Loading...
HomeMy WebLinkAboutSW1191001_18-161 Comments Response Stormwater Permit_11/26/2019CLH design, p.a. 400 Regency Forest Drive, Suite 120 Cary, North Carolina 27518 P: 919.319.6716 C L H www.clhdesignpa.com aESIC__N Stormwater Management Permit Comment Responses Date: November 26, 2019 To: Corey Anen - NCDEQ From: Hannah Banks- CLH Design PA Re: Rutherfordton-Spindale Middle School Dear Corey Anen: Below in red are our responses to the 1st round of review comments received for the above referenced project. Stormwater Program (Corey Anen) Comment 1: The coversheet (Sheet C00.00) lists the existing and proposed impervious coverage as 14.2 acres and 0.77 acres, respectively. This is inconsistent with the proposed design. Please revise this note. Response: Please find the revised cover sheet with updated stormwater data. In addition, a pre - development land use map (C00.01 B) has been provided to clearly indicate existing impervious. Likewise, the post -development land use map (C00.01 A) has been revised to show total site BUA. Application and supplemental form have been revised to reflect these BUA values accordingly. Comment 2: The Overall Site Plan (Sheet C00.01) shows two future additions; however, no future BUA was listed in the application. Was this BUA accounted for when designing the wet ponds? Response: Please find the revised application and supplemental forms with future BUA. As mentioned above, Land Use Maps for pre- and post- development conditions have been revised to indicate future BUA. Comment 3: The existing baseball fields are labelled as offsite but are included in the project area. Offsite areas should only include those outside of the project area. Response: This label has been removed. Any reference to "offsite" area on plans or applications have been revised to 0. Comment 4: The third sheet of the Supplemental EZ, which includes the design information, was not submitted with the application. Please complete and submit a signed and sealed Supplement EZ form with this information. Response: A revised supplemental EZ form has been provided with the 3,d sheet. Comment S: Please add a note to the wet pond detail sheet (Sheet C07.08) showing the proposed diameters of the wet pond orifices. There is a note that says "Drill opening in end Cap. Diameter. Q.' However, in the pond schedule Q refers to the elevation of the orifice. CLH design, p.a. Stormwater Management Permit Comments November 26, 2019 Response: The description in the pond schedule has been revised to "primary spillway orifice diameter" and diameters (in) have been input instead of elevations. The elevation of the spillway orifice is referenced in the pond schedule as item B. Comment 6: Please submit a planting plan for the wet ponds that meets the requirements of Wet Pond MDC 11. Response: Site landscape sheets C06.01 have been included with this submittal. Planting schedule can be found in the notes section on all landscape sheets. Additionally, C07.05 has been included for landscape details and seeding notes. Comment7. Providepdfs ofall revisions, 2 hardcopies ofrevisedplan sheets, and I hardcopy of other documents. Pdfs must be uploaded using the form at. https://edocs.deq.nc.gov/Forms/SW_Project_Submittal Response: With this submittal you will find 2 hard copy plan sets and 1 hardcopy of other documents. All hard copies have been uploaded as well. End of Responses Thank you for all your help and please call with any questions. Sincerely, For CLH design, p.a. Hannah Banks, El Civil Designer CLH design, p.a.