Loading...
HomeMy WebLinkAboutSWA000213_email_20230719 Peck, Kaitlin From:Farkas, Jim J Sent:Wednesday, July 19, 2023 9:22 AM To:Robbie Bell Cc:rrojas@drbgroup.com Subject:RE: \[External\] RE: SWA000213; Station Pointe - Phase 1 Attachments:Capture.PNG Robbie, I was looking over the informa?on provided on 7/17/23. There appears to be a surface water area shown within the Phase 1 project area on the provided plans (see a?ached). Please include this on-site surface water area in Part E5 of the form and recalculate the Total Project Area and %BUA as needed. Please also upload the electronic files from the 7/17/23 submission if you have not already done so to the following link (h?ps://edocs.deq.nc.gov/Forms/SW- Supplemental-Upload). Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Farkas, Jim J Sent: Wednesday, July 12, 2023 1:54 PM To: Robbie Bell <Robbie.Bell@bnkinc.com>; rrojas@drbgroup.com Cc: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Subject: RE: \[External\] RE: SWA000213; Station Pointe - Phase 1 “Total Surface Water Area” (in Part E5 of the Applica?on) corresponds to the surface area of any surface waters located on-site where “surface waters” are those waters that are shown on a USGS topo map and the “surface area” is measured between the banks (for rivers, streams, etc…) or based on the normal pool eleva?on (for lakes, ponds, etc…). Proposed SCMs do not count towards this surface water area. Jim Farkas State Stormwater Engineer 1 North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Robbie Bell <Robbie.Bell@bnkinc.com> Sent: Wednesday, July 12, 2023 1:49 PM To: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; rrojas@drbgroup.com Cc: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Subject: \[External\] RE: SWA000213; Station Pointe - Phase 1 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good a?ernoon Jim. Just to clarify that I need to subtract normal pool areas for “proposed stormwater basins addressing a?enua?on and treatment also, not just exis?ng ponds? Thanks, Kirby R (Robbie) Bell, Jr. PE, CPESC robbie.bell @bnkinc.com P: 919.851.4422 D: 919.645.3540 Bass, Nixon & Kennedy, Inc. 6310 Chapel Hill Road, Suite 250 Raleigh, NC 27607 bnkinc.com Serving the Triangle and surrounding areas since 1969 From: Farkas, Jim J <Jim.Farkas@deq.nc.gov> Sent: Friday, July 07, 2023 2:12 PM To: Robbie Bell <Robbie.Bell@bnkinc.com>; rrojas@drbgroup.com Cc: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Subject: RE: SWA000213; Station Pointe - Phase 1 Robbie, 2 I was looking over the informa?on you provided on 6/9/23. Everything looks good except for a few small issues: Please correct the following: - Please provided documenta?on showing that the Signing Official for the Applicant, Ric J. Rojas, is a principal execu?ve officer of the level of vice-president or that he has the authoriza?on of someone that is a principal execu?ve officer of the level of vice-president. This item is required per 15A NCAC 02H .1040(1)(a), 15A NCAC 02H .1043(3)(b), and Part F7 of the Applica?on. Organiza?on structures differ, so we just want to make sure that “Division President” is comparable to a vice president (you can provide an org chart or other documenta?on indica?ng this or a le?er from someone VP or higher authorizing Mr. Rojas to sign on their behalf). Alterna?vely, you can have someone else (that is a principal execu?ve officer of the level of vice-president) listed as the Applicant and sign the applica?on form. - Applica?on Part E5 – Please revise the Total Project Area and Project Density values. The Total Project Area value excludes the Surface Water Area (13,242 sf) from the Total Property Area (938,718 sf) and the Project Density calcula?on is based on the Total Project Area. Please revise. Please provide the following: - 2x hard copies & 1x electronic copy of documenta?on that the Signing Official is at the level of VP or higher/authoriza?on from someone of level VP or higher sta?ng that the Signing Official can sign on behalf of the Applicant/revised Part D & Part G with someone of level VP or higher as the signing official. - 2x hard copies & 1x electronic copy of the revised page of the Applica?on Form. Hard copies should be mailed to me at the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Electronic copies should be uploaded at the following loca?on: h?ps://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload Since these are really minor things, once I get the hard copies, anything else that may have changed from addressing these issues, and the documents are uploaded to Laserfiche (Provided everything is s?ll in order), we can issue the permit without doing another formal review. Let me know if you have any ques?ons. Jim Farkas State Stormwater Engineer 3 North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Thursday, June 29, 2023 3:57 PM To: Robbie Bell <Robbie.Bell@bnkinc.com>; rrojas@drbgroup.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: RE: SWA000213; Station Pointe Phase 1 (Harnett) **Correc?on* We received your post-construc?on stormwater Authoriza?on to Construct (ATC) permit applica?on for the subject project on 6/9/2023. Reviews under the Fast-Track permi?ng process can take up to 30 calendar days to complete. You can see where this project stands in the review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. h?ps://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Addi?onal file types can be entered into the electronic form by clicking on the “Add Another Post-Construc?on File Upload” link directly below the “State Stormwater Informa?on Uploads” sec?on of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding addi?onal file uploads) will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload en?re plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selec?ng the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan sheets (such as ligh?ng plans, u?lity plans, striping plans, sight distance plans, etc…) as these files are not needed for review. Please type in permit #: SWA000213 This project will be reviewed by Jim Farkas, if you have any ques?ons, please contact them at jim.farkas@deq.nc.gov or at 919-707-3646. Thank you, 4 Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov From: Peck, Kaitlin Sent: Thursday, June 29, 2023 3:53 PM To: Robbie Bell <Robbie.Bell@bnkinc.com>; rrojas@drbgroup.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: SWA000213; Station Pointe Phase 1 (Harnett) Good A?ernoon, We received your post-construc?on stormwater Authoriza?on to Construct (ATC) permit applica?on for the subject project on 6/29/2023. Reviews under the Fast-Track permi?ng process can take up to 30 calendar days to complete. You can see where this project stands in the review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. h?ps://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Addi?onal file types can be entered into the electronic form by clicking on the “Add Another Post-Construc?on File Upload” link directly below the “State Stormwater Informa?on Uploads” sec?on of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding addi?onal file uploads) will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload en?re plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selec?ng the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan sheets (such as ligh?ng plans, u?lity plans, striping plans, sight distance plans, etc…) as these files are not needed for review. Please type in permit #: SWA000213 This project will be reviewed by Jim Farkas, if you have any ques?ons, please contact them at jim.farkas@deq.nc.gov or at 919-707-3646. Thank you, 5 Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov From: Robbie Bell <Robbie.Bell@bnkinc.com> Sent: Thursday, June 8, 2023 9:08 AM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; rrojas@drbgroup.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: \[External\] RE: Station Pointe Phase 1; Angier, Harnett County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Kaitlin, I see what you are talking about. We do show leader lines over to the wetland areas but they are not defined in detail and especially the wetland areas that will be recorded with phase 1 and protected. Will send out today. Thanks, Kirby R (Robbie) Bell, Jr. PE, CPESC robbie.bell @bnkinc.com P: 919.851.4422 D: 919.645.3540 Bass, Nixon & Kennedy, Inc. 6310 Chapel Hill Road, Suite 250 Raleigh, NC 27607 bnkinc.com Serving the Triangle and surrounding areas since 1969 6 From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Wednesday, June 07, 2023 4:04 PM To: rrojas@drbgroup.com; Robbie Bell <robbie.bell@BNKInc.com> Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: Station Pointe Phase 1; Angier, Harnett County Good A?ernoon, I hope you are doing well. We received your application for a new Fast-Track post-construction stormwater permit on 5/30/23 At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 7/7/23) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  2x original hard copies and 1x electronic copy of a site plan corrected to depict wetlands on the project site. Currently it states that wetlands are present on site, but their locations are not indicated. This item is required per 15A NCAC 02H .1043(3)(f) and per Section F, 4 of the Application. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the Fast-Track permitting process can take up to 30 calendar days per statute. Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any ques?ons, please contact Kaitlin Peck at Kaitlin.peck@deq.nc.gov or at (919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist 7 North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 8