Loading...
HomeMy WebLinkAboutNCG210241_Inspection Report_20191210ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality December 10, 2019 Sonoco Products Company - Granite Falls Attention: Robert Cooley 4608 Helton Road Granite Falls, North Carolina 28630 Subject: Compliance Evaluation Inspection Permit: NCG210000 Certificate of Coverage: NCG210241 Caldwell County, North Carolina Dear Mr. Cooley: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on September 26, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincere , Isaiah Reed, CPSWQ, CEPSCI, M 4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ5 North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 l Swannanoa, North Carolina 28778 NCNIH CMIXINP 828.296.4500 Permit: NOG210241 SOC: County: Caldwell Region: Asheville Contact Person: Russell Craig Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 08/01/18 Expiration: 07/31/23 Owner: Sonoco Products Company- Granite Falls Effective: Expiration: Facility: Sonoco Products Co -Granite Fal 4608 Helton Rd Inspection Date: 11/26/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Granite Falls NC 28630 Title: Phone: 828-396-3196 Ext.14 Certification: Phone: Entry Time: 02:OOPM Exit Time: 03:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm water (See attachment summary) Page 1 of 3 Permit: NCG210241 Owner -Facility: Sonoco Products Company - Granite Falls Inspection Date: 11/26/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary On November 26, 2019 this facility was inspected for compliance. I met with Dane Mader on site. During the inspection the following items were noted: 1) A Stormwater Pollution Prevention Plan (SWPPP) has been created, but not maintained. The permittee is directed to review and update the SWPPP as outlined in the NCG210000 General Permit. 2) Qualitative and Analytical monitoring has not been performed on site. The permittee is directed to immediately begin monitoring efforts as outlined in the NCG210000 General Permit. Please give the above items your immediate attention. This facility will be re -inspected on or after January 14, 2020. If the above items have not been addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG210241 Owner -Facility: Sonoco Products Company -Granite Falls Inspection Date: 11126/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ N ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ E ❑ ❑ Comment: See summary for more information. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ M ❑ Comment: See Summary for more information. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3