HomeMy WebLinkAboutSW6191004_SuppEZ-2018-Version-2.1.1_working_11/7/2019SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION Project Name Project Area ac MULTIPURPOSE TRAINING FACILITY, SOTF 3.65 1 2 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 nDoes is roject Hi h or Low Densit ? Hi h this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? 9 Is BUA other that as listed in .1003 4 c-d out of the setback? 10 ps streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 2 12 Bioretention Cell 0 13 Wet Pond 0 14 1 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Dan Saltsman, PE 28 Organization: Stantec 29 Street address: 801 Jones Franklin Rd, Suite 300 30 City, State, Zip: Raleigh, NC 27606 31 Phone numbers : 919-532-2331 32 Email: dan.saltsman@stantec.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Seal Signature of Designer Date DRAINAGE AREAS 1 Ils this a high density project? 2 1 If so, number of drainage areas/SCMs Is all/part of this project subject to previous rule 3 versions? FORMS LOADED Yes 2 TWO DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM Infiltration Basin Infiltration Basin 5 Total BUA in project (sq ft 37662 sf 6permitting) New BUA on subdivided lots (subject to s ft 7 New BUA outside of subdivided lots (subject to ermittin s 8 Offsite - total area (sq ft 10306 sf 4261 sf 6045 sf 9 Offsite BUA (sq ft 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft - Sidewalk (sq ft - Roof (sq ft - Roadway s ft - Future (sq ft - Other, please specify in the comment box below (sq ft New infiltrating permeable pavement on subdivided lots (sq ft 13137 sf 2352 sf 10785 sf 24525 sf 8930 sf 15595 sf 11 12 New infiltrating permeable pavement odutsideof subdivided lots s ft 13 Exisitng BUA that will remain (not subj permitting)s ft 14 ExistingBUA that is alreadypermitted15 Existin BUA that will be removed s 16 Percent BUA 24% 36% 27% 17 Design storm inches 1 in 1 in 1 in 18 Design volume of SCM cu ft 3487 cf 976 cf 2381 cf 19 lCalculation method for design volume Simple Simple Simple ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): Note Line Item #18 Design Volume inlcudes existing impervious areas and is considered the required volume for each drainage area/the site. Actual volumes stored in SCMs are reported on the SCM summary forms. INFILTRATION SYSTEM 1 Drainage area number 2 Design volume of SCM (cu ft) 1 1 2 2244 cf 2685 cf 3 1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? 15 Is there an O&M Plan that complies with General MDC (12)? 16 Does the SCM follow the device specific MDC? 17 Was the SCM designed by an NC licensed professional? Yes Yes SYSTEM MDC FROM 02H .1051 Proposed slope of the subgrade surface (%) 0% 0% Are terraces or baffles provided? No No INFILTRATION 18 19 20 Type of pretreatment: Other Other Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? SHWT elevation (fmsl) Depth to SHWT per soils report (in) Yes Yes 22 23 24 Ground elevation at boring in soils report (fmsl) 245.50 228.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? 26 Soil infiltration rate (in/hr) 2.02 3.30 27 IFactor of safety (FS) (2 is recommended): 2.00 2.00 Elevations 29 Bottom elevation (fmsl) 243.00 ft 223.77 ft 30 Storage elevation (fmsl) 244.50 ft 224.10 ft 31 Bypass elevation (fmsl) 244.50 ft 224.10 ft I For Basins Onl v 32 Bottom surface area, ft2: 724 ft 1391 ft 33 Storage elevation surface area (ft) 1216. ft 1743. ft For Trenches Only 34 Length (ft) 35 Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 ITotal length of perforated piping 39 Stone type, if applicable 40 Stone void ratio (%) _ 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one infiltration port been provided? Volumes/Drawdown 44 Design volume of SCM (cu ft) 2244 cf 2685 cf 45 ITime to drawdown (hours) 23 hrs 23 hrs )DITIONAL INFORMATION — 7Please use this space to provide any additional information about the infiltration 46 system(s): Note: Design Volume of SCM is the actual volume the SCM can hold and not the calucated required volume for water quality. See drainage area summary for required volume. See attached O+M letter for Ft. Bragg compliance. Infiltration 3 10:20 AM 10/3/2019