Loading...
HomeMy WebLinkAboutSWA000060_(4)Cameron Woods 04 Red Pine Ct_10/21/2019PUBLIC UTILITIES EA SEMEN T I \/ 30" CLASS /V RCP STORM PIPELOT 7 \ �. FIRE HYDRANT �\ \ ASSEMBLY \ LOTIB 2" GATE VAL VE 350 340 z 0 Q w J W 330 zp 15'x8' DISSIPA TER PAD CD 00 o 00 rn 6 C° o 0 � 0 n O 0 n II II O F- J II II U) _ > Ld _ > Q F- LLJ> J Ul Ld 0- 0- EXISTING GRADE PROPOSED GRADE 0.56% • 009' 30" RCP class IV 2" BL0WOFF ASSEMBLY 2 " P VC WATER SDR-27 7VALVE MINIMUM 24 " FROM TOP MINIMUM 24 " FROM TOP OF SEWER SLEEVE TO VC WA TER SDR-21 OF WA TER LINE TO BOTTOM OF WA TER MAIN 2" GATE BOTTOM OF STORM PIPE 2" PVC SEWER MAIN INSIDE 4" PVC SLEEVE UNDER ROAD PA VEMEN T a a 0 J U gM nj MINIMUM DEPTH OF WATER o MAIN IS 3' FROM TOP OF g a PIPE TO FINISHED GRADE N W A_,AA 1iAA "fiAA 7 AA AiAA 320 -0 50 STATION Crossing Separation Notes 1. Water line Crossing over or under storm sewer is minimum 24" 2. Water line Crossing over sanitary sewer/force main is minimum 24" 3. Water Line Crossing under sanitary sewer/force main Water line and sewer line shall be ferrous materials i50 40 i30 320 4+ 7.2 z 0 Q w _1W r `f9kylzmIIf, "a o �� •��,a8a�'tr t�°e a � �94 i0f 114rr W. stis 1,�41q 9/04/2019 40' 0 20' 40' 80' 1 INCH = 40 FEET THE FOLLOWING ARE STANDARD ITEMS THAT WILL BE REQUIRED OF ALL ENGINEERS/DEVELOPERS DURING CONSTRUCTION: 1) THE CONTRACTOR WILL NOTIFY MR. ALAN MOSS, UTILITY CONSTRUCTION INSPECTOR WITH HARNETT REGIONAL WATER (HRW) AT LEAST TWO(2) DAYS PRIOR TO CONSTRUCTION COMMENCING. PRIOR TO CONSTRUCTION, THE REGISTERED PROFESSIONAL ENGINEER (PE) AND UTILITY CONTRACTOR SHALL ATTEND A PRE -CONSTRUCTION MEETING WITH HRW. THE OWNER/DEVELOPER MAY ATTEND THIS MEETING IF DESIRED. 2) ONCE THE PROJECT IS APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES (NCDENR) THEN HRW WILL MARK THE UTILITY PLANS 'RELEASED FOR CONSTRUCTION." THE UTILITY CONTRACTOR MUST WORK OFF THE UTILITY PLANS RELEASED BY HRW. IF THE UTILITY CONTRACTOR IS WORKING FROM OTHER PLANS THEN THE CONSTRUCTION MUST STOP UNTIL THE UTILITY PLANS MARKED 'RELEASED FOR CONSTRUCTION" ARE ISSUED BY HRW. 3) THE DEVELOPERS ENGINEER OF RECORD WILL REVIEW ALL SHOP DRAWINGS FOR CONFORMANCE WITH HRW SPECIFICATIONS PRIOR TO SUBMITTAL TO HRW STANDARDS. 4 ALL WATER MAINS, VALVES, FITTINGS AND APPURTENANCES SHALL BE HYDROSTATICALLY TESTED AS PER HRW SPECIFICATIONS. 5 ALL WATER SAMPLES FOR BACTERIA TESTING WILL BE COLLECTED BY THE CONTRACTOR AND WITNESSED BY REPRESENTATIVE OF HRW. 6) THE CONTRACTOR WILL COORDINATE WITH MR. ALAN MOSS, UTILITY CONSTRUCTION INSPECTOR HRW FOR REGULAR INSPECTION VISITATIONS AND ACCEPTANCE OF THE SYSTEM 7) THE DEVELOPER SHALL AT HIS EXPENSE, RETAIN THE SERVICES OF THE ENGINEER OF RECORD FOR THE PURPOSES OF PROVIDING NECESSARY INSPECTIONS AND SUPERVISION OF THE CONSTRUCTION WORK, RECORD DRAWINGS AND ENGINEER CERTIFICATIONS. THE ENGINEER IS RESPONSIBLE TO INSURE THAT CONSTRUCTION IS, AT ALL TIMES, IN COMPLIANCE WITH ACCEPTED SANITARY ENGINEERING PRACTICES AND THE APPROVED PLANS AND SPECIFICATIONS. THE ENGINEER SHALL SUPPLY HRW WITH FIELD REPORTS WHEN EACH INSPECTION IS MADE. 8) UPON COMPLETION AND ACCEPTANCE OF THE SYSTEM, THE ENGINEER WILL FILE A LETTER OF CERTIFICATION THAT THE PROJECT HAS BEEN BUILT IN ACCORDANCE WITH PLANS AND SPECIFICATIONS AS APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES/DIVISION OF ENVIRONMENTAL HEALTH --PUBLIC WATER SUPPLY SECTION WITH A COPY TO HRW 9) THE ENGINEER MUST FILE WITH HRW, FOUR (4) 24X36" BLUE PRINTS (BOND PRINTS) OF THE 'AS -BUILT" OR RECORD DRAWINGS" FOR ALL CONSTRUCTION IN PLACE. THESE DRAWINGS MUST BE SEALED BY THE REGISTERED PROFESSIONAL ENGINEER WITH HIS SIGNATURE AND MARKED 'RECORD DRAWINGS." ANY AND ALL FIELD CHANGE ORDERS THAT WERE MADE DURING CONSTRUCTION SHALL BE PROPERLY DOCUMENTED IN THE 'AS -BUILT RECORD" DRAWINGS. THE 'RECORD DRAWINGS" SHALL INCLUDE ALL LOT NUMBERS, WATER VALVES, VALVE MARKERS, WATER METER SETTERS, FIRE HYDRANTS, BLOW OFF ASSEMBLIES. MANHOLES SEWER CLEAN OUTS, AIR RELEASE VALVES. AND SEWER LIFT STATIONS AS INSTALLED BY THE CONTRACTOR. 10) A DIGITAL COPY OF THE 'RECORD DRAWINGS" MUST BE SUBMITTED TO HRW. PREFERABLY, THE DIGITAL COPY OF THE 'RECORD DRAWINGS" SHOULD BE PRODUCED IN AUTOCAD (DWG) OR(DXF) FORMAT 11) THE 'RECORD DRAWINGS" THAT INCLUDE GRAVITY SEWER LINE EXTENSIONS, SEWER LIFT STATION(S) AND /OR SEWER FORCE MAINS WILL CONTAIN THE FOLLOWING DETAILED INFORMATION. A. LOT NUMBERS THAT WILL BE SERVED BY THE SEWER SYSTEM WILL BE CLEARLY INDENTIFIED ON EACH PAGE OF THE 'AS -BUILT" OR RECORD DRAWINGS" B. THE DISTANCE FOR EACH SEWER SERVICE LATERAL SHALL BE MEASURED FROM THE DOWN GRADE MANHOLE ALONG THE SEWER MAIN TO THE CONNECTION WYE AND ASSOCIATED SEWER CLEANOUT FOR EACH LOT C. THE DIRECTION FOR EACH SEWER SERVICE LATERAL SHALL BE MARKED AS LEFT OR RIGHT FACING UP GRADE FROM THE NEAREST DOWN GRADE MANHOLE D. DIRECTIONAL ARROWS SHALL BE PLACED ON EACH SEWER LINE (GRAVITY AND FORCE MAIN) ON THE OVERALL LAYOUT SHEET FOR EACH PHASE OR SECTION OF THE SEWER SYSTEM. 12) THE ENGINEER WILL SUBMIT IN WRITING THAT ITEMS 1 THROUGH 11 ARE COMPLET AND THAT WARRANTY WILL BEGIN ON THE DATE WHEN THE SYSTEM HAS BEEN ACCEPTED BY NCDENR AND TERMINATE 12 MONTHS THEREAFTER. 13) THE CONTRACTOR WILL NOTIFY HRW WHEN THEY ARE READY TO BEGIN FILLING IN LINES AND COORDINATE THIS WITH MR. ALAN MOSS, UTILITY CONSTRUCTION INSPECTOR HRW. 14) PRIOR TO ACCEPTANCE, ALL SERVICES WILL BE INSPECTED TO INSURE THAT THEY ARE INSTALLED AT THE PROPER DEPTH. ALL METER BOXES MUST BE FLUSH WITH THE GROUND LEVEL AND THE SETTERS ARE TO BE A MINIMUM OF 8" BELOW THE BOX LID. 15) THE ENGINEER WILL PROVIDE A STATEMENT INDICATING THE TOTAL COST OF THE WATER AND/OR SEWER SYSTEM(S). 16 WATER SERVICE WILL BEGIN ONLY UPON SUBMISSION OF FINAL CERTIFICATION AND WARRANTY ACCEPTANCE BY THE DISTRICT 17) UPON RECEIPT OF FINAL CERTIFICATIONS, A COPY WILL BE FORWARDED TO MR. ALAN MOSS, UTILITY CONSTRUCTION INSPECTOR HRW FOR A FINAL INSPECTION 18) THE DEVELOPER/CONTRACTOR WILL BE JOINTLY RESPONSIBLE FOR ANY REPAIRS MADE DURING THE WARRANTY PERIOD. HRW WILL PROVIDE MAINTENANCE WHEN REQUESTED AND BILL THE DEVELOPER/CONTRACTOR. 19) HRW REQUIRES THAT THE CURRENT WATER AND SEWER SYSTEM DEVELOPMENT FEES BE PAID IN ACCORDANCE WITH THE LATEST HARNETT COUNTY WATER AND SEWER USE ORDINANCE. 20) FIRE HYDRANTS ARE INSTALLED AT CERTAIN ELEVATIONS. ANY GRADE CHANGE IN THE VICINITY OF ANY FIRE HYDRANT WITH IMPEDES ITS OPERATION SHALL BECOME THE RESPONSIBILITY OF THE DEVELOPER FOR CORRECTION. CORRECTIONS WILL BE MONITORED BY THE HRW UTILITY CONSTRUCTION INSPECTOR AND THE HARNETT COUNTY FIRE MARSHAL. 21) ALL FIRE HYDRANTS INSTALLATIONS IN HARNETT COUNTY MUST MEET ALL REQUIREMENTS ESTABLISHED BY THE HARNETT COUNTY FIRE MARSHAL'S OFFICE. ALL FIRE HYDRANTS INSTALLATIONS MUST BE INSPECTED BY HARNETT COUNTY DEPUTY FIRE MARSHAL. THE CONTRACTOR SHALL NOTIFY AT THE FIRE MARSHAL AT (910) 893-7580 ONCE THE CONSTRUCTION IS COMPLETE TO REQUEST A SITE INSPECTION OF ALL FIRE HYDRANTS INSTALLATIONS. UPON INSTALLATION OF THE WATER SUPPLY INFRASTRUCTURE, THE ACTUAL FIRE FLOW SHALL BE DETERMINED ON SITE BY A PROFESSIONAL QUALIFIED TO DO SUCH WORK AND FIRE SERVICE PERSONNEL USING AN APPROVED METHOD. I - 331.30 DI TCH SECTIONS SECTION 1 - USE FOR: RED PINE COURT LEFT- STA 0+00 - STA 3+72 WESTERN PINE WAY LEFT. STA 4+70 - STA 8+00 WESTERN PINE WAY RIGHT.• STA 6+30 - END OF CUL-DE-SAC SECTION 2 - USE FOR: RED PINE COURT RIGHT: STA 0+00.00 - STA 3+72 WESTERN PINE WAY LEFT: STA 0+10.75 - STA 4+70 WESTERN PINE WAY RIGHT- STA 0+00.00 - STA 6+30 SECTION 3 - USE FOR. DITCH AT 30" PIPE INLET- STA 8+62.4 LINE DITCH WITH CLASS A RIPRAP OVER FILTER FABRIC STA 8+00.0 - STA 8+62.4 DITCH AT 30'" PIPE OUTLET. STA 9+18.4 PROVIDE 15x8' DISSIPATOR PAD WITH 18" THICK CLASS B RIPRAP PLACED OVER FILTER FABRIC. SECTION 4 -USE FOR: WESTERN PINE WAY LEFT. STA 9+18.4 - END OF CUL-DE-SAC LINE WITH 8' WIDE JUTE MATTING GRASSED DITCH LINE WITH 6' WIDE JUTE MATTING GRASSED DITCF LINE WITH 6' WIDE JUTE MATTING LINE WITH 10' WIDE JUTE MATTING GRASSED DITCH 6' 10' 10' 6' 334.56 335.0 30" CLASS IV RCP @ 0.50% CROSS SECTION OVER 30" RCP RED PINE COURT STA 23+48 334.56 331.02 --/ w rw^� �1 r� O O co �41� LO � w � qa�a LO co w CN dO+�E� r� �y1 "C) a O H Z Q w 04 a O h 5 U fx� a � Co Co Cn O C/) W 0 rL rL 9 U W LU 0 z DATE. 04.01.17 SCALE. 1 "=40' DESIGNED: SWB CHECKED: SWB DRAWN: SWJ APPROVED: IDG LLC SHEET: 4 7 OF CAD FILE: CAMERON PROJECT NO: 2017.01