Loading...
HomeMy WebLinkAboutSW6191102_conveyance swale soil infiltration-REV1-S_3/24/2020OBJECTIVE: SOLUTIONS: CONVEYANCE SWALES RETENTION INFILTRATION TIME McPhail Meadows Verify that swales below grade at discharge point will drain within 72 hours Soils infiltration testing (Ksat) and infiltration calculations TIME TO DRAIN: I Swale(s) I Depth of Swale at Discharge (in) 2,,4,,5 2 113 6 6,7 7.8 8 9 18 Ksat I Time to Drain (hrs) I Meets Requirements? 1.05 1.90 yes 0.20 3.14 0.26 0.62 30-00 2.48 69.23 29.03 yes yes yes yes