (feet) 30 -B 'Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1 0034 c-d) out of the setback? Yes 10 Is streambank stabilization proposed on this project? Yes NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 0 1 12 Bioretention Cell 13 'Wet Pond 14 ;Stormwater Wetland 1 15 (Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 LevBl $ ender -Filter Strip (IS-FS 0 20 Disconnected Impervious Surface (DIS 0 21 Treatment Swale 0 22 Dry Pond 0 23 :Storm Fi (ter 0 24 ;Silva Cell 0 25 lBayfilter 0 26 Filterra 0 FEMMS LQADED DESIGNER CERTIFICATION 27 Name and Title: Kenneth Lorin - Principal 28 ar anization: CLH Desi n PA 29 .Street address: 400 Regency Forest Drive. Smle 120 30 City, State, Zip: Cary, INC 31 (Phone numbers : 919-319-6716 32 Email; 27518 canillaalron slalienlcilt, I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief. true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. SCAB. 23953 Seal hd ure of Designer��� s -ZIj,,- 14M o Date DRAINAGE AREAS 1 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINA FORMATION Entire Site 1 2 4 Type of SCM N/A WET POND WETLAND 5 Total BUA in project (sq ft 382098 sf 349119 sf 32979 sf 6permitting) New BUA on subdivided lots (subject to s ft N/A N/A N/A 7permitting) New BUA outside of subdivided lots (subject to sf 351208 sf 325955 sf 32679 sf 8 Offsite - total area (sq ft 0 19602 sf 0 9 Offsite BUA (sq ft 0 0 0 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft 105490 sf 105490 sf 0 Sidewalk (sq ft 25206 sf 23189 sf 2017 sf Roof (sq ft 58398 sf 58564 sf 0 Roadway s ft 121582 sf 93234 sf 28348 sf Future (sq ft 11326 sf 8712 sf 2614 sf Other, please specify in the comment box below (sq ft 29206 sf 36766 sf -300 sf 11 New infiltrating permeable pavement on subdivided lots (sq ft 0 0 0 12 New infiltrating permeable pavement outside of subdivided lots (sq ft 0 0 0 13permitting) Exisitng BUA that will remain (not subject to s ft 30890 sf 23164 sf 300 sf 14 Existing BUA that is already permitted (sq ft 0 0 0 15 Existing BUA that will be removed (sq ft 0 0 0 16 Percent BUA 14% 43% 37% 17 Design storm inches N/A 1 in 1 in 18 Design volume of SCM cu ft N/A 29521 cf 2822 cf 19 Calculation method for design volume N/A SIMPLE SIMPLE ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): "Other" BUA includes gravel fire lane and 'rock dust' track STORMWATER WETLAND 1 Drainage area number 2 Design volume of SCM (cu ft) GENERAL MDC FROM 02H .1050 2 I 2822 cf 3 Is the SCM sized to treat the SW from all surfaces at build -out? Is the SCM located away from contaminated soils? Yes 4 Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Is there an overflow or bypass for inflow volume in excess of the design volume? No 7 Yes Yes Drawdown Orifice 8 9 What is the method for dewatering the SCM for maintenance?\ 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? No 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes ISTORMWATER WETLAND MDC FROM 02H .1054 18 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes 19 Are berms or baffles provided to improve the flow path? Yes 20 1 Does the orifice drawdown from below the top surface of the permanent pool? Yes 21 Does the wetland minimize impacts to the receiving channel from the 1-yr, 24-hr storm? Yes 22 Is a trash rack or other device provided to protect the outlet system? Yes Elevations 23 24 25 26 27 28 29 Elevation, peak attenuation above temporary pool (if applicable) (fmsl) Elevation, temporary pool (top of the temporary inundation zone) (fmsl) 813.00 Elevation, permanent pool (top of the shallow water zone) (fmsl) 812.00 Elevation, bottom of shallow water zone (fmsl) 811.50 Elevation, bottom of forebay deep pool at deepest point (at forebay entrance) (fmsl) 810.00 810.50 Elevation, bottom of forebay deep pool at shallowest point (at forebay exit) (fmsl) Elevation, bottom of non-forebay deep pool at deepest point (fmsl) 810.00 Plantina Zones 30 Area, total surface area of the SW wetland at temporary pool elev. (sq ft) 4,670.00 31 Area, temporary inundation zone at temporary pool elev. (sq ft) 1,710.00 32 Area, shallow water zone at temporary pool elev. (sq ft) 1,690.00 33 Area, forebay at temporary ool elev. (sq ft 680.00 34 Area, non-forebay deep pool at temporary ool elev . s ft 590.00 35 Percent area provided, temporary inundation zone should be 30-45% 37% 36 Percent area provided, shallow water zone should be 35-45% 36% 37 1 Percent area area forebay) (should be 10-15%) non-forebay) (shouldl be 5-15% 15% 13% 5:04 PM 3/23/2020 STORMWATER WETLAND I Depths and Outlet 39 40 Peak attenuation depth above temporary inundation zone (inches) Temporary inundation zone depth (temporary pool to permanent pool) (inches) Shallow water zone depth (permanent pool to bottom of wetland inches 11 in 12 in 41 6 in 42 Depth, forebay at entrance (permanent pool to bottom of forebay entrance) inches Depth, forebay at exit(permanent pool to bottom of forebay exit inches 30 in 43 24 in 44 1 Depth, non-forebay deep pools(permanent pool to deep pool bottom inches 24 in 45 If there is an orifice, diameter inches 1 in 46 If there is a weir, weir height inches 12 in 47 If there is a weir, weir length inches 12 in 48 Drawdown time for the temporary pool (days) 2.2 ill and Plants 49 Soil amendment depth (inches) 50 Has a soil amendment specification been provided? 51 Hasa landscaping plan that meets SW Wetland MDC (12) been provided? 52 1 Number of plants per 200 square feet (#) in the shallow water zone: Does the temporary inundation zone planting comply with SW Wetland MC 53 (14)? Are the dam structure and temporary fill slopes planted in non -clumping 54 turfgrass? 55 Will cattails be planted in the wetland? DDITIONAL INFORMATION Please use this space to provide any additional information about the 56 stormwater wetland(s): Wetland 2 5:04 PM 3/23/2020 WET POND Drainage area number volume of SCM (cu ft) H_.. GERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? 1Design 29521 cf Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? What is the method for dewatering the SCM for maintenance? Yes 9 Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Is there an O&M Agreement that complies with General MDC (11)? No 14 Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? 16 Does the SCM follow the device specific MDC? 17 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H .1053 18 Method used HRT 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 822.50 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 823.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 826.00 23 Elevation of the permanent pool (fmsl) 826.50 24 Elevation of the top of the vegetated shelf (fmsl) 827.00 25 Elevation of the temporary pool (fmsl) 828.50 26 Surface area of the main permanent pool (square feet) 30040:1 27 Volume of the main permanent pool (cubic feet) 87015 cf 28 Average depth of the main pool (feet) 3.13 ft 29 Average depth equation used Equation 3 30 If using equation 3, main pool perimeter (feet) 796.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 ft 32 Volume of the forebay (cubic feet) 14313 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 54 in 35 Design volume of SCM (cu ft) 29521 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) If weir, weir height (inches) If weir, weir length (inches) Drawdown time for the temporary pool (days) Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Are berms or baffles provided to improve the flow path? 3 in 38 N/A 39 N/A 40 3.8 41 Yes et No 5:04 PM 3/23/2020 WET POND 43 Depth of forebay at entrance (inches) 54 in 44 Depth of forebay at exit (inches) 48 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 10:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) Is a trash rack or other device provided to protect the outlet system? No 51 Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment No Mow Seed Mix 541 Has a planting plan been provided for the vegetated shelf? Yes INFORMATION Please use this space to provide any additional information about the wet pond(s): ADDITIONAL 55 Wet Pond 2 5:04 PM 3/23/2020