Loading...
HomeMy WebLinkAboutSW3191202_2019_11_21 Northgate Site Documents_1/2/2020� U m N n A 0 �f'o 0 DLEY FARM RD ,Qo9 o �I 1 L3 U ROAN �cjs1ST� DESIGN Old Wilkesboro Road (SR 1645) and Bradley Farm Road (SR 1541) --' Statesville, NC 28625 VICINITY MAP a GENERAL NOTES: 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE LATEST EDITION OF THE STATESVILLE LAND DEVELOPMENT STANDARDS MANUAL AND THE LATEST EDITION OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES UNLESS OTHERWISE SPECIFIED IN THE STATESVILLE LAND DEVELOPMENT STANDARDS MANUAL. 2. ALL PUBLIC STREETS WITHIN THE DEVELOPMENT WILL BE CONSTRUCTED TO THE CITY OF STATESVILLE STANDARDS IN ORDER TO BE DEDICATED PUBLIC RIGHT OF WAYS. 3. ALL CURBS SHALL HAVE A 5'-0" RADIUS AT THE FACE OF CURB UNLESS OTHERWISE NOTED. ALL R/W SHALL HAVE A 20' RADIUS UNLESS OTHERWISE NOTED. 4. LAND DEVELOPMENT ENGINEER SHALL BE GIVEN 48 HOURS NOTICE PRIOR TO CONSTRUCTION. 5. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. FURTHER REQUIREMENTS MAY BE MADE BY THE NC DEPARTMENT OF TRANSPORTATION (NCDOT). 6. NON-STANDARD ITEMS (I.E.: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT OF WAY REQUIRE ENCROACHMENT AGREEMENT WITH THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY AND ALL ENCROACHMENT AGREEMENTS. 7. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3600 P.S.I. AT 28 DAYS AND SHALL COMPLY WITH SECTION 1000 OF THE NCDOT STANDARD SPECIFICATIONS. SIDEWALKS SHALL BE CONSTRUCTED OF NOT LESS THAN 3600 PSI CONCRETE AND SHALL BE FOUR (4) INCHES THICK, CONSTRUCTED ON AN ADEQUATELY GRADED BASE, EXCEPT WHERE A SIDEWALK CROSSES A DRIVEWAY IT SHALL BE SIX (6) INCHES THICK. 8. ALL CONCRETE SHALL BE CURED WITH 100% RESIN BASE, WHITE PIGMENTED CURING COMPOUND WHICH MEETS A.S.T.M. SPECIFICATIONS C-309, TYPE 1, APPLIED AT ONE GALLON TO 400 SF WITHIN 24 HOURS OF PLACEMENT OF CONCRETE. 9. ALL CURB AND GUTTER SHALL BE BACKFILLED WITH SOIL APPROVED BY THE INSPECTOR 48 HOURS AFTER CONSTRUCTION TO PREVENT EROSION. 10. ALL BACKFILL SHALL BE NON -PLASTIC IN NATURE, FREE FROM ROOTS, VEGETATIVE MATTER, WASTE, CONSTRUCTION MATERIAL, OR OTHER OBJECTIONABLE MATERIAL. SAID MATERIAL SHALL BE CAPABLE OF BEING COMPACTED BY MECHANICAL MEANS AND THE MATERIAL SHALL HAVE NO TENDENCY TO FLOW OR BEHAVE IN A PLASTIC MANNER UNDER THE TAMPING BLOWS OR PROOF ROLLING. 11. ALL TRENCHES IN THE STREET RIGHT OF WAY SHALL BE BACKFILLED WITH SUITABLE MATERIAL IMMEDIATELY AFTER THE PIPE IS LAID. 12. ALL SUBGRADE FOR ROADS SHALL BE COMPACTED TO 100% OF THE MAXIMUM DENSITY OBTAINABLE WITH THE STANDARD PROCTER TEST. 13. ALL TESTS SHALL BE PERFORMED BY THE DEVELOPER AT NO COST TO THE CITY. 14. CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC AT ALL TIMES WHEN WORKING WITHIN EXISTING STREETS. THE CONTRACTOR SHALL PLACE AND MAINTAIN SIGNS, DANGER LIGHTS, BARRICADES, AND FURNISH WATCHMEN OR FLAGMEN TO DIRECT TRAFFIC IN ACCORDANCE WITH THE WORK AREA TRAFFIC CONTROL HANDBOOK (W.A.T.C.H.). 15. SUBGRADE FOR SIDEWALKS SHALL BE COMPACTED TO 95% OF THE MAXIMUM DENSITY OBTAINABLE WITH THE STANDARD PROCTER TEST. THE SURFACE OF THE SIDEWALK SHALL BE STEEL TROWEL AND LIGHT BROOM FINISHED AND CURED WITH AN ACCEPTABLE CURING COMPOUND. TOOLED JOINTS SHALL BE PROVIDED AT AN INTERVAL NOT LESS THAN FIVE (5) FEET AND EXPANSION JOINTS AT INTERVALS NOT MORE THAN 45 FEET. THE SIDEWALK SHALL HAVE A LATERAL SLOPE OF 1 /4" PER FOOT. 16. THE ELEVATION OF THE SIDEWALK SHALL BE RELATED TO THE ELEVATION OF THE CROWN OF THE ADJACENT ROADWAY. THE SIDEWALK SHALL BE NO LESS THAN SIX (6) INCHES OR MORE THAN 18 INCHES ABOVE THE ROADWAY CROWN, EXCEPT THAT THE CROSSWALK ELEVATIONS SHALL BE PROPERLY RELATED TO THE EXISTING OR PROPOSED ROADWAY CURB. 17. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND/OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR INTERSECTIONS. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR BASED ON FIELD CONDITIONS. 18. UTILITY INSTALLATIONS MAY ONLY CROSS BUFFER AREAS AT INTERIOR ANGLES MEASURED AT PROPERTY LINES WHICH ARE NOT LESS THAN 75 DEGREES AND, TO THE EXTENT POSSIBLE, PATHS CLEARED FOR SUCH UTILITY LINES SHALL BE REPLANTED WITH PLANT MATERIALS FROM THE ORDINANCES APPROVED PLANT LIST. 19. NO BUILDINGS, PARKING SPACES OR MANEUVERING AREAS MAY BE LOCATED WITHIN ANY BUFFER AREAS. 20. THE DEVELOPER SHALL MAKE A DILIGENT EFFORT TO PRESERVE AREAS OF REQUIRED BUFFERS WHERE SIGNIFICANT VEGETATION EXISTS. THESE AREAS SHALL REMAIN UNDISTURBED EXCEPT TO THE EXTENT NECESSARY TO ACCOMMODATE THE ABOVE ITEMS OF THIS SECTION. 21. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT-OF-WAY IF DEEMED NECESSARY BY THE INSPECTOR. 22. "AS -BUILT" DRAWINGS AND PLANS OF THE STORM DRAINAGE SYSTEM, INCLUDING DESIGNED DITCHES, MUST BE SUBMITTED PRIOR TO SUBDIVISION FINAL INSPECTION TO THE CITY ENGINEERING DEPARTMENT IN ACCORDANCE \ \ WITH THE COUNTY SUBDIVISION ORDINANCE. \ \ 23. CURB AND GUTTER ON THE PLANS MAY BE ADJUSTED BASED ON FIELD STAKING BY CITY ENGINEERING. \ ASSOCIATED STORM DRAINAGE MAY ALSO REQUIRE MODIFICATION BASED UPON FIELD CONDITIONS. 24. THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SIDE) IS TO PROVIDE STORM WATER CONVEYANCE AND ANY STRUCTURES AND/OR OBSTRUCTION TO STORM WATER FLOW IS PROHIBITED. EXIST. TREES \ \ 25. HIGH -DENSITY POLYETHYLENE (HOPE) STORM DRAINAGE PIPE INSTALLED WITHIN EXISTING OR PROPOSED PUBLIC \ TO REMAIN STREET RIGHT-OF-WAY MUST BE APPROVED BY THE CITY'S INSPECTOR PRIOR TO ANY BACKFILL BEING PLACED. \ BACKFILL MATERIAL MUST BE APPROVED BY THE CITY INSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE PUBLIC STREET RIGHT-OF-WAY. \ 26. ALL ROAD IMPROVEMENTS ON OLD WILKESBORO ROAD AND BRADLEY FARM ROAD ARE TO BE COORDINATED WITH NCDOT PRIOR TO CONSTRUCTION. ALL ROAD IMPROVEMENTS IN MARJORIE ROAD ARE TO BE COORDINATED WITH THE CITY OF STATEVILLE PRIOR TO CONSTRUCTION. \ \ /♦ ♦I 27. CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING FACILITIES WHICH \ \ ♦♦♦ CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED AT THE ♦♦♦ EXPENSE OF THE APPLICANT. \ /♦♦♦ 28. ALL DEVELOPMENT CREATING A TOTAL 20,000 SQUARE FEET OF IMPERVIOUS AREA SINCE SEPTEMBER 1978 WILL♦♦ REQUIRE STORM DRAINAGE DETENTION. \ /♦, ♦I 1♦ 0 O Q.P O'�p 6z \ \ \ N N \ ti rr 0 c w W z >a DC z OLD WILKESBORO ROAD (SR 1645) I U NO RECORDED ROAD R/W FOUND F O 60' R/W ILLUSTRATED w z NCDOT MAINTAINED I p SPEED LIMIT 45 MPH - - I - - - - zQ U KENHILL ROAD CITY MAINTAINED CONTACT INFORMATION ,0T► RESIDENCE HOUSING ASSOCIATES, LLC CONTACT: DAVID PRESSLY ADDRESS: 1109 DAVIE AVENUE STATESVILLE, NC 28677 PHONE: 704-872-1000 CIVIL ENGINEER & LANDSCAPE ARCHITECT: URBAN DESIGN PARTNERS CONTACT: BRIAN D. SMITH, PE ADDRESS: 1318-E6 CENTRAL AVENUE CHARLOTTE, NC 28205 OWNER: 704-334-3303 FAX:704-334-3305 ARCHITECT: NAMOUR WRIGHT CONTACT: TOM WRIGHT ADDRESS: 1815 S. TRYON STREET, SUITE A CHARLOTTE, NC 28203 PHONE: 704-332-5668 Sheet Index C-1.0 Cover Sheet C-1.1 Submittal Table C-2.0 Existing Conditions C-3.0 Overall Site Plan C-3.1 Site Plan A C-3.2 Site Plan B C-3.3 Accessibility Plan C-4.0 Overall Grading Plan C-4.1 Grading Plan A C-4.2 Grading Plan B C-5.0 Storm Drainage Plan C-5.1 SCM Plan & Details C-5.2 Storm Drainage Area Plan C-5.3 SCM Drainage Area Plan C-6.0 Overall Utility Plan C-7.0 Erosion Control Plan - Phase 1 C-7.1 Erosion Control Plan - Phase 2 C-8.0 Site Specifications & Details C-8.1 Site Specifications & Details C-8.2 Site Specifications & Details C-8.3 Erosion Control Details C-8.4 Erosion Control Details LS-1.0 Overall Landscape Plan LS-1.1 Landscape Plan A LS-1.2 Landscape Plan B LS-2.0 Landscape Details PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 11.21.19 i ti ; 00 N Z (D ^� L.L Q W w J .> (1� � _O W -- ��Q VJ � z C W N cis L oIr L0 z_0 as O Cz Cz W >' a� U m Cz 4-1 W L0 C-0 U) cn W Cz 0 (D O O �\ ) a� O� Uo z O a z 0 Ir O O U J w w a- rn LO O N U z O U) w J w w rn N T Project No: 19-039 Date: 04.02.19 Designed by: udp ML Drawn By: Sheet No: GRAPHIC SCALE 60 0 30 60 120 1 INCH = 60 FEET ■ GRADING & UTILITY 100% CD's TO TRC UTILITY COORDINATION REVISIONS UTILITY REVISIONS SHEET INDEX 04/02/2019: 04/15/2019: 11/13/2019: 11/21/2019: C-1.0 COVER SHEET O O C-1.1 SUBMITTAL TABLE O O O O C-2.0 EXISTING CONDITIONS O O U R B AN C-3.0 OVERALL SITE PLAN O O D E S I G N C-3.1 SITE PLAN A O O C-3.2 SITE PLAN B O O PARTNERS C-3.3 ACCESSIBILITY PLAN O O 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 partners. F 704.334.3305 C-4.0 OVERALL GRADING PLAN O O O u rbandesi gn partners. com C-4.1 GRADING PLAN A O O ncfirm no: P-0418 C-4.2 GRADING PLAN B O O O sc coa no: C-03044 C-5.0 STORM DRAINAGE PLAN O O O C-5.1 SCM PLAN & DETAILS O O C-5.2 STORM DRAINAGE AREA PLAN O O O C-5.3 SCM DRAINAGE AREA PLAN O O FOR C-6.0 OVERALL UTILITY PLAN O O O O C-7.0 EROSION CONTROL PLAN - PHASE 1 O O R E F E R E N C F C-7.1 EROSION CONTROL PLAN - PHASE 2 O O O C-8.0 SITE SPECIFICATIONS & DETAILS O O ONLY C-8.1 SITE SPECIFICATIONS & DETAILS O O C-8.2 SITE SPECIFICATIONS & DETAILS O O C-8.3 EROSION CONTROL DETAILS O O 11.21.19 C-8.4 EROSION CONTROL DETAILS O O --------------------------------------- --------------------------------------- LS-1.0 OVERALL LANDSCAPE PLAN O O LS-1.1 LANDSCAPE PLAN A O O i LS-1.2 LANDSCAPE PLAN B O O � UJ CO LS-2.0 LANDSCAPE DETAILS O O z U (D z Q w W J 0 W i M H O Q T ,/) T �/ J LO C0 00 N U � z U) a) Cu L LO oIr Z 70 U) Cu 0 oaf � IL a a� U cu —� -0 M cz u —U) cz 70 4� 0 � �o V / 0 0 z 0V" Z z z o pc)0 ow > 0 Ir w U C'3 OC Z J q J 0 ? LL > 0: 0: 0: W W W W Ir IL IL IL m Z) Z) Z) C) C) C) dir r r I-- In Cl) r N r Q : 0 r r z r N C7 Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: GENERAL NOTES: 1. CIRCLES ANNOTATE REVISED SHEETS ■ 4735-25-3462 ST. MARKS BAPTIST CHURCH 926-218 ZONED. R-70 (COS) OLD WILKESBORO ROAD (SR 1645) NO RECORDED ROAD R/W FOUND 60' R/W ILLUSTRATED NCDOT MAINTAINED SPEED LIMIT 45 MPH — — 4735-25-5115 BOBBY L. MORRISON 1074-275 ZONED: R-10 (COS) 4735-24-6018 JAMES K. RIDDICK & SAPHERIA RIDDICK 996-1303 ZONED: R-10 (COS) I N N ti T r Q C'o W W z > � Q� z � oa Y� U� O / W U J z z 4735-24— 7070 RICHARD L. HOLLAND 1822-1709 ZONED: R-10 (COS) o S5830'37'E 517.60' (T) 'D o � -7 lWC 8" PVC WATERLINE � IWC 8" PVC WATERLINE \ w — — — — — — — / — — — — — — / -- � —w-- —=-w —=w— �a--`=w=——w----w w— vim— �w----w--=mow= w----w----w \ WC 8' PVC WATERLINE \ — —� — — — — — — — — — — -- — ��1 ohe \ —ohe — —ohe — — l oh — �a —ate —ohe — y —ohe �t — =ohe — — — ohe —ohe — — —ohe — — —ohe CM —ohe — — —fie — —ohe — — — oh= _ > =ohe — — —ohe — _ ohe — — — ohe � o _ — —ohe — — —ohe cQ� �� --- 12" P > A 1PtT / / ELEIB ON� 915.91 ■ �� 3 O 2 %, — I OP�1s1��Q �$1j ! / / /� / �■ I 25' SETBACK FPO �. ,� Q� �� ,ore v �— ----- / �� J5 F. � �--------I--- �------------------}-----------� � ■ � O�p� ��-P���"'� i , , / / / / 6� o� 06ZAGO �/ �� w ��00 �� C5 / Psi ���' Ski r / / I ■ o �ar� �, �� / 2�� / // f / 4735-15-8317 e / ■ / NORA WOODS DANIELS 759-161 ZONED: R-10 (COS) I / � �°tee �� � � � �\ � �� // / / /� I � � / � // � I �■ / �� � I ore/ / / \ \ / / / / / // I \ \ / > ///I LQ��\ ■/ °' I Q Lu p �,� � / ■ / I O z ��E ��g� /A / // / // � � �� \ / ■ / a � W ����� �� 0 A / / O \ / / ■ 4735-24-6828 Q z BEFORE YOU DIG! CALL 811 OR 1-800-632-4949 N.C. ONE —CALL CENTER IT'S THE LAWI EXISTING CONDITIONS NOTES: EXISTING INFORMATION ON THIS PLAN WAS PROVIDED BY: KESTLER SURVEYING, INC 2351 SIMONTON ROAD STATESVILLE, NC 28625 (704) 872-0212 / / I ■ JAMES T. STAPLES Z Q ■ 1109-730 D 1 O \ / / / V I V� ■ > ZONED: R— IOM (COS) r V / / / / / YI ■ P.B. 1, PG. 141 0 CLkz °) o� � I 4735-24-2817 JAMES P. GRAY HEIRS I / / I N ■ / I ZONED:B R- 5MF cu — — — — — — — I o j \ / / / o I ■ o� I I KEN HILL ROAD / / ■ I CITY MAINTAINED \/ I I I I ■ / — A / �� ■ �� S6172'42°E 151.91' (T)_ —� Sy MAN HOLE RIM 0 INVERT N ELEVATION ELEVATION 893.71 884.51 _ � �A I � I I I I � I � � � ■ � � INVERT OUT ELEVATION = 884.51 �--ss--i--ss--i--ss�r COS 8" VC SANITARY SEWER w — — —COS 6" DIP WATER MAIN— �� \ / LLJ I ■� S61.22'42"E 149.61' (T) BARN / LLJ old �■� z — �� �� _ _ / / II I;Q -- --- —� N�I � � /I I / I � I Novi 0 \ — --� aI zI 45-24-5077 924 IREDELL PROPERTIES INC. oV ro \ / / D 10-216 zopeR1 s)E PG. 14 � � I �4735-14-9633 n o' I I / / ■ Oo\ JOY M. CHAPMAN \� 3 805-548 ZONED: R-10 (COS) CP i000♦♦ ���� CQ C) O /♦♦�� A SOIL DRIVE �� �/ ♦♦ ♦�♦♦♦ — -906- 7 �� \ �� PGA �� ♦♦♦ 0001 \ \ \ 4735-24-5077 Gn /♦ IREDELL PROPERTIES INC. / ♦ 1010-216 \ \ \ � ♦♦♦♦ ZONED: R— lOM (COS) ♦♦ P.B. 1, PG. 141 \\II III � I � ♦♦ ) U R B A N DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 FOR REFERENCE ONLY 11.21.19 i C,9 U) W Lu 00 N z ^L L.L > Q LU LU J .> c� _O W -- ��Q VJ N z � U) a� Cu U) L T LO oIr z 70 70 Cu O Cz ti a a� U 0 70 u ._ 7 LO U) U U) z Cz O O .— 4-1 o � . `/) X W 70 z O a z 0 Ir O O U J Ir W W U) z O U) W J Ir W W 0 0 0 rn rn rn r r r Ln Cl) r r r CV � r r O r r CV (`) Project No: 19-039 Date: 04.02.19 Designed by: udp ML Drawn By: Sheet No: °�<<�:\ate GRAPHIC SCALE �s'Q: 40 0 20 40 80 �,�� 1 INCH = 40 FEET C-200 W / — — ohe — — ^ham — ohe — — j ohe ob — — — "PPS-�' 4 FP�p�°��5������ QjQ` pQ'�p QJQ0 / EXIST. TREES TO REMAIN m \ \ EXIST. TREES \ \� TO REMAIN �� N� a oQ 4735-14-9633 CDJOY M. CHAPMAN \ 805-548 c� ZONED: R-10 (COS) � N J J � o \v� BEFORE YOU DIG1 CALL 811 OR 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAWI 4735-25-3462 ST. MARKS BAPTIST CHURCH I 4735-25-5175 926-218 BOBBY L. MORRISON ZONED: R-70 (COS) 1074-275 ZONED: R-10 (COS) OLD WILKESBORO ROAD (SR 1645) NO RECORDED ROAD R/W FOUND 60' R/W ILLUSTRATED NCDOT MAINTAINED SPEED LIMIT 45 MPH - - - - S58 30'37'E 517.60' (T) 4735-24-6018 JAMES K. RIDDICK & SAPHERIA RIDDICK 996-1303 ZONED: R-10 (COS) I N N ti 10�0 U W UJ Z > � Z I oa Y� U� O W Z J 0 Z Q UA9� j 5j 4735-24-7070 RICHARD L. HOLLAND 7822-1709 ZONED: R-10 (COS) I El RIGHT-OF-WAY - ■ 2' SIDEWALK EASEMENT — — — — - z� 8' MIN. STREETYARD F -1 F - - 25' SETBACK 91 L -1 L - -------- [pr----------------- ------- -- ---- - - ---- -- a = o- I ■ , �• : I: • e• 'j O j • p I I I ■ : I I PROP. BUILDING ° II I ■ ±31.100 SIF I I : I: I: ■ ■ ■ I6tj - - 25' LZ I ■ I MOUNTING HEIGHT cc)PROP. ■ HT V I I POLE, TYP. JAMES T. STAPLES Lu ■ I 1109-730 ZONED: R-lOM (COS) 20' STORMWATER CONTROL MEASURE � v I P.B. 1, PG. 141 EASEMENT al ■ ® LuI ■ a PROP. 12' I N ■ ° MOUNTING HEIGHT LIGHT POLE TYP ■ I ■ ^ ■ (*1 DEVELOPMENT SUMMARY TAX PARCEL ID #: 4735-24-2817 TOTAL SITE AREA: 7.53 AC EXISTING ZONING: R-5MF CU* *CONDITION: THE SCHEMATIC PLAN PRESENTED SHALL BE USED AS A BASE FOR THE FINAL PLANS WHICH ARE TO BE SUBMITTED FOR REVIEW BY THE PLANNING BOARD AND APPROVAL BY THE CITY COUNCIL. ZONING #: ZC14-02 PROPOSED USE: SENIOR APARTMENTS UNITS: 80 FLOOR AREA RATIO: 0.11 SETBACKS: FRONT: 25' SIDE: 5' REAR: 25' MAX. BUILDING HEIGHT: 35' VEHICULAR PARKING: REQUIRED: 80 (PER ZONING: 1 SPACE PER UNIT) 112 (PER NCHFA) PROPOSED: 112 HANDICAP PARKING: REQUIRED: 11 SPACES (1 IN 6 SPACES TO BE VAN ACCESSIBLE) PROPOSED: 11 SPACES (2 VAN ACCESSIBLE) PROJECT SCHEDULE: PROJECT COMMENCEMENT: SEPTEMBER 2019 PROJECT COMPLETION: DECEMBER 2020 MAIUHLINESHEETC-3�.1 ICN MATCHLINE SHEET C-3.2 I■ �I ■ KEN HILL ROAD ■ PROP. GAZEBO CITY MAINTAINED � I ■ I I ■ (REF. ARCH.) ■ J I ■ ° ° a ° I ■ S6172'42"E 151.91 ' (T) .e I■ ■ PROP. 25' I : MOUNTING HEIGHT ■ — SHOEBOX LIGHT U) - — POLE, TYP. I ■� ■J a9 ■ uJ ■� W S61°22'42'E 149.61' (T) U) LLJ of I�-u;3- -- ■" PROP. 12' MOUNTING HEIGHT LIGHT POLE, TYP. I� 4735-24-5077 �1 ■ IREDELL PROPERTIES INC. a ■ / 1010-216 ■ ZONED: R-10M (COS) — ■ P.B. 1, PG. 141 TREE PROTECTION ■ FENCE, TYP. PROP. SCM I I ■ (REFER TO DETAIL) (REF. C-5.1) I ■ ■ \ EXIST. TREES ■ \ TO REMAIN � � ♦s / G ♦#5 �O00 / ♦♦ 4735-24-5077 \ \ /♦♦ IREDELL PROPERTIES INC. \ // /♦♦♦ 1010-276 \ / / ♦♦♦ ZONED: R— lOM (COS) / ♦♦ P.B. 1, PG. 141 \ / ♦♦♦♦♦ \ V ♦♦♦ i 01 NOTES: 1. BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY: U R B A N DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 i W N KESTLER SURVEYING, INC. 2351 SIMONTON ROAD STATESVILLE, INC 28625 (704) 872-0212 2. SEE ARCHITECTURAL PLANS FOR BUILDING FOOTPRINT DIMENSIONS PREPARED BY: NARMOUR WRIGHT 1815 S. TRYON STREET, SUITE A CHARLOTTE, INC 28203 (704) 332-5668 3. CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING FACILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED AT THE EXPENSE OF THE APPLICANT. 4. ALL DEVELOPMENT CREATING A TOTAL 20,000 SQUARE FEET OF IMPERVIOUS AREA SINCE SEPTEMBER 1978 WILL REQUIRE STORM DRAINAGE DETENTION. 5. TREES WITHIN THE STREET RIGHT-OF-WAY ARE PROTECTED BY LAW. PERMIT REQUIRED FOR REMOVAL BY CITY OF STATESVILLE. ALL TREES OVER 8-INCHES IN DIAMETER (4.5-FT ABOVE GROUND) IN SETBACK AREA ARE PROTECTED BY LAW. PERMIT REQUIRED FOR REMOVAL BY CITY ENGINEERING. 6. TRASH SERVICE FOR THE SITE WILL BE CONTRACTED THROUGH A PRIVATE COLLECTION COMPANY. COORDINATION FOR SERVICE IS THE RESPONSIBILITY OF THE APPLICANT. 7. DIMENSIONS SHOWN ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. CURB RADII SHALL MEASURE 5' AT FACE OF CURB UNLESS OTHERWISE zz NOTED. 8. LOCATIONS OF SITE LIGHTING ARE APPROXIMATE. THE FINAL NUMBER AND w LOCATIONS OF LIGHTS SHALL BE DETERMINED BY THE OWNER AND DUKE ENERGY. 9. ALL UTILITIES WILL BE UNDERGROUND. m a 0 O Z Z O z z O z p C/) O Ir 0 w > Lu O O Lu z � p � J LL J a_ a_ a_ OJ OJ OJ r r r LO C0 r r r CV � r r O r r r CV C'7 11.21.19 W 00 N W Z QLu W J J o w 00 T U) L J CV C0 co N z N Cn (1) ci) L0 cn Cz mO Ir IL a CU C m — a_ � L0 C-0 +_J Ir a(n / U_0 n cz O I(= Cz O O ^� ) W � CU O0 O Project No: 19-039 Date: 04.02.19 Designed by: udp ML Drawn By: Sheet No: GRAPHIC SCALE 40 0 20 40 80 ONES ONES ONES 1 INCH = 40 FEET C-3mO %1=r1t%AI ^1100 2'-0" VALLEY CURB, TYP. 4735-25-3462 ST. MARKS BAPTIST CHURCH 926-218 ZONED: R-10 (COS) OLD WILKESBORO ROAD (SR 1645) NO RECORDED ROAD R/W FOUND 60' R/W ILLUSTRATED NCDOT MAINTAINED SPEED LIMIT 45 MPH 5' CONCRETE SIDEWALK (NCDOT 848.01) S58'30'37'E 517.60' (1) 4735-25-5115 BOBBY L. MORRISON 1074-275 ZONED: R-10 (COS) PROP. DIRECTIONAL RAMP (REF.NCDOT DETAIL) PPOP CIIRR TPANCITI0N_ 4735-24-6018 JAMES K. RIDDICK & SAPHERIA RIDDICK 996-1303 ZONED: R-70 (COS) APPROXIMATE MONUMENTATION SIGNAGE AREA(S) \ �7 45„ PROP. DIRECTIONAL RAMP (wr7 N(Y1()T f1FTAII ) U R B A N DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 o — I Ma c N° N° 1 _ 0t7�0° yf�Oo T 000° , i,: f00,0p0°°° .—, W Q 11.21.19 z Li Q I Y � U 0 U) U J z >I Lu 0000 z U) w z Ld U ���/ a_ Lu J � gu 1a52 28 / / 0 w cz o -�� r (n J I 40' R as IN W a L 100'R GHT m iT 4II I uJ rER s SURE Uvn L0 ll I I � I I IN �Ln �N QQ ICN CI ?' SIDEWALK EASEMENT 4735-24-6828 JAMES T. STAPLES 1109-730 ZONED: R-10M (COS) P.B. 1, PG. 747 SEE SHEET C-3.0 FOR SITE PLAN NOTES MATCHLINE SEE SHEET C-3.2 BEFORE YOU DIG! CALL 811 OR 1-800-632-4949 N.C. ONE —CALL CENTER IT'S THE LAW! ML GRAPHIC SCALE 30 0 15 30 60 N U � z C oIr L z_0 as O Cz Cz IL W a O U � m Cz U) Cf) /� W _0 Cz Cz 0 o O ^ a_O W u) O V J O z O U z z O z Fn U) O_ 0 W m > w O U C3 OC z z J aa J O?oC? w w w w m m m m � o 0 0 rn rn rn LLI r r r Q r r N O r r z r N C7 Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: C-3ml INCH = 30 FEET EXIST. TREE TO REMAIN ` 47. JOY ZONE c^ \N � O J ' J a Q ncwn 1 utn i 18. 24.0' 18.0' POLE, TYP. Q - - r, MATCHLINE SEE SHEET C-3.1 5 10'R O O 3'R 0 I 22 RIfFi 0 DIRECTIONAL o o 3 R 4'R 23'R 2'-0" { CURB RAMP VALLEY 24.0' ' I II I CURB, TYP. PROP. GAZEBO I � 4 R O SEATING ; (REF. ARCH.) lf AREA (TYP.) 22 R I I � 6 24 0' I S61 °22'42 "E 151.91 ' (T) <a . 95R I DIREC ONAL •� CURBTIRAMP O 5 O PROP. 25' MOUNTING HEIGHT PIANO -STYLE SHOEBox LIGHT — — CROSSWALK POLE, TYP. of 2'-0" CURB & GUTTER, 10' R / ' '• o� TYP. I—561'22'42'E 149.61' (T) 74'R 50,R 0 24.0' / I I \-E Q9 b © 0 2'-0" VALLEY °0 20'R CURB, TYP. / 3'R 10'R 10'R � 60.5' R 3' R 10 I HEAVY DUTY o o \, CONCRETE N PROP. 12' MOUNTING HEIGHT N I 83.5' \ LIGHT POLE, TYP. z_— \ \ \ DUMPSTER 20'R 10 4'R 4'R / ---- ____-- \\ W/ENCLOSURE O I \Fm/ \ J J I I 4735-24-5077 ACCESSIBLE PARKING \ AND SIGNAGE / I REDELL1010 2 PROPERTIES INC. `t ZONED: R-10M (COS) \ \\zl. / 2'-0" VALLEY I ^ I P.B. 1, PG. 141 \ A \ / / CURB, TYP. DIRECTIONAL CURB RAMP 8' CURB -CUT FLUSH WITH 5-14-9633 \ \� 1 HEAVY DUTY CONCRETE TREE PROTECTION �+ I 4. CHAPMAN \ AND SIDEWALK FENCE, TYP. / / PROP. SCM 05-548 \ \ (REFER TO DETAIL) (REF. C-5.1) R-70 (COS) \ EXIST. TREES / \ TO REMAIN \ 101* \ / EXIST. TREE LINE / / OFFER / / / / / , ��tl 3�12° / / / \ / 4735-24-5077 \ / IREDELL PROPERTIES INC. 1010-216 \ / / ZONED: R-10M (COS) P.B. 1, PG. 141 / 101* � / 101* �a306 aCD 0 BEFORE YOU 1117'1IGI CALL 811 OR 1-800-632-4949 Project No: 19-039 N.C. ONE -CALL CENTER IT'S THE LAW! Date: 04.02.19 Designed by: udp ML Drawn By: Sheet No: GRAPHIC SCALE 30 0 15 30 60 1 INCH = 30 FEET C-302 U R B A N DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 SEE SHEET C-3.0 FOR SITE PLAN NOTES 11.21.19 i ti Q0 >> U) LU 00 N Z ^L L.L ; Q LU LU J .> cz_O 00 LU -- ��Q VJ N U � z C C� oIr L0 z_0 as O Cz Cz IL W a U � m W0 � C-0 U) M W Cf) W Cz Cz 0 O a_ O -0 U) �o z OU) Z z O z 0Lno o w U) o Lu � z z J aa J D U) D 0 >IrIrIr Lu Lu Lu Lu �000 m>>> 0)0)0) Wr r r L2 r2 r Q r r N O r r z r N C7 J ohe —ce,'—^h<— —— —ohe —— johe-- "----"he ----ohe— 1000, / EXIST. TREES TO REMAIN m \ \ EXIST. TREES TO REMAIN N10 4735-14-9633 \ JOY M. CHAPMAN \ 805-548 ZONED: R-10 (COS) N J J � 0 \ \ 4735-25-3462 ST. MARKS BAPTIST CHURCH 926-218 ZONED: R-10 (COS) 4735-25-5115 BOBBY L. MORRISON 1074-275 ZONED: R-10 (COS) OLD WILKESBORO ROAD (SR 1645) NO RECORDED ROAD R/W FOUND 60' R/W ILLUSTRATED NCDOT MAINTAINED SPEED LIMIT 45 MPH — — — — S58'30'37'E 517.60' (T) 4735-24-6018 JAMES K. RIDDICK & SAPHERIA RIDDICK 996-7,303 ZONED: R-10 (COS) I I N N ti T QY 0 U W W z > � Q� Z I oa U� O Co U J Z 0 Z Q UQg� j Sj 4735-24-7070 RICHARD L. HOLLAND 1822-1709 ZONED: R-70 (COS) I p STREETYARD F ] ■ 2' SIDEWALK EASEMENT ■ I ■ 8' MIN. 25' SETBACK A L-� L-� 1 ■ ■ --------o;----------------- ------- -- � � ♦ II I: �3 � 1 I PROP. BUILDING �� 1 ±31.100 SIFLl , I ■ ♦ � I I: x ♦ ■ ..�...� :: ���� � �� � � Imo■ i ::::l I I ca V I I ■ JAMES T. STAPLES ■ 1109-730 ZONED: R-10M (COS) ® ' I ■ P.B. 1, PG. 147 1 ♦ cn : Ln I lot 1cn low S61'22'42"E 151.91' (T) 1 In- 1 I■ 1 _ I■ 1 ■ 1 I no ■J - - - - - -1 J U) I ■U Q S61'22"42""E 149.61' (T) �I ■� Lu 01 I25u);nn ■ .'.7.,. I■ J J 4735— 7 / I ■ REDELL PROPERTIES INC. ■ 1010-216 ■ ZONED: R-10M (COS) ■ P.B. 1, PG. 147 I ■ G I on �\ I on ■ \ EXIST. TREES ■ \ TO REMAIN ♦s 000 000l 000 / ♦♦ 4735-24-5077 \ \ / ��♦ IREDELL PROPERTIES INC. /♦♦♦ 1010-216 ♦�� ZONED: R—lOM (COS) P.B. 1, PG. 141 oo'! • i l �\ 01 ACCESSIBILITY LEGEND I KEN HILL ROAD CITY MAINTAINED ACCESSIBLE ROUTE LINE 2% MAX CROSS SLOPE, 5% MAX LONGITUDINAL SLOPE 2% MAX SLOPE AREA IN ALL DIRECTIONS ACCESSIBLE RAMP 2% MAX CROSS SLOPE, 8.33% MAX LONG. SLOPE U R B A N DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 CARO` °°\ 0 o°Oo°o°o°OO 0 �0° °IDS °° °'�� o fj1983_ W4 11.21.19 i U) L a_ . \ /� ti W 00 N ; Z Q W LJJ J W Cn O T VJ Ln CV CIO N z � CIO oIr Z _0 C� O IL a a� U c� m a C-0 T' ■ ■ V) —0 Cz O ■/ 0 cc O_ -0 W O U) 0 0 z o Z V) Z 0 Z p 0 O U) w m O U w Z U J C'3 z aa OC J U) > W oC W oC W oC W Ir W W W 000 LLI Q r L2 r r a2 r r r N O r r z r N C7 BEFORE YOU DIG! CALL 811 OR 1-800-632-4949 Project No: 19-039 N.C. ONE —CALL CENTER IT'S THE LAW! Date: 04.02.19 Designed by: udp ML Drawn By: Sheet No: GRAPHIC SCALE 40 0 20 40 80 1 INCH = 40 FEET C-3m3 4735-25-3462 ST. MARKS BAPTIST CHURCH I 4735-25-5175 926-218 BOBBY L. MORRISON ZONED: R-10 (COS) 75 ZONED. R-20 (COS) OLD WILKESBORO ROAD (SR 1645) 1 NO RECORDED ROAD R/W FOUND / 60' R/W ILLUSTRATED NCDOT MAINTAINED ' SPEED LIMIT 45 MPH — — r I N N ti � C] 4735-24-6018 0 Lu JAMES K. RIDDICK & LL l Z SAPHERIA RIDDICK 996-7,303 i ZONED: R-10 (COS) Fr Z oa Y75 U� O W z J 0 Z / Uag/ 4735-24-7070 RICHARD L. HOLLAND 1822-1709 ZONED: R-70 (COS) _■ ............ S58'30'37'E 517.60' (T) -W / / -- \ _ ohe-2� — —ohe--�—ohe-- johe-1-------•.-----� — hee- -- -- ---- - — SS SS SS SS - - - - - - - - - - - 932 925 — — : 2' SIDEWALK EASEMENT -(F� / �a1% .W W �i . 933 ' - w �w wl ; Q`\v QPOc_C� / j ice' / •' 920 25' 5FTBAC 917 L � o L �.CA �/oheCr ♦ / — — — P c / i --- Ra I ■ li I 'i '�p�6� oloe °�� �.�(R����O� TREE PROTECTION ■ 5 / �� i _ \ 1�. ��P FENCE, TYP. ,i O �■ REFER TO DETAIL • I I ■ CA � 5 jai ( ) � � ° � � / � •° I � ■ 3 00 ■ / / \ / PROP. BUILDING a, �, I ■ 9 \ / . ±31,100 SF i I / I ■� FIFE: 919.25 EXIST. TREES / \\ TO REMAIN O1 rn Co \ Cn \ \ EXIST. TREES TO REMAIN \ \ \ o \of NN (\ J J a O \ \ \ BEFORE YOU DIG! CALL 811 OR 1-800-632-4949 N.C. ONE —CALL CENTER IT'S THE LAW! POST CONSTRUCTION SUMMARY TAX PARCEL NUMBERS: 4735-24-2817 DEVELOPMENT TYPE: RESIDENTIAL SITE AREA: 7.53 AC SCM DRAINAGE AREA: 4.93 AC EXISTING IMPERVIOUS: 8,706 SF EXISTING BUILT -UPON AREA: 3% PROPOSED IMPERVIOUS: BUILDING: 32,274 SF PARKING/SIDEWALK: 71,142 SF TOTAL IMPERVIOUS: 103,416 SF 2.37 AC PROPOSED BUILT -UPON -AREA: 32% DENSITY: HIGH DEVELOPMENT OR REDEVELOPMENT: DEVELOPMENT ■ I ( ■ t/ — I ° o 4 ■ �o� o N N I ■� Q Lu ' 6-6_61� 0) i . w� ■ 0_0 1 ■ 4735-24-6828 Z_ \ \ / U I E JAMES T. STAPLES Q 0) 917 7109-730 O ♦ \ Lu I ■ ZONED: R-10M (COS) 3 I� 1 5Z ■ P.B. 1, PG. 147 Q ■ rn ■ � � Q U °0 -- / — 01 ■ ■ _ 0) r MATCHLINE SHEET C-4.1 °) I MATCHLINE SHEET C-4.2 I I � --- •1 � o I �■ I LFF.,� ' �' ■ KEN HILL ROAD \ I ■ CITY MAINTAINED 1 ■ •'� 1^O ��'j II ■ / / S61'22'42"E 151.91' (T) I I g14 913 �o'i / :■ -r i--ss——--ss-— i-- f � \ ° / / I � � ■� uJ / S61'22'42"E 149.61' (T) 00 0— `�\� �� of �;jz � ! GRADING AND STORM DRAINAGE NOTES: D L rn I ~ ( 1. ON -SITE BURIAL PITS REQUIRE A PERMIT. NQ, °� / / I i� 2. ANY GRADING DONE BEYOND THE DENUDED LIMITS INDICATED ON THE CONSTRUCTION DOCUMENTS IS A VIOLATION AND IS SUBJECT TO A FINE. Ln I ■ N 3. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN I I� I ' IS A VIOLATION AND IS SUBJECT TO A FINE. I \ 0�1 •� 4. ALL FINAL CURB AND STREET GRADES AT INTERSECTIONS SHALL BE COORDINATED 4735-24-5077 WITH INSPECTOR. \ �+ ♦ ' / g11 ■ IREDELL PROPERTIES INC. • - - rn . ■ 1070-216 5. APPROVAL OF CONSTRUCTION DOCUMENTS IS NOT AN AUTHORIZATION TO GRADE ----- - � � - �� / � 1p ■ ZONED: R-10(COS) ■ P.B. 1, PG. 147 ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, \ \s - - �- / = \ \ rn ♦ o PERMISSION SHALL BE OBTAINED BY CONTRACTOR FROM THE AFFECTED PROPERTY \n``� c� J sr \ ♦♦ ■ OWNERS. DENUDED LIMITS / a\ ■ 4735-14-9633 \ T (5.85 ACRES) / ' I i 6. IN ORDER TO ENSURE PROPER DRAINAGE, CONTRACTOR SHALL MAINTAIN A MINIMUM JOY M. CHAPMAN \ �� I I I: OF 0.5% 805-548 SLOPE ON THE CURB. ZONED: R-10 (COS) _ gti� \ ■ IN 7. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT OF \ J TREE PROTECTION PROP. SCM WAY IF DEEMED NECESSARY BY THE INSPECTOR. � � ♦` \ \ FENCE, I REF: C-5.1 ® ■ 8. THE LOCAL ENGINEERING DEPARTMENT HAS NOT REVIEW AND DOES NOT ASSUME \ \ (REFER TODETAIL) I \ i90 gp� �p RESPONSIBILITY FOR THE STRUCTURAL STABILITY OF ANY EXISTING OR PROPOSED \ EXIST. TREES 91 g1� °� Og RETAINING WALLS ON THE SITE. \\ 9 TO REMAIN ; \ , .�♦s �� 9. NON-STANDARD ITEMS (I.E.: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT OF WAY REQUIRE A LOCAL OR STATE ENCROACHMENT AGREEMENT PRIOR TO \ \ w i :..�♦• \902' \ INSTALLATION. _ _ \ / �♦ \ 10. ALL SIDEWALKS, STOOPS, TERRACES AND OTHER PAVED AREAS SHALL SLOPE AWAY \ �fi \ \ \ � � • � FROM BUILDING(S) AT A MINIMUM OF 2%. _904— \ I / ♦ (� 11. CONTRACTOR SHALL CONTACT INSPECTOR 48 HOURS BEFORE CONSTRUCTION. ♦110��•�5�� \ 12. STABILIZE ALL SLOPES GREATER THAN 3:1 WITH JUTE MESH. \ \ \ I / ��P♦♦ - sos- - - - — 13. ALL ELEVATIONS ARE IN REFERENCE TO THE BENCHMARK WHICH MUST BE VERIFIED - - �G� 1� ®♦ 7 BY THE CONTRACTOR PRIOR TO STARTING CONSTRUCTION. P Tl 20 l♦00I 14. ALL CONTOURS AND SPOT ELEVATIONS REFLECT FINISHED GRADES. REFER TO \ PAVEMENT CROSS-SECTION DATA TO ESTABLISH CORRECT SUB -BASE, AGGREGATE \ �' <\ I \ \ \ / �' 25 ��5�1�i♦♦• BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. ♦♦♦♦� 15. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY WITH EXISTING CONTOURS. 4735-24-5077 1 / �♦ IREDELL PROPERTIES INC. 1010-216 \ \ I / y / �♦ ZONED: R—lOM (COS) / �♦ P.B. 1, PG. 141 \ 1 I♦♦ IF ANY DISCREPANCY IN ELEVATION, AS NOTED ON THE �♦♦♦ GRADING PLAN, OCCURS ON SITE DURING CONSTRUCTION THE / \\ \\� �/�\ :.��♦� — — — — — — — — _ GENERALARCHITOECTACTOR AND CIIVILTOENGIONEERCT THE LANDSCAPE IMMEDIATELY. l �\ ML GRAPHIC SCALE 40 0 20 40 80 ONES ONES ONES 1 INCH = 40 FEET U R B A N DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 SEAL 27890 �qN DII111���`\ 11.21.19 i U)� Lu 00 N z ^L L.L Q LU LU J .> (1� 0 00 _o Lu T �Q Cn N z � C N C%� L L0 oIr z Cn as O CIO L U �m Cz ■ � LO � 0 OC -cz W O 0 O_ (v O � ) W OO z O Z Z O Z p U) O 0 w > Lu 0 Lu � z Z J aa J U) 0 > OC Ir OC Lu Lu Lu Lu rn rn rn LLI r r r CO r QLn r r N 0 r r z r N C7 Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: C-400 U R B A N DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 N EAL ti T _ _ 27890 G jNI N Luz I N ` ''��/lllIIDII111��`\\ > � oC z Q 4735-25-3462 Y 11.21.19 ST. MARKS BAPTIST CHURCH 4735-24-6018 4735-25-5115 926-218 BOBBY L. MORRISON JAMES K. RIDDICK & (_� 4735-24-7070 ZONED: R-10 (COS) SAPHERIA RIDDICK 1074-996-1303 O ~ 0 RICHARD L. HOLLAND 1822-1709 ZONED: R-10 (COS) ZONED: R-70 (COS) W ZONED: R-10 (COS) z J �z I I 0 OLD WILKESBORO ROAD (SR 1645) NO RECORDED ROAD R/W FOUND - 60' R/W ILLUSTRATED U) NCDOT MAINTAINED / SPEED LIMIT 45 MPH / / S' 1q. % cz \ \ ............................................■■...■■.■.■■.■.■��............■.�..■■...■ ■...■....■.. Li N ] \\ ■■. S58°30'37"E 51760' (T) ■ ° \ \7 TBM: TOP H YD r � I \ N ■ \ ELEV.• 975.91 \ / - - - - - - - - - - - _ - - - - i / / _ ��.�... ■ F=--w---� - =w=---w-= _ w - w==Pwa�_ w-- w- = FG920.60 --- - ==w-===w_�--w-- - - -- - ------ -- �� ......... ' . ®� ..■ ■ _ she - -ohe - -ohe - - -ohe _ - "^ ohe - BC 920.13 BC 919.27 e -ohe - - e - - -ohe oTe - - - ohe - - - ohe - - ^"� -- ..�■.....� .. ............ ...... .........► FG919.75 a - a a ° a �F 0 BC 919.229.7 -qq- - SS - SS SS SS o SS TC 92 - S --� a G920.60 a a by9 TC919.72 F.........■....■■...■■...■■...■■...�■...�■... Q - - FG 919.75 - - - - ■ �6 2 BC 920.12 BC 920.00 BC 919.27 \ 2' SIpEWALK EASEMENT TC 920.62 TC 920.50 _ _ � ■ Q / 2/f 925 / _ TC 919.77 �oQ� ��o / �/ gI1 ��■■ 1 e 8' MIN w w w BC 919.50 w Bc 919.14 w w / ■ ■ OPOg�o / / ♦ / t� �.' / rc s2o.00 Tc 919.64 ,�� o / ■ `w �� 0- Q� / l // �� /i °/ .�� 920 25' SETBACK 917 - - / / ■ j -oh // Q. ' _ t 5 / \/ TBM: TOP H YD APO ��G QNr O� \"`Pn�C / / // 41 ohe \ / I FG s18.75 / FG s15.88owl ^ °' ■ ° ° BC 918.62 � ` ■ / � �'�PR / / ■ / I° °a� res1s.12 I as ° r ■ � ■ / S b / ■ so/ j .®C. / / TREE PROTECTION ii / ■ / // / // �a• G� / FENCE, TYP. • / P°° / ■ 8 E/ (REFER TO DETAIL) ■ / ' O � ■ }+ r �, ° / 0 / I ■ ■ / /" / 93s / �. / / / ■ / PROP. BUILDING � �I � � �, � i I ■ DENUDED LIMITS ■ 3 ±31,100 SF i�♦♦ / / / (5.85 ACRES) ■ / ■ ■ / ■ FIFE: 919.25 � �� ■ o� EXIT. TREES / \ 0) / TO REMAIN ■ / 3 � � \ 7) °a � / / ■ / \ ■ � FG 918.75 � � / � / \ BC 917.14 ■ / \ J �\ / ■ / Q FG 917.95 FG 917.95 BC 917.60 TC 917.64 I ■ / ■ \ / / / ■ / \ 918 a-c.o1 TC 918.10 Fcsns2 / � �� ■ / \ / • `n o FG °° N N BC 917.40 ° va a FG 917.62 TC 917.90 I / ■ BC 917.80 BC 917.60 BC 917.14 / a p� p / / ■ / PROP. 3:1 BC 917.40 \ TC 917.90 TC 918.30 TC 918.10 TC 917.64 ■ / �� /\ TC 917.90 \ FG / j� / / ■ F P o SLOPE 6 �� \ • / / BC 917.20 TC 917.44 a a' ■ /� � \ 5� 0�6 09 / , \ \ • / _� / TC 917.70 FG 917.30 BC 916.25 m II 4735-24-6828 ■ BC 917.45 JAMES T STAPLES i \ ♦ / / FG 917.10 917 FG 917.30 TC 917.95 BTC \ 917.85 TC 916.75 \ � \ 7109-730 8♦ I\� ZONED: R-10M (COS) ■ / \ ♦ C 917.70 FG 917.10 / . ■ BC 916.44 P.B. 1, PG. 141 ■ i ♦ ^ / I i \ ♦ TC 916.94 BC 916.35 BC 917.32 \ rn TC 917.32 h / ■ \ / \ ♦ TC 917.75 ° TC 916.85 \ I/ ■ i � ♦ FG 917.85 ° BC 917.10 � BC L 91630 ; I \ i BC917.40 °° TC917.60 TC91/ TC 916.60 TC 916.40 \ I ... ♦ TC 917.90 a FG 917.30 FG 916.95 BC 916.10 BC 915.90 / / ■ BC 916.40 0 • '♦ PROP. 3:1 ■ \ \ I I \ ♦♦ I 1 �j BC916.44 TC916.90 � I ' ■ 1 v TC916s4 aa/ �, / SLOPE \ - - - \ \ \ I \ \ e ♦ BC 918.70 BC 918.00 a ,rd 0' BC 91 6.42/ I ■ \ TC 919.20 TC 918.50 �J I FG 916.95 BC 915.70 TC 916.92 � ■ / 0 r ■ \ \ I \ ■ �0 -- - - - - - TC916.20 O BC 916.10 / O ■ 918.55 TC 916.60 s / \ \ I \ \ ♦ BC 919.05 BC 917.40 / FGFG 918.75 p / ■ \ \ ♦ BC 919.70 TC 917.90 BC 917.00 ( e ..li �p °' / / ■ \ X ♦. TC 920.20 - TC 917.50 FG 916.95 / BC 916.00\ \ \ 1` \ ♦♦ N BC 991144..9400917.940 BC915.491495BTCC 9170 1 n■ / ■■ 915.45 / ■ \ ♦ N �� BC 918.76917.25 I ,^�' ■ � \ \ \ °� TC919.26 °� a °Fcsn.85 TC917.75 FG916.47 FG915.55 / MATCHLINE SEE SHEET C-4.2 ■ o - - - - - - - - - - - \ \ r CC9L1� 1 O� BEFORE YOU DIG! CALL 811 OR 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAWI GRADING LEGEND: TOP OF CURB TC BOTTOM OF CURB BC TOP OF WALL TW BOTTOM OF WALL BW TOP OF STAIRS TS BOTTOM OF STAIRS BS BREAK POINT BP HIGH POINT HP LOW POINT LP YARD INLET YI EXISTING ELEVATION EX Z D Z Z O Z p U) O 0 w > O O Lu Z Q J J D (� 0 1J W W i 0- 0- � 0 0 3) rn rn r r r 0 Cl) r r r N � r r r N M Project No: 19-039 Date: 04.02.19 Designed by: udp ML Drawn By: Sheet No: GRAPHIC SCALE 30 0 15 30 60 1 INCH = 30 FEET C-401 ti ti Q0 Lu CO D N w Z QLu W J J_ > ow O T U) CV co CV z N N Cz C!) Lf7 Ir U) N ■■ - 906 -001* — ♦ 47,35-24-5077 \ \ \� \ \\ I ll // / / / / /♦•�♦ IREDELL 10R0 PERTIES INC1-216 \ / �•♦♦ ZONED: R-10M (COS) \ / /♦♦♦ P.B. 1, PG. 141 06 to i ♦�♦\� O ♦� 0 cn BEFORE YOU DIG1 CALL 811 OR 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAWI MATCHLINE SEE SHEET C-4.1 ■ S61 `22'42"E 151.97' (T) — S61`22'42"E 149.61' (T) _ )P. 3:1 IPE 4735-24-5077 IREDELL PROPERTIES INC. 1010-216 ZONED- R-10M (COS) P.B. 1, PG. 141 a GRADING LEGEND: TOP OF CURB TC BOTTOM OF CURB BC TOP OF WALL TW BOTTOM OF WALL BW TOP OF STAIRS TS BOTTOM OF STAIRS BS BREAK POINT BP HIGH POINT HP LOW POINT LP YARD INLET YI EXISTING ELEVATION EX U R B A N DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 SEAL = 27890 PII*�����`\ 11.21.19 i ti >, U) Lu Lu 00 N z � ^ L.L > Q LU LU J J .> O Lu F --- Q-- T �/ U) N U � z a� V ) o z / � V J as O Cz ILL. W U � OD m �Cz LO �C-0 Cv z Cz O O •— o Cza� � rIL� V O Z O a z 0 Iz O O U J Lu a_ rn r LO r O z O U) w C3 Z 0 Lu a_ rn r ri r r r CV U) z O w J Lu a_ rn r r CV r r (`) Project No: 19-039 Date: 04.02.19 Designed by: udp ML Drawn By: Sheet No: GRAPHIC SCALE 30 0 15 30 60 1 INCH = 30 FEET C-402 FP�p�0�v5���`��� Q`PO��G 90 01 'op 0 0) W /� rl / ore ohe -- j�e- / EXIST. TREES TO REMAIN l I \ \ \ rn � rn � EXIST. TREES \ TO REMAIN \� N 4735-25-3462 ST. MARKS BAPTIST CHURCH I 4735-25-5175 926-218 BOBBY L. MORRISON ZONED: R-70 (COS) 74 ZONED.-20 (COS) OLD WILKESBORO ROAD (SR 1645) Kin RECORDED ROAD R/W FOUND 60' R/W ILLUSTRATED NCDOT MAINTAINED SPEED LIMIT 45 MPH - - - 15" INV:918.80a _ 15" INV:917_50 18" RCP ' PROP. °j \ PROP. CB-6 CB-5 \\ / 18" RCP PROP. ,\ .9 / CB-3 / \ 18" RCP \ \ -s24 � - - \ a �`L PROP.- \ - PROP. --FES-2- \ CB-4 \� 4735-14-9633 C� � \ JOY M. CHAPMAN ` \� 805-548- - ZONED: R-10 (COS) \ EXIST. TREES \ \ TO REMAIN \ 4735-24-6018 JAMES K. RIDDICK & SAPHERIA RIDDICK 996-1303 ZONED: R-10 (COS) 4735-24-7070 RICHARD L. HOLLAND 7822-1709 ZONED: R-10 (COS) I I N N ti Q U w UJ Z > � Z I oa U� O W U J Z 0 Z U / / one - - - one - - - - one - = one - - - - one SS _ I SS ► SS ► SS ■ SIDEWALK 2' EASEMENT ■ / C' I : I N �, I ■ �10 rn / CA 0) o I / `" °' I ■ / ■ 4735-24-6828 L1 I I ■ < IF :M MAINT. ;ESS ESMT. JAMES T. STAPLES Lu ■ 1109-730 I I i ZONED: R-10M (COS) I / P.B. 1, PG. 141 ■ / I ■ / ■ C Ln I■ �I° i O � I 0� � mp. 3-12 N / / I■/ ■ I C �o& 'ROP. ■ ;B-11 ■// �O I 913 �o I■ ti ■ o ■J Ln I I ■U D - - - 0 LLJ o I■�- -1 rp VARIABLE WIDTH 0 0 I ■� / I I:Q SCM MAINTENANCE / ■� 0 & ACCESS ESMT. ■ ■ ■ LO III I Im : rn PROP. 'FES-0 4735-24-5077 IREDELL PROPERTIES INC. 0) ■ 1010-216 ■ ZONED: R-10M (COS) P.B. 1, PG. 141 os\ ■ I 18" RCP W/ ANTI -SEEP COLLARS PROP. I I ■ OCS-1 J ■ ■ ■ ■ ■ s \� ♦ CS-- 04-- - os - - ♦♦♦♦♦♦ \ I \ \ / /�♦ � 4735-24-5077 ♦♦♦♦ 01 IREDELL 1PRPER6TIES INC. \ \ I / / / ♦♦♦ ZONED: R-10M (COS) \ \ I / ♦♦♦ P.B. 1, PG. 141 000l BEFORE YOU DI431 l / CALL 811 OR 1-800-632-4949 N.C. ONE -CALL CENTER ITS THE LAWI o l � I STORM DRAINAGE PIPE TABLE UPSTREAM STRUCTURE DOWNSTREAM STRUCTURE SLOPE LENGTH SIZE & MATERIAL YI-15 CO-14 1.13% 48.8' 12" HDPE YI-9 CB-8 1.61 % 74.8' 15" RCP OCS-1 FES-0 1.00% 50.0' 18" RCP JB-7 CB-6 0.83% 59.9' 18" RCP CO-14 CB-13 1.07% 37.3' 12" HDPE CB-17 CB-16 1.11 % 58.7' 15" RCP CB-16 CB-12 1.52% 118.7' 15" RCP CB-13 CB-12 1.00% 190.9' 15" RCP CB-12 CB-11 1.67% 54.0' 15" RCP CB-11 CB-10 1.27% 63.0' 18" RCP CB-10 CB-3 1.16% 60.3' 18" RCP CB-8 JB-7 2.33% 60.1' 15" RCP CB-6 CB-5 1.16% 90.3' 18" RCP CB-5 CB-4 1.12% 102.8 18" RCP CB-4 CB-3 1.11 % 108.0' 18" RCP CB-3 FES-2 1.40% 35.7' 24" RCP DRIVEWAY IN DRIVEWAY OUT 1.507. 86.5' 15" RCP I KENHILL ROAD CITY MAINTAINED STORM DRAINAGE STRUCTURE TABLE STRUCTURE ID STRUCTURE DETAILS RIM: 911.56 INV IN: 907.50 (CB-4) CB-3 INV IN: 908.00 (CB-10) INV OUT: 906.50 (FES-2) RIM: 915.41 CB-4 INV IN: 908.80 (CB-5) INV OUT: 908.70 (CB-3) RIM: 918.58 INV IN: 910.05 (CB-6) CB-5 INV IN: 914.50 (ROOF-2) INV OUT: 909.95 (CB-4) RIM: 916.58 CB-6 INV IN: 911.20 (JB-7) INV OUT: 911.10 (CB-5) RIM: 916.30 INV IN: 913.30 (YI-9) CB-8 INV IN: 916.00 (ROOF-1) INV OUT: 913.20 (JB-7) RIM: 913.04 CB-10 INV IN: 908.80 (CB-11) INV OUT: 908.70 (CB-3) RIM: 914.34 CB-11 INV IN: 909.70 (CB-12) INV OUT: 909.60 (CB-10) RIM: 914.45 INV IN: 910.70 (CB-13) CB-12 INV IN: 910.70 (CB-16) INV OUT: 910.60 (CB-11) RIM: 918.64 CB-13 INV IN: 912.70 (CO-14) INV OUT: 912.60 (CB-12) RIM: 915.38 INV IN: 912.60 (CB-17) CB-16 INV IN: 912.60 (ROOF-3) INV OUT: 912.50 (CB-12) RIM: 915.94 CB-17 INV IN: 913.83 (ROOF-4) INV OUT: 913.25 (CB-16) RIM: 919.47 CO-14 INV IN: 913.20 (YI-15) INV OUT: 913.10 (CB-13) RIM: 903.79 FES-0 INV IN: 902.00 (OCS-1) RIM: 908.33 FES-2 INV IN: 906.00 (CB-3) RIM: 917.87 JB-7 INV IN: 911.80 (CB-8) INV OUT: 911.70 (CB-6) RIM: 910.00 OCS-1 INV OUT: 902.50 (FES-0) RIM: 916.37 YI-9 INV OUT: 914.50 (CB-8) RIM: 915.87 YI-15 INV OUT: 913.75 (CO-14) STORM DRAINAGE NOTES: 1. IN ORDER TO ENSURE PROPER DRAINAGE, CONTRACTOR SHALL MAINTAIN A MINIMUM OF 0.5% SLOPE ON THE CURB. 2. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT OF WAY IF DEEMED NECESSARY BY THE INSPECTOR. 3. NON-STANDARD ITEMS (I.E.: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT OF WAY REQUIRE A LOCAL OR STATE ENCROACHMENT AGREEMENT PRIOR TO INSTALLATION. 4. ALL SIDEWALKS, STOOPS, TERRACES AND OTHER PAVED AREAS SHALL SLOPE AWAY FROM BUILDING(S) AT A MINIMUM OF 2%. 5. CONTRACTOR SHALL CONTACT INSPECTOR 48 HOURS BEFORE CONSTRUCTION. 6. ALL ELEVATIONS ARE IN REFERENCE TO THE BENCHMARK WHICH MUST BE VERIFIED BY THE CONTRACTOR PRIOR TO STARTING CONSTRUCTION. 7. ALL YARD INLETS SHALL BE NYLOPLAST 15" STANDARD GRATES. REFER TO SHEET C-8.0 FOR DETAIL. 8. ALL CATCH BASINS SHALL BE STANDARD PRECAST IN ACCORDANCE WITH THE CITY OF STATESVILLE STANDARD DETAIL #ST-5. REFER TO SHEET C-8.0 FOR DETAIL. ML GRAPHIC SCALE 40 0 20 40 80 1 INCH = 40 FEET URBAN DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 SEAL 27890 11.21.19 i ti >> U) w w 00 N z ^L L.L > Q w w J . > (1� _O W � -- ��Q VJ CIJ 0 �+ z U) U) L OIt LO z `� c� O Cz Cz L- ^� U m �_0 c CZ LO C-0 Cz C/)_ 0 Cz 0 Ir E O O L N O O VJ O Z O U z z o z p U O 0 w U O w U C3 OC z Z J a J O ? (5 > OC OC OC w w w w o 0 0 rn rn rn dir r r C0 r QLO r r CV � r r O r r zr CV C'7 Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: C-5mO CONSTRUCTION SPECIFICATIONS SCM INSET TABLE - SAND FILTER TOP OF SAND BED A. EARTHWORK 1. THE FOUNDATION AREA SHALL BE CLEARED OF TREES, LOGS, STUMPS, ROOTS, BOULDERS, SOD AND UNSUITABLE SOIL. IF NEEDED TO ESTABLISH PROJECT NAME: NORTHGATE GRATE TOP ACTS AS VEGETATION, THE TOPSOIL SHALL BE STOCKPILED AND SPREAD ON THE COMPLETED DAM AND SPILLWAYS. THE FOUNDATION AREA SHALL BE 100-YEAR WSE: 910.74 EMERGENCY SPILLWAY TOP OF POND: 911.00 THOROUGHLY SCARIFIED BEFORE PLACEMENT OF THE FILL MATERIAL. SEQUENCE ID: 1 50-YEAR WSE: 910.45 2. EXISTING STREAM CHANNELS IN THE FOUNDATION AREA SHALL BE SLOPED NO STEEPER THAN A RATIO OF ONE HORIZONTAL TO ONE VERTICAL. 18" CLEANED THEY SHALL BE DEEPENED AND WIDENED AS NECESSARY TO REMOVE ALL STONES, GRAVEL, SAND, STUMPS, ROOTS, AND OTHER OBJECTIONABLE SAND FILTER TYPE: SURFACE "CONCRETE" 25-YEAR WSE: 910.17 MATERIAL AND TO ACCOMMODATE COMPACTION EQUIPMENT. FOUNDATION AREAS SHALL BE KEPT FREE OF STANDING WATER WHEN FILL IS PLACED WASHED GRATE TOP: 910.00 ON THEM. THE BORROW AREAS SHALL BE CLEARED OF STUMPS, ROOTS AND UNSUITABLE SOIL. THE WATER QUALITY BASIN SHALL BE CLEARED SAND BED 10-YEAR WSE: 909.58 ° REFER TO DETAIL 0 ( ) AND ALL STUMPS REMOVED. 3. BEFORE FILLING OPERATIONS BEGIN, THE SOILS ENGINEER WILL TAKE REPRESENTATIVE SAMPLES OF EACH PROPOSED FILL MATERIAL AND TEST DRAINAGE AREA (AC): ( ) 4.93 AC U R B A N o ° THEM TO DETERMINE THE COMPACTION AND CLASSIFICATION CHARACTERISTICS (PROCTOR TEST). ONLY THOSE MATERIALS AS APPROVED BY THE SOILS ENGINEER WILL BE USED AS FILL ON THE DAM. GENERALLY SM OR SC CLASSIFICATION SOILS WILL BE ACCEPTABLE. COMPACTED EARTH FILLS LAND USE/DEVELOPMENT TYPE: RESIDENTIAL ° TOP OF GRAVEL BED 0.5' ° 4.00.5' SHALL BE CONSTRUCTED TO THE ELEVATIONS, LINES, GRADES AND CROSS SECTIONS INDICATED ON THE PLANS. D E S I G N 4. AFTER STRIPPING OF FOUNDATIONS AND REMOVAL OF WEAK OR UNSUITABLE MATERIALS HAS BEEN COMPLETED, AND BEFORE START OF MATERIAL PERCENT BUILT -UPON AREA: 42% ° o PLACEMENT, COMPACTED EARTH SHALL BE USED TO FILL ALL STUMP HOLES, MINOR EXCAVATIONS AND DEPRESSIONS FOR CAVITIES INSIDE THE FILTER FABRIC: 2-YEAR WSE: 907.94 EARTH FILL LIMITS. PARTNERS 12" OPEN WEB TURF MAT 1-YEAR WSE: 907.59 5. FILL SHALL BE PLACED IN HORIZONTAL LAYERS OF NOT MORE THAN (9") LOOSE DEPTH. AS SOON AS FEASIBLE AFTER STARTING CONSTRUCTION FOREBAY PRESENT: YES GRAVEL BED OR APPROVED EQUAL O ° 6" ORIFICE: 907.33 OF A FILL SLOPE THE CENTRAL PORTION THEREOF SHALL BE BUILT AND MAINTAINED SLIGHTLY HIGHER THAN THE SIDES TO ALLOW FREE DRAINAGE 1318-e6 central ave. P 704.334.3303 BOTTOM OF GRAVEL BED W/ TRASH RACK TO THE SIDE SLOPES. MEDIA DEPTH: 2.5 FT charlotte, nc 28205 F 704.334.3305 1-INCH (WQv) WSE: 906.67 ° (REFER TO DETAIL) 6. EACH LAYER OF FILL SHALL BE COMPACTED BY ROLLING WITH COMPACTION EQUIPMENT WHICH IS BEST SUITED FOR THE TYPES OF SOIL urbandesignpartners. com - • - • - • --\r - • - • - ENCOUNTERED. FILL ADJACENT TO PIPE CONDUIT AND ANTISEEP COLLARS SHALL BE COMPACTED BY HAND. EACH LAYER OF FILL SHALL BE FLOW DIVERTERS PRESENT: NO nc firm no: P-0418 ° COMPACTED TO NOT LESS THAN 95% MAXIMUM DRY DENSITY (STANDARD PROCTOR) WITHIN 2% OF OPTIMUM MOISTURE CONTENT. WETTING OR sc coa no: C-03044 6" PERFORATED PIPE & 4'x4' OUTLET STRUCTURE � DRYING OF THE MATERIAL AND MANIPULATION TO SECURE UNIFORM MOISTURE CONTENT THROUGHOUT EACH LAYER SHALL BE REQUIRED. DENSITY GRAVEL UNDERDRAIN SYSTEM 6 °WALL THICKNESS ( ) TESTS WILL BE PERFORMED AT A FREQUENCY AS SPECIFIED BY THE SOILS ENGINEER. AS A MINIMUM, TESTS WILL BE PERFORMED ON EVERY THIRD REGULATED BY: STATESVILLE UDO §8.05 LIFT OR EVERY 1000 CUBIC YARDS WHICHEVER COMES FIRST. ALSO DENSITY TEST WILL BE PERFORMED WHENEVER FILL MATERIAL CHARACTERISTICS SAND FILTER: CROSS-SECTION BOTTOM OF POND: 905.00 CHANGE. TREATMENT EFFECTIVENESS: 85% TSS B. OUTLET DEVICE ° 0 1. OUTLET DEVICE COMPONENTS ARE TO FABRICATED AS SHOWN ON THE PLANS. NC STATE PLANE X (EASTING): 1,432,268 S� TO BE CONNECTED - 2. CONTRACTOR TO SUBMIT DESIGNED SHOP DRAWINGS TO THE CIVIL ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION TO THE OUTLET DEVICE. 'L � �•. STRUCTURALLY BOTTOM OF SAND: 903.50 SHOP DRAWINGS SHOULD INCLUDE PRECAST BOX DESIGN, TRASH RACK, GRATED COVER, ALUMINUM STEPS, AND ALL DRAIN/ORIFICE PIPING NC STATE PLANE Y NORTHING ( ) 754,651 _ = SEAL - (REFER TO DETAIL) 1 0 REQUIRED. 27890 NOTES: / ° \ 00 0000000000 6" UNDERDRAIN o / � 0000000000 18" RCP OUTLET & C. CONCRETE 1. ALL CONCRETE SHALL CONFORM TO THE STANDARD SPECIFICATIONS FOR READY MIXED CONCRETE, ASTM C 94. AN AIR -ENTRAINING ADMIXTURE ' .F 1. "CONCRETE" SAND REFERS TO SAND THAT IS COMMONLY 00 BOTTOM OF GRAVEL: 902.50 SHALL BE ADDED. THE CONCRETE SHALL BE PROPORTIONED TO MEET THE FOLLOWING REQUIREMENTS: COMPRESSIVE STRENGTH: MINIMUM 3600 PSI WATER -CEMENT RATIO: 0.40 - 0.50 4/I/'Ip111`5��`` USED IN CONCRETE MIXES. ` SCM INSET TABLE - DRY DETENTION ANTI -FLOTATION DEVICE SLUMP: MINIMUM 3", MAXIMUM 5" AIR CONTENT: MINIMUM 5%, MAXIMUM 8% 2. ALL DRAINAGE AREAS TO A SAND FILTER FACILITY ARE TO 0 7.0'Lx7.0'Wx1.5'D COARSE AGGREGATE: 1" - 1 1/2" BE STABILIZED PRIOR TO INSTALLATION OF SAND. p V INVERT: 901.00 D. GRASSING PROJECT NAME: NORTHGATE 11.21.19 3. UNDERDRAIN PIPES SHALL BE 6" PERFORATED SCHEDULE 1. GRASS ALL AREAS DISTURBED BY CONSTRUCTION PER SPECIFICATION OF EROSION CONTROL DETAIL SHEET. 40 PVC (PER AASHTO M278) OR DOUBLE WALL HDPE (PER SEQUENCE ID: 1 AASHTO M252). PERFORATIONS SHOULD BE V" SPACED 6" E. PLANTING ON CENTER ALONG 4 LONGITUDINAL ROWS SPACED 90' 1. PLANTINGS ARE DESIGNED PER THE GUIDANCE OF THE HARP (HABITAT ASSESSMENT AND RESTORATION PROGRAM) MANUAL. SURFACE AREA: 10,845 SF (AT TOP) APART. 2. ADDITIONAL PLANTING INFORMATION CAN BE FOUND IN CHAPTER A-3 OF THE NORTH CAROLINA STORMWATER DESIGN MANUAL. SAND FILTER - OPERATION & MAINTENANCE DRAINAGE AREA (AC): 4.93 AC SECTION VIEW: SAND FILTER SCALE: NTS SECTION VIEW: OUTLET STRUCTURE SCALE: NTS CO CONSTRUCTION LAND USE/DEVELOPMENT TYPE: RESIDENTIAL D NO RUNOFF SHOULD ENTER THE FILTERS SAND BED UNTIL THE UPSTREAM DRAINAGE AREA IS COMPLETELY STABILIZED AND SITE CONSTRUCTION IS _� (n COMPLETED. ANY DISTURBED AREAS WITHIN THE SAND FILTER FACILITY DRAINAGE AREA MUST BE IDENTIFIED AND STABILIZED. FILTRATION CONTROLS PERCENT BUILT -UPON AREA: 42% U) W z MUST ONLY BE CONSTRUCTED AFTER THE CONSTRUCTION SITE IS STABILIZED. Q ® MAINTENANCE GUIDELINES FOREBAY PRESENT: YES w_ J J ® SAND FILTERS SHALL BE INSPECTED QUARTERLY AND WITHIN 24 HOURS AFTER EVERY STORM EVENT GREATER THAT 1.0-INCH. RECORDS OF > > ®� OPERATION AND MAINTENANCE WILL BE KEPT IN A KNOWN SET LOCATION AND AVAILABLE UPON REQUEST. TRASH AND DEBRIS SHOULD BE REMOVED FLOW DIVERTERS PRESENT: NO �� p w 0®® ®® AS NECESSARY. SEDIMENT SHOULD BE CLEANED OUT OF THE SEDIMENT CHAMBER WHEN IT ACCUMULATES TO A DEPTH OF MORE THAN 6 INCHES. ® ® 0®®®® 00® 0 FACE OF OUTLET WHEN THE FILTERING CAPACITY OF THE FILTER DIMINISHES SUBSTANTIALLY (E.G. WHEN WATER PONDS ON THE SURFACE OF THE FILTER BED FOR MORE REGULATED BY: STATESVILLE UDO §8.05 cz o 00® 0®® 000 ® STRUCTURE THAN 24 HOURS), THE UNDERLYING 3-INCHES OF FILTER MATERIAL SHOULD BE REMOVED AND REPLACED WITH FRESH MATERIAL. THE REMOVED r 0.5 FT.� 4.0 FT. 0.5 FT. �� 0®® 000 0®®0 t� 00® 0®® 00®0 1/4" HDPE PLATE BOLTED TO STRUCTURE SEDIMENTS SHOULD BE TESTED AND DISPOSED OF IN AN ACCEPTABLE MANNER (E.G. LANDFILL). SILT/SEDIMENT SHOULD BE REMOVED FROM THE FILTER BED WHEN THE ACCUMULATION EXCEEDS 1-INCH. TREATMENT EFFECTIVENESS: 85% TSS ®a 00 ®® 0 ®® o 0� HDPE STRUCTURAL PLASTIC THE SAND MEDIA SHALL BE SKIMMED AT LEAST ONCE A YEAR. NC STATE PLANE X (EASTING): 1,432,268 LO � a a °a_[2-1/2" �� ®'0�� "o 1/4" PLATE AND GRATING WITH 3/4" HOLES AND A MIN. VEGETATION WITHIN THE SEDIMENTATION CHAMBER SHOULD BE REMOVED, PREFERABLY BY HAND. PESTICIDES SHOULD BE WIPED ON PLANTS RATHER Q� 00 N � cacao OF 30% OF OPENING AREA, NC STATE PLANE Y (NORTHING); 754,651 U 0 00 ALL SIDES AND BOTTOM. THAN SPRAYING. z 2-1 /2" EDGE T � 0 0, 00® a°a°a°o°o 1 ® 0000000ooaa� DIRECT MAINTENANCE ACCESS SHOULD BE PROVIDED TO THE PRETREATMENT AREA AND THE FILTER BED. �®p ® ®® 000000 oQOQOQOQ0 0 0 OUTLET CONTROL STRUCTURE SHALL BE CAST IN PLACE CONCRETE. A PROFESSIONAL ENGINEER SHALL CERTIFY CONSTRUCTION OF THE STRUCTURE ILL_ HINGE(S) ® ® 000 0000000o 000000 0000000000000000 0 UPON COMPLETION. O 00 0 U) I F- -w ISOMETRIC a °°° HDPE STRUCTURAL PLASTIC = 01 J �> z ° 1- - - - - _ 1 /4" PLATE AND GRATING o I -w O T / HINGE N. WITH 1" HOLES AND A MIN. OF 30% OF OPENING AREA I -� -� z � • / MANUFACTURED BY PLASTIC 3 o II - a 1 /8" STEEL SOLUTIONS INC. OR EQUAL = rn II = ANGLE PLATE = --- VARIABLE WIDTH 1� - I }� 0 Ir YxY ALUMINUM GRATING AND \ \ ° ° a I o SCM MAINTENANCE a rn & ACESS ESMT. I - E HATCH TO BE DESIGNED AND I a I \ a 00000a ° °oa af ICz CERTIFIED BY MANUFACTURER. °°°°° 03 2" GRATE CONTRACTOR TO SUBMIT i / ° ° ° Q. 006 ' °j �' °' /- A SHOP DRAWINGS TO ENGINEER 6" STAINLESS STEEL a / ° ° ° ' a° a 0 0° 00 o a' L --------- II i �� � FOR APPROVAL PRIOR TO / ANCHOR BOLT. EPDXY a o a m o o ------- -- --- PROP SAND BED - ^, W m FABRICATION IN PLACE ° i I TOP ELEV: 905.00 0) 1 AREA: 600 SF I Q QQOQ0 0 SINGLE BMP °0°°°°°° ° I 20' / DIM: 20'x30' I I = SECTION ORI ICE ° 0 ° 18" RCP I '� I - - CD �- PROP. 6" PVC 0 - r CLEANOUTS 0 TOP OF SYSTEM 1 1 - � PROP. FES-0 & � � � C/) ELEVATION J �1 9 PROP. FES-2 & - PROP. CONCRETE OUTLET STRUCTURE (REFER TO DETAIL) I RIP RAP APRON - INV: 902.00 - rr (� `v Cz O OSCALE:NTS DETAIL: GRATE TOP DETAIL: ORIFICE TRASH RACK SCALE: NTS RIP RAP APRON L.- O INV: 906.00 N - rn 0)- C G ` ' s 5"X5„X3/8„ I : O STAINLESS STEEL ANGLE TRENCH WIDTH �= TRENCH /o i Y 50 LF OF 18" RCP 0 1.00%I W/ ANTI COLLARS - - - WIDTH -SEEP GRADE I 0 ALL JOINTS 7.0 FT. / i I = = -� = = = (REFER TO DETAIL) I = O w 11= w LLI FOREBAY PROP. 6" PVC - z 0 z o � z1.0' TYPICAL 0 18„ BOTTOM UNDERDRAINS O =1 ELEV: 906.00 )PE TOWARDS OCS O w0 III- a / �� - /II U, 11 4l a as aI L ,PROP. 3:, Uc�Ir z 6;. °� \ O I� = O III II \ PROP. 3:1 °' g10 SLOPE i - O o p� a / • 6" STAINLESS STEEL = = as a a a STORM 4 II SLOPE g� / \ PROP. STONE goy SE��PG - - c� Lu Lu C�5 Lu Lu ANCHOR BOLT. EPDXY ' ° a \ ' IN PLACE d a a a a III a LINE ° 6" 12 III FOREB_ BERM TOP ELEV: 908.00 25 FF _ ♦♦� 6" PVC 8 ^°G REFER TO DETAIL UNDERD RAIN FOR STEP DESIGN a Q ° a a a �� -III (DIAMETER a I a II VARIES) TOP WIDTH: 2.0' G 1? ♦♦♦ In - = a a Q moo° �y/ / ♦♦♦� D D D o q I_I-III -III �� a a ° a ANTI 1� \�� / ♦♦♦ / 0_ 0_ 7 0_ -SEEP - II 1= COLLAR I�Q \ t'� ♦♦♦♦ �� Sri r ANTI -FLOTATION DEVICE =III 1= w a a -4- -4 J =_ I= a a -III- Q�OQ��♦♦♦♦♦ /♦♦♦ ' O T r T r TOP OF DAM 6 =1 o III 12"-� L; III=III- WIDTH: 10.0'ANTI-SE /A♦♦♦♦ + III P COLLAR. 000 rc / -III CLASS BE CONCRETE. ♦♦♦♦♦ - \ -q Project No: 19-039 - 0��5�° ♦♦♦♦♦ � � fL- � STAINLESS STEEL ANGLE CLIPS '- SECTION A -A / '♦♦♦��-c�`� i \ / �♦���5����5`O�` � Date: 04.02.19 Designed by: udp TYPICAL PLAN VIEW �'►♦♦ 5 OUTLET / Drawn By: / � /♦♦♦♦♦ D Sheet No: � / PLAN VIEW: OUTLET STRUCTURE SCALE: NTS DETAIL: ANTI -SEEP COLLAR SCALE: NTS PLAN VIEW: SAND FILTER DRY DETENTION POND SCALE: 1 - 20 - ' ■ — — -- --- i i i i �z vo 5Q / / 4735-15-8317 NORA WOODS DANIELS / 759-161/ ZONED: R-10 (COS) / 4735-25-3462 ST. MARKS BAPTIST CHURCH 926-218 ZONED: R-10 (COS) OLD WILKESBORO ROAD (SR 1645) NO RECORDED ROAD R/W FOUND 60' R/W ILLUSTRATED NCDOT MAINTAINED SPEED LIMIT 45 MPH _ — 4735-25-5175 4735-24-6018 BOBBY L. MORRISON JAMES K. RIDDICK & 1074-275 SAPHERIA RIDDICK ZONED: R-10 (COS) 996-7303ZONED: R-10 (COS) I J � CV CV ti T rr 0 C,O L Lu Z Iz Z oa �75; U� CIO0 W U J Z 0 Z U 4735-24-7070 RICHARD L. HOLLAND 1822-1709 ZONED: R-70 (COS) � I I I I KENHILL ROAD CITY MAINTAINED - —I I URBAN DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 Z 0 z z o z p U) 0 o w> 0 w U C3 OC Z J q J 0 ? 0 > oC oC oC W W W L loo/--906----- m D D D I r r r i a QrrN z r CV C) 4735-2PERTE7 CALL 81FORE 800-6632! 4949 / REDELL PROPERTIES INC. \ 1010-216 Project No: 19-039 ZONED: R-10M (COS) N.C. ONE -CALL CENTER 10, P.B. 1, PG. 141 IT'S THE LAWI Date: 04.02.19 f / — _ _ Designed by: udp / ML Drawn By: Sheet No: GRAPHIC SCALE 40 0 20 40 80 1 INCH = 40 FEET 0 /0' SEAL = 27890 11.21.19 Q0 L 00 D CV Z U Lu Z Q L W J J_ 0 L _ T U) L0 CV C0 CC) C\1 U Z 6 U) a� U) T LO LO Cz It ^— Cn c� 0 z ^Ir W Cz L u- Q a a� co D Mo cz LO �,'I- cz 0 Cz 0 0 cr �0 0 �N URBAN ti N DESIGN T �o UJ T_ �o PARTNERS Lu z Z I " z Lu 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 0 1 0 Q urbandesignpartners. com nc firm no: P-0418 OLD WILKESBORO ROAD (SR 1645) I NO RECORDED ROAD R/W FOUND 60 R/W ILLUSTRATED NCDOT MAINTAINED () F o cn U Lu z Jp OLD WILKESBORO ROAD (SR 1645) NO RECORDED ROAD R/W FOUND NED Y g U O U) U z sc coa no: C-03044 IIIII I I I1111 SPEED LIMIT 45 MPH Z U NCDOTIMAINTA SPEED LIMIT 45 MPH / p / z r /— Q a i — / / - SEAL - 27890 - o 000, O - _ -- `1 N1b '0 '3 �) o / �O ` I / - - - of PO ` / - .. - - - �� //,, DIllllllll\\\\\\\ x �F p�oo\'��P �e / / / `J / l Q0 5� �o / p�o���'J �P� / / �1 11.21.19 / 11 I \�P 3`° / / / 1 `�� �`Q� / / ��G OQ• G p\� 35 / / / Fr" o0o M _ I �`� . Q o �0 CP boo SHEET 150 FLOW LF ® 2.67% >' I // / i / PROP. BUILDING ±31,100 SIF , _\ / \ / �' _ / �\ �� / / \ / / / EFP�\� // �� / — ILI / \ I TOTAL BYPASS / DRAINAGE AREA o$ 1.48 AC '9 // LU 00 — � N u) z 0 � Q w 0�� 09 i / / / ` < \ LU J \ ` \ PRE —DEVELOPED DRAINAGE AREA: 4.96 AC — — `\ I I / \ \ I 1 \\ TOTAL SCM 1 URAINAGE AREA / /_ 4.93 AC — / l / / / / 0 � / o 00 l �.. > rn - Q � r � ` Tc: 30 MIN. \ I\ / / I.d /, L0 w U \ / SHALLOW CONCENTRATED FLOW 655 LF ® 4.27% \ W I I I �� I I I / o°k I / � }� Z 6 / m 1 � U) CJ \\ BARN \ \ . LO I CZ � -- o L.I� / I4 I cz / / I 1 E ow 1 I- cz CD -944— — \ 0 Cz <190, 0 pC J , - 101* / \ \, I \ \ I / / _ �U^^ VJ O l / _ z O \I I 000 z cn \I ow Ir w \ I \ U C3 Z OC \ Z O J ? (5 oC J > oC oC oC PRE -DEVELOPED DRAINAGE AREA MAP SCALE: 1"=60' POST -DEVELOPED DRAINAGE AREA MAP SCALE:1"=60' W Ir W a- W a- W a- 000 m> >> 0) r 0) r 0) r Q L2 r � O 2 r r r r N r r z r N C7 Project No: 19-039 a , Date: 04.02.19 Designed by: udp BEFORE YOU DIQI D Drawn By: CALL 811 OR 1-800-632-4949 Sheet No: N.C. ONE —CALL CENTER GRAPHIC SCALE IT'S THE LAWI 60 0 30 60 120 1 INCH 60 FEET C�5m3 = FARM RD INTERSTATE 40 S� VICINITY MAP a FIRE HYDRANT TEST HYDRANT LOCATION: TEST RESULTS: DATE PERFORMED: PRESSURE: FLOW: END OF KENHILL ROAD I 10/10/2018 60 psi 791 GPM IWC B" PVC WATERLINE ohe \ ohe O ��11 O•J \Q - - loe- P `P Q� J ode / �J P� z 3,? Jo o*v`� / 100, o� CONSTRUCTION NOTES: 1. ALL WORK SHALL BE COORDINATED WITH THE CITY OF STATESVILLE, THE DESIGN ENGINEER, THE N.C. DEPARTMENT OF TRANSPORTATION. ALL GAS, TELEPHONE, & POWER UTILITIES, AND ANY OTHERS AS REQUIRED. 2, ALL WATER LINES INSTALLED ON SECONDARY ROADS SHALL BE ACCORDING TO THE NC DOT "POLICIES AND PROCEDURES FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHT-OF-WAYS" MANUAL. 3. TAKE PROPER PRECAUTIONS NOT TO DISTURB EXISTING PROPERTY CORNERS. ANY NECESSARY REMOVAL AND RESETTING OF PROPERTY IRONS SHALL BE DONE BY A REGISTER LAND SURVEYOR- 4. FENCES DAMAGED DURING CONSTRUCTION MUST BE REPLACED. USE TEMPORARY FENCING TO PREVENT ESCAPE OF LIVESTOCK. 5. ALL RIGHT-OF-WAYS SHALL BE GRADED, SHAPED, SEEDED AND STABILIZED AFTER CONSTRUCTION IS COMPLETE. 6. ALL RIGHT-OF-WAYS SHALL BE GRADED IN A MANNER AS TO NOT ALLOW ANY STANDING WATER. 7. ANY EXCAVATED WOOD, ROCKS, ANDIOR DEBRIS SHALL BE DISPOSED OF OFF SITE BY THE CONTRACTOR. N O ONSITE BURYING WILL BE ALLOWED. 8. ANY TREES SCARRED DURING CONSTRUCTION SHALL HAVE THE SCARS TRIMMED AND PAINTED WITH ASPHALT-13ASE TREE PAINT. 11. PLUG ALL PIPE OPENINGS AND FILL ANY EXPOSED TRENCHES AT THE END OF THE DAY. 12. DO NOT TIE NEW WATER LINES INTO EXISTING WATER LINES UNTIL AUTHORIZED BY LOCAL AND STATE AUTHORITIES. 13. THE USE AND STORAGE OF EXPLOSIVES SHALL CONFORM TO LOCAL, STATE, AND FEDERAL LAWS. 14. COSTS OF CONCRETE COLLARS AND PLUGS SHALL BE INCLUDED IN THE UNIT PRICE OF PIPE UNLESS OTHERWISE NOTED IN THE PROPOSAL. 16. COSTS OF ADAPTERS, ETC REQUIRED FOR CONNECTIONS OF PVC, C.L. AND D.I. PIPE SHALL BE INCLUDED IN THE UNIT PRICE OF PIPE. 16. ALL FENCES CROSSED DURING CONSTRUCTION SHALL BE REPLACED WITH FENCE OF LIKE MATERIAL, INCLUDE A NEW 19 OR WIDER GATE OF LIKE MATERIAL AT EACH FENCE CROSSING FOR ACCESS. COST OF REPLACING FENCES AND PROVIDING GATES SHALL BE INCLUDED IN UNIT PRICE BID PER LINEAR FOOT OF PIPE. 17. ANY PIPES WHICH MUST BE INSTALLED INSIDE A DITCH OR AT A CREEK CROSSING TO ALLOW ACCESS DURING CONSTRUCTION SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE UNLESS OTHERWISE SPECIFIED. SAID PIPE SHALL BE NO LESS THAT 12" DIAMETER UNLESS OTHERWISE DETERMINED BY THE DESIGN ENGINEER.. COST FOR INSTALLING THIS PIPE SHALL BE INCLUDED IN THE UNIT PRICE BID PER LINEAR FOOT OF PIPE. EROSION CONTROL NOTES 1. ALL SITES ARE SUBJECT TO INSPECTION FOR EROSION CONTROL. 2. ANY LAND DISTURBING ACTIVITIES OF 1 ACRE OR MORE (V2 ACRE WITHIN A PROTECTED WATERSHED AREA) SHALL REQUIRE A LAND DISTURBING PERMIT FROM THE IREDELL COUNTY PLANNING DEPARTMENT. 3. IT IS THE CONTRACTORS RESPONSIBILITY TO MONITOR AND MAINTAIN ALL EROSION CONTROL PRACTICES IN AND AROUND THE SITE. 4. AS PER N.C.G.S. 113A.-57(2)...IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. 5. PURSUANT TO N.C.G.S, I MA 57(3)...PROVISIONS FOR AGROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT, WHICHEVER IS SHORTER, EXCEPT AS PROVIDED IN 15A NCAC 46.0124(e), B. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON PLANS MAY BE REQUIRED IF STABILIZATION IS N07 ACHIEVED WITHIN SPECIFIED TIME LIMITS OR IF UNDUE SEDIMENTATION OCCURS. CITY OF STATESVILLE PUBLIC WORKS DEPARTMENT SANITARY SEWER General Notes DETAIL # REVISED S-14 MAY 2010 SCALE: SHEET# N.T.S. 1 OF 1 CONSTRICTION NOTES: 1. ALL WORK SHALL BE COORDINATED WITH THE CITY OF STATESVILLE, THE DESIGN ENGINEER, THE N.C. DEPARTMENT OF TRANSPORTATION, ALL GAS, TELEPHONE. & POWER UTILITIES. AND ANY OTHERS AS REQUIRED. 2. ALL WATER LINES INSTALLED ON SECONDARY ROADS SHALL BE ACCORDING TO THE NCDOT "POLICIES AND PROCEDURES FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHT-OF-WAYS" MANUAL. 3. TAKE PROPER PRECAUTIONS NOT TO DISTURB EXISTING PROPERTY CORNERS. ANY NECESSARY REMOVAL AND RESETTING OF PROPERTY IRONS SHALL BE DONE BY A REGISTER LAND SURVEYOR- 4. FENCES DAMAGED DURING CONSTRUCTION MUST BE REPLACED. USE TEMPORARY FENCING TO PREVENT ESCAPE OF LIVESTOCK. 5. ALL RIGHT-OF-WAYS SHALL BE GRADED, SHAPED, SEEDED AND STABILIZED AFTER CONSTRUCTION IS COMPLETE. 6. ALL RIGHT-OF-WAYS SHALL BE GRADED IN A MANNER AS TO NOT ALLOW ANY STANDING WATER. T. ANY EXCAVATED WOOD, ROCKS, ANDIOR DEBRIS SHALL BE DISPOSED OF OFF SITE BY THE CONTRACTOR. NO ONSITE BURYING WILL BE ALLOWED. 8. ANY TREES SCARRED DURING CONSTRUCTION SHALL HAVE THE SCARS TRIMMED AND PAINTED WITH ASPHALT -BASE TREE PAINT. 11. PLUG ALL PIPE OPENINGS AND FILL ANY EXPOSED TRENCHES AT THE END OF THE DAY, 12. DO NOT TIE NEW WATER LINES INTO EXISTING WATER LINES UNTIL AUTHORIZED BY LOCAL AND STATE AUTHORITIES. 13. THE USE AND STORAGE OF EXPLOSIVES SHALL CONFORM TO LOCAL. STATE, AND FEDERAL LAWS. 14. COSTS OF CONCRETE COLLARS AND PLUGS SHALL BE INCLUDED IN THE UNIT PRICE OF PIPE UNLESS OTHERWISE NOTED IN THE PROPOSAL. 15. COSTS OF ADAPTERS, ETC REQUIRED FOR CONNECTIONS OF PVC, C.I., AND D.I. PIPE SHALL BE INCLUDED IN THE UNIT PRICE OF PIPE. 16. ALL FENCES CROSSED DURING CONSTRUCTION SHALL BE REPLACED WITH FENCE OF LIKE MATERIAL. INCLUDE A NEW 10' OR WIDER GATE OF LIKE MATERIAL AT EACH FENCE CROSSING FOR ACCESS. COST OF REPLACING FENCES AND PROVIDING GATES SHALL BE INCLUDED IN UNIT PRICE BID PER LINEAR FOOT OF PIPE, 17. ANY PIPES WHICH MUST BE INSTALLED INSIDEA DITCH OR AT A CREEK CROSSING TO ALLOW ACCESS DURING CONSTRUCTION SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE UNLESS OTHERWISE SPECIFIED. SAID PIPE SHALL BE NO LESS THAT 12" DIAMETER UNLESS OTHERWISE DETERMINED BY THE DESIGN ENGINEER.. COST FOR INSTALLING THIS PIPE SHALL BE INCLUDED IN THE UNIT PRICE BID PER LINEAR FOOT OF PIPE. EROSION CONTROL NOTES 1. ALL SITES ARE SUBJECT TO INSPECTION FOR EROSION CONTROL. 2. ANY LAND DISTURBING ACTIVITIES OF 1 ACRE OR MORE (112 ACRE WITHIN A PROTECTED WATERSHED AREA] SHALL REQUIRE A LAND DISTURBING PERMIT FROM THE IREDELL COUNTY PLANNING DEPARTMENT. 3. IT IS THE CONTRACTORS RESPONSIBILITY TO MONITORAND MAINTAIN ALL EROSION CONTROL PRACTICES IN AND AROUNDTHE SITE. 4. AS PER N.C.G.S.113A: 57(2)...IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION, 5. PURSUANT TO N.C.G,S.113A.-57(3)...PROVISIONS FOR A GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT, WHICHEVER IS SHORTER, EXCEPT AS PROVIDED IN 15A NCAG 413.0124(e). 6. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON PLANS MAY BE REQUIRED IF STABILIZATION IS NOT ACHIEVED WITHIN SPECIFIED TIME LIMITS OR IF UNDUE SEDIMENTATION OCCURS - CITY OF STATESVILLE PUBLIC WORKS DEPARTMENT WATER LINE General Notes DETAIL # REVISED W-18 MAY 2010 SCALE: SHEET# N.T.S. 1 OF 1 -ohe-- Tahe 4735-25-3462 ST. MARKS BAPTIST CHURCH 926-218 ZONED: R-10 (COS) OLD WILKESBORO ROAD (SR 1645) NO RECORDED ROAD R/W FOUND 60' R/W ILLUSTRATED NCDOT MAINTAINED SPEED LIMIT 45 MPH - - PROP. UNDERGROUND PLASTIC METER BOX WITH HOSE BIB EXIST. TREES TO REMAIN \ EXIST. TREES TO REMAIN ON THIS SHEET PROP. 3/4" WATER LINE 183 LF TEE TO BOX PROP. UNDERGROUND - PLASTIC METER BOX WITH HOSE BIB PROP. 2" PVC CONDUIT FOR FUTURE ELECTRICAL 4735-25-5175 BOBBY L. MORRISON 1074-275 ZONED: R-10 (COS) 4735-24-6018 JAMES K. RIDDICK & SAPHERIA RIDDICK 996-7303 ZONED: R-10 (COS) PROP. UNDERGROUND PI AQTIC AAFTFP POY I N N I` D�0 U) W Z Lu >� Fr Z 0< �e2 UD U)0 W Z J 0 z U 0 SS SIDEWALK EASEMENT -�■ ca ■ ■ ■ ■ ■ I■ ■ ■ ■ i h47,35-24-6828 '. r�,, U ■ JAMES T. STAPLES LU ■ 1109-730 ZONED: R-10M (COS) ■ P.B. 1, PG. 147 ■ wI ■ Ln i li ■ 4735-24-7070 RICHARD L. HOLLAND 1822-1709 ZONED: R-70 (COS) PROP. Q0 I Lu �Q 2 W_ �a Og a C) o 0I I 1+ 0 U R B A N DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 urbandesignpartners.com nc firm no: P-0418 sc coa no: C-03044 SEA 27890 ';��,A •'LNG I NE��•,`��; _q/V I I IDI 11.21.19 i W N a_ cz I I KEN HILL ROAD L CITY MAINTAINED 0 1P MAN HOLE RIM ELEVATION = 893.71 INVERT IN ELEVATION=884.51 INVERT OUT ELEVATION = 884.51 0 un ss- COS 8" VC SS�NITARY SEWER COS 6" DIP WATER MAIN IW - 7.- ILu 65 TIE TO EXIST. SSMH U \ °I I�uJ N 18 RCP �� ■ \00■ \ \ \ 18" RCP / I ■ d ~ 8" RCP 1z \ ■ 4735-OPERTIE a T ■ IREDELL PROPERTIES INC. c� � ■ 1070-216 a ■ ZONED: R-10M (COS) o - ■ P.B. 1, PG. 141 N 4735-14-9633 JOY M. CHAPMAN PROP. SCM 805-548 \ �� REF: C-5.1 I ■ ZONED: R-10 (COS) \ / / I I (\ I I \ EXIST. TREES ■ PROP. 6%6" TAPPING \\ TO REMAIN \ ♦♦♦s PROP. 3"x6" TAPPING SLEEVE &VALVE SLEEVE & VALVE \ /♦♦♦♦ (STD: W-17) (STD: W-17) WC 8" PVC WATEI �\ \ /♦♦♦ ohe -\ PROP. 3" DOMESTIC a ° WATER METER ea / PROP. 6" FIRE SERVICE W/ 1" FIRE ASSEMBLY / / / /d / PROP. 6" PVC FIRE LINE 13 LF TAP TO ASSEMBLY 26 LF ASSEMBLY TO BFP PROP. 6" FIRE DCV BFP-/ (STD: W-11) b I h° 3 � a Lh WATER LINE INSET \ \ 5 ---PROP. -Y4' CORP. STOP \ \ / v�5��%♦ ���`�� (STD: W-2) \ 0 /♦♦G�( l PROP. 3/4' IRR. METER \ INFER ♦♦0 0,�E�O`� ER 22LLFTAP TO METER MOTBFP \ �� C ♦♦♦��P(�5 �� PROP. BALL VALVE BEHIND METER \ K 1� :♦♦♦♦ � n /♦ PROP. 3/4'x4' TEE \ i,�SE�� ♦♦♦ 19 LF BFP TO TEE \ i 25 / / ♦♦♦ v \ , ♦♦♦ i \ � ♦♦♦♦ -PROP. 3" PVC WATER LINE SETBA \ / ♦♦♦ - -13 LF TAP TO METER - - / / i♦ 4735-24-5077 25 LF METER TO BFP \ 100"00 IREDELL PROPERTIES INC. ♦♦♦ 1010-216 PROP. 3/4" BFP \ / / ♦♦♦ ZONED. R-lG. (COS) / ♦♦ P.B. 1, PG. 141 \ / / :♦♦♦ '00,0RPZ-PROPBFP' DOM. \\� / ♦♦♦♦♦♦♦ V ♦ / -COORDINATE TIE-IN /♦j♦♦ LOCATIONS W/ ♦♦♦ PLUMBING PLANS ♦♦ L GSA SCALE: 1 " = 20' �I■ ■ ■ I� ■ ■ .I ■ ■ ■ ■ ' I■ ■ I■ BEFORE YOU SIC! CALL 811 OR 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAWI D 0 GRAPHIC SCALE 40 0 20 40 80 1 INCH = 40 FEET Z O Z Z O Z 0 U) O 0 W > Lu O CC Ir (n � Q Z J J O 5; Ir I w w w w 0 0 0 rn rn rn LLI r r r QLO Cl) r r r N O r r 0 r N Cl) z Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: C-6mO ti W CO D N Lu z Q LL W J J_ 0 W O T U) Liz CV C0 Cb C11 z CU j _N Cu Liz U) ■ MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING MORE THAN 0.5" RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAPS AND INLET PROTECTION 4735-25-3462 DEVICES WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL sr. MARKS BAPTIST CHURCH s2s-218 WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS ZONED: R-10 (COS) PROPERLY. 3. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5 FT DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. OLD WILKESBORO ROAD (SR 1645) NO RECORDED ROAD R/W FOUND 4. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED 60' R/W ILLUSTRATED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS NCDOT MAINTAINED DENSE VEGETATIVE COVER. / SPEED LIMIT 45 MPH EXIST. DRIVE & 12" CMP TO BE REMOVED -w ��� -- --- - _----__- _ ---- \ _ '00 `��1 --ohe-2� - - h<--�-ohe-- johe-� yr� s --��ohe-c6� ��4----.h...�----°-----� �--------.� y i 0� SILT FEN (NCDEQ: � ( Q O� / o) O �0A� z �e , 100, , -C X T C e \ EXIST. THE 14 TO( REMAI y � C41/ 514 i EROSION CONTROL LEGEND: CONSTRUCTION ENTRANCE CLOTH & GRAVEL INLET PROTECTION ■---------■ DENUDED LIMIT - - - ohe - EXISTING OVERHEAD ELECTRIC - - uge - EXISTING UNDERGROUND ELECTRIC _9 EXISTING GAS LINE COL) EXISTING UTILITY POLE aD FLARED END SECTION POROUS BAFFLES RIP RAP APRON ROCK CHECK DAM ROCK PIPE INLET PROTECTION & HDPE SLOPE DRAIN SANITARY SEWER (PROPOSED) SANITARY SEWER (EXISTING) SILT FENCE F L®J SILT SACK INLET PROTECTION ❑ SKIMMER STONE SILT FENCE OUTLET STORM DRAINAGE PIPE (PROPOSED) STORM DRAINAGE (EXISTING) ro � TEMPORARY DIVERSION DITCH xx TREE PROTECTION FENCE w WATER LINE (PROPOSED) WATER LINE (EXISTING) EXIST. TREES) TO REMAIN - - - \ N - - -- \ 924 \/ 4735-74-9633 JOY M. CHAPMAN \ 805-548 ZONED- R-10 (COS) _g22 i i � I / / I / J � � I I DEMOLITION NOTES: \ 1. EXISTING INFORMATION ON THIS PLAN WAS TAKEN FROM A SURVEY PREPARED BY: \ KESTLER SURVEYING, INC. 2351 SIMONTON ROAD STATESVILLE, NC 28625 \ (704) 872-0212 2. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS. \ 3. HOLD ON SITE PRE -CONSTRUCTION MEETING WITH NCDEQ EROSION CONTROL INSPECTOR PRIOR TO ANY DEMOLITION. 4. SITE IS OCCUPIED BY EXISTING BUILDINGS, STORM LINES, PAVEMENT, POWER POLES AND UTILITIES. IT IS CONTRACTO S RESPONSIBILITY TO CONTACT ALL UTILITY COMPANIES THAT MAY HAVE UTILITIES ON THE SITE TO GET A DETERMINATI IF ANY UTILITIES EXIST THAT WILL BE IMPACTED AND DETERMINE THE REQUIRED PROCEDURE FOR ABANDONMENT OF THE EXIST G U TI LI TI ES. \ 5. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND SEQUENCING OF DEMOLITION OR RELOCATION OF UTILITIES WITH APPLICABLE UTILITY COMPANY. 6. CONTRACTOR TO REMOVE EXISTING STRUCTURES AS DIRECTED BY OWNER. CONTRACTOR TO REMOVE STRUCTURES, FENCES, SH DS AND MISC. DEBRIS. \\ 7. ALL MATERIAL GENERATED BY THE DEMOLITION, CLEARING AND GRUBBING SHALL BE HAULED FROM THE SITE BY THE CONTRACTOR IN ACCORDANCE WITH THE IREDELL COUNTY HEALTH DEPARTMENT AND THE ENVIRONMENTAL PROTECTION DEPARTMENT REGULATIONS AND ORDINANCES. 8. ALL AREAS WHERE PAVEMENT, BUILDING SLABS, FOUNDATIONS, UTILITIES, CONDUITS, AND/OR UTILITY STRUCTURES HAVE BEEN REMOVED SHALL BE BACKFILLED WITH SELECT BACKFILL MATERIAL. ALL SELECT BACKFILL MATERIAL SHALL BE PLACED AND COMPACTED PER THE REQUIREMENTS OF THE SPECIFICATIONS AND THE ON -SITE GEOTECHNICAL ENGINEER. 9. ALL WORK WITHIN THE STREET RIGHT OF WAY SHALL BE IN CONFORMANCE WITH ALL APPLICABLE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION AND CITY OF STATESVILLE REQUIREMENTS. 10. CONTRACTOR SHALL MAINTAIN TWO-WAY TRAFFIC AT ALL TIMES WHEN WORKING WITHIN EXISTING STREETS. THE CONTRACTOR SHALL PLACE AND MAINTAIN SIGNS, DANGER LIGHTS, BARRICADES, AND FURNISH WATCHMEN OR FLAG MEN TO DIRECT TRAFFIC IN ACCORDANCE WITH THE WORK AREA TRAFFIC CONTROL HANDBOOK (W.A.T.C.H.). i N N ti T_ QY 0 4735-25-5115 4735-24-6078 1 - W I ✓AMES K. RIDDICK & z 4735-24-7070 BOBBY L. MORRISON SAPHERIA RIDDICK LLl - RICHARD L. HOLLAND 7074-275 996-1303 i Q 1822-1709 ZONED: R-10 (COS) ZONED: R-10 (COS) z ZONED: R-10 (COS) \ 4735-24-2817 JAMES P. GRAY HEIRS 93E-81, 73-177 ZONED: R-5MF CU EXIST. DRIVE TO--, BE REMOVED 15" HDPE SLOPE'► DRAIN / EXIST. TREES W/ 6'x6' RIP RAP ,APRON / TO REMAIN (NCDEQ: 1P.32) ) / SOIL / DRIv TREE PROTECTION FENCE, TYP. \ (REFER TO DETAIL) \ \ \ / LP / \ \ / '0000.� i � A \/ 101* - ohe J STONE SILT FENCE OUTLET #1 (REFER TO DETAIL) DRAINAGE AREA: 0.36 AC 4735-24-6828 1 JAM 11099-330PLES i ZONED: R-10M (COS) / P.B. 1, PG. 141 / DRAINAGE AREA DELINEATION Q` �-STONE SILT FENCE OUTLET #2 / (REFER TO DETAIL) / DRAINAGE AREA: 0.30 AC - STONE SILT FENCE OUTLET #3 (REFER TO DETAIL) DRAINAGE AREA: 0.49 AC 1 18" FES & RIP RAP APRON I N V: 902.00 4735-24-5077 IREDELL PROPERTIES INC. 1010-276 ZONED: R-10M (COS) P.B. 1, PG. 141 0 STONE SILT FENCE OUTLET #4 (REFER TO DETAIL) DRAINAGE AREA: 0.06 AC / L 16' SPILLWAY / ELEV: 909.50 / LINE W/ GEOTEXTILE FABRIC TO TOE OF SLOPE STONE SILT FENCE OUTLET #5 y (REFER TO DETAIL) DRAINAGE AREA: 0.09 AC / PROP. SKIMMER BASIN (PH1) / - _ DRAINAGE AREA: 4.74 AC DENUDED AREA: 3.90 AC BOTTOM ELEV: 906.00 SED. STORAGE: 1.5' 4735-24-5077 STORAGE DEPTH: 2.0' IREDELL PROPERTIES INC. TOP OF DAM: 911.00 1070-216 MIN. DIMENSIONS: 70'x15O' ZONED: R-10M (COS) P.B. 1, PG. 141 s EROSION CONTROL NOTES: 1. ALL "NCDEQ" NUMBERS REFER TO THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY EROSION AND SEIDMENT CONTROL PLANNING & DESIGN MANUAL. 2. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE NC DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ). 3. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION AND IS SUBJECT TO A FINE. 4. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION AND IS SUBJECT TO A FINE. 5. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3:1 SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. ALL AREAS MUST BE SEEDED AND MULCHED WITHIN 14 CALENDAR DAYS. REFER TO EROSION CONTROL ORDINANCE FOR ADDITIONAL REQUIREMENTS. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF NCDENR. 7. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10 FEET REQUIRE ADEQUATE TERRACING. 8. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 9. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK AND OTHER ACCUMULATIONS. 10. RETAINING WALLS DESIGNED FOR CRITICAL AREAS (I.E., ON PROPERTY LINES AND R/W) MAY REQUIRE PE SEAL. 11. THE CITY OF STATESVILLE ENGINEERING DEPARTMENT HAS NOT REVIEWED THE STRUCTURAL STABILITY OF ANY RETAINING WALLS ON THE SITE AND DOES NOT ASSUME RESPONSIBILITY FOR THEM. 12. NON STANDARD ITEMS (IE: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT-OF-WAY MUST HAVE AN ENCROACHMENT AGREEMENT PRIOR TO INSTALLATION. 13. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND Q SEQUENCE. IALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION Oz Q�a LU 14. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST z BE PRESENTED AT PRE -CONSTRUCTION MEETING. a 15. ALL OUTLETS (ORIFICES, GRATES, ETC.) ON PERMANENT CONCRETE OUTLET Q= STRUCTURES SHALL REMAIN SEALED UNTIL SITE STABILIZATION IS ACHIEVED. < U SKIMMER SHALL BE CONNECTED TO FACE OF OUTLET STRUCTURE THROUGH A TEMPORARY 6" ORIFICE. ONCE EROSION CONTROL MEASURES ARE REMOVED AND BASIN IS CONVERTED TO A PERMANENT STORMWATER CONTROL MEASURE, THE TEMPORARY SKIMMER ORIFICE SHOULD BE PERMANENTLY SEALED. 16. COIR MESH BAFFLES IN SEDIMENT BASINS SHALL BE USED. SEE SECTION 6.65 OF THE NCDEQ EROSION & SEDIMENT CONTROL DESIGN MANUAL FOR ADDITIONAL INFORMATION. MATERIAL SUCH AS 700 G/M" 2 EROSION CONTROL BLANKET OR EQUIVALENT SHOULD BE USED. KEN HILL ROAD CITY MAINTAINED CONSTRUCTION SCHEDULE: 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM NCDEQ. 2. SET UP ON -SITE PRECONSTRUCTION CONFERENCE WITH THE EROSION CONTROL INSPECTOR. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION AND IS SUBJECT TO FINE. 3. INSTALL CONSTRUCTION ENTRANCE, SILT FENCE AND OTHER EROSION CONTROL MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. INSTALL ANY ADDITIONAL MEASURES AS DIRECTED BY INSPECTOR AT PRECONSTRUCTION CONFERENCE. 4. CALL FOR ON -SITE INSPECTION BY INSPECTOR. ONCE THE INSPECTOR APPROVES AND THE GRADING PERMIT IS ISSUED, CLEARING AND GRUBBING MAY BEGIN. 5. INSTALL DIVERSION DITCHES, ROCK CHECK DAMS, INITIAL SEDIMENT BASIN, RIPRAP APRONS, AND ALL OTHER EROSION CONTROL MEASURES AS SHOWN. DIVERSION DITCHES SHALL BE LINED WITH NORTH AMERICAN GREEN S75 CHANNEL LINER (OR APPROVED EQUAL) AND STABILIZED IMMEDIATELY. 6. BEGIN DEMOLITION, CLEARING AND GRUBBING THE REMAINDER OF THE SITE. CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES DURING GRADING OPERATIONS. 7. AS AREAS ARE BROUGHT TO GRADE, IMMEDIATELY STABILIZE THEM. SLOPE DRAINS AND DIVERSION DITCHES SHOULD BE CONTINUOUSLY MOVED UP THE SLOPE AS FILL INCREASES. 8. GRADE IN THE DRIVEWAY AND PARKING LOT AND CONSTRUCT CHANNELS AND SWALES, PROVIDING SLOPE PROTECTION AS NEEDED. 9. FINISH THE SLOPES AS SOON AS ROUGH GRADING IS COMPLETE. LEAVE THE SURFACE SLIGHTLY ROUGHENED AND VEGETATE/MULCH IMMEDIATELY. 10. COMPLETE UTILITY CONSTRUCTION & STABILIZE THESE AREAS UPON COMPLETION OF INSTALLATION. 11. CONTACT INSPECTOR FOR INSPECTION OF COMPLETED CONSTRUCTION. 12. UPON INSPECTION AND APPROVAL, REMOVE ONLY THOSE EROSION CONTROL DEVICES AS INSTRUCTED BY THE INSPECTOR. 13. REQUEST FINAL INSPECTION FROM INSPECTOR. 14. UPON APPROVAL, REMOVE ALL REMAINING EROSION CONTROL DEVICES, SEEDING AS NECESSARY UPON THIS REMOVAL. 15. SEDIMENT BASIN TO BE CONVERTED TO PERMANENT STORMWATER CONTROL MEASURE UPON REMOVAL OF ALL EROSION CONTROL MEASURES. SAND BED TO BE INSTALLED AFTER CONSTRUCTION IS COMPLETE AND SKIMMER HAS BEEN REMOVED. PERMANENTLY SEAL THE ORIFICE THAT WAS USED TO TIE THE SKIMMER TO THE OUTLET STRUCTURE UPON REMOVAL. GENERAL NOTES: •• ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND U.S. DEPARTMENT OF AGRICULTURE. •• FOR PHASED EROSION CONTROL PLAN, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. P\-) BEFORE YOU DIC31 CALL 811 OR 1-800-632-4949 N.C. ONE -CALL CENTER GRAPHIC SCALE IT'S THE LAWI 40 0 20 40 80 1 INCH = 40 FEET URBAN DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 11.21.19 i ti >I UJ ; 00 N Z � ^L L.L Q LU LU J .> (z 0 rn O T w � < Q T �/ U) CIJ 0 Cz }� Z T W U) VJ U) Cz Lo 0 a- It z `� O E Cz IL a U czC: /y� n- -0 = I..L +-J OCD O .� IZ U)Cz U }' 00 cr 0 E0 O N VJ VJ O w od o z O Z z O z Q 0 O Ir 0 w > Lu o � Lu Z Z J a J O ? oC > oC Ir oC w w w w rn rn rn r r r QLO Cl) r r r CV � r r O r r z r CV Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: C-700 / W'00, / --ohe-2——^he— ohe-- johe-1 / / / // 3 / ohe 100,100, EROSION CONTROL LEGEND: CONSTRUCTION ENTRANCE CLOTH & GRAVEL INLET PROTECTION ■---------• DENUDED LIMIT — — — ohe EXISTING OVERHEAD ELECTRIC — — — age EXISTING UNDERGROUND ELECTRIC — — — — e EXISTING GAS LINE EXISTING UTILITY POLE aD FLARED END SECTION POROUS BAFFLES RIP RAP APRON ROCK CHECK DAM ROCK PIPE INLET PROTECTION & HDPE SLOPE DRAIN SANITARY SEWER (PROPOSED) S SANITARY SEWER (EXISTING) SILT FENCE F=a SILT SACK INLET PROTECTION L®J ❑ SKIMMER STONE SILT FENCE OUTLET STORM DRAINAGE PIPE (PROPOSED) STORM DRAINAGE (EXISTING) ro TEMPORARY DIVERSION DITCH xx TREE PROTECTION FENCE w WATER LINE (PROPOSED) ----W— WATER LINE (EXISTING) T i 0 EXIST. TREES TO REMAIN — — — — N — — — - \ 924"'�\ 4735-14-9633 \ JOY M. CHAPMAN 805-548 ZONED: R-10 (COS) i i i N N ti T rr 4735-25-3462 4735-24-6018 r ST. MARKS BAPTIST CHURCH 4735-25-5115 JAMES RIDDICK & Z 4735-24-7070 Lu 926-2BOBBY L. MORRISON SAPHERIA RIDDICK Lu — RICHARD L. HOLLAND ZONED: R-10 (COS) 1074-275 996-1303 i Q ZONED R— 2 170 (COS) ZONED: R-10 (COS) ZONED: R-10 (COS) Fr Z I OQ OLD WILKESBORO ROAD (SR 1645) NO RECORDED ROAD R/W FOUND 60' R/W ILLUSTRATED NCDOT MAINTAINED SPEED LIMIT 45 MPH i REMOVE & REPLACE EXIST. ASPHALT AS NECESSARY FOR SEWER INSTALLATION \ o � -4 — — — — — T V PROTECTION, TYP. AT ALL INLETS / ® (REFER TO DETAIL) _ DRAINAGE AREA \ DELINEATION / EXIST. TREES / f / TO REMAIN / TREE PROTECTION < FENCE, TYP. (REFER TO DETAIL) 7 \\ \ I \ "♦♦♦ 4735-24-5077 ♦♦ IREDELL PROPERTIES INC. /♦♦ 1010-2 \ M ♦♦♦♦ ZONP.B. R PG. 74105) ) SS _ I SS ► SS ■ / ■ < 4735-24-6828 ■ ■ JAMES T. STAPLES ■ ■■ i 1109-730 ZONED: R-10M (COS) / P.B. 1, PG. 141 N ■ o0 ■ REMOVE & REPLACE ■u EXIST. ASPHALT AS :2 / NECESSARY FOR ;_J 4 SEWER INSTALLATION i V Lu -— i QC) ? r wUj 1 I ■Jz ■ FAIRCLOTH SKIMMER SKIMMER SIZE: 2.0" ■ ■ ORIFICE DIAMETER: 1.5" (REFER TO DETAIL) ■ ■ ■ 4735-24-5077 ■ IREDELL PROPERTIES INC. ■ 1010-216 ■ ZONED: R-10M (COS) ■ P.B. 1, PG. 141 o 0 ■ ■ i i ♦s � � 90 z, ♦♦��e 16SPILLWAY v� /♦ ��` ELEV: 909.50 '0 LINE LINE W/ GEOTEXTILE FABRIC TO TOE OF SLOPE 906— — PROP. SKIMMER BASIN (PH2) DRAINAGE AREA: 4.98 AC DENUDED AREA: 3.85 AC BOTTOM ELEV: 906.00 SED. STORAGE: 1.5' STORAGE DEPTH: 2.0' TOP OF DAM: 911.00 MIN. DIMENSIONS: 70'x15O' I Qo � a W_ � Fra Og U 12 KENHILL ROAD CITY MAINTAINED SEE SHEET C-7.0 FOR EROSION CONTROL NOTES, CONSTRUCTION SCHEDULE & MAINTENANCE PLAN BEFORE YOU DI431 CALL 811 OR 1-800-632-4949 N.C. ONE —CALL CENTER IT'S THE LAWI ML GRAPHIC SCALE 40 0 20 40 80 URBAN DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 i S / 2 SEAL 27890 D. 111100 11.21.19 i ti O Lu >z 00 N � ^� L.L a LU LLi J . \ cz 0 � O T w � < Q T �/ U) CIJ 0 }� Z CIO6 N> W ♦ /) � C L Cz O�It LO z �� O oaf � E Cz tl 2 a Uo co o� }+ � j CD U) O1 U `/) W Cz 0 O 0O O ■C/) 0 WO U Z O U5 w i m di Q O z z O a z 0 Ir O O U J D Ir w a_ a- 0 D rn LO 0 r U z O U) w Ir 0 Z 0 Ir w a_ D rn ri T M1 U) z O U) w J D Ir w a_ D rn T CV T (y) Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: C-701 INCH = 40 FEET RT�h 8" 1" CIA. HOLES TAPERED TO 1-10 DIA. ON OPPOSITE SIDE ¢y FRAME. GRATE, AND HOOD AS PER NCDOT STANDARD 840.03 1599CG5 N rT + \� d 4° �d q� a • 112" 41�• TOP OF CONTRACTION APPROX. DRAIN AREA • 92.70 SO IN APPROX. WEIGHT WITH FRAME= 59.62 LBS to' e a O COVER VIEW ��..��?? JOINT ill $'TYPICAL PICAL /1I A A SEE PLANS w 30, O O O � I w �6 w •M 30" CURB & GUTTER SECTION ��s EXPANSION " ''w ° ••- . w w JOINT w w y �w�,1pF4 ' ° w p15 O O BOTTOM OF d / 114" PER FT. ' w w w U R B A N 45" x y y w w ° HINGED GRATE T COVER VIEW a d - I FOR EASY ACCESS DESIGN • 314" RAD. TOP ° - ° • d•• a �� CD �A- 718" RAD. BOTTOM •1 60,TYP. / \ \ 4" 4 w 4 ! � � � \ �! I a ; � 1.68 i PARTNERS 24" PLAN f f i / _ ! 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 rtners.com 24" CURB & GUTTER SECTION ,' DETAIL 1S' ISOMETRIC VIEW FIG firm o: P-0gn nctirm no: P-0418 JOINrsEALER JOINTSEALER ° 3 _ 114" 1" _ - sc coa no: C-03044 III/ R 118, R 118" 1" 117, / \1 SLIGHTLY BEVELED 14" 101 ,14^ O%EDIUSGE TOOLED EDGE 11 ° a I�r 114' 118" RADIUS /7 / SURFACETO • { I • - ' a - •.... BE MACHINED IL112' 1-0l8" 1 r < a d db 4 - as ," I -I r112p tl4 • . ^ JOINT FILLER a . • - _ • MINIMUMWEIGHT 383 LBS 20-1Q" Te R 4' 8-114' e7h PLACE SEALANT IN SAW CU7 MATERIAL MATERIAL CONTRACTION JOINTS EXPANSIONJOINT EDGE NOT PLaiI1FE 0R,VN5 TO WA7FH,4AY5 16.25 `YY\111I/hI •' Q' -1-VTd" ' ..:. �P. SPECIFICATION CLASSA-48RON MEETING 11 \ TRANSVERSE EXPANSION JOINT CONTRACTION JOINT 0 RMIN4FRTS 21-112" 12' 2 SECTION VIEW ti �� - AL 27890 Notes: 2, NOTE: NYI-oaLgsr D1ICTILEIRON ��� = 1. CONTRACTION JOINTS SHALL BF SPACED AT 10 FOOT INTERVALS UNLESS A CURBING MACHINE IS USEn, THEN 15 7007 JOINT SPACING MAY BE USED. JOINT SPACING MAY BE ALTERED BY THE ENGINEER TO PREVENT UNCONTROLLED CRACKING. 2. CONTRACTION JOINTS MAY BE INSTALLED BY THE USE OF TEMPLATES OR FORMED BY OTHER APPROVED METHODS. WHERE SUCH TH N07ES:I�Rll 1. BOXES SHALL BE DESIGNED TO WITHSTAND H-20 LOADINGS TYPE "]E" 34-412" GENERAL NOTES: SECTION A -A 1. INSTALL 112' EXPANSION JOINTS AT 50' O.C. AND WHERE WALKS ABUT OTHER WALKS, OR OTHER CONSTRUCTION. SCORE WALK TO A OEFTH OF D14 AT 5' TO 6' O.C. 1.12 16.13 �i �.••. `�.•. i� /p '�I'/G I Nf``. • \� `� i JOINTS ARE NOT FORMED BY TEMPLATES, A MINIMUM DEPTH OF 1 1121NCH SHALL BE OBTAINED. 3. ALL CONTRACTION JOINTS SHALL BE FILLED WITH JOINT SEALER. 2. USE GRATE. 3. FOR BOXES 8' pEEP ANp LESS USE 6"THICK WRLLS ANC BOTTOM SLAB, FOR BOXES GREATER THAN 8' DEEP USE ALL CASTINGS SHALL BE MADE OF CLEAN, EVEN GRAIN, TOUGH GREY CAST IRON. 7HE CASTING SHALL BE SMOOTH, 2. ALL SIDEWALKS SHALL BE 3W0 PSI. 3. CONORETE SHALL 8E BROOM FINISHED WITH 2.5" STRIKING AROUND EDGES TO GNE A /lI D • S YYN\� // 4. EXPANSION JOINTS SHALL BE SPACED AT 90 FOOT INTERVALS, AND ADJACENTTO ALL RIGID OBJECTS. 8" THICK WRLLS AND BOTTOM SLABS. TRUE TO PATTERN, ANO FREE FROM PROJECTIONS, SAND HOLES, WARP, AND OTHER DEFECTS. 4. STEPS SHALL BE REQUIRED FOR BOXES OVER T-5" DEEP. STEPS SHALL BE 1T ON CENTER AND IN ACCORDANCE 2. ALL CASTINGS SHALL BE COATED WITH COAL TAR PITCH VARNISH WHILE HOT. PICTURE FRAME APPEARANCE. / / I I II I I I I11 5. ALL CURB AND GUTTER SHALL HAVE A 30W PSI COMPRESSIVE STRENGTH (off 28 DAYS. 6. WHEN NECESSARY AS PER NCDOT OR THE CITY ENGINEER, USE MOUNTABLE CURB AND GUTTER AS PER NCOOT STANDARD #846.07. WITH NCDOT SPECIFICATIONS. 3. ALL COVERS USED FOR STORM SEWER STRUCTURES SHALL HAVE "STORM SEWER" CAST ON THEM. 5. CATCH BASINS SHOULD NOT BE PLACED IN THE RADII OF INTERSECTIONS UNLESS APPROVED BY THE ENGINEER. DIMENSIONS ARE FOR REFERENCE ONLY THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH DRAWN BY ESC MATERIAL J138 VERCHA.AVE ACTUAL DIMENSIONS MAY VARY NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT BUFOFW. GA 30518 DIMENSIONS ARE IN INCHES OR POSSESSION OF THIS PRINT DOES NOT CONFER, DATE 3.446 oL1CTILEiION L� PHN (770) 93MAO •I •I 2 •I 1 1 • L 1 •I • 1 oi9T^T Syf DETAIL # REVISED o� AT DETAIL # REVISED o aT DETAIL # REVISED of AT DETAIL # REVISED GRATE MEETS H-20 LOAD RATING TRANSFER, OR LICENSE THE USE OF THE DESIGN OR Nylaplast AX �°;� 4M �,,, CITY OF STATESVILLE STREET sTa MAvzolo CITY OF STATESVILLE Roaoways ST-5 - ,,, _ ,� CITY OF STATESVILLE STREET ST-7 - ,;_ rt� CITY OF STATESVILLE STREET ST-9 MAY2010 QUALITY: MATERIALS SHALL CONFORM TOASTMA536GRADETO-0O�AS TEPRODUCTIONOFT45PRINTORAICAL INFORMATION SHOWN :REN RE4TBEI7BY EBC PROJECiNOJNALIE G ri REPRODUCTION OF THS PRINT OR ANYIHFORMATION TRLE Mgiflll ,lGlRIILT"■ - U INgfS10'.M K m. Standard Precast IN�IRIAY�46pNlT"■ Storm Sewer Frame iNuusTlir u PAINT: CASTINGS ARE FURNISHED WITH A BLACK PAINT CONTAINED HEREIN, OR MANUFACTURE OF ANY SATE 3-746 1s IN STANDARD GRATE ASSEMBLY SCALE: SHEET# PUBLIC WORKS DEPARTMENT Curb & Gutter Section '�rq�pgOt �p � PUBLIC WORKS DEPARTMENT 'PTy' SCALE: SHEET# �o ti� and SCALE: PUBLIC WORKS DEPARTMENT SHEET# SCALE: SHEET# �p PUBLIC WORKS DEPARTMENT Concrete Sidewalks LOCKING DEVICE AVAILABLE UPON REQUEST SEE DRAWING NO. ARTICLE HEREFROM, FOR 7001-110-032 ISFORII DEN, "OEPTBYSPEGIFICWRITTEN THE DISCLOSURE TO OTHERS A 1g 7001-J19-E08 REV' N.T.S. 1 OF 1 OZ Catch Basin N.T.S. 1 OF 1 Oi Cover N.T.S. 1 OF 1 Oi N.T.S. I OF 1 PERMMONFROM NYLOPLAST. quo,O.,,O AaT 0wG5IIE SCALE SHEET 1OF1 DWGNO, C i ti �, LU � N •. y'°a s oR a y 1 3/4" VARIES Ld L= 10 FEET IN LONGITUDINAL SECTION //�� D Y/ W z F �Eio �Aq �'"$ .° <• a ' - 45 DEGREE CHAMFER 8 MAX. SPAN, SEE PLAN io p L L/4 L/4 L/4 L/4 Q W J ALL FOUR SIDES I a a W J °. 8. 2" x 4" CAP 25" RADIUS o w o v A B Z " C M iv'0 BACK OF CURB -0 Q •\ Q w 4MIN. ' J�j 2" x 2" LATH 6" O.C. 6 1/2" M _ _ _ cz o ~ I �A�'�° �• (VERTICAL) • \ e, °• °..: ° 24 . • 41 ' • • •! 418" 1 FACE OF CURB N r \ 9 �+ a A- ° 2" x 2" LATH, 6" O.C. 2'-0" VALLEY GUTTER •f. RADIUS .a t d' .I . • - A B C } w a i • (HORIZONTAL)A.L '' `LIP OF GUTTER/EOP N 2" x 4" CAP 4 2'-0" PLAN VIEW w N '1\.. �AP�T•f'�4gTF0 w \\ \ \ \ 2" x 2" NAILING STRIP 7 1/Z U Z \ \ ' �.\ NOTES: \ \ .. 4" x 4" POST NOTES: 1. TRANSITION IS NOT TO BE LOCATED WITHIN THE CURB RADIUS. � Q. .°. . e < ' do. .4 1 \ d • . c ° ° a n U) 1. CURB SHALL BE DEPRESSED AT DESIGNATED AREAS EVEN IF SIDEWALK IS 44" " I ='-4 1/2" C� (/� NOTTHERE ISOMETRIC VIEW 2. ALL HANDICAP ACCESS RAMPS SHALL BE 1 X 6" 2'-3• -1 1/z" INSTALLED AS PER A.D.A. SPECIFICATIONS. 3. NO SLOPE ON THE WHEELCHAIR RAMP SECTION A -A SECTION B-B SECTION C-C ■ Cz T L� SHALL EXCEED 1"i12"(GRIN RELATIONSHIPrOTHEGRAnEOFTHE VALLEY CURB AND GUTTER O }' T STYE F. CURBANDBEYOND GUTTER 2" x 2" NAILING STRIP SCALE: NTS C/) SEE PLANS PAVEMENT SIDEWALK _-_ -- --- 12" , 6' CO NC. PAD 6 MINIMUM NUMBER MINIMUM NUMBER OF ACCESSIBLE PARKING REQUIREMENTS -1 1=11I=I-i '- 1z:1 MAXSLQPE 18" ELEVATION TOTAL PARKING SPACES OF ACCESSIBLE SPACES ACCESSIBLE SPACES REQUIRED PROVIDED SPACES REQUIRED TO BE VAN ACCESSIBLE PARKING SPACE PAVEMENT MARKINGS (A © © CURB SECTION A -A 6"x6"x1.4"W WWM NOTES: 1 TO 25 1 1 SIGNAGE-� ® ® ® ® © © ® © MUTCD L.L. a) T DETAIL# REVISED 4' COMPACTED SUBGRADE �:LCONCRETE 1. ALL WOOD TO BE PRESSURE TREATED 26 TO 50 2 1 (MUST NOT OBSTRUCT ACCESSIBLE ROUTE) ACCESSIBLE ROUTE V A N R7-8P ACCESSIBLE 12"x6" N O MUTCD RESERVE D o y ` CITY OF STATESVILLE STREET ST-,0 „WO."WW"" FOOTING 40 CCA OR EQUAL. 2. ALL HARDWARE TO BE GALVANIZED 51 TO 75 3 1 76 To 100 4 1 (SEE NOTE 2) R7-1 PARKING 12•x,9- PARKING MUTCD R7-8 - � m SCALE: SHEET' �b v� PUBLIC WORKS DEPARTMENT Accessible Curb -Cut �Ty`O N.T.S. 1 OF 1 SECTION UNLESS OTHERWISE NOTED. 50. sTD. No 101 TO 150 5 1 50.09 FOR DIMENSIONS__, ® ® ® RESERVED Murco PARKING 12"x18" ANY ICE (� � ^ 151 To 200 s 1® ® R7 8 ,2"x,8" TIME V ,--, L0 201 TO 300 7 2 ONEOUTOF EVERY - WALL SECTION 301 TO 400 8 2 401 TO 500 9 2 11' 5' SIX (6) ACCESSIBLE 8' 8' 8' 8' S' g' SPACES, BUT NOT LESS THAN ONE, IS OPTIONAL MAXIMUM SUPPLEMENTAL PENALTY ACCESSIBLE SIGN LOADING 12'x9" Iz" `~ � ♦ ♦ v Cl) 501 TO 1000 2% OF TOTAL 1 IN EVERY 6 ACCESSIBLE SPACES VAN REQUIRED TO BE VAN ACCESSIBLE, PER VAN ZONE $250 3,.e W -0 W BRICK ROWLOCK ° ° SPACACCESSIBLE SECTION 1106.5 OF ACCESSIBLE NC STATE BUILDING CODE MAXIMUM SUPPLEMENTAL PENALTY ACCESSIBLE SIGN 5O 12•x9• p cr 1001 AND OVER EACH 100 OVER FOR 000 ACCESSIBLE SPACES RY 6 (OPTIONS 1) (OPTIONS 2) G5�"- s SEE STANDARD N0. 50.10C FOR U) 00 6" I.D. STEEL ROUND TUBE SLEEVE HINGE. ° ° SIGN DETAIL O WELD TO GATE FRAME. (TYP.) WITH GREASE NIPPLE CENTERED S 0 LD I ER COURSE °UPPLEMETAL o REFERENCE: SECTION 1 106 OF INCNC BUILDING CODE -0 EQUAL EQUAL FENCE AND GATE TO BE HORIZONTAL AND PLUMBS F3 BU X 1/ SEE TUBULAR STEEL E BRICK RUNNING BOND TYP. 10 1. ALL 12"08" ACCESSIBLE SIGNS (R7-8 & R7-1) SHALL BE MOUNTED AT 7 FEET FROM GRADE TO BOTTOM EDGE OF SIGN FACE (MUTCD). MOUNTING C TYP. 1 1 4" I NOTE: BRICK SELECTED BY 1 OWNER. �, HEIGHT CAN BE REDUCED To 5 FEET IF PLACED IN AN AREA BETWEEN SIDEWALK AND BUILDING FACE IN WHICH PEDESTRIANS ARE NOT EXPECTED To 0 v J 0 12„ USE. 2"X4" TOP RAIL 2. IF ACCESSIBLE ROUTE IS A RAISED SIDEWALK AREA, THEN RAMPS ARE REQUIRED I� 6„ q1"X2" STEEL RECTANGULAR TUBE SPACER (TYP.) 2"X2" VERT. & HORIZ. LATTICE AT LOADING ZONE AREA. MAINTAIN MIN. 4' WIDE CONTINUOUS PASSAGE. 3. VERTICAL CLEARANCE FOR VANS MUST BE GREATER THAN 98-INCHES. �'� f SIGN R7-8P ACCESSIBLE z 4. THIS DETAIL IS TO PROVIDE GENERAL GUIDANCE FOR PARKING LAYOUT AND F O ~ 2"X4" MID RAIL - " DESIGN; REFER TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) z L+I �_ 2"X4" VERT. STYLE -BOTH SIDES #3 REBAR C� 24 OC VERTICALLY1 U.S. DEPARTMENT OF TRANSPORTATION AND NORTH CAROLINA DEPARTMENT OF z z Q "X6" TRANSPORTATION SUPPLEMENT AND NC BUILDING CODE FOR ADDITIONAL RESERVED O w 1 N 1 T&G VERTICAL SIDING RABBIT LIT. LATTICE AND VERT. SIDING TO THE BACK OF THE RAILS AND STYLES. SOLDIER COURSE ° ° ° ° INFORMATION. �� G PARKING 0 pC > O U) -I o ATTACH WITH EXTERIOR GRADE SCREWS. 12' ; A C C E,,= S E3 H L E3 f SIGN R7-8 O Lu X 1 /4 ROUND LAP LIT. RAILS AND STYLES AS SHOWN, ATTACH WITH EXTERIOR GRADE SCREWS. >- z >- stop PLA E (TYP.) ATTACH 2"X4" RAILS & STYLES TO TO GATE FRAME WITH 1 4 HORIZONTAL REINFORCING , -+- E z O a 3" STAINLESS STEEL BUTTON HEAD EVERY 6TH COURSE I U5 pC BOLTS WITH LOCK WASHER AND > 12" NUT. SIZE LENGTH TO FIT WITH MAXIMUM. 1 2" EXTENSION BEYOND „ w w w w NUT. BOLT HEADS TO FACE OUT. 2'X4' BOTTOM RAIL 6 CONCRETE PAD, MAX0 MAXIMUM � PENALTY SUPPLEMENTAL w w w -- -- - - - - - ----------- 3600 PSI 28 DAYS z $ 250 •• GATE POST TO BE 6" I.D. ROUND STEEL TUBE WITH A ACCESSIBLE SIGN Dp 30�� 6" CONCRETE (360OPSI) CANE BOLT - PROVIDE SLEEVE w/ 6"x6" WWM CLOSED (4" MIN) ROUNDED CAP PENALTY R7-8P a a POSITIONSFOREACHGATE X-X X-X-X 0 'n ~ � Cl) N CONCRETE POST FOOTING DIMENSIONS (INCHES) 0 � 'It 6„ HOLD FOOTING FOR POST BELOW BOTTOM ELEVATION NOTES: ILO ~ OF SLAB 6 X6 X WWM = Z DO $2,50 A B c D E F G H J K L E Z 1- 1- 1 • ALL WOOD TO BE PRESSURE TREATED 40 CCA. 3/8" (TYPICAL) 12 s 3/8 3/a 1-1/2 1-1/20 1/2 1D 2-1/2 4 1-1/2 L~n z ,- CV c'7 2. ALL HARDWARE TO BE GALVANIZED UNLESS OTHERWISE w 3. ALOL STEEL POSTS AND GATE FRAME TO PRIMED AND PAINTED WITH 2 COATS EACH. COLOR TO BE SELECTED BY OWNER. 3/8" (TYPICAL) C S 2 0 e 3 7 . 6 .INCREASE SPACING 50% (FEDERAL HIGHWAY ADMINISTRATION/USDOT) SERIES D LETTERS w FINISHED GRADE 4LD-FHWA :, .. Project NO: 1 9-039 4. ALL STEEL MEMBERS TO BE SHOP WELDED. PROVIDE SHOP DRAWINGS FOR APPROVAL PRIOR TO FABRICATION. #3 REBAR @ r 1.3 10" III III GATES Date: 04.02.19 5. RETAINING WALL AND FOOTINGS BEYOND NOT SHOWN. SEE DETAILS THIS SHEET. � 2 O.C. LONGITUDINALLY LEGEND AND BORDER -GREEN u. I 24" O.C. HORIZONTALLY LEGEND AND BORDER - GREEN BACKGROUND - WHITE Designed by: udp BACKGROUND - WHITE NOTE: SIGN APPROVED FOR USE UNDER GENERAL STATUTE 20-37.6 SUPPLEMENTAL VAN ACCESSIBLE SIGN (R7-8P) USED IF Drawn By: THIS PENALTY SIGN IS REQUIRED TO ACCOMPANY ALL R7-8 THERE IS ONLY ONE REQUIRED ACCESSIBLE PARKING SPACE (MUST BE VAN ACCESSIBLE) AND AT EACH Sheet No: PARKING SIGNS ERECTED AFTER DECEMBER 31,1990 ADDITIONAL REQUIRED VAN ACCESSIBLE SPACE. DUMPSTER ENCLOSURE DETAILS SCALE:NTS ACCESSIBLE PARKING & SIGNAGE STANDARDS SCALE: NTS _8mO v vm c NOTES: yyH Z It" EXPANSION JO: STD. 848.01, rp-n 0 CONSTRUCT STANDARD SIDEWALK 5' WIDE AND (SEE m z = > 4" THICK UNLESS OTHERWISE DENOTED ON PLANS. = O D n m = N o o PLACE A GROOVE JOINT 1" DEEP WITH 1/g" RADII z H o F_ IN THE CONCRETE SIDEWALK AT 5' INTERVALS. �=�z ONE 1/2" EXPANSION JOINT WILL BE REQUIRED AT 50' D D INTERVALS. A Y2" EXPANSION JOINT WILL BE REQUIRED rn H WHERE THE SIDEWALK JOINS ANY RIGID STRUCTURE. a Z N SIDENA SEE STD. DWG. 848.05 FOR WHEELCHAIR RAMP LOCATION REQUIREMENTS AND CONSTRUCTION GUIDELINES. 4^� 1,b" RAID SURFACE OF SIDEWALK " EX z o� ~Q Q HO~C=U ooyzz LU<L= U Q O Cn F ~ O W oowa z ; Cr CL CL LU o m JOINT SEALERLL CDCnLz" r1W.T JOINT WIDTH I�JOINT FILLERz T = SIDEWALK THICKNESS atDoMp D St" (SEE STD. 846.01) 0 2 N y o TRANSVERSE EXPANSION JOINT o W 0 IN SIDEWALK PLAN VIEW ¢ o W It" EXPANSION JOINT v a H FILL 4$ WIDE x 1 DEEP GROOVED OR = Z z SAWN JOINT WITH JOINT rn C 7C m BUILDING, / SEALING COMPOUND ~' = WALL, ETC. RAE) Lzu P PROPOSED OCONC. / P P CONCRETE ROP• CBrG oPAVEMENT SIDEWALK SHEET 1 OF 1 CAD ,,., DETAILS SHOWING JOINTS IN CONCRETE SIDEWALK I CAD „4 2'-5" cuas a avrmw �`��•. ii END TREATMENT .ayf I I I I I I I I k 7D. ! I 10, R.3a• I Rw I - - - - -=--- -� -- ---I R�96' Y ME OF PAYL4%W ��. 1� y . ra-coNceera cure DarLcreAeRL n. fs � `.lr �,_ARw,aN PAY LIMITS FOR 1 CURB RAMP C833% rl?:a) MAX RAMP SLOPE (a; cRoss saoPR: z ii` cuRR RAMPS RRQ_ A ("') MIN _ uxDiND WITD A MAXIMUM CROSS SLOPE AND LONGITUDINAL SLOPE OF 2.6tlK, N'NSRb PEDRSZRIANS PERFORM NRNING MANEWERS. SLOI•R TO DHAIN TD CUAB. I I TSlandnrd ConCfele t DAch Sid. s5D.01 I IRipRDp or Matting) IH4 l 1 1 I R.3ar SIW171X1+4TIGlE I f►yp.a R�]D' EDGE Of 1'rIvv4NT EDGE OF PAVtYam 170rnNG ROM EOGI of MYpaw tL1Y -• NOTE: Permanent Drpinoge oasements may be required to accomodate drainage he3yond tho right -of -sway. RECOMMENDED ROAD C0tgNECTI0N WITH CURB ANn GUTTER NDNWALR � iy l' J TYPE 16 y --------r'----- t77 1' '- ""NGRRra DrPRF�sFD "GRR B.]]M "I1�ALIXOSWPS �` MfN TYPE 1 REFER TO ROADWAY STANDARD DRAWING NUMReR eI&OS SHEET 3 OF S FOR ALL TAMP NOTRS -0" TO EDGE OF PARKING SPACE EDGE OF PARKING SPACE SEE PLAN FOR PAVEMENT TYPE =III I a all q 4 a d m COMPACTED SUBGRADE #5 REBAR @ l'-6" DEPTH IN UNDISTURBED SOIL. HAMMER SHARP END AND RECESS FROM TOP OF WHEELSTOP 1/2". CONCRETE OR PLASTIC WHEELSTOP CONCRETE CURB STOP LANE WIDTH (L) LANE WIDTH (L) LANE WIDTH (L) LANE WIDTH (L) L/2 !? L/2 L/2 L/2 L/2 (TYP) T NOTES: 1. PER MUTCD STANDARDS, WHEN CROSSWALK LINES ARE USED THEY SHALL CONSIST OF SOLID WHITE LINES THAT MARK THE CROSSWALK. THEY SHALL BE NOT LESS THAN 150 MM (6 IN) NOR GREATER THAN 6DO MM (24 IN) IN WIOTH. 2. IF TRANSVERSE ONES ARE USED TO MARK A CROSSWALK, THE GAP BETWEEN THE LINES SHOULD NOT BE LESS THAN 1.8 M (6 FT). IF DIAGONAL OR LONGITUDINAL LINES ARE USED WITHOUT TRANSVERSE LINES TO MARK A CROSSWALK, THE CROSSWALK SHOULD NOT BE LESS THAN 1.5 M (6 FT) WIDE, 3. IF USED, THE DIAGONAL OR LONGITUDINAL LINES SHOULD BE 306 TO 600 MM (12 TO 24 IN) WIDE AND SPACED 300 TO 1500 MM (12 TO 60 IN) APART, THE MARKING DESIGN SHOULD AVOID THE WHEEL PATHS, AND THE SPACING SHOULD NOT EXCEED 2.5 TIMES THE LINE WIDTH. IDTk ALK, i Is NOT V 1' OF IMP] CURB TRANSITION SCALE: NTS r PIANO -STYLE CROSSWALK SCALE: NTS I SAW CUT JOINTS EXISTING PAVEMENT 4 0 a . NEW ASPHALT 'SUPER PAVE S9.5B' ° a TO MATCH EXISTING PAVEMENT' AVEMENT ° • ° " THICKNESS OR 2.5" MIN. ° D 8 8 a F • , Il s EXISTING STONE d a COMPACTED l!l l�!lll ABC STONE $, 1111 IIIII J f V COMPACTEDJ -11111111-1� BACKFILL III�III� U�RIES IIIIf��l �' -11_1111 . I1 COMPACT SELECT BACKFILL IN G" LIFTS p•p' _ ( MATERIAL NO / LARGER THAN 1") SEE NOTE # 1 '� Q - • NOTES: SEE NOTE # 2 $ 1. WHEN IN ROCK OR NON -CUSHIONING MATERIAL PLACE A BED OF # 57 STONE AT LEAST 6' THICK BELOW MIDPOINT OF PIPE FOR TRENCH DEPTH'S UP TO 16. WHEN TRENCH IS GREATER THAN 16 DEEP PLACE AN ADDITIONAL V OF CUSHIONING STONE FOR EACH 2' OF DEPTH UP TO A MAXIMUM CUSHIONING DEPTH OF 12'. 2. WHERE UNSUITABLE SOIL IS ENCOUNTERED, EXCAVATE THE SOIL AS DIRECTED BY THE ENGINEER AND BACKFILL WITH #57 STONE. 3. BACKFILL SHALL BE COMPACTED TO 95%STANDARD PROCTOR DENSITY. 4- WHEN WORKING WITHIN NCDOT RIGHT-CF-WAYS IT MAY BE REQUIRED TO ADD A ONE (1] INCH ASPHALT OVERLAY OVER AND AROUND THE CUT AREA OVERLAP NEW ASPHALT AND STONE 12" MIN. BRACE TRENCH AS REQUIRED BY EXISTING SOIL CONDITIONS PIPE DIAMETER LESS THAN 14' 12' W' TO 36" 18, MORE THAN 24' 24" DETAIL# REVISED CITY OF STATESVILLE SANITARY SEWER 5-11 MAY 2010 PUBLIC WORKS DEPARTMENT Trench, Bedding, & SCALE: SHEET# Backfill in Paved Roads N.T.S. 1 OF 1 w w • BRACE TRENCH AS REQUIRED w w w w w v w BY EXISTING SOIL CONDITIONS LOOSE BACKFILL W . . • , • W • . • . w, Y' w w * v- W w w w w m W w HEAPED UP TO PROMOTE . W W • 111 I w w + `/ VEGETATION W ` - • � - w GROWTH " . -� • .... yy�y y 'y y yyw y, y y COMPACTED 6 IIIII=11 /�/ BACKFILL :. Il-III //ram//� COMPACT SELECT �\/\// / BACKFILL IN 6" LIFTS -111� ( MATERIAL ND LARGER THAN 1" /PIpE SEE NOTE#1 �~ OP SEE NOTE # 2 I 14 NOTES' PIPE DIAMETER 1F LESS THAN 14' 12' 14" TO 36" 18' MORE THAN 24' 24" 1. WHEN IN ROCK OR NON -CUSHIONING MATERIAL PLACE A BED OF # 57 STONE AT LEAST V THICK BELOW MIDPOINT OF PIPE FOR TRENCH DEPTH'S UP TO 161. WHEN TRENCH IS GREATER THAN 16' DEEP PLACE AN ADDITIONAL 1" OF CUSHIONING STONE FOR EACH T OF DEPTH UP TO A MAXIMUM CUSHIONING DEPTH OF 12". 2. WHERE UNSUITABLE SOIL IS ENCOUNTERED, EXCAVATE THE SOILAS DIRECTED BYTHE ENGINEERAN❑ BACKFILL W ITH #57 STONE. 3. BACKFILL SHALL BE COMPACTED TO 95% STANDARD PROCTOR DENSITY. T DETAIL# REVISED CITY OF STATESVILLE SANITARY SEWER &12 MAY 2010 iNpmAr AGIKOIruAr PUBLIC WORKS DEPARTMENT Trench, Bedding, & SCALE: SHEET# - ov Backfill Off Road N.T.S. 1 OF 1 a v - fi, w Cr CL o � U Y W � wo �> o � w �o ¢ Mo � U 4 §E p � 2 W a m m w a x �m o w �2 ,uIx } >0W ,ay Wz za W �F 9 •Z _ -----* - CITY OF STATESVILLE PUBLIC WORKS DEPARTMENT SANITARY SEINER Utilities in RM DETAIL # REVISED S-13 MAY 2010 SCALE: SHEET# N.T.S. 1 OF 1 BACK OF CJRB UP TO 1.5% 70P OF CONCRETE CURB (BEYOND) J (2.0% MAX) RAMP SLCPE UP TO DETECTABLE WARNING 75% (8.33% MAX) 1/2- EXPANSION JOINT SW TRANSITION SEE DETAIL 10,3513 PANEL -SEE SIDEWALK TRANSrFION ' ` • • •" NON -WALK SURFACE PANEL - SEE 6 NOTE 5 2' MIN, _ _ _ _ U RBA N NOTE 5 s Up s7.5% p !� o UP ro 7.sc. MATCH I$'� VARIES 4 L.- 2" TO 5.0' 6" D E S I G N SIDEWALK WIDTH F THERE IS AN SEE 2'-6" CURB DETECTABLE WARNING NTERSECTING TOE OF RAMP -A ` • AND GUTTER 2' MIN. WIDTH IN RAMP, A TURNING DETAIL BELOW DIRECTION OF SPACE/LANDING Is PARTNERS R6' RADIUS VARIES . PEDESTRIAN TRAVEL REQUIRED WITH ` • CONCRETE SECTION A -A 1.5% (2% MAX.} CROSS SLOPE AND 1318-e6 central ave. P 704.334.3303 SIDEWALK (OR TURNING SPACE: IF RUNNING SLOPE charlotte, nc 28205 F 704.334.3305 INTERSECTING RAMP} " FLOWUNE DEPTH urbandesignpartners. com AT RAMP LOCATION nc firm no: P-0418 PLAN TYP. 3-4a T$} SN Ton$w N PwIl sc coa no: C-03044 RAMP RUNNING EDGE OF (UP To s% MAX.) rl uu1 1 fu Nx1 PAVEMENT SLOPE UP TO 7.57 1/2' EXPANSION JOINT (TYP,) (8.33% MAX) (INCLUDES • DETECTABLE` CROSS -SLOPE . W � NON --WALK I' s SURFACE IIIII 111/777/ WARNING) 1-5% {2-00% MA z _s CURB AND GUTTER \11111j1 - W TOE OF RAMP 2'-6" CURB AND GUTTER DETAIL VARIES` n° °° °°°°°°°°°°°°°°°°°0 MAXIMUM SLOPES FOR CURB AND GUTTER DEPRESSION AT DIRECTIONAL RAMPS /� NOTES: _ �' • ,. 1 1. USE THIS DETAIL ONLY UNDER THE FOLLOWING CIRCUMSTANCES: - SEAL - 5-FOOT SIDEWALKS WITH CURB RADII OF 35 FEET OR LESS 6-FOOT SIDEWALKS WITH CURB RA➢II OF 30 FEET OR LESS - 27890 CURB HEIGHT = = VARIES 0- TO 6" SIDEWALK TRANSITION 1' f� SEE NOTE 2 PANEL - SEE NOTE 5 8-FOOT SIDEWALKS WITH CURB PAOR OF 25 FEET OR LESS 2- DIRECTIONAL RAMPS WITH RETURNED CURBS AS SHOWN MAY BE VSED WHENRA PLANTING STRIP (NON -WALK SURFACE) 1$ PROVIDED. 00 NOT USE THIS DETWL IF THERE IS HARDSCAPE - •• '• ` •'�"' (WALKABLE SURFACE) INSTEAD OF A PLANTING STRIP. IF A WALKABLE SURFACE IS ADJACENT /A��/� �i�/p V I NE��•��� TO RAMP CONSTRUCT CONCRETE FLARES WITH SLOPES UP TO 10% MAX, INSTEAD OF i� ••. \\ CONSTRUCTION JOINT (TYP.) RETURNED CURBS.3- ALL //A/IIIDIIII111111\ 4. ENSURE FLUSH COHOITONSTAT RAMP TO GUTTER TRANSITION PERSPECTIVE S. SIDEWALK TRANSITION PANEL: PREFERRED DESIGN IS T.5% 2.0% N ALL INPEC 04S IN FRONT c MAX)) OF GRADE BREAK &DRAIN TO FLOW LINE. RUNNING SLOPE OF THIS AREA MUST T k NO E CEED 2%. CROSS -SLOPE MAY MATCH STREET GRADE AT BACK OF CURB WHEN STREET GRADE >2%- TRANSITION TO 1-5% (70% MAX) CROSS -SLOPE AT TOF OF RAMP. 11 21 1 9 SCALE:NTSr DIRECTIONAL CURB RAMP MANHOLE RING, AND COVER (SEE DETAIL) If2 PIPE DIA. 213 PIPE DIA, SECTION THRU TROUGH GROUT MANHOLE FRAME TO THE TOP OF MANHOLE GRADE RINGS AS REQUIRED A " USE AN APPROVED BITUMINOUS a 4, BASE SEALANT APPLIED TO TOP OF CONE SECTION STEPS SHALL BE PLACED ` AT 12" ON CENTER AND SHALL CONFORM TONCDOTSPECIFICATIONS e ' USE ECCENTRIC CONE GROUT ALL ° ° a EXTERIOR JOINTS (TM ALL JOINTS TO BE TONGUE & GROOVE WI • �� o PREFORMED BUTYL RUBBER (MASTIC} GASKET 4 4' MEETING AASHTO M-198, ASTM. C-990 - d d < 4 4' I.D. PRECAST MANHOLE 4 l2p TO MEET REQUIREMENTS OF ASTM C478, AASHTO M-199 a , 1 5I I' ) as P�F A I0 l $' MIN q5 ri�q °REo d NOTES: u 1. MANHOLE DESIGN SPECIFICATIONS SHALL CONFORM TO LATEST ASTM AND NCDOT SPECIFICATIONS FOR "PRECAST REINFORCED CONCRETE MANHOLE SECTIONS'. 4' 2. DESIGN SHALL MEET H-20 LOADINGS. USE PRECAST OPENINGS FOR ALL 3. MANHOLE RINGS EXPOSED ABOVE PIPES. FLEXIBLE CONNECTORS SHALL GRADE SHALL BE ANCHORED TO THE MEET THE REQUIREMENTS OFASTM GRADE RINGS ANDIOR ECCENTRIC �" 6) g, C923 SPECIFICATIONS. SEE PLANS FOR SECTION WITH (2)1IP" ANCHOR BOLTS. PIPE SIZES AND INVERT ELEVATIONS. 4, CONTRACTOR SHALL SUPPLY CONCRETE: COLLARS OR FLEXIBLE 6" ASE THE CHANNEL DROP THRU RUBBER BOOTS CN ALL MANHOLE MANHOLE IS 0.2' MIN AND 1.6 MAX INFLUENT AND EFFLUENT PIPES - SANITARY DETAIL# REVISED CITY OF STATESVILLE SEWER S-4 MAY 2010 r uuSTAT•AGAKOLrIIAE ( PUBLIC WORKS DEPARTMENT 4'PRECAST MANHOLE SCALE: SHEET# N.T.S. 1 OF 1 Water Line Standard Materials For water line construction, the following specific materials or brands are considered acceptable for the City of Statesville's system. Fire Hvdrants: All must have National Standard Threads, 4 z Inch valve openings, and open left (counter -clockwise). American Flow Control (American Darling) Mark-73, Mueller Super Centurion 200 and Clow Medallion F-2545 are approved hydrants. Water Valves: All valves must open to the right (clockwise). Quarter turn ball valves should be used an sizes u Q p to 2 inch diameter water lines. Each valve shall have a flat head (such as a core stop) for onloff operation. Reslllent wedge type valves must be used on sizes 2-2 to 10 Inch diameter water Imes. On 12 Inch or larger, butterfly valves with double disc gates must be used. Approved valves are American Flow Control (American Darling), Mueller and Clow. Pipe Materials: All major water mains 6 inch and larger shall be ductile iron class 50 or Gass 350. Water taps'/, Inch through 1 Inch shall be type K soft capper line. Type L hard capper shall be used for 2 Inch reduced at the meter for 1 '/. Inch service. Water Meters: All water meters shall be In Cubic feet par seoond. The City can fumish meters (far cost) for application on Imes to be dedicated to the City. Size will be determined according to the demand. All meters 31nch and larger are to have ductile Iron pipe to the City side of the meter. Fittings shall be brass for % inch through 1 inch and be flared or compression type. Fittings for t inch shall be compression only. Approved types are Ford, Mueller, and McDonald. Approved meter boxes are Brooks #1419 for % inch through 1 inch services and Brooks # 1730 for 2 inch services. All boxes must be 18 inch deep with plastic lid and cast iron readers. Any prefabricated meter vault not installed by the City must be pre approved by the City Engineer. Tapping Sleeves: The following area approved standards: American Flow Control (American Dading) - Mechanical Joint. Mueller - Mechanical JOInt Romac - Stainless steel with ductile Iron flange. DETAIL # REVISED CITY OF STATESVILLE WATERLINES W-1 MAY 2010 PUBLIC WORKS DEPARTMENT Standard Materials SCALE: SHEET# N.T.S. 1 OF 1 TWO 1' DIA. HOLES SPACED OPPOSITE OF EACH OTHER 4-VDIA ANCHOR HOLES A V2" TOP OF COVER VIEW o A i SCALE: NTS _>I U) U) ^L I..L cz Q 0 112" BOTTOM OF COVER 11T' R 1 A 1" R + 60" TYP. L4E PLAN 23-1YF � }+ DETAIL 318 3,' �Y-1 Y4-314" SURFACE TO BE MACHINED O 21.51 22-519Fr " 25-114" 7" SURFACE TO BE MACHINED 23 314" 7-112' R1j MINIMUM WEIGHTS-LES.- - - - - -- 1-1�- - FRAME -190 1" COVER -120 22-718" 112" TOTAL-310 24-1f2" f 4-18"33-1l4" GENERAL NOTES: SECTION A -A 1. ALL CASTINGS SHALL BE MADE OF CLEAN, EVEN GRAIN, TOUGH GREY CAST IRON. THE CASTING SHALL BE SMOOTH, TRUE TO PATTERN, AND FREE FROM PROJECTIONS, SAND HOLES, WARP, AND OTHER DEFECTS. 2. ALL CASTINGS SHALL BE COATED WITH COAL TAR PITCH VARNISH WHILE HOT. 3. ALL COVERS USED FOR SANITARY SEWER STRUCTURES SHALL HAVE 'SANITARY SEWER" CAST ON THEM. 4. THE IRON USED FOR THESE CASTINGS SHALL CONFORM TO THE SPECIFICATIONS OF THE ASTM DESIGNATION A48 FOR CLASS 30 GREY IRON. • DETAIL # REVISED U) CITY OF STATESVILLE SANITARY SEWERS 5-9 MAY 2010 Standard Manhole Frame SCALE: SHEET# PUBLIC WORKS DEPARTMENT and Cover N.T.S. 1 OF 1 WATER a PQaQ O O NOTES: 1. BODY CASTING TO BE TYLER MANUFACTURE NO.6855SERIES, 5.114" SHAFT, SLIP TYPE, OR APPROVED EQUAL. SCREW TYPE NOTACCEPTED 2. THE BOTTOM PIECE SHALL BE BEVELED AT THE LOWER END TO FIT AROUND THE STUFFING BOX GLAND AND SHALL REST ON TWO BRICKS UNDER EACH SIDE OF THE BASE. 3. FITS 4" THRU IT VALVES CT CITY OF STAT PUBLIC WORKS DEP DROP LID 55I16, f 9" 7518" 7318" 6-318" T 3116 72 BOTTOM SECTION ti a 318" TOP SECTION ESVILLE ARTMENT WATERLINE Standard Valve Box DETAIL # W-7 REVISED - SCALE: SHEET# N.T.S. 1 OF 1 fig Z 0 U5 > LU m W Q 0 Z Z 0 a Z 0 0 0 U J LU a - CT) LID O r U) Z 0 U) > LU C3 Z 0 LU a - CT) Cl) T CV Z 0 w > LU Ir J LU a - CT) CV T Co Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: C-8ml _JL LU Co D CV Z U LU Z Q Lj W J _J W H O ��/� T �/ J Li J CV C0 00 C14 9' DIAMETER NO.3 REBAR PLAN FINISH 7 gI GRADE 2" 4 5" 27' DIAMETER SECTION A -A 23' DIAMETER NO.3 REBAR A VALVE BOX TOP MARKED WATER PRECAST CONCRETE VALVE BOX DETAIL # REVISED CITY OF STATESVILLE WATERLINE W-8 PUBLIC WORKS DEPARTMENT Valve Box Protector SCALE: SHEET# N.T.S. 1 OF I LOCKABLE FLIP TOP FIBERGLASS / / ENCLOSURE FASTEN ENCLOSURE TO SLAB TYP. X / X DETECTOR CHECK PLAN VIEW LOCKABLE FLIP - TOP FIBERGLASS ENCLOSURE d USED .I.P. FROM STREET CCNNECTION TO BACK SIDE OF RPZ 4" Ay d SECTION X-X NOTE: 1. ALL BACKFLOW ASSEMBLY'S SHALL BE MAINTAINED BY THE CUSTOMER. 2. ENSURE ASSEMBLY WILL FIT WITHIN THE FIBERGLASS ENCLOSURE. CHECK DIMENSIONS BEFORE ORDERING ENCLOSURE. 3. SLOPE CONCRETE PAD TO DRAIN PORTS. 4. ASSEMBLY SHALL BE PLACED ON THE CUSTOMERS PROPERTY BEHIND THE METER. IF APPROVED BY THE CITY ENGINEER, THE ASSEMBLY MAY BE PLACED INSIDE OR BESIDE THE BUILDING. S. ASSEMBLY SHALL BE ACCESSIBLE BY CITY INSPECTORS. 6. TAMPER SWITCHES WITH ALARM SHALL BE SUPPLIFD ON THE DEVICE WHEN USED FOR FIRE LINE APPLICATIONS AS PER NO FIRE CODE. 7. METER SHALL READ IN CUBIC FEET. 8 AS AN QPTION THE ASSEMBLY MAY BE PLACED IN A BELOW GROUND INSTALL120V RECEPTACLE WITH GFCI FOR HEATER CONNECTION DRAIN PORT TYPICAL EACH SIDE ISOMETRIC VIEW OF VAULT. THE VAULT SHALL BE APPROVED BY THE CITY ENGINEER. TYPICAL ENCLOSURE DETAIL # REVISED CITY OF STATESVILLE WATER LINE W-11 DEC 2010 PUBLIC WORKS DEPARTMENT 3" -10" DCV Assembly SCALE: SHEET# (Above Ground) N.T.S. 1 OF 1 4 NEW ASPHALT 'SUPERPAVE S9.5B' ~ TO MATCH EXISTING PAVEMENT THICKNESS OR 2.5" MIN. ° s d dd " ° d COMPACTED 1= ABC STONE 1111 l� COMPACTED-----'-" I� - jlll BACKFILL �} 1 � VPR1E`' 1 1111=11_� � COMPACT SELECT BACKFILL IN G" LIFTS bp'. ( MATERIAL NO LARGER THAN 1" ) SEE NOTE # 1 0.0 NOTES: SEE NOTE # 2 1. WHEN IN ROCK OR NON -CUSHIONING MATERIAL PLACE A BED OF # 57 STONE AT LEAST 6' THICK BELOW MIDPOINT OF PIPE FOR TRENCH DEPTH'S UP TO 16'. WHEN TRENCH IS GREATER THAN 16 DEEP PLACE AN ADDITIONAL 1" OF CUSHICN ING STONE FOR EACH 2' OF DEPTH UP TO A MAXIMUM CUSHIONING DEPTH OF 12". 2. WHERE UNSUITABLE SOIL IS ENCOUNTERED, EXCAVATE THE SOIL AS DIRECTED BY THE ENGINEER AND BACKFILL WITH #57 STONE. 3. BACKFILL SHALL BE COMPACTED TO 96%STANDARD PROCTOR DENSITY. 4. WHEN WORKING WITHIN NCDOT RIGHT-OF-WAYS IT MAY BE REQUIRED TO ADD A ONE (1) INCH ASPHALT OVERLAY OVER AND AROUND THE CUT AREA OVERLAP NEW ASPHALT AND STONE 12' MIN - BRACE TRENCH AS REQUIRED BY EXISTING SOIL CONDITIONS PIPE DIAMETER * LESS THAN 14' 12' 14"TO36" 18" MORE THAN 24' 24' AT DETAIL# REVISED `0 yc� CITY OF STATESVILLE WATERLINE W-14 MAY2010 .N� y PUBLIC WORKS DEPARTMENT Trench Bedding, & SCALE: SHEET# t+7i rsR��` Backfill in Paved Roads N.T.S. I OF I w 6 BRACE TRENCH AS REQUIRED W w u w w w w BY EXISTING SOIL CONDITIONS LOOSE BACKFILL HEAPEDUPTO • + w w w w w PROMOTE VEGETATION y y l _ GROWTH w . W+, [lyy 7 1 T l 1 �J r l J COMPACTED BACKFILL v�lES `1 COMPACT SELECT BACKFILL IN (M ATERIAL ap: SEE NOTE# 1 �� � � 0• SEE NOTE i12 NOTES: PIPE DIAMETER * LESS THAN 14' 12' 14"TO36" 18' MORE THAN 24' 24' 1. WHEN IN ROCK OR NON -CUSHIONING MATERIAL PLACE A BED OF # 57 STONE AT LEAST W THICK BELOW MIDPOINT OF PIPE FOR TRENCH DEPTH'S UP TO 16'. WHEN TRENCH IS GREATER THAN 19 DEEP PLACE AN ADDITIONAL 1" OF CUSHIONING STONE FOR EACH 2' OF DEPTH UP TO A MAXIMUM CUSHIONING DEPTH OF 12'. 2. WHERE UNSUITABLE SOIL IS ENCOUNTERED, EXCAVATE THE SOIL AS DIRECTED BY THE ENGINEER AND BACKFILL WITH #57 STONE. 3. BACKFILL SHALL BE COMPACTED TO 95%STANDARD PROCTOR DENSITY. AT DETAIL# REVISED CITY OF STATESVILLE WATERLINE W-15 MAY 2019 Trench, Bedding, & SCALE: SHEET# PUBLIC WORKS DEPARTMENT +.o Backfill Off Road N.T.S. 1 OF I A UNDISTURE BEHIND BLC i CONCRETEBL EXISTING LINE USE VALVE BOX STABILIZING PAD WHEN PLACED IN AREAS SUBJECT TO TRAFFIC UNDISTURBED EARTH :11 VALVE BOX (SEE DETAIL) TAPPING SLEEVE II CONCRETE BRICKS TI 1 UNDER VALVE BOIL M.J. GATE VALVE rl MEGALUG JOINT RESTRAINT _II OR EQUIVALENT "C" SEE CHART °° III a `/`� , /J✓� UNDISTURBED EARTH CONCRETE BRICK BLOCKING CONCRETE BLOCKING COMPACTED EARTH SECTION A -A NOTES: 1. THE GATE VALVE SHALL OPEN TO THE RIGHT. 2. USE FULL BODY TAPPING SLEEVE WITH GASKET AND MECHANICAL JOINT OUTLET. 3. CONCRETE BLOCKING IS TO BE FORMED TO ENSURE ACCESSIBILITY TO FITTINGS AND POURED AGAINST UNDISTURBED EARTH. 4. FITTINGS ARE TO BE COMPLETELY WRAPPED WITH PLASTIC, PRIOR TO POURING CONCRETE. 5. CONCRETE TO BE MINIMUM 3.000 PSI. @ 28 DAYS. URBAN DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 \�NI\11111111///// 0' 7 SEAL 27890 S40/ DII11111�\\ 11.21.19 DETAIL # REVISED CITY OF STATESVILLE WATERLINE i W-17 11N� PUBLIC WORKS DEPARTMENT Tapping Sleeve SCALE: SHEET# LOB N.T.S. 1 OF I ^ LU CO N U) LU z > LLl � Q J a_ LU J 0 LU i rn I— cz O Q < UT ) T �/ Li J C\J C0 00 W 0 U }� Z C U) a� VJ U) LO O �� z �) 0 W 0 C�Old Cz U)U- (D �a U om -- cz ULO (� T ■ T Er UC/) (D W Cz o Ir U)0 0 (D Cn 0 (� o z 0 z z O z oUn0 0 w U) 0 w U C3 C1C Z J a J 0 ? oC > I LU LU LU LU a- a- a- r r r LO Cl) r Q r r N � r r O r r z Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: C-802 CONSTRUCTION SPECIFICATIONS: MAINTENANCE: CONSTRUCTION SPECIFICATIONS: MAINTENANCE: 1. PLACE STONE TO THE LINES AND DIMENSIONS SHOULD IN THE PLAN ON A FILTER FABRIC FOUNDATION. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. 3. EXTEND STONE ATLEAST 1.5 FEET BEYOND THE DITCH BANK TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. 4. SET SPACING BETWEEN THE DAMS TO ASSURE THAT THE ELEVATION AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL, TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN 2. AND OTHER OBJECTIONABLE MATERIAL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS ELEVATION OF THE UPPER DAM. 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM HEAVY FLOW THAT COULD CAUSE EROSION. AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING AND REPLACE IF DAMAGED DURING CLEANOUT OPERATIONS. 3. ALL DESIGN REQUIREMENTS. NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE. 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO SIGNEDCLEANOUT, SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE 4. THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. AND APPROPRIATELY STABILIZE IT. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT DAMAGE OR BLOCKAGE FROM DISPLACED STONES. SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT. InAend9gaugewiretobasin sideorinstallT•posttoanchor A MACHINE REGRADING AND CLEANOUT. MAINTENANCE: Drapeffl bae ma terra I over wue strand and baffle to sid a of ba sin a nd secure t o vertical post U R B N 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS securewithplastic ties atpomandenwire every12' Baffle Material IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (ONE-HALF INCH OR GREATER) f� 4Max ��J D E S I G N RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE TEMPORARY EARTHEN DIVERSION DIKE (6.20A) CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES I Gauge 9GaugeMinH1gh PARTNERS OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES Landscaping Tension wine Strand 3rWN.* Variable Depth CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. Shall Be Secured 1318-e6 central ave. P 704.334.3303 Compacted sail 2 ' REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW To Post To support charlotte, nc 28205 F 704.334.3305 �•� min �� THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER • THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. man 1.5' min. J _ , Secure bottom of baffle to round with Baffle Material 9 12" sta les at 12" p maximum spacing. urbandesignpartners. com nc firm no: P_0418 - Baffle Material sc coo no: C 03044 ;. .:.. ---------------------------- - _a;� �� steel Post First Chamber Second Chamber r T-0-Depth 25%of surface area 25%of surface area Outlet zone 18 min j _ 111�' �y ; ■ w"' _ 25%of surface area Baffle Material should be secured to the bottom Inlet zone and sidesofbasinusing l2•landscapestaples 25% of surface area \``\\ ij �1 1 _ 6 typlCal # ,: t.: L = The distance such that points • 5'Crestwidth , / A and B are of equal elevation FilterCl'oth , TEMPORARY DIVERSION DIKE FOR VEHICLE CROSSING (6.206) Plan View A s _ SEAL = 27890 i7�r5t} 3C�r8L�3t@ 12" of 1vCOOT#5 or #57 ri= trasFted sturos 1.5" Structure \' __ 3:1 rnax Skimmer / i qAi S� ////��rr1111D1111\\\\\\\\\ 1 8 rnln VJ [ Clrws 8 Riprap Riprap Dew Device �6f} mc.x r.T or Slope Drain 11.21.19 �� I y� j Filter Cloth { f -e: r• �"L ` ' ' 1,. `. Earthen embankment Emergency 9' typical llr YP I ��� {l�l z 1.1 i - with stabilized Spillway side slopes 4' to 61-4 flil 6aFfles TEMPORARY DIVERSION DITCH CHECK DAM BAFFLES i � ti SCALE: NTS SCALE: NTS SCALE: NTS NCDEQ:6.20 NCDEQ:6.83 NCDEQ:6.65 >I LU00 N MAINTENANCE: U) LU Z N > �Iarr irfi INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED Wire L LU w J J REPAIRS IMMEDIATELY. Cro55-5ection SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, View REPLACE IT PROMPTLY. Filter Q 0 � LU REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN irentrench• Steel fabric Back{ill Natural AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING i � (� F- < Arm Assambiy past and compact thoroughly ground 6 r maw CLEANOUT. �� REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND Q r U) �} - "C'Enclosure , STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.LO INSTALLATION SPECIFICATIONS: �•"�'"'�f"'•" �•• [L - _ upslop'- min 0 i a _ _ •"•; 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. "• " ' •' a" CHECK WITH A LEVEL IF NECESSARY. 2 *' �•■� :' . ^•^ min OO N Water Entry PERICAPE E v3r-w Unit 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. •'" �� ; ;� :: "• U ?VC 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. Skimmw Vent PVC End PVC El'bow Sehedule 40 firpe 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. j r�44att¢rrrrg Cap pvc pipe " 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. U) ypll{orra ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH Writer ;.xu•face VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED CCZ Average Area41 Pvc Lnd Cap TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH THREE TIES. �% T Width 114E L 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. Sahedcie40 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION. LO t ►lr ed of basin water =r faae at PVC Ptpa PVC Pipe �` c TEE Holes P. � PVC Tee t0rifice �y 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO 8' max• standard strength fabric with wire fence T fr Baff{es topaf principal spillwayelevotfon UnderxiclE Flexible Plate THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT 6' max, extra strength fabric without wire fence EXERTINGC/� LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. V - . _:: O Steel ...... --- east �+ �P Fr arbam-d RIDADWi F6e�[1!�! structure B[rf�r�,3 � ENb VIEW �ys� ■firaia tarry Surface Plastic or wire ties CZ (D I_ cz L.L F1Z0f1, ' Y J- rJ/ ]8-24" � Wire _ _ fence =-co DMo. erirg � 6' min invert elevationof NOTE: __-- __ = Ivotur;;i tY] Zone ti- -��- errrer gency spillway Etnergency SEE SECTION 6.64 OF THE NORTH CAROLINA - _ _ - .. ground -- O Filter fabric sell#way EROSION AND SEDIMENT CONTROL PLANNING AND 4-1 cz 5edih\enf Cross-5eetian storage zone DESIGN MANUAL FOR CONSTRUCTION, INSTALLATION, AND MAINTENANCE SPECIFICATIONS FOR SKIMMER BASIN. 8" 4" f C j co View z�„ td&trg Filter ■ T fabric Cn 0 � _0 SKIMMER BASIN SKIMMER SILT FENCE `� � SCALE: NTS SCALE: NTS SCALE: NTS � NCDEQ:6.65 NCDEQ:6.64 NCDEQ:6.62 O o O CONSTRUCTION SPECIFICATIONS: GENTLE SLOPES (D U) O MAINTENANCE: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE 100 Ibs/acre tall fescue MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. SEEDING 80 Ibs/acre of tall fesue 30 Ibs/acre Sericea lespedeza INSPECT THE SLOPE DRAIN AND SUPPORTING MIXTURE (unscarified after August 15) O DIVERSION AFTER EVERY RAINFALL, AND 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 10 Ibs/acre Kobe lespedeza PROMPTLY MAKE NECESSARY REPAIRS. WHEN THE 44. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS PROTECTED AREA HAS BEEN PERMANENTLY Diversion 4 min Island over inlet I. I SUBJECT TO SEEPAGE OR HIGH WATER TABLE. FALL: August 25 - October 9Aug� Late February 15 April 15 FALL: Au ust 25 - October Late February 15 April 15 STABILIZED, TEMPORARY MEASURES MAY BE Dike ,,, • { REMOVED, MATERIALS DISPOSED OF PROPERLY, "�'� '~' �: 3;1 winter: - winter: - ;:*;::•; . ;. AND ALL DISTURBED AREAS STABILIZED "',;:= r,;;.:.:..:. rr:;,;=. F•Iald-dvtnrn stakes.�4.'•,.-,�;.,. SEEDING To extend spring seeding into June, add 15 To extend spring seeding into June, add 15 z0 .,�.�••.,.,..,.- APPROPRIATELY. =_ ids;.'_' ti y I 1 DATES Ibs/acre hulled Bermudagrass Ibs/acre hulled Bermudagrass 0 Z Z Overseeding of Kobe lespedeza over fall -seeded Overseeding of Kobe lespedeza over fall -seeded O Z tall fescue is very effective. tall fescue is very effective. 0 U O - rl=iilfl 1I l HIP let 10' spacing _ _ II{4� �, «{�-� �111 1111 �f+Tt 0 6 4 O O U > LU C3 z_ C/) > w OC SEEDING AMENDMENTS Apply lime and fertilizer per soil tests, or 4000 PP Y P Ibs/acre limestone and 1000 Ibs/acre 10-10-10 fertilizer. Apply lime and fertilizer per soil tests, or 4000 PP Y P Ibs/acre limestone and 1000 Ibs/acre 10-10-10 fertilizer. TEMPORARY SEEDING FOR WARM AND COOL SEASON �lal;c{� \1G r Z o J J corrugatedt > Ir Ir Ir f ICI pipe A � �� r /{ EARLY SUMMER SEASON LU LU LU LU � Top of / `It, hand -compacted fill (island) k SEEDING 40 Ibs/acre of German millet 120 Ibs/acre Rye (grain) 00 > > > Stabilize �j ��ay' 6" MIXTURE i�Top �on� L outlet - - 4-6' rrtin I min` 80 Ibs/acre of tall fesue 80 Ibs/acre tall fesue w 0' u) 0' cri 0' r N A = �atur 1a 1.5' fttirl _ ; :. y: 31 =''•';,__-;;Y 2- '1Z` � coarse aggregate tZ` r o r r r r r May 1 - August 15 October 25 - December 30 flr;l- Iil1� �ffj�� -� ;illl �lsll�lllfi�lfifl= r ;-.:,fi-:-:--•:':,1y: ;� version_ 4' m in i at anal - level section -- - - -- - - - - - Refertilize if growth is not fully adequate. Between December 30 - February 15, add 50 Z r N CONSTRUCTION SPECIFICATIONS: SEEDING Ibs/acre of annual Kobe lespedeza. DATES Apply 4000 Ibs/acre straw or equivalent Pro j Project No: 19-039 1. PLACE SLOPE DRAINS ON UNDISTURBED SOIL OR WELL COMPACTED FILL AT LOCATIONS AND ELEVATIONS SHOWN ON THE PLAN. hydrOSeeding. Apply 4000 IbS/acre straw Or equivalent 2. 3. SLIGHTLY SLOPE THE SECTION OF PIPE UNDER THE DIKE TOWARD ITS OUTLET. HAND TAMP THE SOIL UNDER AND AROUND THE ENTRANCE SECTION IN LIFTS NOT TO EXCEED 6 INCHES. hydroseeding. Date: 04.02.1 9 4. ENSURE THAT FILL OVER THE DRAIN AT THE TOP OF THE SLOPE HAS MINIMUM DIMENSIONS OF 1.5 FEET DEPTH, 4 FEET TOP WIDTH, MAINTENANCE: AND 3:1 SIDE SLOPES. Designed by: udp 5. 6. ENSURE THAT ALL SLOPE DRAINCONNECTIONS AC WATERTIGHT. ENSURE THAT ALL FILL MATERIAL IS WELL -COMPACTED. SECURELY FASTEN THE EXPOSED SECTION OF THE DRAIN WITH ISW E WELL -COMPACTED. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE SEEDING Apply lime and fertilizer per soil tests, or 2000 PP Y P Apply lime and fertilizer per soil tests, or 2000 PP Y P Drawn By: GROMMETS OR STAKES SPACED NO MORE THAN10FEETAPART. PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, AMENDMENTS lbs/acre limestone and 750 Ibs/acre 10-10-10 lbs/acre limestone and 750 Ibs/acre 10-10-10 7. EXTEND THE DRAIN BEYOND THE TOE OF THE SLOPE, AND ADEQUATELY PROTECT THE OUTLET FROM EROSION. INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS fertilizer. fertilizer. Sheet No: 8. MAKE THE SETTLED, COMPACTED DIKE RIDGE NO LESS THAN 1 FEET ABOVE THE TOP OF THE PIPE AT EVERY POINT. NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS 9. IMMEDIATELY STABILIZE ALL DISTURBED AREAS FOLLOWING CONSTRUCTION. SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY SLOPE DRAIN SCALE: NTS CONSTRUCTION ENTRANCE SCALE: NTS SEEDING SCHEDULE _ 8m3- NCDEQ: 6.32A NCDEQ: 6.06 ALTERNATE WALL ~i TABLE OF DIMENSIONS CONFIGURATION p T A 9 c E L WT- 2" Faircloth Skimmer® Cut Sheet 12" 2-1/4' 4" 2'-0" 4'-1.. 2'-0" 6'-1" 734 J. W. Faircioth &Son, Inc. - � ,s" 2-1/4" 6" 2'-3" 3'-10" z'-o" S'-," 730 WWw.Faircloth5kimmer.Com 1S" 2-1/2" 9" 2'-3' S-10' 3'-0' C-1" 1190 LLJ 24" 3" 14" 3'-8" 2-6" 4'-0" S'-2" 1770 1" Vent -------------- ----------- ---------- 5 30" 3-1/2" 1'-4" 4'-fi" 1'-B' S'-0" 6'-2" 2380 Inlet 4' Sch 40 wifn Yellow tip Aluminum straps 36" 4" 1'-3" 5'-3" 2`-11" 6'-0" 8'-" 5320 uspending inlet coupling , 42" 4-1/2' 1'-9" 5'-3" 2'-11' fi'-fi" 8'-2" 5S20 cannecGon 1 2 !" pvc iloat � 48" 5" 2'-0" r}`-O" 2'-3" 7'-0" 8'-2" 7470 Iq � 54" 5-1/2' 2'-3" 5'- 6' 2'- 10" 7'-6" $'-4" $810 27., z 1 60" 6" 2'-8" 5'-O" 3'-3" W-0" W-3" i 11817 1 %:" Sch 40 SOLID pvc Hf 66' B-1/2' 3'-0" 6'-0' 2'-3" S'-6" S'-3" 12530 L = LENGTH barrel or "arm" 72" 7" 3'-0" ti'-5" i'-8" 8'-0" S'-3" 13980 s PLAN SUPPLIED BY USER 3: 1 SZ OPT 6 a a SECTION 1 �� SEE STD, 20.23 AND 20.24 lf` f 115 / k � f k k k 4' QM1 � rS I, E IT�, GENERAL NOTES: t. SEE FORMER NCDOT STANDARD 310.01 FOR DETAILS. 2. REINFORCEMENT SHALL CONFORM TO THE REQUIREMENTS OF REINFORCED CONCRETE PIPE or LIKE DIAMETER PER AASHTO M170, TABLE 2, WALL B. 3• ALL CONCRETE TO BE 3600 P.S,I COMPRESSIVE STRENGTH. 4- PROVIDE TONGUE OR SPIGOT JOINT AT INLET END SECTION. 5. PROVIDE GROOVE OR BELL JOINT AT OUTLET END SECTION. 6. THE DIMENSIONS FOR END SECTIONS SHALL SUBSTANTIALLY AGREE WITH THE TADLE- MINOR VARIATIONS WILL SE PERMITTED 8ASED ON THE MANUFACTURER'S STANDARD FORMS AND TEMPLATES. 7. NOT TO BE USER IN NCDOT MAINTAINED RIGHT OF WAY. I/ FLARED END SECTION SCALE: NTS W2 END OF FLARED SECTION NOTES: 1. ALL APRONS SHALL BE CLASS B RIP RAP. 2. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 3. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED 9 SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1 5. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 6. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 7. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. 8. FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO PLACEMENT OF RIP RAP. 9. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL MUST BE STABILIZED. NATURAL GRADE .01 NOTE: LAYER OF FILTER FABRIC MINIMUM H-2/3 PIPE DIAMETER SECTION B-B * d50 (see fig 8.06 a&b "NC SEDIMENT AND EROSION CONTROL MANUAL dmax = 1.5 x d50 T = 1.5 X dmax. T(min.)=10" (IF NEEDED) v MIN. I I/ RIP RAP APRON AT PIPE OUTFALL SCALE: NTS NORTH AM ERICAN GREEN EROSION CONTROL Products Guaranteed SOLUTIONS 14649 HIGHWAY 41 NORTH EVANSVILLE, IN 47725 800-772-2040 www.nogreen.com T (15CM ^i I A \ikirl IkIe-rA 1 1 ATIA\1 0 (15 CM) (15-CM) -5" A - 12.5 CM) 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP'S), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEE MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE RECP'S IN A 6' (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30 CM) OF RECP'S EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP'S WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF RECP'S BACK OVER SEED AND COMPACTED SOIL. SECURE RECP'S OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) ACROSS THE WIDTH OF THE RECP'S. 3. ROLL CENTER RECP'S IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. RECP'S WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP'S MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM, STAPLES AND STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE RECP'S END OVER END (SHINGLE STYLE) WITH A 4"-6" (10 CM - 15 CM) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4-- (10 CM) APART AND 4" (10 CM) ON CENTER TO SECURE RECP'S. 5. FULL LENGTH EDGE OF RECP'S AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELYI 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT RECP'S MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5 CM - 12.5 CM) (DEPENDING ON RECP'S TYPE) AND STAPLED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30-40 FOOT (9 M- 12 M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER OVER ENTIRE WIDTH OF CHANNEL. 8. THE TERMINAL END OF THE RECP'S MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NOTE: IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERTY ANCHOR THE RECP'S. NOTE: A " HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF B CRITICAL POINTS: NECESSARY TO ALLOW STAPLES TO SECURE THE C CRITICAL POINTS ALONG THE CHANNEL SURFACE. A. OVERLAPS AND SEAMS B. PROJECTED WATER LINE IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR C. CHANNEL BOTTOM/SIDE STAKE LENGTHS GREATER THAN 6" (15 CM) MAY SLOPE VERTICES BE NECESSARY TO PROPERLY ANCHOR THE RECP'S. CHANNEL INSTALLATION Class B Ripra Flow Natural rap Headwall, 1' min it from road shoulder CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SOIL. 2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE AROUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THE MINIMUM CREST WIDT OF THE RIPRAP SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MINIMUM HEIGHT SHOULD BE 2 FEET, BUT ALSO 1 FOOT LOWER THAN THE SHOULDER OF THE EMBANKMENT OR DIVERSIONS. 3. A 1 FOOT THICK LAYER OF NCDOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP. 4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE. 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. MAINTENANCE: Figure 6.55a Rock pipe inlet protection plan view and cross-section view ROCK PIPE HORSESHO INLET PROTECTION 1 NORTH AMERICAN GREEN d 3.4 STAPLES PER SQ. YD. 4' WIDE ROLLS 1. INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICATION (1/2-INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. 2. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. 3. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. 4. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. 5. AFTER ALL THE SEDIMENT PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. 0 o 0 0 � 0 0 0 O O O 2g� 0 0 0 O O 51' 0 0 O O O 0 0 0 3.4 STAPLES PER SQ. YD. 8' WIDE ROLLS STAPLE PATTERN IIDII GUIDE SCALE: NTS NCDEQ: 6.55 FLOAT TOP VIEW 27„ 2 - r Pa[mtN: S,87a,751 Skimmer shown in T floating position 1 %" hose, ss clamps 2'inlet 2" HEAD on center 2' threaded male fitting a on outlet end extension of inlet and orifice 1. Skimmer can be attached to a straight 4" sch 40 pipe through the dam but the pipe may need to be anchored to the bottom at the connection so it is secure. Coupling can be removed and hose attached to outlet using the threaded 2" fitting. Typical methods used; on a metal structure a steel stubout welded on the side at the bottom side with a 2" threaded coupling or reducers; on a concrete structure with a hole or orifice at the bottom, use a steel plate with a hole cut in it and coupling welded to it that will fit over the hole in the concrete and bolted to the structure with sealant; grout a 4" pvc pipe in a hole in the concrete to connect the skimmer. 2. Dimensions are approximate, not intended as plans for construction. 3. Barrel (solid, not foam care pipe) should be 1.4 times the depth of water with a minimum length of 6' so the inlet can be pulled to the side for maintenance. If more than 8' long weight may have to be added to inlet to counter the increased buoyancy. 4. Inlet tapers down from 2" maximum inlet to a 1 %" barrel and hose. Barrel is smaller to reduce buoyancy and tendency to lift inlet but is sufficient for flow through inlet because of slope. The inlet orifice can be reduced using the plug and cutter provided to control the outflow rate. 5. Inlet is 4" pipe between the straps with aluminum screen door for access to the inlet and orifice inside. 6. Capacity 3,283 cubic feet per day maximum with 2" inlet and 2" head. Inlet can be reduced by installing a smaller orifice using the plug and cutter provided to adjust flow rate for the particular basin volume and drawdown time required. 7. Shipped assembled. User glues inlet extension and barrel, installs vent, cuts orifice in plug and attaches to outlet pipe or structure. Includes flexible hose, rope, orifice cutter, etc. WATER ENTRY UNIT GENERAL NOTE: WITH TRASH SCREEN 1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. 2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN CORRECT AMOUNT OF TIME. M0{JIFICATIONS MAY BE REQUIRED IF FIELD CONDITIONS WARRANT A CHANGE- 3. EMBANKMENT MUST BE COMPACTED TO DESIGN SPECIFICATIONS. 4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION oRiriORIFICE OPENING INSIDE THE INSTALLED. ZONTAL TUBE WITH A `5- EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT THE CONSTANT HYDRAULIC HEAD DISCHARGE END OF THE PIPE - SCHEDULE 40 PVC PIPE REL OR ARM) BLE HOSE GRATE 6, INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT MANNER. 7. EIGHT SIZES OF SKIMMERS ARE AVAILABLE, REFER TO THE FLOW SHEET, CUT SHEET, AND INSTRUCTIONS ON WEB SITE FOR EACH SIZE. ARTHEN EMBANKMENT HEIGHT OF -EMERGENCY SPILLWAY OTHERUSTORM WATTERFD SCHAT A WHEN NO OPENINGS EXIST (MAJOR STORM EVENT) VC VENT PIPE STORM WATER DISCHARGE ' OPENING OUTLET PIPE - , r•• � I I . I YVATER ENTRY UNIT i ; ; •i••- li : ...u--_-------- E INVERT OF LOWEST STORM PVC VENT .WATER DISCHARGE OPENING PIPE (MINOR STORM EVENT) OAT FLEXIBLE HOSE MUST BE _SECURELY FASTENED TO THE WATER QUALITY DISCHARGE OPENING EXIBLE HOSE L-1.4YDEPTH TO THE OVERFLOW MINIMUM LENGTH APPLIES SCHEDULE 40 PVC PIPE {BARREL OR ARM) END VIEW SIDE VIEW MAINTAIN DEPRESSION 70 - - (NO SCALE) MINIMIZE CHANCE OF SKIMMER BECOMING STUCK DRAWN BY T. R. EVANS 10/10 FAIRCLOTH SKIMMIERe DISCHARGE SYSTEM WITH OUTLET J. W. FAiRCL°TM & N INC. wurw.FAIRCLo1}1s1�1MMeR.caM STRUCTURE TTrLEPHON) _ (919) 732-1244 FAX: (919) 732-12666rs EMAIL WARREN@FAIRCLOTHSKIMMER.COM NOTES: 1. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK. 2. FILTER TYPES SHALL BE APPROVED BY THE CITY INSPECTOR PRIOR TO INSTALLATION. 3. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION OF THE ENGINEER. 4. FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE. 5. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). 6. FILTER BAGS SHALL NOT BE ALLOWED IN EXISTING CITY OR NCDOT ROADS. �r�Tk�w k I:r•Z•l�� GRATE 1" REBAR FOR BAG REMOVAL FROM INLET FILTER BAG DUMP LOOP' CATCH BASIN DEFLECTOR JTLET INSTALLATION SCALE: NTS r CATCH BASIN (SILT SACK) INLET PROTECTION URBAN DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. corn nc firm no: P-0418 sc coa no: C-03044 O ; SEA = 27890 /��/IIIIIDI111,���\\ 11.21.19 i U) LU w CO N z L.L L U LLl J .\ cz 0 O T LU < Q T �/ ) U CV }� Z rn co OIt LLO z cn O �CC C }� \+ W Cz � Q a a� U O }+ LL j .� U U Ir `0 Cz O 00 ■U) O O O JC: WO z O z z 0 Z o (n O 0 LU U O LU U C'3 OC z J a J O ? oC > IY lY lY Lu Lu Lu Lu a- a- a- Im 0 m =) =) =) 0) 0) 0) r r r LO Lh r Q r r CV ' r r O r r r CV M z Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: SCALE: NTS C-804 i - W \ he NORTH NORTH WEST \ PROPERTY LINE / / MATCHLINE SHEET LS-1.1 MATCHLINE SHEET LS-1.2 \ \ \ \ \ \ WEST PROPERTY LINE - - W - - - - W - - - - W - - - - — ohe — — — — ohe — — — - —r TREE PROTECTION FENCE ddd TREE PROTECTION FENCE i LANDSCAPE REQUIREMENTS: BUFFERS AND SCREENING: ALL PARKING SPACES, DUMPSTERS, AND RECYCLING CONTAINERS MUST BE SCREENED FROM PUBLIC \ RIGHTS OF WAY AND ADJACENT PROPERTIES. .,ne———— ohe — — — SS _SS__W_ ■ ■ I ■ ■ I; I ■ I■ I ■ 3 ■ ■ ■ I 3 I ■ ■ I■ I ,I: I ■ ■ 3 : I I I �■ I 3 I■ I I; I ■ ■ 3 ■ I I ■ I■ I 3 BEAST PROPERTY ■ LINE Cn .I ■ I 3 ■ I I Is \� I3 \ \ ► , I-i--ss-- __1 ---- W ---_—_ 3� I I ■ — — I I ■ N \ �I ■ I I I \ / I■ TREE PROTECTION O / L`t*' ` - ■ I I \ \ FENCE / ,, ._: ■ � ♦♦ SOUTH PROPERTY LINE ♦ LEGEND \ \ / /♦♦ \ \ i ♦♦♦♦ TREES CODE BOTANICAL NAME / COMMON NAME .00 ♦♦♦♦♦♦ ABU ♦�♦♦♦ ARA 10:♦♦ \ \ \ / /i♦♦♦ CDE CFL ♦♦\ 0 0 � s ♦♦ N ♦♦�of i� ACER BUERGERIANUM / TRIDENT MAPLE ACER RUBRUM AUTUMN BLAZE' / AUTUMN BLAZE RED MAPLE CEDRUS DEODARA / DEODAR CEDAR CORNUS FLORIDA / EASTERN DOGWOOD QSH QUERCUS SHUMARDII / SHUMARD RED OAK NORTH WEST PROPERTY LINE U R B A N 8' STREET YARD 36 POINTS PER 100 LINEAR FEET D E S I G N (153.21 LF/ 100)36 = 55.16 POINTS REQUIRED MIN. 3 SHADE TREES OR 4 ORNAMENTAL TREES PER 100 LINEAR FEET PARTNERS (153.21 LF/ 100)3 = 4.60 SHADE TREES REQUIRED 1318-e6 central ave. P 704.334.3303 5 SHADE TREES PROVIDED charlotte, nc 28205 F 704.334.3305 5(12 POINTS) = 60 POINTS PROVIDED urbandesignpartners. com nc firm no: P-0418 TOTAL POINTS PROVIDED: 60 POINTS sc coa no: C-03044 NORTH EAST PROPERTY LINE 8' STREET YARD 36 POINTS PER 100 LINEAR FEET 0000000000 (492.33 LF/ 100)36 = 177.24 POINTS REQUIRED to Ci�R 0 oOO 0.1 MIN. 3 SHADE TREES OR 4 ORNAMENTAL TREES PER 100 LINEAR FEET o°O�,°°°pgC° °,�/5vo (492.33 LF/ 100)4 = 19.69 ORNAMENTAL TREES REQUIRED o �Q° `°Q9 0 20 ORNAMENTAL TREES PROVIDED 1983 �0`[o 20(6 POINTS) = 120 POINTS PROVIDED 30 MEDIUM SHRUBS PROVIDED 0o-Pp°°°°°°°°°°°° 30(2 POINTS) = 60 POINTS PROVIDED °°°O 4/F M. ° 00000000p0 TOTAL POINTS PROVIDED: 180 POINTS WEST PROPERTY LINE 11.21.19 15' TYPE C BUFFER TOTAL LINEAR FEET: 682.29 REQUIRED BUFFER LINEAR FEET: 119.00* 70 POINTS PER 100 LINEAR FEET (119.00 LF/ 100)70 = 83.30 POINTS REQUIRED i MIN. 2 SHADE TREES PER 100 LINEAR FEET (119.00 LF/ 100)2 = 2.38 SHADE TREES REQUIRED W 00 N MIN. 1 ORNAMENTAL TREE PER 100 LINEAR FEET Fn (199.00 LF/ 100)1 = 1.19 ORNAMENTAL TREES REQUIRED U) > Z 3 SHADE TREE PROVIDED L Q J 3(12 POINTS) = 36 POINTS W J 2 ORNAMENTAL TREES PROVIDED 0 W 2(6 POINTS) = 12 POINTS PROVIDED > O Q 12 LARGE SHRUBS PROVIDED Q T U) 12(3 POINTS) = 36 POINTS PROVIDED TOTAL POINTS PROVIDED: 84 POINTS LO CV EAST PROPERTY LINE c-0 15' TYPE C BUFFER � TOTAL LINEAR FEET: 493.36 }� z REQUIRED BUFFER LINEAR FEET: 360.48* 70 POINTS PER 100 LINEAR FEET (360.48 LF/ 100)70 = 252.34 POINTS REQUIRED 2 CIO MIN. 2 SHADE TREES PER 100 LINEAR FEET I— v) (360.48 LF/ 100)2 = 7.21 SHADE TREES REQUIRED }+ ., MIN. 1 ORNAMENTAL TREE PER 100 LINEAR FEETLO L (360.48 LF/ 100)1 = 3.60 ORNAMENTAL TREES REQUIRED O T 8 SHADE TREES PROVIDED C/) 8(12 POINTS) = 96 POINTS _0 4 ORNAMENTAL TREES PROVIDED 0 4(6 POINTS) = 24 POINTS PROVIDED fr 50 LARGE SHRUBS PROVIDED CIO 50(3 POINTS) = 150 POINTS PROVIDED TOTAL POINTS PROVIDED: 270 POINTS USOUTH PROPERTY LINE cz m 15' TYPE C BUFFER* U _0 *EXISTING VEGETATION WITHIN BUFFER AREA SHALL BE USED TO MEET BUFFER REQUIREMENT. PROPOSED LANDSCAPE SHALL BE SUPPLEMENTED PER THE DIRECTION OF THE CITY ARBORIST I j AND/ OR PLANNERS TO MEET INTENT OF BUFFER. FINAL LOCATION OF LANDSCAPE MATERIAL � WITHIN BUFFER SHALL BE DETERMINED BY THE CITY ARBORIST AND/ OR PLANNERS. INTERNAL TREES: Cz W ALL NEW PARKING SPACES MUST BE WITHIN 60 FEET OF THE TRUNK OF A TREE. J Cz O 1 SHADE TREE OR 2 ORNAMENTAL TREES PER 12 PARKING SPACES REQUIRED fr 108 PARKING SPACES/ 12 = 9 SHADE TREES OR 18 ORNAMENTAL TREES 2 O 12 POINTS REQUIRED PER 12 PARKING SPACES L 108 PARKING SPACES = 108 POINTS REQUIRED 9 SHADE PROVIDED JC: > 3 9(12 POINTS) = 108 POINTS � O O R I u T Lu m a O/ O Z z O Z Z O Z p U) O 0 w > OC > O O Lu z � o � J � J D D a_ a_ a_ 0 0 0 > > > rn rn rn r r r LO Cl) r r r CV � r r O r r r CV C'7 BEFORE YOU DIGI SHRUBS CODE BOTANICAL NAME / COMMON NAME CALL 811 OR 1-800-632-4949 Project No: 19-039 N.C. ONE -CALL CENTER IVO ILEX VOMITORIA / YAUPON HOLLY IT'S THE LAWI Date: 04.02.19 O Designed by: udp MCE MYRICA CERIFERA / WAX MYRTLE ML Drawn By: RCA RHODODENDRON CALENDULACEUM / FLAME AZALEA GRAPHIC SCALE Sheet No: 40 0 20 40 80 NOTES: _ SEE SHEET LS-2.0 FOR FULL ORDINANCE REQUIRED PLANT SCHEDULE 1 INCH = 40 FEET LS1 00 \ NORTH WEST \ PROPERTY LINE �� / 4 / e ohe - - TREE PROTECTION FENCE CD \ MATCHLINE SEE LS-1.2 LEGEND TREES CODE BOTANICAL NAME / COMMON NAME ABU ACER BUERGERIANUM / TRIDENT MAPLE ARA ACER RUBRUM AUTUMN BLAZE' / AUTUMN BLAZE RED MAPLE • CDE CEDRUS DEODARA / DEODAR CEDAR • CFL CORNUS FLORIDA / EASTERN DOGWOOD • QSH QUERCUS SHUMARDII / SHUMARD RED OAK SHRUBS CODE BOTANICAL NAME / COMMON NAME 0 IVO ILEX VOMITORIA / YAUPON HOLLY OMCE MYRICA CERIFERA / WAX MYRTLE 0 RCA RHODODENDRON CALENDULACEUM / FLAME AZALEA NOTES: SEE SHEET LS-2.0 FOR FULL ORDINANCE REQUIRED PLANT SCHEDULE TREE PLANTING & PRESERVATION REQUIREMENTS: OLD WILKESBORO ROAD (SR 1645) U o NO RECORDED ROAD R/W FOUND I U j C) C) 60' R/W ILLUSTRATED J NCDOT MAINTAINED 0 SPEED LIMIT 45 MPH L - z Q NORTH EAST\S C) PROPERTY LINE J7 � n �� 2\�TJ S58130'37"E 577.60' (T) 1. PLANT MATERIALS MUST BE SELECTED FROM AN APPROVED SPECIES LIST PREPARED BY THE CITY ARBORIST/HORTICULTURIST AND CONFORM TO THE REQUIREMENTS DESCRIBED IN THE LATEST EDITION OF AMERICAN STANDARD FOR NURSERY STOCK. USE OF NATIVE PLANT MATERIAL IS ENCOURAGED. NO SYNTHETIC PLANTS SHALL BE USED TO SATISFY THE REQUIREMENTS. 2. PLANTING STANDARDS FOR BUFFER YARDS AND STREET YARDS ARE BASED ON THE MINIMUM REQUIREMENTS PER ONE HUNDRED (100) FEET LINEAR FEET. ALL FRACTIONAL PLANT UNIT REQUIREMENTS RESULTING FROM LINEAR CALCULATIONS SHALL BE ROUNDED UP TO THE NEAREST WHOLE PLANT UNIT. 3. SHADE TREES SHALL BE A MINIMUM OF TWO AND ONE-HALF (2%) INCHES IN CALIPER AT TIME OF PLANTING. 4. ORNAMENTAL TREES MUST BE A MINIMUM OF EIGHT (8) FEET IN HEIGHT (FROM TOP OF ROOT BALL TO TOP OF TREE) AT THE TIME OF PLANTING. 5. SHRUBBERY SHALL BE A MINIMUM OF THREE (3) GALLON IN SIZE AT TIME OF PLANTING. 6. NO PLANT MATERIALS SHALL BE INSTALLED WITHIN AN UNDERGROUND OR OVERHEAD UTILITY EASEMENT OR A DRAINAGE EASEMENT OR BE LOCATED IN THE PROXIMITY OF METERS, SWITCHES, EQUIPMENT PANELS, COVERS, BOXES, EQUIPMENT, ETC., ASSOCIATED WITH UTILITIES OR SAFETY EQUIPMENT WITHOUT PRIOR APPROVAL OF THE DIRECTOR OF PUBLIC WORKS AND THE EASEMENT HOLDER AT THE TIME OF THE LANDSCAPE SITE PLAN APPROVAL. 7. DEVELOPER/OWNER SHALL FURNISH AND ENSURE THAT ALL PLANT MATERIALS LISTED ON THE LANDSCAPE SITE PLAN ARE INSTALLED TO ADEQUATELY CREATE A PROPER GROWING ENVIRONMENT FOR PLANT MATERIAL. THIS WOULD INCLUDE THE LOCATION OF MATERIAL, PLANTING, PROXIMITY TO BUILDING AND OTHER PLANT MATERIAL ALLOWING FOR AIR, LIGHT, WATER, GROWTH AT MATURITY, ETC. PLANT BEDS SHALL BE MULCHED AND WATERED TO ENSURE SURVIVAL AND GROWTH OF PLANT MATERIAL. 8. IT SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER AND/OR TENANT TO MAINTAIN AND ENSURE THE SURVIVAL OF PLANT MATERIAL IN PERPETUITY. SUCH MAINTENANCE SHALL INCLUDE ALL ACTIONS NECESSARY TO KEEP THE LANDSCAPED AREAS FREE OF LITER AND DEBRIS AND TO KEEP PLANTINGS HEALTHY AND ORDERLY IN APPEARANCE. DEAD PLANT MATERIAL MUST BE REPLACED BY THE PROPERTY OWNER AND/OR TENANT AS SOON AS PRACTICAL, BUT IN NO CASE MORE THAN ONE HUNDRED EIGHTY (180) DAYS. 9. WALKWAYS SHALL FEATURE ADJOINING LANDSCAPED AREAS. 10. WALKWAYS ALONG FRONT AND SIDES OF BUILDINGS FACING STREET YARDS WHERE IMPERVIOUS SURFACE DIRECTLY ABUTS BUILDING SHALL PROVIDE PLANTING BEDS WITH A MINIMUM WIDTH OF THREE (3) FEET FOR FOUNDATION LANDSCAPING, EXCEPT WHERE FEATURES SUCH AS ARCADES, AWNINGS, ENTRANCES OR ENTRYWAYS ARE PART OF THE FACADE. 11. BUILDING SETBACKS (AS LISTED IN SECTION 60.1.4) SHALL SUPERSEDE LANDSCAPING REQUIREMENTS. 12. TREE TOPPING IS PROHIBITED. TREES, SHRUBS, OR OTHER PLANT MATERIAL SHALL BE PRUNED IN ACCORDANCE WITH AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) STANDARDS. 13. ALL PLANTING AREAS SUBJECT TO VEHICULAR TRAFFIC SHALL BE PROTECTED WITH BARRIERS INCLUDING, BUT NOT LIMITED TO, CURBS, WHEEL STOPS, OR WALLS. WHEEL STOPS SHALL BE USED WHERE CURBING IS NOT USED OR LESS THAN SIX (6) INCHES IN HEIGHT. CURBING AND WHEEL STOPS SHALL BE CONTINUOUSLY MAINTAINED. 14. LOCATION OF PLANTING MATERIAL OUTSIDE SHADE OF BUILDING: WHERE A BUILDING IS LOCATED LESS THAN TEN (10) FEET FROM A PROPERTY LINE, AND THE PLANTING YARD WOULD BE HEAVILY SHADED BY BUILDINGS ON BOTH SIDES OF THE PROPERTY LINE, THE REQUIRED TREES AND SHRUBS MAY BE PLANTED OUTSIDE THE SHADED AREA TO IMPROVE SURVIVABILITY. 2' SIDEWALK EASEMENT EAST PROPERTY LINE LANDSCAPE REQUIREMENTS: BUFFERS AND SCREENING: ALL PARKING SPACES, DUMPSTERS, AND RECYCLING CONTAINERS MUST BE SCREENED FROM PUBLIC RIGHTS OF WAY AND ADJACENT PROPERTIES. NORTH WEST PROPERTY LINE U R B A N 8' STREET YARD 36 POINTS PER 100 LINEAR FEET D E S I G N (153.21 LF/ 100)36 = 55.16 POINTS REQUIRED MIN. 3 SHADE TREES OR 4 ORNAMENTAL TREES PER 100 LINEAR FEET PARTNERS (153.21 LF/ 100)3 = 4.60 SHADE TREES REQUIRED 1318-e6 central ave. P 704.334.3303 5 SHADE TREES PROVIDED charlotte, nc 28205 F 704.334.3305 5(12 POINTS) = 60 POINTS PROVIDED urbandesignpartners. com nc firm no: P-0418 TOTAL POINTS PROVIDED: 60 POINTS sc coa no: C-03044 NORTH EAST PROPERTY LINE 8' STREET YARD 36 POINTS PER 100 LINEAR FEET 0000000000 (492.33 LF/ 100)36 = 177.24 POINTS REQUIRED o°oorat CA�O aOO MIN. 3 SHADE TREES OR 4 ORNAMENTAL TREES PER 100 LINEAR FEET °°°° Q.°°°°IDS o zo° °o (492.33 LF/ 100)4 = 19.69 ORNAMENTAL TREES REQUIRED o ��` "9 0 spa o 20 ORNAMENTAL TREES PROVIDED ot. 1983 *0 o 20(6 POINTS) = 120 POINTS PROVIDED o� ° O ° 30 MEDIUM SHRUBS PROVIDED °°o�Q°°°°°°°°°°°°. o0 30(2 POINTS) = 60 POINTS PROVIDED °°°O °ooz M 00000°° TOTAL POINTS PROVIDED: 180 POINTS WEST PROPERTY LINE 11.21.19 15' TYPE C BUFFER TOTAL LINEAR FEET: 682.29 REQUIRED BUFFER LINEAR FEET: 119.00* 70 POINTS PER 100 LINEAR FEET (119.00 LF/ 100)70 = 83.30 POINTS REQUIRED i MIN. 2 SHADE TREES PER 100 LINEAR FEET ti (119.00 LF/ 100)2 = 2.38 SHADE TREES REQUIRED 00 W 00 N MIN. 1 ORNAMENTAL TREE PER 100 LINEAR FEET U) Z U (199.00 LF/ 100)1 = 1.19 ORNAMENTAL TREES REQUIRED U) W Z 3 SHADE TREE PROVIDED L LLj Q J 3(12 POINTS) = 36 POINTS W J 2 ORNAMENTAL TREES PROVIDED 0 W 2(6 POINTS) = 12 POINTS PROVIDED > O Q 12 LARGE SHRUBS PROVIDED Q T U) 12(3 POINTS) = 36 POINTS PROVIDED TOTAL POINTS PROVIDED: 84 POINTS LO CV EAST PROPERTY LINE c-0 15' TYPE C BUFFER � TOTAL LINEAR FEET: 493.36 }� z REQUIRED BUFFER LINEAR FEET: 360.48* 70 POINTS PER 100 LINEAR FEET (360.48 LF/ 100)70 = 252.34 POINTS REQUIRED 2 Cu MIN. 2 SHADE TREES PER 100 LINEAR FEET I- C1� (360.48 LF/ 100)2 = 7.21 SHADE TREES REQUIRED }+ ., MIN. 1 ORNAMENTAL TREE PER 100 LINEAR FEETLO L (360.48 LF/ 100)1 = 3.60 ORNAMENTAL TREES REQUIRED O 8 SHADE TREES PROVIDED CO 8(12 POINTS) = 96 POINTS c� 4 ORNAMENTAL TREES PROVIDED 0 4(6 POINTS) = 24 POINTS PROVIDED Ir E 50 LARGE SHRUBS PROVIDED Cz 50(3 POINTS) = 150 POINTS PROVIDED li TOTAL POINTS PROVIDED: 270 POINTS � co SOUTH PROPERTY LINE m 15' TYPE C BUFFER* _0 Cz c *EXISTING VEGETATION WITHIN BUFFER AREA SHALL BE USED TO MEET BUFFER REQUIREMENT. cz PROPOSED LANDSCAPE SHALL BE SUPPLEMENTED PER THE DIRECTION OF THE CITY ARBORIST � j AND/ OR PLANNERS TO MEET INTENT OF BUFFER. FINAL LOCATION OF LANDSCAPE MATERIAL WITHIN BUFFER SHALL BE DETERMINED BY THE CITY ARBORIST AND/ OR PLANNERS. ^, C-0 INTERNAL TREES: ALL NEW PARKING SPACES MUST BE WITHIN 60 FEET OF THE TRUNK OF A TREE. Cz Cz Ur 1 SHADE TREE OR 2 ORNAMENTAL TREES PER 12 PARKING SPACES REQUIRED cr 108 PARKING SPACES/ 12 = 9 SHADE TREES OR 18 ORNAMENTAL TREES 2 O _0_0 12 POINTS REQUIRED PER 12 PARKING SPACES 108 PARKING SPACES = 108 POINTS REQUIRED 9 SHADE PROVIDED 9(12 POINTS) = 108 POINTS Cz O R I u T w Lu a O/ O z BEFORE YOU DIGI CALL 811 OR 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAWI ML GRAPHIC SCALE 30 0 15 30 60 INCH = 30 FEET z O z z O z Q U) O 0 w U O w U C3 OC Z � p � m 0 m w w w a_ a_ a_ 000 D D D rn rn rn r r r Ln C0 r r r N � r r O r r r N C'7 Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: LS- 1 0 1 MATCHLINE SEE LS-1.1 � � � LANDSCAPE REQUIREMENTS: 120 BUFFERS AND SCREENING: I `7 ALL PARKING SPACES, DUMPSTERS, AND RECYCLING CONTAINERS MUST BE SCREENED FROM PUBLIC X / i IVO RIGHTS OF WAY AND ADJACENT PROPERTIES. EWEST PROPERTY LINE TO REMAIN TREE PROTECTION FENCE \o \ \ ► . .... \\ \ '_ \ ARA t5 TREE PROTECTION / \� FENCE 4735-14-963,3 �n \ + • \ c JOY M. CHAPMAN 805-548 \ \\ ZONED: R-70 (COS) \ \\ \ EXIST. TREES \ \ TO REMAIN / / LEGEND / TREES CODE BOTANICAL NAME / COMMON NAME \ / \ \10, • ABU ACER BUERGERIANUM /TRIDENT MAPLE \ \\ ��PE� SOUTH PROPERTY LINE • ARA ACER RUBRUM AUTUMN BLAZE' /AUTUMN BLAZE RED MAPLE \\ i \G� / / • CDE CEDRUS DEODARA / DEODAR CEDAR \ \ • CFL CORNUS FLORIDA / EASTERN DOGWOOD \ i / 101* • QSH QUERCUS SHUMARDII / SHUMARD RED OAK \ \ / / IRED4735-24-5077 \ \ ELL PROPERTIES INC. 1010-216 ZONED: R-10M (COS) SHRUBS CODE BOTANICAL NAME / COMMON NAME P.B. 1, PG. 141 IVO ILEX VOMITORIA / YAUPON HOLLY \ \ / / / V / MCE MYRICA CERIFERA /WAX MYRTLE 10, RCA RHODODENDRON CALENDULACEUM / FLAME AZALEA �1 NOTES: �0��5 �g 06 SEE SHEET LS-2.0 FOR FULL ORDINANCE REQUIRED PLANT SCHEDULE o 0 0 TREE PLANTING & PRESERVATION REQUIREMENTS: 1. PLANT MATERIALS MUST BE SELECTED FROM AN APPROVED SPECIES LIST PREPARED BY THE CITY ARBORIST/HORTICULTURIST AND CONFORM �rn TO THE REQUIREMENTS DESCRIBED IN THE LATEST EDITION OF AMERICAN STANDARD FOR NURSERY STOCK. USE OF NATIVE PLANT MATERIAL IS ENCOURAGED. NO SYNTHETIC PLANTS SHALL BE USED TO SATISFY THE REQUIREMENTS. \� 2. PLANTING STANDARDS FOR BUFFER YARDS AND STREET YARDS ARE BASED ON THE MINIMUM REQUIREMENTS PER ONE HUNDRED (100) FEET LINEAR FEET. ALL FRACTIONAL PLANT UNIT REQUIREMENTS RESULTING FROM LINEAR CALCULATIONS SHALL BE ROUNDED UP TO THE NEAREST WHOLE PLANT UNIT. 3. SHADE TREES SHALL BE A MINIMUM OF TWO AND ONE-HALF (2%) INCHES IN CALIPER AT TIME OF PLANTING. C) 4. ORNAMENTAL TREES MUST BE A MINIMUM OF EIGHT (8) FEET IN HEIGHT (FROM TOP OF ROOT BALL TO TOP OF TREE) AT THE TIME OF \! PLANTING. o 5. SHRUBBERY SHALL BE A MINIMUM OF THREE (3) GALLON IN SIZE AT TIME OF PLANTING. 6. NO PLANT MATERIALS SHALL BE INSTALLED WITHIN AN UNDERGROUND OR OVERHEAD UTILITY EASEMENT OR A DRAINAGE EASEMENT OR BE LOCATED IN THE PROXIMITY OF METERS, SWITCHES, EQUIPMENT PANELS, COVERS, BOXES, EQUIPMENT, ETC., ASSOCIATED WITH UTILITIES OR SAFETY EQUIPMENT WITHOUT PRIOR APPROVAL OF THE DIRECTOR OF PUBLIC WORKS AND THE EASEMENT HOLDER AT THE TIME OF THE LANDSCAPE SITE PLAN APPROVAL. 7. DEVELOPER/OWNER SHALL FURNISH AND ENSURE THAT ALL PLANT MATERIALS LISTED ON THE LANDSCAPE SITE PLAN ARE INSTALLED TO ADEQUATELY CREATE A PROPER GROWING ENVIRONMENT FOR PLANT MATERIAL. THIS WOULD INCLUDE THE LOCATION OF MATERIAL, PLANTING, PROXIMITY TO BUILDING AND OTHER PLANT MATERIAL ALLOWING FOR AIR, LIGHT, WATER, GROWTH AT MATURITY, ETC. PLANT BEDS SHALL BE MULCHED AND WATERED TO ENSURE SURVIVAL AND GROWTH OF PLANT MATERIAL. 8. IT SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER AND/OR TENANT TO MAINTAIN AND ENSURE THE SURVIVAL OF PLANT MATERIAL IN PERPETUITY. SUCH MAINTENANCE SHALL INCLUDE ALL ACTIONS NECESSARY TO KEEP THE LANDSCAPED AREAS FREE OF LITER AND DEBRIS AND TO KEEP PLANTINGS HEALTHY AND ORDERLY IN APPEARANCE. DEAD PLANT MATERIAL MUST BE REPLACED BY THE PROPERTY OWNER AND/OR TENANT AS SOON AS PRACTICAL, BUT IN NO CASE MORE THAN ONE HUNDRED EIGHTY (180) DAYS. 9. WALKWAYS SHALL FEATURE ADJOINING LANDSCAPED AREAS. 10. WALKWAYS ALONG FRONT AND SIDES OF BUILDINGS FACING STREET YARDS WHERE IMPERVIOUS SURFACE DIRECTLY ABUTS BUILDING SHALL PROVIDE PLANTING BEDS WITH A MINIMUM WIDTH OF THREE (3) FEET FOR FOUNDATION LANDSCAPING, EXCEPT WHERE FEATURES SUCH AS ARCADES, AWNINGS, ENTRANCES OR ENTRYWAYS ARE PART OF THE FACADE. 11. BUILDING SETBACKS (AS LISTED IN SECTION 60.1.4) SHALL SUPERSEDE LANDSCAPING REQUIREMENTS. 12. TREE TOPPING IS PROHIBITED. TREES, SHRUBS, OR OTHER PLANT MATERIAL SHALL BE PRUNED IN ACCORDANCE WITH AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) STANDARDS. 13. ALL PLANTING AREAS SUBJECT TO VEHICULAR TRAFFIC SHALL BE PROTECTED WITH BARRIERS INCLUDING, BUT NOT LIMITED TO, CURBS, WHEEL STOPS, OR WALLS. WHEEL STOPS SHALL BE USED WHERE CURBING IS NOT USED OR LESS THAN SIX (6) INCHES IN HEIGHT. CURBING AND WHEEL STOPS SHALL BE CONTINUOUSLY MAINTAINED. 14. LOCATION OF PLANTING MATERIAL OUTSIDE SHADE OF BUILDING: WHERE A BUILDING IS LOCATED LESS THAN TEN (10) FEET FROM A PROPERTY LINE, AND THE PLANTING YARD WOULD BE HEAVILY SHADED BY BUILDINGS ON BOTH SIDES OF THE PROPERTY LINE, THE REQUIRED TREES AND SHRUBS MAY BE PLANTED OUTSIDE THE SHADED AREA TO IMPROVE SURVIVABILITY. NORTH WEST PROPERTY LINE 8' STREET YARD 36 POINTS PER 100 LINEAR FEET (153.21 LF/ 100)36 = 55.16 POINTS REQUIRED MIN. 3 SHADE TREES OR 4 ORNAMENTAL TREES PER 100 LINEAR FEET (153.21 LF/ 100)3 = 4.60 SHADE TREES REQUIRED 5 SHADE TREES PROVIDED 5(12 POINTS) = 60 POINTS PROVIDED TOTAL POINTS PROVIDED: 60 POINTS NORTH EAST PROPERTY LINE 8' STREET YARD 36 POINTS PER 100 LINEAR FEET (492.33 LF/ 100)36 = 177.24 POINTS REQUIRED MIN. 3 SHADE TREES OR 4 ORNAMENTAL TREES PER 100 LINEAR FEET (492.33 LF/ 100)4 = 19.69 ORNAMENTAL TREES REQUIRED 20 ORNAMENTAL TREES PROVIDED 20(6 POINTS) = 120 POINTS PROVIDED 30 MEDIUM SHRUBS PROVIDED 30(2 POINTS) = 60 POINTS PROVIDED TOTAL POINTS PROVIDED: 180 POINTS WEST PROPERTY LINE 15' TYPE C BUFFER TOTAL LINEAR FEET: 682.29 REQUIRED BUFFER LINEAR FEET: 119.00* 70 POINTS PER 100 LINEAR FEET (119.00 LF/ 100)70 = 83.30 POINTS REQUIRED MIN. 2 SHADE TREES PER 100 LINEAR FEET (119.00 LF/ 100)2 = 2.38 SHADE TREES REQUIRED MIN. 1 ORNAMENTAL TREE PER 100 LINEAR FEET (199.00 LF/ 100)1 = 1.19 ORNAMENTAL TREES REQUIRED 3 SHADE TREE PROVIDED 3(12 POINTS) = 36 POINTS 2 ORNAMENTAL TREES PROVIDED 2(6 POINTS) = 12 POINTS PROVIDED 12 LARGE SHRUBS PROVIDED 12(3 POINTS) = 36 POINTS PROVIDED TOTAL POINTS PROVIDED: 84 POINTS EAST PROPERTY LINE 15' TYPE C BUFFER TOTAL LINEAR FEET: 493.36 REQUIRED BUFFER LINEAR FEET: 360.48* 70 POINTS PER 100 LINEAR FEET (360.48 LF/ 100)70 = 252.34 POINTS REQUIRED MIN. 2 SHADE TREES PER 100 LINEAR FEET (360.48 LF/ 100)2 = 7.21 SHADE TREES REQUIRED MIN. 1 ORNAMENTAL TREE PER 100 LINEAR FEET (360.48 LF/ 100)1 = 3.60 ORNAMENTAL TREES REQUIRED 8 SHADE TREES PROVIDED 8(12 POINTS) = 96 POINTS 4 ORNAMENTAL TREES PROVIDED 4(6 POINTS) = 24 POINTS PROVIDED 50 LARGE SHRUBS PROVIDED 50(3 POINTS) = 150 POINTS PROVIDED TOTAL POINTS PROVIDED: 270 POINTS SOUTH PROPERTY LINE 15' TYPE C BUFFER* *EXISTING VEGETATION WITHIN BUFFER AREA SHALL BE USED TO MEET BUFFER REQUIREMENT. PROPOSED LANDSCAPE SHALL BE SUPPLEMENTED PER THE DIRECTION OF THE CITY ARBORIST AND/ OR PLANNERS TO MEET INTENT OF BUFFER. FINAL LOCATION OF LANDSCAPE MATERIAL WITHIN BUFFER SHALL BE DETERMINED BY THE CITY ARBORIST AND/ OR PLANNERS. INTERNAL TREES: ALL NEW PARKING SPACES MUST BE WITHIN 60 FEET OF THE TRUNK OF A TREE. 1 SHADE TREE OR 2 ORNAMENTAL TREES PER 12 PARKING SPACES REQUIRED 108 PARKING SPACES/ 12 = 9 SHADE TREES OR 18 ORNAMENTAL TREES 12 POINTS REQUIRED PER 12 PARKING SPACES 108 PARKING SPACES = 108 POINTS REQUIRED 9 SHADE PROVIDED 9(12 POINTS) = 108 POINTS BEFORE YOU DIGI CALL 811 OR 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAWI ML GRAPHIC SCALE 20 0 10 20 40 URBAN DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 11.21.19 i ti >> U); LU 00 N Z ^L L.L Q LU LU J .> cz 00 o Lu Q-- T �/ U) 0 z }� U) a) U) L OIt LO z `� c� O Cz U- O Uo co 00 I..L � LO ^, � WIr i.L C/) cz U� ♦^ V, O O Cn C O z O U5 w m di O z z O a z 0 Ir O O U J w a_ a- rn r LO 0 r z O U) w Ir 0 z 0 Ir w a_ rn r ri T M1 U) z O U) w J w a_ rn r N T Project No: 19-039 Date: 04.02.19 Designed by: udp Drawn By: Sheet No: LS-1 02 INCH = 30 FEET 1. REMOVE WIRE AND NYLON TWINE FROM BALL AND NOTES: CANOPY. I 2. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER 1. SCARIFY ROOT MASS OF INSTALLATION. CONTAINERIZED PLANT MATERIAL. TYP. COLLAR MIN. 2" HT. 3. STAKING IS REQUIRED FOR ALL TREES IN R.O.W. OR 2. INSTALL CONTAINERIZED PLANTS AT UPON REQUEST OF ARBORIST. FINSHED GRADE 4" LAYER OF APPROVED 4. REMOVE EXCESS SOIL FROM SITE AND DISPOSE OF IN MULCH A LEGAL MANNER. 3. TAMP PLANTING MIX FIRMLY AS PIT IS FILLED AROUND 5. RESEED UNMULCHED, DISTURBED AREAS. EACH PLANT BALL. 4 6" MIN. 3/4" NYLON STRAP 4. OMIT COLLAR AROUND EACH SHRUB 6" LARGER KNOT WITH � DIAMETER WHEN IRRIGATION SYSTEM IS PRESENT. "v" TRENCH AROUND ENTIRE PLANTING BED ROOT CROWN TO BE AT FINISH GRADE KEEP MULCH MAY FROM 5. SOAK EACH PLANT BALL AND TRUNK 1" TO 2" PIT IMMEDIATELY AFTER EDGE of 4" H H / e" WOE MAXIMUM INSTALLATION. PLANTING BED BERM WBIDE OF ROOTBALL 4' MAXIMUM LAYER OF MULCH ] - WOOD SrAKES C_IE18' WITH cENreRm 3/8• HOLE HOLE DRIVEN IN LINE WITH STRAP EQUALLY SPACED AROUND TREE FINISH GRADE REMOVE TYPICAL EXCESS SOIL FROM ROOT CROWN REMOVE TOP 1/3 BURLM UNDISR - EL AND ANY NAILS/PINS. ETC. ROOT BALL DUL 12" REMOVE TOP 1/3 OF WIRE VARIES BASKET WHERE PRESENT !! RAISE PIT BOTTOM TO SET ROOT CROWN :�/ AT THE CORRECT HEIGHT. FIRM SOW. UNDER ROOT BALL ALL TREES SHALL MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2004) FOR EXAMPLE: CAJPER HEIGHT (RANGE) MAX. HEIGHT MIN. ROOT BALL DIA. MIN. ROOT BALL DEPTH 2" 12-14' 16 24" 16" 3" 14-16' 16 32" 21" TREE PLANTING FOR SINGLE AND MULTI -STEM TREES SEE APPROVED TREE 1 PRESERVATION PLAN FOR REQUIRED RADIUS OF TREE BARRIER PLAN VIEW OF ROOT ZONE ONE INCF OR FOR PRUNING SEE WHI( INTERNATIONAL SOCIETY OF ARBORICULTURE SPECS. DEAD TREES AND SCRUB Of GROWTH SHALL BE CUT FILL ADJACENT GRADE. NO GRU ALLOWED UNDER DRIP LINE. 2"x4" STANDARDS + 1 "x4" RAILS OR ORANGE SAFETY FENCING MAY BE USED. CROWN HEIGHT IN INCHES EQUALS MEDIAN AS SPECIFIED WIDTH IN FEET TO 12" MAX. FINAL GRADE 10' (EX.) 10' (EX.) �� EXISTING GRADE TYPICAL BED CROWNING SCALE: NTS r 1 SHRUB PLANTING B E D NOTES: 1. REMOVE ALL BARRIERS UPON COMPLETION OF PROJECT. 2. LANDSCAPING PLANS SHALL SHOW THE LOCATIONS OF ALL TREE PROTECTION FENCES. IRK MULCH, PLACE BARK i AT AREAS NOT :CTED BY BARRIER. r 1 TREE PROTECTION FENCE SCALE: NTS I PLANT SCHEDULE CODE QTY BOTANICAL NAME / COMMON NAME CONT CAL ABU 20 ACER BUERGERIANUM / TRIDENT MAPLE B & B 2" CAL ARA 9 ACER RUBRUM AUTUMN BLAZE' / AUTUMN BLAZE RED MAPLE B & B 2.5" CAL CDE 11 CEDRUS DEODARA / DEODAR CEDAR B & B 2.5" CAL CFL 6 CORNUS FLORIDA / EASTERN DOGWOOD B & B 2" CAL QSH 5 QUERCUS SHUMARDII / SHUMARD RED OAK B & B 2.5" CAL IRUBS CODE QTY BOTANICAL NAME / COMMON NAME 0 IVO 45 ILEX VOMITORIA / YAUPON HOLLY OMCE 22 MYRICA CERIFERA / WAX MYRTLE 0 RCA 35 RHODODENDRON CALENDULACEUM / FLAME AZALEA /x_xxN_PLANT CODE XX PLANT QUANTITY NOTES: NOTE TO CONTRACTOR: IF GRAPHIC REPRESENTATION OF PLANTINGS ON PLANS DO NOT MATCH QUANTITIES IN PLANT SCHEDULE, GRAPHIC REPRESENTATION OF PLANTINGS WILL GOVERN. TREES NOT IN A LANDSCAPE BED SHALL RECEIVE A 4' DIAMETER MULCH RING. ALL DISTURBED AREA NOT IN A LANDSCAPE BED SHALL BE SODDED OR SEEDED. SIZE 8'-10' HT 10'-12' HT 10'-12' HT 8'-10' HT 10'-12' HT CONT MIN HEIGHT MIN WIDTH SPACING SPACING VARIES SEE LANDSCAPE PLAN z N PLANT MIX TAMP SOIL MIX UNDER EACH PLANT BALL TO MINIMIZE SETTLEMENT TYPICAL PLANTING BED DETAIL 1'P. TAGGERED ROWS EQUAL SPACING J EDGE OF BETWEEN ALL PLANTS BPELpNTING TYPICAL PLANTING BED PLAN TOP ALL DIAMETER SOIL LINE 2" MAXIMUM OF SOIL COVERING ACCEPTABLE )WN TOP OF BALL AS DUG NATURAL SOIL LINE SPECIFIED BALL DIAMETER -EFFECTIVE BALL DIAMETER UNACCEPTABLE SOIL COVERING ROOT CROWN ACCEPTABLE CONDITION (AS DELIVERED) UNACCEPTABLE CONDITION (AS DELIVERED) NOTE: A ROOT COLLAR EXCAVATION FOR ALL TREES SPECIFIED WILL BE DONE BY THE CITY ARBORIST TO ENSURE THAT WILL BE DONE BY THE CITY ARBORIST TO ENSURE THAT TREES WERE NOT PLANTED/GROWN TOO DEEPLY AT SOURCE (NURSERY). LANDSCAPE CONTRACTOR SHALL HAVE SUPPLIER MARK GROUND LEVEL LINE ABOVE ROOT BALL. IF CITY ARBORIST DETERMINES THAT THERE IS EXCESSIVE SOIL OVER THE ROOT CROWN, THESE TREES WILL BE REJECTED. SCALE: NTS ROOT CROWN DEPTHS SCALE: NTS CLDSM40.05 (TREE ROOT BALL CONDITION ON TREES FROM SUPPLIERS) CLDSM40.09 REMARKS MATCHED, STRONG CENTRAL LEADER, GOOD FOLIAGE, FULL CROWN STRONG CENTRAL LEADER, GOOD FOLIAGE, FULL CROWN STRONG CENTRAL LEADER, GOOD FOLIAGE, FULL CROWN STRONG CENTRAL LEADER, GOOD FOLIAGE, FULL CROWN MATCHED, STRONG CENTRAL LEADER, GOOD FOLIAGE, FULL CROWN 3 GAL 15" 15" AS SHOWN FULL, HEALTHY FOLIAGE 3 GAL 15" 15" AS SHOWN FULL, HEALTHY FOLIAGE 3 GAL 15" 15" AS SHOWN FULL, HEALTHY FOLIAGE URBAN DESIGN PARTNERS 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 u rbanclesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 11.21.19 1 TREE PLANTING & PRESERVATION REQUIREMENTS: GENERAL PLANTING NOTES: 1. QUANTITIES NECESSARY TO COMPLETE THE WORK ON THE DRAWINGS SHALL BE FURNISHED BY THE CONTRACTOR. QUANTITY ESTIMATES HAVE BEEN MADE CAREFULLY, BUT THE LANDSCAPE ARCHITECT ASSUMES NO LIABILITY FOR ERRORS OR OMISSIONS. HIS ESTIMATES ARE ONLY AN AID FOR CLARIFICATION OF UNITS AND A CHECK FOR THE CONTRACTOR TO COMPARE WITH HIS OWN ESTIMATES. DIFFERENCES SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT. NO EXTRA COMPENSATION SHALL BE ALLOWED FOR EXTRA QUANTITIES NECESSARY TO COMPLETE THE WORK. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF PLANT MATERIALS ACCORDING TO THE DRAWINGS AND PLANT SCHEDULE. CONTRACTOR SHALL PROVIDE SPECIFIC CULTIVARS AND/OR VARIETIES AS INDICATED ON THE PLANT SCHEDULE. ANY SUBSTITUTIONS INSTALLED WITHOUT PRIOR APPROVAL OF LANDSCAPE ARCHITECT WILL BE REJECTED AND SHALL BE REPLACED BY THE CONTRACTOR AT NO EXTRA COST TO THE OWNER. 3. PLANTING PLANS INDICATE DIAGRAMMATIC LOCATIONS ONLY. SITE ADJUSTMENTS OF PLANTING DESIGN AND RELOCATION OF PLANT MATERIALS DUE TO ON SITE CONDITIONS SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. PLANTS INSTALLED PRIOR TO LANDSCAPE ARCHITECT'S APPROVAL ARE SUBJECT TO RELOCATION BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. rLAIVI M 1. MINIMUMMUM TREE SIZE AT PLANTING IS 2" CALIPER AND 8' TALL FOR SINGLE -STEM TREES. ALL MULTI -STEM PLANTS MUST BE TREE FORM, 13. MINIMUM TREE SIZE AT PLANTING IS 2-INCH CALIPER (FOR SINGLE STEM TREES). ALL MULTI -STEM PLANTS MUST BE TREE FORM, MAXIMUM 3 TO 5 TRUNKS, AND MINIMUM 10' TALL. WHERE 3" SINGLE -STEM CALIPER TREES ARE SPECIFIED/REQUIRED THE MINIMUM HEIGHT SHALL BE 10' TALL, IF MULTI -STEM TREES ARE SPECIFIED THEN THEY SHALL BE A MINIMUM OF 12' TALL. 2. ALL NEW TREES MUST HAVE STRAIGHT TRUNKS WITH STRONG CENTRAL LEADERS INTACT TO THE TOP OF THE CROWN UNLESS MULTI -STEM TREES ARE SPECIFIED. ALL REQUIRED TREES SHALL BE TYPICAL OF THEIR SPECIES AND VARIETY, HAVE NORMAL GROWTH HABITS, HAVE WELL -DEVELOPED BRANCHES, BE VIGOROUS AND HAVE FIBROUS ROOT SYSTEMS. TREES WITH MAJOR GIRDLING ROOTS WILL NOT BE ACCEPTED. TREES WITH CO -DOMINANT BRANCHING WILL NOT BE ACCEPTED. TREES THAT HAVE BEEN SHEARED, TOPPED OR CUT BACK TO MULTIPLY THE BRANCHING STRUCTURE WILL NOT BE ACCEPTED. TREES SHALL BE FREE OF ABRASIONS, DAMAGE, DISEASE, PESTS AND CRACKS. ALL PRUNING CUTS GREATER THAN INCH DIAMETER SHALL HAVE CALLUS TISSUE FORMED PRIOR TO PLANTING. NO PRUNING CUT ON THE TRUNK SHALL BE MORE THAN ONE-HALF THE DIAMETER OF THE CENTRAL LEADER AT THE HEIGHT WHERE THE CUT WAS MADE. ROOT FLARES SHALL BE LOCATED AT GRADE. TREES WITH MORE THAN 2" OF SOIL COVERING THE ROOT BALL/FLARE FROM WILL NOT BE ACCEPTED (CLDS.40.09). 3. SIZE OF REQUIRED PLANTS, SPREAD OF ROOTS AND SIZE OF BALLS SHALL BE IN ACCORDANCE WITH ANSI Z60.1 (LATEST EDITION) AS PUBLISHED BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION, EXCEPT i _ _ � �_ •� LLI W Q Lu > Q 0 M T_ ti ti 00 N Z LL J > U) Lu I- WHERE SPECIFIED/AUTHORIZED BY URBAN FORESTRY. N 4. PLANTS SHALL BE SPECIMEN QUALITY AND SHALL BE SOUND, HEALTHY AND VIGOROUS, WELL -BRANCHED, 4. ALL REQUIRED TREES OF A PARTICULAR SPECIES AND VARIETY SHALL BE UNIFORM IN SIZE AND C-p AND DENSELY FOLIATED WHEN IN LEAF. PLANT MATERIAL SHALL BE FIRST QUALITY STOCK AND SHALL CONFIGURATION. 00 CONFORM TO THE CODE OF STANDARDS SET FORTH IN THE CURRENT EDITION OF THE AMERICAN STANDARDS 5. PERIMETER TREES IN URBAN ZONES SHALL BE 3" IN CALIPER AND BE FREE OF BRANCHES UP TO 6' FROM FOR NURSERY STOCK SPONSORED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. THE TOP OF ROOT CROWN (BALL). C14 z 6. A MINIMUM OF 50% OF NEW TREES MUST BE NATIVE SPECIES, AND SITES WITH MORE THAN 20 TREES 5. HEIGHT AND SPREAD DIMENSION SPECIFIED REFER TO THE MAIN BODY OF THE PLANT AND NOT FROM REQUIRED WILL HAVE TO INSTALL MULTIPLE (3 OR MORE) SPECIES PURSUANT TO THE TREE ORDINANCE BRANCH TIP TO TIP. IF A RANGE OF SIZE IS GIVEN, NO PLANT SHALL BE LESS THAN THE MINIMUM SIZE AND GUIDELINES. NOT LESS THAN 50% OF THE PLANTS SHALL BE AS LARGE AS THE MAXIMUM SIZE SPECIFIED. 7. 75% OF REQUIRED TREES MUST BE LARGE MATURE SPECIES EXCEPT IN SITUATIONS WITH OVERHEAD POWER f'ti1 U) LINE CONFLICTS. V r 6. SHADE TREES SHALL HAVE A STRONG CENTRAL LEADER UNLESS OTHERWISE SPECIFIED. Cu PLANTING REQUIREMENTS MAXIMUM 3 TO 5 TRUNKS, AND MINIMUM 8 FEET TALL. U) 7. LEAVES MUST BE OF MEDIUM FOLIAGE, ALL GOOD LEAVES, MAXIMUM OF 10% CHLOROSIS ALLOWED, WITH NO 8• SEE CLDS 40.01 & 40.09 (ON PLAN) FOR DETAILED TREE PLANTING REQUIREMENTS. EXTREME SUCCULENCE PLACE PLANTS UPRIGHT AND TURNED SO THAT THE MOST ATTRACTIVE SIDE IS VIEWED. 9• PLASTIC HOSE PARTS WILL NOT BE ACCEPTED FOR TREE STAKING. SEE CLDS 40.01 FOR APPROVED STAKING 8. ROOTS MUST BE STURDILY ESTABLISHED IN BALL THAT HAS BEEN TIGHTLY WRAPPED AND SECURELY TIED 10. METHOD/MATERIALS. ALL STRAPPING, AND TOP 1/3 OF WIRE BASKET AND BURLAP MUST BE CUT AWAY AND REMOVED FROM ROOT O LO T WITH TWINE OR WIRE, OR PINNED. BALL WHEN PLANTING. fr 9. PLACE PLANTS UPRIGHT AND TURNED SO THAT THE MOST ATTRACTIVE SIDE IS VIEWED. 11. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS; REMOVE CO COMPACTED SOIL AND ADD 18" NEW TOPSOIL, OR TILL AND AMEND THE TOP 18" OF EXISTING SOIL TO MEET 10. PROVIDE 4" THICKNESS MULCH AT ALL PLANTS AND PLANTING BEDS. MULCH SHALL BE SINGLE TOPSOIL/PLANTING MIX STANDARDS FOR TREES (WITHIN ENTIRE MINIMUM AREA OF 274 SQUARE FEET). 0 HAMMERED HARDWOOD MULCH (UNLESS NOTED OTHERWISE). IT SHALL BE CLEAN, FRESH, AND FREE OF 12. TREES PLANTED ON PUBLIC PROPERTY WILL NEED APPROVAL FROM THE CITY ARBORIST AND/OR NCDOT. �� f STICKS, BRANCHES, SOIL OR OTHER FOREIGN MATERIAL. 13. REVIEW SOIL REQUIREMENTS IN THE TREE ORDINANCE GUIDELINES AT: HTTP: [/CHARLOTTENC.GOV/LD THEN E CLICK TREES. Cz 11. BACKFILL PLANTING MIXTURE SHALL BE ONE PART APPROVED PLANTING SOIL MIXED WITH ONE PART L.L_ NATIVE SOIL FROM THE TREE PIT OR SHRUB BED AREA. LANDSCAPE CONTRACTOR SHALL SUBMIT SAMPLES OF UTILITY ISSUES ^ ♦ V rt a PLANTING SOIL TO BE USED TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 14. IF ANY UTILITY IS BEING INSTALLED IN OR NEAR ANY REQUIRED TREE(S) OR TREE SAVE AREA(S), CALL URBAN W FORESTRY SPECIALIST TO RESOLVE PRIOR TO UTILITY INSTALLATION. Cz co 12. PLANTS SHALL BE SUBJECT TO REVIEW BY LANDSCAPE ARCHITECT AT NURSERY OR ON SITE PRIOR TO 15. LARGE MATURING TREES MAY NOT BE PLANTED WITHIN 25' OF OVERHEAD POWER DISTRIBUTION OR m PLANTING. LANDSCAPE ARCHITECT WILL BE THE SOLE JUDGE OF THE QUALITY AND ACCEPTABILITY OF TRANSMISSION LINES. MATERIALS AND PLACEMENT. CONTRACTOR SHALL SUBMIT PHOTOS OF ALL TREES WITH BID SUBMITTAL IF 16. IF TREES CONFLICT WITH ANY UTILITIES OR SIGNS; CALL URBAN FORESTER TO RESOLVE BEFORE PLANTING. REQUESTED BY LANDSCAPE ARCHITECT OR OWNER. 17. ADJUST TREE PLANTING LOCATIONS TO AVOID EXISTING UNDERGROUND UTILITIES. PLANT 15' FROM ALL UNDERGROUND UTILITIES. Q cz LO 13. THE LANDSCAPE CONTRACTOR SHALL TAKE SOIL SAMPLES FROM ALL PARTS OF THE SITE AND SHALL 18. NO LIGHT POLES, UTILITIES OR TRANSFORMERS CAN BE INSTALLED IN TREE ISLANDS. HAVE THEM TESTED BY THE LOCAL COUNTY AGENT. THE CONTRACTOR SHALL PROVIDE ONE COPY OF THE 19. COMMERCIAL SCALE LIGHTING (> 15' IN HEIGHT) MUST BE A MINIMUM DISTANCE OF 30' FROM A TREE. C-0 TEST RESULTS TO THE LANDSCAPE ARCHITECT PRIOR TO ORDERING PLANT MATERIALS OR MAKING ANY PEDESTRIAN SCALE LIGHTING (S 15' IN HEIGHT) MUST BE A MINIMUM DISTANCE OF 15' FROM A TREE. SHOW ■ fr AMENDMENTS TO THE ON SITE SOIL. ANY SOIL AMENDMENTS REQUIRED AS INDICATED BY THE SOIL TEST SITE LIGHTING ON LANDSCAPE PLAN. �Cn SHALL BE PROVIDED BY THE LANDSCAPE CONTRACTOR. THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT OF AMENDMENTS AND OBTAIN A WRITTEN APPROVAL FOR PROPOSED AMENDMENTS. TREE SAVE AND PRESERVATION Cz Cz 14. FERTILIZER SHALL BE A COMPLETE FERTILIZER; 50% OF NITROGEN OF WHICH IS DERIVED FROM NATURAL 20. TREE PROTECTION MUST BE INSTALLED AND VERIFIED BY URBAN FORESTRY PRIOR TO STARTING ANY ♦ , U °C CONSTRUCTION ACTIVITY. ORGANIC SOURCES OR UREAFORM. FERTILIZER SHALL BE DELIVERED TO THE SITE IN STANDARD SIZE 21. SHOW TREE PROTECTION AND TREES SAVE AREAS ON EROSION CONTROL, GRADING AND LANDSCAPE PLAN �/� 0 UNOPENED CONTAINERS WHICH SHOW THE WEIGHT, CHEMICAL ANALYSIS, AND MANUFACTURER. IT SHALL BE SHEETS. 0 STORED IN A DRY LOCATION UNTIL ITS USE. FERTILIZER FOR TREES, SHRUBS, AND GROUNDCOVER AREAS 22. COMMERCIAL TREE SAVE AREAS MUST BE RECORDED ON A FINAL PLAT WITH THE MECKLENBURG COUNTY ^ ♦ n SHALL BE A SLOW RELEASE TYPE AND SHALL BE APPLIED AS FOLLOWS: REGISTER OF DEEDS BEFORE URBAN FORESTRY HOLDS CAN BE RELEASED. A 10' NO BUILD ZONE AROUND W a) TREES AND SHRUBS TREES: 1 LB / INCH OF CALIPER 23. TREE SAVE AREAS MUST BE REFERENCED ON THE PLAT. TREE SAVE AREAS SHALL BE FREE OF INVASIVE PLANT SPECIES. IF AN AREA PROPOSED FOR TREE SAVE MARCH -MAY 10-10-10 SHRUBS: 3�i LB INCH HEIGHT / CONTAINS INVASIVE PLANT SPECIES AT TIME OF PROPOSAL, SUCH INVASIVE PLANT SPECIES SHALL BE JUNE-OCTOBER 6-10-10 REMOVED PRIOR TO FINAL CO. !WWWWW_ J 0 NOVEMBER-FEBRUARY 6-12-12 24. THE AREA OF ANY EASEMENTS (WATER, SEWER, UTILITY, ETC.) CAN NOT BE COUNTED TOWARD THE TREE 15. LANDSCAPE CONTRACTOR SHALL PERFORM PERCOLATION TESTS IN ALL TREE PITS. IF PITS DO NOT DRAIN SAVE REQUIREMENT. WITHIN 30 MINUTES, CONTACT LANDSCAPE ARCHITECT AND DO NOT PLANT THE TREE WITHOUT ON SITE 25. ANY ALTERATIONS TO TREE SAVE AREAS MUST BE ACCOMPLISHED WITHOUT MECHANIZED EQUIPMENT. INSPECTION OF DRAINAGE. LANDSCAPE ARCHITECT MAY REQUIRE ADDITIONAL SUBSURFACE DRAIN LINES FROM 26. NO STRUCTURE WILL BE ALLOWED WITHIN 10' OF TREE SAVE AREAS UNLESS APPROVED BY URBAN FORESTRY. THE TREE PITS. 27. ALL TREES ON PUBLIC PROPERTY ARE PROTECTED AND REMOVAL MUST BE PERMITTED BY THE CITY ARBORIST (704)336-4262. z MACHINERY OPERATION OR CONTACT URBAN FORESTRY SPECIALIST PRIOR TO ANY CRANE SET-UP, 16. IF SURFACE DRAINAGE IS NOT SUFFICIENT (STANDING WATER) NOTIFY LANDSCAPE ARCHITECT IN WRITING 28. BEFORE INSTALLING THE PLANTS, OTHERWISE CONTRACTOR SHALL BE TOTALLY REPONSIBLE FOR THE TEMPORARY BUILDING ERECTION THAT MAY IMPACT CHARLOTTE TREE ORDINANCE PROTECTED TREES OR TREE Q z (n GUARANTEE AND LIVABILITY OF THE PLANTS. SAVE AREAS, INCLUDING TREES LOCATED IN STREET RIGHT OF WAY. IMPACTS MAY INCLUDE BUT ARE NOT z O z LIMITED TO: ENCROACHING WITHIN TREE DRIP -LINES, EXCAVATION, SOIL COMPACTION, TREE TRIMMING, 0 (n O ERECTING AND DISMANTLING OF CONSTRUCTION CRANES. 17. ALL UNDERGROUND UTILITIES SHALL BE LOCATED BEFORE DIGGING. THE CONTRACTOR SHALL BE FULLY O Lu > RESPONSIBLE FOR ALL DAMAGE OF UNDERGROUND OR OVERHEAD UTILITY LINES. GENERAL OU (D Lu 18. CERTIFICATE OF INSPECTION AS MAY BE REQUIRED BY LAW FOR TRANSPORTATION OF PLANT MATERIALS Ir 29. SUBMIT REQUIRED CO/HOLD RELEASE FORM AT HTTP: //CHARLOTTENC.GOV/LD FOR AN INSPECTION OF TREE 0 � SHALL ACCOMPANY EACH INVOICE FOR EACH SHIPMENT OF PLANTS. CERTIFICATES SHALL BE FILED WITH PROTECTION/PLANTING AREAS, A MINIMUM OF 5 DAYS BEFORE THE CO/HOLD RELEASE IS NEEDED. z J a J LANDSCAPE ARCHITECT PRIOR TO ACCEPTANCE OF MATERIAL. INSPECTION BY STATE OR FEDERAL AUTHORITIES 30. VISIT CITY OF CHARLOTTE'S LAND DEVELOPMENT WEBSITE FOR ADDITIONAL INFORMATION AND URBAN O_ oC AT THE PLACE OF GROWTH DOES NOT PRECLUDE REJECTION OF THE MATERIAL BY THE LANDSCAPE ARCHITECT. FORESTRY REQUIREMENTS: HTTP: //CHARLOTTENC.GOV/LD THEN CLICK TREES. U5 O >Lu Lu Lu Lu OC OC OC 19. ALL PLANT MATERIALS AND INSTALLED LANDSCAPE SUPPLIES SHALL BE WARRANTED FOR A PERIOD OF TOPSOIL/PLANTING MIX - MINIMUM REQUIREMENTS: Ir a_ a_ a_ ONE YEAR AFTER FINAL ACCEPTANCE OF THIS PROJECT. 31. WHERE PAVEMENT CUTOUTS ON RENOVATED SITES ARE REQUIRED AND/OR WHERE NEW PLANTING STRIPS OR ISLANDS ARE REQUIRED, ALL PAVEMENT, CONSTRUCTION DEBRIS AND GRAVEL SUB -BASE MUST BE REMOVED 5.:m m 0 20. CONTRACTOR'S PRICES SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY TO COMPLETE THE WORK BEFORE PREPARING SOIL AND PLANTING TREES. EXISTING COMPACTED SOIL MUST BE REMOVED AND REPLACED m =) =) =) (i.e. MULCH, PLANTING, SOIL MIX, WOOD AND WIRE STAKING MATERIAL, ETC.). WITH 24" OF TOPSOIL/PLANTING MIX -OR- EXISTING SOIL MAY BE UNCOMPACTED TO A DEPTH OF 24" AND rn rn rn AMENDED TO MEET TOPSOIL STANDARDS FOR THE ENTIRE PLANTING AREA. w r r r 21. THE COMPLETION OF THE CONTRACT WILL BE ACCEPTED AND NOTICE OF COMPLETION RECORDED ONLY 32. SOIL IN ALL PLANTING STRIPS OR ISLANDS, WHETHER EXISTING OR NEW(ON NEW OR RENOVATED SITES), MUST Q LO Cl) ry WHEN THE ENTIRE CONTRACT IS COMPLETED TO THE SATISFACTION OF THE LANDSCAPE ARCHITECT, OWNER, MEET THE MINIMUM TOPSOIL/PLANTING MIX SPECIFICATIONS. SOIL AMENDMENTS OR FRESH TOPSOIL/PLANTING 'It r r AND THE OWNER'S CONSTRUCTION REPRESENTATIVE. WITHIN TEN DAYS NOTICE BY THE CONTRACTOR OF MIX ARE OFTEN NEEDED FOR PLANTING AREAS AT SITES WHERE ORIGINAL TOPSOIL IS OF POOR QUALITY, SUBSTANTIAL COMPLETION THE LANDSCAPE ARCHITECT WILL INSPECT THE PROPERTY. HE WILL EITHER HEAVILY COMPACTED OR WHERE TOPSOIL HAS BEEN COMPLETELY REMOVED DURING GRADING. APPROVE THE WORK FOR THE OWNER'S ACCEPTANCE OR WILL ISSUE A "PUNCH LIST" OF ITEMS TO BE 33. TOPSOIL/PLANTING MIX SHOULD BE NATURAL, FERTILE, AGRICULTURAL SOIL CAPABLE OF SUSTAINING VIGOROUS z T N (' COMPLETED OR CORRECTED. IF A PUNCH LIST IS ISSUED, FINAL ACCEPTANCE WILL BE DONE AS SOON AS THE PLANT GROWTH. IT SHOULD BE UNIFORM COMPOSITION THROUGHOUT, WITH ADMIXTURE OF SUBSOIL. IT SHOULD CONTRACTOR COMPLETES ALL PUNCH LIST ITEMS. BE FREE OF STONES, LUMPS, LIVE PLANTS AND THEIR ROOTS, STICKS AND OTHER EXTRANEOUS MATTER. 22. AMENDED SOIL MEDIA REQUIREMENTS: A PLANTING MIX MAY BE DEVELOPED THAT WILL BE AN 34. ro TOPSOIL SHOULD NOT BE USED WHILE IN A FROZEN OR MUDDY CONDITION. Pject NO: 19-039 TOPSOIL/PLANTING MIX SHALL HAVE AN ACIDITY RANGE OF PH 5.5-7.0 AND THE FOLLOWING COMPOSITION: � ACCEPTABLE PLANTING MEDIA BY AMENDING THE EXISTING SOIL OR BY REMOVING THE EXISTING SOIL AND CLAY (RED CLAY, WELL PULVERIZED) MINIMUM 10%; MAXIMUM 35% REPLACING IT WITH NEW PLANTING MIX. THE PLANTING MIX SHALL HAVE UNIFORM COMPOSITION COMPOST*/ORGANIC MINIMUM 5%; MAXIMUM 10% Date: 04.02.19 THROUGHOUT, WITH A MIXTURE OF SUBSOIL. IT SHALL BE FREE OF STONES, LUMPS, LIVE PLANTS AND SILT MINIMUM 30%; MAXIMUM 50% THEIR ROOTS, STICKS, AND OTHER EXTRANEOUS MATTER. IT SHALL CONTAIN NO MAN LIMADE MATERIALS COARSE SAND (FREE OF ROCKS, 0.5 TO 1.0 MM F) MINIMUM 30%; MAXIMUM 45% Designed by: udp UNLESS OTHERWISE SPECIFIED. PLANTING MIX SHALL NOT BE USED WHILE IN A FROZEN OR MUDDY *ORGANIC MATERIAL SUCH AS SAWDUST OR LEAF MOLD THAT HAS COMPLETED THE DECOMPOSITION PROCESS. CONDITION. Drawn By: *NOTE: CONTRACTOR TO PROVIDE TEST SAMPLES OF AMENDED SOIL WITH TESTING DATA FOR ALL PLANTING RECOMMENDATIONS: BED AREAS AMENDED ON SITE. TEST SAMPLES SHALL FALL WITHIN TOLERANCES SHOWN ABOVE. 35. ALL PLANTING AREAS SHOULD BE TESTED FOR PROPER DRAINAGE. DRAINAGE SHOULD BE CORRECTED AS Sheet No: PLANTING SHALL NOT BEGIN UNTIL SOIL HAS BEEN AMENDED AND SOIL TEST SAMPLES HAVE BEEN NECESSARY TO INSURE PROPER TREE GROWTH AND SURVIVAL. THE FOLLOWING LEVEL OF NUTRIENT ELEMENTS REVIEWED AND APPROVED BY OWNER AND LANDSCAPE ARCHITECT. IS RECOMMENDED FOR PROPER GROWTH: CALCIUM 55 - 80% MAGNESIUM 10 - 30% POTASSIUM 5 - 8% LS-200