Loading...
HomeMy WebLinkAboutSW6230103_Supplemental Info Review_20231020 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 10/20/2023 2:09:50 PM (Supplemental Submittal) Accept by Kaitlin Peck 10/23/2023 7:33:57 AM (Supplemental Info Submittal) • The task was assigned to Kaitlin Peck 10/20/2023 2:09:52 PM DEQ • Submittal from 10/20/2023 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW6230103 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* Carter Farms-Phase 1 Owner/Operator* David Geoff Becker County: Hoke Submitter Name:* Averette Engineering Who is submitting this information? E-mail Address:* Mitchell@averette-emg.com Phone Number* 9104885656 Additional E-mail for (Optional) Submittal Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* Design Calculations File Upload Click the upload button,or drag and drop files to attach 2023.07.24-STORMWATER MANANGEMENT 2.28MB REPORT.pdf Only PDF files are accepted. File Type* Application Form File Upload Click the upload button,or drag and drop files to attach 2023.05.04 SSW-SWU-101-Application-DEMLR- 521.12K6 SPU Oct 2013.pdf Only PDF files are accepted. File Type* O&M Agreement/Plan File Upload Click the upload button,or drag and drop files to attach 0-M-EZ-20201215-2.1--3-.pdf 165.89KB Only PDF files are accepted. File Type* Supplement-EZ Form File Upload Click the upload button,or drag and drop files to attach S u p p E Z-2020-Version-2.1.3-20201203-D E M L R- 288.48K6 SW.pdf Only PDF files are accepted. File Type* Stormwater Narrative File Upload Click the upload button,or drag and drop files to attach 2023.07.24-STORMWATER MANANGEMENT 2.28MB REPORT.pdf Only PDF files are accepted. File Type* Plansheet-Grading/Drainage Plan File Upload Click the upload button,or drag and drop files to attach 2022.07.21-CarterFarms D&D-C7- 618.08KB GRADING&DRAINAGE.pdf Only PDF files are accepted. File Type* Plansheet-Other File Upload Click the upload button,or drag and drop files to attach 2022.07.21-CarterFarms D&D-C9-EC-FINAL.pdf 709.97KB Only PDF files are accepted. File Type* Plansheet-Misc. Detail File Upload Click the upload button,or drag and drop files to attach 2022.07.21-CarterFarms D&D-C17-DETAIL.pdf 2.78MB Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: * By checking the box and signing box below, I certify that: • I have given true,accurate,and complete information on this form; • I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Mitchell Averette Signature: Date Submitted: 10/20/2023 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW6230103 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Brianna Holland Any Comments or Added Info for CO Staff Reviewer? Review Date* 10/23/2023