Loading...
HomeMy WebLinkAboutSW3190506_Supplement EZ Form_20190701SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 jProject Name this project use an of( site SCM7 COMPLIANCE WITH 02H .1003(4) ll the vegetated setback remain vegetate[ BUA other that as listed in .1003(4)(c-d) o streambank stabilization proposed on this INUMBER AND TYPE OF SCMs: " 11 lInfiltration System__ 0 12 Bioretention Cell _ 0 13 Wet Pond 0 14 Stormwaler Wetland 0 15 Permeable Pavement 16 Sand Filter 1 17 1 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Sp reader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) _ 0 21 Treatment Swale _ 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 0 25 Bayfilter 26 Filters 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Frank Cantrell Cardno 28 Organization: 29 Street address: 9800 Southern Pine Blvd. Suite I 30 City, State, Zip: Charlotte, NC 28273 31 Phone numbers : 9BO-422-0936 32 Email: frank.cantrell@cardno.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. :�'t,0 oF�ssroa��y, SEAL c i 03981I Q. v '%9 '•%!f�INEE • �4, �r ';�' Signature of Designer t Z49l q Date DRAINAGE AREAS 1 lis this a hi h densityproject? No 2 If so number of drainage areas/SCMs 1 Is all/part of this project subject to previous rule 3 versions? No CLICK TO LOAD FORM `7AINAGE AREA INFORMATION Entire Site 1 Type of SCM Sand Filter 5 Total BUA in project (sq ft 102095 sf fipermitting) New BUA on subdivided lots (subject to s ft 7permitting) New BUA outside of subdivided lots (subject to s 8 Offsito - total area (sq ft 9 Offsite BUA (sq ft 10 113reakdown of new BUA outside subdivided lots: -Parking sq ft 43926 sf - Sidewalk (sq ft 6870 sf Roof (sq ft 20250 sf Roadway s ft 28049 sf Future (sq ft 3000 sf Other, please specify in the comment box below (sq ft 11 New infiltrating permeable pavement on subdivided lots (sq ft 12 New infiltrating permeable pavement outside of subdivided lots (sq ft 13permitting) Exisitng BUA that will remain (not subject to s ft 14 Existing BUA that is already permitted (sq ft 15 Existing BUA that will be removed (sq ft 16 Percent BUA 10% 17 Design storm inches 1 in 18 Design volume of SCM cu ft 39097 cf 19 Calculation method for design volume ADDITIONALINEORMATION 20 Please use this space to provide any additional information about the drainage area(s): RAINAGE AREA INFORMATION Entire Site 1 4 lTvpeofSCM N/A 5 Total BUA from project (sq ft) 6 1995 rules SL 2006-246 2008 rules _ 2017 rules 7 New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 2008 rules _ 2017 rules 8 New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules SL 2006-246 2008 rules 2017 rules 9 Offsite - total area (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 11 IDGSIgn storm (inches) SAND FILTER 1 Drainage area number 1 2 Design volume of SCM (u ft) " GENERAL MDC FROM 02H .1050 3 is the SCM sized to treat the SW from all surfaces at build -out? -1 4 Is the SCM located away from contaminated soils? 5 What are the side slopes of the SCM (H:V)? 3:1 j Does the SCM have retaining walls, gabion walls or other engineered 6 side slopes? No Are the inlets, outlets, and receiving stream protected from erosion (10- 7 year storm)? Yes Is there an overflow or bypass for inflow volume in excess of the design 8 volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM he cleaned out after consiruclion? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 jDoe.% the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? 14 [s there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? 16 Does the SCM follow the device specific MDC? Yes 17 as t e SCM designed by an NC license professional? . 0 FROM -._ -ems 2H .1056 MDC SHWT elevation (fmsi) Yes 18 19 Type of sand filter (open or closed) Open 20 If closed, will the Filter will be pre -cast or pour -in -place? 21 If closed, top of grate elevation (fmsl) 22 Is this sand Filter designed to attenuate peak flows? Yes Sediment Chamber 23 Volume that can be retained in the sediment chamber (cubic feet) 19549 of 24 Will there be a permanent pool in the sediment chamber? No 25 Bottom of the sediment chamber (fmsl) 684.00 26 Area of the sediment chamber (square feet) 5114 sf 27 Physical depth of the sediment chamber (inches) 24 in 28 Pending depth in the sediment chamber, above any permanent pool (inches) in 29 Elevation of top of weir between chambers (fmsl) 686 d Chamber o IVolume that can be retained in the sand chamber (cubic feet) 19549 of m 32 Area of the sand chamber (square feet) 5114 sf 33 Physical depth of the sand chamber (inches) 24 in 34 Pending depth in the sand chamber, above any permanent pool (inches) in 35 Elevation of the bypass device (fmsl) none 36 Type of bypass device n/a 37 Mechanism for distributing flow over the sand surface n/a per hour at 40 1 the sand surface? Yes Is at least one clean -out pipe provided at the low point of each 41 junderdraln line? Yes 42 1 Will clean -out pipes be capped? es ADDITIONAL INFORMATION Please use this space to provide any additional information about the 43 Sand F'llter(s): Sand Filter 1 1:08 PM 7/1/2019