Loading...
HomeMy WebLinkAboutSW6200104_Capital 3+73_2/4/2020Culvert Report Hydraflow Express Extension for Autodesk0 Civil 3DO by Autodesk, Inc. Thursday, Dec 19 2019 CAPITAL 3+73 X PIPE Invert Elev Dn (ft) = 352.00 Calculations Pipe Length (ft) = 55.40 Qmin (cfs) = 19.90 Slope (%) = 8.66 Qmax (cfs) = 19.90 Invert Elev Up (ft) = 356.80 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 30.0 Shape = Circular Highlighted Span (in) = 30.0 Qtotal (cfs) = 19.90 No. Barrels = 1 Qpipe (cfs) = 19.90 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 4.71 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 6.41 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 354.01 HGL Up (ft) = 358.31 Embankment Hw Elev (ft) = 359.00 Top Elevation (ft) = 360.29 Hw/D (ft) = 0.88 Top Width (ft) = 32.00 Flow Regime = Inlet Control Crest Width (ft) = 200.00 eer (t) 361.00 -W.00 30M 368M 367M 3%M 355-00 354.00 353.00 352.00 351.00 0 CAPITAL 3+T3X PIPE 5 10 15 2� 2E a� 35 40 45 5� 55 a� 65 Circular Culvert HGL Embank Hw Depth (t) 420 320 2.20 120 020 -0. so -2.80 -3.80 -4.80 -5.80 75 80 Reach (R)