Loading...
HomeMy WebLinkAboutNCG160158_DMR Upload Review_20230720 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 7/19/2023 12:21:51 PM(DMR Submittal) Submit by Brittany.Cook 7/20/2023 1:52:19 PM (DMR Submittal Review) • The task was assigned to DEMLR SW Admin for DMRs 7/19/2023 12:21:52 PM • Brittany.Cook assigned the task to Brittany.Cook 7/19/2023 1:59:18 PM [rftDQ DMR Submittal from 7/19/2023 Permit and Facility Information: .............................................................................................................................................. Permit Number* Enter COC or Individual Permit Number NCG160158 Must begin with NCS or NCG Facility Name:* APAC Atlantic Inc-North Quarry Plant(42403) Owner/Operator APAC Atlantic Inc-Thompson-Arthur Div Name:* County:* Forsyth Note: Facility name and county are used to help the reviewer verify the permit number entered,and to display the Regional Office address on the submitter's form(not here).These metadata details will be pulled from current BIMS information after the DMR(s)are filed. If the submittal is accepted,simply note any errors in the reviewer's comments. Reason for not yet If applicable: reporting data Still in process. through eDMR for this permit: Monitoring Period Information: .............................................................................................................................................................................................................................................................................................................................................................................................. Monitoring Period What is the YEAR of the sample date(s)? Year:* 2023 DMR Upload* Click the upload button or drag and drop files here to attach document. Sampling Event 18-signed APAC Plant 5 DMR.pdf 837.12KB Only PDFs are accepted. Comments: * By checking the box and signing box below, I certify that: o I have given true,accurate,and complete information on this form; d I agree that submission of this Discharge Monitoring Report(DMR)Upload form is a"transaction"subject to Chapter 66, Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); d I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act"); o I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit this DMR Upload form. Full Name:* John Parker Alvis Name of person submitting this form Email Address:* palvis@ei1.com Phone Number:* 9802412469 Signature: e-dfir��r t.�4•t['�lstf Date:* 07/19/2023 Review Review Date: 07/20/2023 Confirm Permit No.* Correct the permit ID number if needed. NCG160158 Confirm DMR Year* 2023 Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above. Can submittal be Yes accepted?* No(Explain why below) Do Central Office No staff need to be Yes alerted?* Do Regional Office No staff need to be Yes alerted? Type of Permit* General Ensures DMR(s)filed correctly.