Loading...
HomeMy WebLinkAboutSWA000197_Stormwater Report_20230424STORMWATER MANAGEMENT REPORT OAKMONT SUBDIVISION PHASE III Docs Road & Executive Drive Barbecue, NC 27546 Harnett County Bohler Project #: NCR201044 1st NCDENR Submittal August 27, 2021 2nd NCDENR Submittal December 22, 2021 3rd NCDENR Submittal June 17, 2022 4t" NCDENR Submittal January 19,2023 Charlie Yowell,PE HLER BOHLER ENGINEERING NC, PLLC 4130 Parklake Avenue, Suite 130, Raleigh, NC 27612 NCBELS # P-1132 I P: 919-578-9000 1 F: 919-703-2665 www.bohlerengineering.com TABLE OF CONTENTS 1. DESCRIPTION............................................................................................................................ 1 1.1 PROJECT NARRATIVE................................................................................................................1 1.2 EXISTING CONDITIONS.............................................................................................................1 1.3 PROPOSED CONDITIONS..........................................................................................................2 1.4 CALCULATIONS........................................................................................................................2 1.5 CONCLUSIONS..........................................................................................................................3 APPENDIX A: FEMA FLOOD MAP APPENDIX B: NRCS SOIL RESOURCES REPORT APPENDIX C: USGS QUADRANGLE MAP APPENDIX D: PRE -DEVELOPMENT DRAINAGE MAP APPENDIX E: POST -DEVELOPMENT DRAINAGE MAP APPENDIX F: STORMWATER CONVEYANCE NETWORK CALCULATIONS APPENDIX G: WET POND DESIGN CALCULATIONS BOHLER BOHLER ENGINEERING NC, PLLC 1. DESCRIPTION 1.1 PROJECT NARRATIVE The following report is for a proposed site plan located at Docs Road & Executive Drive in Barbecue Township, Harnett County, NC. The proposed site is 325.12 acres in size, of which 18.63 acres will comprise the proposed limits of disturbance. The site drains directly into Rocky Run Creek, a NC DEQ "Class U waterway located in the Cape Fear River basin. The site is zoned Residential/Agricultural District (RA-20R) within the Harnett County zoning limits. 1.2 EXISTING CONDITIONS The current site consists of previously subdivided single family lots and portions of undeveloped wooded areas. Of the overall 325.12 acres on the site, approximately 138.16 acres have previously been subdivided into public roads and private single family lots, leaving approximately 186.96 acres of mostly undeveloped area. This 186.96 acre portion is identified under Harnett County GIS by PIN 0507-53-6396.000, and this land is almost exclusively wooded. Slopes on site within our proposed disturbed area range from approximately 1 % to 25%. No steep slopes (greater than 25%) are anticipated to be impacted per this site plan. At =� I Current Site Location (Not to Scale) BOHLER�� BOHLER ENGINEERING NC, PLLC PAGE 1 1 1.3 PROPOSED CONDITIONS Our project is proposing to subdivide the remaining aggregate 186.96 acres of the site into 128 individual lots and public roads. Executive Drive will be extended eastward to the existing property line, and a new north -south road terminating at cul-de-sacs on both ends will be constructed perpendicular to Executive Drive. Hopeland Drive will be extended northward terminating at a cul- de-sac, and a new east -west road (Ramshead Road) will be constructed terminating at a cul-de- sac perpendicular to Hopeland Drive. Additionally, three new north -south roads terminating at cul- de-sacs will be constructed perpendicular to Ramshead Road. Access to the site will be via an existing entrance at the intersection of Docs Road and Executive Drive, and future connectivity to the adjacent property will be available at the proposed termination of Executive Drive. Under NCDEQ stormwater ordinance, stormwater detention is required for this proposed development. The proposed stormwater conveyance system safely conveys the 10 year design storm and adheres to the material, size, slope, cover, and crossing requirements dictated in the County's stormwater ordinance. 1.4 CALCULATIONS Routing calculations were performed using the computer program HydroCAD (version 10.0) by HydroCAD Software Solutions LLC. HGL calculations were performed using Bently StormCAD. Below details the calculation summaries for the wet pond designs throughout the site. Under NCDEQ stormwater ordinance, the site has been designed to meet the runoff treatment of the 1" of rainfall. Six (6) wet ponds have been proposed throughout the site closest to the streams/wetlands as an additional method of water quality. Point of Analysis 1-Year Storm Discharge cfs 100-Year Storm Discharge cfs 1-Year Storm Elevation 100-Year Storm Elevation Pond 1 1.61 184.99 262.78 265.50 Pond 2 1.55 84.17 272.14 274.00 Pond 3 11.88 57.59 299.14 301.00 Pond 4 26.80 109.51 264.84 265.97 Pond 5 3.17 19.40 272.35 272.93 Pond 6 4.60 18.53 305.62 307.52 BOHLER BOHLER ENGINEERING NC, PLLC PAG E 12 The proposed stormwater conveyance system was designed to control and safely convey the 10-year, 24-hour return frequency storm event. The HGL calculations for the 10-year storm event are summarized in Appendix F and Appendix G. 1.5 CONCLUSIONS The requirements and criteria of Harnett County's stormwater management ordinance are met or exceeded, and adverse post -development stormwater runoff impacts from the development have been responsibly minimized or entirely eliminated. The proposed development contributes to no greater than a 10% increase in the overall post -developed peak discharge from the site compared to pre -developed rates for the 10-year and 25-year storm events. The 10-year storm event is safely conveyed through the stormwater conveyance network, and outfalls at properly sized rip rap aprons to ensure that scouring and erosion downstream are minimized. BOHLER BOHLER ENGINEERING NC, PLLC PAG E 13 APPENDIX A: FEMA FLOOD MAP BOHLER// BOHLER ENGINEERING NC, PLLC National Flood Hazard Layer FI RMette 78o59'25"W 35ol9'51"N MIT %41w� r p- . a AF 0 250 500 1,000 1,500 r FEMA �i Feet 1.61000 78o58'48"W35ol9'21"N 2,000 Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 Legend SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT Without Base Flood Elevation (BFE) Zone A, V, A99 SPECIAL FLOOD Wit h BFE or Depth ZoneAE, AO, AH, VE, AR HAZARD AREAS Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zonex Future Conditions 1% Annual Chance Flood Hazard Zonex Area with Reduced Flood Risk due to OTHER AREAS OF Levee. See Notes. Zone FLOOD HAZARD Area with Flood Risk due to Leveezone D NO SCREEN Area of Minimal Flood Hazard Q Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard GENERAL - — - - Channel, Culvert, or Storm Sewer STRUCTURES i i i i i i i Levee, Dike, or Floodwall e zo.z Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation a - - - Coastal Transect —sfa— Base Flood Elevation Line (BFE) Limit of Study Jurisdiction Boundary — --- Coastal Transect Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature Digital Data Available AN 0 No Digital Data Available MAP PANELS ® Unmapped 0 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 3/18/2021 at 6:24 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data overtime. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. APPENDIX B: NRCS SOIL RESOURCES REPORT BOHLER// BOHLER ENGINEERING NC, PLLC USDA united states Department of Agriculture N RCS Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Harnett County, North Carolina August 6, 2021 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nres.usda.gov/wps/ portal/nres/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https:Hoffices.sc.egov.usda.gov/locator/app?agency=nres) or your NRCS State Soil Scientist (http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nres142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. Contents Preface............................................................................................... SoilMap............................................................................................. SoilMap.......................................................................................... Legend............................................................................................ MapUnit Legend............................................................................. Map Unit Descriptions..................................................................... Harnett County, North Carolina ................................................... Bb—Bibb soils, frequently flooded ........................................... BnB—Blaney loamy sand, 2 to 8 percent slopes ..................... BnD—Blaney loamy sand, 8 to 15 percent slopes ................... CaB—Candor sand, 0 to 8 percent slopes .............................. CaD—Candor sand, 8 to 15 percent slopes ............................ GaB—Gilead loamy sand, 2 to 8 percent slopes ..................... GaD—Gilead loamy sand, 8 to 15 percent slopes ................... LaB—Lakeland sand, 0 to 8 percent slopes ............................ Pd—Pits-Dumps complex........................................................ VaB—Vaucluse loamy sand, 2 to 8 percent slopes .................. VaD—Vaucluse loamy sand, 8 to 15 percent slopes ............... VeB—Vaucluse gravelly loamy sand, 2 to 8 percent slopes.... VeD—Vaucluse gravelly loamy sand, 8 to 15 percent slopes.. VeE—Vaucluse gravelly loamy sand, 15 to 25 percent slopes W—Water................................................................................. WfB—Wakulla sand, 0 to 8 percent slopes .............................. References........................................................................................ Glossary............................................................................................ .2 .5 A ..7 .8 .8 11 11 12 13 14 15 17 18 20 21 21 22 24 25 26 28 28 30 32 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. ,� r , .�, 2i•.i� B'nB GaB- GaB srt ;.• ll GaB r GaB BnB'• f. '. GaB Bb ;_ BnD GaD I�BnB� BnB GaB ---Va Bb GaB BnB_ GaB W VaD BnB BnB /j Bb�D BnD B n D VeD VeB VeD �•' CaB VeB BnB - BnB aB BnB C - _ DCaB y UaD GaB BnB rt r,s' Bb BnD VeD R BnB CaBr GaBBnnpB CaB GaB BnD VeB IBb BnD CaD VeB BnB'. VaB�, . VeB BnB VeE VeB 1 VeD* gng CaD CaB B' D Bn, B /BnB GaB BnD r W VaD BnB �Bb r - BnD *' I-) �Pd / r- --•' BnB � � +., '�` �" ..;'}� � • v' + WfB CaB VaB . Pd VaB VaB CaB .�.CaB VaB • 1 MAP LEGEND Area of Interest (AOI) F7 Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Iwo Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit �i Gravelly Spot Landfill A. Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip oa Sodic Spot Custom Soil Resource Report MAP INFORMATION Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. Stony Spot Very Stony Spot Please rely on the bar scale on each map sheet for map measurements. Wet Spot 4� Other Source of Map: Natural Resources Conservation Service Web Soil Survey URL: �- Special Line Features Coordinate System: Web Mercator (EPSG:3857) Water Features Streams and Canals Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts Transportation distance and area. A projection that preserves area, such as the E F Rails Albers equal-area conic projection, should be used if more ..,0 Interstate Highways accurate calculations of distance or area are required. US Routes This product is generated from the USDA-NRCS certified data as Major Roads of the version date(s) listed below. Local Roads Soil Survey Area: Harnett County, North Carolina Background Survey Area Data: Version 17, Jun 4, 2020 Aerial Photography Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 22, 2018—Jul 30, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. 7 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Bb Bibb soils, frequently flooded 165.3 13.1 % BnB Blaney loamy sand, 2 to 8 percent slopes 312.4 24.7% BnD Blaney loamy sand, 8 to 15 percent slopes 129.7 10.3% CaB Candor sand, 0 to 8 percent slopes 203.7 16.1 % CaD Candor sand, 8 to 15 percent slopes 26.5 2.1 % GaB Gilead loamy sand, 2 to 8 percent slopes 109.7 8.7% GaD Gilead loamy sand, 8 to 15 percent slopes 11.7 0.9% LaB Lakeland sand, 0 to 8 percent slopes 42.3 3.3% Pd Pits -Dumps complex 8.4 0.7% VaB Vaucluse loamy sand, 2 to 8 percent slopes 20.1 1.6% VaD Vaucluse loamy sand, 8 to 15 percent slopes 44.5 3.5% VeB Vaucluse gravelly loamy sand, 2 to 8 percent slopes 43.0 3.4% VeD Vaucluse gravelly loamy sand, 8 to 15 percent slopes 64.8 5.1 % VeE Vaucluse gravelly loamy sand, 15 to 25 percent slopes 17.9 1.4% W Water 3.1 0.2% WfB Wakulla sand, 0 to 8 percent slopes 61.0 4.8% Totals for Area of Interest 1,264.0 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the Custom Soil Resource Report characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into Iandforms or Iandform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered Custom Soil Resource Report practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha -Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 10 Custom Soil Resource Report Harnett County, North Carolina Bb—Bibb soils, frequently flooded Map Unit Setting National map unit symbol: 3snw Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 210 to 265 days Farmland classification: Not prime farmland Map Unit Composition Bibb, undrained, and similar soils: 80 percent Johnston, undrained, and similar soils: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Bibb, Undrained Setting Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Parent material: Sandy and loamy alluvium Typical profile A - 0 to 6 inches: sandy loam Cgl - 6 to 60 inches: sandy loam Cg2 - 60 to 80 inches: loamy sand Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Poorly drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): High (1.98 to 5.95 in/hr) Depth to water table: About 0 to 12 inches Frequency of flooding: FrequentNone Frequency of ponding: None Available water capacity: Moderate (about 7.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: A/D Hydric soil rating: Yes Description of Johnston, Undrained Setting Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Parent material: Sandy and loamy alluvium 11 Custom Soil Resource Report Typical profile A - 0 to 30 inches: mucky loam Cgl - 30 to 34 inches: loamy fine sand Cg2 - 34 to 80 inches: fine sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Very poorly drained Runoff class: Ponded Capacity of the most limiting layer to transmit water (Ksat): High (1.98 to 5.95 in/hr) Depth to water table: About 0 inches Frequency of flooding: FrequentNone Frequency of ponding: Frequent Available water capacity: High (about 9.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7w Hydrologic Soil Group: A/D Hydric soil rating: Yes BnB—Blaney loamy sand, 2 to 8 percent slopes Map Unit Setting National map unit symbol. 3snx Elevation: 160 to 660 feet Mean annual precipitation: 38 to 52 inches Mean annual air temperature: 61 to 70 degrees F Frost -free period: 210 to 245 days Farmland classification: Farmland of statewide importance Map Unit Composition Blaney and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Blaney Setting Landform: Low hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Sandy and loamy marine deposits Typical profile A - 0 to 4 inches: loamy sand E - 4 to 25 inches: loamy sand 12 Custom Soil Resource Report Bt - 25 to 62 inches: sandy clay loam C - 62 to 80 inches: loamy coarse sand Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.57 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Low (about 4.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3s Hydrologic Soil Group: C Ecological site: F137XY002GA - Loamy Summit Woodland - PROVISIONAL Hydric soil rating: No BnD—Blaney loamy sand, 8 to 15 percent slopes Map Unit Setting National map unit symbol. 3sny Elevation: 160 to 660 feet Mean annual precipitation: 38 to 52 inches Mean annual air temperature: 61 to 70 degrees F Frost -free period: 210 to 245 days Farmland classification: Farmland of statewide importance Map Unit Composition Blaney and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Blaney Setting Landform: Low hills Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Sandy and loamy marine deposits Typical profile A - 0 to 4 inches: loamy sand E - 4 to 25 inches: loamy sand Bt - 25 to 62 inches: sandy clay loam C - 62 to 80 inches: loamy coarse sand 13 Custom Soil Resource Report Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.57 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Low (about 4.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: F137XY006GA - Loamy Backslope Woodland - PROVISIONAL Hydric soil rating: No CaB—Candor sand, 0 to 8 percent slopes Map Unit Setting National map unit symbol: 3snz Elevation: 160 to 750 feet Mean annual precipitation: 38 to 52 inches Mean annual air temperature: 61 to 70 degrees F Frost -free period: 210 to 245 days Farmland classification: Not prime farmland Map Unit Composition Candor, moderately wet, and similar soils: 85 percent Minor components: 8 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Candor, Moderately Wet Setting Landform: Low hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Sandy and loamy marine deposits and/or eolian sands Typical profile A - 0 to 8 inches: sand E - 8 to 27 inches: sand Bt - 27 to 39 inches: loamy sand E' - 39 to 58 inches: sand B't - 58 to 80 inches: sandy clay loam 14 Custom Soil Resource Report Properties and qualities Slope: 0 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat excessively drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 48 to 72 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Low (about 3.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Ecological site: F137XY001 GA - Dry Sandy Upland Woodland Hydric soil rating: No Minor Components Ailey, moderately wet Percent of map unit. 5 percent Landform: Low hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Head slope Down -slope shape: Concave Across -slope shape: Convex Hydric soil rating: No Bibb, undrained Percent of map unit. 2 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit. 1 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes CaD—Candor sand, 8 to 15 percent slopes Map Unit Setting National map unit symbol: 3sp0 Elevation: 160 to 750 feet 15 Custom Soil Resource Report Mean annual precipitation: 38 to 52 inches Mean annual air temperature: 61 to 70 degrees F Frost -free period: 210 to 245 days Farmland classification: Not prime farmland Map Unit Composition Candor and similar soils: 80 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Candor Setting Landform: Low hills Landform position (two-dimensional): Backslope, shoulder Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Sandy and loamy marine deposits and/or eolian sands Typical profile A - 0 to 8 inches: sand E - 8 to 25 inches: sand Bt - 25 to 38 inches: loamy sand E' - 38 to 62 inches: sand B't - 62 to 80 inches: sandy clay loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat excessively drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 72 to 78 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Very low (about 2.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Ecological site: F137XY004GA - Dry Sandy Backslope Woodland - PROVISIONAL Hydric soil rating: No Minor Components Ailey Percent of map unit. 7 percent Landform: Low hills Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Hydric soil rating: No it. Custom Soil Resource Report Bibb, undrained Percent of map unit: 2 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit: 1 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes GaB—Gilead loamy sand, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 3sph Elevation: 160 to 660 feet Mean annual precipitation: 38 to 52 inches Mean annual air temperature: 61 to 70 degrees F Frost -free period: 210 to 245 days Farmland classification: All areas are prime farmland Map Unit Composition Gilead and similar soils: 90 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Gilead Setting Landform: Low hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Loamy and clayey marine deposits Typical profile Ap - 0 to 5 inches: loamy sand Bt1 - 5 to 8 inches: sandy loam Bt2 - 8 to 42 inches: sandy clay Bt3 - 42 to 52 inches: sandy clay loam C1 - 52 to 76 inches: clay C2 - 76 to 80 inches: gravelly sand Properties and qualities Slope: 2 to 8 percent 17 Custom Soil Resource Report Depth to restrictive feature: More than 80 inches Drainage class: Moderately well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately high (0.00 to 0.57 in/hr) Depth to water table: About 18 to 30 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C Hydric soil rating: No Minor Components Bibb, undrained Percent of map unit. 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit. 2 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes GaD—Gilead loamy sand, 8 to 15 percent slopes Map Unit Setting National map unit symbol. 3spj Elevation: 160 to 660 feet Mean annual precipitation: 38 to 52 inches Mean annual air temperature: 61 to 70 degrees F Frost -free period: 210 to 245 days Farmland classification: Farmland of statewide importance Map Unit Composition Gilead and similar soils: 85 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. 18 Custom Soil Resource Report Description of Gilead Setting Landform: Low hills Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Loamy and clayey marine deposits Typical profile Ap - 0 to 5 inches: loamy sand Bt1 - 5 to 8 inches: sandy loam Bt2 - 8 to 42 inches: sandy clay Bt3 - 42 to 52 inches: sandy clay loam C1 - 52 to 76 inches: clay C2 - 76 to 80 inches: gravelly sand Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class: Moderately well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately high (0.00 to 0.57 in/hr) Depth to water table: About 18 to 30 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Hydric soil rating: No Minor Components Bibb, undrained Percent of map unit. 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit. 2 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes 19 Custom Soil Resource Report LaB—Lakeland sand, 0 to 8 percent slopes Map Unit Setting National map unit symbol: 3spn Elevation: 160 to 660 feet Mean annual precipitation: 38 to 52 inches Mean annual air temperature: 61 to 70 degrees F Frost -free period: 210 to 245 days Farmland classification: Not prime farmland Map Unit Composition Lakeland and similar soils: 80 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Lakeland Setting Landform: Low hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Sandy marine deposits and/or eolian sands Typical profile A - 0 to 6 inches: sand C1 - 6 to 48 inches: sand C2 - 48 to 80 inches: sand Properties and qualities Slope: 0 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class: Excessively drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): High to very high (5.95 to 19.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Low (about 4.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Ecological site: F137XY001 GA - Dry Sandy Upland Woodland Hydric soil rating: No 20 Custom Soil Resource Report Pd—Pits-Dumps complex Map Unit Composition Pits: 50 percent Dumps: 30 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Pits Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8s Hydric soil rating: No Description of Dumps Setting Parent material: Loamy mine spoil or earthy fill Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8s Hydric soil rating: No VaB—Vaucluse loamy sand, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 3sgj Elevation: 80 to 660 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 210 to 265 days Farmland classification: Farmland of statewide importance Map Unit Composition Vaucluse and similar soils: 80 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Vaucluse Setting Landform: Low hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex 21 Custom Soil Resource Report Parent material: Loamy and sandy marine deposits Typical profile Ap - 0 to 6 inches: loamy sand E - 6 to 15 inches: loamy sand Bt - 15 to 29 inches: sandy clay loam Btx - 29 to 58 inches: sandy clay loam BC - 58 to 80 inches: sandy loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 15 to 35 inches to fragipan Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.57 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Very low (about 2.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3s Hydrologic Soil Group: C Ecological site: F137XY002GA - Loamy Summit Woodland - PROVISIONAL Hydric soil rating: No Minor Components Bibb, undrained Percent of map unit. 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit. 2 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes VaD—Vaucluse loamy sand, 8 to 15 percent slopes Map Unit Setting National map unit symbol: 3sgk Elevation: 80 to 660 feet Mean annual precipitation: 38 to 55 inches 22 Custom Soil Resource Report Mean annual air temperature: 59 to 70 degrees F Frost -free period: 210 to 265 days Farmland classification: Not prime farmland Map Unit Composition Vaucluse and similar soils: 80 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Vaucluse Setting Landform: Low hills Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Loamy and sandy marine deposits Typical profile Ap - 0 to 6 inches: loamy sand E - 6 to 15 inches: loamy sand Bt - 15 to 29 inches: sandy clay loam Btx - 29 to 58 inches: sandy clay loam BC - 58 to 80 inches: sandy loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: 15 to 35 inches to fragipan Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.57 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Very low (about 2.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: C Ecological site: F137XY006GA - Loamy Backslope Woodland - PROVISIONAL Hydric soil rating: No Minor Components Bibb, undrained Percent of map unit. 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit. 2 percent 23 Custom Soil Resource Report Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes VeB—Vaucluse gravelly loamy sand, 2 to 8 percent slopes Map Unit Setting National map unit symbol. 3sgI Elevation: 160 to 660 feet Mean annual precipitation: 38 to 52 inches Mean annual air temperature: 61 to 70 degrees F Frost -free period: 210 to 245 days Farmland classification: Not prime farmland Map Unit Composition Vaucluse and similar soils: 90 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Vaucluse Setting Landform: Low hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Loamy and sandy marine deposits Typical profile Ap - 0 to 6 inches: gravelly sandy loam E - 6 to 14 inches: gravelly sandy loam Bt - 14 to 29 inches: sandy clay loam Btx - 29 to 58 inches: sandy clay loam BC - 58 to 80 inches: sandy loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 15 to 35 inches to fragipan Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.57 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Low (about 3.1 inches) Interpretive groups Land capability classification (irrigated): None specified 24 Custom Soil Resource Report Land capability classification (nonirrigated): 3s Hydrologic Soil Group: C Ecological site: F137XY002GA - Loamy Summit Woodland - PROVISIONAL Hydric soil rating: No Minor Components Bibb, undrained Percent of map unit: 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit: 2 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes VeD—Vaucluse gravelly loamy sand, 8 to 15 percent slopes Map Unit Setting National map unit symbol: 3sgm Elevation: 160 to 660 feet Mean annual precipitation: 38 to 52 inches Mean annual air temperature: 61 to 70 degrees F Frost -free period: 210 to 245 days Farmland classification: Not prime farmland Map Unit Composition Vaucluse and similar soils: 85 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Vaucluse Setting Landform: Low hills Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Loamy and sandy marine deposits Typical profile Ap - 0 to 6 inches: gravelly sandy loam E - 6 to 14 inches: gravelly sandy loam Bt - 14 to 29 inches: sandy clay loam 25 Custom Soil Resource Report Btx - 29 to 58 inches: sandy clay loam BC - 58 to 80 inches: sandy loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: 15 to 35 inches to fragipan Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.57 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Low (about 3.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: C Ecological site: F137XY006GA - Loamy Backslope Woodland - PROVISIONAL Hydric soil rating: No Minor Components Bibb, undrained Percent of map unit. 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit. 2 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes VeE—Vaucluse gravelly loamy sand, 15 to 25 percent slopes Map Unit Setting National map unit symbol: 3sgn Elevation: 160 to 660 feet Mean annual precipitation: 38 to 52 inches Mean annual air temperature: 61 to 70 degrees F Frost -free period: 210 to 245 days Farmland classification: Not prime farmland Map Unit Composition Vaucluse and similar soils: 80 percent W Custom Soil Resource Report Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Vaucluse Setting Landform: Low hills Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Convex Across -slope shape: Linear Parent material: Loamy and sandy marine deposits Typical profile Ap - 0 to 6 inches: gravelly sandy loam E - 6 to 14 inches: gravelly sandy loam Bt - 14 to 29 inches: sandy clay loam Btx - 29 to 58 inches: sandy clay loam BC - 58 to 80 inches: sandy loam Properties and qualities Slope: 15 to 25 percent Depth to restrictive feature: 15 to 35 inches to fragipan Drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.57 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Low (about 3.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: C Ecological site: F137XY006GA - Loamy Backslope Woodland - PROVISIONAL Hydric soil rating: No Minor Components Bibb, undrained Percent of map unit. 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit. 2 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes 27 Custom Soil Resource Report ViTAMY 'i Map Unit Composition Water: 100 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Water Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8w Hydric soil rating: No WfB—Wakulla sand, 0 to 8 percent slopes Map Unit Setting National map unit symbol: 3sgt Elevation: 160 to 660 feet Mean annual precipitation: 38 to 52 inches Mean annual air temperature: 61 to 70 degrees F Frost -free period: 210 to 245 days Farmland classification: Not prime farmland Map Unit Composition Wakulla and similar soils: 90 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Wakulla Setting Landform: Low hills Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Sandy and loamy marine deposits and/or eolian sands Typical profile A - 0 to 7 inches: sand E - 7 to 24 inches: sand Bt - 24 to 42 inches: loamy sand C - 42 to 85 inches: sand Properties and qualities Slope: 0 to 8 percent Depth to restrictive feature: More than 80 inches 28 Custom Soil Resource Report Drainage class: Somewhat excessively drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): High to very high (1.98 to 19.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity: Very low (about 2.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3s Hydrologic Soil Group: A Ecological site: F137XY001 GA - Dry Sandy Upland Woodland Hydric soil rating: No Minor Components Bibb, undrained Percent of map unit. 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit. 2 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes 29 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep -water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ n res/d eta i I/n ati o n a I/s o i Is/?cid = n res 142 p2_0 54262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www. nres. usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www. nres. usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nres.usda.gov/wps/portal/nres/detail/soils/ home/?cid=nres142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepastu re/?cid=stelprdb1043084 30 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ n res/d eta i I/so i Is/scie ntists/?cid=n res 142 p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid = n res 142 p2_05 3624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:H www.nrcs.usda.gov/lnternet/FSE—DOCUMENTS/nrcsl 42p2_052290. pdf 31 Glossary Many of the terms relating to landforms, geology, and geomorphology are defined in more detail in the following National Soil Survey Handbook link: "National Soil Survey Handbook." ABC soil A soil having an A, a B, and a C horizon. Ablation till Loose, relatively permeable earthy material deposited during the downwasting of nearly static glacial ice, either contained within or accumulated on the surface of the glacier. AC soil A soil having only an A and a C horizon. Commonly, such soil formed in recent alluvium or on steep, rocky slopes. Aeration, soil The exchange of air in soil with air from the atmosphere. The air in a well aerated soil is similar to that in the atmosphere; the air in a poorly aerated soil is considerably higher in carbon dioxide and lower in oxygen. Aggregate, soil Many fine particles held in a single mass or cluster. Natural soil aggregates, such as granules, blocks, or prisms, are called peds. Clods are aggregates produced by tillage or logging. Alkali (sodic) soil A soil having so high a degree of alkalinity (pH 8.5 or higher) or so high a percentage of exchangeable sodium (15 percent or more of the total exchangeable bases), or both, that plant growth is restricted. Alluvial cone A semiconical type of alluvial fan having very steep slopes. It is higher, narrower, and steeper than a fan and is composed of coarser and thicker layers of material deposited by a combination of alluvial episodes and (to a much lesser degree) landslides (debris flow). The coarsest materials tend to be concentrated at the apex of the cone. 32 Custom Soil Resource Report Alluvial fan A low, outspread mass of loose materials and/or rock material, commonly with gentle slopes. It is shaped like an open fan or a segment of a cone. The material was deposited by a stream at the place where it issues from a narrow mountain valley or upland valley or where a tributary stream is near or at its junction with the main stream. The fan is steepest near its apex, which points upstream, and slopes gently and convexly outward (downstream) with a gradual decrease in gradient. Alluvium Unconsolidated material, such as gravel, sand, silt, clay, and various mixtures of these, deposited on land by running water. Alpha,alpha-dipyridyl A compound that when dissolved in ammonium acetate is used to detect the presence of reduced iron (Fe II) in the soil. A positive reaction implies reducing conditions and the likely presence of redoximorphic features. Animal unit month (AUM) The amount of forage required by one mature cow of approximately 1,000 pounds weight, with or without a calf, for 1 month. Aquic conditions Current soil wetness characterized by saturation, reduction, and redoximorphic features. Argillic horizon A subsoil horizon characterized by an accumulation of illuvial clay. Arroyo The flat -floored channel of an ephemeral stream, commonly with very steep to vertical banks cut in unconsolidated material. It is usually dry but can be transformed into a temporary watercourse or short-lived torrent after heavy rain within the watershed. Aspect The direction toward which a slope faces. Also called slope aspect. Association, soil A group of soils or miscellaneous areas geographically associated in a characteristic repeating pattern and defined and delineated as a single map unit. Available water capacity (available moisture capacity) The capacity of soils to hold water available for use by most plants. It is commonly defined as the difference between the amount of soil water at field moisture capacity and the amount at wilting point. It is commonly expressed as inches of water per inch of soil. The capacity, in inches, in a 60-inch profile or to a limiting layer is expressed as: 33 Custom Soil Resource Report Very low: 0 to 3 Low: 3 to 6 Moderate: 6 to 9 High: 9 to 12 Very high: More than 12 Backslope The position that forms the steepest and generally linear, middle portion of a hillslope. In profile, backslopes are commonly bounded by a convex shoulder above and a concave footslope below. Backswamp A flood -plain landform. Extensive, marshy or swampy, depressed areas of flood plains between natural levees and valley sides or terraces. Badland A landscape that is intricately dissected and characterized by a very fine drainage network with high drainage densities and short, steep slopes and narrow interfluves. Badlands develop on surfaces that have little or no vegetative cover overlying unconsolidated or poorly cemented materials (clays, silts, or sandstones) with, in some cases, soluble minerals, such as gypsum or halite. Bajada A broad, gently inclined alluvial piedmont slope extending from the base of a mountain range out into a basin and formed by the lateral coalescence of a series of alluvial fans. Typically, it has a broadly undulating transverse profile, parallel to the mountain front, resulting from the convexities of component fans. The term is generally restricted to constructional slopes of intermontane basins. Basal area The area of a cross section of a tree, generally referring to the section at breast height and measured outside the bark. It is a measure of stand density, commonly expressed in square feet. Base saturation The degree to which material having cation -exchange properties is saturated with exchangeable bases (sum of Ca, Mg, Na, and K), expressed as a percentage of the total cation -exchange capacity. Base slope (geomorphology) A geomorphic component of hills consisting of the concave to linear (perpendicular to the contour) slope that, regardless of the lateral shape, forms an apron or wedge at the bottom of a hillside dominated by colluvium and slope -wash sediments (for example, slope alluvium). Bedding plane A planar or nearly planar bedding surface that visibly separates each successive layer of stratified sediment or rock (of the same or different lithology) 34 Custom Soil Resource Report from the preceding or following layer; a plane of deposition. It commonly marks a change in the circumstances of deposition and may show a parting, a color difference, a change in particle size, or various combinations of these. The term is commonly applied to any bedding surface, even one that is conspicuously bent or deformed by folding. Bedding system A drainage system made by plowing, grading, or otherwise shaping the surface of a flat field. It consists of a series of low ridges separated by shallow, parallel dead furrows. Bedrock The solid rock that underlies the soil and other unconsolidated material or that is exposed at the surface. Bedrock -controlled topography A landscape where the configuration and relief of the landforms are determined or strongly influenced by the underlying bedrock. Bench terrace A raised, level or nearly level strip of earth constructed on or nearly on a contour, supported by a barrier of rocks or similar material, and designed to make the soil suitable for tillage and to prevent accelerated erosion. Bisequum Two sequences of soil horizons, each of which consists of an illuvial horizon and the overlying eluvial horizons. Blowout (map symbol) A saucer-, cup-, or trough -shaped depression formed by wind erosion on a preexisting dune or other sand deposit, especially in an area of shifting sand or loose soil or where protective vegetation is disturbed or destroyed. The adjoining accumulation of sand derived from the depression, where recognizable, is commonly included. Blowouts are commonly small. Borrow pit (map symbol) An open excavation from which soil and underlying material have been removed, usually for construction purposes. Bottom land An informal term loosely applied to various portions of a flood plain. Boulders Rock fragments larger than 2 feet (60 centimeters) in diameter. Breaks A landscape or tract of steep, rough or broken land dissected by ravines and gullies and marking a sudden change in topography. 35 Custom Soil Resource Report Breast height An average height of 4.5 feet above the ground surface; the point on a tree where diameter measurements are ordinarily taken. Brush management Use of mechanical, chemical, or biological methods to make conditions favorable for reseeding or to reduce or eliminate competition from woody vegetation and thus allow understory grasses and forbs to recover. Brush management increases forage production and thus reduces the hazard of erosion. It can improve the habitat for some species of wildlife. Butte An isolated, generally flat-topped hill or mountain with relatively steep slopes and talus or precipitous cliffs and characterized by summit width that is less than the height of bounding escarpments; commonly topped by a caprock of resistant material and representing an erosion remnant carved from flat -lying rocks. Cable yarding A method of moving felled trees to a nearby central area for transport to a processing facility. Most cable yarding systems involve use of a drum, a pole, and wire cables in an arrangement similar to that of a rod and reel used for fishing. To reduce friction and soil disturbance, felled trees generally are reeled in while one end is lifted or the entire log is suspended. Calcareous soil A soil containing enough calcium carbonate (commonly combined with magnesium carbonate) to effervesce visibly when treated with cold, dilute hydrochloric acid. Caliche A general term for a prominent zone of secondary carbonate accumulation in surficial materials in warm, subhumid to and areas. Caliche is formed by both geologic and pedologic processes. Finely crystalline calcium carbonate forms a nearly continuous surface -coating and void -filling medium in geologic (parent) materials. Cementation ranges from weak in nonindurated forms to very strong in indurated forms. Other minerals (e.g., carbonates, silicate, and sulfate) may occur as accessory cements. Most petrocalcic horizons and some calcic horizons are caliche. California bearing ratio (CBR) The load -supporting capacity of a soil as compared to that of standard crushed limestone, expressed as a ratio. First standardized in California. A soil having a CBR of 16 supports 16 percent of the load that would be supported by standard crushed limestone, per unit area, with the same degree of distortion. Canopy The leafy crown of trees or shrubs. (See Crown.) WV Custom Soil Resource Report Canyon A long, deep, narrow valley with high, precipitous walls in an area of high local relief. Capillary water Water held as a film around soil particles and in tiny spaces between particles. Surface tension is the adhesive force that holds capillary water in the soil. Catena A sequence, or "chain," of soils on a landscape that formed in similar kinds of parent material and under similar climatic conditions but that have different characteristics as a result of differences in relief and drainage. Cation An ion carrying a positive charge of electricity. The common soil cations are calcium, potassium, magnesium, sodium, and hydrogen. Cation -exchange capacity The total amount of exchangeable cations that can be held by the soil, expressed in terms of milliequivalents per 100 grams of soil at neutrality (pH 7.0) or at some other stated pH value. The term, as applied to soils, is synonymous with base -exchange capacity but is more precise in meaning. Catsteps See Terracettes. Cement rock Shaly limestone used in the manufacture of cement. Channery soil material Soil material that has, by volume, 15 to 35 percent thin, flat fragments of sandstone, shale, slate, limestone, or schist as much as 6 inches (15 centimeters) along the longest axis. A single piece is called a channer. Chemical treatment Control of unwanted vegetation through the use of chemicals. Chiseling Tillage with an implement having one or more soil -penetrating points that shatter or loosen hard, compacted layers to a depth below normal plow depth. Cirque A steep -walled, semicircular or crescent -shaped, half -bowl -like recess or hollow, commonly situated at the head of a glaciated mountain valley or high on the side of a mountain. It was produced by the erosive activity of a mountain glacier. It commonly contains a small round lake (tarn). 37 Custom Soil Resource Report Clay As a soil separate, the mineral soil particles less than 0.002 millimeter in diameter. As a soil textural class, soil material that is 40 percent or more clay, less than 45 percent sand, and less than 40 percent silt. Clay depletions See Redoximorphic features. Clay film A thin coating of oriented clay on the surface of a soil aggregate or lining pores or root channels. Synonyms: clay coating, clay skin. Clay spot (map symbol) A spot where the surface texture is silty clay or clay in areas where the surface layer of the soils in the surrounding map unit is sandy loam, loam, silt loam, or coarser. Claypan A dense, compact subsoil layer that contains much more clay than the overlying materials, from which it is separated by a sharply defined boundary. The layer restricts the downward movement of water through the soil. A claypan is commonly hard when dry and plastic and sticky when wet. Climax plant community The stabilized plant community on a particular site. The plant cover reproduces itself and does not change so long as the environment remains the same. Coarse textured soil Sand or loamy sand. Cobble (or cobblestone) A rounded or partly rounded fragment of rock 3 to 10 inches (7.6 to 25 centimeters) in diameter. Cobbly soil material Material that has 15 to 35 percent, by volume, rounded or partially rounded rock fragments 3 to 10 inches (7.6 to 25 centimeters) in diameter. Very cobbly soil material has 35 to 60 percent of these rock fragments, and extremely cobbly soil material has more than 60 percent. COLE (coefficient of linear extensibility) See Linear extensibility. Colluvium Unconsolidated, unsorted earth material being transported or deposited on side slopes and/or at the base of slopes by mass movement (e.g., direct gravitational action) and by local, unconcentrated runoff. 38 Custom Soil Resource Report Complex slope Irregular or variable slope. Planning or establishing terraces, diversions, and other water -control structures on a complex slope is difficult. Complex, soil A map unit of two or more kinds of soil or miscellaneous areas in such an intricate pattern or so small in area that it is not practical to map them separately at the selected scale of mapping. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Concretions See Redoximorphic features. Conglomerate A coarse grained, clastic sedimentary rock composed of rounded or subangular rock fragments more than 2 millimeters in diameter. It commonly has a matrix of sand and finer textured material. Conglomerate is the consolidated equivalent of gravel. Conservation cropping system Growing crops in combination with needed cultural and management practices. In a good conservation cropping system, the soil -improving crops and practices more than offset the effects of the soil -depleting crops and practices. Cropping systems are needed on all tilled soils. Soil -improving practices in a conservation cropping system include the use of rotations that contain grasses and legumes and the return of crop residue to the soil. Other practices include the use of green manure crops of grasses and legumes, proper tillage, adequate fertilization, and weed and pest control. Conservation tillage A tillage system that does not invert the soil and that leaves a protective amount of crop residue on the surface throughout the year. Consistence, soil Refers to the degree of cohesion and adhesion of soil material and its resistance to deformation when ruptured. Consistence includes resistance of soil material to rupture and to penetration; plasticity, toughness, and stickiness of puddled soil material; and the manner in which the soil material behaves when subject to compression. Terms describing consistence are defined in the "Soil Survey Manual." Contour striperopping Growing crops in strips that follow the contour. Strips of grass or close -growing crops are alternated with strips of clean -tilled crops or summer fallow. Control section The part of the soil on which classification is based. The thickness varies among different kinds of soil, but for many it is that part of the soil profile between depths of 10 inches and 40 or 80 inches. 39 Custom Soil Resource Report Coprogenous earth (sedimentary peat) A type of limnic layer composed predominantly of fecal material derived from aquatic animals. Corrosion (geomorphology) A process of erosion whereby rocks and soil are removed or worn away by natural chemical processes, especially by the solvent action of running water, but also by other reactions, such as hydrolysis, hydration, carbonation, and oxidation. Corrosion (soil survey interpretations) Soil -induced electrochemical or chemical action that dissolves or weakens concrete or uncoated steel. Cover crop A close -growing crop grown primarily to improve and protect the soil between periods of regular crop production, or a crop grown between trees and vines in orchards and vineyards. Crop residue management Returning crop residue to the soil, which helps to maintain soil structure, organic matter content, and fertility and helps to control erosion. Cropping system Growing crops according to a planned system of rotation and management practices. Cross -slope farming Deliberately conducting farming operations on sloping farmland in such a way that tillage is across the general slope. Crown The upper part of a tree or shrub, including the living branches and their foliage. Cryoturbate A mass of soil or other unconsolidated earthy material moved or disturbed by frost action. It is typically coarser than the underlying material. Cuesta An asymmetric ridge capped by resistant rock layers of slight or moderate dip (commonly less than 15 percent slopes); a type of homocline produced by differential erosion of interbedded resistant and weak rocks. A cuesta has a long, gentle slope on one side (dip slope) that roughly parallels the inclined beds; on the other side, it has a relatively short and steep or clifflike slope (scarp) that cuts through the tilted rocks. 40 Custom Soil Resource Report Culmination of the mean annual increment (CMAI) The average annual increase per acre in the volume of a stand. Computed by dividing the total volume of the stand by its age. As the stand increases in age, the mean annual increment continues to increase until mortality begins to reduce the rate of increase. The point where the stand reaches its maximum annual rate of growth is called the culmination of the mean annual increment. Cutbanks cave The walls of excavations tend to cave in or slough. Decreasers The most heavily grazed climax range plants. Because they are the most palatable, they are the first to be destroyed by overgrazing. Deferred grazing Postponing grazing or resting grazing land for a prescribed period. Delta A body of alluvium having a surface that is fan shaped and nearly flat; deposited at or near the mouth of a river or stream where it enters a body of relatively quiet water, generally a sea or lake. Dense layer A very firm, massive layer that has a bulk density of more than 1.8 grams per cubic centimeter. Such a layer affects the ease of digging and can affect filling and compacting. Depression, closed (map symbol) A shallow, saucer -shaped area that is slightly lower on the landscape than the surrounding area and that does not have a natural outlet for surface drainage. Depth, soil Generally, the thickness of the soil over bedrock. Very deep soils are more than 60 inches deep over bedrock; deep soils, 40 to 60 inches; moderately deep, 20 to 40 inches; shallow, 10 to 20 inches; and very shallow, less than 10 inches. Desert pavement A natural, residual concentration or layer of wind -polished, closely packed gravel, boulders, and other rock fragments mantling a desert surface. It forms where wind action and sheetwash have removed all smaller particles or where rock fragments have migrated upward through sediments to the surface. It typically protects the finer grained underlying material from further erosion. Diatomaceous earth A geologic deposit of fine, grayish siliceous material composed chiefly or entirely of the remains of diatoms. 41 Custom Soil Resource Report Dip slope A slope of the land surface, roughly determined by and approximately conforming to the dip of the underlying bedrock. Diversion (or diversion terrace) A ridge of earth, generally a terrace, built to protect downslope areas by diverting runoff from its natural course. Divided -slope farming A form of field striperopping in which crops are grown in a systematic arrangement of two strips, or bands, across the slope to reduce the hazard of water erosion. One strip is in a close -growing crop that provides protection from erosion, and the other strip is in a crop that provides less protection from erosion. This practice is used where slopes are not long enough to permit a full striperopping pattern to be used. Drainage class (natural) Refers to the frequency and duration of wet periods under conditions similar to those under which the soil formed. Alterations of the water regime by human activities, either through drainage or irrigation, are not a consideration unless they have significantly changed the morphology of the soil. Seven classes of natural soil drainage are recognized —excessively drained, somewhat excessively drained, well drained, moderately well drained, somewhat poorly drained, poorly drained, and very poorly drained. These classes are defined in the "Soil Survey Manual." Drainage, surface Runoff, or surface flow of water, from an area. Drainageway A general term for a course or channel along which water moves in draining an area. A term restricted to relatively small, linear depressions that at some time move concentrated water and either do not have a defined channel or have only a small defined channel. Draw A small stream valley that generally is shallower and more open than a ravine or gulch and that has a broader bottom. The present stream channel may appear inadequate to have cut the drainageway that it occupies. Drift A general term applied to all mineral material (clay, silt, sand, gravel, and boulders) transported by a glacier and deposited directly by or from the ice or transported by running water emanating from a glacier. Drift includes unstratified material (till) that forms moraines and stratified deposits that form outwash plains, eskers, kames, varves, and glaciofluvial sediments. The term is generally applied to Pleistocene glacial deposits in areas that no longer contain glaciers. 42 Custom Soil Resource Report Drumlin A low, smooth, elongated oval hill, mound, or ridge of compact till that has a core of bedrock or drift. It commonly has a blunt nose facing the direction from which the ice approached and a gentler slope tapering in the other direction. The longer axis is parallel to the general direction of glacier flow. Drumlins are products of streamline (laminar) flow of glaciers, which molded the subglacial floor through a combination of erosion and deposition. Duff A generally firm organic layer on the surface of mineral soils. It consists of fallen plant material that is in the process of decomposition and includes everything from the litter on the surface to underlying pure humus. Dune A low mound, ridge, bank, or hill of loose, windblown granular material (generally sand), either barren and capable of movement from place to place or covered and stabilized with vegetation but retaining its characteristic shape. Earthy fill See Mine spoil. Ecological site An area where climate, soil, and relief are sufficiently uniform to produce a distinct natural plant community. An ecological site is the product of all the environmental factors responsible for its development. It is typified by an association of species that differ from those on other ecological sites in kind and/or proportion of species or in total production. Eluviation The movement of material in true solution or colloidal suspension from one place to another within the soil. Soil horizons that have lost material through eluviation are eluvial; those that have received material are illuvial. Endosaturation A type of saturation of the soil in which all horizons between the upper boundary of saturation and a depth of 2 meters are saturated. Eolian deposit Sand-, silt-, or clay -sized clastic material transported and deposited primarily by wind, commonly in the form of a dune or a sheet of sand or loess. Ephemeral stream A stream, or reach of a stream, that flows only in direct response to precipitation. It receives no long -continued supply from melting snow or other source, and its channel is above the water table at all times. 43 Custom Soil Resource Report Episaturation A type of saturation indicating a perched water table in a soil in which saturated layers are underlain by one or more unsaturated layers within 2 meters of the surface. Erosion The wearing away of the land surface by water, wind, ice, or other geologic agents and by such processes as gravitational creep. Erosion (accelerated) Erosion much more rapid than geologic erosion, mainly as a result of human or animal activities or of a catastrophe in nature, such as a fire, that exposes the surface. Erosion (geologic) Erosion caused by geologic processes acting over long geologic periods and resulting in the wearing away of mountains and the building up of such landscape features as flood plains and coastal plains. Synonym: natural erosion. Erosion pavement A surficial lag concentration or layer of gravel and other rock fragments that remains on the soil surface after sheet or rill erosion or wind has removed the finer soil particles and that tends to protect the underlying soil from further erosion. Erosion surface A land surface shaped by the action of erosion, especially by running water. Escarpment A relatively continuous and steep slope or cliff breaking the general continuity of more gently sloping land surfaces and resulting from erosion or faulting. Most commonly applied to cliffs produced by differential erosion. Synonym: scarp. Escarpment, bedrock (map symbol) A relatively continuous and steep slope or cliff, produced by erosion or faulting, that breaks the general continuity of more gently sloping land surfaces. Exposed material is hard or soft bedrock. Escarpment, nonbedrock (map symbol) A relatively continuous and steep slope or cliff, generally produced by erosion but in some places produced by faulting, that breaks the continuity of more gently sloping land surfaces. Exposed earthy material is nonsoil or very shallow soil. Esker A long, narrow, sinuous, steep -sided ridge of stratified sand and gravel deposited as the bed of a stream flowing in an ice tunnel within or below the ice (subglacial) or between ice walls on top of the ice of a wasting glacier and left 44 Custom Soil Resource Report behind as high ground when the ice melted. Eskers range in length from less than a kilometer to more than 160 kilometers and in height from 3 to 30 meters. Extrusive rock Igneous rock derived from deep-seated molten matter (magma) deposited and cooled on the earth's surface. Fallow Cropland left idle in order to restore productivity through accumulation of moisture. Summer fallow is common in regions of limited rainfall where cereal grain is grown. The soil is tilled for at least one growing season for weed control and decomposition of plant residue. Fan remnant A general term for landforms that are the remaining parts of older fan landforms, such as alluvial fans, that have been either dissected or partially buried. Fertility, soil The quality that enables a soil to provide plant nutrients, in adequate amounts and in proper balance, for the growth of specified plants when light, moisture, temperature, tilth, and other growth factors are favorable. Fibric soil material (peat) The least decomposed of all organic soil material. Peat contains a large amount of well preserved fiber that is readily identifiable according to botanical origin. Peat has the lowest bulk density and the highest water content at saturation of all organic soil material. Field moisture capacity The moisture content of a soil, expressed as a percentage of the ovendry weight, after the gravitational, or free, water has drained away; the field moisture content 2 or 3 days after a soaking rain; also called normal field capacity, normal moisture capacity, or capillary capacity. Fill slope A sloping surface consisting of excavated soil material from a road cut. It commonly is on the downhill side of the road. Fine textured soil Sandy clay, silty clay, or clay. Firebreak An area cleared of flammable material to stop or help control creeping or running fires. It also serves as a line from which to work and to facilitate the movement of firefighters and equipment. Designated roads also serve as firebreaks. 45 Custom Soil Resource Report First bottom An obsolete, informal term loosely applied to the lowest flood -plain steps that are subject to regular flooding. Flaggy soil material Material that has, by volume, 15 to 35 percent flagstones. Very flaggy soil material has 35 to 60 percent flagstones, and extremely flaggy soil material has more than 60 percent flagstones. Flagstone A thin fragment of sandstone, limestone, slate, shale, or (rarely) schist 6 to 15 inches (15 to 38 centimeters) long. Flood plain The nearly level plain that borders a stream and is subject to flooding unless protected artificially. Flood -plain landforms A variety of constructional and erosional features produced by stream channel migration and flooding. Examples include backswamps, flood -plain splays, meanders, meander belts, meander scrolls, oxbow lakes, and natural levees. Flood -plain splay A fan -shaped deposit or other outspread deposit formed where an overloaded stream breaks through a levee (natural or artificial) and deposits its material (commonly coarse grained) on the flood plain. Flood -plain step An essentially flat, terrace -like alluvial surface within a valley that is frequently covered by floodwater from the present stream; any approximately horizontal surface still actively modified by fluvial scour and/or deposition. May occur individually or as a series of steps. Fluvial Of or pertaining to rivers or streams; produced by stream or river action. Foothills A region of steeply sloping hills that fringes a mountain range or high -plateau escarpment. The hills have relief of as much as 1,000 feet (300 meters). Footslope The concave surface at the base of a hillslope. A footslope is a transition zone between upslope sites of erosion and transport (shoulders and backslopes) and downslope sites of deposition (toeslopes). Forb Any herbaceous plant not a grass or a sedge. W. Custom Soil Resource Report Forest cover All trees and other woody plants (underbrush) covering the ground in a forest. Forest type A stand of trees similar in composition and development because of given physical and biological factors by which it may be differentiated from other stands. Fragipan A loamy, brittle subsurface horizon low in porosity and content of organic matter and low or moderate in clay but high in silt or very fine sand. A fragipan appears cemented and restricts roots. When dry, it is hard or very hard and has a higher bulk density than the horizon or horizons above. When moist, it tends to rupture suddenly under pressure rather than to deform slowly. Genesis, soil The mode of origin of the soil. Refers especially to the processes or soil -forming factors responsible for the formation of the solum, or true soil, from the unconsolidated parent material. Gilgai Commonly, a succession of microbasins and microknolls in nearly level areas or of microvalleys and microridges parallel with the slope. Typically, the microrelief of clayey soils that shrink and swell considerably with changes in moisture content. Glaciofluvial deposits Material moved by glaciers and subsequently sorted and deposited by streams flowing from the melting ice. The deposits are stratified and occur in the form of outwash plains, valley trains, deltas, kames, eskers, and kame terraces. Glaciolacustrine deposits Material ranging from fine clay to sand derived from glaciers and deposited in glacial lakes mainly by glacial meltwater. Many deposits are bedded or laminated. Gleyed soil Soil that formed under poor drainage, resulting in the reduction of iron and other elements in the profile and in gray colors. Graded striperopping Growing crops in strips that grade toward a protected waterway. Grassed waterway A natural or constructed waterway, typically broad and shallow, seeded to grass as protection against erosion. Conducts surface water away from cropland. 47 Custom Soil Resource Report Gravel Rounded or angular fragments of rock as much as 3 inches (2 millimeters to 7.6 centimeters) in diameter. An individual piece is a pebble. Gravel pit (map symbol) An open excavation from which soil and underlying material have been removed and used, without crushing, as a source of sand or gravel. Gravelly soil material Material that has 15 to 35 percent, by volume, rounded or angular rock fragments, not prominently flattened, as much as 3 inches (7.6 centimeters) in diameter. Gravelly spot (map symbol) A spot where the surface layer has more than 35 percent, by volume, rock fragments that are mostly less than 3 inches in diameter in an area that has less than 15 percent rock fragments. Green manure crop (agronomy) A soil -improving crop grown to be plowed under in an early stage of maturity or soon after maturity. Ground water Water filling all the unblocked pores of the material below the water table. Gully (map symbol) A small, steep -sided channel caused by erosion and cut in unconsolidated materials by concentrated but intermittent flow of water. The distinction between a gully and a rill is one of depth. A gully generally is an obstacle to farm machinery and is too deep to be obliterated by ordinary tillage whereas a rill is of lesser depth and can be smoothed over by ordinary tillage. Hard bedrock Bedrock that cannot be excavated except by blasting or by the use of special equipment that is not commonly used in construction. Hard to reclaim Reclamation is difficult after the removal of soil for construction and other uses. Revegetation and erosion control are extremely difficult. Hardpan A hardened or cemented soil horizon, or layer. The soil material is sandy, loamy, or clayey and is cemented by iron oxide, silica, calcium carbonate, or other substance. 48 Custom Soil Resource Report Head slope (geomorphology) A geomorphic component of hills consisting of a laterally concave area of a hillside, especially at the head of a drainageway. The overland waterflow is converging. Hemic soil material (mucky peat) Organic soil material intermediate in degree of decomposition between the less decomposed fibric material and the more decomposed sapric material. High -residue crops Hill Such crops as small grain and corn used for grain. If properly managed, residue from these crops can be used to control erosion until the next crop in the rotation is established. These crops return large amounts of organic matter to the soil. A generic term for an elevated area of the land surface, rising as much as 1,000 feet above surrounding lowlands, commonly of limited summit area and having a well defined outline. Slopes are generally more than 15 percent. The distinction between a hill and a mountain is arbitrary and may depend on local usage. Hillslope A generic term for the steeper part of a hill between its summit and the drainage line, valley flat, or depression floor at the base of a hill. Horizon, soil A layer of soil, approximately parallel to the surface, having distinct characteristics produced by soil -forming processes. In the identification of soil horizons, an uppercase letter represents the major horizons. Numbers or lowercase letters that follow represent subdivisions of the major horizons. An explanation of the subdivisions is given in the "Soil Survey Manual." The major horizons of mineral soil are as follows: 49 Custom Soil Resource Report O horizon: An organic layer of fresh and decaying plant residue. L horizon: A layer of organic and mineral limnic materials, including coprogenous earth (sedimentary peat), diatomaceous earth, and marl. A horizon: The mineral horizon at or near the surface in which an accumulation of humified organic matter is mixed with the mineral material. Also, a plowed surface horizon, most of which was originally part of a B horizon. E horizon: The mineral horizon in which the main feature is loss of silicate clay, iron, aluminum, or some combination of these. B horizon: The mineral horizon below an A horizon. The B horizon is in part a layer of transition from the overlying A to the underlying C horizon. The B horizon also has distinctive characteristics, such as (1) accumulation of clay, sesquioxides, humus, or a combination of these; (2) prismatic or blocky structure; (3) redder or browner colors than those in the A horizon; or (4) a combination of these. C horizon: The mineral horizon or layer, excluding indurated bedrock, that is little affected by soil -forming processes and does not have the properties typical of the overlying soil material. The material of a C horizon may be either like or unlike that in which the solum formed. If the material is known to differ from that in the solum, an Arabic numeral, commonly a 2, precedes the letter C. Cr horizon: Soft, consolidated bedrock beneath the soil. R layer: Consolidated bedrock beneath the soil. The bedrock commonly underlies a C horizon, but it can be directly below an A or a B horizon. M layer: A root -limiting subsoil layer consisting of nearly continuous, horizontally oriented, human -manufactured materials. W layer: A layer of water within or beneath the soil. Humus The well decomposed, more or less stable part of the organic matter in mineral soils. Hydrologic soil groups Refers to soils grouped according to their runoff potential. The soil properties that influence this potential are those that affect the minimum rate of water infiltration on a bare soil during periods after prolonged wetting when the soil is not frozen. These properties include depth to a seasonal high water table, the infiltration rate, and depth to a layer that significantly restricts the downward movement of water. The slope and the kind of plant cover are not considered but are separate factors in predicting runoff. Igneous rock Rock that was formed by cooling and solidification of magma and that has not been changed appreciably by weathering since its formation. Major varieties include plutonic and volcanic rock (e.g., andesite, basalt, and granite). Illuviation The movement of soil material from one horizon to another in the soil profile. Generally, material is removed from an upper horizon and deposited in a lower horizon. 50 Custom Soil Resource Report Impervious soil A soil through which water, air, or roots penetrate slowly or not at all. No soil is absolutely impervious to air and water all the time. Increasers Species in the climax vegetation that increase in amount as the more desirable plants are reduced by close grazing. Increasers commonly are the shorter plants and the less palatable to livestock. Infiltration The downward entry of water into the immediate surface of soil or other material, as contrasted with percolation, which is movement of water through soil layers or material. Infiltration capacity The maximum rate at which water can infiltrate into a soil under a given set of conditions. Infiltration rate The rate at which water penetrates the surface of the soil at any given instant, usually expressed in inches per hour. The rate can be limited by the infiltration capacity of the soil or the rate at which water is applied at the surface. Intake rate The average rate of water entering the soil under irrigation. Most soils have a fast initial rate; the rate decreases with application time. Therefore, intake rate for design purposes is not a constant but is a variable depending on the net irrigation application. The rate of water intake, in inches per hour, is expressed as follows: Very low: Less than 0.2 Low: 0.2 to 0.4 Moderately low: 0.4 to 0.75 Moderate: 0.75 to 1.25 Moderately high: 1.25 to 1.75 High: 1.75 to 2.5 Very high: More than 2.5 Interfluve A landform composed of the relatively undissected upland or ridge between two adjacent valleys containing streams flowing in the same general direction. An elevated area between two drainageways that sheds water to those drainageways. Interfluve (geomorphology) A geomorphic component of hills consisting of the uppermost, comparatively level or gently sloping area of a hill; shoulders of backwearing hillslopes can narrow the upland or can merge, resulting in a strongly convex shape. 51 Custom Soil Resource Report Intermittent stream A stream, or reach of a stream, that does not flow year-round but that is commonly dry for 3 or more months out of 12 and whose channel is generally below the local water table. It flows only during wet periods or when it receives ground -water discharge or long, continued contributions from melting snow or other surface and shallow subsurface sources. Invaders On range, plants that encroach into an area and grow after the climax vegetation has been reduced by grazing. Generally, plants invade following disturbance of the surface. Iron depletions See Redoximorphic features. Irrigation Application of water to soils to assist in production of crops. Methods of irrigation are: Basin: Water is applied rapidly to nearly level plains surrounded by levees or dikes. Border: Water is applied at the upper end of a strip in which the lateral flow of water is controlled by small earth ridges called border dikes, or borders. Controlled flooding: Water is released at intervals from closely spaced field ditches and distributed uniformly over the field. Corrugation: Water is applied to small, closely spaced furrows or ditches in fields of close -growing crops or in orchards so that it flows in only one direction. Drip (or trickle): Water is applied slowly and under low pressure to the surface of the soil or into the soil through such applicators as emitters, porous tubing, or perforated pipe. Furrow: Water is applied in small ditches made by cultivation implements. Furrows are used for tree and row crops. Sprinkler.- Water is sprayed over the soil surface through pipes or nozzles from a pressure system. Subirrigation: Water is applied in open ditches or tile lines until the water table is raised enough to wet the soil. Wild flooding: Water, released at high points, is allowed to flow onto an area without controlled distribution. Kame A low mound, knob, hummock, or short irregular ridge composed of stratified sand and gravel deposited by a subglacial stream as a fan or delta at the margin of a melting glacier; by a supraglacial stream in a low place or hole on the surface of the glacier; or as a ponded deposit on the surface or at the margin of stagnant ice. 52 Custom Soil Resource Report Karst (topography) A kind of topography that formed in limestone, gypsum, or other soluble rocks by dissolution and that is characterized by closed depressions, sinkholes, caves, and underground drainage. Knoll A small, low, rounded hill rising above adjacent landforms. Ksat See Saturated hydraulic conductivity. Lacustrine deposit Material deposited in lake water and exposed when the water level is lowered or the elevation of the land is raised. Lake plain A nearly level surface marking the floor of an extinct lake filled by well sorted, generally fine textured, stratified deposits, commonly containing varves. Lake terrace A narrow shelf, partly cut and partly built, produced along a lakeshore in front of a scarp line of low cliffs and later exposed when the water level falls. Landfill (map symbol) An area of accumulated waste products of human habitation, either above or below natural ground level. Landslide A general, encompassing term for most types of mass movement landforms and processes involving the downslope transport and outward deposition of soil and rock materials caused by gravitational forces; the movement may or may not involve saturated materials. The speed and distance of movement, as well as the amount of soil and rock material, vary greatly. Large stones Rock fragments 3 inches (7.6 centimeters) or more across. Large stones adversely affect the specified use of the soil. Lava flow (map symbol) A solidified, commonly lobate body of rock formed through lateral, surface outpouring of molten lava from a vent or fissure. Leaching The removal of soluble material from soil or other material by percolating water. 53 Custom Soil Resource Report Levee (map symbol) An embankment that confines or controls water, especially one built along the banks of a river to prevent overflow onto lowlands. Linear extensibility Refers to the change in length of an unconfined clod as moisture content is decreased from a moist to a dry state. Linear extensibility is used to determine the shrink -swell potential of soils. It is an expression of the volume change between the water content of the clod at 1 /3- or 1 /10-bar tension (33kPa or 10kPa tension) and oven dryness. Volume change is influenced by the amount and type of clay minerals in the soil. The volume change is the percent change for the whole soil. If it is expressed as a fraction, the resulting value is COLE, coefficient of linear extensibility. Liquid limit The moisture content at which the soil passes from a plastic to a liquid state. Loam Soil material that is 7 to 27 percent clay particles, 28 to 50 percent silt particles, and less than 52 percent sand particles. Loess Material transported and deposited by wind and consisting dominantly of silt - sized particles. Low strength The soil is not strong enough to support loads. Low -residue crops Such crops as corn used for silage, peas, beans, and potatoes. Residue from these crops is not adequate to control erosion until the next crop in the rotation is established. These crops return little organic matter to the soil. Marl An earthy, unconsolidated deposit consisting chiefly of calcium carbonate mixed with clay in approximately equal proportions; formed primarily under freshwater lacustrine conditions but also formed in more saline environments. Marsh or swamp (map symbol) A water -saturated, very poorly drained area that is intermittently or permanently covered by water. Sedges, cattails, and rushes are the dominant vegetation in marshes, and trees or shrubs are the dominant vegetation in swamps. Not used in map units where the named soils are poorly drained or very poorly drained. Mass movement A generic term for the dislodgment and downslope transport of soil and rock material as a unit under direct gravitational stress. 54 Custom Soil Resource Report Masses See Redoximorphic features. Meander belt The zone within which migration of a meandering channel occurs; the flood - plain area included between two imaginary lines drawn tangential to the outer bends of active channel loops. Meander scar A crescent -shaped, concave or linear mark on the face of a bluff or valley wall, produced by the lateral erosion of a meandering stream that impinged upon and undercut the bluff. Meander scroll One of a series of long, parallel, close -fitting, crescent -shaped ridges and troughs formed along the inner bank of a stream meander as the channel migrated laterally down -valley and toward the outer bank. Mechanical treatment Use of mechanical equipment for seeding, brush management, and other management practices. Medium textured soil Very fine sandy loam, loam, silt loam, or silt. Mesa A broad, nearly flat topped and commonly isolated landmass bounded by steep slopes or precipitous cliffs and capped by layers of resistant, nearly horizontal rocky material. The summit width is characteristically greater than the height of the bounding escarpments. Metamorphic rock Rock of any origin altered in mineralogical composition, chemical composition, or structure by heat, pressure, and movement at depth in the earth's crust. Nearly all such rocks are crystalline. Mine or quarry (map symbol) An open excavation from which soil and underlying material have been removed and in which bedrock is exposed. Also denotes surface openings to underground mines. Mine spoil An accumulation of displaced earthy material, rock, or other waste material removed during mining or excavation. Also called earthy fill. Mineral soil Soil that is mainly mineral material and low in organic material. Its bulk density is more than that of organic soil. 55 Custom Soil Resource Report Minimum tillage Only the tillage essential to crop production and prevention of soil damage. Miscellaneous area A kind of map unit that has little or no natural soil and supports little or no vegetation. Miscellaneous water (map symbol) Small, constructed bodies of water that are used for industrial, sanitary, or mining applications and that contain water most of the year. Moderately coarse textured soil Coarse sandy loam, sandy loam, or fine sandy loam. Moderately fine textured soil Clay loam, sandy clay loam, or silty clay loam. Mollic epipedon A thick, dark, humus -rich surface horizon (or horizons) that has high base saturation and pedogenic soil structure. It may include the upper part of the subsoil. Moraine In terms of glacial geology, a mound, ridge, or other topographically distinct accumulation of unsorted, unstratified drift, predominantly till, deposited primarily by the direct action of glacial ice in a variety of landforms. Also, a general term for a landform composed mainly of till (except for kame moraines, which are composed mainly of stratified outwash) that has been deposited by a glacier. Some types of moraines are disintegration, end, ground, kame, lateral, recessional, and terminal. Morphology, soil The physical makeup of the soil, including the texture, structure, porosity, consistence, color, and other physical, mineral, and biological properties of the various horizons, and the thickness and arrangement of those horizons in the soil profile. Mottling, soil Irregular spots of different colors that vary in number and size. Descriptive terms are as follows: abundance —few, common, and many; size —fine, medium, and coarse; and contrast —faint, distinct, and prominent. The size measurements are of the diameter along the greatest dimension. Fine indicates less than 5 millimeters (about 0.2 inch); medium, from 5 to 15 millimeters (about 0.2 to 0.6 inch); and coarse, more than 15 millimeters (about 0.6 inch). Mountain A generic term for an elevated area of the land surface, rising more than 1,000 feet (300 meters) above surrounding lowlands, commonly of restricted summit area (relative to a plateau) and generally having steep sides. A mountain can W Custom Soil Resource Report occur as a single, isolated mass or in a group forming a chain or range. Mountains are formed primarily by tectonic activity and/or volcanic action but can also be formed by differential erosion. Muck Dark, finely divided, well decomposed organic soil material. (See Sapric soil material.) Mucky peat See Hemic soil material. Mudstone A blocky or massive, fine grained sedimentary rock in which the proportions of clay and silt are approximately equal. Also, a general term for such material as clay, silt, claystone, siltstone, shale, and argillite and that should be used only when the amounts of clay and silt are not known or cannot be precisely identified. Munsell notation A designation of color by degrees of three simple variables —hue, value, and chroma. For example, a notation of 10YR 6/4 is a color with hue of 10YR, value of 6, and chroma of 4. Natric horizon A special kind of argillic horizon that contains enough exchangeable sodium to have an adverse effect on the physical condition of the subsoil. Neutral soil A soil having a pH value of 6.6 to 7.3. (See Reaction, soil.) Nodules See Redoximorphic features. Nose slope (geomorphology) A geomorphic component of hills consisting of the projecting end (laterally convex area) of a hillside. The overland waterflow is predominantly divergent. Nose slopes consist dominantly of colluvium and slope -wash sediments (for example, slope alluvium). Nutrient, plant Any element taken in by a plant essential to its growth. Plant nutrients are mainly nitrogen, phosphorus, potassium, calcium, magnesium, sulfur, iron, manganese, copper, boron, and zinc obtained from the soil and carbon, hydrogen, and oxygen obtained from the air and water. Organic matter Plant and animal residue in the soil in various stages of decomposition. The content of organic matter in the surface layer is described as follows: 57 Custom Soil Resource Report Very low: Less than 0.5 percent Low: 0.5 to 1.0 percent Moderately low: 1.0 to 2.0 percent Moderate: 2.0 to 4.0 percent High: 4.0 to 8.0 percent Very high: More than 8.0 percent Outwash Stratified and sorted sediments (chiefly sand and gravel) removed or "washed out" from a glacier by meltwater streams and deposited in front of or beyond the end moraine or the margin of a glacier. The coarser material is deposited nearer to the ice. Outwash plain An extensive lowland area of coarse textured glaciofluvial material. An outwash plain is commonly smooth; where pitted, it generally is low in relief. Paleoterrace Pan An erosional remnant of a terrace that retains the surface form and alluvial deposits of its origin but was not emplaced by, and commonly does not grade to, a present-day stream or drainage network. A compact, dense layer in a soil that impedes the movement of water and the growth of roots. For example, hardpan, fragipan, claypan, plowpan, and traffic pan. Parent material The unconsolidated organic and mineral material in which soil forms. Peat Ped Unconsolidated material, largely undecomposed organic matter, that has accumulated under excess moisture. (See Fibric soil material.) An individual natural soil aggregate, such as a granule, a prism, or a block. Pedisediment A layer of sediment, eroded from the shoulder and backslope of an erosional slope, that lies on and is being (or was) transported across a gently sloping erosional surface at the foot of a receding hill or mountain slope. Pedon The smallest volume that can be called "a soil." A pedon is three dimensional and large enough to permit study of all horizons. Its area ranges from about 10 to 100 square feet (1 square meter to 10 square meters), depending on the variability of the soil. 58 Custom Soil Resource Report Percolation The movement of water through the soil. Perennial water (map symbol) Small, natural or constructed lakes, ponds, or pits that contain water most of the year. Permafrost Ground, soil, or rock that remains at or below 0 degrees C for at least 2 years. It is defined on the basis of temperature and is not necessarily frozen. pH value A numerical designation of acidity and alkalinity in soil. (See Reaction, soil.) Phase, soil A subdivision of a soil series based on features that affect its use and management, such as slope, stoniness, and flooding. Piping Formation of subsurface tunnels or pipelike cavities by water moving through the soil. Pitting Pits caused by melting around ice. They form on the soil after plant cover is removed. Plastic limit The moisture content at which a soil changes from semisolid to plastic. Plasticity index The numerical difference between the liquid limit and the plastic limit; the range of moisture content within which the soil remains plastic. Plateau (geomorphology) A comparatively flat area of great extent and elevation; specifically, an extensive land region that is considerably elevated (more than 100 meters) above the adjacent lower lying terrain, is commonly limited on at least one side by an abrupt descent, and has a flat or nearly level surface. A comparatively large part of a plateau surface is near summit level. Playa The generally dry and nearly level lake plain that occupies the lowest parts of closed depressions, such as those on intermontane basin floors. Temporary flooding occurs primarily in response to precipitation and runoff. Playa deposits are fine grained and may or may not have a high water table and saline conditions. 59 Custom Soil Resource Report Plinthite The sesquioxide-rich, humus -poor, highly weathered mixture of clay with quartz and other diluents. It commonly appears as red mottles, usually in platy, polygonal, or reticulate patterns. Plinthite changes irreversibly to an ironstone hardpan or to irregular aggregates on repeated wetting and drying, especially if it is exposed also to heat from the sun. In a moist soil, plinthite can be cut with a spade. It is a form of laterite. Plowpan A compacted layer formed in the soil directly below the plowed layer. Ponding Standing water on soils in closed depressions. Unless the soils are artificially drained, the water can be removed only by percolation or evapotranspiration. Poorly graded Refers to a coarse grained soil or soil material consisting mainly of particles of nearly the same size. Because there is little difference in size of the particles, density can be increased only slightly by compaction. Pore linings See Redoximorphic features. Potential native plant community See Climax plant community. Potential rooting depth (effective rooting depth) Depth to which roots could penetrate if the content of moisture in the soil were adequate. The soil has no properties restricting the penetration of roots to this depth. Prescribed burning Deliberately burning an area for specific management purposes, under the appropriate conditions of weather and soil moisture and at the proper time of day. Productivity, soil The capability of a soil for producing a specified plant or sequence of plants under specific management. Profile, soil A vertical section of the soil extending through all its horizons and into the parent material. Proper grazing use Grazing at an intensity that maintains enough cover to protect the soil and maintain or improve the quantity and quality of the desirable vegetation. This practice increases the vigor and reproduction capacity of the key plants and Custom Soil Resource Report promotes the accumulation of litter and mulch necessary to conserve soil and water. Rangeland Land on which the potential natural vegetation is predominantly grasses, grasslike plants, forbs, or shrubs suitable for grazing or browsing. It includes natural grasslands, savannas, many wetlands, some deserts, tundras, and areas that support certain forb and shrub communities. Reaction, soil A measure of acidity or alkalinity of a soil, expressed as pH values. A soil that tests to pH 7.0 is described as precisely neutral in reaction because it is neither acid nor alkaline. The degrees of acidity or alkalinity, expressed as pH values, are: Ultra acid: Less than 3.5 Extremely acid: 3.5 to 4.4 Very strongly acid: 4.5 to 5.0 Strongly acid: 5.1 to 5.5 Moderately acid: 5.6 to 6.0 Slightly acid: 6.1 to 6.5 Neutral: 6.6 to 7.3 Slightly alkaline: 7.4 to 7.8 Moderately alkaline: 7.9 to 8.4 Strongly alkaline: 8.5 to 9.0 Very strongly alkaline: 9.1 and higher Red beds Sedimentary strata that are mainly red and are made up largely of sandstone and shale. Redoximorphic concentrations See Redoximorphic features. Redoximorphic depletions See Redoximorphic features. Redoximorphic features Redoximorphic features are associated with wetness and result from alternating periods of reduction and oxidation of iron and manganese compounds in the soil. Reduction occurs during saturation with water, and oxidation occurs when the soil is not saturated. Characteristic color patterns are created by these processes. The reduced iron and manganese ions may be removed from a soil if vertical or lateral fluxes of water occur, in which case there is no iron or manganese precipitation in that soil. Wherever the iron and manganese are oxidized and precipitated, they form either soft masses or hard concretions or nodules. Movement of iron and manganese as a result of redoximorphic processes in a soil may result in redoximorphic features that are defined as follows: 61 Custom Soil Resource Report 1. Redoximorphic concentrations. —These are zones of apparent accumulation of iron -manganese oxides, including: A. Nodules and concretions, which are cemented bodies that can be removed from the soil intact. Concretions are distinguished from nodules on the basis of internal organization. A concretion typically has concentric layers that are visible to the naked eye. Nodules do not have visible organized internal structure; and B. Masses, which are noncemented concentrations of substances within the soil matrix; and C. Pore linings, i.e., zones of accumulation along pores that may be either coatings on pore surfaces or impregnations from the matrix adjacent to the pores. 2. Redoximorphic depletions. —These are zones of low chroma (chromas less than those in the matrix) where either iron -manganese oxides alone or both iron -manganese oxides and clay have been stripped out, including: A. Iron depletions, i.e., zones that contain low amounts of iron and manganese oxides but have a clay content similar to that of the adjacent matrix; and B. Clay depletions, i.e., zones that contain low amounts of iron, manganese, and clay (often referred to as silt coatings or skeletans). 3. Reduced matrix. —This is a soil matrix that has low chroma in situ but undergoes a change in hue or chroma within 30 minutes after the soil material has been exposed to air. Reduced matrix See Redoximorphic features. Regolith All unconsolidated earth materials above the solid bedrock. It includes material weathered in place from all kinds of bedrock and alluvial, glacial, eolian, Iacustrine, and pyroclastic deposits. Relief The relative difference in elevation between the upland summits and the lowlands or valleys of a given region. Residuum (residual soil material) Rill Unconsolidated, weathered or partly weathered mineral material that accumulated as bedrock disintegrated in place. A very small, steep -sided channel resulting from erosion and cut in unconsolidated materials by concentrated but intermittent flow of water. A rill generally is not an obstacle to wheeled vehicles and is shallow enough to be smoothed over by ordinary tillage. M. Custom Soil Resource Report Riser The vertical or steep side slope (e.g., escarpment) of terraces, flood -plain steps, or other stepped landforms; commonly a recurring part of a series of natural, steplike landforms, such as successive stream terraces. Road cut A sloping surface produced by mechanical means during road construction. It is commonly on the uphill side of the road. Rock fragments Rock or mineral fragments having a diameter of 2 millimeters or more; for example, pebbles, cobbles, stones, and boulders. Rock outcrop (map symbol) An exposure of bedrock at the surface of the earth. Not used where the named soils of the surrounding map unit are shallow over bedrock or where "Rock outcrop" is a named component of the map unit. Root zone The part of the soil that can be penetrated by plant roots. Runoff The precipitation discharged into stream channels from an area. The water that flows off the surface of the land without sinking into the soil is called surface runoff. Water that enters the soil before reaching surface streams is called ground -water runoff or seepage flow from ground water. Saline soil A soil containing soluble salts in an amount that impairs growth of plants. A saline soil does not contain excess exchangeable sodium. Saline spot (map symbol) An area where the surface layer has an electrical conductivity of 8 mmhos/cm more than the surface layer of the named soils in the surrounding map unit. The surface layer of the surrounding soils has an electrical conductivity of 2 mmhos/cm or less. Sand As a soil separate, individual rock or mineral fragments from 0.05 millimeter to 2.0 millimeters in diameter. Most sand grains consist of quartz. As a soil textural class, a soil that is 85 percent or more sand and not more than 10 percent clay. Sandstone Sedimentary rock containing dominantly sand -sized particles. 63 Custom Soil Resource Report Sandy spot (map symbol) A spot where the surface layer is loamy fine sand or coarser in areas where the surface layer of the named soils in the surrounding map unit is very fine sandy loam or finer. Sapric soil material (muck) The most highly decomposed of all organic soil material. Muck has the least amount of plant fiber, the highest bulk density, and the lowest water content at saturation of all organic soil material. Saturated hydraulic conductivity (Ksat) The ease with which pores of a saturated soil transmit water. Formally, the proportionality coefficient that expresses the relationship of the rate of water movement to hydraulic gradient in Darcy's Law, a law that describes the rate of water movement through porous media. Commonly abbreviated as "Ksat." Terms describing saturated hydraulic conductivity are: Very high: 100 or more micrometers per second (14.17 or more inches per hour) High: 10 to 100 micrometers per second (1.417 to 14.17 inches per hour) Moderately high: 1 to 10 micrometers per second (0.1417 inch to 1.417 inches per hour) Moderately low: 0.1 to 1 micrometer per second (0.01417 to 0.1417 inch per hour) Low: 0.01 to 0.1 micrometer per second (0.001417 to 0.01417 inch per hour) Very low: Less than 0.01 micrometer per second (less than 0.001417 inch per hour). To convert inches per hour to micrometers per second, multiply inches per hour by 7.0572. To convert micrometers per second to inches per hour, multiply micrometers per second by 0.1417. Saturation Wetness characterized by zero or positive pressure of the soil water. Under conditions of saturation, the water will flow from the soil matrix into an unlined auger hole. Scarification The act of abrading, scratching, loosening, crushing, or modifying the surface to increase water absorption or to provide a more tillable soil. Sedimentary rock A consolidated deposit of clastic particles, chemical precipitates, or organic remains accumulated at or near the surface of the earth under normal low temperature and pressure conditions. Sedimentary rocks include consolidated equivalents of alluvium, colluvium, drift, and eolian, lacustrine, and marine deposits. Examples are sandstone, siltstone, mudstone, claystone, shale, conglomerate, limestone, dolomite, and coal. 64 Custom Soil Resource Report Sequum A sequence consisting of an illuvial horizon and the overlying eluvial horizon. (See Eluviation.) Series, soil A group of soils that have profiles that are almost alike, except for differences in texture of the surface layer. All the soils of a series have horizons that are similar in composition, thickness, and arrangement. Severely eroded spot (map symbol) An area where, on the average, 75 percent or more of the original surface layer has been lost because of accelerated erosion. Not used in map units in which "severely eroded," "very severely eroded," or "gullied" is part of the map unit name. Shale Sedimentary rock that formed by the hardening of a deposit of clay, silty clay, or silty clay loam and that has a tendency to split into thin layers. Sheet erosion The removal of a fairly uniform layer of soil material from the land surface by the action of rainfall and surface runoff. Short, steep slope (map symbol) A narrow area of soil having slopes that are at least two slope classes steeper than the slope class of the surrounding map unit. Shoulder The convex, erosional surface near the top of a hillslope. A shoulder is a transition from summit to backslope. Shrink -swell The shrinking of soil when dry and the swelling when wet. Shrinking and swelling can damage roads, dams, building foundations, and other structures. It can also damage plant roots. Shrub -coppice dune A small, streamlined dune that forms around brush and clump vegetation. Side slope (geomorphology) A geomorphic component of hills consisting of a laterally planar area of a hillside. The overland waterflow is predominantly parallel. Side slopes are dominantly colluvium and slope -wash sediments. Silica A combination of silicon and oxygen. The mineral form is called quartz. C-9 Custom Soil Resource Report Silica-sesquioxide ratio Silt The ratio of the number of molecules of silica to the number of molecules of alumina and iron oxide. The more highly weathered soils or their clay fractions in warm -temperate, humid regions, and especially those in the tropics, generally have a low ratio. As a soil separate, individual mineral particles that range in diameter from the upper limit of clay (0.002 millimeter) to the lower limit of very fine sand (0.05 millimeter). As a soil textural class, soil that is 80 percent or more silt and less than 12 percent clay. Siltstone An indurated silt having the texture and composition of shale but lacking its fine lamination or fissility; a massive mudstone in which silt predominates over clay. Similar soils Soils that share limits of diagnostic criteria, behave and perform in a similar manner, and have similar conservation needs or management requirements for the major land uses in the survey area. Sinkhole (map symbol) A closed, circular or elliptical depression, commonly funnel shaped, characterized by subsurface drainage and formed either by dissolution of the surface of underlying bedrock (e.g., limestone, gypsum, or salt) or by collapse of underlying caves within bedrock. Complexes of sinkholes in carbonate -rock terrain are the main components of karst topography. Site index A designation of the quality of a forest site based on the height of the dominant stand at an arbitrarily chosen age. For example, if the average height attained by dominant and codominant trees in a fully stocked stand at the age of 50 years is 75 feet, the site index is 75. Slickensides (pedogenic) Grooved, striated, and/or glossy (shiny) slip faces on structural peds, such as wedges; produced by shrink -swell processes, most commonly in soils that have a high content of expansive clays. Slide or slip (map symbol) A prominent landform scar or ridge caused by fairly recent mass movement or descent of earthy material resulting from failure of earth or rock under shear stress along one or several surfaces. Slope The inclination of the land surface from the horizontal. Percentage of slope is the vertical distance divided by horizontal distance, then multiplied by 100. Thus, a slope of 20 percent is a drop of 20 feet in 100 feet of horizontal distance. .: Custom Soil Resource Report Slope alluvium Sediment gradually transported down the slopes of mountains or hills primarily by nonchannel alluvial processes (i.e., slope -wash processes) and characterized by particle sorting. Lateral particle sorting is evident on long slopes. In a profile sequence, sediments may be distinguished by differences in size and/or specific gravity of rock fragments and may be separated by stone lines. Burnished peds and sorting of rounded or subrounded pebbles or cobbles distinguish these materials from unsorted colluvial deposits. Slow refill The slow filling of ponds, resulting from restricted water transmission in the soil. Slow water movement Restricted downward movement of water through the soil. See Saturated hydraulic conductivity. Sodic (alkali) soil A soil having so high a degree of alkalinity (pH 8.5 or higher) or so high a percentage of exchangeable sodium (15 percent or more of the total exchangeable bases), or both, that plant growth is restricted. Sodic spot (map symbol) An area where the surface layer has a sodium adsorption ratio that is at least 10 more than that of the surface layer of the named soils in the surrounding map unit. The surface layer of the surrounding soils has a sodium adsorption ratio of 5 or less. Sodicity The degree to which a soil is affected by exchangeable sodium. Sodicity is expressed as a sodium adsorption ratio (SAR) of a saturation extract, or the ratio of Na+ to Ca++ + Mg++. The degrees of sodicity and their respective ratios are: Slight: Less than 13:1 Moderate: 13-30:1 Strong: More than 30:1 Sodium adsorption ratio (SAR) A measure of the amount of sodium (Na) relative to calcium (Ca) and magnesium (Mg) in the water extract from saturated soil paste. It is the ratio of the Na concentration divided by the square root of one-half of the Ca + Mg concentration. Soft bedrock Bedrock that can be excavated with trenching machines, backhoes, small rippers, and other equipment commonly used in construction. 67 Custom Soil Resource Report Soil A natural, three-dimensional body at the earth's surface. It is capable of supporting plants and has properties resulting from the integrated effect of climate and living matter acting on earthy parent material, as conditioned by relief and by the passage of time. Soil separates Mineral particles less than 2 millimeters in equivalent diameter and ranging between specified size limits. The names and sizes, in millimeters, of separates recognized in the United States are as follows: Very coarse sand: 2.0 to 1.0 Coarse sand: 1.0 to 0.5 Medium sand: 0.5 to 0.25 Fine sand: 0.25 to 0.10 Very fine sand: 0.10 to 0.05 Silt: 0.05 to 0.002 Clay: Less than 0.002 Solum The upper part of a soil profile, above the C horizon, in which the processes of soil formation are active. The solum in soil consists of the A, E, and B horizons. Generally, the characteristics of the material in these horizons are unlike those of the material below the solum. The living roots and plant and animal activities are largely confined to the solum. Spoil area (map symbol) A pile of earthy materials, either smoothed or uneven, resulting from human activity. Stone line In a vertical cross section, a line formed by scattered fragments or a discrete layer of angular and subangular rock fragments (commonly a gravel- or cobble - sized lag concentration) that formerly was draped across a topographic surface and was later buried by additional sediments. A stone line generally caps material that was subject to weathering, soil formation, and erosion before burial. Many stone lines seem to be buried erosion pavements, originally formed by sheet and rill erosion across the land surface. Stones Rock fragments 10 to 24 inches (25 to 60 centimeters) in diameter if rounded or 15 to 24 inches (38 to 60 centimeters) in length if flat. Stony Refers to a soil containing stones in numbers that interfere with or prevent tillage. I- Custom Soil Resource Report Stony spot (map symbol) A spot where 0.01 to 0.1 percent of the soil surface is covered by rock fragments that are more than 10 inches in diameter in areas where the surrounding soil has no surface stones. Strath terrace A type of stream terrace; formed as an erosional surface cut on bedrock and thinly mantled with stream deposits (alluvium). Stream terrace One of a series of platforms in a stream valley, flanking and more or less parallel to the stream channel, originally formed near the level of the stream; represents the remnants of an abandoned flood plain, stream bed, or valley floor produced during a former state of fluvial erosion or deposition. Striperopping Growing crops in a systematic arrangement of strips or bands that provide vegetative barriers to wind erosion and water erosion. Structure, soil The arrangement of primary soil particles into compound particles or aggregates. The principal forms of soil structure are: Platy: Flat and laminated Prismatic: Vertically elongated and having flat tops Columnar: Vertically elongated and having rounded tops Angular blocky: Having faces that intersect at sharp angles (planes) Subangular blocky.- Having subrounded and planar faces (no sharp angles) Granular: Small structural units with curved or very irregular faces Structureless soil horizons are defined as follows: Single grained: Entirely noncoherent (each grain by itself), as in loose sand Massive: Occurring as a coherent mass Stubble mulch Stubble or other crop residue left on the soil or partly worked into the soil. It protects the soil from wind erosion and water erosion after harvest, during preparation of a seedbed for the next crop, and during the early growing period of the new crop. Subsoil Technically, the B horizon; roughly, the part of the solum below plow depth. Subsoiling Tilling a soil below normal plow depth, ordinarily to shatter a hardpan or claypan. Custom Soil Resource Report Substratum The part of the soil below the solum. Subsurface layer Any surface soil horizon (A, E, AB, or EB) below the surface layer. Summer fallow The tillage of uncropped land during the summer to control weeds and allow storage of moisture in the soil for the growth of a later crop. A practice common in semiarid regions, where annual precipitation is not enough to produce a crop every year. Summer fallow is frequently practiced before planting winter grain. Summit The topographically highest position of a hillslope. It has a nearly level (planar or only slightly convex) surface. Surface layer The soil ordinarily moved in tillage, or its equivalent in uncultivated soil, ranging in depth from 4 to 10 inches (10 to 25 centimeters). Frequently designated as the "plow layer," or the "Ap horizon." Surface soil The A, E, AB, and EB horizons, considered collectively. It includes all subdivisions of these horizons. Talus Rock fragments of any size or shape (commonly coarse and angular) derived from and lying at the base of a cliff or very steep rock slope. The accumulated mass of such loose broken rock formed chiefly by falling, rolling, or sliding. Taxadjuncts Soils that cannot be classified in a series recognized in the classification system. Such soils are named for a series they strongly resemble and are designated as taxadjuncts to that series because they differ in ways too small to be of consequence in interpreting their use and behavior. Soils are recognized as taxadjuncts only when one or more of their characteristics are slightly outside the range defined for the family of the series for which the soils are named. Terminal moraine An end moraine that marks the farthest advance of a glacier. It typically has the form of a massive arcuate or concentric ridge, or complex of ridges, and is underlain by till and other types of drift. Terrace (conservation) An embankment, or ridge, constructed across sloping soils on the contour or at a slight angle to the contour. The terrace intercepts surface runoff so that water soaks into the soil or flows slowly to a prepared outlet. A terrace in a field 70 Custom Soil Resource Report generally is built so that the field can be farmed. A terrace intended mainly for drainage has a deep channel that is maintained in permanent sod. Terrace (geomorphology) A steplike surface, bordering a valley floor or shoreline, that represents the former position of a flood plain, lake, or seashore. The term is usually applied both to the relatively flat summit surface (tread) that was cut or built by stream or wave action and to the steeper descending slope (scarp or riser) that has graded to a lower base level of erosion. Te rracettes Small, irregular steplike forms on steep hillslopes, especially in pasture, formed by creep or erosion of surficial materials that may be induced or enhanced by trampling of livestock, such as sheep or cattle. Texture, soil The relative proportions of sand, silt, and clay particles in a mass of soil. The basic textural classes, in order of increasing proportion of fine particles, are sand, loamy sand, sandy loam, loam, silt loam, silt, sandy clay loam, clay loam, silty clay loam, sandy clay, silty clay, and clay. The sand, loamy sand, and sandy loam classes may be further divided by specifying "coarse," "fine," or "very fine." Thin layer Till Otherwise suitable soil material that is too thin for the specified use. Dominantly unsorted and nonstratified drift, generally unconsolidated and deposited directly by a glacier without subsequent reworking by meltwater, and consisting of a heterogeneous mixture of clay, silt, sand, gravel, stones, and boulders; rock fragments of various lithologies are embedded within a finer matrix that can range from clay to sandy loam. Till plain An extensive area of level to gently undulating soils underlain predominantly by till and bounded at the distal end by subordinate recessional or end moraines. Tilth, soil The physical condition of the soil as related to tillage, seedbed preparation, seedling emergence, and root penetration. Toeslope The gently inclined surface at the base of a hillslope. Toeslopes in profile are commonly gentle and linear and are constructional surfaces forming the lower part of a hillslope continuum that grades to valley or closed -depression floors. 71 Custom Soil Resource Report Topsoil The upper part of the soil, which is the most favorable material for plant growth. It is ordinarily rich in organic matter and is used to topdress roadbanks, lawns, and land affected by mining. Trace elements Chemical elements, for example, zinc, cobalt, manganese, copper, and iron, in soils in extremely small amounts. They are essential to plant growth. Tread The flat to gently sloping, topmost, laterally extensive slope of terraces, flood - plain steps, or other stepped landforms; commonly a recurring part of a series of natural steplike landforms, such as successive stream terraces. Tuff A generic term for any consolidated or cemented deposit that is 50 percent or more volcanic ash. Upland An informal, general term for the higher ground of a region, in contrast with a low-lying adjacent area, such as a valley or plain, or for land at a higher elevation than the flood plain or low stream terrace; land above the footslope zone of the hillslope continuum. Valley fill The unconsolidated sediment deposited by any agent (water, wind, ice, or mass wasting) so as to fill or partly fill a valley. Variegation Refers to patterns of contrasting colors assumed to be inherited from the parent material rather than to be the result of poor drainage. Varve A sedimentary layer or a lamina or sequence of laminae deposited in a body of still water within a year. Specifically, a thin pair of graded glaciolacustrine layers seasonally deposited, usually by meltwater streams, in a glacial lake or other body of still water in front of a glacier. Very stony spot (map symbol) A spot where 0.1 to 3.0 percent of the soil surface is covered by rock fragments that are more than 10 inches in diameter in areas where the surface of the surrounding soil is covered by less than 0.01 percent stones. Water bars Smooth, shallow ditches or depressional areas that are excavated at an angle across a sloping road. They are used to reduce the downward velocity of water and divert it off and away from the road surface. Water bars can easily be driven over if constructed properly. 72 Custom Soil Resource Report Weathering All physical disintegration, chemical decomposition, and biologically induced changes in rocks or other deposits at or near the earth's surface by atmospheric or biologic agents or by circulating surface waters but involving essentially no transport of the altered material. Well graded Refers to soil material consisting of coarse grained particles that are well distributed over a wide range in size or diameter. Such soil normally can be easily increased in density and bearing properties by compaction. Contrasts with poorly graded soil. Wet spot (map symbol) A somewhat poorly drained to very poorly drained area that is at least two drainage classes wetter than the named soils in the surrounding map unit. Wilting point (or permanent wilting point) The moisture content of soil, on an ovendry basis, at which a plant (specifically a sunflower) wilts so much that it does not recover when placed in a humid, dark chamber. Windthrow The uprooting and tipping over of trees by the wind. 73 Z US �� U.S. DEPARTMENT OF THE INTERIOR The National Map U.S. GEOLOGICAL SURVEY I I science for a changing world = U S Top 0 -79.0000' 35.3750' 682000nn E 83 84 85 86 87 391 6000mN 15 14 13 12 10 09 07 06 05 04 03 MCDOUGALD=RD ald_BT o �y N G / l�/ P PAS / AGFRD - 0✓ „' 200 0 300 �. Barbec e Cr — — ALTON NO - 0 o � 7 0 RockyfRun,Cr O / 350 yOO pRAI�N EX CUTIVE DR � o 0 RD �� O ApJ 0 L o RANDI LN ,RO C I q<ts I FORT BRA O ��. C, O A m O � O A< Ham Hill C N Ao RD Id W O, IS 88 89 90 91 ANDERSON CREEK QUADRANGLE NORTH CAROLINA - HARNETT COUNTY 7.5-MINUTE SERIES -78.8750' 92 93 35.3750' 250 300 ns- � 0 0 - U D .� �(? J FARRARiRD t ° -j A P �r l h 10 rs o�L 1iP so STANCIL RD G — - 1 orringto- "-•crossroad / D S 'I -TT RD - GRANDFAT �z HER DR - --+� 0 zp �LZttle_ — LARK RD D _ - Darroch Cem — —� • �l0 Upper L zo RD Upper Little R �. ` - /-$r 0 O 211 U (7 0 0 'Kates r 4. _ F " lackGem'� �B161z- wam — N Pro � .,. •'-mac - � 200 You gsn Pond ry° _ 0 J 11L - 11L1 - �� �� O �• ,1L ,1L Y,lt. / REMINGTON HILL DR W sts 9nd 210 LEMUEL LACKRD Q s Anderson C� d Q Creek o A_hongl zoo (; l R' ° 10 T1Q> N O WAYSIDE-h o� � ti9 - 0� PG rO O o VVo — 5J o \ N 0 0 0 a a x - � O < Q - o \ - o 0 `( ul 21 150 sOn Bethel ° �Ce/m/ \. 16 15 14 13 12 10 09 07 06 05 04 3903000mN 35.2500° 82 83 84 85 86 87 88 89 90 91 92 693000mE 35.2500' -79.0000'-78.8750' Produced by the United States Geological Survey MN. * SCALE 1 :24 000 ROAD CLASSIFICATION North American Datum of 1983 (NAD83)Expressway Local Connector rn World Geodetic System of 1984 (WGS84). Projection and N 1 0.5 0 KILOMETERS 1 2 NOgg��H co 1 000-meter grid: Universal Transverse Mercator, Zone 17S ARd�INA Secondary Hwy Local Roa 93' 1000 500 0 METERS 1000 2000 d °rn This map is not a legal document. Boundaries may be 1s1 MILS Ramp 4WD generalized for this map scale. Private lands within government 1°12" 1 0.5 0 1 Y reservations may not be shown. Obtain permission before 21 MILS MILES • Interstate Route US Route O State Route entering private lands. 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 QUADRANGLE LOCATION N oX Imagery .....................................................NAIP, July 2016 - November 2016 FEET tD Roads ......................................... U.S. Census Bureau, 2016 UTM GRIDAND 2019 MAGNETIC NORTH o Names............................................................................GNIS, 1980 - 2018 1 Broadway DECLINATION AT CENTER OF SHEET �„� (OHydrography...............................National Hydrography Dataset, 1899 - 2018 2 3 2 Manners =) Contours .................... CONTOUR INTERVAL 10 FEET ........................National Elevation Dataset, 2008 u.s.Nasonalcria 3Lillington � Boundaries ..............Multiple sources; see metadata file 2017 - 2018 NORTH AMERICAN VERTICAL DATUM OF 1988 100,000-m Square ID 4 5 4 Olivia co O 5 Bunnlevel Z Wetlands.................FWS National Wetlands Inventory 1983 This map was produced to conform with the LL PV National Geospatial Program US Topo Product Standard, 2011. 6 Overhills W A metadata file associated with this product is draft version 0.6.18 6 7 8 8 Manchester hesster ir mb AN DERSON CREEKS NC Z ir N 0 Grid Zone Designation ADJOINING QUADRANGLES Z Z 17S 2019 CC Q�2 LtAUREL DR m K'YIIyS oP �0 NSA W O L /1z Pond/, F s o /D z z aEL BAPTIST RD fakers, and CY APPENDIX C: USGS QUADRANGLE MAP BOHLER// BOHLER ENGINEERING NC, PLLC Z US �� U.S. DEPARTMENT OF THE INTERIOR The National Map U.S. GEOLOGICAL SURVEY I I science for a changing world = U S Top 0 -79.0000' 35.3750' 682000nn E 83 84 85 86 87 391 6000mN 15 14 13 12 10 09 07 06 05 04 03 MCDOUGALD=RD ald_BT o �y N G / l�/ P PAS / AGFRD - 0✓ „' 200 0 300 �. Barbec e Cr — — ALTON NO - 0 o � 7 0 RockyfRun,Cr O / 350 yOO pRAI�N EX CUTIVE DR � o 0 RD �� O ApJ 0 L o RANDI LN ,RO C I q<ts I FORT BRA O ��. C, O A m O � O A< Ham Hill C N Ao RD Id W O, IS 88 89 90 91 ANDERSON CREEK QUADRANGLE NORTH CAROLINA - HARNETT COUNTY 7.5-MINUTE SERIES -78.8750' 92 93 35.3750' 250 300 ns- � 0 0 - U D .� �(? J FARRARiRD t ° -j A P �r l h 10 rs o�L 1iP so STANCIL RD G — - 1 orringto- "-•crossroad / D S 'I -TT RD - GRANDFAT �z HER DR - --+� 0 zp �LZttle_ — LARK RD D _ - Darroch Cem — —� • �l0 Upper L zo RD Upper Little R �. ` - /-$r 0 O 211 U (7 0 0 'Kates r 4. _ F " lackGem'� �B161z- wam — N Pro � .,. •'-mac - � 200 You gsn Pond ry° _ 0 J 11L - 11L1 - �� �� O �• ,1L ,1L Y,lt. / REMINGTON HILL DR W sts 9nd 210 LEMUEL LACKRD Q s Anderson C� d Q Creek o A_hongl zoo (; l R' ° 10 T1Q> N O WAYSIDE-h o� � ti9 - 0� PG rO O o VVo — 5J o \ N 0 0 0 a a x - � O < Q - o \ - o 0 `( ul 21 150 sOn Bethel ° �Ce/m/ \. 16 15 14 13 12 10 09 07 06 05 04 3903000mN 35.2500° 82 83 84 85 86 87 88 89 90 91 92 693000mE 35.2500' -79.0000'-78.8750' Produced by the United States Geological Survey MN. * SCALE 1 :24 000 ROAD CLASSIFICATION North American Datum of 1983 (NAD83)Expressway Local Connector rn World Geodetic System of 1984 (WGS84). Projection and N 1 0.5 0 KILOMETERS 1 2 NOgg��H co 1 000-meter grid: Universal Transverse Mercator, Zone 17S ARd�INA Secondary Hwy Local Roa 93' 1000 500 0 METERS 1000 2000 d °rn This map is not a legal document. Boundaries may be 1s1 MILS Ramp 4WD generalized for this map scale. Private lands within government 1°12" 1 0.5 0 1 Y reservations may not be shown. Obtain permission before 21 MILS MILES • Interstate Route US Route O State Route entering private lands. 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 QUADRANGLE LOCATION N oX Imagery .....................................................NAIP, July 2016 - November 2016 FEET tD Roads ......................................... U.S. Census Bureau, 2016 UTM GRIDAND 2019 MAGNETIC NORTH o Names............................................................................GNIS, 1980 - 2018 1 Broadway DECLINATION AT CENTER OF SHEET �„� (OHydrography...............................National Hydrography Dataset, 1899 - 2018 2 3 2 Manners =) Contours .................... CONTOUR INTERVAL 10 FEET ........................National Elevation Dataset, 2008 u.s.Nasonalcria 3Lillington � Boundaries ..............Multiple sources; see metadata file 2017 - 2018 NORTH AMERICAN VERTICAL DATUM OF 1988 100,000-m Square ID 4 5 4 Olivia co O 5 Bunnlevel Z Wetlands.................FWS National Wetlands Inventory 1983 This map was produced to conform with the LL PV National Geospatial Program US Topo Product Standard, 2011. 6 Overhills W A metadata file associated with this product is draft version 0.6.18 6 7 8 8 Manchester hesster ir mb AN DERSON CREEKS NC Z ir N 0 Grid Zone Designation ADJOINING QUADRANGLES Z Z 17S 2019 CC Q�2 LtAUREL DR m K'YIIyS oP �0 NSA W O L /1z Pond/, F s o /D z z aEL BAPTIST RD fakers, and CY APPENDIX D: PRE -DEVELOPMENT DRAINAGE MAP BOHLER// BOHLER ENGINEERING NC, PLLC a BOHLER BOHLER ENGINEERING NC, PLLC NCBELS P-1132 4130 PAR KLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone: (919) 578-9000 NC@,BohierEng.com 'Z4 � gm 19 I / DPP 40 i i:- /4D A / . ® ,per ® ® \ . . . MA 0 PRE DEVELOPMENT DRAINAGE AREA MAP BARBEQUE TOWNSHIP, NC 275461 PLAN REV.0 LEGEND — OVERALL BOUNDARY — SUBCATCHMENT BOUNDARY TIME OF — Q — CONCENTRATION -MIN 5 MINUTES — — — SOIL BOUNDARY DESIGN POINT SUBCATCHMENT �# OUTLET CONTROL STRUCTURE OR POND DRAINAGE AREA 1 WOODS=166.45 AC LAWN=24.76 AC ® z ACRE LOTS= 5.87 AC TOTAL= 197.08 AC DRAINAGE AREA 2 WOODS= 146.74 AC LAWN=1.81 AC 'ACRE LOTS= 174.35 AC TOTAL= 322.90 AC DRAINAGE AREA 3 EM WOODS= 76.53 AC LAWN= 0 AC ® 7ACRE LOTS= 0 AC TOTAL= 76.53 AC 8/10/21 1 JDW I NCR201044 1 Rev.O N 600 300 150 0 600 A 600' APPENDIX E: POST -DEVELOPMENT DRAINAGE MAP BOHLER// BOHLER ENGINEERING NC, PLLC FIOHLER POST DCVCLOI'MCNT 01" APPENDIX F: STORMWATER CONVEYANCE NETWORK CALCULATIONS - EXCLUDING G-20 TO G-24 BOHLER BOHLER ENGINEERING NC, PLLC Conduit FlexTable: DOT Report -Node- Upstream Downstream -Depth- Upstream Downstream (ft) -EGL- Upstream Downstream (ft) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Invert- Upstream Downstream (ft) Section Discharge Capacity (cfs) -X- Upstream Downstream (ft) -Y- Upstream Downstream (ft) E-20 1.43 272.18 275.00 271.62 270.20 19.75 2,005,745.86 574,773.36 E- 10 (N/A) (N/A) 271.44 271.24 270.00 61.99 2,005,759.26 574,791.94 L-20 0.65 271.59 275.59 271.35 270.70 3.46 2,005,981.01 574,987.57 L-10 (N/A) (N/A) 271.94 270.57 270.00 19.53 2,005,887.21 574,982.60 L-21 0.50 271.77 275.59 271.60 271.09 1.57 2,006,009.91 574,985.19 L-20 0.65 271.43 275.59 271.44 270.70 4.57 2,005,981.01 574,987.57 L-30 0.43 272.08 276.24 271.92 271.49 1.34 2,005,986.41 575,053.24 L-20 0.65 271.43 275.59 271.35 270.70 10.75 2,005,981.01 574,987.57 L-31 0.35 272.22 276.24 272.09 271.74 0.81 2,006,015.32 575,050.86 L-30 0.43 271.96 276.24 271.94 271.49 4.66 2,005,986.41 575,053.24 E-51 0.29 273.26 276.87 273.16 272.87 0.56 2,005,966.84 574,817.25 E-50 0.46 272.99 276.87 272.93 272.48 6.46 2,005,995.65 574,813.93 L-41 0.51 273.41 277.66 273.41 272.90 0.16 2,006,021.55 575,126.63 L-40 1.20 273.41 277.66 273.41 272.20 10.01 2,005,992.65 575,129.01 L-40 1.20 273.49 277.66 273.41 272.20 0.40 2,005,992.65 575,129.01 L-30 0.43 271.96 276.24 271.92 271.49 9.28 2,005,986.41 575,053.24 E-50 0.46 273.09 276.87 272.93 272.48 1.30 2,005,995.65 574,813.93 E-40 0.92 272.89 278.92 272.86 271.94 4.57 2,005,965.46 574,711.23 E-30 1.43 273.38 279.96 272.83 271.40 19.75 2,005,937.22 574,664.51 E-20 1.43 272.26 275.00 271.65 270.20 47.18 2,005,745.86 574,773.36 E-40 0.92 272.93 278.92 272.86 271.94 2.07 2,005,965.46 574,711.23 E-30 1.43 272.87 279.96 272.83 271.40 4.51 2,005,937.22 574,664.51 E-60 1.48 277.20 282.87 276.49 275.02 16.80 2,005,821.70 574,567.59 E-30 1.43 272.87 279.96 273.03 271.40 31.99 2,005,937.22 574,664.51 E-61 0.32 278.79 282.86 278.68 278.36 0.65 2,005,808.93 574,593.63 E-60 1.48 279.09 282.87 278.25 275.02 7.24 2,005,821.70 574,567.59 E-70 5.36 281.70 284.81 280.47 275.11 15.37 2,005,731.10 574,539.13 E-60 1.48 279.09 282.87 276.07 275.02 21.38 2,005,821.70 574,567.59 E-71 0.31 281.41 284.94 281.30 280.98 0.64 2,005,722.00 574,567.07 E-70 5.36 281.48 284.81 280.47 275.11 28.61 2,005,731.10 574,539.13 E-80 1.38 285.55 289.02 284.51 283.13 13.92 2,005,632.13 574,523.89 E-70 5.36 281.48 284.81 280.47 275.11 21.18 2,005,731.10 574,539.13 E-81 0.41 285.08 289.02 284.93 284.52 1.10 2,005,627.71 574,552.55 E-80 1.38 287.19 289.02 284.58 283.13 6.46 2,005,632.13 574,523.89 E-90 1.30 293.11 297.35 292.30 291.00 11.71 2,005,481.98 574,500.76 E-80 1.38 287.19 289.02 284.39 283.13 23.11 2,005,632.13 574,523.89 E-100 1.38 294.37 297.35 293.15 291.76 10.88 2,005,477.56 574,529.42 E-90 1.30 293.55 297.35 292.30 291.00 9.76 2,005,481.98 574,500.76 NCR201044 - STM BUA MAX REV - HOPELAND DRIVE StormCAD uPDATE.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.02.04] 1/25/2023 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA Page 1 of 2 +1-203-755-1666 Conduit FlexTable: DOT Report -Node- Upstream Downstream -Depth- Upstream Downstream (ft) -EGL- Upstream Downstream (ft) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Invert- Upstream Downstream (ft) Section Discharge Capacity (cfs) -X- Upstream Downstream (ft) -Y- Upstream Downstream (ft) E-111 0.36 298.26 301.38 298.13 297.77 0.85 2,005,373.00 574,483.98 E-110 1.63 296.61 301.38 295.85 294.23 22.51 2,005,368.59 574,512.64 E-110 1.63 296.93 301.38 295.85 294.23 10.04 2,005,368.59 574,512.64 E-100 1.38 294.19 297.35 293.15 291.76 10.30 2,005,477.56 574,529.42 E-121 0.74 299.87 303.61 299.85 299.11 0.71 2,005,227.96 574,461.64 E-120 1.13 300.85 303.61 299.85 298.72 6.46 2,005,223.55 574,490.30 E-120 1.13 300.65 303.61 299.85 298.72 8.39 2,005,223.55 574,490.30 E-110 1.63 296.61 301.38 295.85 294.23 10.73 2,005,368.59 574,512.64 E-131 0.31 303.05 306.67 302.94 302.62 0.64 2,005,112.19 574,438.78 E-130 5.43 302.59 306.67 302.18 296.76 28.77 2,005,104.01 574,466.60 E-130 5.43 302.78 306.67 302.18 296.76 6.86 2,005,104.01 574,466.60 E-120 1.13 300.85 303.61 299.64 298.72 8.89 2,005,223.55 574,490.30 E-140 0.96 304.00 309.34 303.52 302.56 5.62 2,005,044.78 574,445.69 E-130 5.43 302.59 306.67 302.18 296.76 9.75 2,005,104.01 574,466.60 E-141 0.37 304.84 309.34 304.71 304.34 0.88 2,005,055.88 574,418.90 E-140 0.96 305.06 309.34 304.02 302.56 9.13 2,005,044.78 574,445.69 E-151 0.96 313.34 317.61 313.32 312.10 0.87 2,004,917.74 574,336.75 E-150 0.78 313.75 317.81 313.18 311.62 8.27 2,004,896.36 574,356.73 E-150 0.78 312.73 317.81 312.40 311.62 3.72 2,004,896.36 574,356.73 E-140 0.96 305.06 309.34 303.19 302.56 14.61 2,005,044.78 574,445.69 E-160 4.12 320.66 323.88 320.40 316.28 2.64 2,004,809.29 574,268.39 E-150 0.78 313.75 317.81 313.17 311.62 15.26 2,004,896.36 574,356.73 E-161 0.39 322.35 324.00 322.21 321.82 0.96 2,004,832.37 574,250.01 E-160 4.12 320.48 323.88 320.40 316.28 27.75 2,004,809.29 574,268.39 E-170 0.47 325.30 330.28 325.12 324.65 1.44 2,004,729.50 574,168.24 E-160 4.12 320.48 323.88 320.40 316.28 12.63 2,004,809.29 574,268.39 E-171 0.39 325.82 330.28 325.68 325.28 1.01 2,004,752.18 574,150.17 E-170 1 0.471 325.42 1 330.28 1 325.15 1 324.65 1 7.91 1 2,004,729.50 574,168.24 NCR201044 - STM BUA MAX REV - HOPELAND DRIVE StormCAD uPDATE.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.02.04] 1/25/2023 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA Page 2 of 2 +1-203-755-1666 Conduit FlexTable: DOT Report -Node- Upstream Downstream -Depth- Upstream Downstream (ft) -EGL- Upstream Downstream (ft) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Invert- Upstream Downstream (ft) Section Discharge Capacity (cfs) -X- Upstream Downstream (ft) -Y- Upstream Downstream (ft) G-110 0.61 325.75 328.46 325.51 324.90 2.32 2,004,216.98 574,853.56 G-100 1.12 325.65 328.46 325.49 324.37 9.35 2,004,243.96 574,842.92 G-100 1.12 326.26 328.46 325.49 324.37 8.16 2,004,243.96 574,842.92 G-90 1.34 316.32 319.14 315.63 314.29 17.89 2,004,328.56 575,003.44 G-81 0.45 309.24 312.13 309.08 307.13 1.28 2,004,450.79 575,147.38 G-80 1.46 310.83 312.13 308.39 306.94 17.06 2,004,465.39 575,122.32 G-80 1.46 310.19 312.13 308.39 306.94 18.84 2,004,465.39 575,122.32 G-70 1.89 294.54 308.89 293.89 292.00 33.34 2,004,660.41 575,185.75 G-71 0.46 301.63 309.27 301.46 301.00 1.35 2,004,631.92 575,211.35 G-70 1.89 294.54 308.89 298.21 292.00 21.33 2,004,660.41 575,185.75 G-61 0.38 289.52 294.81 289.38 289.00 0.95 2,005,077.03 575,216.77 G-60 2.76 283.44 293.99 285.18 278.50 21.27 2,005,119.37 575,187.72 G-51 0.39 284.82 287.88 284.69 284.30 0.96 2,005,527.03 575,216.17 G-50 2.36 278.29 287.26 280.18 273.90 22.19 2,005,568.61 575,187.12 G-50 2.36 278.32 287.26 276.26 273.90 55.20 2,005,568.61 575,187.12 J-10 2.65 275.17 278.54 271.40 269.20 65.15 2,005,577.39 575,423.23 J-10 2.65 273.36 278.54 271.85 269.20 63.05 2,005,577.39 575,423.23 K-19 2.75 271.17 281.48 269.76 267.00 77.94 2,005,792.33 575,439.17 K-19 2.75 271.82 281.48 269.76 267.00 78.36 2,005,792.33 575,439.17 0-1 (K-10) (N/A) (N/A) 257.00 264.99 257.00 172.45 2,005,798.06 575,647.76 K-40 0.99 274.50 279.51 273.99 273.00 5.94 2,005,969.74 575,186.58 K-30 1.08 274.07 278.77 272.83 272.00 9.63 2,006,026.10 575,181.94 K-41 0.40 274.55 279.47 274.40 274.00 1.05 2,005,976.25 575,215.57 K-40 0.99 274.16 279.51 273.99 273.00 13.28 2,005,969.74 575,186.58 K-30 1.08 273.59 278.77 273.08 272.00 7.83 2,006,026.10 575,181.94 K-21 1.43 271.28 276.22 270.93 269.50 12.07 2,006,033.89 575,435.78 K-20 0.98 271.31 275.47 270.88 269.90 6.43 2,006,035.10 575,467.68 K-21 1.43 271.28 276.22 270.93 269.50 12.00 2,006,033.89 575,435.78 K-21 1.43 271.59 276.22 270.93 269.50 15.67 2,006,033.89 575,435.78 K-22 1.50 271.49 275.96 270.33 269.02 24.83 2,005,989.79 575,436.42 K-22 1.50 271.24 275.96 270.52 269.02 17.26 2,005,989.79 575,436.42 K-19 2.75 271.17 281.48 269.76 267.00 26.36 2,005,792.33 575,439.17 StormCAD NCR201044 - STM BUA MAX REV - RAMSHEAD DRIVE.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.02.04] 1/25/2023 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203- Page 1 of 4 755-1666 Conduit FlexTable: DOT Report -Node- Upstream Downstream -Depth- Upstream Downstream (ft) -EGL- Upstream Downstream (ft) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Invert- Upstream Downstream (ft) Section Discharge Capacity (cfs) -X- Upstream Downstream (ft) -Y- Upstream Downstream (ft) K-23 0.57 271.70 276.50 271.49 270.92 2.02 2,006,065.87 575,414.93 K-21 1.43 271.28 276.22 270.93 269.50 11.55 2,006,033.89 575,435.78 J-20 1.58 271.87 275.27 271.85 270.27 3.73 2,005,567.44 575,527.02 J-23 2.10 271.87 276.24 271.86 269.76 47.92 2,005,567.88 575,480.07 J-23 2.10 271.89 276.24 271.86 269.76 6.15 2,005,567.88 575,480.07 J-10 2.65 275.17 278.54 271.85 269.20 44.35 2,005,577.39 575,423.23 J-21 0.97 271.88 275.89 271.86 270.89 1.17 2,005,601.58 575,480.18 J-23 2.10 271.87 276.24 271.86 269.76 7.21 2,005,567.88 575,480.07 J-22 0.97 271.87 275.89 271.86 270.89 1.30 2,005,525.19 575,480.29 J-23 2.10 271.87 276.24 271.86 269.76 10.42 2,005,567.88 575,480.07 G-130 0.54 334.89 338.65 334.69 334.15 1.84 2,004,101.92 574,679.45 G-120 0.78 334.35 338.65 334.24 333.46 9.23 2,004,124.83 574,661.82 G-120 0.78 334.57 338.65 334.24 333.46 3.70 2,004,124.83 574,661.82 G-100 1.12 325.65 328.46 325.49 324.37 13.23 2,004,243.96 574,842.92 G-91 0.99 315.74 319.16 315.65 314.66 2.48 2,004,301.76 575,018.72 G-90 1.34 316.32 319.14 315.63 314.29 6.15 2,004,328.56 575,003.44 I-20 0.82 282.03 285.90 281.72 280.90 5.43 2,005,114.69 575,527.32 i-23 0.99 281.68 286.68 281.61 280.62 19.90 2,005,114.12 575,495.38 I-21 0.47 281.90 286.25 281.72 281.25 1.43 2,005,151.23 575,495.38 i-23 0.99 281.68 286.68 281.61 280.62 7.72 2,005,114.12 575,495.38 I-22 0.56 282.03 286.25 281.81 281.25 2.00 2,005,075.53 575,495.52 i-23 0.99 281.68 286.68 281.61 280.62 7.57 2,005,114.12 575,495.38 G-52 2.28 278.92 290.63 278.92 276.64 0.52 2,005,340.49 575,215.09 G-53 2.67 278.92 290.69 278.92 276.25 6.63 2,005,339.80 575,187.57 K-43 0.34 280.34 284.38 280.22 279.88 0.75 2,005,752.95 575,214.01 K-42 0.69 280.19 284.38 280.17 279.48 7.85 2,005,753.06 575,186.93 K-42 0.69 280.49 284.38 280.17 279.48 2.61 2,005,753.06 575,186.93 K-40 0.99 274.16 279.51 273.99 273.00 6.16 2,005,969.74 575,186.58 H-23 1.71 295.59 305.28 294.95 293.24 11.37 2,004,643.31 575,313.06 G-70 1.89 294.54 308.89 293.89 292.00 25.43 2,004,660.41 575,185.75 H-24 0.36 295.29 305.28 295.15 294.79 0.86 2,004,672.22 575,315.12 H-23 1.71 294.96 305.28 294.95 293.24 14.94 2,004,643.31 575,313.06 StormCAD NCR201044 - STM BUA MAX REV - RAMSHEAD DRIVE.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.02.04] 1/25/2023 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203- Page 2 of 4 755-1666 Conduit FlexTable: DOT Report -Node- Upstream Downstream -Depth- Upstream Downstream (ft) -EGL- Upstream Downstream (ft) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Invert- Upstream Downstream (ft) Section Discharge Capacity (cfs) -X- Upstream Downstream (ft) -Y- Upstream Downstream (ft) i-23 0.99 281.98 286.68 281.61 280.62 8.81 2,005,114.12 575,495.38 I-25 1.70 281.29 290.87 281.28 279.58 38.88 2,005,127.78 575,350.67 I-25 1.70 281.42 290.87 281.28 279.58 10.88 2,005,127.78 575,350.67 G-60 2.76 283.44 293.99 281.26 278.50 37.79 2,005,119.37 575,187.72 I-24 0.44 282.02 290.87 281.86 281.42 1.22 2,005,098.54 575,350.62 I-25 1.70 281.29 290.87 281.28 279.58 16.20 2,005,127.78 575,350.67 J-11 0.53 274.82 278.59 274.62 271.75 1.77 2,005,548.79 575,423.12 J-10 2.65 275.17 278.54 271.85 269.20 19.29 2,005,577.39 575,423.23 G-60 2.76 282.84 293.99 281.26 278.50 49.43 2,005,119.37 575,187.72 G-54 2.98 280.10 292.32 280.10 277.12 53.89 2,005,231.03 575,186.74 G-54 2.98 281.75 292.32 280.10 277.12 50.58 2,005,231.03 575,186.74 G-53 2.67 278.92 290.69 278.92 276.25 40.78 2,005,339.80 575,187.57 G-55 1.14 280.10 292.20 280.10 278.96 0.47 2,005,230.71 575,214.57 G-54 2.98 280.10 292.32 280.10 277.12 16.61 2,005,231.03 575,186.74 G-53 2.67 280.65 290.69 278.92 276.25 51.80 2,005,339.80 575,187.57 G-56 2.34 277.63 289.15 277.61 275.27 45.71 2,005,450.00 575,187.13 G-56 2.34 279.56 289.15 277.61 275.27 53.49 2,005,450.00 575,187.13 G-50 2.36 278.29 287.26 276.27 273.90 50.15 2,005,568.61 575,187.12 G-57 0.41 277.68 289.02 277.52 277.11 0.96 2,005,450.03 575,215.68 G-56 2.34 277.63 289.15 277.61 275.27 9.04 2,005,450.00 575,187.13 G-90 1.34 316.54 319.14 315.63 314.29 12.79 2,004,328.56 575,003.44 G-83 1.44 310.94 315.47 310.91 309.47 27.96 2,004,396.98 575,069.75 G-83 1.44 312.41 315.47 310.91 309.47 17.15 2,004,396.98 575,069.75 G-80 1.46 310.83 312.13 308.12 306.94 20.82 2,004,465.39 575,122.32 G-84 0.74 310.97 314.65 310.89 310.15 1.70 2,004,373.10 575,093.57 G-83 1.44 310.94 315.47 310.91 309.47 9.17 2,004,396.98 575,069.75 G-70 1.89 295.61 308.89 293.89 292.00 32.34 2,004,660.41 575,185.75 G-63 1.92 289.16 305.35 289.16 287.24 53.44 2,004,779.50 575,186.05 G-63 1.92 291.09 305.35 289.16 287.24 34.52 2,004,779.50 575,186.05 G-62 1.93 288.84 300.31 285.68 284.06 38.87 2,004,924.94 575,187.12 G-64 0.36 289.62 305.20 289.50 289.14 0.82 2,004,779.36 575,214.69 G-63 1.92 289.16 305.35 289.16 287.24 16.64 2,004,779.50 575,186.05 StormCAD NCR201044 - STM BUA MAX REV - RAMSHEAD DRIVE.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.02.04] 1/25/2023 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203- Page 3 of 4 755-1666 Conduit FlexTable: DOT Report -Node- Upstream Downstream -Depth- Upstream Downstream (ft) -EGL- Upstream Downstream (ft) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Invert- Upstream Downstream (ft) Section Discharge Capacity (cfs) -X- Upstream Downstream (ft) -Y- Upstream Downstream (ft) G-62 1.93 288.06 300.31 285.99 284.06 35.90 2,004,924.94 575,187.12 G-65 2.56 285.42 297.57 283.39 280.83 52.34 2,005,009.18 575,187.09 G-65 2.56 285.57 297.57 283.39 280.83 37.18 2,005,009.18 575,187.09 G-60 2.76 283.44 293.99 281.26 278.50 38.02 2,005,119.37 575,187.72 H-20 0.93 296.12 299.79 295.72 294.79 5.85 2,004,635.09 575,465.37 H-25 1.18 295.59 300.99 295.56 294.38 13.64 2,004,636.89 575,431.98 H-25 1.18 296.16 300.99 295.56 294.38 9.29 2,004,636.89 575,431.98 H-23 1.71 294.96 305.28 294.95 293.24 11.52 2,004,643.31 575,313.06 H-22 0.44 296.09 300.13 295.94 295.50 1.36 2,004,609.43 575,431.59 H-25 1.18 295.59 300.99 295.56 294.38 21.21 2,004,636.89 575,431.98 H-21 0.55 296.25 300.00 296.05 295.50 2.13 2,004,682.51 575,448.25 H-25 1 1.18 1 295.59 1 300.99 1 295.56 1 294.38 1 15.97 1 2,004,636.89 575,431.98 StormCAD NCR201044 - STM BUA MAX REV - RAMSHEAD DRIVE.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.02.04] 1/25/2023 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203- Page 4 of 4 755-1666 Conduit FlexTable: DOT Report -Node- Upstream Downstream -Depth- Upstream Downstream (ft) -EGL- Upstream Downstream (ft) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Invert- Upstream Downstream (ft) Section Discharge Capacity (cfs) -X- Upstream Downstream (ft) -Y- Upstream Downstream (ft) A-61 0.32 324.72 328.80 324.61 324.29 0.67 2,006,353.42 572,666.97 A-60 0.73 324.81 328.80 324.24 323.51 9.13 2,006,325.63 572,675.26 A-60 0.73 324.54 328.80 324.24 323.51 3.27 2,006,325.63 572,675.26 A-50 3.23 321.97 326.61 322.01 318.49 9.46 2,006,351.59 572,765.36 A-41 0.24 322.54 326.71 322.45 322.21 0.40 2,006,401.84 572,837.26 A-40 0.98 321.11 324.82 321.10 320.12 11.71 2,006,344.58 572,832.38 A-50 3.23 321.93 326.61 321.71 318.49 4.56 2,006,351.59 572,765.36 A-40 0.98 321.11 324.82 321.19 320.12 10.66 2,006,344.58 572,832.38 A-51 0.29 322.47 326.58 322.37 322.08 0.54 2,006,379.97 572,759.15 A-50 3.23 321.97 326.61 321.71 318.49 9.13 2,006,351.59 572,765.36 A-110 0.29 320.02 325.09 319.92 319.63 0.54 2,005,593.65 572,782.14 A-100 0.43 314.80 319.47 314.42 314.03 10.95 2,005,778.94 572,751.71 A-111 0.20 320.84 325.08 320.77 320.57 0.27 2,005,581.04 572,747.35 A-110 0.29 320.09 325.09 319.98 319.63 9.13 2,005,593.65 572,782.14 A-40 0.98 321.61 324.82 321.10 320.12 5.89 2,006,344.58 572,832.38 A-30 1.19 309.86 320.83 316.12 308.56 13.83 2,006,245.68 572,843.58 A-30 1.19 310.25 320.83 309.75 308.56 11.03 2,006,245.68 572,843.58 A-10 1.19 305.86 311.74 303.38 302.60 43.39 2,006,248.39 573,002.80 A-31 3.60 316.03 320.79 316.02 312.42 0.74 2,006,243.91 572,806.64 A-30 1.19 309.86 320.83 315.89 308.56 18.78 2,006,245.68 572,843.58 A-70 0.70 310.45 317.08 310.20 309.50 3.95 2,006,101.53 572,825.73 A-30 1.19 309.86 320.83 309.75 308.56 16.00 2,006,245.68 572,843.58 A-101 0.23 315.28 319.48 315.20 314.97 0.34 2,005,780.18 572,714.73 A-100 0.43 314.80 319.47 314.46 314.03 9.13 2,005,778.94 572,751.71 A-100 0.43 314.62 319.47 314.46 314.03 1.21 2,005,778.94 572,751.71 A-90 0.53 312.30 316.46 311.91 311.39 8.47 2,005,918.76 572,776.32 C-30 0.46 310.63 318.25 310.46 310.00 1.37 2,006,748.03 572,686.57 C-20 0.54 309.69 318.25 308.80 308.42 12.91 2,006,757.62 572,722.31 C-20 0.54 309.17 318.25 308.97 308.42 1.87 2,006,757.62 572,722.31 C-10 (N/A) (N/A) 308.44 306.97 302.56 13.59 2,006,721.38 572,815.25 A-80 0.58 311.08 316.09 310.86 310.28 2.81 2,005,988.59 572,795.19 A-70 0.70 310.43 317.08 310.26 309.50 16.00 2,006,101.53 572,825.73 StormCAD NCR201044 - STM BUA MAX REV - EXECUTIVE DRIVE.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.02.04] 1/25/2023 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203- Page 1 of 4 755-1666 Conduit FlexTable: DOT Report -Node- Upstream Downstream -Depth- Upstream Downstream (ft) -EGL- Upstream Downstream (ft) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Invert- Upstream Downstream (ft) Section Discharge Capacity (cfs) -X- Upstream Downstream (ft) -Y- Upstream Downstream (ft) A-71 0.33 313.01 317.08 312.90 312.57 0.70 2,006,111.19 572,790.01 A-70 0.70 310.43 317.08 312.06 309.50 9.13 2,006,101.53 572,825.73 A-91 0.20 312.23 316.46 312.16 311.96 0.26 2,005,928.42 572,740.60 A-90 0.53 312.30 316.46 311.92 311.39 6.46 2,005,918.76 572,776.32 A-90 0.53 312.11 316.46 311.92 311.39 1.74 2,005,918.76 572,776.32 A-80 0.58 311.04 316.09 311.55 310.28 4.57 2,005,988.59 572,795.19 A-81 0.31 312.00 316.09 311.90 311.59 0.61 2,005,998.24 572,759.48 A-80 0.58 311.04 316.09 311.48 310.28 6.46 2,005,988.59 572,795.19 A-10 1.19 304.29 311.74 303.79 302.60 11.03 2,006,248.39 573,002.80 A-10 (N/A) (N/A) 300.92 300.49 297.00 44.49 2,006,103.95 573,009.35 A-63 0.35 327.61 331.64 327.49 327.14 0.78 2,006,314.60 572,553.98 A-62 0.53 327.21 331.64 326.81 326.36 9.14 2,006,287.03 572,562.95 A-62 0.53 327.09 331.64 326.89 326.36 1.79 2,006,287.03 572,562.95 A-60 0.73 324.81 328.80 324.07 323.51 9.75 2,006,325.63 572,675.26 D-20 1.73 267.31 271.43 266.53 264.80 25.66 2,006,660.24 574,766.35 D-10 (N/A) (N/A) 266.75 265.62 263.00 55.55 2,006,744.78 574,816.11 D-30 1.73 268.06 274.61 267.28 265.55 25.66 2,006,615.70 574,704.99 D-20 1.73 267.47 271.43 266.59 264.80 34.91 2,006,660.24 574,766.35 D-40 1.69 268.74 274.29 267.98 266.29 24.71 2,006,561.48 574,701.59 D-30 1.73 268.39 274.61 267.19 265.55 40.89 2,006,615.70 574,704.99 D-50 1.66 270.24 276.02 269.50 267.84 23.82 2,006,549.35 574,617.86 D-40 1.69 269.52 274.29 267.72 266.29 51.80 2,006,561.48 574,701.59 D-51 0.28 270.06 276.18 269.96 269.68 0.53 2,006,578.20 574,611.72 D-50 1.66 269.54 276.02 269.50 267.84 9.14 2,006,549.35 574,617.86 D-61 0.37 272.05 278.04 271.91 271.54 0.90 2,006,576.55 574,549.99 D-60 1.70 274.77 278.04 271.91 270.21 9.13 2,006,547.56 574,550.76 D-60 1.70 272.91 278.04 271.91 270.21 22.78 2,006,547.56 574,550.76 D-50 1.66 269.54 276.02 269.53 267.84 37.75 2,006,549.35 574,617.86 D-70 1.66 276.86 281.86 275.94 274.28 21.50 2,006,544.90 574,450.80 D-60 1.70 274.77 278.04 271.42 270.21 44.48 2,006,547.56 574,550.76 D-71 0.55 275.96 281.86 275.91 275.36 0.98 2,006,573.89 574,450.03 D-70 1.66 278.53 281.86 275.94 274.28 9.13 2,006,544.90 574,450.80 StormCAD NCR201044 - STM BUA MAX REV - EXECUTIVE DRIVE.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.02.04] 1/25/2023 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203- Page 2 of 4 755-1666 Conduit FlexTable: DOT Report -Node- Upstream Downstream -Depth- Upstream Downstream (ft) -EGL- Upstream Downstream (ft) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Invert- Upstream Downstream (ft) Section Discharge Capacity (cfs) -X- Upstream Downstream (ft) -Y- Upstream Downstream (ft) D-81 0.41 279.92 285.86 279.77 279.36 1.08 2,006,571.22 574,350.06 D-80 1.60 282.37 285.86 279.63 278.03 9.13 2,006,542.23 574,350.83 D-80 1.60 280.47 285.86 279.63 278.03 19.77 2,006,542.23 574,350.83 D-70 1.66 278.53 281.86 275.46 274.28 42.61 2,006,544.90 574,450.80 D-91 0.44 283.97 289.86 283.80 283.36 1.26 2,006,568.56 574,250.10 D-90 1.52 285.92 289.86 283.80 282.28 9.13 2,006,539.57 574,250.87 D-90 1.52 284.56 289.86 283.80 282.28 17.89 2,006,539.57 574,250.87 D-80 1.60 282.37 285.86 279.12 278.03 45.51 2,006,542.23 574,350.83 D-101 0.37 289.88 295.88 289.74 289.37 0.91 2,006,563.20 574,050.17 D-100 1.43 289.74 295.89 289.72 288.29 9.13 2,006,534.21 574,050.94 D-100 1.43 290.39 295.89 289.72 288.29 15.80 2,006,534.21 574,050.94 D-90 1.52 285.92 289.86 283.37 282.28 38.55 2,006,539.57 574,250.87 D-110 1.36 292.80 298.41 292.19 290.83 14.23 2,006,531.54 573,951.11 D-100 1.43 289.74 295.89 289.73 288.29 32.33 2,006,534.21 574,050.94 D-111 0.38 292.43 298.41 292.29 291.91 0.96 2,006,560.53 573,950.24 D-110 1.36 294.21 298.41 292.19 290.83 9.13 2,006,531.54 573,951.11 D-120 1.27 296.38 302.14 295.83 294.56 12.53 2,006,527.66 573,853.67 D-110 1.36 294.21 298.41 292.09 290.83 41.16 2,006,531.54 573,951.11 D-121 0.36 296.13 302.14 296.00 295.64 0.85 2,006,556.63 573,852.24 D-120 1.27 298.41 302.14 295.83 294.56 9.13 2,006,527.66 573,853.67 D-130 1.26 303.31 308.60 302.58 301.32 10.84 2,006,519.60 573,724.86 D-120 1.27 298.41 302.14 295.78 294.56 23.12 2,006,527.66 573,853.67 D-131 0.44 302.61 308.60 302.54 302.10 0.80 2,006,548.51 573,722.60 D-130 1.26 304.77 308.60 302.58 301.32 9.13 2,006,519.60 573,724.86 D-140 1.18 306.91 312.41 306.31 305.13 9.28 2,006,512.83 573,644.14 D-130 1.26 304.77 308.60 302.20 301.32 22.16 2,006,519.60 573,724.86 D-141 0.35 306.38 312.41 306.26 305.91 0.80 2,006,541.71 573,641.48 D-140 1.18 307.58 312.41 306.31 305.13 9.13 2,006,512.83 573,644.14 D-150 1.08 309.02 314.72 308.52 307.44 7.70 2,006,503.88 573,555.53 D-140 1.18 307.58 312.41 306.06 305.13 16.17 2,006,512.83 573,644.14 D-151 0.34 308.68 314.72 308.56 308.22 0.74 2,006,532.71 573,552.36 D-150 1.08 308.53 314.72 308.52 307.44 9.13 2,006,503.88 573,555.53 StormCAD NCR201044 - STM BUA MAX REV - EXECUTIVE DRIVE.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.02.04] 1/25/2023 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203- Page 3 of 4 755-1666 Conduit FlexTable: DOT Report -Node- Upstream Downstream -Depth- Upstream Downstream (ft) -EGL- Upstream Downstream (ft) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Invert- Upstream Downstream (ft) Section Discharge Capacity (cfs) -X- Upstream Downstream (ft) -Y- Upstream Downstream (ft) D-160 1.01 310.62 316.36 310.09 309.08 6.21 2,006,490.73 573,447.01 D-150 1.08 308.53 314.72 308.52 307.44 7.41 2,006,503.88 573,555.53 D-161 0.39 310.38 316.36 310.25 309.86 0.96 2,006,519.50 573,443.26 D-160 1.01 310.70 316.36 310.09 309.08 9.13 2,006,490.73 573,447.01 D-170 0.86 311.68 317.71 311.29 310.43 4.52 2,006,478.23 573,358.56 D-160 1.01 310.70 316.36 309.99 309.08 7.33 2,006,490.73 573,447.01 D-171 0.35 311.68 317.71 311.56 311.21 0.79 2,006,506.90 573,354.25 D-170 0.86 312.01 317.71 311.29 310.43 9.13 2,006,478.23 573,358.56 D-180 0.70 313.90 320.20 313.62 312.92 3.00 2,006,460.79 573,250.81 D-170 0.86 312.01 317.71 311.12 310.43 9.35 2,006,478.23 573,358.56 D-181 0.34 314.16 320.20 314.04 313.70 0.76 2,006,489.37 573,245.86 D-180 0.70 313.78 320.20 313.62 312.92 9.13 2,006,460.79 573,250.81 D-190 0.48 316.95 323.57 316.77 316.29 1.49 2,006,444.79 573,162.98 D-180 0.70 313.78 320.20 313.62 312.92 12.17 2,006,460.79 573,250.81 D-191 0.34 317.53 323.57 317.41 317.07 0.75 2,006,473.27 573,157.53 D-190 1 0.48 1 317.09 1 323.57 1 316.73 1 316.29 1 9.13 1 2,006,444.79 573,162.98 StormCAD NCR201044 - STM BUA MAX REV - EXECUTIVE DRIVE.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.03.02.04] 1/25/2023 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203- Page 4 of 4 755-1666 APPENDIX G: WET POND DESIGN CALCULATIONS BOHLER BOHLER ENGINEERING NC, PLLC E A 1 PRE DA 2) PRA ';�7 ';�7 47 PRE DP1 PRE DP2 PRE DP3 PRE DP1 PRE DP2 (new Reach) Subcat Reach on Link Routing Diagram for NCR201044 - Drainage Area MAX BUA-jdw - LOT 34 Prepared by Bohler Engineering, Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 2 Area Listing (selected nodes) Area CN Description (acres) (su bcatch me nt-n u mbe rs) 51.760 54 1/2 acre lots, 25% imp, HSG A (PRE DA 1, PRE DA 2) 130.360 80 1/2 acre lots, 25% imp, HSG C (PRE DA 1, PRE DA 2) 11.470 85 1/2 acre lots, 25% imp, HSG D (PRE DA 2) 26.570 74 >75% Grass cover, Good, HSG C (PRE DA 1, PRE DA 2) 50.390 30 Woods, Good, HSG A (PRE DA 1, PRE DA 2, PRE DA 3) 251.460 70 Woods, Good, HSG C (PRE DA 1, PRE DA 2, PRE DA 3) 73.104 77 Woods, Good, HSG D (PRE DA 1, PRE DA 2) 595.114 69 TOTAL AREA NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 3 Soil Listing (selected nodes) Area Soil Subcatchment (acres) Group Numbers 102.150 HSG A PRE DA 1, PRE DA 2, PRE DA 3 0.000 HSG B 408.390 HSG C PRE DA 1, PRE DA 2, PRE DA 3 84.574 HSG D PRE DA 1, PRE DA 2 0.000 Other 595.114 TOTAL AREA NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 4 Ground Covers (selected nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 51.760 0.000 130.360 11.470 0.000 0.000 26.570 0.000 50.390 0.000 251.460 73.104 0.000 193.590 1/2 acre lots, 25% imp PRE DA 1, PRE DA 2 0.000 26.570 >75% Grass cover, Good PRE DA 1, PRE DA 2 0.000 374.954 Woods, Good PRE DA 1, PRE DA 2, PRE DA 3 102.150 0.000 408.390 84.574 0.000 595.114 TOTAL AREA NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 5 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment PRE DA 1: Runoff Area=197.100 ac 0.74% Impervious Runoff Depth>0.65" Flow Length=6,400' Tc=55.8 min CN=70 Runoff=69.33 cfs 10.623 of Subcatchment PRE DA 2: Runoff Area=322.194 ac 14.57% Impervious Runoff Depth>0.69" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=125.95 cfs 18.553 of Subcatchment PRE DA 3: Runoff Area=75.820 ac 0.00% Impervious Runoff Depth>0.19" Flow Length=2,280' Tc=25.4 min CN=56 Runoff=6.44 cfs 1.210 of Reach PRE DP1: PRE DP1 Inflow=69.33 cfs 10.623 of Outflow=69.33 cfs 10.623 of Reach PRE DP2: PRE DP2 Inflow=125.95 cfs 18.553 of Outflow=125.95 cfs 18.553 of Reach PRE DP3: (new Reach) Inflow=6.44 cfs 1.210 of Outflow=6.44 cfs 1.210 of Total Runoff Area = 595.114 ac Runoff Volume = 30.386 of Average Runoff Depth = 0.61" 91.87% Pervious = 546.716 ac 8.13% Impervious = 48.398 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment PRE DA 1: Runoff = 69.33 cfs @ 12.64 hrs, Volume= 10.623 af, Depth> 0.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 6.700 30 Woods, Good, HSG A 24.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 130.150 70 Woods, Good, HSG C 29.630 77 Woods, Good, HSG D 197.100 70 Weighted Average 195.635 70 99.26% Pervious Area 1.465 98 0.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total Subcatchment PRE DA 1: Hydrograph - - ■Runoff 75 - 69.33 cfs - - - 70 -Typ A �4-or I --I -- -- -- I --I -- I --I ---I -- I -- 65 l- -� kainlfaH=3',-06+F------------- 60 e r ' ------+------------I---4---- -- ---+----------------+--- 55 Rlunbff Area=11971.100 aG so Rlundf Volurnle=1-0.623af-I--- -- ---+---I--- ----------+--- 45 R';undf-De Ah�0.65-„ -- -- -- - --- -- --- 40 .2 35-OowLe,-n9th=6�400' - -_-i -- --i -- -- -= -_- -- -- - -- -- - -- --- - --- -- -- ---- - --- -- -- -- -- --- - 30 _T =55.81 mrn_ - -- 25-GN-7ii-I'i--- I'i---I'i----I'I--- I'i---I'i----I'i---I',--- - ----I',--- I',---I',----I',---,- I'--- 20 �r V 1s 10 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment PRE DA 2: Runoff = 125.95 cfs @ 12.62 hrs, Volume= 18.553 af, Depth> 0.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 50.750 54 1/2 acre lots, 25% imp, HSG A 16.275 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 125.510 80 1/2 acre lots, 25% imp, HSG C 72.905 70 Woods, Good, HSG C 43.474 77 Woods, Good, HSG D 11.470 85 1/2 acre lots, 25% imp, HSG D 322.194 71 Weighted Average 275.261 66 85.43% Pervious Area 46.932 98 14.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total N 3 0 LL 140 130 120 110 50 40 30 20 10 Subcatchment PRE DA 2: Hydrograph --+---+------+---L--+---+--+---+--- -+---+---+--+---+--+--- �1 I I I I I I I I I I I I I I I I I 1 ------r------7---'r-----r------7-----r---'r--7---'r-- --- Runoff I I I I I 1 125.95 cfs I I I I I 1 TYp1f4=fir- --- --- 11year f aififaO=�.-06�1-----1---;--- - --I---+---I- - -+ - -- L -----+--- I - --+ --- 1--- Runoff Area=322.19'14 a'1c ---1--- ------ -- --- - - - - -- ------ Runbff Vol'Ium'Ie=18.553 of -------------------------------------- -R';un6ff-Qepth>0.69"'11-- -- - -- -Tc= 4:4-mj'n--'Y--,--- --I--- ---I-- - - - - - - i- - ---1---t---1---rt---r--y- t---1---+- --1-- ----1--- L - - -�- �1,---1---1---1, - - L - - -�- - - L - -- - - L - 1--- - L - - - --1--- ------ --- --I - -- I----I___II___I- i 1 NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment PRE DA 3: Runoff = 6.44 cfs @ 12.32 hrs, Volume= 1.210 af, Depth> 0.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 48.405 70 Woods, Good, HSG C 75.820 56 Weighted Average 75.820 56 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total Subcatchment PRE DA 3: Hydrograph 7 ❑Runoff 6.44 cfs Type-H-24,hT'1L------ --- ;-- -- -; -- -- --- 6 1 1 1 l l l l l l l 1 1 Tyear Railnfall=3.06" 5 Run6ff'Arda=7&820 a�C-- ;-- -- -; -- -- R''1unpff''Volume=1_.�10'',af --- ----'--- ---------+---'--- 4 Runoff Depth>0! 191' Fivw-LdnothT2;28 --- ---'1l - ---'1l --- l -- --- 3 TIC=25.4 m'ljn z ------L--- ---L--- L--- 1---1--- 1---L --- L----1---1---7-- I I I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 9 Summary for Reach PRE DP1: PRE DP1 Inflow Area = 197.100 ac, 0.74% Impervious, Inflow Depth > 0.65" for 1-year event Inflow = 69.33 cfs @ 12.64 hrs, Volume= 10.623 of Outflow = 69.33 cfs @ 12.64 hrs, Volume= 10.623 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP1: PRE DP1 Hydrograph ■ Inflow 75 ------ ------------------- ---- -Inflow Arga=;1� - C 69.33 cfs ------r-- � �� ----- ------ ---' ------ --;--- -- -- ■ Outflow 70 II I I .-i I I L I I I I I I 65 ,I - J - - - L - - -I- - - L - - J - - - L - - J - - - L - - J - - - L - - I I I I I I I I I - -I- - - L - I - J - I - - L - I - J - - - L - - I 60 ,i ---I---I----I---I------I----I---I----I---I- ----I---I----I---I----I---I--- 55 ,'I I I I I I I I I I I I I I I I I 50 I I I I I I I I I I I I I I I I I 45 y --y---r------r--y---r--y---r--y---r ------r--y---r--y---r-- I I I I I I I I I I I I I I I I U 40 ,I _ _ J - - - L - - _I_ - - L J - - - L J - - - L J - - - L _ _I_ _ _ L _ _ J _ _ _ L _ _ J _ _ _ L 3 0 35 1 --r--- r ---I-- r--r---r--r---r--r- --r --I-- r--r---r--r---r-- LL 30 25 20 ------ r--- ---r-----'r-----'r-- ---i --r-- ---'r-- ---r-- 15 I I I I I I I I I I I 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 10 Summary for Reach PRE DP2: PRE DP2 Inflow Area = 322.194 ac, 14.57% Impervious, Inflow Depth > 0.69" for 1-year event Inflow = 125.95 cfs @ 12.62 hrs, Volume= 18.553 of Outflow = 125.95 cfs @ 12.62 hrs, Volume= 18.553 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP2: PRE DP2 Hydrograph --+---+--+---+--+--+---+------+------+--+---+--+---+--+---+--+--- 140 ■ Inflow r---+--------r------r-- ---r- r-----r--r---r--+--- ❑Oufflow 130 125.95 cfs ----- - --- --- -tr�flow �rqa=32�.-1 �i4-ate -- 120 ,i 1107 100 go-:--+---+--+---+--+------+------+---i- ---+--+---+--+---+--+--- w 80---,---i-------- +---------,---i --- --i -----i--+---i --+--- i 3 70 ' 0 LL 60--r---r--r---r--r------r---r--r---i -r--r---r--r---r--+--- 50 i 40 30-- r - - - ------r--r------r--- ---r-- ---r--r---I---r--- Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 11 Summary for Reach PRE DP3: (new Reach) Inflow Area = 75.820 ac, 0.00% Impervious, Inflow Depth > 0.19" for 1-year event Inflow = 6.44 cfs @ 12.32 hrs, Volume= 1.210 of Outflow = 6.44 cfs @ 12.32 hrs, Volume= 1.21Oaf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP3: (new Reach) Hydrograph ■ Inflow ❑ Outflow 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 12 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment PRE DA 1: Runoff Area=197.100 ac 0.74% Impervious Runoff Depth>0.99" Flow Length=6,400' Tc=55.8 min CN=70 Runoff=113.56 cfs 16.337 of Subcatchment PRE DA 2: Runoff Area=322.194 ac 14.57% Impervious Runoff Depth>1.05" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=201.81 cfs 28.210 of Subcatchment PRE DA 3: Runoff Area=75.820 ac 0.00% Impervious Runoff Depth>0.38" Flow Length=2,280' Tc=25.4 min CN=56 Runoff=19.38 cfs 2.410 of Reach PRE DP1: PRE DP1 Inflow=113.56 cfs 16.337 of Outflow=113.56 cfs 16.337 of Reach PRE DP2: PRE DP2 Inflow=201.81 cfs 28.210 of Outflow=201.81 cfs 28.210 of Reach PRE DP3: (new Reach) Inflow=19.38 cfs 2.410 of Outflow=19.38 cfs 2.410 of Total Runoff Area = 595.114 ac Runoff Volume = 46.957 of Average Runoff Depth = 0.95" 91.87% Pervious = 546.716 ac 8.13% Impervious = 48.398 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment PRE DA 1: Runoff = 113.56 cfs @ 12.61 hrs, Volume= 16.337 af, Depth> 0.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 6.700 30 Woods, Good, HSG A 24.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 130.150 70 Woods, Good, HSG C 29.630 77 Woods, Good, HSG D 197.100 70 Weighted Average 195.635 70 99.26% Pervious Area 1.465 98 0.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total Subcatchment PRE DA 1: Hydrograph 1 I I 125---1---Y---r--Y---r--Y---Y---1---+------ ------1---Y---1---+---r--Y--- ■Runoff 120 -- -----'--- -- -- -- - 113.56cfs - ---- --- 115 --+ ii AA -+--+---+--+---+------ --+---+---+--+---+--+--- - �1 �i- K------------'--- _ _ _ _ Y _ 110 Ty -- - -- -- --- -- --- --- -- --- -- 105 - ---- - ------+------ - - - ---------+--- -- --- 100-2�yaa- a�Fi€a-=ti�:�Q��------------ ------------------------- 95 - --- - ----,�-------/-►--+------ ------------+--- -- --- 90 �-Runof€-Area=i9/-�.-10Ma14 --'1---11-----------------'1 ------ --- 85--L---1---1--- -----L---'---+---'---- - -'--- ---'---+---L--L--- 80 Rlu-n6ff /olurr�'�e=-16.' 3-7 a€T -- --- ---1---r---1---T---F-- ,1 ;--- 75---1---L---I---L---L--J---L---I---+---1------1--- L--- I---+--- L-- L - -- w 70 -F�' -n6f€-Np >0.99";--- ;-- --- ---'1---;---'1---;---;--;--- U 65------L---1---1-L--J---L---1---1---1--- ----1---L---1---L---L-- --- 30 60 i t ��j1 r Y ------r - - -I Y r - -r - -- 0oWLength-&,4Of�'1-- --- -- -- - - --- -- --- -- --- a 55 1 C pp1 y 50-T=5.v1-mn--r--r---r---1---r---1-- - --1---r---r--r---r--r--- 45----------'-----------'---'I I - ---' ---1 ---'---'--------'------ -' - -- A� 1 I I I I I 1 40 , 1 �IY--1------r--Y------1--- i --- 1-- -- -I--- i---I--- ---I i--- 35------ - - - - -- --- ------------1----- -- --- ------ ------ --- 25--------------'------------------' ---'-- ---'-----------'-------'--- 20---i------i--- --- -- ---------+---i-- --- -------+--- -- --- 1 NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment PRE DA 2: Runoff = 201.81 cfs @ 12.60 hrs, Volume= 28.210 af, Depth> 1.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 50.750 54 1/2 acre lots, 25% imp, HSG A 16.275 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 125.510 80 1/2 acre lots, 25% imp, HSG C 72.905 70 Woods, Good, HSG C 43.474 77 Woods, Good, HSG D 11.470 85 1/2 acre lots, 25% imp, HSG D 322.194 71 Weighted Average 275.261 66 85.43% Pervious Area 46.932 98 14.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total Subcatchment PRE DA 2: Hydrograph -r------r---r--r---r------7------,---r------r------r---r--,--- 220 1 i i I I- --- I--- --- I - - -I- -- I- -- Runoff ---�'�/--�----------i- 201.81 cfs 210 L-- ----------i---'�--�--- 90 200-Tl p M �4=or-'r------'t------ t --- r-- r--- ---'t--- ---t---'r--�--- 180-2--�yea-r kajn1 fA0=-3.70! i - --T - - -i- ------i---T - - -i--- T - - - i -- --- 170-1--{�l- I -- L---L - -L -----I---1---I--- ------------L - -- --�--- 160 -Runoff-Runoff--Y---I r---I---Y--- I --- Y---r--, 150 - --- ---I--- - I I--,-------�I------�I - -- ---I� -- --- 140 R�UJ1bff "Iu--ll� -- -- - _ 130-Run�-- I--- � '--I---,T--- T-- --- --- T--- T 120 - �- --- - - 3 110-Fovtengt�=','60''------+---'-- - --'---------+---' -- --- �-°° 100 - 90-T-c=�4-4-m'n--Ir-----r---li---7---1i-- ---li---r---Ir--7---Ir-- --- �i 80----------,--- - - -,---,---- - -, - -- ---,-- ---,---,---,--- ---, -- --- 70 -- 1- - - 1 - - - L - - J - L - - 1 - '- - L - - 60---i--- ---L-- --- -- ------i--- ---i-- --- --- ---L-- --- -- --- 50------ r------ r--- r-- r--- r------ r - - - r- ---r--r---r--r---r-- --- 40---li------li--- ---i---li------li------li-- ---li - - - ---li - -- 30---1---L---1---1---L--J---L---1---L---'-----L--- L - - -L - 20---r---r-rt---r--y--r---i---+ -r---r------r- 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment PRE DA 3: Runoff = 19.38 cfs @ 12.27 hrs, Volume= 2.410 af, Depth> 0.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 48.405 70 Woods, Good, HSG C 75.820 56 Weighted Average 75.820 56 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total Subcatchment PRE DA 3: Hydrograph 21----r------- r,--- 20I1---�---r1---I- 19.38 cfs ------------------t -, - - -- --- ■Runoff 19 -T- H- 4,hT--------'-------'---L --------------------------- 18---1---1---'------L---'---1---L---1---L-- - ---L------1----------i--- 17 2-+year-Rainfall= 7Q"-------+-- - ---+------+----------+--- 20 15 ---- 1------- ---------- 1---- 14 -Run f#o urr�e -Z1 of -'---' - - --- ---------------- --- 13---'---Q----�-- L----1---L---1---L- -L---L------L----------L--- 12 -Runoff epth>a.3$1- -- -- - -- --- -- --- 11---1---r---r--r------r---r------r- r---r------r---r------r--- 0 10-Flflv�-L-�� th-2328 '--- -- - -------------------------- LL T 9_T_1___1C_----L---L------L---L--- ---L- L---L---'---L---'----'---L--- 7 - +----y---r------rt---r------r- r y t 6 CIS=,56-I---- -- --I--- -- -- - - - --I-------I-- --- 5 - --- ----�--- ----�--- - ---�- --- - --- ----�--- 4---1--- L - -- L--- L-- - ---L- - -1---L--------L--- 3------+---'--- ------'--- ------'--- - -- --- --- 2---I--- r---r-- r--- r--- I NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 16 Summary for Reach PRE DP1: PRE DP1 Inflow Area = 197.100 ac, 0.74% Impervious, Inflow Depth > 0.99" for 2-year event Inflow = 113.56 cfs @ 12.61 hrs, Volume= 16.337 of Outflow = 113.56 cfs @ 12.61 hrs, Volume= 16.337 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP1: PRE DP1 Hydrograph --T---------- ---7------T------ r------ -- ---r-- ---r--7------T--- ■Inflow 125 120 115 --J---1---L------L------L------L- --; -----;---I--_ - ------yyi�n�-1--- 113.56 cfs �� ��9,7.- 00-acl --- ---L--L---L--L------L--- L---1 --1--;---' L--L -- --- '--- ---I---T--- L --- ■Oufflow 110 --L-----L------7------r---I---r---- ---r-- ---L- --- --T--- 105 --L---'---L---1---L---1---L --- --- L --- '- --- L--L---L--L--- --- L--- 100 -- -----7---I---7---I---r---I---r---- - - -r-- ---L--7--- - -T --- 95 --+------+------+------+------+---- ---+--+---+--+------+--- „ 85 --+------+------+------+------+---- ---+--+---+--+------+--- 75 --+------+------+------+------+--- --+--+---+--+------+--- H 70 U 65 -----I--- ------+------+------r---I --r--1---+--+------+--- 0 60 ---'------L'--------------------L--- --L--L'---'----'---'---'---- E SS _ _ 7 - - - _ - - L - - - - - - Y - - - - - - t - - - - - - r - - -I - r - - 7 - - - r - - Y - - -1- - - ? - - - 50 --J--L------ L------L------L --- L L L 1---1---L--- 45 --T------ ------7------T------r--- --,---r-- ------T--- 40 --J---1---L------1------L------L---' ---1 L--L------L--- 35 --7---II--7------7------r------r---II -7---Ir--7---II --T--- 30 --L------L---1---L------L------L---' -L--L------L--- 25 20 I --+------+------+------+------+-- I I + I I I I I I I I ------+--- - - 15 - 10 5 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 17 Summary for Reach PRE DP2: PRE DP2 Inflow Area = 322.194 ac, 14.57% Impervious, Inflow Depth > 1.05" for 2-year event Inflow = 201.81 cfs @ 12.60 hrs, Volume= 28.210 of Outflow = 201.81 cfs @ 12.60 hrs, Volume= 28.21Oaf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP2: PRE DP2 Hydrograph -----------------' T - - - - ---- - - + - - - I - - - T - - -I - - - r - - 1 - ------- ---- - - r - -'-----------' - , - - - r - - T - - - ------'---- ■ Inflow 220 210 `- ------ 1 IflDW ------------+------ r —�J2 .-1t}4-a, 201.81 Cfs -- --�--;---' --- -- --7---' --- -+--- -T--- ■Oufflow 200 -- - -- - - - - - - -- - - - - - -- 190 --+------+------+--+---+------+--+- ---+--+---+--+---+--+--- 180 - - - - -II - - 1 - - - I - - - 7 - - - I - - - T - - - I - - - T ---I- - - - 7 - - 7 - - -I - - 7 - - -II - - T - - - 170 --J---1---1---1---1------L --- ---L --- I---- L--1 --- L--1 --- 1---L--- 160 --y---Ir-- ---li---7---1i---+---li---r---li- ---r--y---I1--7------T--- 150 ------I--- ---I--------- ---------------I--- ---I--- ---I--- --- 140 --J---1---L------L------+------+---' -- -- ---L--L------L--- w 130 V120 --y---Ir-- ------I--- ---li---7---1i---+---li---r---li ---I--------- ----------- --r--y---Ir--7--- --I--- ---I--- --- ---I--- T--- --- 3 110 --J---1---1---1---1------L------L---' --L--1---L--1------1--- 0 100 --7---------- Ir--7---1i---r---li---r---li --r-- ---Ir--7---Ir--T--- 90 ---------------------------------- --------------------- 80 ------------ 1---1---1---+------L--- - -- --- --1------+--- 70 --7---------- I---7---1i---r---Ir--r-- r------Ir--7---Ir--T--- 60 -- - -- - - - - - - - - - - - - - - -- 50 --------- ---1---1---1---+------+-- -- --- --1---I--- --- 40 --7--- -- ------7------T------r-- --1 - -- --T--- 30 -- - -- - - - - - - - -- - 20 10 000 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 18 Summary for Reach PRE DP3: (new Reach) Inflow Area = 75.820 ac, 0.00% Impervious, Inflow Depth > 0.38" for 2-year event Inflow = 19.38 cfs @ 12.27 hrs, Volume= 2.410 of Outflow = 19.38 cfs @ 12.27 hrs, Volume= 2.41Oaf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP3: (new Reach) Hydrograph --�---L---i---L--�---L--�---r_ �---L--�---L---i---r--�---L--�---r-- ■ Inflow 21 ----r------r-- ---r-- ---r- - ------r-- ---r-- ---r- Outflow 20 ------------ -- 4r7�,20, -----91---a 193cfsInfl9 -;'------------ ;'---- --------' ---- ------- ;'--- - 19 r -r--- ---r--r---r--r---r-- 18 ----------- - -,--- --------------,--- -,----,---,----,---,----,---,--- 17 -- ---------L-- --- -- --- -- -- -L------L-- ---L-- ---L-- 16 -----r------r-- ---r-- ---r-- ---i -r------r-- ---r-- ---r-- 15 -----r------ r- --- -- r------ r- - - - - -i -r------r-- ---r-- ---r-- 14 -- - -- - -- - -- - -- - -- - - - -- - -- 13 -----L------L-- --- -- --- -- --- -L------L-- --- -- ---r-- w 12 u -r---r- r---r--r- -r--r--r--r-- -r- r---r--r- -r--r---r- 0 10 --L---L------ L- - L---L --L---L --L-- L------L--L---L--L---L-- a 9 8 -- r--- r------r--r- -- r--r - - --- --- r -----r-- ---r-- ---r-- 7 -- - -- - -- - -- - -- -- - - - -- - -- 6 --L---L------L--L---L--L---L--L--- ----L--L---L--L---L-- 5 --r---r---li---r--r---r--r---r--r--- -r--r---r-- 4 ------r--------- ---r------r------ -- --------- 3 -- - -- - -- - -- - -- - - - 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 19 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment PRE DA 1: Runoff Area=197.100 ac 0.74% Impervious Runoff Depth>2.12" Flow Length=6,400' Tc=55.8 min CN=70 Runoff=255.70 cfs 34.839 of Subcatchment PRE DA 2: Runoff Area=322.194 ac 14.57% Impervious Runoff Depth>2.20" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=443.31 cfs 59.183 of Subcatchment PRE DA 3: Runoff Area=75.820 ac 0.00% Impervious Runoff Depth>1.12" Flow Length=2,280' Tc=25.4 min CN=56 Runoff=79.25 cfs 7.081 of Reach PRE DP1: PRE DP1 Inflow=255.70 cfs 34.839 of Outflow=255.70 cfs 34.839 of Reach PRE DP2: PRE DP2 Inflow=443.31 cfs 59.183 of Outflow=443.31 cfs 59.183 of Reach PRE DP3: (new Reach) Inflow=79.25 cfs 7.081 of Outflow=79.25 cfs 7.081 of Total Runoff Area = 595.114 ac Runoff Volume = 101.103 of Average Runoff Depth = 2.04" 91.87% Pervious = 546.716 ac 8.13% Impervious = 48.398 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment PRE DA 1: Runoff = 255.70 cfs @ 12.59 hrs, Volume= 34.839 af, Depth> 2.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 6.700 30 Woods, Good, HSG A 24.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 130.150 70 Woods, Good, HSG C 29.630 77 Woods, Good, HSG D 197.100 70 Weighted Average 195.635 70 99.26% Pervious Area 1.465 98 0.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total Subcatchment PRE DA 1: Hydrograph ---i------i--- ---il- --i------i--------- ---i---i------i--- ---li ----- 280■Runoff ---�--- L---�--- L --- L -- L --- L---�--- L - 255.70 cfs -I--- L---I--- L ---L -- L --- 260 -7 7 h"? i14_+_r--------r-------------------r---------- -- --- 240 7 �j 220 1 yr-R in aif=5.44"r--- T-- ----- ---- r---I---T --- --,--- Rlunb -Area=197.'10�ac - - --- ----------------- zoo 180 Runbff Vollum'e=34.839 of ---i---r---r--r---r--r---r---i---r---r-- ----i---r---r--r---r--r--- w 160-R'OOff-DePW>2-�V -- --- -- ., C c A 140 0 -�0���1g1�=5,400�'---'--- ---'-- ----'---'---'--- ---' ----- a 120 y 100 -T�=5:8-min---------r--- +-- -- ------r------+--- -- --- 80 GR=7O----i--- --I--- ---I-- -- -I--- -- I--- ---'--- ---------------------------'-- ---' '---'----'---'---'---'--- 60 1 1 ------ ------ --- -- --- ------ ----- --- - - -- - - -- --- -- --- 40 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment PRE DA 2: Runoff = 443.31 cfs @ 12.57 hrs, Volume= 59.183 af, Depth> 2.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 50.750 54 1/2 acre lots, 25% imp, HSG A 16.275 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 125.510 80 1/2 acre lots, 25% imp, HSG C 72.905 70 Woods, Good, HSG C 43.474 77 Woods, Good, HSG D 11.470 85 1/2 acre lots, 25% imp, HSG D 322.194 71 Weighted Average 275.261 66 85.43% Pervious Area 46.932 98 14.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total Subcatchment PRE DA 2: Hydrograph 480 460 ------+------+---+--+---+------+------+---+------+------+---+--+--- ------�,------------; - ---j---LL---1--d-1---L--J---L---1---L- 443.31 cfs -1---L---1---L---L--I--- -----�,--- --- ■Runoff 420 -TJ_C"iif �'#=�r-L------L---''---i---''- �---'' - - '' L--�--- 420 400 , I �' � � � I � � -��/ � 1[nf a1�5.44��I I---r---r-- � � � � r---I---r---I---r---r--r--- --- � --- � --- --- 380 360 340 � --- -p---------------' Randff Area=322.194 aIC--+---�--- ------- - - - - -- - - ------ - - - - - ---'--- +------+------+---r--+--- ----,----------=---,--- ---,--- --- 320 300 --L---------'1---------r;L r------ T -- - -'nbff�-V�ou-r---t--=-5---9---101o--f- ---------'1--------- T1------- --LLrI' ---------- - 80,RunVff�e#�2.20`--- u 2 -- -- �r-r--r--- 1-----1--Ru - ---r---r--r--- r----------- -- a3 240 220 =�}'I ------ I +Ejovtength' +a7+1�}+ --- + - - - - 200 ------ ----- - ----- ------ --- -- --- 180 160 140 ' l --`•'F-m�n-- -- ---------+---'-- ---F----T------T----- _1_Y--1---1---L--J---L---1---1---'-- I I - -'--- -------T --- -'- I ------+--- --- --L---1---1 ---T - --- I -- - - -F L-- --- - --- --- 120 100 i ---I---r--- I - - - L--- L-- L--- r--- I - - --------------'------------------' - T ---I- - - ---I---r---I---T---L--�--- ---'-- - - -'- --- --------' ---L---'--- I I t I I I 40 ----+--- +---+--+ +------+ -- +---+------ 1 NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment PRE DA 3: Runoff = 79.25 cfs @ 12.22 hrs, Volume= 7.081 af, Depth> 1.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 48.405 70 Woods, Good, HSG C 75.820 56 Weighted Average 75.820 56 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total Subcatchment PRE DA 3: Hydrograph 85---li--- it ---ill -- it---ail---li--- it ---ill ---il— �--------- �---�--- it---ail---li---Ili --- ■Runoff ------ ------ ------ ----- 79.25 cfs - -�p-N-- why. r---------r-- -,---r-----------------r--- 75------+------+---r------+---+------+— —+---+------+----------+--- 70 10-yr_R�infall=5'44'''--- ------ - - ------'----------'--- --- 65 J-Runbff Arda=75.�829at--- ---L- ----L------1---1------- --- 60 55-Runpiff_Volume=7 081-Af ----r--;---r---'--- ---'------T--- 50 Runoff Depth>1.fi31'-- -- - - -- - --- -- --- 45 ---------i--- ------i------r------r— —---r---i----------i--- --- 40 FloW_ 6ngth#2,2.8W-- -- - -- --- -- -- --- 30 _�5.4mrn-----,------———— ---,---------,---i ——— —------,---- /�+w' TC i r---r---r r---r---i— r— r---r r---i i r--- 25 _\.t1,4�4=76—'r-----r------rt---r------r—---r---------r------fi--- 20------+--------r---------r------+— — 1 5 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 23 Summary for Reach PRE DP1: PRE DP1 Inflow Area = 197.100 ac, 0.74% Impervious, Inflow Depth > 2.12" for 10-yr event Inflow = 255.70 cfs @ 12.59 hrs, Volume= 34.839 of Outflow = 255.70 cfs @ 12.59 hrs, Volume= 34.839 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP1: PRE DP1 Hydrograph -L--1---L--1---1- ----+- ----+- -L--L- -L--L--' --- +-- 280 260 -ff� i 1 rqa=;1S7.-9 }0-�C 255.70 cfs --' -- ---'------ - --T-- 240 ------ -- ------ ------ ------ ---- ------ ------ ------ -- 220--+---+--+---I---+---I---+------+--+- ---+--+---+--+---I---+-- 200 180 W 160--7------7---I---7---I---T---I---+---I --r--7---r--7---I---+-- � I I I I I I I I I I I I I I I 140 ------ -- ------ ------ ------ --- -- -----F--�--- -- -- 0 _ ,' I I I I I I I I I I I I I I I I I a 120--+---+--+---+--+--+---+------+--+ --+--+---+--+---I---+-- 100 ,i 80 'I 60--7------7---r--7------r------r-- ---r--7------+-- 20 000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ❑ outflow NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 24 Summary for Reach PRE DP2: PRE DP2 Inflow Area = 322.194 ac, 14.57% Impervious, Inflow Depth > 2.20" for 10-yr event Inflow = 443.31 cfs @ 12.57 hrs, Volume= 59.183 of Outflow = 443.31 cfs @ 12.57 hrs, Volume= 59.183 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP2: PRE DP2 Hydrograph 480 460 --+---+--+---+--+--+---+------ _f "fj W a= .-1q4-dam 443.31 cfs -+--+---+--+---+--+-- ---------------------- 440 ----------+---+------+--+- +---+--+---+--+---+--+-- 420 ----------------------------------- ------------------------ 400 --+---+--+---+--+--+---+------+--+- ---+--+---+--+---+--+-- 380 ----------------- -------------- ---- --- ---- --- ---- ------ --- 360 --+---+--+---+--+--+---+------+--+- ---+--+---+--+---+--+-- 340 ---------------- ------------------ ----------------------- 320 --+------+---+--+--+---+------+--+ --+--+---+--+---+--+-- 300 ---------------------------------- ----------------------- _ w 280 260 ---------------------------------- ------ --- ------------- 3 240 �—°° 220 --+------+------+------+------+--+ --- ---- --- --+--+---+--+---+--+-- 200 --+------+---+--+--+---+------+--+ -+--+---+--+---+--+-- 180 --------------------------------- --------------------- 160 --+---+--+---+--+--+---+------+-- -+--+---+--+---+--+-- 140 120 --+---+--+---+--+--+---+------+-- --+---+--+---+--+-- 100 ---------------------------------- ---------------- 80 --+------+---+--+--+---+------+-- +-- --+---+--+-- 60 --------------------------------- ------ 40 20 01 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ■ outflow NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 25 Summary for Reach PRE DP3: (new Reach) Inflow Area = 75.820 ac, 0.00% Impervious, Inflow Depth > 1.12" for 10-yr event Inflow = 79.25 cfs @ 12.22 hrs, Volume= 7.081 of Outflow = 79.25 cfs @ 12.22 hrs, Volume= 7.081 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP3: (new Reach) Hydrograph ---�---� ---�---� -- �---� ---�---�-�---'----'-------�---� ---�---� ---�---� -- ■Inflow ------ ------ -- -------------- ------ 179.25cfs ------ - ----- -- ■ Outflow80 85 .� -1rtf w�Area=7$.8'2fll'a ------------------------- -------------------------- 75 70-� 65 --r---r--r I --r---r------r--r---r--r---r--r--- ---r--r---r--r---r--r--- I I --r--r---r--r---r--r---r-- I I -r---i---r--r---r--r---r-- I I 60 55 w 50 u 45 -- --- ------L-- ---L-- --- -- ---L------L-- ---L-- ---L-- 40 LL- - - - - - - - - - - - - - - - - - - - - - - - - - 35 30 -------------,--- --------------,--- ----,---,----,---,----,---,--- 25 I I 1 20 -- -- - ----- - - - -- -- --- -- - - 15 r r-r r rrr r r---r--r---r--r---r-- 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 26 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment PRE DA 1: Runoff Area=197.100 ac 0.74% Impervious Runoff Depth>2.56" Flow Length=6,400' Tc=55.8 min CN=70 Runoff=310.33 cfs 42.035 of Subcatchment PRE DA 2: Runoff Area=322.194 ac 14.57% Impervious Runoff Depth>2.65" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=535.61 cfs 71.163 of Subcatchment PRE DA 3: Runoff Area=75.820 ac 0.00% Impervious Runoff Depth>1.44" Flow Length=2,280' Tc=25.4 min CN=56 Runoff=105.80 cfs 9.092 of Reach PRE DP1: PRE DP1 Inflow=310.33 cfs 42.035 of Outflow=310.33 cfs 42.035 of Reach PRE DP2: PRE DP2 Inflow=535.61 cfs 71.163 of Outflow=535.61 cfs 71.163 of Reach PRE DP3: (new Reach) Inflow=105.80 cfs 9.092 of Outflow=105.80 cfs 9.092 of Total Runoff Area = 595.114 ac Runoff Volume = 122.290 of Average Runoff Depth = 2.47" 91.87% Pervious = 546.716 ac 8.13% Impervious = 48.398 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment PRE DA 1: Runoff = 310.33 cfs @ 12.59 hrs, Volume= 42.035 af, Depth> 2.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 6.700 30 Woods, Good, HSG A 24.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 130.150 70 Woods, Good, HSG C 29.630 77 Woods, Good, HSG D 197.100 70 Weighted Average 195.635 70 99.26% Pervious Area 1.465 98 0.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total Subcatchment PRE DA 1: Hydrograph 340 ■Runoff ---I---r---I---r---r--r---r---I---r- -I---r---r--r---r--r--- 320310.33 cfs - p - -- --- --- +------ - ------------+--- -- --- 300 P`i11 �y--r-L--J---L---1---1---1--- L------L---1---1---L-- --- 280Fes"-,---T ---,--------------,--- I�,--- ------ 260 -Runoff-Area=197.100 ac ..... --- r-- -- - --- ---r-- 240--+---+---+--+---+--+---+--+---+---+-- +--+---+---+--+---+--+--- 220 J Runbff_Volum'e=42FMafI --- ----------L------i---'L-- --- i I I I I I I I I I I w zoo -R'unbff-Depth>2.5611--- --- - --- -- --- - --- - --- 180 I I I I - - o 160_Oov-VLength=6a4'00'--------+---I-- - -- ------- EL C 120 100 R -- -I- -- -- - -- 80 i - - -I - - - t - - -I- - - t - - - r - - - - - - t - - -I- - - + - - -I- - - - - r - - - t - - -I... -- + - - - I--, - - - 60- , 40---'---L------1---L--J---L------1---'- --- --- - -- --- 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment PRE DA 2: Runoff = 535.61 cfs @ 12.56 hrs, Volume= 71.163 af, Depth> 2.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 50.750 54 1/2 acre lots, 25% imp, HSG A 16.275 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 125.510 80 1/2 acre lots, 25% imp, HSG C 72.905 70 Woods, Good, HSG C 43.474 77 Woods, Good, HSG D 11.470 85 1/2 acre lots, 25% imp, HSG D 322.194 71 Weighted Average 275.261 66 85.43% Pervious Area 46.932 98 14.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total 550 500 450 400 H 350 3 300 0 LL 250 200 150 100 50 Subcatchment PRE DA 2: Hydrograph � � � � � � � � � � � � � � � � � � I ■Runoff --- -- --- -- ---- --` 535.61 cfs -I------I--- --- -- - T�peil �4-0r- -';------j--- -2 YrIIRi-nf�ll=�a5"---- -R'unbff-�4rela=3221.-194a'�E--T------ -Ru-n6ff-Volumb=71.-163-af+-- - Ru-n6ff-PeptN>2.66 ---- -FloWLength=3,9'60-'--- - -- - -T=�j4.4-- - -- - -- - - - -'; - - - L ------r- -- - --T--- -- --- -'I- - - + - - -'� - - -1 - - - -------- - - I --- ,- - -, NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment PRE DA 3: Runoff = 105.80 cfs @ 12.22 hrs, Volume= 9.092 af, Depth> 1.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 48.405 70 Woods, Good, HSG C 75.820 56 Weighted Average 75.820 56 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total Subcatchment PRE DA 3: Hydrograph 115---i------'I--- ---i---'I------'I-----'I------'I--- ---'i ----- ■Runoff 110 ---L---1---1--- L---I---L 105.80 cfs-----L---1---1--- -- --- 105 -� N 3hr-- r------r-- ----r------r---I---r---'r--;--- 100 �' -- --- -----� -- ------�--- ---�-- --;---�---;---�------�--- --- 95 j -25-year Rai nfaNr6'05"-----------------;---------I--- --- 90 ---I-- r-- I---T--- T--T--- r--- I - - - T ---I----T---I--- r--- I - - - T -----T--- 85 . R'unbff'Ar6a-15�62aac-- - -- 80---I---+---I- - -+ - -- -----+---I---+---I-- --------+------+--- -- --- 75 ;' -R'Itm 'Noll um' e=9.092'Ilaf---'I-- -'---- - -',-- -'I--- ---' -- --- 70 65 R�Ian(ffi�'ID�th>1,44 `- --- - r----- --- -'r-- 60 --------------------- ---'I---L------L------L--- IL - -�--- so F1ovV16nioth 2�2$f'--- -- ---'�------ ---------'�--�--- 45 40 -U' 54-M'n -- ---------+----- ------------+--- -- --- 35-�IIIY��6----r---r--r---r------r---'i- r------r---'r--r---r-- --- M1� ,I I I I I I I I I I I I I I I I I I 25T------+------+---+--+---+------+---- - ------+------+---+--+--- 20 I r---I---T---T--T---r---I--- T - - -I- I--- r - - - I -- T--- r - -T--- 10------+------+---+--+---+------+---I- ---+- --- 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 30 Summary for Reach PRE DP1: PRE DP1 Inflow Area = 197.100 ac, 0.74% Impervious, Inflow Depth > 2.56" for 25-year event Inflow = 310.33 cfs @ 12.59 hrs, Volume= 42.035 of Outflow = 310.33 cfs @ 12.59 hrs, Volume= 42.035 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP1: PRE DP1 Hydrograph 340 320 �'I 'I - - T - - - - - - T - - -II--II- - - T - I I I I I =ftj qw �krqa—+197.'� d aC 310.33 cfs I- - I - T - - I 300 --- -- ---I -- ---II--- -- 280 260 240 ---I--- -----I------I------I--- ---I- --- -- --- -- --- -- -- 220 ------I------I-----------------------I--- ---I--- I ---I--- 7 -- w 200 --r---Ir--T---Ir--7------T---Ir--r--- --r--T --- r--------T-- v 180 I --r---r--r---r--r------r------r---I I I I I I I I I I I --r--r---r--r---r--+-- I I I I I I 0 160 LL 140 120-- 100 ---I--- -----I------I------I--- -- --- --- -- --- -- -- 80 -----------------I---I---,---I---, -- --T---Ii -----Ir7------T------r-- -- --------I -------I 7---Ii --T-- -- 60 ' 40 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ❑ Outflow NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 31 Summary for Reach PRE DP2: PRE DP2 Inflow Area = 322.194 ac, 14.57% Impervious, Inflow Depth > 2.65" for 25-year event Inflow = 535.61 cfs @ 12.56 hrs, Volume= 71.163 of Outflow = 535.61 cfs @ 12.56 hrs, Volume= 71.163 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP2: PRE DP2 Hydrograph 550-h1flow �4rga=;32�.-i �}4-ac 535.61 cfs 500----------------------------�- 450 -----------1---1---------------'- 400--J---1---L------1------L------L---' w350 ------ -- ------ ------ ------ --- U I I I I I I I I I 3 300------I--- ------ ----------------- 0 a 250---I---; -----I------I--- + ---I---+ --- 200 -- --- --T------T--- - --+------r-- ,' I I I I I I I I I I 150 -- ------7---r--T---I---r------+--- Time (hours) r-- ---r--7------rt--- ■ Inflow ❑Outflow '---L-- ---L--L---L--1---1---L--- --Iil-- --�i---7---�I---7---�I--- II r-- ---L--1---1---1--- ---Iil --- -- --7---7 ---Iil -- --- it --- II T--- NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 32 Summary for Reach PRE DP3: (new Reach) Inflow Area = 75.820 ac, 0.00% Impervious, Inflow Depth > 1.44" for 25-year event Inflow = 105.80 cfs @ 12.22 hrs, Volume= 9.092 of Outflow = 105.80 cfs @ 12.22 hrs, Volume= 9.092 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP3: (new Reach) Hydrograph --y---r-- ---'---'----'---'----' ------rt------+------r------r------r--y---r--rt---r--+--- ----------'---' -------------' ------'---- ■ Inflow 115 110 -+---+--+---+--+--+---+----- tr�fl nV''Area�� :$ Q �o5.so Cfs -- - +--+- -----'I--- -+--+ --+ ---II- +--- - --- ■ outflow 105 -- ---- ------ -- --?-----r--- - ---r-- --- -- ------+--- 100 -- ------ ------------t---I- - -t--- ----t--t---t-- ------t--- 95 --L---'--- ---1---1---'---------L---' li -L---L-- ---L--L------L--- 90 --t-- ----t---li--- t---li--- t--- --- t - - -li - ---t-- --- t-- t----- -t--- 85 ----- ---------------------- ------ -------------------------- 80 --+------+------+------+------+-- -+---+--+---+--+------+--- 75 ----------- ---------------- - - - - -- -------------------------- 70 -- ------ ------ ------------r-- - ---r-- --- -- ------+--- T � 65 --r--- r-- r---r-- r---I---r---I---r--- -r---r--r---r--rI--- +--- 60 0 -- - -- - - - - - - -- t---t--t---t--t------t--- - -- - - - - - -- 55 --t---t-- ---li---t---li---+------t-- a50 ----- ---------------------- - - - 45 --+---+--+---+--+--+---+------+-- +---+--+---+--+---I---+--- 40 ------I--- ---I------------------- ----I--- -- - I --- -- - I -- - --- 35 --J---1---L------L------L------L-- --L--L---L--L------+--- 30 -- ------ ------------t------t-- --t--,---t--t------t--- 25 --------------------------------- --------------------- 20 -- t - - -t -----li---t---li---t------t-- -- ---t--t----- --- -t 15 --------------------------------- - ------- 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 33 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment PRE DA 1: Runoff Area=197.100 ac 0.74% Impervious Runoff Depth>3.54" Flow Length=6,400' Tc=55.8 min CN=70 Runoff=431.75 cfs 58.195 of Subcatchment PRE DA 2: Runoff Area=322.194 ac 14.57% Impervious Runoff Depth>3.65" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=740.17 cfs 97.980 of Subcatchment PRE DA 3: Runoff Area=75.820 ac 0.00% Impervious Runoff Depth>2.19" Flow Length=2,280' Tc=25.4 min CN=56 Runoff=168.36 cfs 13.853 of Reach PRE DP1: PRE DP1 Inflow=431.75 cfs 58.195 of Outflow=431.75 cfs 58.195 of Reach PRE DP2: PRE DP2 Inflow=740.17 cfs 97.980 of Outflow=740.17 cfs 97.980 of Reach PRE DP3: (new Reach) Inflow=168.36 cfs 13.853 of Outflow=168.36 cfs 13.853 of Total Runoff Area = 595.114 ac Runoff Volume = 170.028 of Average Runoff Depth = 3.43" 91.87% Pervious = 546.716 ac 8.13% Impervious = 48.398 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment PRE DA 1: Runoff = 431.75 cfs @ 12.58 hrs, Volume= 58.195 af, Depth> 3.54" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 6.700 30 Woods, Good, HSG A 24.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 130.150 70 Woods, Good, HSG C 29.630 77 Woods, Good, HSG D 197.100 70 Weighted Average 195.635 70 99.26% Pervious Area 1.465 98 0.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total Subcatchment PRE DA 1: Hydrograph 480---II------II--- ---i---II---------T--------- ----II------II--- ---li ----- ■Runoff - - - - - - L - - -1- - - t - - - L - - L - - - L - - -1- - - 1 - -�- - - L - - -1- - - 1 - - - L - - L - - - a6o A440 431.75 cfs I I I I I I 420 -Typq 4--�K-r--y--- ---------'--- ------ ------ ---r-- --- 400 380-5'yKlc'�I�lf���� -1----1---1-------1---,---1----1--- 1----1--- 360 - 1---L- 1-- L---L--J---L---1---1---1--- L---'---L---1---1---L � I � -- --- 340 -Runoff-ea=197,10,0-ac--7---Ir-- r---li---r---li---7---Ir-- --- 320 300 Blurb#f-Volu l e=58r195-afl------ ------ ------ --- -- --- u 260-FlU-n6ff-U-C !� 4"i---i--- ---i-----i------i--- ---it-- --- 220 -� n ex�g t�=1fi, 100 --- - -- - ----- --- --1--- --- LL I I 200 - ----�--- -- ---------+----- - ----- ------+---L---1--- 180-T=5.8'I-kl�#k�- T------ T---'I-- ------ T--- ---T---' --;--- 160 - -----'---L------L-------' ---'-- -------L-------'-------'--- 140 TJ n 120------',------?---',-- - - -',---'1------',-- --- ----',---'1--- -- -', -- - -- 100---1---L---1---1---L--J---L---1---L---1-- - - -L L------L---L--L--- , 80---I---r---I---r---r--r---r---I--- r - - - I- r- -r---r--r---r--r--- 60---'------'----------'------'--- ---'----'--- --'------'--- --- 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment PRE DA 2: Runoff = 740.17 cfs @ 12.55 hrs, Volume= 97.980 af, Depth> 3.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 50.750 54 1/2 acre lots, 25% imp, HSG A 16.275 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 125.510 80 1/2 acre lots, 25% imp, HSG C 72.905 70 Woods, Good, HSG C 43.474 77 Woods, Good, HSG D 11.470 85 1/2 acre lots, 25% imp, HSG D 322.194 71 Weighted Average 275.261 66 85.43% Pervious Area 46.932 98 14.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total Subcatchment PRE DA 2: Hydrograph ■ Runoff 800 - 740.17 cfs - - - - - - ---, -- I ---, -- --, ---, -- ---, -- 7so -T PF, M �` Or- ----r---I---7-- --- ------r------7---'�--�--- 700------L---' L-- L-- L- 1---L---'--- ---'--- L--- '--- L--- L--L--- 650 --------- 600 Rlu-nb#f -Fi Ilia=322.19,4 at- - Y - - r r Y r 550 of R�unbff-Volume= - -��-98fl'� - .. - L----- --- --L-- 500 I I I I I I I I ------------------------------------- ------------------------ 450 Runoff-DeP_t_h>3.65"!------7---I-- ------r------7---'r--,--- 0 C �L L---1---L---�-- �- L- �- L- L- L- 3 400 -FjoW Length '�e �' --- -- -- -- -- - -- a 350 - 1--- 300 Tr,= 4.4-mj'n -, ---- i---- i--- i ---i-- ----------,--- + ------ --- - -----r---r--r---r-- r---r------r----- -- --i---r---i---r------r--- 250 ' CN=71-----1--- J---L--- i -- -- -------L------i---'L-- --- 200 150 --+---+---+--+---+--+---+--+---+---+ ---+ -+---+--+---+--+--- 100-'--- L - - -'-- L-- -L --L--L---1---1 -'- L---L--- L---L--L--- 50 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment PRE DA 3: Runoff = 168.36 cfs @ 12.21 hrs, Volume= 13.853 af, Depth> 2.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 48.405 70 Woods, Good, HSG C 75.820 56 Weighted Average 75.820 56 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total Subcatchment PRE DA 3: Hydrograph 180 I I I I I I, 'i 'i II I--�--- � _ -i--- i ---li -- i--- ■Runoff -- ----T - - - - -- ------j 168.36 cfs --- --- - --- 170 ;' -�YpgV �4=err --I r--- T-- -------- r------T--- --,--- 160 _ 150 -5� dearl-Rarinf��1=p7�,35��----7----- -- ------r------7---I--,--- 140 f�Unoff /`1reaa 5.OLVI ac--- ---Ir---Ir---li------li------Ir--i--- 130 ---I---try-�--`r,--rt---r--yq-�--r---i---+---r- --r---i---r---i---+---r--y--- 120 -Ru-n6 f Volumb=-13.853-af+---�---------- ------ --- -- --- N 110 AU-ndf-De+tfi�2.49W--- +-- -- -'---'---------+---' -- --- 100 ------ ------ -- -- ---------+----- - ------------+--- -- --- go a80 ----�--- -- --- ------ ----- ------ ------ --- -- --- 70 ---'L--J---------1---'--'L---'---------1---'�---I ,I Tc=Z5.4mjn /►Iw' �Ic I I I I I I I I I I I I I I I I 60---'I------'i---'i----'i ---'i- i---'i---'i---'i----'i ---'i---'i--- 50---'------'----------'---T - - -'--- T - - - '-----'------'------'--- --- 40 30 20 ---'---'---'----------'---'-- - '---' ---'- --- ---'- in 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 37 Summary for Reach PRE DP1: PRE DP1 Inflow Area = 197.100 ac, 0.74% Impervious, Inflow Depth > 3.54" for 50-year event Inflow = 431.75 cfs @ 12.58 hrs, Volume= 58.195 of Outflow = 431.75 cfs @ 12.58 hrs, Volume= 58.195 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP1: PRE DP1 Hydrograph --+---+--+---+--+--+---+------+--+---+--+---+--+---+--+---+--+-- 480 460 440 I -- ------ -------------T- -["flpw�rpa—, ------ ------+------+- �^ --- 431.75 Cfs 9L7- VIJ-a�r ---- --- - -- --r-- -- --- ---'�--T-------T-- ---L--L------L-- -- ------+-- 420 --T--- -- ------ T------T------+- - -- T- -- T - -T - ----7---T--T-- 400 380 ---'---'-----------------'-----------'- --T------ T---Ir--T---li- ---'----'---'----'---'---'--- -- T---Ir--T---li- ---T-- ---T--T---T--T-- 360 340 ----------------------------------- --T---T-- ---li---T---li---+---li---T---li- ----------------------- ---T--T---T--T---T--+-- 320 ---------------------------------- ---------------------- 300 --+---+--+------+--+---+------+--+ ---+--+---+--+---I---+-- w 280 --- - -- -- -- - -- --- - - - - -- u 260 -------- - - - - --- ------+------+--- -- -----------------+-- 0 220 ----------------------+------+---' -- - --- - ---- ------- -+-- LL 200 --T------ T----- - T------T------r---I --r--T---T--T--- --T-- 180 --J---1---L------L------+------+-- li---T---Ir--T-- -L- - ---L--L------+-- 160 --T------ T---I-- - T--- -T-- ---T--T---T--T-- 140 --J---1---L---1---1---1---L------L-- li li L--L---L--1---1---L-- 120 100 --T---T-- --------- --- -- ------------------------ -T--- --- T------T -- - -- -T---T--T---T--T-- ---------------- 80 60 -- T- - - I --- --------------------------------- ------+------+------T-- T-- ----- -+--+----- -T -- - 40 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ■ Outflow NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 38 Summary for Reach PRE DP2: PRE DP2 Inflow Area = 322.194 ac, 14.57% Impervious, Inflow Depth > 3.65" for 50-year event Inflow = 740.17 cfs @ 12.55 hrs, Volume= 97.980 of Outflow = 740.17 cfs @ 12.55 hrs, Volume= 97.980 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP2: PRE DP2 Hydrograph ■Inflow 800 -J---1---1- -1---L- ----+- ----+- �rtA 740.17 cfs -�--�- ----------------------- -L--L- I - '--- I I L- ■ Outflow 750 .- t---t--t---t--t--- t--- 700 -�I --7------------t------t------t---II- --- I I I 650 L +- 600 --J---1---L------L------+------+---'- --L--L- ----L ------ -- 550 500 �I -- ---t-- ---i---------t------t---i --t-- ---t--7---t--t--- 450 'I 3 400 0 ---I---I--- ---I------I--- ----I--- --I--- ---I--- ---I--- --- a 350 I I---- 300 �I 250 --+---+--+---+--+--+---+------+--- I I I I I I I I I -+--+---+--+---+--+--- I I I I I 200 150 - - t 100 --t------------t- -----t-- - - - -- -t-- ---- -t--- 50 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 39 Summary for Reach PRE DP3: (new Reach) Inflow Area = 75.820 ac, 0.00% Impervious, Inflow Depth > 2.19" for 50-year event Inflow = 168.36 cfs @ 12.21 hrs, Volume= 13.853 of Outflow = 168.36 cfs @ 12.21 hrs, Volume= 13.853 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP3: (new Reach) Hydrograph ------ -- ------ ------------'-------------F -- --- -- --- -- --- ■Inflow ---'--- ------'---------------- -- -- --- -- --- -- I --- ■Oufflow 180 I -Iri#1 w'Area�� :$ 0 168.36 cfs ----'--- I'I---'I--- I'I------?--- 170 160 -J------L------1------L---'-- '- - -- -- ---L--1------L-- 150 ------I --- ------ -- ------ ------ -----I -- ---I -- ---I -- --- 140 130 -J---1---L------L------L------L-- -J---L--J---L--L------L-- 120 w 110 --J------L---1---L------L---'---L--- -J---L--L---L--L---'---L--- 100 0 90 --J------L---1---L------L------L-- J- --L--L---L --L------L--- LL 80 L- I J---L--J---L--J---I---1-- I I 70 L L L L L L L L + 60 -J---1---J---'----L I---L------L- J---L--J---L--J------J-- 50 40 --------L------L------L------L-- -L--L---L--L------+--- 30 I I I I I I I I I I I I I I I 20 10 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 40 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment PRE DA 1: Runoff Area=197.100 ac 0.74% Impervious Runoff Depth>4.23" Flow Length=6,400' Tc=55.8 min CN=70 Runoff=515.67 cfs 69.488 of Subcatchment PRE DA 2: Runoff Area=322.194 ac 14.57% Impervious Runoff Depth>4.35" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=881.21 cfs 116.672 of Subcatchment PRE DA 3: Runoff Area=75.820 ac 0.00% Impervious Runoff Depth>2.74" Flow Length=2,280' Tc=25.4 min CN=56 Runoff=213.71 cfs 17.334 of Reach PRE DP1: PRE DP1 Inflow=515.67 cfs 69.488 of Outflow=515.67 cfs 69.488 of Reach PRE DP2: PRE DP2 Inflow=881.21 cfs 116.672 of Outflow=881.21 cfs 116.672 of Reach PRE DP3: (new Reach) Inflow=213.71 cfs 17.334 of Outflow=213.71 cfs 17.334 of Total Runoff Area = 595.114 ac Runoff Volume = 203.495 of Average Runoff Depth = 4.10" 91.87% Pervious = 546.716 ac 8.13% Impervious = 48.398 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment PRE DA 1: Runoff = 515.67 cfs @ 12.58 hrs, Volume= 69.488 af, Depth> 4.23" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 6.700 30 Woods, Good, HSG A 24.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 130.150 70 Woods, Good, HSG C 29.630 77 Woods, Good, HSG D 197.100 70 Weighted Average 195.635 70 99.26% Pervious Area 1.465 98 0.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total Subcatchment PRE DA 1: Hydrograph � � � - - ■Runoff sso 515.67 cfs - -- ---------+------ - ------------+--- -- --- 500 Ty pq L- ii�--1- _I__ L- _I___L_ _1___1_ -L--J- 450 � 100=year kain',fa]�=&22 - - - - - -- 400 Runoff-Arew 197.100 ac -T-- ---------r------T---,�--;--- 350 ' Run6ffVolufte=89A 8 of - --- - -- - --- --- -- w R'unbff-De >311,-- --- - -- --- --- --- —� 300 ' - HoW teogth=&,40(Y---I - -- T---I-----I--- - - I --- - -- E 250 , -T-f,=$5:8', mjn------------- --- -- - ----- ------ --- -- --- 200 I I I I I - V N �-0-'I- - - - - -'- - -'I - - - - - -'I - - - - - -'I- - - - - - -'I- 150 100 ---1---L---1---L---L--J---L---1---L-------L--- --'- -- L - -- L -- J--- 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment PRE DA 2: Runoff = 881.21 cfs @ 12.55 hrs, Volume= 116.672 af, Depth> 4.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 50.750 54 1/2 acre lots, 25% imp, HSG A 16.275 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 125.510 80 1/2 acre lots, 25% imp, HSG C 72.905 70 Woods, Good, HSG C 43.474 77 Woods, Good, HSG D 11.470 85 1/2 acre lots, 25% imp, HSG D 322.194 71 Weighted Average 275.261 66 85.43% Pervious Area 46.932 98 14.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total Subcatchment PRE DA 2: Hydrograph 950 ---'---�---'---�---�--�---�---'---�- 881.21 cfs-'---�---'---�---�--�- ■ Runoff 900 -------I---I---'---+------ ----'--- ------+--- -- --- 850 800 /--- -Type fC 41�r--I -- -------------I'------I'--- -Joo-yet-K Rqiiaall=$.�2"-�------'------'---' ------.---I ---'--- ---' -- -- --- --- 7oo -RpnOff dreg=322,194, aq---+---I--- ---- ---+------+---+--+--- 650 -RAj"f1: Volvme=1 6.672,-af ------ II --- ---; ------ ---- --- 600 u 550 ' ---I---+---I---+---+--+---+--+---+---I--- --+---+---+--+---+--+--- -Run-off D' epth>,4.3'5--t---'---+---'-- ---'---t---'---+---'r--y--- �.. o soo 450 - I I I I I I I I -Flovi ; Length=�,990'-+------+ --- +- --+---+---+--+---+--+--- r I + Ir--y--- _ " ---I---+---+--+---r--+---r---li---+---I+- ---li--- -Tt-=54.41f 'drt- --- I--- - -- 350 300 _-----7---r--1---T---I---T---I-- -- --I--- ---I---r---I---T--- r-- T--- r--- I---T---I-- -- --I---r---r--T---r--T--- T- - -I--- T - - -r --1--- 250 r------T---r-----r------T---I-- --- r------ T - - -r-- --- 200 I I I 150 I 100 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment PRE DA 3: Runoff = 213.71 cfs @ 12.20 hrs, Volume= 17.334 af, Depth> 2.74" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 48.405 70 Woods, Good, HSG C 75.820 56 Weighted Average 75.820 56 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total Subcatchment PRE DA 3: Hydrograph '-L---1---1---L--J---L---1---1---'---�---L---'---L---'---L---L--�--- ■Runoff 230---I---�---I---�---�--�---�---I---+ 213.71 cfs---I---�---I-------�--�--- 220 ------------�,---�1------�1--- ---- ------1-------I------i--- 210 -� pp it 4-0r-�--�---r------ ---'-- --------r------ --- --�--- 200 --r------T---T----r--�`--T---I-- --T------r--- ---T- --r--T--- 190 00-year- 1 in�lfa =-8122 --- II---II----II----II--- II ----II--- II --- II- -- II--- 180------+--1---+---+--+---+------+----- --+------+------+---+--+--- 170 Runoff -Axea=75-.92Qaw--- ---I-- - --I--- --I--- -- -- 160--L---1---1---L--J---L---1---1---'----L------L---1---L---L-- --- 150-Riu-n6 f Volumb=17-334-af+---I-- -- ---I--- ---------- -- --- 140 - --- - - ------ ------------- ------ ------ --- w 130-R'ui10ff-be�l��.4��---'--- ---'-- ----'------'--------j--- o 110 -FjoW engIh=',I8WI- -- I - -- ---1---1r---1---- - -I ------1r-- - -- LL 100 - -- +- - - I ------+--+---+------+----- +------+------+---+--+--- 90 -T=5�4-fin-----------------I- ----I---',---I---'1---'1---'1--- 80 -�+-L---1---7---L--J---L---1---1---'--------L---1---L---L-- --- 70-t+=S�----+---r-----+------+---I--------+------+---r-- --- ' 60---I1--- �i---I1--- I1 ---�i---I1--- �i---I1--- I1 ---�1-----I1--- �i---I1--- I1 ---li -- I1--- 40------ r------T--- ----- r------T---I- -------r---I---T---r-- --- 30---'---'--------'----------'----'--- _ I ---------------- 20 - +- - +- +--+---+------+- + 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 44 Summary for Reach PRE DP1: PRE DP1 Inflow Area = 197.100 ac, 0.74% Impervious, Inflow Depth > 4.23" for 100-year event Inflow = 515.67 cfs @ 12.58 hrs, Volume= 69.488 of Outflow = 515.67 cfs @ 12.58 hrs, Volume= 69.488 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP1: PRE DP1 Hydrograph 7 -T F -T I ■Inflow I ❑ Outflow 550 'I j ffi-Iw 7 r a=19 - ac 515.67 cfs --; -- --- -- ---I, -- -- - q -- 500 .� --L-------------+------+------r-------r-----'r--+------+--- 450 --L--- -----1---1------1---'---L---I- ---L--L---L--L------L--- 400 ------ -- ------ ------ ------ --- --- -- --- -- --- -- --- 350 y ------ I----I-------I---I--- r---I--- r --- ---, ---I---, ---I - - - - ----I --- U -- 300 i --r---r--r---I---r---I---r---I---r---I --r--r---r--r---r--r--- p� FL 250 I I -- - L -- -- --- -- ---L-- --- 200 I I I I I I I I I I I I I I I ---'---------------------------'--- ------------------'---- 150 I ------I------I------------------- ------I------I--- --- I I I I I I I I I I I I I 100 , I -- r--- r-- r---I--- r---I---r---I---r-- r ---r---r--r--- 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 45 Summary for Reach PRE DP2: PRE DP2 Inflow Area = 322.194 ac, 14.57% Impervious, Inflow Depth > 4.35" for 100-year event Inflow = 881.21 cfs @ 12.55 hrs, Volume= 116.672 of Outflow = 881.21 cfs @ 12.55 hrs, Volume= 116.672 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP2: PRE DP2 Hydrograph ■ Inflow 950 -----'------'------'--- ---'- - -RR1 91 rfQ- -- --- -- ------+--- ■ Outflow 0 ---- 881i-.21 cfs OW r ---rr----rtr-- ---r-----tr-- -- r2.r-- -2�-5r- -r -- r-----rr----yr-- 850 800 750 ' -----�---7 ---'------------------------------i -- ---�--- --- 700 650 -J---1---L------1------L------L--11 - -L---J L--L------L-- 600 ----'------'------'---------r---' -- -- --- -- ------+-- 550 500 I t Y r 7 - - - - - - - - - - - - - - - -II - - - - - - -Ir - - - - -- 0 450 --r---r--r---r--r---i---r---r--r---i --r--r---r--r---r--r--- LL 400 -- ---i -----i---------r------r---i _ -r-- --- -- ---i --T--- 350 - - -- - - - - - - - -- - - - - - - 300 250 200 -J---1---L------1------L------L- L- -J L--L---'---1-- 150 ----'------'------'---------L- - -- -+- 100 50OF0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 46 Summary for Reach PRE DP3: (new Reach) Inflow Area = 75.820 ac, 0.00% Impervious, Inflow Depth > 2.74" for 100-year event Inflow = 213.71 cfs @ 12.20 hrs, Volume= 17.334 of Outflow = 213.71 cfs @ 12.20 hrs, Volume= 17.334 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach PRE DP3: (new Reach) Hydrograph -L---'------1---L------+---' +------L--L---L -- ---L--L------+--- ■ Inflow 230 220 ,�I --,--lo-'-----------L--------n--'-- -If �%�/ rela 213.71 cfs V- y- -- -- --r--y ---'--- ---r--rt ---'--- ------ + --- +--- 0 outflow 210 �fl' I -------------------- -------------- .II I I I I ------------------------- I I I I I I 190 ---------------- ------------------ -------------------------- 180 --+------+---+--+--+---+------+-- -+---+--+---+--+---+--+--- 160 --J---1---1------L------L------+-- - ---L--1---L--L---'---L--- 150 -- ----- T------T- -----T--- - --T-- - -- -T- -T- --T- -T---T--T- -- 140 y --------------------------------- -------------------------- 3 120 ---'---'-------------'---' ---'---' -- --'---' ---'---' ---'---' --'---- 0 110 --+---+--+---+--+--+---+------+-- +---+--+---+--+---+--+--- LL100 --------------------------------- ------------------------- 90 --------L------L------+------+-- ---L--L---L--L------+--- 80 --T-----T------ T--- I - - - T--- ---r-- T-- - r - -T --- --T--- --T--- 70 --J---1---1------L---'---+------+- L---L--1---L--L------+--- 60 --T------ T------ T------T---I- - -T -- ---T--T---T--T---I---T--- 50 --------------------------------- ---------------------- 40 -------- T------ T------ T-- - - - -T- -T---+--+------T--- 30 --------------------------------- --------- -- 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DA P1 DA P2 DA3 MAX DA P4 DA P5 UD3 DAP6 (new t bcat) DA 2 b MAX IMP DA3M XIMP (new ubcat) � I O d UD 1 1P 2P 3P 4P 5P 6P O O (new lond) (new Pond) (new ond) ( w Pond (new Pond) (new Pond) FDP 3 UD2 El � POST DP2 (new Reach) POST DP1 POST DP2 Subcat Reach on Link NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 2 Area Listing (selected nodes) Area CN Description (acres) (su bcatch me nt-n u mbe rs) 41.336 54 1/2 acre lots, 25% imp, HSG A (UD 1, UD2) 134.834 80 1/2 acre lots, 25% imp, HSG C (UD 1, UD2) 10.550 85 1/2 acre lots, 25% imp, HSG D (UD2) 7.121 39 >75% Grass cover, Good, HSG A (DA P1, DA P2) 45.207 74 >75% Grass cover, Good, HSG C (DA P1, DA P2, DA P4, DA P5, DA P6, DA3 MAX, UD 1, UD2) 0.890 80 >75% Grass cover, Good, HSG D (DA P1, DA P5) 2.561 98 Paved parking, HSG A (DA P1) 1.445 98 Paved roads w/curbs & sewers, HSG A (DA P2) 18.415 98 Paved roads w/curbs & sewers, HSG C (DA P1, DA P2, DA P4, DA P5, DA P6, DA3 MAX) 0.461 98 Paved roads w/curbs & sewers, HSG D (DA P5) 50.072 30 Woods, Good, HSG A (UD 1, UD2, UD3) 209.268 70 Woods, Good, HSG C (UD 1, UD2, UD3) 72.953 77 Woods, Good, HSG D (UD 1, UD2) 595.113 70 TOTAL AREA NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 3 Soil Listing (selected nodes) Area Soil Subcatchment (acres) Group Numbers 102.535 HSG A DA P1, DA P2, UD 1, UD2, UD3 0.000 HSG B 407.724 HSG C DA P1, DA P2, DA P4, DA P5, DA P6, DA3 MAX, UD 1, UD2, UD3 84.854 HSG D DA P1, DA P5, UD 1, UD2 0.000 Other 595.113 TOTAL AREA NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 4 Ground Covers (selected nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 41.336 0.000 134.834 10.550 7.121 0.000 45.207 0.890 2.561 0.000 0.000 0.000 1.445 0.000 18.415 0.461 50.072 0.000 209.268 72.953 0.000 186.720 1/2 acre lots, 25% imp UD 1, U D2 0.000 53.218 >75% Grass cover, Good DA P1, DA P2, DA P4, DA P5, DA P6, DA3 MAX UD 1, U D2 0.000 2.561 Paved parking DA P1 0.000 20.321 Paved roads w/curbs & sewers DA P1, DA P2, DA P4, DA P5, DA P6, DA3 MAX 0.000 332.293 Woods, Good UD 1, U D2 UD3 102.535 0.000 407.724 84.854 0.000 595.113 TOTAL AREA NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Prepared by Bohler Engineering HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Printed 1/20/2023 Page 5 Pipe Listing (selected nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 1 P 260.50 255.25 67.0 0.0784 0.011 24.0 0.0 0.0 2 2P 270.50 270.00 39.5 0.0127 0.011 24.0 0.0 0.0 3 3P 297.50 296.00 74.4 0.0202 0.011 24.0 0.0 0.0 4 4P 261.00 260.00 52.9 0.0189 0.011 36.0 0.0 0.0 5 5P 271.00 270.00 20.6 0.0485 0.011 24.0 0.0 0.0 6 6P 302.00 300.00 55.2 0.0362 0.011 24.0 0.0 0.0 NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 6 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDA P1: (new Subcat) Runoff Area=21.910 ac 37.43% Impervious Runoff Depth>0.90" Tc=5.0 min CN=75 Runoff=39.00 cfs 1.649 of SubcatchmentDA P2: DA 2 MAX IMP Runoff Area=9.450 ac 40.05% Impervious Runoff Depth>0.96" Tc=5.0 min CN=76 Runoff=17.83 cfs 0.753 of SubcatchmentDA P4: (new Subcat) Runoff Area=11.220 ac 59.98% Impervious Runoff Depth>1.74" Tc=5.0 min CN=88 Runoff=37.15 cfs 1.626 of SubcatchmentDA P5: Runoff Area=2.000 ac 41.35% Impervious Runoff Depth>1.59" Tc=5.0 min CN=86 Runoff=6.12 cfs 0.264 of SubcatchmentDA P6: Runoff Area=1.790 ac 35.20% Impervious Runoff Depth>1.31" Tc=5.0 min CN=82 Runoff=4.60 cfs 0.195 of SubcatchmentDA3 MAX: DA 3 MAX IMP Runoff Area=6.160 ac 43.99% Impervious Runoff Depth>1.51" Tc=5.0 min CN=85 Runoff=18.09 cfs 0.777 of SubcatchmentUD 1: Runoff Area=175.189 ac 0.84% Impervious Runoff Depth>0.69" Flow Length=6,400' Tc=55.8 min CN=71 Runoff=67.02 cfs 10.080 of SubcatchmentUD2: Runoff Area=293.364 ac 15.41% Impervious Runoff Depth>0.69" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=114.68 cfs 16.893 of SubcatchmentUD3: Runoff Area=74.030 ac 0.00% Impervious Runoff Depth>0.17" Flow Length=2,280' Tc=25.4 min CN=55 Runoff=4.84 cfs 1.040 of Reach DP 3: (new Reach) Inflow=5.52 cfs 1.170 of Outflow=5.52 cfs 1.170 of Reach POST DP 1: POST DP1 Inflow=67.25 cfs 10.731 of Outflow=67.25 cfs 10.731 of Reach POST DP 2: POST DP2 Inflow=122.10 cfs 19.438 of Outflow=122.10 cfs 19.438 of Pond 1P: (new Pond) Peak Elev=262.78' Storage=45,684 cf Inflow=39.00 cfs 1.649 of Primary=1.61 cfs 0.651 of Secondary=0.00 cfs 0.000 of Outflow=1.61 cfs 0.651 of Pond 2P: (new Pond) Peak Elev=272.14' Storage=17,040 cf Inflow=17.83 cfs 0.753 of Primary=1.55 cfs 0.391 of Secondary=0.00 cfs 0.000 of Outflow=1.55 cfs 0.391 of Pond 3P: (new Pond) Peak Elev=299.14' Storage=11,925 cf Inflow=18.09 cfs 0.777 of Primarp11.88 cfs 0.613 of Secondary=0.00 cfs 0.000 of Outflow=11.88 cfs 0.613 of Pond 4P: (new Pond) Peak Elev=264.84' Storage=23,707 cf Inflow=37.15 cfs 1.626 of Primary=26.80 cfs 1.356 of Secondary=0.00 cfs 0.000 of Outflow=26.80 cfs 1.356 of NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 7 Pond 5P: (new Pond) Peak Elev=272.35' Storage=5,007 cf Inflow=6.12 cfs 0.264 of Primary=3.17 cfs 0.184 of Secondary=0.00 cfs 0.000 of Outflow=3.17 cfs 0.184 of Pond 6P: (new Pond) Peak Elev=305.62' Storage=4,133 cf Inflow=4.60 cfs 0.195 of Primary=0.73 cfs 0.130 of Secondary=0.00 cfs 0.000 of Outflow=0.73 cfs 0.130 of Total Runoff Area = 595.113 ac Runoff Volume = 33.276 of Average Runoff Depth = 0.67" 88.31% Pervious = 525.551 ac 11.69% Impervious = 69.562 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment DA P1: (new Subcat) Runoff = 39.00 cfs @ 11.96 hrs, Volume= 1.649 af, Depth> 0.90" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 0.324 80 >75% Grass cover, Good, HSG D 8.306 74 >75% Grass cover, Good, HSG C 5.639 98 Paved roads w/curbs & sewers, HSG C 5.080 39 >75% Grass cover, Good, HSG A 2.561 98 Paved parking, HSG A 21.910 75 Weighted Average 13.710 61 62.57% Pervious Area 8.200 98 37.43% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5 minute pipe flow Subcatchment DA P1: (new Subcat) Hydrograph -L---'------L--- '--- L---L--- '---L--- '------L--- '--- ------- ---r--- ■Runoff az- ---�---�---�---�---' 39.00 cfs---�---�---�--- ----�---�--- 40---1---r---r--r---r---I---r---r---I r---r---I---r---I----I---r--- 38 - - -�A�hx----'I-------------'I-- --- -------'I--- -------------- 36 --I I Raffa]1= 01 -7f---1---'i -------'i---------'i---1---'i --- 34 -T�e C-------r- -----r----------------r--- 32 -Runoff-' rda= 21.'glaad---I---; - -- ---I---I--- - - -I, - - -I --- I - -- 30 28 --- 1I - -R'Lm ffVo un�a 1-.614glaf- ---------------------------- I��-{'�(I�j r�r I QQQ--I��I I r/�r li/�j/�� I I I I U 22 R1 - � t . ■ ID `�> - I V V II,--- r --- I --- r - - 7 - - - r - - -I- - - Y - - - I ---- I --- r - - - 3 22 _T____�Y*_^__I___�_ 18 /�+-------------------------------'- ----------------------'---- 16-t,'�=�-'------ L---1--- 1--- L--- 1 --- L -- ---L---'---L-------'---r--- 1 1 1 1 1 1 1 1 1 1 1 1 14---1--- Y--- r--r---r---1---r---r---1---r--r---r---1------------- r--- 12 1 I I I r---r--r---r---1---r---r---1---r r---r---1---r---r---1---r--- 10---�------�--- ------�--- ------�--- 1 -- ------�----------�--- 1 --- 8---1---1---'------ L------L--- L---'- --L --L---L------L----------r--- 6---'---+----------L----------L---'------L---'--- ------'-- --- I I 4---1---Y---r--r---r---1---r--- r---1---r ----1---- 1----1- �--- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment DA P2: DA 2 MAX IMP Runoff = 17.83 cfs @ 11.96 hrs, Volume= 0.753 af, Depth> 0.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 3.624 74 >75% Grass cover, Good, HSG C 2.041 39 >75% Grass cover, Good, HSG A 2.340 98 Paved roads w/curbs & sewers, HSG C 1.445 98 Paved roads w/curbs & sewers, HSG A 9.450 76 Weighted Average 5.665 61 59.95% Pervious Area 3.785 98 40.05% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P2: DA 2 MAX IMP Hydrograph ------',---------',---'--- --- �--------------, - - -,-------,----------, --- ❑Runoff 19 ---66',-----}---------'----------' 17.83 cfs --- I ---',--- -------------- 18 Y f----------------'I------'--- 17 ---------------------------- 16-1F�I�fai1����Y-- -- --- ------ --- ------ --- 15------i---I--- --- ---I---- --- ------ - -- --- ---------------- --- 14 _R�dff A r6&a 450V ari!------'-- ---------'--- I'---'----'---'---- I I I I I 3 ,2---_-II �--.-+II 5------+If---+II ------++I IO=Yojr=--- R----II ------L+III 1III ------III --------'III ----- 11 -RtnfiI I :I96 I� I I 10 ----------- 9 -Ta ----- - --+---+------+---+--+---+--- $ - T---T---------T---I---+ --T---T----------------+--- 7----------------- I-----}---------+------+--- 6---+---T----- T--- I - - - T---T------+ ----- T---------T--- - -T - -- 5---___Y------7---Y----------r---I---+--7---Y------ ---r-----+___ 4------7---r----- r- - - I --- i 3------T - - -II--T--- T------T--- T------T- T---T----- - - --II------T--- 2------ T - - - '�-----r---------r------T - --'---------'�----- -T - -- q I I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment DA P4: (new Subcat) Runoff = 37.15 cfs @ 11.96 hrs, Volume= 1.626 af, Depth> 1.74" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 4.490 74 >75% Grass cover, Good, HSG C 6.730 98 Paved roads w/curbs & sewers, HSG C 11.220 88 Weighted Average 4.490 74 40.02% Pervious Area 6.730 98 59.98% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P4: (new Subcat) Hydrograph ao -L---'--- ---L--- '--- L---L--- '---L--- '------L I I I I I I I I I I I ---1---1---'------L------1---L---I 37.15 cfs --- '--- ------- ---1--- I I I I I I I ---L------1-------'--- - ■ Runoff 38 36 1---+------+---+------+---+------ - -Typ H- 4-hx JTI^r- � r rt---i---r�-+--r---i---r- ---+---+------+----------+--- I I ---r---r---i---r---r---i---r--- 34 32 1Tyel�ra��fa]l�w F-I------I - 1 ar--I--------------,----- ---i---I------i---I------I --- ----------I----------,---I 30 _R�unbI AC6a-41.22aad.---1 � I I I -- ---� ------ ---�_ I I I I I I I 28 26 ---'--------------------------------'- -�'� �} Vo)ume=1-.126af -'---r ---'---'----'----'---'----'---'---- -----r----------------�--- w 24 22 - ---�- ---�- L---------L---'---r -Runa�f �iQ th>a,741'---r---I---+ I I I ----L----------------�--- --1---r---I---�---I----I---+--- 3 20 O a 18 ^//I} {{'�� yynn ��V.O ffiJ 11',-- r------r--- r-- -I---r - ----r- 1 r---r---I-- r---r---I-- r --r---r---I---r----------T--- r---r--------I---I---r--- 16 -�'1U�_�-�--- ------�--- ------�--- -- --- ---I_ ----------------- 14 ---___ - ___� I I I I I I I I I I I I I I 12 ---1--- 1--- '------L------L---L---'- --L -- ---L------L----------L--- 10 I I I I I I I I I I ------+-----------L---'------L---'---r I I I I I I I -----L---'----------'--- --- 8 ------+-----------L---------r---�---r -----L--------------�--- 6 ------Y------r---r------r---r---I---r I----I---r--- - r---r---I--- r--- 4 i ---I--Y------r--r---I-- T---r---I- ---r---I---r-- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment DA P5: Runoff = 6.12 cfs @ 11.96 hrs, Volume= 0.264 af, Depth> 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 0.366 98 Paved roads w/curbs & sewers, HSG C 0.461 98 Paved roads w/curbs & sewers, HSG D 0.607 74 >75% Grass cover, Good, HSG C 0.566 80 >75% Grass cover, Good, HSG D 2.000 86 Weighted Average 1.173 77 58.65% Pervious Area 0.827 98 41.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P5: Hydrograph � � � � � � � � � � � � � � � � I ❑Runoff 6.12 cfs 6 Typip II 24,,hr -- -- -- _1TYearRairifa11= 06"_'---1---L 5- R'un6ff'Arda=2.0004c� -R'ungf volume=a.�64',af----� 4 R�u naff 'Depth> 1 ! 59'' 3 c=5.0-'wnii1 --L--- - --- -- CN=86 ------------------------------------ z 'I 1 I I I I I I I I I I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment DA P6: Runoff = 4.60 cfs @ 11.96 hrs, Volume= 0.195 af, Depth> 1.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 0.630 98 Paved roads w/curbs & sewers, HSG C 1.160 74 >75% Grass cover, Good, HSG C 1.790 82 Weighted Average 1.160 74 64.80% Pervious Area 0.630 98 35.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P6: Hydrograph ------t------y---r------+----------r-------+----------r------rt---- 5 � � � � � � � � � � � � � � � ■Runoff 4.60 cfs Type II 1I124,lIhr'II 4 1 +yes r Ra i rnfa11=3.06" -1- - - Ru n bff 'Arba-1.790 '' ac� 3 Rungf#'1VoWme=a.1';95'Iaf -- --;-- -- --- Run off IIbe th> 1131' LL Td=5.0-wnir - -- - - - -- - - - - -- - -- - 2 C'IN=82 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment DA3 MAX: DA 3 MAX IMP Runoff = 18.09 cfs @ 11.96 hrs, Volume= 0.777 af, Depth> 1.51" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 3.450 74 >75% Grass cover, Good, HSG C 2.710 98 Paved roads w/curbs & sewers, HSG C 6.160 85 Weighted Average 3.450 74 56.01 % Pervious Area 2.710 98 43.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA3 MAX: DA 3 MAX IMP Hydrograph 20------- - - - --- --- ------ --- ------ --- - 18.09 c 18 17---I---+------+- 'i-,-�r�------+---+------+- 16-�yearRainfA =3I.W------ ---r- 15 ---------T- 14 Run ff_Ar-"=6.'11I60!ad I ----I--- 1 13-RIIunplifiVolume=a.177af- 12 I -----------------------�---- 11 u#uRaD �t[T!>-a- 0-I-5-1-! ---- ! ------II----- -!I 3 10+ --- 9a t=5r011--ift-- IL---II---1---I I 8 -i--i - -i--i- -I ---LI 11 6---I----------4------I--- ------I--- 5------T--- I -- - - - - - - - - - - - - - - - - -- - - - --+ 4------7------;---r---------r------r 3------ T- - - Ir -----r---Ir-----r---I---r 2 ---Ii--T---Ii ---T---Ii- T--- T---I---T �---�---�---�---II----II---�--- ■Runoff SI, ------I----------I--- --- -----+---I-------------+--- --;---r------4----------T--- -- III -- - +-- -II --- III----------+--- --I---I-- -I--- I-------I--- I--- -- III---I�---II--- III---I�---II---I� --- -- ---I- ------I--- ----'I--- --- -- ---I- ------I--- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment UD 1: Runoff = 67.02 cfs @ 12.63 hrs, Volume= 10.080 af, Depth> 0.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 4.459 30 Woods, Good, HSG A 21.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 113.857 70 Woods, Good, HSG C 29.253 77 Woods, Good, HSG D 175.189 71 Weighted Average 173.724 71 99.16% Pervious Area 1.465 98 0.84% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total Subcatchment UD 1: Hydrograph � � � � � � � � � � � �-'----'--- I' ---'----'---'----I ■Runoff ---------------------------------- 67.02 cfs 65 Type peli=br-' --------------------------------------- 60 ' —1.� ar kairffa1,1=31.06�' } 55 i�no f-Axea=175.189-ac---Ii---Ir-- 501 1 ' ' -Rundf-`k�olurng=10..0N-of-I------ 45 I I I I I I I I w Ku__n_ ff-Deptr5,(Y.69 -I-- -- 40 0 35 Flow Length=,6,400';------'--- -- LL �C��C pp 30.ei-n------,--- li---,----,---r-- 25-EIY-��-' -- I ---I -- -' --- ------'11--- -- 20 ---I---r---r--r---r---I---r---r---I---r- 15 ------------------------------------- 10 5 - -r--- -------- -----i---- --r- ------------I---r--- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment UD2: Runoff = 114.68 cfs @ 12.62 hrs, Volume= 16.893 af, Depth> 0.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 40.326 54 1/2 acre lots, 25% imp, HSG A 18.198 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 129.984 80 1/2 acre lots, 25% imp, HSG C 48.796 70 Woods, Good, HSG C 43.700 77 Woods, Good, HSG D 10.550 85 1/2 acre lots, 25% imp, HSG D 293.364 71 Weighted Average 248.149 67 84.59% Pervious Area 45.215 98 15.41 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total Subcatchment UD2: Hydrograph -r------r---r--r---r------7------,---r------r------r---r--,--- 125---1---L---1---L---L--J---L---1---1---------L------L------L---L-- --- �RUnoff 120 -rr-i---r-it--r--r---r--r---r---i---r- 114.68 cfs ----t------t---t--t--- 110 qYP-r--r---r-- r---r-- r------r---r--r---r--r--- 100 -J1er fai�1=F�6yr----- t--- 'I--- t---'I--- t---'I--- t--- t--t--- 95 90lU- f V 1 f -r F1 d a= 2 9V r V V 4 at- - Y r -- -I r--- Y --- r 7 85 - --- ----'--- - ' -- L---'i- ---- - ---'i------t---'i ----- 80 -R fdlf-N��� �= F0.-09 i�f+---i--- ---i-------i---+---r--1--- 75 ------ - ---- -- -��i---'i--- Li---'i----- -'i------'i--- - - - 'i ----- 70 K';u-nbff-Ku-69 t -- --- -- -- ---r-- -------------------------------------- - ------------- ----------- 65 F�Ov��et�gh='�,;---'--- ---' -- ------',---'--- ---' -- --- 0 60 50-T�_�.'F-�IY-L-------------+----- - --------- --+ - -- -- --- ,i ,i 45 - - -Rw--7T------ ---,---,---,---,--- ---,-- -- -,---,---,--- ---, -- --- 40 CIY—/-i--- --- -- ------i--- ---i-- -- -i------i--- --- ----- 35T------ - - - --- --- ------ ------ ----- -- - -- -- - - ------------ 30 ------ ------ --- -- ---------+----- -- --------+--- -- --- ,i 20---i--- ---L-- --- -- ---------+---i-- --- ----L--+--- -- --- 15 i---'i--- �i---'i--- it ---i-- -'i--- i---'i--- i---'i-- ---�i---'i-- �------- 10 --- ---- - --- -- - - ------ --- --- ------ ------ 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment UD3: Runoff = 4.84 cfs @ 12.35 hrs, Volume= 1.040 af, Depth> 0.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-year Rainfall=3.06" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 46.615 70 Woods, Good, HSG C 74.030 55 Weighted Average 74.030 55 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total Subcatchment UD3: Hydrograph -- -i--- r--- T------ -- 4 5 .84 cfs Type 11 124,l,hr -1-IrRa'hafal1=3.0V - ------ 4 R�u nbff 'Arba-74MO ad R'unpff'Volume=1_.040',af ___ 3 R�unaff Depth>0! 17'' -Flow_Ldnoth- 2801 I 1 L 2 TIC=25.4 mln CW=;55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 17 Summary for Reach DP 3: (new Reach) Inflow Area = 75.820 ac, 0.83% Impervious, Inflow Depth > 0.19" for 1-year event Inflow = 5.52 cfs @ 12.34 hrs, Volume= 1.170 of Outflow = 5.52 cfs @ 12.34 hrs, Volume= 1.170 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach DP 3: (new Reach) Hydrograph ■ Inflow ❑ Outflow 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 18 Summary for Reach POST DP 1: POST DP1 Inflow Area = 197.099 ac, 4.90% Impervious, Inflow Depth > 0.65" for 1-year event Inflow = 67.25 cfs @ 12.63 hrs, Volume= 10.731 of Outflow = 67.25 cfs @ 12.63 hrs, Volume= 10.731 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach POST DP 1: POST DP1 Hydrograph --r---r--r---r--r---r--r---r--r---r--r---r--r---r--r---r--r---r-- - 70 .2- 5 cfs lrIowuea-197) -�C- r-- - 65 L--6-7 ----L L---- I I I I I -------tL----yL------'rL---- L------ 60 -----r------1--1---1--1---1-- ---r -----r-- ---r-- ---r-- 55-- --L--- L------L--L--- L-- L--- L- -L - - -L -----L- -L- --L- -L- --L 50 --r---r--r---r--r---r--r---r--r---r -r---r--r---r--r---r-- 45 �� --L---L-----L--L--- L--L--- L- -L - - -L ----L-------L---L-- N V40 --r---r rr-rr-r--r---r rr-rr---r-- 3 0 35 - -L---L------L-- L--- L--L--- L--L- - -L -----L--L--- IL --L---L-- LL 30 25 20 15 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ■ Outflow NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 19 Summary for Reach POST DP 2: POST DP2 Inflow Area = 322.194 ac, 18.39% Impervious, Inflow Depth > 0.72" for 1-year event Inflow = 122.10 cfs @ 12.61 hrs, Volume= 19.438 of Outflow = 122.10 cfs @ 12.61 hrs, Volume= 19.438 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach POST DP 2: POST DP2 Hydrograph II---II---1,--- �I---1,--- �I---I--- I----1,--- IIr -I---I--------------I---- �------I'- ----�+------II'I-------�+-------- ■Inflow 130 I ❑Outflow 14- 2.10 cfs - 120 nfow, rqa=+32�._ac I I I I I I I I I I I I I I I I 110--r---I------r-- T------r------r - - -I- - - - r --,---r--------T--- ,' I I I I I I I I I I I I I I I I I I 100 90 - - I -I- - - L - - -I- - - i - - - - - - L - - - - - - r - - -I- - - - L - - L - - - L - - 1 - - - �'I I I I I I I I I I I I I I I I I 80 -- ---I--- ------+--- - - - r------}---I -- -- -----+------+--- y U 3 I I I I I I I I I I I I I I I �I I 0 '---- - - - - -I-------I---I--- r----I- a 60 ' -----I------I------I------I--- -- - -- --- --------+--- 50 I I I I I I I I I I I I I I 40--r---r--r---r--r------r------r-- r --r---r--r---r--r--- ------I------I------I----- -I--- -- ---I--- -- - I--- --- 30 I I I I I I I I I I I I I 20 ------------------L------r-- L--L- -- ��I I I I I I I I I I I I 10 000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 20 Summary for Pond 1 P: (new Pond) Inflow Area = 21.910 ac, 37.43% Impervious, Inflow Depth > 0.90" for 1-year event Inflow = 39.00 cfs @ 11.96 hrs, Volume= 1.649 of Outflow = 1.61 cfs @ 13.87 hrs, Volume= 0.651 af, Atten= 96%, Lag= 114.6 min Primary = 1.61 cfs @ 13.87 hrs, Volume= 0.651 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 262.78' @ 13.87 hrs Surf.Area= 22,305 sf Storage= 45,684 cf Plug -Flow detention time= 238.7 min calculated for 0.651 of (40% of inflow) Center -of -Mass det. time= 144.7 min ( 952.2 - 807.5 ) Volume Invert Avail.Storage Storage Description #1 260.50' 127,850 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 260.50 17,090 0 0 261.00 18,913 9,001 9,001 262.00 20,793 19,853 28,854 263.00 22,729 21,761 50,615 264.00 24,721 23,725 74,340 265.00 26,711 25,716 100,056 266.00 28,877 27,794 127,850 Device Routing Invert Outlet Devices #1 Primary 260.50' 24.0" Round RCP -Round 24" L= 67.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 260.50' / 255.25' S= 0.0784 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 260.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #5 Secondary 264.61' 65.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #6 Device 1 264.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=1.60 cfs @ 13.87 hrs HW=262.78' (Free Discharge) L1=RCP_Round 24" (Passes 1.60 cfs of 21.40 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.24 cfs @ 7.10 fps) 3=Orifice/Grate (Orifice Controls 0.68 cfs @ 1.37 fps) 4=Orifice/Grate (Orifice Controls 0.68 cfs @ 1.37 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=260.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 21 Pond 1 P: (new Pond) Hydrograph ------'----------------' ---'-- 39.00 CfS ----------------' ---'--- M Inflow (Outflow -1--1---------IL--L--1- -I'-- -���/���� p .� i ^ -- ---------L--L--1--J--_ ---------r--r--7-- - -- ❑ Primary ^_Secondary 42 �JY1ri-�11��� I:�Ft�---r --1--1------1---L--L--J------'---L --J- --------L--L--J- -J--- e V 36 -- - -----I---r �to age=...... --+---------r--+--+--+--- ,',' � I �I I I - I I I I I I I I I I - - I I I - - I I I I - - I I I I I I I - -- I 32 30 28 ,'I -- --------------'I------------'I- --1--1---------L--L--L------'---L ------------'I--- L---------L--L--L--J--- ---'I--- 26 ---------li---Ir--Ir--r--4---li---Ir--r ---li---Ir--r--r-- --7--- � 24 V 22 0 20 --t--+---------r--r--+------I---r --' --------'---' --' --------'---' ---------r--+-- ------'---' --' -- --+--- ---'--- LL 18 --+-----------L-------------r---------L------�--- 16 14 --1--1---------L--L--L------'--- L---------L--L--L--L--- 12 --T-----1---I---r--r------------ ---------r--r-- - -I- -- 10 --1--1---1---'---L--L--L------'--- --------L--L--L--J--- 8 6 1.61 cfs 0.00 CfS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 1 P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 266 ----tt--t----r-+------+--------+----II----t----I-+- ---r t-�- 265 f/ 264 w I I I I I I I I I I I I I I I w I I I I I I I I I I I u I I I I I I I o I I I I I I I I I I I I I I I I 263 w I I I I I I I I I I I u I I I I I I I W----1----L1--J---L-J--1----1---1-1----1----1----1 --1-L--1------1-1- 262 ----' - -'--'-------------------------- - - - -"- ---'-----'----'--- - '---' --'- 261 Custom Stage Data 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) LJ Surface ■ Storage NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 22 Summary for Pond 2P: (new Pond) Inflow Area = 9.450 ac, 40.05% Impervious, Inflow Depth > 0.96" for 1-year event Inflow = 17.83 cfs @ 11.96 hrs, Volume= 0.753 of Outflow = 1.55 cfs @ 12.56 hrs, Volume= 0.391 af, Atten= 91 %, Lag= 35.5 min Primary = 1.55 cfs @ 12.56 hrs, Volume= 0.391 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 272.14' @ 12.56 hrs Surf.Area= 11,642 sf Storage= 17,040 cf Plug -Flow detention time= 182.5 min calculated for 0.391 of (52% of inflow) Center -of -Mass det. time= 93.9 min ( 899.0 - 805.1 ) Volume Invert Avail.Storage Storage Description #1 270.50' 56,463 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 270.50 8,641 0 0 271.00 10,007 4,662 4,662 272.00 11,429 10,718 15,380 273.00 12,908 12,169 27,549 274.00 14,443 13,676 41,224 275.00 16,035 15,239 56,463 Device Routing Invert Outlet Devices #1 Primary 270.50' 24.0" Round RCP -Round 24" L= 39.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 270.50' / 270.00' S= 0.0127 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 270.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.00' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 273.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 273.50' 60.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=1.53 cfs @ 12.56 hrs HW=272.14' (Free Discharge) L1=RCP_Round 24" (Passes 1.53 cfs of 12.70 cfs potential flow) �2=Orifice/Grate (Orifice Controls 0.13 cfs @ 6.01 fps) 3=Orifice/Grate (Orifice Controls 1.40 cfs @ 1.22 fps) 4=Orifice/G rate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=270.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 23 19 18 17 16 15 14 13 12 11 3 10 LL 8 7 6 4 3 i 0.00 CfS Pond 2P: (new Pond) Hydrograph --_--7_ y'--- _--_--_-- -- 17.83 cfS---------------------- Inflow - - - - 11-1 1-- - -t--Y---------Y--Y-- Y--- ---I---Y --Y---I---I---Y--Y--Y--Y--- _ J - - -I L - - L - - J --L--=---------L--L--=------,-^ GG...F..-----1---1--- 1.55 cfs I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 2P: (new Pond) E Inflow f Outflow ❑ Primary Secondary Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,00011,000 12,00013,00014,000 15,00016,000 ❑ Surface ■ Storage 275 274 ----L-1--1---IL---JJ--J--LJ---JL--J-------JI----1--1 L - - -L -L--'- w1 w 1 ---r---T---IT---TT--r--rr---TI--- 1 1 1 1 1 1 1 11 1 1 ----r1-----7--r-- r--- rr- -T --I- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 273 0 1 1 1 1 11 1 1 1 11 1 1 1 u 1 1 1 1 1 1 1 1 1 w w 272 271 ---r- T---IT---TT-- --rT---Ti--T--1--1 - --r--rr---rr--T--1- Custom Stage Data 0 5,600 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 24 Summary for Pond 3P: (new Pond) Inflow Area = 6.160 ac, 43.99% Impervious, Inflow Depth > 1.51" for 1-year event Inflow = 18.09 cfs @ 11.96 hrs, Volume= 0.777 of Outflow = 11.88 cfs @ 12.03 hrs, Volume= 0.613 af, Atten= 34%, Lag= 4.4 min Primary = 11.88 cfs @ 12.03 hrs, Volume= 0.613 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 299.14' @ 12.03 hrs Surf.Area= 8,251 sf Storage= 11,925 cf Plug -Flow detention time= 90.3 min calculated for 0.612 of (79% of inflow) Center -of -Mass det. time= 33.4 min ( 816.5 - 783.1 ) Volume Invert Avail.Storage Storage Description #1 297.50' 40,368 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 297.50 5,965 0 0 298.00 7,000 3,241 3,241 299.00 8,091 7,546 10,787 300.00 9,239 8,665 19,452 301.00 10,444 9,842 29,293 302.00 11,705 11,075 40,368 Device Routing Invert Outlet Devices #1 Primary 297.50' 24.0" Round RCP -Round 24" L= 74.4' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 297.50' / 296.00' S= 0.0202 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 297.50' 1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 298.50' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 300.00' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 300.50' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=11.65 cfs @ 12.03 hrs HW=299.13' (Free Discharge) L1=RCP_Round 24" (Passes 11.65 cfs of 14.85 cfs potential flow) �2=Orifice/Grate (Orifice Controls 0.07 cfs @ 6.02 fps) 3=Orifice/Grate (Orifice Controls 11.57 cfs @ 2.89 fps) 4=Orifice/G rate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=297.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 25 Pond 3P: (new Pond) Hydrograph --L--L------'--- - -L- -L -'---'---L--L--L---------L--L--L--L--- 1 --+--+---1---1---r--r-- 18.09 Cfs - - - - - - - - - - - - - M Inflow ---------------------------- 1---1---1--------- - -----;--- InflowArea�.1 Ve-; -- -- ---1--- --L-- �outf�ow ❑ Primary 20 i1--- _Secondary 19 -P1etrf-v_��99:�''---I1--- ----------- -- -- ------ 18 L _L L----'---L -L---------L--L--L--L-- 17 16 1 TS o;-- _F}9T_51-----'---- ----------- 1 -1 r__ r -1 1 1 1 1 -- 1 -- 1 ------ 1 15 14 --+----------- --}-- -- 11.88 Cfs ----------- --+-- --+--- 13 --T-- T--- --------T--T---1---r -----------T--T-- -- --- 12 - - - - - - - - - - - - - - - u 11 z --- - - - ' -- -- -- --------'- -------'--- -- -- -- -- 3 10 --T--T---1---1---F--T--T---1---1 --T---1---1---T--T--T--T--- ° LL -+-- ---'-- -- L -- -----'---' -------'--- L -- -- ---- 7 --rt--4---1---1---r--r-----1---1 , r r , 7 6 --- - - - - - - - - - - - - - - 5 - --------'--- -- L -----'---' ----'--- -- L -- -- L-- 3 0.00 Cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 3P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 ■ Surface ■ Storage 302 301 -----1--L--1----L1-----L-L-------LL-----LL--------' ----'-'- -- ---' w1 w 300 1 -- -- ---- ----- - -------- - ----- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ----- 1 1 --- 1 1 1 0 1 1 1 1 11 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 w 299 298 ----- -r--r----r1 - ---i --- --------1----1-T ---- ---1 Custom Stage Data 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 26 Summary for Pond 4P: (new Pond) Inflow Area = 11.220 ac, 59.98% Impervious, Inflow Depth > 1.74" for 1-year event Inflow = 37.15 cfs @ 11.96 hrs, Volume= 1.626 of Outflow = 26.80 cfs @ 12.02 hrs, Volume= 1.356 af, Atten= 28%, Lag= 3.9 min Primary = 26.80 cfs @ 12.02 hrs, Volume= 1.356 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 264.84' @ 12.02 hrs Surf.Area= 19,351 sf Storage= 23,707 cf Plug -Flow detention time= 80.7 min calculated for 1.353 of (83% of inflow) Center -of -Mass det. time= 32.2 min ( 806.5 - 774.3 ) Volume Invert Avail.Storage Storage Description #1 263.50' 70,810 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 263.50 15,234 0 0 264.00 17,440 8,169 8,169 265.00 19,702 18,571 26,740 266.00 22,021 20,862 47,601 267.00 24,396 23,209 70,810 Device Routing Invert Outlet Devices #1 Primary 261.00' 36.0" Round RCP -Round 36" L= 52.9' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 261.00' / 260.00' S= 0.0189 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 263.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 264.17' 60.0" W x 10.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 265.50' 60.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 266.50' 60.0" W x 60.0" H Vert. Orifice/Grate C= 0.600 #6 Secondary 265.50' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=25.97 cfs @ 12.02 hrs HW=264.83' (Free Discharge) L1=RCP_Round 36" (Passes 25.97 cfs of 64.95 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.12 cfs @ 5.38 fps) 3=Orifice/Grate (Orifice Controls 25.86 cfs @ 2.61 fps) 4=Orifice/Grate ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=263.50' (Free Discharge) L6= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 27 Pond 4P: (new Pond) ..... n A 1 i . - , , i --------------------------------- 10 Pond 4P: (new Pond) 0 2,000 4,000 6,000 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 Surface ❑ Storage -------T------r- -- -----rl----r----n--------r-r------r- --r--- 271 -------+------ - -- --------------u- - - - - --- - ------ --- -- 270 ----L---L------ -L--L----------L --- -Ll --------L -L------L---L-- 269 ---- - - -I----- -T --I ---I ------I---- -----I - - - - -I-- - - -----I- ------ wI w . 268 ---- ---TI I I I I I I I I I I I I I I - I c 7 r-�--� II r---- n I r r 17---r-- f6 267 w 266 265 ---- ----- -I ---I -- - - - ----- ---- -------- ------ --- ---- 264 Custom Stage Data 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 28 Summary for Pond 5P: (new Pond) Inflow Area = 2.000 ac, 41.35% Impervious, Inflow Depth > 1.59" for 1-year event Inflow = 6.12 cfs @ 11.96 hrs, Volume= 0.264 of Outflow = 3.17 cfs @ 12.06 hrs, Volume= 0.184 af, Atten= 48%, Lag= 5.9 min Primary = 3.17 cfs @ 12.06 hrs, Volume= 0.184 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 272.35' @ 12.06 hrs Surf.Area= 6,559 sf Storage= 5,007 cf Plug -Flow detention time= 116.7 min calculated for 0.183 of (69% of inflow) Center -of -Mass det. time= 49.1 min ( 829.4 - 780.3 ) Volume Invert Avail.Storage Storage Description #1 271.50' 17,465 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 271.50 5,054 0 0 272.00 6,157 2,803 2,803 273.00 7,317 6,737 9,540 274.00 8,533 7,925 17,465 Device Routing Invert Outlet Devices #1 Primary 271.00' 24.0" Round RCP -Round 24" L= 20.6' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 271.00' / 270.00' S= 0.0485 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 271.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 273.70' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 272.77' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.12 cfs @ 12.06 hrs HW=272.34' (Free Discharge) L1=RCP_Round 24" (Passes 3.12 cfs of 11.07 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.02 cfs @ 4.31 fps) 3=Orifice/Grate (Orifice Controls 1.55 cfs @ 1.59 fps) 4=Orifice/Grate (Orifice Controls 1.55 cfs @ 1.59 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=271.50' (Free Discharge) L6= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 29 Pond 5P: (new Pond) Hydrograph 2 CfS M Inflow 6.1 --+-- -----------+--+-- --- +--+--+------i--- --+-- MOutflow hf10W Arre9=2.0oO l aC ❑ Primary � � � � � � � � � � _ Secondary , I I I 6 -Fleck El"=21;2:33'; ---,-- - -- +,--- -,�- -- ; -- I I I I I I I I I I I I I I I I I I Sto'r --0 5- ;007 f- --- - -- --+--------'--- --+-- 5 -- t-- t-- t---------t- -t - -t- -t--t--t---------t--t-- H 4- 3.17 Cfs I I I I I I I I I I I I I I I a 3 'L 1 0.00 Cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 0 Pond 5P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 ■ Surface ■ Storage 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 30 Summary for Pond 6P: (new Pond) Inflow Area = 1.790 ac, 35.20% Impervious, Inflow Depth > 1.31" for 1-year event Inflow = 4.60 cfs @ 11.96 hrs, Volume= 0.195 of Outflow = 0.73 cfs @ 12.17 hrs, Volume= 0.130 af, Atten= 84%, Lag= 12.8 min Primary = 0.73 cfs @ 12.17 hrs, Volume= 0.130 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 305.62' @ 12.17 hrs Surf.Area= 4,160 sf Storage= 4,133 cf Plug -Flow detention time= 144.7 min calculated for 0.130 of (67% of inflow) Center -of -Mass det. time= 72.0 min ( 862.9 - 790.9 ) Volume Invert Avail.Storage Storage Description #1 304.50' 22,746 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 304.50 3,032 0 0 305.00 3,706 1,685 1,685 306.00 4,436 4,071 5,756 307.00 5,223 4,830 10,585 308.00 6,066 5,645 16,230 309.00 6,966 6,516 22,746 Device Routing Invert Outlet Devices #1 Primary 302.00' 24.0" Round RCP -Round 24" L= 55.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 302.00' / 300.00' S= 0.0362 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 304.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 305.20' 12.0" Vert. Orifice/Grate C= 0.600 #4 Secondary 307.50' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #5 Device 1 307.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=0.72 cfs @ 12.17 hrs HW=305.62' (Free Discharge) L1=RCP_Round 24" (Passes 0.72 cfs of 30.61 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.00 fps) 3=Orifice/Grate (Orifice Controls 0.69 cfs @ 2.21 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=304.50' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 1-year Rainfall=3.06" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 31 Pond 6P: (new Pond) Hydrograph 4.60 cfs Inflow Arrea=1.790�aC 5 - - - - - -- - - - - - - - - - Pea' k dIe'v 305.62 Stora ey4 133 I I I I I I I I I cf w 3 ----- li--------------- li -- li---i---- ---- li------------i--- li -- u 0 LL I I I I I I I I I I I I I I I I , I I 2 __L__1__J___I___I___L__ 1__1___ I___I __ L__1__J___I___I___ L__ 1__ 0.73 Cfs 1 , 0.00 Cfs 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 6P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 Storage (cubic -feet) ■ Inflow Outflow ❑ Primary Secondary ■ Surface ■ Storage NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 32 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDA P1: (new Subcat) Runoff Area=21.910 ac 37.43% Impervious Runoff Depth>1.32" Tc=5.0 min CN=75 Runoff=56.97 cfs 2.403 of SubcatchmentDA P2: DA 2 MAX IMP Runoff Area=9.450 ac 40.05% Impervious Runoff Depth>1.38" Tc=5.0 min CN=76 Runoff=25.74 cfs 1.087 of SubcatchmentDA P4: (new Subcat) Runoff Area=11.220 ac 59.98% Impervious Runoff Depth>2.29" Tc=5.0 min CN=88 Runoff=48.07 cfs 2.138 of SubcatchmentDA P5: Runoff Area=2.000 ac 41.35% Impervious Runoff Depth>2.12" Tc=5.0 min CN=86 Runoff=8.05 cfs 0.353 of SubcatchmentDA P6: Runoff Area=1.790 ac 35.20% Impervious Runoff Depth>1.80" Tc=5.0 min CN=82 Runoff=6.26 cfs 0.268 of SubcatchmentDA3 MAX: DA 3 MAX IMP Runoff Area=6.160 ac 43.99% Impervious Runoff Depth>2.03" Tc=5.0 min CN=85 Runoff=23.97 cfs 1.044 of SubcatchmentUD 1: Runoff Area=175.189 ac 0.84% Impervious Runoff Depth>1.05" Flow Length=6,400' Tc=55.8 min CN=71 Runoff=107.71 cfs 15.327 of SubcatchmentUD2: Runoff Area=293.364 ac 15.41% Impervious Runoff Depth>1.05" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=183.75 cfs 25.685 of SubcatchmentUD3: Runoff Area=74.030 ac 0.00% Impervious Runoff Depth>0.35" Flow Length=2,280' Tc=25.4 min CN=55 Runoff=16.09 cfs 2.141 of Reach DP 3: (new Reach) Inflow=17.55 cfs 2.343 of Outflow=17.55 cfs 2.343 of Reach POST DP 1: POST DP1 Inflow=113.34 cfs 16.719 of Outflow=113.34 cfs 16.719 of Reach POST DP 2: POST DP2 Inflow=194.20 cfs 29.423 of Outflow=194.20 cfs 29.423 of Pond 1P: (new Pond) Peak EIev=263.07' Storage=52,305 cf Inflow=56.97 cfs 2.403 of Primary=6.03 cfs 1.392 of Secondary=0.00 cfs 0.000 of Outflow=6.03 cfs 1.392 of Pond 2P: (new Pond) Peak EIev=272.43' Storage=20,482 cf Inflow=25.74 cfs 1.087 of Primary=7.49 cfs 0.723 of Secondary=0.00 cfs 0.000 of Outflow=7.49 cfs 0.723 of Pond 3P: (new Pond) Peak EIev=299.43' Storage=14,355 cf Inflow=23.97 cfs 1.044 of Primary=15.86 cfs 0.879 of Secondary=0.00 cfs 0.000 of Outflow=15.86 cfs 0.879 of Pond 4P: (new Pond) Peak EIev=265.01' Storage=26,964 cf Inflow=48.07 cfs 2.138 of Primary=37.24 cfs 1.864 of Secondary=0.00 cfs 0.000 of Outflow=37.24 cfs 1.864 of NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 33 Pond 5P: (new Pond) Peak Elev=272.46' Storage=5,788 cf Inflow=8.05 cfs 0.353 of Primary=5.66 cfs 0.271 of Secondary=0.00 cfs 0.000 of Outflow=5.66 cfs 0.271 of Pond 6P: (new Pond) Peak Elev=305.92' Storage=5,393 cf Inflow=6.26 cfs 0.268 of Primary=1.77 cfs 0.202 of Secondary=0.00 cfs 0.000 of Outflow=1.77 cfs 0.202 of Total Runoff Area = 595.113 ac Runoff Volume = 50.446 of Average Runoff Depth = 1.02" 88.31% Pervious = 525.551 ac 11.69% Impervious = 69.562 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment DA P1: (new Subcat) Runoff = 56.97 cfs @ 11.96 hrs, Volume= 2.403 af, Depth> 1.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 0.324 80 >75% Grass cover, Good, HSG D 8.306 74 >75% Grass cover, Good, HSG C 5.639 98 Paved roads w/curbs & sewers, HSG C 5.080 39 >75% Grass cover, Good, HSG A 2.561 98 Paved oarkina. HSG A 21.910 75 Weighted Average 13.710 61 62.57% Pervious Area 8.200 98 37.43% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5 minute pipe flow Subcatchment DA P1: (new Subcat) Hydrograph --+---+---+--+---+------+---+--+-+---+--+---+------+---+--+---+---I ■Runoff 56.97 cfs 55 �1 ae C - - --i--- 1---I--- L--- L---I --- 1--- L---I --- L- 50 2+year Rainfa'11=3.70" 45 ' Ru n bff rba,21.910 ad ---�--- 1---I--- L--- L---I --- 1--- L---I --- L- 40 R',unpff Volume=',2.403',af ------------------------------------- 35 TR'yun�off 'Devth,,>1;321'___-___'___- a 30 25 20 ---------------i---------i- - - ---i 15 --------------------------------i- 10 ---�--- �i---�--- it---�i---�--- it---�i---�---'+ 5 --- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment DA P2: DA 2 MAX IMP Runoff = 25.74 cfs @ 11.96 hrs, Volume= 1.087 af, Depth> 1.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 3.624 74 >75% Grass cover, Good, HSG C 2.041 39 >75% Grass cover, Good, HSG A 2.340 98 Paved roads w/curbs & sewers, HSG C 1.445 98 Paved roads w/curbs & sewers, HSG A 9.450 76 Weighted Average 5.665 61 59.95% Pervious Area 3.785 98 40.05% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P2: DA 2 MAX IMP Hydrograph ------r------r---r------r---r------r---r--r---r------r----------r- 28 - - - ❑Runoff -- -- -- ---- ---I 25.74 cfs r-- - --- -- -- 26 1 1 _T-H-�4,h --- -- -- - --- -- --- -- --- 24 22 2+year-Railnfa11--3.-70" -- - --- -- - -- -- -- - -- 20 R'unb rba,9.4'50 �ac � I I I I I 1 1 18 _R',unOff Vol un,e=-',1_.d87 !af -I--- -- ------I------I----I--- --- 16 Ru n aff 'De w -T .�pth>1.38r�---r--r---r-- r--- r---I--- r - --�,-- r- - -r - -- a 12 14 - 11i1 --i---------i---i---i -----i---------i---i---i --- ----L---------L------r -----r---------------- 10 - -- 8 6 ---1---1---------L------1---L---1---L--L--- L ------L---------- --- 4 ---i---t---r--r---r---i---r---r---i---r r- -r---i---r---r---i---r--- 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment DA P4: (new Subcat) Runoff = 48.07 cfs @ 11.95 hrs, Volume= 2.138 af, Depth> 2.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 4.490 74 >75% Grass cover, Good, HSG C 6.730 98 Paved roads w/curbs & sewers, HSG C 11.220 88 Weighted Average 4.490 74 40.02% Pervious Area 6.730 98 59.98% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P4: (new Subcat) Hydrograph I I I I I I I I 148 .07 cfs I I I I I I I I I I I I I I I I ------------------------- ■Runoff -------------------------------- -- ' I I - 45 -2-ryear-Rainfall=31W---------r- 40 ' ' -R'un fAr6a=41,�22Qad-- -- 35-R'lunpff Vojur,02.1,38 !af ---! 30 Rlunoff Derth>2.12911'-------'II-- 0 25 T&5.0 Milli LL 20 CN=$8 ---I---r---r--r---r---I---r---r---I---r 15 10 5 Lij 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment DA P5: Runoff = 8.05 cfs @ 11.96 hrs, Volume= 0.353 af, Depth> 2.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 0.366 98 Paved roads w/curbs & sewers, HSG C 0.461 98 Paved roads w/curbs & sewers, HSG D 0.607 74 >75% Grass cover, Good, HSG C 0.566 80 >75% Grass cover, Good, HSG D 2.000 86 Weighted Average 1.173 77 58.65% Pervious Area 0.827 98 41.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P5: Hydrograph � � � � � � � � � � � � � � � � � � � � ❑Runoff --- --- ------ ---T 8.05 cfs T------ --- ------ ---- 8 Typip 11 124,l,hr, rRa[nfaill= 7WF 7 2Tye --- -- -Rundf#'Ard-a=�2-Q00Tac�---T---T 6 R'u n Off 'Vol u nee=0.3 .Sl, of 5 Runoff Depth>2! 12" 4 Ttc=5.0-wnir - -- - --- -- ---iL- ,I- - -, - -- +- - -,- -- - -- 3 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment DA P6: Runoff = 6.26 cfs @ 11.96 hrs, Volume= 0.268 af, Depth> 1.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 0.630 98 Paved roads w/curbs & sewers, HSG C 1.160 74 >75% Grass cover, Good, HSG C 1.790 82 Weighted Average 1.160 74 64.80% Pervious Area 0.630 98 35.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P6: Hydrograph � � � � � � � � � � � � � � � � I ■Runoff 6.26 cfs 6 Type -H- I�Ihr --- -- 2TyearRairnfaill=3.70" ---I---+---I ----------- I ---+---I--- - --- r 5 R�unbff'Arba-1.790'*a ,'-R'Iungf#'Iv0ume=0.�6taf w 4 I I I I I I I I I RlunOff (Depth>1,80'' LL 3 Tic=5.-0-Iwnir ----- --- -- C'IN=82 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment DA3 MAX: DA 3 MAX IMP Runoff = 23.97 cfs @ 11.96 hrs, Volume= 1.044 af, Depth> 2.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 3.450 74 >75% Grass cover, Good, HSG C 2.710 98 Paved roads w/curbs & sewers, HSG C 6.160 85 Weighted Average 3.450 74 56.01 % Pervious Area 2.710 98 43.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA3 MAX: DA 3 MAX IMP Hydrograph ------+------+---+------+---+------ +------+---+------+----------+- 26 - - ■Runoff --- r--- r--r---r--- I---r---r-- 23.97 cfs r---r--- r---r-- r--- 24 1H4-hx JTI^r-- � r r---i---r---r---i---r- ---r---r---i---r---r---i---r--- 22 -2 par Ra!nfa11=3.-7w"-!------! ----;---!------I---r------! --- 20 1 -Ru1n6ff Area.-101 a -- -- - --- -- --- 18 16 R'u�-ffVolume-,1-.Q44�f--- -- -- --- -- -- --- -� 14 Runoff- De th>2:G3'�-- -- 12 Tic=v.0 h----- 1ir -- -- --- -- --- - -I- - - � - - I - - - - - 4 - - 6 4 r - - -I- - - r - r - - - r - - - - - - r - - - - - - - - - - - - - - 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment UD 1: Runoff = 107.71 cfs @ 12.61 hrs, Volume= 15.327 af, Depth> 1.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 4.459 30 Woods, Good, HSG A 21.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 113.857 70 Woods, Good, HSG C 29.253 77 Woods, Good, HSG D 175.189 71 Weighted Average 173.724 71 99.16% Pervious Area 1.465 98 0.84% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total Subcatchment UD 1: Hydrograph 120---i------II--- ---i---II------II--- -------------II------II--- ---li ----- ■Runoff --------------------�-----I---I- 1- L- �- 107.71 cfs I -- I --I -- A 105 -Tp� ��[['F',,�K-'r----�'---'------'--- ----'---'---'------'r-- --- 195-21y�a- FI ai fG1O ',7�n --i------i-------i---,---i--- ------ go)----I-R'----L- ' --- L--- L---AL -- L--- 1--- 1---'--- L---'--- L--- 1--- L--- L--L--- 85-Ru-fbff-�4rea=17-5r189at--Y r ---r-- Y r 80 1 Nw ,I_- 'I '- - - -- -_ _I - - - I-'-- -- -- -- _- _-I-- -- -- IL - fu775 -nbff-Volume=1-5r327af --- -- 65 un6De0E"-- ----- --- -- --- ----- 1--------- +IT1 --- --- --L-- ---- -ff01.---1-- p# I -- I -- --- - I I I I I I I 55 nW ength=1fi,100 --- - -- - ---- --- --1~50 -- --- LL _�__�___�-__1---+---I-- - __I---I------+-__�--I- 45-T�=45.81- in- -----T------T---'I-- ------T------T---' --T--- 40 --'---L------L---'---' ---'-- ------L---'---'--------- 35 TJ ,i 30---�--- �,---�---?---,-- -II --- ,-- -- -- it - - --- ---�, �--- ,-- -- -- �i---�--- it--- 20T ---I---r---I---r---r--r---r---I--- r - - - I-- ---r-- ---r--r---r--r--- 15---'---------I-------'---------I---'---------'- I---'--- --- 1 NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment UD2: Runoff = 183.75 cfs @ 12.60 hrs, Volume= 25.685 af, Depth> 1.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 40.326 54 1/2 acre lots, 25% imp, HSG A 18.198 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 129.984 80 1/2 acre lots, 25% imp, HSG C 48.796 70 Woods, Good, HSG C 43.700 77 Woods, Good, HSG D 10.550 85 1/2 acre lots, 25% imp, HSG D 293.364 71 Weighted Average 248.149 67 84.59% Pervious Area 45.215 98 15.41 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total Subcatchment UD2: Hydrograph ---1---r---r--r---r--r---r---1---r------r---r---1---r---1---r---r--r--- 200 �1 1 1 Runoff T---�---T--- F-- ---- T--- ---T- 183.75 cfs 'I-- T--- ---T---F--,--- 190------I---'-------------- ------ ----------------- --I 180-T11�i-K-'�------'�---'I--- I'I---'I--- F------'�---'I--- I'I ---'F -- I'I--- 160-21�e1_r Fl�air��a�l=�.7�yr--1---1---'--- L--- '---L---'---1---L-- --- 150 kulnbff-Area=293.-364ac-- --;--- ---;-- --;--- --I -- 140---1--------------------------+------ ------------+--- -- --- 130 1 -Ru-n6 f Volumb=2-5.-685-af+---�--- ------ ------ --- -- --- N 12O -r- TfY___I___Y___I___---I--- r--- Y--- r -- r--- 110 -F-;un-f-DeOthFT.�5-r---I---T---I--- ------r---I---T---F--;--- 0 100 � tertg h=�,9I (YI- - - I - -- ---I-- -- --I--- --I--- --- a90------------------------------- - --- -- - ----- I --- --- I --- ---I--- 80-T��j4:4-- --- --- - -- - - --- --- --- 70 /►iA' ---------'------'--- ---'-- -- -------- '------'--- --- 60 --- --- -- --- 50 ------------T-----------------+----- --------------+--- ------ I I 40---1---r---r--r---r--r---r---1--- + --- 1-- ---r--r---1---+---r--I--- '1 30 - - -I r - I- - - r - - - r - - r - - - r - - -I Y � T 1- - - 20I T---T- --- T---T 1IT - ---1- r 10 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment UD3: Runoff = 16.09 cfs @ 12.28 hrs, Volume= 2.141 af, Depth> 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.70" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 46.615 70 Woods, Good, HSG C 74.030 55 Weighted Average 74.030 55 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total Subcatchment UD3: Hydrograph 18 ---i---+---r--+---r---i---+---r---i---+---r--+---r---i---+---r---i---+--- ❑Runoff 17 - 16.09 cfs -- --------------------- 16 -Type-H-24,hT 1 - ---t I---L ---'---L -- - ---L ---'--- ---'---'--- --- 15--- ---------------- --- 2=+ye-Ra[nfa11=37W"- -- -- -- 14 - -- --- --------- ---- y� r- ----r---i--- ---i------r--- 13-Rundff Ar a=1�.�}39 ---�--- 12 11 _A,unffo ur>�e=_',2.141_ of------1 --- ---�'�---I---�'�----�'�------ u 10 Ri----i------i ----i---------i------i --- unOff D t[T>a35' 8 FIQV1r_L$_n thT2-1280'--- -- -- -I----------------- -r--- r--r---r------r---r--- ---r- --r---r--r---r------r--- 5- -DN= S-----------------------'--- - - -}-----------------+--- 4j----------��---------------------�- -----------��-------- 3 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 43 Summary for Reach DP 3: (new Reach) Inflow Area = 75.820 ac, 0.83% Impervious, Inflow Depth > 0.37" for 2-year event Inflow = 17.55 cfs @ 12.27 hrs, Volume= 2.343 of Outflow = 17.55 cfs @ 12.27 hrs, Volume= 2.343 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach DP 3: (new Reach) Hydrograph --�---r---i---r--�---r--�---r_ �---r--�---r---i---r--�---r--�---r-- ■ Inflow 19 -----r------r--1---r-- ---r- - 1r ------r-- ---r-- 'r--,--- ---r-- Outflow 18 - ;- - ---I - -r --;- 1 ff j�)w � krp-a,=7 -- 17.55 cfs $2Q r -r -r--- -r- ---r------ r-r--r- -rr---r- -- F 17 16 15 14 -L---L------L--L---L--L ---L--L ---' -L------L--L---L--L---L-- 13 -L---L------L--L--- L--L--- L- -L--- -L--- ---L--L --- L--L --- L-- 12 ----L------L-- --- -- --- -- --- -L------L-- --- -- ---r-- " 10 3 ------ r--- ---r-----'r-- ---'r-- --- r------r------'r-- ---r-- 0 9 -- r--- r-- r---r--r---r -- r--- r - -r - -- r--r---r--r---r--r---r-- LL 6 5 4 -L---L__- ---L-----L_-L --- L--L-- - -L - -L -- - 3 - ----L------L--L---L--L---L-- -- - - - --- 2 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 44 Summary for Reach POST DP 1: POST DP1 Inflow Area = 197.099 ac, 4.90% Impervious, Inflow Depth > 1.02" for 2-year event Inflow = 113.34 cfs @ 12.61 hrs, Volume= 16.719 of Outflow = 113.34 cfs @ 12.61 hrs, Volume= 16.719 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs 125 120 115 110 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 Reach POST DP 1: POST DP1 Hydrograph 1 - - -'- - - L - -�f� �4V1� rpa-1� .Avv-dC 113.34 cfs ---------------------------i- --- ------I--- ---'--- -----------------I- ------I------'--- ------ ------- - -- -I- - + - - - - - - + - - - - - - + - - - -----Ir--- --li---I---li---T---li--- T - - - li - - L - - -'- - - 1 - - -'- - - 1 - - -'- - - 1 - - -'- -- T- --II- -- T---II - -- T-- - II - -- T-- - II - -- r---II -'- - - 1 - - -'- - - 1 - - -'- - - 1 - - -'- - - L - - -' --T---II--T------ T------ T--- - --r---II 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 45 Summary for Reach POST DP 2: POST DP2 Inflow Area = 322.194 ac, 18.39% Impervious, Inflow Depth > 1.10" for 2-year event Inflow = 194.20 cfs @ 12.58 hrs, Volume= 29.423 of Outflow = 194.20 cfs @ 12.58 hrs, Volume= 29.423 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach POST DP 2: POST DP2 Hydrograph ■ Inflow 210 - --- -- -------T - -----r---I- -r- 1 1 QA gn rfQ -r-- --- -- --- - +------+--- -T - -- 0Outflow 200 ----------------I'------�w-'--- -[jjfjG � 4i�pa=32 194.20 cfs .-194-dC -----'--- --I -- ---I -- ---I--- --- 190 --r---r--r------r------r---I---r---I- r---r--r---r--r---I---r--- 180 ------I--- ---I--------------------I- ---I--- ---I--- ---I--- --- 170 --J---1---1---1---1------i------L---'- --L-- ---L--1---1---+--- 160 ----I--- ---I------I--- ---I--- ---I- -- -- --- -- ------+-- 150 --7---------- Ir--7---1i---r---Ir--r---li --r-- ---Ir--7---Ir--rt--- 140 -- - -- - - - - - - - - -- - - - - - -- _ 130 --L---'--- ---1---1---'--- ------1---' -- -- ---L--1------+--- w 120 U - - - - - + - - - - - + - - - - - + - - - - - + - -I - - + - - + - - + - - + - -I- - - + - 3 110 I ----------- -------- -------- - -, --- --,---I---, -----------I--- 0 100 -- - -- - - - - - - - -- - - - - - -- 90 --+------+------+------+------+-- -+--+---+--+---+--+--- 80 --------- --------- -----r---- - -r - -- r -r--,---Ir--I------T--- 70 -- - -- - - - - - - - -- - - - - - -- 60 --J---1---L------1------L------L- L- -L---L--1---1---+--- 50 --y---Ir-- ---+--rt---li---+---li---r-- r-- 1---Ir--rt---Ir--+--- 40 --------------- +-- --------- - - I--- ----I ------------ 30 -- - -- - - - - - - -- - 20 10 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 46 Summary for Pond 1 P: (new Pond) Inflow Area = 21.910 ac, 37.43% Impervious, Inflow Depth > 1.32" for 2-year event Inflow = 56.97 cfs @ 11.96 hrs, Volume= 2.403 of Outflow = 6.03 cfs @ 12.43 hrs, Volume= 1.392 af, Atten= 89%, Lag= 28.0 min Primary = 6.03 cfs @ 12.43 hrs, Volume= 1.392 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 263.07' @ 12.43 hrs Surf.Area= 22,877 sf Storage= 52,305 cf Plug -Flow detention time= 164.8 min calculated for 1.389 of (58% of inflow) Center -of -Mass det. time= 82.8 min ( 882.3 - 799.5 ) Volume Invert Avail.Storage Storage Description #1 260.50' 127,850 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 260.50 17,090 0 0 261.00 18,913 9,001 9,001 262.00 20,793 19,853 28,854 263.00 22,729 21,761 50,615 264.00 24,721 23,725 74,340 265.00 26,711 25,716 100,056 266.00 28,877 27,794 127,850 Device Routing Invert Outlet Devices #1 Primary 260.50' 24.0" Round RCP -Round 24" L= 67.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 260.50' / 255.25' S= 0.0784 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 260.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #5 Secondary 264.61' 65.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #6 Device 1 264.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=6.01 cfs @ 12.43 hrs HW=263.07' (Free Discharge) L1=RCP_Round 24" (Passes 6.01 cfs of 23.72 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.26 cfs @ 7.57 fps) 3=Orifice/Grate (Orifice Controls 2.88 cfs @ 2.21 fps) 4=Orifice/Grate (Orifice Controls 2.88 cfs @ 2.21 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=260.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 47 Pond 1 P: (new Pond) Hydrograph r--T--- ------r--r--r- --I-- 56.97 FLIhfl0WAkea#2s1.9'110' aat.60 5s - 50 -------- -- -- --- --- 45- 40 u 35 0 30 -- t__ r------I--- r -- r -- r------I--- r 25 - 1 -- L------'--- L L -- 1---'--- 15 .03 6fs 10 C 0.00 Cfs ---------1 - -- - - -r - - - Cfs i outflow ----------------- ------ !MInflow Primary -- - --III--- III --- Ir--Ir--r-- r--- Secondary I - - - L - I I - L- I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 1 P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 266 - ---rt-- t----r- t------t--- -----+----II----t----I-Y- ---r t-�- 265 f/ 264 w I I I I I I I I I I I I I I I w I I I I I I I I I I I u I I I I I I I 0 263 w I I I I I I I I I I I u I I I I I I I W----1----L1--J---L-J__1----1---1-1----1----1----1 --1-L--1------1-1- 262 261 Custom Stage Data 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) LJ Surface ■ Storage NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 48 Summary for Pond 2P: (new Pond) Inflow Area = 9.450 ac, 40.05% Impervious, Inflow Depth > 1.38" for 2-year event Inflow = 25.74 cfs @ 11.96 hrs, Volume= 1.087 of Outflow = 7.49 cfs @ 12.10 hrs, Volume= 0.723 af, Atten= 71 %, Lag= 8.6 min Primary = 7.49 cfs @ 12.10 hrs, Volume= 0.723 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 272.43' @ 12.10 hrs Surf.Area= 12,071 sf Storage= 20,482 cf Plug -Flow detention time= 130.4 min calculated for 0.721 of (66% of inflow) Center -of -Mass det. time= 55.6 min ( 853.0 - 797.4 ) Volume Invert Avail.Storage Storage Description #1 270.50' 56,463 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 270.50 8,641 0 0 271.00 10,007 4,662 4,662 272.00 11,429 10,718 15,380 273.00 12,908 12,169 27,549 274.00 14,443 13,676 41,224 275.00 16,035 15,239 56,463 Device Routing Invert Outlet Devices #1 Primary 270.50' 24.0" Round RCP -Round 24" L= 39.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 270.50' / 270.00' S= 0.0127 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 270.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.00' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 273.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 273.50' 60.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=7.43 cfs @ 12.10 hrs HW=272.43' (Free Discharge) L1=RCP_Round 24" (Passes 7.43 cfs of 15.96 cfs potential flow) �2=Orifice/Grate (Orifice Controls 0.14 cfs @ 6.55 fps) 3=Orifice/Grate (Orifice Controls 7.29 cfs @ 2.11 fps) 4=Orifice/G rate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=270.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 49 •- i � � • - i• 7.4CfS Pond 2P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,00011,000 12,00013,00014,000 15,00016,000 ❑ Surface ■ Storage 275 274 ----L-1--1---11---JJ--J--LJ---JL--J-------JI----I--1 L - - -L -L-t wI w I ---r---T---IT---T1--1--11---11--- I I I I I I I I I I I -I---1I----I-7--r-- r--- rr--T --I- I I I I I I I I I I I I I I I I I I I II I I I I I I I I I 273 o I I I I I I I I I II I I I u I I I I I I I I I > ---L-1--1---11---1-1 II --i_j- -- --L---L L--i--I- w w 272 271 ---r- T---IT---T1--1--11---11 --1-----1--r --r r--- r r-- T--I- Custom Stage Data 0 5,600 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 50 Summary for Pond 3P: (new Pond) Inflow Area = 6.160 ac, 43.99% Impervious, Inflow Depth > 2.03" for 2-year event Inflow = 23.97 cfs @ 11.96 hrs, Volume= 1.044 of Outflow = 15.86 cfs @ 12.03 hrs, Volume= 0.879 af, Atten= 34%, Lag= 4.3 min Primary = 15.86 cfs @ 12.03 hrs, Volume= 0.879 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 299.43' @ 12.03 hrs Surf.Area= 8,582 sf Storage= 14,355 cf Plug -Flow detention time= 76.0 min calculated for 0.879 of (84% of inflow) Center -of -Mass det. time= 28.4 min ( 805.0 - 776.6 ) Volume Invert Avail.Storage Storage Description #1 297.50' 40,368 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 297.50 5,965 0 0 298.00 7,000 3,241 3,241 299.00 8,091 7,546 10,787 300.00 9,239 8,665 19,452 301.00 10,444 9,842 29,293 302.00 11,705 11,075 40,368 Device Routing Invert Outlet Devices #1 Primary 297.50' 24.0" Round RCP -Round 24" L= 74.4' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 297.50' / 296.00' S= 0.0202 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 297.50' 1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 298.50' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 300.00' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 300.50' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=15.63 cfs @ 12.03 hrs HW=299.41' (Free Discharge) L1=RCP_Round 24" (Passes 15.63 cfs of 18.18 cfs potential flow) �2=Orifice/Grate (Orifice Controls 0.08 cfs @ 6.55 fps) 3=Orifice/Grate (Orifice Controls 15.55 cfs @ 3.89 fps) 4=Orifice/G rate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=297.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 51 Pond 3P: (new Pond) Hydrograph i - - T - -I - - -I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 23 97 CfS M Inflow ---------------------�+-------------- -- -- ------ (Outflow - InfloYY�-Area.-1 i70 lac ❑ Primary � � ; ; � � � �� Secondary 26 243F;-- - + - - -I - - - I- - - + - - + - - + - - -- 22 _StorageT_14}3551ICf''- -'--------'---'--'-----'--- 20 --+--+---------+--+--+-- -+---------+--+--+--+--- 18 15.86 Cfs 16 -- �i---�i---it---;I --;I -- �i---it---;- -- �i---�i---it---;I --;I -- �i---li--- w--1--1---------L--L--L---'---' --L---------L--L--L--L--- 14 'i 3- -T--T---------r- T--T-- -i---i -----------T--T-- -- --- a 12-1--L---------L--L--L---'---' -L---'---'---L--L--L--L-- 10 - -T--T------------ r-- T-- - i---i --T---------r--r--T--T--- 4 0.00 Cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 3P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 ■ Surface ■ Storage 302 -----1--L--1----L1-----L-L-------1L-----LL--------'----'-'- -- ---' 301 -- -- - - -- - - - - -- --------- ----- --- 300 1 11 >-----'--L--L----L'---L-L---'----LL-----LL-------1-1-----'-'----L---' w 299 ------r--T----ri - ---i --- ---- ---------i-T ---- ---i 298 Custom Stage Data 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 52 Summary for Pond 4P: (new Pond) Inflow Area = 11.220 ac, 59.98% Impervious, Inflow Depth > 2.29" for 2-year event Inflow = 48.07 cfs @ 11.95 hrs, Volume= 2.138 of Outflow = 37.24 cfs @ 12.01 hrs, Volume= 1.864 af, Atten= 23%, Lag= 3.4 min Primary = 37.24 cfs @ 12.01 hrs, Volume= 1.864 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 265.01' @ 12.01 hrs Surf.Area= 19,728 sf Storage= 26,964 cf Plug -Flow detention time= 69.6 min calculated for 1.859 of (87% of inflow) Center -of -Mass det. time= 29.0 min ( 797.1 - 768.1 ) Volume Invert Avail.Storage Storage Description #1 263.50' 70,810 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 263.50 15,234 0 0 264.00 17,440 8,169 8,169 265.00 19,702 18,571 26,740 266.00 22,021 20,862 47,601 267.00 24,396 23,209 70,810 Device Routing Invert Outlet Devices #1 Primary 261.00' 36.0" Round RCP -Round 36" L= 52.9' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 261.00' / 260.00' S= 0.0189 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 263.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 264.17' 60.0" W x 10.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 265.50' 60.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 266.50' 60.0" W x 60.0" H Vert. Orifice/Grate C= 0.600 #6 Secondary 265.50' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=36.52 cfs @ 12.01 hrs HW=265.00' (Free Discharge) L1=RCP_Round 36" (Passes 36.52 cfs of 66.10 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.13 cfs @ 5.73 fps) 3=Orifice/Grate (Orifice Controls 36.39 cfs @ 2.92 fps) 4=Orifice/Grate ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=263.50' (Free Discharge) L6= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 53 Pond 4P: (new Pond) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 4P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 271 w 268 0 267 w w ----- 24,000 F Surface ❑ Storage -- -- II-----I-- - -----I- ---� ---- �� Custom Stage Data, 10,000 20,006 30,000 40,000 50,000 60,000 70,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 54 Summary for Pond 5P: (new Pond) Inflow Area = 2.000 ac, 41.35% Impervious, Inflow Depth > 2.12" for 2-year event Inflow = 8.05 cfs @ 11.96 hrs, Volume= 0.353 of Outflow = 5.66 cfs @ 12.02 hrs, Volume= 0.271 af, Atten= 30%, Lag= 4.1 min Primary = 5.66 cfs @ 12.02 hrs, Volume= 0.271 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 272.46' @ 12.02 hrs Surf.Area= 6,696 sf Storage= 5,788 cf Plug -Flow detention time= 97.4 min calculated for 0.271 of (77% of inflow) Center -of -Mass det. time= 38.7 min ( 812.7 - 773.9 ) Volume Invert Avail.Storage Storage Description #1 271.50' 17,465 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 271.50 5,054 0 0 272.00 6,157 2,803 2,803 273.00 7,317 6,737 9,540 274.00 8,533 7,925 17,465 Device Routing Invert Outlet Devices #1 Primary 271.00' 24.0" Round RCP -Round 24" L= 20.6' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 271.00' / 270.00' S= 0.0485 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 271.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 273.70' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 272.77' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=5.45 cfs @ 12.02 hrs HW=272.45' (Free Discharge) L1=RCP_Round 24" (Passes 5.45 cfs of 12.56 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 4.60 fps) 3=Orifice/Grate (Orifice Controls 2.71 cfs @ 1.91 fps) 4=Orifice/Grate (Orifice Controls 2.71 cfs @ 1.91 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=271.50' (Free Discharge) L6= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 55 Pond 5P: (new Pond) Hydrograph --r-- -----I-----r--T--------I---- -r- -T- ----I--- -- --T-- 8.05 CfS ■ Inflow ,II --I-----IIII------T- -I------N---------T--T-- il- ■Outflow 9 Primary I hf10W Arre9=2.0W aC O SPrZ econdary ry Freak EIev=27112.46'lll---I---I- -- II -----I---I---II --II -- -- 7 StoraoeT5,788 df --r--rt--y---------t--t-- 5.66 Cfs--t--t-----------r--t-- 6 --T--T-- -- T--T--7---I--T--T--T- - -II- - --F T-- w 5 I I I I I I I I I I I I I I I I I 3 ,I -- II -----I---I---II -- II -- -- ---I -- II -----I---I---II --II -- -- 0 4 LL 3 2 0.00 Cfs 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 0 500 Pond 5P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 ■ Surface ■ Storage 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 56 Summary for Pond 6P: (new Pond) Inflow Area = 1.790 ac, 35.20% Impervious, Inflow Depth > 1.80" for 2-year event Inflow = 6.26 cfs @ 11.96 hrs, Volume= 0.268 of Outflow = 1.77 cfs @ 12.10 hrs, Volume= 0.202 af, Atten= 72%, Lag= 8.6 min Primary = 1.77 cfs @ 12.10 hrs, Volume= 0.202 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 305.92' @ 12.10 hrs Surf.Area= 4,376 sf Storage= 5,393 cf Plug -Flow detention time= 117.7 min calculated for 0.201 of (75% of inflow) Center -of -Mass det. time= 55.4 min ( 839.5 - 784.1 ) Volume Invert Avail.Storage Storage Description #1 304.50' 22,746 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 304.50 3,032 0 0 305.00 3,706 1,685 1,685 306.00 4,436 4,071 5,756 307.00 5,223 4,830 10,585 308.00 6,066 5,645 16,230 309.00 6,966 6,516 22,746 Device Routing Invert Outlet Devices #1 Primary 302.00' 24.0" Round RCP -Round 24" L= 55.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 302.00' / 300.00' S= 0.0362 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 304.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 305.20' 12.0" Vert. Orifice/Grate C= 0.600 #4 Secondary 307.50' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #5 Device 1 307.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=1.77 cfs @ 12.10 hrs HW=305.92' (Free Discharge) L1=RCP_Round 24" (Passes 1.77 cfs of 32.30 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.65 fps) 3=Orifice/Grate (Orifice Controls 1.74 cfs @ 2.88 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=304.50' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 2-year Rainfall=3.70" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 57 Pond 6P: (new Pond) Hydrograph --r-- -- --------r--T------------ -r- -T- - ------ -- --T-- 6.26 Cfs LInfloww -ryy�`-w-`-j�-.y N-------------------r-- -- ry 7 Ihf]O Area=1.790'ac ndary -F�eal05.2'I'---'-- - -- - -- 6 Sto'ra eT5 '393 of -L--L--L---------L--L--L------II--L-------------L--�- w 4 - - a 3 1 77 cfS 2 1 0.00 Cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 6P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 Storage (cubic -feet) ■ Surface ■ Storage NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 58 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDA P1: (new Subcat) Runoff Area=21.910 ac 37.43% Impervious Runoff Depth>2.59" Tc=5.0 min CN=75 Runoff=110.57 cfs 4.733 of SubcatchmentDA P2: DA 2 MAX IMP Runoff Area=9.450 ac 40.05% Impervious Runoff Depth>2.68" Tc=5.0 min CN=76 Runoff=49.15 cfs 2.111 of SubcatchmentDA P4: (new Subcat) Runoff Area=11.220 ac 59.98% Impervious Runoff Depth>3.84" Tc=5.0 min CN=88 Runoff=77.86 cfs 3.586 of SubcatchmentDA P5: Runoff Area=2.000 ac 41.35% Impervious Runoff Depth>3.63" Tc=5.0 min CN=86 Runoff=13.35 cfs 0.605 of SubcatchmentDA P6: Runoff Area=1.790 ac 35.20% Impervious Runoff Depth>3.24" Tc=5.0 min CN=82 Runoff=10.94 cfs 0.483 of SubcatchmentDA3 MAX: DA 3 MAX IMP Runoff Area=6.160 ac 43.99% Impervious Runoff Depth>3.53" Tc=5.0 min CN=85 Runoff=40.28 cfs 1.812 of SubcatchmentUD 1: Runoff Area=175.189 ac 0.84% Impervious Runoff Depth>2.20" Flow Length=6,400' Tc=55.8 min CN=71 Runoff=236.74 cfs 32.160 of SubcatchmentUD2: Runoff Area=293.364 ac 15.41% Impervious Runoff Depth>2.20" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=403.64 cfs 53.888 of SubcatchmentUD3: Runoff Area=74.030 ac 0.00% Impervious Runoff Depth>1.06" Flow Length=2,280' Tc=25.4 min CN=55 Runoff=71.57 cfs 6.518 of Reach DP 3: (new Reach) Inflow=75.04 cfs 6.930 of Outflow=75.04 cfs 6.930 of Reach POST DP 1: POST DP1 Inflow=255.42 cfs 35.852 of Outflow=255.42 cfs 35.852 of Reach POST DP 2: POST DP2 Inflow=422.45 cfs 61.100 of Outflow=422.45 cfs 61.100 of Pond 1P: (new Pond) Peak Elev=264.61' Storage=89,835 cf Inflow=110.57 cfs 4.733 of Primary=33.35 cfs 3.692 of Secondary=0.01 cfs 0.000 of Outflow=33.36 cfs 3.692 of Pond 2P: (new Pond) Peak Elev=273.48' Storage=33,969 cf Inflow=49.15 cfs 2.111 of Primary=24.64 cfs 1.740 of Secondary=0.00 cfs 0.000 of Outflow=24.64 cfs 1.740 of Pond 3P: (new Pond) Peak EIev=300.21' Storage=21,393 cf Inflow=40.28 cfs 1.812 of Primary=24.88 cfs 1.644 of Secondary=0.00 cfs 0.000 of Outflow=24.88 cfs 1.644 of Pond 4P: (new Pond) Peak EIev=265.47' Storage=36,204 cf Inflow=77.86 cfs 3.586 of Primary=56.10 cfs 3.306 of Secondary=0.00 cfs 0.000 of Outflow=56.10 cfs 3.306 of NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 59 Pond 5P: (new Pond) Peak Elev=272.68' Storage=7,230 cf Inflow=13.35 cfs 0.605 of Primary=10.72 cfs 0.523 of Secondary=0.00 cfs 0.000 of Outflow=10.72 cfs 0.523 of Pond 6P: (new Pond) Peak Elev=306.71' Storage=9,102 cf Inflow=10.94 cfs 0.483 of Primary=3.84 cfs 0.413 of Secondary=0.00 cfs 0.000 of Outflow=3.84 cfs 0.413 of Total Runoff Area = 595.113 ac Runoff Volume = 105.895 of Average Runoff Depth = 2.14" 88.31% Pervious = 525.551 ac 11.69% Impervious = 69.562 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 60 Summary for Subcatchment DA P1: (new Subcat) Runoff = 110.57 cfs @ 11.96 hrs, Volume= 4.733 af, Depth> 2.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 0.324 80 >75% Grass cover, Good, HSG D 8.306 74 >75% Grass cover, Good, HSG C 5.639 98 Paved roads w/curbs & sewers, HSG C 5.080 39 >75% Grass cover, Good, HSG A 2.561 98 Paved parking, HSG A 21.910 75 Weighted Average 13.710 61 62.57% Pervious Area 8.200 98 37.43% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5 minute pipe flow Subcatchment DA P1: (new Subcat) Hydrograph 120 ' ------ ---II--- ---I---II------II------II--- -- 110.57 cfs --- ---II--- ---+--- ---I ---+--------- ----- ■Runoff 110 105 l -� pp h-I 43h------ T----- -T - --r --- ------T------T---Ir--;--- --`r----1---L--J---L---1---1---I- ---L------L------1---L--L--- I I 95 195 i -1Q=y�'-RaintfaII=5144"---II--- ---II----lr---ll--- - - - ---II--- I---lr-- --- 90 85 - _RlundfFArda=2t,9 9 aC--' ---II----+------+---I--- ---------- ------- ---I+-- ------ --- --- 80 75 'I _Rllura+ I olu e--&131-af+---I- --------- O I = I +--- ---+ - -- -- --- N 70 .V.. 65 _ _I�_�_--L_ _ 1_1T_ L ^/J _A_+___ I___1___I_ ___L---I___ -RliUn� IDepth>2.59',-__I---Y---I----r--_I___+___I___Y--- L___I___ 1___ L__J___ 3 60 1 55 - ---------------------------------I- -------------------I- I I I I I I I -1i���.0 iFF ----- +------+---I- - r---I- +------+- r--y--- 45 ,I ----------I----------I--- I --- I - -- ---I- -C IIhF�i--I--- --- -- ---+------+---I- ---------+------+--- I I I I I I I I I I I I I ---1--- I I 40 I 25 I I --------------I------------------I ---I------------------I I -------I--- 15 --------------I------------------I ---I ----------- --I-------I--- 5 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 61 Summary for Subcatchment DA P2: DA 2 MAX IMP Runoff = 49.15 cfs @ 11.96 hrs, Volume= 2.111 af, Depth> 2.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 3.624 74 >75% Grass cover, Good, HSG C 2.041 39 >75% Grass cover, Good, HSG A 2.340 98 Paved roads w/curbs & sewers, HSG C 1.445 98 Paved roads w/curbs & sewers, HSG A 9.450 76 Weighted Average 5.665 61 59.95% Pervious Area 3.785 98 40.05% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P2: DA 2 MAX IMP Hydrograph ❑ Runoff --- i--L--- i - - -L -- 49.15 cfs L--- 1-- - --- 50 -TOO H-Z4,hr_!---I--- ---!---I---r- 45 Rain!fal1=5.44"-- -- 40 R�u n bff rba,9.4'50 '�ac -I--- Y---I--- r--- r---I --- r --- r---I--- r- 35 R'Iunpff Volume='12.1'l 'Iaf I ------------------------------------ -- I I I I I I I I I I 30 R'Iunoff 'IDeipth>2.68�I' LL 25 Ttc=5.0 enih 15 10 5 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 62 Summary for Subcatchment DA P4: (new Subcat) Runoff = 77.86 cfs @ 11.95 hrs, Volume= 3.586 af, Depth> 3.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 4.490 74 >75% Grass cover, Good, HSG C 6.730 98 Paved roads w/curbs & sewers, HSG C 11.220 88 Weighted Average 4.490 74 40.02% Pervious Area 6.730 98 59.98% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P4: (new Subcat) Hydrograph -T------,---T------T---T------T------,---T------T----------T--- 85 1 ■Runoff 80 77.s 86 cf p_ L----1------L---�--- - ------L---I----------I---1--- 75�Y--4,��1P---'�--- ---'�------'� -------'�---'�-------------'� --- 70 -1-01 I - - - ��------r--- 65 Run6ff Ar6a=41-220 ad----- - -- --- -- --- 60------+------ ---------'--- ------ -- --- -----------------k 55 -R'u qf# VoNur� e=15865, of -'---L - - ---L---1---L----------L--- 50 I I I I I I I I 45 -Runoff De -fh>1.8WV- -- -- -- - --- -- -- --- 3--r---r-- ---r---i---r---r---i---r --r---r---i---r---r---i---r--- 40-ii��-3.-O-mi�--+------+---+---i---+ --+---+---i---+---i----i---+--- LL35 RF Q 30 --- 25 20- -----+---r-- r--- r------ r--- r-- -i---r --r---r------r---r---I---+--- 15---1---1---L-----L- -----L---L---i---L -- ---L------L---L------L--- 10 5 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 63 Summary for Subcatchment DA P5: Runoff = 13.35 cfs @ 11.95 hrs, Volume= 0.605 af, Depth> 3.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 0.366 98 Paved roads w/curbs & sewers, HSG C 0.461 98 Paved roads w/curbs & sewers, HSG D 0.607 74 >75% Grass cover, Good, HSG C 0.566 80 >75% Grass cover, Good, HSG D 2.000 86 Weighted Average 1.173 77 58.65% Pervious Area 0.827 98 41.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P5: Hydrograph ---1---1---'---�---L---'---L---L---'- L---'---�---L---'---�---'----'---�---I ❑Runoff 14 13.35 cfs 13 Typ�_II_------r -- --- -- 12 -10-yr-Rajrvfa[1+=&44''------- 11---+- 1 1 R''undff r6a,2'00''ac'l--- ,----- 10 9 - R',u n Off Vo I u r�ie=,U.$0 of - - - 'Runoff De 5EI - 'I�F= -- -- --- -- -- ---'--- 1---'--- --- L- - -'--- 1--- L- - -'--- L 4- -1 - - - t 3 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 64 Summary for Subcatchment DA P6: Runoff = 10.94 cfs @ 11.95 hrs, Volume= 0.483 af, Depth> 3.24" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 0.630 98 Paved roads w/curbs & sewers, HSG C 1.160 74 >75% Grass cover, Good, HSG C 1.790 82 Weighted Average 1.160 74 64.80% Pervious Area 0.630 98 35.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P6: Hydrograph 1I 2 ■Runoff ---1 --- T--- T--;---T---I---�--------I 10.94 cfs ;---T---I-------'---I---T--- 11 T�QQ-AA4 hr_ �F- � T---I---T---T------+----T---T----------------+--- 10 ,-a0-yr_Raarvfa[L=&44'1'---,----�--- - --- ---+---'--- ----------+--- -Run f# Area=41901acL-- ---+ -- ---L---1---L---1---1---1--- R'ungf# VoNume=0.483af - - - -- N 7 I I I I I I I I �lu4f#IDepth>3.241�'-- -- -- -- --- -- -- --- 6-T��-0-ri--T------T---T---'---T --T---T-----------------T--- 5--+---+------+---+--+---+ --+---+------+---+--+---+--- 3 ---1---1---'---- --L------L---L---'---L -----L---'-------------L--- 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 65 Summary for Subcatchment DA3 MAX: DA 3 MAX IMP Runoff = 40.28 cfs @ 11.95 hrs, Volume= 1.812 af, Depth> 3.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 3.450 74 >75% Grass cover, Good, HSG C 2.710 98 Paved roads w/curbs & sewers, HSG C 6.160 85 Weighted Average 3.450 74 56.01 % Pervious Area 2.710 98 43.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA3 MAX: DA 3 MAX IMP Hydrograph 44------I------ I - -- I -- ----I--- I--- ---r---i--- I---I------I--------- - I - -- ■Runoff I 40.28 cfs ---L---1---1---1----1------- 38 Ji pe u 24 36 , - 1 V-yr-Ra1rvft[II=&.4 7---'---'---' -----'---'-------'---'---'---' --- 34---I---+------�--Jac--A-I---4------ I - - - +- ------+----------------+--- 32 -Rundff ']'-'pt,rea=V.-i TaC ---I---r--;---r------ ---'i------r--- 30 28—Run Off V0)UMe=l1-.&12 of--- -- ---; -- --- -- -- --- 24 Run �6ffepth> �53,�---r------r -----r------I---I------r--- LL 20-��G—�O-�iaa---'--- - -- - -- ----'----------'- --- 18 �+w'-r-- +--- r------+---r---i---r --+---r------+---r------r--- 16-\t4�4=5------------------------I- --;---I----I---;---I----I---I---- 14---1---1---'------1------1---L---1---L -- ---L------1----------i--- 12------+------+---+------+---+---I---+ --+---+---I---+---I----I---+--- 10------ r---r-- r--- r--- r--r---r---i---r --r---r---r--r---r-----r--- 8---�i--- ---�i -- ------�i--- ------�i--- i_ -- ------�i--- ---�i---�i--- i_--- 4 ---i +---i---+-r---i- +---r---i--- ---r---i---+-----i- - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 66 Summary for Subcatchment UD 1: Runoff = 236.74 cfs @ 12.59 hrs, Volume= 32.160 af, Depth> 2.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 4.459 30 Woods, Good, HSG A 21.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 113.857 70 Woods, Good, HSG C 29.253 77 Woods, Good, HSG D 175.189 71 Weighted Average 173.724 71 99.16% Pervious Area 1.465 98 0.84% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total Subcatchment UD 1: Hydrograph T -T F T F T T F� I ■Runoff 236.74 cfs 20 -Type it �4-0K-'�------'I---'I--- I'I - -- 220 10- -R inf aai=5.44"----''-----''--- 200 -Runoff A-rea=17-9.-1819-ac-�---'--- 180 - I I I I I I I I -Rlun6ff-Volume=32.-16-0 of ---I--- 160 I I I I I 1 I I w Run6ff-[Yeoth:�2.20"' -- --- 140 0 120 F owtength=-6,4'100'I,------i--- - --r- -r - -- - --- 100 Tf,= 5.81 m i n - --I---r---r t--- r--r--- r--- ---t---r- 80 CN=71 60 ---I--- ------ - -- r--I - -- r - - - - -- T----- 40 I I I I I I I I I I I 20 IL - - -'--- L---'--- L -- -L -- I - -- -----r- -- ---t---r--r--- - - -I- - - r - - -I- - - t - - - r - - r - - - - I- - - T - - - -1 - 1 --- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 67 Summary for Subcatchment UD2: Runoff = 403.64 cfs @ 12.57 hrs, Volume= 53.888 af, Depth> 2.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 40.326 54 1/2 acre lots, 25% imp, HSG A 18.198 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 129.984 80 1/2 acre lots, 25% imp, HSG C 48.796 70 Woods, Good, HSG C 43.700 77 Woods, Good, HSG D 10.550 85 1/2 acre lots, 25% imp, HSG D 293.364 71 Weighted Average 248.149 67 84.59% Pervious Area 45.215 98 15.41 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total Subcatchment UD2: Hydrograph - r - - -1--- T - - - r - - r - - - r - - -I- - - r - - -I- - - 1 - - - r - - -I- - - r - - -I- - - r - - - r - - r - - - 440 �-- -� --- �- 420 --- --- ----------- 403.64 cfs --------------�L----- 400-T���_}�-�r-----t------t---�---pq r------t------t---�r--�--- 380 ----------- f----------=---,------,----------=---�------------ 360 -a Y-R-ainaal�.44'- --- --- -- 340 - 1---L- I-- L----' I-----------------------------�--- 320 Rlu-nbff-Area=293.364-lc--7---I--- r------r------7---'r--�--- 300---1 - --------------------1-- 1---�I-- 280-R'�unbfUV61um'Le=' .88$I-a ------1--- L--- I --- - --- L--- --- 240 ------ -- --- � 0'T------T-- --------T------T--- --,--- 240 - - 3 zzo -� ov-1�teng fl=' , ,60''------+---'-- - --- '--- --- --- +--- ' -- --- ,L 200 - - 180 y� r r--r---r------r---r- - -----r---r--r---r--r- 160-/�+fM�-,,LL---4•'F-min-------------,--- ---,-- --------- -, ------,--- - -- 140-�1V--'------IL--L�------'--- ---'-- --- --'------'---- - - IL - - --- 120 ------ ------ --- -- ---------+----- --- ----------+--- -- --- 100------r------ r--- r-- r--- r------ r - - -- - -�r ---r------r---r--,--- 80---li------li--- ---i---li------li------li-- ---li - - - - ---li ----- 60---1---L---1---L---L--J---L---1---L---- ---L-- L---L-- --- 40----r - - - r rt---r--y r------+- y---r---i-- 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 68 Summary for Subcatchment UD3: Runoff = 71.57 cfs @ 12.22 hrs, Volume= 6.518 af, Depth> 1.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.44" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 46.615 70 Woods, Good, HSG C 74.030 55 Weighted Average 74.030 55 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total Subcatchment UD3: Hydrograph ------r---r--r---r------r---r---I- T- --r--r---r------r----------r--- ------L------L---L------L---L---I---L------L----------L--- ■Runoff 71.57 cfs 70 65-a-0yr- Rai ftfal1=&447------------ 60 55-:-Run ff-Arda�74-:'0'30 ad---'--- - -- ----------- -- ---a-- -- 50-Run pff_VoIume=6 s�,7a{ 'a`----Ir- u 3 45 ---L-'-L- _�ujQ DeptF>1-M06 40 ,l-------- thT2; 80?-- -- 035 oW Ldn - C 30 I,---,----,---,-- 25 ---1---r---------r------+- 20 15 ---I--- 10 ---'---L-----L---L---'---L---L------L- 5 I I - ------------- ----------- ------- -, ----------- - - - --- - -- -,- - -I- -- ---,---,---, --- ---r---'I----------- - - - - -- ---- - -' ----------'--- --- --T------�---I---I---T--- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 69 Summary for Reach DP 3: (new Reach) Inflow Area = 75.820 ac, 0.83% Impervious, Inflow Depth > 1.10" for 10-yr event Inflow = 75.04 cfs @ 12.22 hrs, Volume= 6.930 of Outflow = 75.04 cfs @ 12.22 hrs, Volume= 6.930 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach DP 3: (new Reach) Hydrograph ------------------- -------- ---- --------------------------�--- ■Inflow 80 'I -----r------r-- -fin 1QWArea=7�82{� ---1L-- 1 ---1L----- 1 1 75.04 Cfs I a-L------L-- ---r---I I I --- I ---L-- 1IF I - 1 --- I ---L-- r-- ■Outflow 75 J L L- J L J L J L L J L J L 70 - - - - - - - -�- - - - - - - - - - - - - - - - - - - - - -I- - - - - - - - - - - - - - - 65 60 55 --7---r---1i---r-----1L-----1L--7---i -r---1i---r-----IL--7---r-- 50 ,I -----IF---1---IF ---IF ---IF ---I ----1--- I -- ---�--�---I u 45 .... ,I 1 L - - _I_ - - L _ _ L _ 1---1 _ _ L _ _ J _ _ _ L _ _ J _ _ _ _ L - 1---1 - _I_ - - L _ _ J _ 1---1 _ _ L _ _ J _ _ _ L 0 40 --J---1--J---1 -- -----r---1---r---1---IL---1---IL---1 -- --J--- -1--J---1 -7---1---r--I---IL---1---r-- -- --J---1 -- LL 35 30 - - - - - L - - -1- - - L - - - - - - L - - - - - L - - - - - L - - -1- - - L - - - - - - L - -- 25 ,I -I- - - L - - J - - - L - - J - - -- 20 15 10 �I 5 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 70 Summary for Reach POST DP 1: POST DP1 Inflow Area = 197.099 ac, 4.90% Impervious, Inflow Depth > 2.18" for 10-yr event Inflow = 255.42 cfs @ 12.57 hrs, Volume= 35.852 of Outflow = 255.42 cfs @ 12.57 hrs, Volume= 35.852 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach POST DP 1: POST DP1 Hydrograph -L--1---L--1---1- ----+- ----+- -L L --L- ---L--' --- +-- 280 , 260 1 rqa='�� .-� -�C 255.42 cfs --' -- ---'------ - --T-- 220 -----I---------+------+------r---I- ---r--1---r--+------+-- 200---,---; -----,------,------,---; --- ---; -- ---; -- ---; -- -- 180 W 160--7------7---I---7---I---T---I---+---I --r--7---r--7---I---+-- � I I I I I I I I I I I I I I I 140 ------ -- ------ ------ ------ --- -- -----F--�--- -- -- 0 a 120--+---+--+---+--+--+---+------+-- --+--+---+--+---+--+-- 100 ---I----I---, -- I I I I I I I I I I I I I I 80 'I 60--7------7------7------T------7-- r- '---r--7------T-- 20- ESP! 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ❑ Outflow NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 71 Summary for Reach POST DP 2: POST DP2 Inflow Area = 322.194 ac, 18.39% Impervious, Inflow Depth > 2.28" for 10-yr event Inflow = 422.45 cfs @ 12.55 hrs, Volume= 61.100 of Outflow = 422.45 cfs @ 12.55 hrs, Volume= 61.100 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach POST DP 2: POST DP2 Hydrograph --,---I--- ---'---'----'---'----' ---I--- T- - -I--- r---I - -- r-- - I --- T -- T - --------------- -- T --, ------------' ---T -- T- - -I--- ------'---- T --- ■ Inflow 460 44o -+------+------+------+------ f fIOW 422.45 cfs P ='$� +--+- - -- ---I--- -+--+ --- ---I- +--- ----- ■Outflow 420 .-i4-dam 400 --r---I---r-- -I--- T---I---r---I- r-- -r-- r-- -r-- r---I-- -T--- 380 -- L- - -'--- ---1---1---'---------L---'- li --L-- ---L--1------1--- 360 --------- ----li------- --- r---li---r---li- ---r-- ---Ir--rt---Ir--t--- 340 ------------------------ ---- - - ---- ------------------------ 320 --y---Ir-- ---li---1---li---+---li---r---li ---r--y---Ir--rt---Ir--+--- 300 ---------------------------------- ------------------------ 280 -- ------ ------ ------------r--- ---r-- --- -- ------+--- w 260 � -r---i --r- -I---r--I---r--I---r- I -r--r- -r--r- -i --T- " 240 -- - -- - - - - - - - - -- - - - - rtIr--+--- - -- 0 220 --y---Ir-- ---li---rt---li---+---li---r-- --r--y---Ir-- --- a 200 --- - - - - -- -- - -- 180 --+------+------+------+------+-- + -+--+---+--+------+--- 160 ---- - - I --- - - - I ------------- - - - --- - ---- ---I--- ---I--- --- 140 --J---1---L------1---'--- ------L- L L--L---L--1---1---L--- 120 -- ------ ------------r------r-- r- -,---r-- ------T--- 100 -------------------------------- -- ----------------- 80 --------- ----li-------li---r------r- r- ------Ir--t--- 60 ------------------------------ - ------ 40 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 72 Summary for Pond 1 P: (new Pond) Inflow Area = 21.910 ac, 37.43% Impervious, Inflow Depth > 2.59" for 10-yr event Inflow = 110.57 cfs @ 11.96 hrs, Volume= 4.733 of Outflow = 33.36 cfs @ 12.09 hrs, Volume= 3.692 af, Atten= 70%, Lag= 8.1 min Primary = 33.35 cfs @ 12.09 hrs, Volume= 3.692 of Secondary = 0.01 cfs @ 12.10 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 264.61' @ 12.09 hrs Surf.Area= 25,938 sf Storage= 89,835 cf Plug -Flow detention time= 103.2 min calculated for 3.692 of (78% of inflow) Center -of -Mass det. time= 44.1 min ( 829.3 - 785.2 ) Volume Invert Avail.Storage Storage Description #1 260.50' 127,850 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 260.50 17,090 0 0 261.00 18,913 9,001 9,001 262.00 20,793 19,853 28,854 263.00 22,729 21,761 50,615 264.00 24,721 23,725 74,340 265.00 26,711 25,716 100,056 266.00 28,877 27,794 127,850 Device Routing Invert Outlet Devices #1 Primary 260.50' 24.0" Round RCP -Round 24" L= 67.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 260.50' / 255.25' S= 0.0784 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 260.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #5 Secondary 264.61' 65.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #6 Device 1 264.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=33.31 cfs @ 12.09 hrs HW=264.60' (Free Discharge) L1=RCP_Round 24" (Inlet Controls 33.31 cfs @ 10.60 fps) 2=Orifice/Grate (Passes < 0.33 cfs potential flow) 3=Orifice/Grate (Passes < 16.16 cfs potential flow) 4=Orifice/Grate (Passes < 16.16 cfs potential flow) =Orifice/Grate (Passes < 30.72 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 12.10 hrs HW=264.61' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 0.00 cfs @ 0.05 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 73 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 1 P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 266 ----rt--y----r-y--i----+--------+----u----rt----i-t- ---r rt-�- 265 ----i---- +-- - ---I- ---i--------i---- -- --- ----i- --+ --i-- - - 264 263 ----1----L1--J---L-J--1----1---1-1----1----1----1 ---L--1----1--1-1- 262 261 Custom Stage Data 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) E Inflow f Outflow ❑ Primary Seconda Secondary LJ Surface ■ Storage NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 74 Summary for Pond 2P: (new Pond) Inflow Area = 9.450 ac, 40.05% Impervious, Inflow Depth > 2.68" for 10-yr event Inflow = 49.15 cfs @ 11.96 hrs, Volume= 2.111 of Outflow = 24.64 cfs @ 12.05 hrs, Volume= 1.740 af, Atten= 50%, Lag= 5.8 min Primary = 24.64 cfs @ 12.05 hrs, Volume= 1.740 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 273.48' @ 12.05 hrs Surf.Area= 13,650 sf Storage= 33,969 cf Plug -Flow detention time= 82.2 min calculated for 1.735 of (82% of inflow) Center -of -Mass det. time= 31.4 min ( 814.7 - 783.3 ) Volume Invert Avail.Storage Storage Description #1 270.50' 56,463 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 270.50 8,641 0 0 271.00 10,007 4,662 4,662 272.00 11,429 10,718 15,380 273.00 12,908 12,169 27,549 274.00 14,443 13,676 41,224 275.00 16,035 15,239 56,463 Device Routing Invert Outlet Devices #1 Primary 270.50' 24.0" Round RCP -Round 24" L= 39.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 270.50' / 270.00' S= 0.0127 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 270.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.00' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 273.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 273.50' 60.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=24.59 cfs @ 12.05 hrs HW=273.48' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 24.59 cfs @ 7.83 fps) �2=Orifice/Grate (Passes < 0.18 cfs potential flow) 3=Orifice/Grate (Passes < 21.29 cfs potential flow) 4=Orifice/G rate (Passes < 21.51 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=270.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 75 N U 3 0 LL 0.00 Cfs Pond 2P: (new Pond) Hyd rog raph --T I---------'r--r ---I-- 49.15 Cfs---------r--r--;-- --- -Inflow ArKea=-9.450'ac'�--- -Peak FFev=-211-48'',---';-- -Sto;rageT83,-969 cf;---';-- --L--L--- L--L--L--- ---L -- -- ------ -- 24.64 Cfs - - I T-- T- - -I- I- r-- T-- T ---I- I -- T -- r------I--- r -- r -- r- - - I - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 1 Pond 2P: (new Pond) E Inflow f outflow ❑ Primary Secondary Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,00011,000 12,00013,00014,000 15,00016,000 ❑ Surface ■ Storage 275 274 ---L-1--1---'L---LL--L--LL--- -------'--- '----'--1 L - - -L -L--'- wI ---r---T---IT--- TT--r--TT---TI- I I I I ------ TI---- TT --r -- r---rr--T--I- I I I I I I I I I I I I I 273 o I I I I I I I I I II I I I u I I I I I I I I I I II w 272 271 ---r- T---IT--- TT--T- -TT---TT--T--I-T TT--r-_Tr---rr--T--I- Custom Stage Data 0 5,600 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 76 Summary for Pond 3P: (new Pond) Inflow Area = 6.160 ac, 43.99% Impervious, Inflow Depth > 3.53" for 10-yr event Inflow = 40.28 cfs @ 11.95 hrs, Volume= 1.812 of Outflow = 24.88 cfs @ 12.03 hrs, Volume= 1.644 af, Atten= 38%, Lag= 4.5 min Primary = 24.88 cfs @ 12.03 hrs, Volume= 1.644 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 300.21' @ 12.03 hrs Surf.Area= 9,489 sf Storage= 21,393 cf Plug -Flow detention time= 57.3 min calculated for 1.640 of (91 % of inflow) Center -of -Mass det. time= 25.4 min ( 789.4 - 764.0 ) Volume Invert Avail.Storage Storage Description #1 297.50' 40,368 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 297.50 5,965 0 0 298.00 7,000 3,241 3,241 299.00 8,091 7,546 10,787 300.00 9,239 8,665 19,452 301.00 10,444 9,842 29,293 302.00 11,705 11,075 40,368 Device Routing Invert Outlet Devices #1 Primary 297.50' 24.0" Round RCP -Round 24" L= 74.4' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 297.50' / 296.00' S= 0.0202 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 297.50' 1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 298.50' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 300.00' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 300.50' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=24.51 cfs @ 12.03 hrs HW=300.18' (Free Discharge) L1=RCP_Round 24" (Inlet Controls 24.51 cfs @ 7.80 fps) �2=Orifice/Grate (Passes < 0.10 cfs potential flow) 3=Orifice/Grate (Passes < 23.00 cfs potential flow) 4=Orifice/G rate (Passes < 4.00 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=297.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 77 Pond 3P: (new Pond) Hydrograph -- ----------- -- -- -------------- 40.28 Cfs -- -- -- --- MInflow -------w------.}-------�+----- --------- --- -------- -- outflow --- ----- ------ I II Io AreA�.1 V0 ��Ci -- -- -- --- ❑Primary 44 ,' i - -1- I I Secondary 42 [� 1rr rr '- �'�---'-----L---1---1---L-- -�eaR�4P��J1V�r1---,---,---------,---, --, --L--L--- ------,--- 40 38 36 �1 -- --------- -- -- - ------ ----------- - ora a#21,393�e#---,--- --------,--- -- --T-- -- -- -- --- --- 34 ,' 1 -1--1- -1--- L-- L--L---'-- -'---L ----------L--L----L-- - - - 32' 1 24.88 Cfs 28 _ _ -T-- -------- --r-- - - -------- --r-- -- -- - w 26 �� --1--1---------L--L--L------'- --L---------L--L--L--- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 w 24 22 0 _ -1--1--1---1---L--L--L- -'---' -L- -------L--L--L--L- 20 -T--L--1---1---L--r--L- -1---1 -L- -1---1---r--r--L--L- -- LL 18 ---------------L---------'--- 1 6 --rt-----li---Ir--Ir--r-----li--- -----li---Ir--r--r-- --7--- 14 --1--1---------L--L--L---'-----L---------L- -L---I _J - 12 � --T--7---------Ir--T--7---II-- ----------r--T--7--1--- - 10 ---------------------------- ---------------------- 8 6 0.00 Cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 3P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 ■ Surface ■ Storage 302 301 -----1--L--1----L1-----L-L-------LL-----LL--------' ----'-'- --L---' w1 w 300 1 - ----- -- -- ---- ----- - -------- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ----- 1 1 --- 1 1 1 0 1 1 1 1 11 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 w 299 298 ----- -r--r----r1 L-L---i ---L ---- L----1----1-T ---- ---1 Custom Stage Data 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 78 Summary for Pond 4P: (new Pond) Inflow Area = 11.220 ac, 59.98% Impervious, Inflow Depth > 3.84" for 10-yr event Inflow = 77.86 cfs @ 11.95 hrs, Volume= 3.586 of Outflow = 56.10 cfs @ 12.02 hrs, Volume= 3.306 af, Atten= 28%, Lag= 3.8 min Primary = 56.10 cfs @ 12.02 hrs, Volume= 3.306 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 265.47' @ 12.02 hrs Surf.Area= 20,786 sf Storage= 36,204 cf Plug -Flow detention time= 54.4 min calculated for 3.297 of (92% of inflow) Center -of -Mass det. time= 26.4 min ( 782.3 - 755.9 ) Volume Invert Avail.Storage Storage Description #1 263.50' 70,810 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 263.50 15,234 0 0 264.00 17,440 8,169 8,169 265.00 19,702 18,571 26,740 266.00 22,021 20,862 47,601 267.00 24,396 23,209 70,810 Device Routing Invert Outlet Devices #1 Primary 261.00' 36.0" Round RCP -Round 36" L= 52.9' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 261.00' / 260.00' S= 0.0189 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 263.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 264.17' 60.0" W x 10.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 265.50' 60.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 266.50' 60.0" W x 60.0" H Vert. Orifice/Grate C= 0.600 #6 Secondary 265.50' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=55.33 cfs @ 12.02 hrs HW=265.45' (Free Discharge) L1=RCP_Round 36" (Passes 55.33 cfs of 73.01 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.14 cfs @ 6.57 fps) 3=Orifice/Grate (Orifice Controls 55.19 cfs @ 4.42 fps) 4=Orifice/Grate ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=263.50' (Free Discharge) L6= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 79 Pond 4P: (new Pond) ..... e e . 1A 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 4P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 271 w 268 0 267 w w ----- --T-I----- r-T--T-----rl----r---- n-----r--r-r-----I- ---r-- ----L---L------L-L--L----------L----LI--------L-L------L---L-- ---- ---------i-----------I-------- ,I-----I---i- r-----I- ---i -- 24,000 Surface ❑ Storage -------+-------------------+----------I 24,000 Surface ❑ Storage -------+-------------------+----------I --- +- -- ----+ ---- il----- I--- ---------i ---- �� Custom Stage Data, 10,000 20,006 30,000 40,000 50,000 60,000 70,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 80 Summary for Pond 5P: (new Pond) Inflow Area = 2.000 ac, 41.35% Impervious, Inflow Depth > 3.63" for 10-yr event Inflow = 13.35 cfs @ 11.95 hrs, Volume= 0.605 of Outflow = 10.72 cfs @ 12.00 hrs, Volume= 0.523 af, Atten= 20%, Lag= 3.1 min Primary = 10.72 cfs @ 12.00 hrs, Volume= 0.523 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 272.68' @ 12.00 hrs Surf.Area= 6,941 sf Storage= 7,230 cf Plug -Flow detention time= 74.0 min calculated for 0.523 of (86% of inflow) Center -of -Mass det. time= 31.0 min ( 792.4 - 761.4 ) Volume Invert Avail.Storage Storage Description #1 271.50' 17,465 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 271.50 5,054 0 0 272.00 6,157 2,803 2,803 273.00 7,317 6,737 9,540 274.00 8,533 7,925 17,465 Device Routing Invert Outlet Devices #1 Primary 271.00' 24.0" Round RCP -Round 24" L= 20.6' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 271.00' / 270.00' S= 0.0485 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 271.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 273.70' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 272.77' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=10.64 cfs @ 12.00 hrs HW=272.67' (Free Discharge) L1=RCP_Round 24" (Passes 10.64 cfs of 15.43 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.12 fps) 3=Orifice/Grate (Orifice Controls 5.30 cfs @ 2.65 fps) 4=Orifice/Grate (Orifice Controls 5.30 cfs @ 2.65 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=271.50' (Free Discharge) L6= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 81 Pond 5P: (new Pond) Hydrograph - -+--I---------r - -r- --I-----------r--r--1--y--- MInflow 13.35 CfS outflow -I I I I I I I I I I I I I I I 1 1 - -I - I - - - L Inflow !1Area V =2.QOA Iaq ❑ Primary _ Inflow i _i __ i___i___i___i __i __ i___i___ —Secondary 14 - e-�� - -r---------r--r--r - -,--- 13--+--+-`--I---1--- --+-• -- ------I--- --+-- --+--- 12 ,' _StorageT7,'2130tfQ f_ 10.72 ifs------11---' --' - ---'I--- 11 I I I I I I I I I I 10--+--rt---------r--r--rt---I---I---------r--r-- --y--- N I I I I I I I I I I I I I I I tV $ 0 7 -- -T--r--------r--r- -r- -I---I r- -------r--r--r--r- LL 6 5-1--1---------L--L--1---I-- ---------L--L--1--1-- 4 --T--T--------- T T--T-----i--- ----------T--T--T 3--T--- 2 0.00 Cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 0 Pond 5P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 ■ Surface ■ Storage 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 11 24-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 82 Summary for Pond 6P: (new Pond) Inflow Area = 1.790 ac, 35.20% Impervious, Inflow Depth > 3.24" for 10-yr event Inflow = 10.94 cfs @ 11.95 hrs, Volume= 0.483 of Outflow = 3.84 cfs @ 12.07 hrs, Volume= 0.413 af, Atten= 65%, Lag= 7.2 min Primary = 3.84 cfs @ 12.07 hrs, Volume= 0.413 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 306.71' @ 12.07 hrs Surf.Area= 4,995 sf Storage= 9,102 cf Plug -Flow detention time= 87.5 min calculated for 0.411 of (85% of inflow) Center -of -Mass det. time= 43.1 min ( 814.2 - 771.1 ) Volume Invert Avail.Storage Storage Description #1 304.50' 22,746 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 304.50 3,032 0 0 305.00 3,706 1,685 1,685 306.00 4,436 4,071 5,756 307.00 5,223 4,830 10,585 308.00 6,066 5,645 16,230 309.00 6,966 6,516 22,746 Device Routing Invert Outlet Devices #1 Primary 302.00' 24.0" Round RCP -Round 24" L= 55.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 302.00' / 300.00' S= 0.0362 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 304.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 305.20' 12.0" Vert. Orifice/Grate C= 0.600 #4 Secondary 307.50' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #5 Device 1 307.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=3.81 cfs @ 12.07 hrs HW=306.69' (Free Discharge) L1=RCP_Round 24" (Passes 3.81 cfs of 36.34 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.04 cfs @ 7.06 fps) 3=Orifice/Grate (Orifice Controls 3.77 cfs @ 4.80 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=304.50' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346 Type 1124-hr 10-yr Rainfall=5.44" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 83 Pond 6P: (new Pond) Hydrograph 10.94 Cfs Inflow -- -----------.y--+--(�-------------- --+-- -- --- fOutflow -Iftf]O �-Area=I.7 0-�aC-- - - -- ❑Primary -+ -+- +---+--+--+--+--+- Secondary 12 10-fo'raeT9;'TOf--------,, --;-------------;---,--- $ - -- ; - - ; --- ;--;--;--- ---; ;---------;--;--;--;--- -T--_T --r-- - --+-- -- --- 0 6 r LL 5 - -- -- - -- -- 3.84 cfs-- 4 3 'i R, 2 0.00 Cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 6P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 Storage (cubic -feet) ■ Surface ■ Storage NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 84 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDA P1: (new Subcat) Runoff Area=21.910 ac 37.43% Impervious Runoff Depth>3.07" Tc=5.0 min CN=75 Runoff=130.27 cfs 5.614 of SubcatchmentDA P2: DA 2 MAX IMP Runoff Area=9.450 ac 40.05% Impervious Runoff Depth>3.17" Tc=5.0 min CN=76 Runoff=57.71 cfs 2.496 of SubcatchmentDA P4: (new Subcat) Runoff Area=11.220 ac 59.98% Impervious Runoff Depth>4.39" Tc=5.0 min CN=88 Runoff=88.26 cfs 4.105 of SubcatchmentDA P5: Runoff Area=2.000 ac 41.35% Impervious Runoff Depth>4.18" Tc=5.0 min CN=86 Runoff=15.21 cfs 0.696 of SubcatchmentDA P6: Runoff Area=1.790 ac 35.20% Impervious Runoff Depth>3.76" Tc=5.0 min CN=82 Runoff=12.60 cfs 0.561 of SubcatchmentDA3 MAX: DA 3 MAX IMP Runoff Area=6.160 ac 43.99% Impervious Runoff Depth>4.07" Tc=5.0 min CN=85 Runoff=46.02 cfs 2.090 of SubcatchmentUD 1: Runoff Area=175.189 ac 0.84% Impervious Runoff Depth>2.65" Flow Length=6,400' Tc=55.8 min CN=71 Runoff=286.01 cfs 38.670 of SubcatchmentUD2: Runoff Area=293.364 ac 15.41% Impervious Runoff Depth>2.65" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=487.69 cfs 64.795 of SubcatchmentUD3: Runoff Area=74.030 ac 0.00% Impervious Runoff Depth>1.36" Flow Length=2,280' Tc=25.4 min CN=55 Runoff=96.69 cfs 8.420 of Reach DP 3: (new Reach) I nflow= 100.67 cfs 8.910 of Outflow=100.67 cfs 8.910 of Reach POST DP 1: POST DP1 Inflow=307.42 cfs 43.235 of Outflow=307.42 cfs 43.235 of Reach POST DP 2: POST DP2 Inflow=509.73 cfs 73.276 of Outflow=509.73 cfs 73.276 of Pond 1P: (new Pond) Peak Elev=264.99' Storage=99,667 cf Inflow=130.27 cfs 5.614 of Primary=35.30 cfs 4.245 of Secondary=38.12 cfs 0.320 of Outflow=73.42 cfs 4.565 of Pond 2P: (new Pond) Peak Elev=273.69' Storage=36,874 cf Inflow=57.71 cfs 2.496 of Primary=26.34 cfs 2.032 of Secondary=12.38 cfs 0.091 of Outflow=38.72 cfs 2.123 of Pond 3P: (new Pond) Peak EIev=300.49' Storage=24,127 cf Inflow=46.02 cfs 2.090 of Primary=26.68 cfs 1.922 of Secondary=0.00 cfs 0.000 of Outflow=26.68 cfs 1.922 of Pond 4P: (new Pond) Peak EIev=265.62' Storage=39,453 cf Inflow=88.26 cfs 4.105 of Primary=61.63 cfs 3.799 of Secondary=4.02 cfs 0.024 of Outflow=65.62 cfs 3.823 of NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 85 Pond 5P: (new Pond) Peak Elev=272.75' Storage=7,734 cf Inflow=15.21 cfs 0.696 of Primary=11.97 cfs 0.613 of Secondary=0.00 cfs 0.000 of Outflow=11.97 cfs 0.613 of Pond 6P: (new Pond) Peak Elev=306.97' Storage=10,418 cf Inflow=12.60 cfs 0.561 of Primary=4.30 cfs 0.490 of Secondary=0.00 cfs 0.000 of Outflow=4.30 cfs 0.490 of Total Runoff Area = 595.113 ac Runoff Volume = 127.449 of Average Runoff Depth = 2.57" 88.31% Pervious = 525.551 ac 11.69% Impervious = 69.562 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 86 Summary for Subcatchment DA P1: (new Subcat) Runoff = 130.27 cfs @ 11.96 hrs, Volume= 5.614 af, Depth> 3.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 0.324 80 >75% Grass cover, Good, HSG D 8.306 74 >75% Grass cover, Good, HSG C 5.639 98 Paved roads w/curbs & sewers, HSG C 5.080 39 >75% Grass cover, Good, HSG A 2.561 98 Paved parking, HSG A 21.910 75 Weighted Average 13.710 61 62.57% Pervious Area 8.200 98 37.43% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5 minute pipe flow 110 100 90 80 0 70 LL 60 50 40 30 Subcatchment DA P1: (new Subcat) Hydrograph + � � � � � � � � � � � � � � � � � � � ■Runoff ----------------- ---I--- 130.27 cfs---I---------+--- -- - � p�-ll-'�4 hx +--- T-- ---------+------T---F---1 -2-5=yaar-Rairrf-aN-r6.05"-- - -- --- R'unOf'Arda-121 91aac-- -- -- -- - --- ----- r T---T---1--- T---r --- r T---r- -I - -- RIu n off 'IVo',I u me=5. 14'I of ---------------------------- Runwaf# �De;ptk>3 071'--- +-- ---------+------+--- -- --- -��------ T- - - I- -- LI ---I- - - - T---I--- T- - - I - -- LI - - -r LI - -- -C''N-15-''I---1--- J---L --- i-- ---'L------L------L---'L---I--- - - -I- - - + - - - + - - + - - - L - - + - - - )----I - - - L - - -I - - - L - - - L - - L - - - L - - -I- - - L - - - L - - -I- - - L - - -I - - - L - - - L - - L - - - - - -I- - - + - - - + - - + - - - L - - + - - - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 87 Summary for Subcatchment DA P2: DA 2 MAX IMP Runoff = 57.71 cfs @ 11.96 hrs, Volume= 2.496 af, Depth> 3.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 3.624 74 >75% Grass cover, Good, HSG C 2.041 39 >75% Grass cover, Good, HSG A 2.340 98 Paved roads w/curbs & sewers, HSG C 1.445 98 Paved roads w/curbs & sewers, HSG A 9.450 76 Weighted Average 5.665 61 59.95% Pervious Area 3.785 98 40.05% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P2: DA 2 MAX IMP Hydrograph 60 55 e-11- 4lh�----------'------,, - 50 23-year RainfaClT6:05 45 R'u n bff rda;9.450 �ac 40 R'u n pff V M u rye=,2.496 of ------------------------------------ u 35 � � � 1� � � � Runoff 'Depth>3:1.71'-------'---- 0 30 Tic=5.0 enih 25 _CsN='L7-6-----------',----------',--- 20 15 10 -- --- ---- - --- -- 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 88 Summary for Subcatchment DA P4: (new Subcat) Runoff = 88.26 cfs @ 11.95 hrs, Volume= 4.105 af, Depth> 4.39" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 4.490 74 >75% Grass cover, Good, HSG C 6.730 98 Paved roads w/curbs & sewers, HSG C 11.220 88 Weighted Average 4.490 74 40.02% Pervious Area 6.730 98 59.98% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P4: (new Subcat) Hydrograph 95 -1---'--- ---L--- '--- L---L--- '---L ---1---1---' -----L------1---L---I --- '------L 88.26 cfs --- 1 ---L------1---' '--- ------- ---'--- ---1--- --- ■Runoff 90 85 `1 11 1T42 1 L---1---1-- L---' --- -L---L---'---L---'----'---1--- - J�F'-`�--��r---''--- ------''--- - --- ------''--- -------''--- --- 80 -2���ar� R�infaHT6:0�";---',---; - --- ---;---',--- -- -',---',---; --- 75 70 ' ---'------'------r---'------r------r- -R'undf#Arch='4a:'229ad--- ''--- --- -- ---r---'--- ---------�----------1 -------'--- --- 66 -F�'un f o ur>�e=_'4.1-10 of-'--- - - ---}---'--- ----------+--- u 55 3 50 - -�------'---+ R�un Dept[T>4.39 � -T---+---------r------+---r--- -- ---+ ------'--- ----------+--- 045 -i���-i--r---li---rt---r---li---r --y---r---li--- ---Ir---li---+--- 40 -----r---li---rt---r---i---r -- ---r---li--- ---Ir---li---r--- 35 -CN=$8-------r------rt---r------t -- ---r------ ---------- --- 30 ------7---�r------- - -�r-------- -i---r -----r---�r-----�r-----r--- 25 20 r---r - r--- r - - -i-- r---r---i-- r r---r---i---r---r ---i---r--- 15 ------7---r-----r---r-----r---i---r - ---r---r--71---r------r--- 10 ---- -T--- -- -r - - -----r------ - ---r---I- -- - ---- - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 89 Summary for Subcatchment DA P5: Runoff = 15.21 cfs @ 11.95 hrs, Volume= 0.696 af, Depth> 4.18" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 0.366 98 Paved roads w/curbs & sewers, HSG C 0.461 98 Paved roads w/curbs & sewers, HSG D 0.607 74 >75% Grass cover, Good, HSG C 0.566 80 >75% Grass cover, Good, HSG D 2.000 86 Weighted Average 1.173 77 58.65% Pervious Area 0.827 98 41.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P5: Hydrograph 17---I+---1-I- - +-I--�--+-15.21 cfs]16 - --- ---I ❑Runoff 14 -25 -yaar Rai fallTf .a5 +--+---+- 13---1--- --- '--- ---L---I---L---L---I---L- 12-RIun6ff rd&2-000I'ac! ------ - 11-Rtmpf�V0ume=1a.C';9C5'af - -- -' 10---I----------I--- --- ---I---+ 9LL J-R'iunoff 'Depth,>4.11-81'-- -- -- 7 -i---i ---------i---I--- 6INf= 6- -----L---1---1---L---I---L s 4 ---1--- T-- - I ---, --- T---I--- 7 --- r---I---+ 2 _ ------- -- --- -- --- --- -- --- -- -1---Ir---'r-- I - - -'i ------ Ir +---+------+-------I---+ --- L- --I- ---------'--- L -'I- - - I - - -'I- - - -'I - - - L 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 90 Summary for Subcatchment DA P6: Runoff = 12.60 cfs @ 11.95 hrs, Volume= 0.561 af, Depth> 3.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 0.630 98 Paved roads w/curbs & sewers, HSG C 1.160 74 >75% Grass cover, Good, HSG C 1.790 82 Weighted Average 1.160 74 64.80% Pervious Area 0.630 98 35.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P6: Hydrograph 14 --I--- -- -li -- i- -- - -I- -- - -i- - -I--- - ---I- -- - - -II---I- -- - ■Runoff r--- ,---r--- r---r-- 12.60 cfs 11 ---r---------- -------t--- 12 Type-H-24,,hir--- --- -- -- 11 25-year RainfaIIT6.05"I ---I- --+ - - - I- -- ------ I- - -+ ------I---+- 10 R'lu n bff Arba=1.790 ''ac -I--- t---I --- t--- r---I--- t--- t---I --- t- 9-Rungff VOume-=-',0.5'61--af --- u 8 ��------'--- -Runaf# Deptiv>176 3 7 I I I I I I °-TI�=5..0-Min --; ---I,- ---; ------ a 6 5 -CN=$2 --- -- - --- -- -- ' 4 3 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 91 Summary for Subcatchment DA3 MAX: DA 3 MAX IMP Runoff = 46.02 cfs @ 11.95 hrs, Volume= 2.090 af, Depth> 4.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 3.450 74 >75% Grass cover, Good, HSG C 2.710 98 Paved roads w/curbs & sewers, HSG C 6.160 85 Weighted Average 3.450 74 56.01 % Pervious Area 2.710 98 43.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA3 MAX: DA 3 MAX IMP Hydrograph 50 48 ------t---r--+---r------+---r------+------+---+------+---r------+--- -- - - - - -' ---'---'---'-------' ---' --- --+---+------+---+------+---+---I 46.02 cfs ---'-------' ---'---'---' --- +---+------+---+--+---+--- ■Runoff 46 -T�---- d- ���r---'--------- - - - - -- Ty - ----------'-------------'---- 42 40 �'---'---' - -25-year-Rainfall-T-6�W�7-+--+---+- ----'---'-------'---'---'---' --- ---+---+------+----------+--- 38 36 / + +---�---+ Rtt t1�i.-160 IaC -- ---'---'--- ---'---'---' --- --+---+------+---+--+---+--- 32 ---' --- -'---------- I --- '---II --- I --- '--- + -Ru of Vo)ume=2.09G of+---+ -- -' --- I --- - ---'--- -------'---- --+---+------+----------+--- 30 u 28 = -p----;-,�-�---------------------------,= -R�uno11 I'D"I U >4����'---;------ -r----- -/-- -- -----=---------------- --- --i--- ------ ---'I ---'--- --- 0 24 LL 22 �--+------+---+--+---+ =!-=.Q_111_1� 'lil--------------------- --+---+------+------+---+--- ------ ------- ---- ----------- 20 18 --+--- ---I--- --- ---I--- -DI=--------------------------- -- --- --------------I--- --- 1 6 --+---+---+--+---+------+---+--+---+ --+---+------+---+--+---+--- 12 10 ------+------ --- ------ ---------+ ---,------,------+---I----------,---+ -----+----------------+--- -----+---�,-------------+--- 8 + --+---+------+---+------+---+--+---+ I I --+---+------+----------+--- 4 ---�-----�---�-----------�--- - --+---�---�-----�- - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 92 Summary for Subcatchment UD 1: Runoff = 286.01 cfs @ 12.58 hrs, Volume= 38.670 af, Depth> 2.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 4.459 30 Woods, Good, HSG A 21.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 113.857 70 Woods, Good, HSG C 29.253 77 Woods, Good, HSG D 175.189 71 Weighted Average 173.724 71 99.16% Pervious Area 1.465 98 0.84% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total 320 300 280 260 240 220 200 H 180 3 160 LL 140 120 100 Subcatchment UD 1: Hydrograph ---1---L---1---1---L--J---L---'--- - I----L---1---1---L-- ---I ■Runoff ------ ------------------ - ---�- 286.01 cfs I I I I -TXpII4-r-'+-- ---------+---'-- -Runoff-ATea=175189 a��c-- ---I-- --- --- L------ 1-------'---+------1---'--- Runbff Vol'Ium'Ie=38.670'� of R''un6ff-DepW>2.65"1L------L---- .'-FjoWtength='16,400''',---,--- ---,-- Tr= 5.81 m i n ---I--- T-- -II--- T - -- Ir -- T - -- T-- - II - -- T---II-- ,I - - -'- - - L - - -I- - - 1 - - - L - - L - - - L - - -'- ----- - --''I- -- L--- 'I - -- T - - - IL -- --- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 93 Summary for Subcatchment UD2: Runoff = 487.69 cfs @ 12.56 hrs, Volume= 64.795 af, Depth> 2.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 40.326 54 1/2 acre lots, 25% imp, HSG A 18.198 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 129.984 80 1/2 acre lots, 25% imp, HSG C 48.796 70 Woods, Good, HSG C 43.700 77 Woods, Good, HSG D 10.550 85 1/2 acre lots, 25% imp, HSG D 293.364 71 Weighted Average 248.149 67 84.59% Pervious Area 45.215 98 15.41 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total Subcatchment UD2: Hydrograph I I I I I I I I I I I I I I I I I I I ■Runoff '---'I---�---I---�---�--�---�---I---+- 487.69 cfs-'ll---�---'ll---�---'I�--�- 500 1 I TYp��l4-r - --- ---- T--- 11--- 450 2 -X ar111Rainf 11=6.05--11 -- - - - +--- 1--- 400 l I Runoff Area=293.36'14 a'1c -------------------------------------- 350 R'lunbff Vol'1um'1e=64.7951 of 300 Runoff Depth>2.65" o zso ' Flow Length=;3,q60'; - --- i ---I-- LL zoo 150 G1N=74 --- r------ --- 100 50 ---I1--- 1i---I1--- Ili ---li -- Ili--- --- -------1--- ---1--- --- 1 NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 94 Summary for Subcatchment UD3: Runoff = 96.69 cfs @ 12.22 hrs, Volume= 8.420 af, Depth> 1.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year Rainfall=6.05" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 46.615 70 Woods, Good, HSG C 74.030 55 Weighted Average 74.030 55 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total Subcatchment UD3: Hydrograph 105 ■Runoff --- r------ r-- ---T 96.69 cfs------r---1---T---F--�--- 100T--------'--- -- ---- -- --- ---=------ =------=--- 95 F -i- u- 4,hi�-----------'--- ---_ --------------------------- JI - � 90 - 1- - - + - - -I- - - + - 85 25-yaear- Rai rtfa[I-;=6,05"---t-- -- --r------t------t---r------ 80 r-----T----- --------r------T---r-- --- 75 Run - off �4rda#7C 030 ad - - - - - 70-R''unL ff'Vo'lun�eLS- 2II'af1---1-- -L---1---L--- 1---1--- L--L--- 65 60 55 ' -Run D"th>1,.36f`-- T-- -- - r - -- T--- - --- ' G {,� p��--------------- -'-------'--- 0 50 -r 1- -L-I--L*,2vVL---1---1---1---L------L---1---1---L---1 --- LL 45 40 -��- -----L------+----- -------L------+--- -- --- �i i 30-C,-S-----, ---,---,--- r-------, ---,-----,--- r-------, ---,---,--- 25---'------'----------'---T ---'---T ---' ------------------------- 20---1---L--- 1---1--- L--- --- L--- 1---1 --- '- -----L------1---L--L--- 15------------- --- -- ---------+---- -- ---------+--- - -- 10---i---r---r--r---r--r---r---i---r---r i---r- - 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 95 Summary for Reach DP 3: (new Reach) Inflow Area = 75.820 ac, 0.83% Impervious, Inflow Depth > 1.41" for 25-year event Inflow = 100.67 cfs @ 12.22 hrs, Volume= 8.910 of Outflow = 100.67 cfs @ 12.22 hrs, Volume= 8.91Oaf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach DP 3: (new Reach) Hydrograph --J---1---L------L ------ +---'-- -- -- ---L--L------L-- 110 105 --,�+,-�-�-+--+/A--�-+--+--+---+----- tl'll l0w 100.67 CfS II'llrea��.$O ----,--- --+--+---+ ---,--- --- ---+--+-- ---,--- -- 100 -- -- _?"- --L---1---L-- - -+--' -L---L--L---L--L------L-- 95 --t------t---li---t---li---t---li---r---li - ---r-- ---Ir--t------t-- 90 ------,--- ---,------,----------,---- -----,--- ---,--- ---,--- -- 85 --J---1---L------L------+------+---' -L---L--L---L--L------+-- 80 --t-- ---- t--- li--- t---li---+------r -- -t---r--t---Ir--t---Ir--+-- 75 ------ -- ------ ------ ------ -- ----- -- --- -- --- -- -- 70 65 --J---1---L------L------+------+-- TTTT -L---L-- L- --L--L------+-- T------T-- N 60 --T--- --------------------------------- --- ------ ------ --------- -T---T--,---Ir ------------------------ -- 3 55 ° 50 --------L------L------+------+-- -- t-- ---- -------t------ t--- - - -r -- ---L--L---L--L------+-- t---t--t---r--t------t-- LL 45 -- - -- - - - - - - - - -- - - - - - - 40 --------L------L------+------+-- ---L--L---L--L------+-- 35 -- --- -------- T------T------r-- ---r-- ---L- -T- -- --T-- 30 -- - -- - - - - - - - - -- - - - - - - 25 --+---+--+---+--+--+---+------+-- -+--+---+--+---I---+-- 20 --T--- --T------T---1---T---I---r-- --T---L--T--- --T-- 15 -- - -- - - - - - - --- 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ■ Outflow NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 96 Summary for Reach POST DP 1: POST DP1 Inflow Area = 197.099 ac, 4.90% Impervious, Inflow Depth > 2.63" for 25-year event Inflow = 307.42 cfs @ 12.57 hrs, Volume= 43.235 of Outflow = 307.42 cfs @ 12.57 hrs, Volume= 43.235 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach POST DP 1: POST DP1 Hydrograph --J---1---L---1---L------ - -----L------L-- L--- L -- ---L--L---1---1-- 320 _fo � a='1 � 02r307.42Cfsdh -,F -- -1-----rI' -----F-----I' -- --T- -- 300 280 --r---r--r---i---r---i---r---i---r---i- ---r--r---r--r---r--+-- 260 240 V 180 -- ---i -----r7------T------r---i --r--7---r--7---i --T-- 3 0 160 --r---r--r---i---r---i---r---i---r---i + + --r--r---r--r---r--+-- + LL 140 - - -- - - - - _ - - - - - 120 100--- --------- ------ ------ ------ -- -------------- -- 80 ------,------,--- ---,----------,--- -- r-- ---- -, --- - - -, -- - -- 60 --7---i--7---r7------T------r-- ---r--7---i --T-- 40 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ■ outflow NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 97 Summary for Reach POST DP 2: POST DP2 Inflow Area = 322.194 ac, 18.39% Impervious, Inflow Depth > 2.73" for 25-year event Inflow = 509.73 cfs @ 12.54 hrs, Volume= 73.276 of Outflow = 509.73 cfs @ 12.54 hrs, Volume= 73.276 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach POST DP 2: POST DP2 Hydrograph ■ Inflow 550 Inflow�4rga=';32�.194 ac 509.73 cfs -------'------'--- - - - ❑ Outflow 500 ---I---;-----------------------I- ----;--;---;--------;--- 450 --+------+------+------+------r---I- ---+--+---+--+------+--- 400 --L---'------1---1------1---'---L---- -L -- ---L--L---'---L--- 350 I I I I I I I I I I I I I I I I I ------'�----------'�------'�------'� ---' ---'�------'� ---'� ---'� --'-� --- y 300 I I I I I I I I I I I I I I I 3 I I I I I I I I I I I I I I I o a 250 --+------+------+------+------r--- --+--+---+--+___I---+--- 200 --L------L---1---1------L------L-- L -L--L---L--L------L--- 150 ------I------I------------------ -- ------I------I--- --- 100 -- ----- T------T------T-- - ---T- T-- --T--- T --T --- 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 98 Summary for Pond 1 P: (new Pond) Inflow Area = 21.910 ac, 37.43% Impervious, Inflow Depth > 3.07" for 25-year event Inflow = 130.27 cfs @ 11.96 hrs, Volume= 5.614 of Outflow = 73.42 cfs @ 12.05 hrs, Volume= 4.565 af, Atten= 44%, Lag= 5.8 min Primary = 35.30 cfs @ 12.05 hrs, Volume= 4.245 of Secondary = 38.12 cfs @ 12.05 hrs, Volume= 0.320 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 264.99' @ 12.05 hrs Surf.Area= 26,682 sf Storage= 99,667 cf Plug -Flow detention time= 92.9 min calculated for 4.565 of (81 % of inflow) Center -of -Mass det. time= 39.5 min ( 821.1 - 781.5 ) Volume Invert Avail.Storage Storage Description #1 260.50' 127,850 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 260.50 17,090 0 0 261.00 18,913 9,001 9,001 262.00 20,793 19,853 28,854 263.00 22,729 21,761 50,615 264.00 24,721 23,725 74,340 265.00 26,711 25,716 100,056 266.00 28,877 27,794 127,850 Device Routing Invert Outlet Devices #1 Primary 260.50' 24.0" Round RCP -Round 24" L= 67.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 260.50' / 255.25' S= 0.0784 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 260.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #5 Secondary 264.61' 65.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #6 Device 1 264.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=35.23 cfs @ 12.05 hrs HW=264.97' (Free Discharge) L1=RCP_Round 24" (Inlet Controls 35.23 cfs @ 11.21 fps) 2=Orifice/Grate (Passes < 0.34 cfs potential flow) 3=Orifice/Grate (Passes < 18.06 cfs potential flow) 4=Orifice/Grate (Passes < 18.06 cfs potential flow) =Orifice/Grate (Passes < 62.64 cfs potential flow) Secondary OutFlow Max=36.31 cfs @ 12.05 hrs HW=264.97' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 36.31 cfs @ 1.54 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 99 Pond 1 P: (new Pond) Hydrograph -- ----------------- - 130.27 cfS ----- -------------- M inflow Outflow -1 nilow A rjm:a 2 A aG -I- -II -- r- - - -i-- - ----II - F 1F /-FFiG -F�7 ItJ ❑ Primary .A�1 i- _Secondary - 130 120 Storage=�99'66©f----- -- ---------- - --r--r --I- -�- -r--r--t--r---I ---r--r--t--r--r------r-- 110 - -- --------'--- -- -- -- ---' --'--- -- -- --------'-- 100 -----------------------; 73.42Cfs ------------------,--- _ 90 -- r-- r-- r---------r--r-- r --T-- -----Ir--r--r--r------II--- N U 80 I I I I I I I I I I I I I I I I L J J L L J J L J J J 3 70 0 LL 60 --r--r--r---li---li---r--r-- -- -- --r--r--r--r--r------r-- 50 -L--L--L--------L--L----L--L--L--L-----'-- - - 38.12 cfs - - - 40 30 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 1 P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 U Surface ■ Storage 266 ----I----rt--r----r-r--I----+---I-I----+----u----r----I-r- ---r 265 r-r- 264 w w I I I I I I I I I I I I I I I I I I I I I I I I I I u I I I I I I I 0 263 w I I I I I I I I I I I u I I I I I I I W ----1----LL--J-- -L-J--1----1---1-1----1----1----1 --1-L--1------L-1- 262 ----' --'--'------- ---------- --------- ----"- ---'---------'----'---' --'- 261 Custom Stage Data 0 20,000 40,000 60,000 80,000 10050 120,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 100 Summary for Pond 2P: (new Pond) Inflow Area = 9.450 ac, 40.05% Impervious, Inflow Depth > 3.17" for 25-year event Inflow = 57.71 cfs @ 11.96 hrs, Volume= 2.496 of Outflow = 38.72 cfs @ 12.03 hrs, Volume= 2.123 af, Atten= 33%, Lag= 4.7 min Primary = 26.34 cfs @ 12.03 hrs, Volume= 2.032 of Secondary = 12.38 cfs @ 12.03 hrs, Volume= 0.091 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 273.69' @ 12.03 hrs Surf.Area= 13,973 sf Storage= 36,874 cf Plug -Flow detention time= 74.7 min calculated for 2.123 of (85% of inflow) Center -of -Mass det. time= 28.7 min ( 808.4 - 779.7 ) Volume Invert Avail.Storage Storage Description #1 270.50' 56,463 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 270.50 8,641 0 0 271.00 10,007 4,662 4,662 272.00 11,429 10,718 15,380 273.00 12,908 12,169 27,549 274.00 14,443 13,676 41,224 275.00 16,035 15,239 56,463 Device Routing Invert Outlet Devices #1 Primary 270.50' 24.0" Round RCP -Round 24" L= 39.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 270.50' / 270.00' S= 0.0127 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 270.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.00' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 273.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 273.50' 60.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=26.17 cfs @ 12.03 hrs HW=273.67' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 26.17 cfs @ 8.33 fps) �2=Orifice/Grate (Passes < 0.18 cfs potential flow) 3=Orifice/Grate (Passes < 22.95 cfs potential flow) 4=Orifice/G rate (Passes < 36.14 cfs potential flow) Secondary OutFlow Max=10.89 cfs @ 12.03 hrs HW=273.67' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 10.89 cfs @ 1.04 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 101 N U 3 0 LL Pond 2P: (new Pond) Hydrograph 57.71 -Inflo v-Area=-9.-450-'ac'-- _P!eak eIe_v_=27,3.69'1------' -Sto,ra0eT36;37-4,C# - --! --------- -- -- -- --- M Inflow Cfs M outflow ------------r--r-- --y--- ❑Primary Secondary 38.72 Cfs --1--1--- JS j j----------- j-- I I - - I - - -'I- I I - -'I- - - L - I - L - I - - I - - - - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 2P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,00011,000 12,00013,00014,000 15,00016,000 ❑ Surface ■ Storage 275 ----L---1---IL---JJ--J--LJ---JI---J-------JI----I--1 L - - -L -L --I- 274 - --T---T---IT--- TT--T--TT---TI- ------TI----1-7--T-- T--- TT - -T --I- 273 ---L---L---'11---1-1--LL--- LI--- J----I---LI - - - -I- --L--LL---LL--L --I- 272 ---T- T---IT--- TT--T--TT---TI--T----I-T --T --TT --- T T -- T --I- 271 Custom Stage Data 0 5,600 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 102 Summary for Pond 3P: (new Pond) Inflow Area = 6.160 ac, 43.99% Impervious, Inflow Depth > 4.07" for 25-year event Inflow = 46.02 cfs @ 11.95 hrs, Volume= 2.090 of Outflow = 26.68 cfs @ 12.04 hrs, Volume= 1.922 af, Atten= 42%, Lag= 5.1 min Primary = 26.68 cfs @ 12.04 hrs, Volume= 1.922 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 300.49' @ 12.04 hrs Surf.Area= 9,830 sf Storage= 24,127 cf Plug -Flow detention time= 53.8 min calculated for 1.917 of (92% of inflow) Center -of -Mass det. time= 25.1 min ( 785.7 - 760.6 ) Volume Invert Avail.Storage Storage Description #1 297.50' 40,368 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 297.50 5,965 0 0 298.00 7,000 3,241 3,241 299.00 8,091 7,546 10,787 300.00 9,239 8,665 19,452 301.00 10,444 9,842 29,293 302.00 11,705 11,075 40,368 Device Routing Invert Outlet Devices #1 Primary 297.50' 24.0" Round RCP -Round 24" L= 74.4' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 297.50' / 296.00' S= 0.0202 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 297.50' 1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 298.50' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 300.00' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 300.50' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=26.52 cfs @ 12.04 hrs HW=300.47' (Free Discharge) L1=RCP_Round 24" (Inlet Controls 26.52 cfs @ 8.44 fps) �2=Orifice/Grate (Passes < 0.10 cfs potential flow) 3=Orifice/Grate (Passes < 25.21 cfs potential flow) 4=Orifice/G rate (Passes < 16.67 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=297.50' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 103 Pond 3P: (new Pond) Hydrograph i - - T - -I - - -I 46.02 CfS M Inflow -+-- ---------I+-- -- - -'I--------I--- Inflow_ A_rrea-6.160 lac -- -- -- --- fOutflow ❑ Primary 50 L I 4 _ _I_ _I I_ _I_ _I_ - - - - - - - - - - - - - - - - _I _I _ I_ I_ - - - - - - Secondary I Peak EI v=300. 9''� I I I I I I I I I I I I -_T-_r I I Lrr -I---I r r I I Sto'rade*24,127'� cf r r r r 40 - - + - - 4 - -I- - - L - + - - + - - - 35 _ _L _I_I_I_I------'-'-- __-_ -I- -I- -I- ---- �---126.68 I Cfs I I I I I I I w30 -- ------------------------ ----------- L-- --- ------ 3 25 --+-----------'L--*-----'I--- -----------r--+-- -- --- 0 LL 20 I I I I I I I I I I I 1 1 L L 1 --L---------L--L--L--L--- I I I I 15 I I I I I I I I I I I I I I 10 0.00 Cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 3P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 ■ Surface ■ Storage 302 301 -----1--L--1----L1-----L-L-------LL-----LL--------' ----'-'---L---' w w 300 -- -- ---- -- - -- - - --- - ----- I I I I I I I I I ----- --- I o I I I I I I I I I I I I I I I I I I > -- ---'--L--L----L'---L-L---'----LL-----LL-------1-1-----'-'----L---' w 299 298 ----- -L--r----rl ,-,---i---„---- ---------I-T ----,---I Custom Stage Data 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 104 Summary for Pond 4P: (new Pond) Inflow Area = 11.220 ac, 59.98% Impervious, Inflow Depth > 4.39" for 25-year event Inflow = 88.26 cfs @ 11.95 hrs, Volume= 4.105 of Outflow = 65.62 cfs @ 12.01 hrs, Volume= 3.823 af, Atten= 26%, Lag= 3.5 min Primary = 61.63 cfs @ 12.01 hrs, Volume= 3.799 of Secondary = 4.02 cfs @ 12.01 hrs, Volume= 0.024 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 265.62' @ 12.01 hrs Surf.Area= 21,145 sf Storage= 39,453 cf Plug -Flow detention time= 51.1 min calculated for 3.813 of (93% of inflow) Center -of -Mass det. time= 25.8 min ( 778.5 - 752.7 ) Volume Invert Avail.Storage Storage Description #1 263.50' 70,810 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 263.50 15,234 0 0 264.00 17,440 8,169 8,169 265.00 19,702 18,571 26,740 266.00 22,021 20,862 47,601 267.00 24,396 23,209 70,810 Device Routing Invert Outlet Devices #1 Primary 261.00' 36.0" Round RCP -Round 36" L= 52.9' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 261.00' / 260.00' S= 0.0189 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 263.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 264.17' 60.0" W x 10.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 265.50' 60.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 266.50' 60.0" W x 60.0" H Vert. Orifice/Grate C= 0.600 #6 Secondary 265.50' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=60.77 cfs @ 12.01 hrs HW=265.60' (Free Discharge) L1=RCP_Round 36" (Passes 60.77 cfs of 74.90 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.15 cfs @ 6.84 fps) 3=Orifice/Grate (Orifice Controls 60.12 cfs @ 4.81 fps) 4=Orifice/Grate (Orifice Controls 0.50 cfs @ 1.01 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=3.43 cfs @ 12.01 hrs HW=265.61' (Free Discharge) L6= Broad -Crested Rectangular Weir (Weir Controls 3.43 cfs @ 0.81 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 105 Pond 4P: (new Pond) Hydrograph 88 26 Cfs M Inflow --r--r---i---r--r--r--r---i-----i---r--r--r--r--r--- Outflow r /� /�.� - T, - ---,- --------------,------,--- ❑Primary -L�W-�il�li,1 1-�Li--- -----'---'---�--L-- --J--- Secondary 95 + --- r-------+ --+---------+--+--+--+--- 90 _Peak-leer=�6-----,---, --------,---, --, -----,--- 85------'---' --'-----'--- 80 - 65.62cfs�-1---------L--L--1--J--- -9 - 75--+--+---------r--r--+-- -----------r--+-- --+--- 70 61.63 Cfs - - - - - - - 65 _ 60--+--+---------+--+--+---,---i --+---------+--+--+--+--- T 55 u --T--------r--r--r-----i---i --------r--r--r-- -- --- i 50 0 45-1--1---'---'---L--L--L---'---' -L---'---'---L--L--L--L-- LL 40 35 30 25 - -----------L-- -- -----------------L-- -- --L-- 20 - - - - - 15 10 4.02 cfs 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 4P: (new Pond) 0 2,000 4,000 6,000 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 Surface ❑ Storage r - r - - r - - - - -I-I- - - - r - - - - n - - - - -I- - - r - r - - - - -I- T - - - r - - - 271 270 ---- L --- 1-'----- L - L -- L----- '-' - - -- L -- - - LI--- - - I - -- L - L-- - - -'- L --- L -- 269 ------ - ------ ---------------T --- ----------- - - - - -- ------ w 268 F C 267 w 266 265 264 Custom Stage Data 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 106 Summary for Pond 5P: (new Pond) Inflow Area = 2.000 ac, 41.35% Impervious, Inflow Depth > 4.18" for 25-year event Inflow = 15.21 cfs @ 11.95 hrs, Volume= 0.696 of Outflow = 11.97 cfs @ 12.01 hrs, Volume= 0.613 af, Atten= 21 %, Lag= 3.2 min Primary = 11.97 cfs @ 12.01 hrs, Volume= 0.613 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 272.75' @ 12.01 hrs Surf.Area= 7,025 sf Storage= 7,734 cf Plug -Flow detention time= 69.4 min calculated for 0.613 of (88% of inflow) Center -of -Mass det. time= 30.2 min ( 788.3 - 758.1 ) Volume Invert Avail.Storage Storage Description #1 271.50' 17,465 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 271.50 5,054 0 0 272.00 6,157 2,803 2,803 273.00 7,317 6,737 9,540 274.00 8,533 7,925 17,465 Device Routing Invert Outlet Devices #1 Primary 271.00' 24.0" Round RCP -Round 24" L= 20.6' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 271.00' / 270.00' S= 0.0485 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 271.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 273.70' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 272.77' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=11.86 cfs @ 12.01 hrs HW=272.74' (Free Discharge) L1=RCP_Round 24" (Passes 11.86 cfs of 16.31 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.28 fps) 3=Orifice/Grate (Orifice Controls 5.92 cfs @ 2.96 fps) 4=Orifice/Grate (Orifice Controls 5.92 cfs @ 2.96 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=271.50' (Free Discharge) L6= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 107 Pond 5P: (new Pond) Hydrograph --t--r---1---1---r--r--7 -1---1---r--r--r---1---1---r--r--r--t--- --t--r---1---1---r--r--r---1-----1---1---r--r--,--r--- 1 15.21 Cfs 1 1 MInflow --sty--r---1---1-^-.yr--r--rt---1-- ---1---1---r--r--r--r--- - I nfl o YY1-/�- rea=-2.-000_1 -i - -I---I---i 1 --I --r - - - ffloutflow Primary � 17 I- i _ Secondary 16 --p--ar------1---r-- --�f --� 1---1---r --r---1---1---r--r--r--t--- 1 1 1 1 1 1 ev1 111.97 14 ----11---11---r--fi-- Cf- cfs -St rageTr1173 (+ - -- 1--- 13 -1- --t--rt- r--4 --t---1---1---r--r--t--t--- 12 --rt--1---1i---1r--1r--r-----1---1r -----1i---1r--r--r-- --7--- 11 --+--rt---1I---1I---1r--r------1---1i -----1i---1i---r--r-- --y--- N 10 --rt--1---1i---1r--1r--r-----1---1i------1i---1---r--r-- --7--- 9 --t--rt---1i---1i---1r--r--rt---1---1i--�---1i---1i---r--r--�--�--- 0 $ --t--r---1---1---r--r--r------ 1 --r---1---r--r--r--r--r--- 1 LL 7 , , , _-t--r---I---I---r--r--r---I---I --r---I---I---r--r--r--t--- 6 AU --T--I---1i---1i---1r--r-----1---1i -----1i---1r--r--r-- --7--- 5 --t--r---------r--r--r---I---I --r---I---I---r--r--r--t--- 4 - -T--r---------r--r--r---I - - -I r--------- r --r --r--r --- 3 2 0.00 Cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 5P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 ■ Surface ■ Storage 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 108 Summary for Pond 6P: (new Pond) Inflow Area = 1.790 ac, 35.20% Impervious, Inflow Depth > 3.76" for 25-year event Inflow = 12.60 cfs @ 11.95 hrs, Volume= 0.561 of Outflow = 4.30 cfs @ 12.08 hrs, Volume= 0.490 af, Atten= 66%, Lag= 7.3 min Primary = 4.30 cfs @ 12.08 hrs, Volume= 0.490 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 306.97' @ 12.08 hrs Surf.Area= 5,198 sf Storage= 10,418 cf Plug -Flow detention time= 83.4 min calculated for 0.490 of (87% of inflow) Center -of -Mass det. time= 42.5 min ( 810.1 - 767.6 ) Volume Invert Avail.Storage Storage Description #1 304.50' 22,746 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 304.50 3,032 0 0 305.00 3,706 1,685 1,685 306.00 4,436 4,071 5,756 307.00 5,223 4,830 10,585 308.00 6,066 5,645 16,230 309.00 6,966 6,516 22,746 Device Routing Invert Outlet Devices #1 Primary 302.00' 24.0" Round RCP -Round 24" L= 55.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 302.00' / 300.00' S= 0.0362 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 304.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 305.20' 12.0" Vert. Orifice/Grate C= 0.600 #4 Secondary 307.50' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #5 Device 1 307.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=4.29 cfs @ 12.08 hrs HW=306.96' (Free Discharge) L1=RCP_Round 24" (Passes 4.29 cfs of 37.63 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.04 cfs @ 7.49 fps) 3=Orifice/Grate (Orifice Controls 4.24 cfs @ 5.40 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=304.50' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 25-year Rainfall=6.05" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 109 • • . ' • • ..... •1 Inflow •0 i ' • • • • M i LL 111 /////////////////////////////////////////////// Pond 6P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 Storage (cubic -feet) E Inflow M Outflow ❑ Primary Secondary ■ Surface ■ Storage NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 110 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDA P1: (new Subcat) Runoff Area=21.910 ac 37.43% Impervious Runoff Depth>4.14" Tc=5.0 min CN=75 Runoff=173.01 cfs 7.564 of SubcatchmentDA P2: DA 2 MAX IMP Runoff Area=9.450 ac 40.05% Impervious Runoff Depth>4.25" Tc=5.0 min CN=76 Runoff=76.23 cfs 3.347 of SubcatchmentDA P4: (new Subcat) Runoff Area=11.220 ac 59.98% Impervious Runoff Depth>5.59" Tc=5.0 min CN=88 Runoff=110.31 cfs 5.223 of SubcatchmentDA P5: Runoff Area=2.000 ac 41.35% Impervious Runoff Depth>5.36" Tc=5.0 min CN=86 Runoff=19.17 cfs 0.893 of SubcatchmentDA P6: Runoff Area=1.790 ac 35.20% Impervious Runoff Depth>4.91" Tc=5.0 min CN=82 Runoff=16.16 cfs 0.732 of SubcatchmentDA3 MAX: DA 3 MAX IMP Runoff Area=6.160 ac 43.99% Impervious Runoff Depth>5.25" Tc=5.0 min CN=85 Runoff=58.22 cfs 2.692 of SubcatchmentUD 1: Runoff Area=175.189 ac 0.84% Impervious Runoff Depth>3.65" Flow Length=6,400' Tc=55.8 min CN=71 Runoff=395.14 cfs 53.245 of SubcatchmentUD2: Runoff Area=293.364 ac 15.41% Impervious Runoff Depth>3.65" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=673.94 cfs 89.212 of SubcatchmentUD3: Runoff Area=74.030 ac 0.00% Impervious Runoff Depth>2.10" Flow Length=2,280' Tc=25.4 min CN=55 Runoff=156.30 cfs 12.948 of Reach DP 3: (new Reach) Inflow=160.91 cfs 13.607 of Outflow=160.91 cfs 13.607 of Reach POST DP 1: POST DP1 Inflow=419.21 cfs 59.741 of Outflow=419.21 cfs 59.741 of Reach POST DP 2: POST DP2 Inflow=702.34 cfs 100.450 of Outflow=702.34 cfs 100.450 of Pond 1P: (new Pond) Peak Elev=265.36' Storage=109,882 cf Inflow=173.01 cfs 7.564 of Primary=37.16 cfs 5.206 of Secondary=114.22 cfs 1.290 of Outflow=151.38 cfs 6.496 of Pond 2P: (new Pond) Peak Elev=273.92' Storage=40,113 cf Inflow=76.23 cfs 3.347 of Primary=28.06 cfs 2.563 of Secondary=42.49 cfs 0.407 of Outflow=70.55 cfs 2.970 of Pond 3P: (new Pond) Peak EIev=300.87' Storage=27,961 cf Inflow=58.22 cfs 2.692 of Primary=29.12 cfs 2.404 of Secondary=16.77 cfs 0.117 of Outflow=45.89 cfs 2.521 of Pond 4P: (new Pond) Peak EIev=265.85' Storage=44,418 cf Inflow=110.31 cfs 5.223 of Primary=71.00 cfs 4.762 of Secondary=21.56 cfs 0.174 of Outflow=92.56 cfs 4.937 of NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 111 Pond 5P: (new Pond) Peak Elev=272.88' Storage=8,636 cf Inflow=19.17 cfs 0.893 of Primary=13.85 cfs 0.794 of Secondary=2.55 cfs 0.015 of Outflow=16.40 cfs 0.809 of Pond 6P: (new Pond) Peak Elev=307.41' Storage=12,822 cf Inflow=16.16 cfs 0.732 of Primary=8.47 cfs 0.659 of Secondary=0.00 cfs 0.000 of Outflow=8.47 cfs 0.659 of Total Runoff Area = 595.113 ac Runoff Volume = 175.856 of Average Runoff Depth = 3.55" 88.31% Pervious = 525.551 ac 11.69% Impervious = 69.562 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 112 Summary for Subcatchment DA P1: (new Subcat) Runoff = 173.01 cfs @ 11.96 hrs, Volume= 7.564 af, Depth> 4.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 0.324 80 >75% Grass cover, Good, HSG D 8.306 74 >75% Grass cover, Good, HSG C 5.639 98 Paved roads w/curbs & sewers, HSG C 5.080 39 >75% Grass cover, Good, HSG A 2.561 98 Paved parking, HSG A 21.910 75 Weighted Average 13.710 61 62.57% Pervious Area 8.200 98 37.43% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5 minute pipe flow Subcatchment DA P1: (new Subcat) Hydrograph 190 ■Runoff 180 173.01 cfs 170 - ype-H-24yh-------, ------ ---- ---,------, ------ ---, -- --- 160 1-_5 - ---- -- - _ -ear j ear--- -- -- --- --- --- 150 --- y- -- -- 140-R�tun6f#'�Ar6a;21-141aae-- ---- 130 ' 120 -R',Wra�f#VOluq��=7�64'of -- -- -- --- -- - -- -- --- w 110 1 1F ------'i---1---''1 100 JI--- ----- i- w Runaff='�De� th>4'.1 -- --- -- -- 0 90 - 1���7.�1--------- ------ ----- ------ ---T ------T --- --- --- LL 80 ------------------------------------ ---------------------------- 70 _C'5-,-----------------,--- ---,-- -------------,---T ---,--- --- 60 ------i-------i---i----i---i-------i---- 50 40 ------T ---------- ------T --- ---i- ------------- ------- ------- 30 ------- r------ i--- i------ r------ i- 20 ------ ---------------- ------ --- - 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 113 Summary for Subcatchment DA P2: DA 2 MAX IMP Runoff = 76.23 cfs @ 11.96 hrs, Volume= 3.347 af, Depth> 4.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 3.624 74 >75% Grass cover, Good, HSG C 2.041 39 >75% Grass cover, Good, HSG A 2.340 98 Paved roads w/curbs & sewers, HSG C 1.445 98 Paved roads w/curbs & sewers, HSG A 9.450 76 Weighted Average 5.665 61 59.95% Pervious Area 3.785 98 40.05% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P2: DA 2 MAX IMP Hydrograph ------+------ --- ------ ---------+---------+---I----4----------+--- ❑Runoff -- 76.23 cfs --- ------ L-- --- -- 75 TYp�-u- � I T--------�---F------r- 70 -5fl yaar Rainfa11T7.35 65---1---y--- '--- --- L--- '--- L--- L--- '--- L- 60 Runbff I C$a=19 4'5Q''�ar,'�---'---' - 55 -Rungf VO�Ume=a.3�;47'af 50 45 _R'unoff 'Depth,>4.------ -- a 40 -T7 5.0_enj f--L---------L------r 35 - ---- - - - -i- - - I--- 30 �II�� 6--L---L---1---1---L---'---L 25 20 ---I--- + ---I--- r--- r---I--- r--- r---I--- r 10 ------- -- --- -- --- --- -- --- -- 5 ---}---'--- ------ -'- - -+ L---L---'- -- L-------'---L �i---'r---'i--- it---'i---'i---r --- L---'--- L-------' --- L 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 114 Summary for Subcatchment DA P4: (new Subcat) Runoff = 110.31 cfs @ 11.95 hrs, Volume= 5.223 af, Depth> 5.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 4.490 74 >75% Grass cover, Good, HSG C 6.730 98 Paved roads w/curbs & sewers, HSG C 11.220 88 Weighted Average 4.490 74 40.02% Pervious Area 6.730 98 59.98% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P4: (new Subcat) Hydrograph t - - -I- - - + - - -I--- I - - - r - - -I- - - t - - -I--- + - - - r - - y - - - 120 ------ ---II--- ---Ii---II------II--- I---II------II--- -- -II ----- ■Runoff ' -- 110.31 cfs ------+------+---+--+--- 110 H ---;---II------II--- ---I ----- 105-TJFpe-11-I24yh1�Ir-----+------+---I- ---------+------+--- -- --- 100 -50=year--- n ------ .15"--- - - -I----lr-- -ll - -----II------lr-- --- 95 - - - 90-R�unaffAr6a=41' U ac-- ---I- --------------- -I ------ --- 85 - - $5-RIluraoffI o ume=a. 2 IIaf ---II- ---II---II--- -II--- -II~-- W 70 - I---L_ I 1_ r J L---1---1---I- ---L---I---L---I---L---L--L--- 65 -Ru ofUDePth>&59��--- T-- ---Ir---I---r---I---T---Ir--;--- -T----------- y-,--- -------L---I---! ---I-----------L---I---! ---I- ,° 55 -1 ��.0 iFF ----- + ------+---I- - r---I- +--- ---+- r--,--- so /�+ I I I I I I I I I I -- - I -- - - -- -� -- - --- 45-�sN=98-I-------------+------+---I- ---------+------+--- -- --- ,I 40 , I I I I I I I I I I I I I I I I I I 35------L------L---L--J---L------+---I- ---------+------+--- -- --- I I I I 30---I---r--- r-- r--- r--I--- r--- I - - - + ---r r---I---r---r--+---r--,--- 25 I ---I--- I----I----I---I----I- -- I- -- -I- -- i---I--I----I- -- I - ---I- - --I---I--- i--- , ,I 15---I------I----------I------I--- ---I --- ---I--- --- �I 10---+---I--+---r--+--+------+--- -----I---+-+---r- - 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 115 Summary for Subcatchment DA P5: Runoff = 19.17 cfs @ 11.95 hrs, Volume= 0.893 af, Depth> 5.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 0.366 98 Paved roads w/curbs & sewers, HSG C 0.461 98 Paved roads w/curbs & sewers, HSG D 0.607 74 >75% Grass cover, Good, HSG C 0.566 80 >75% Grass cover, Good, HSG D 2.000 86 Weighted Average 1.173 77 58.65% Pervious Area 0.827 98 41.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P5: Hydrograph ------;------;---------- ;--- ------- ---- 21 20 --- -p--- w- L--- -t ---I 19.17( 19 -�1 "r-N-'F�hi r------+---r------+- 18 ------r---r--r---r------r---r------r- 17 -50year"r Rain#aHT7.35"r ----- 16-p-Ai---------- ------^-^- --- _ 15-Rundf# r6a^ZF01Ofl �aC �------'- w 12 - I----- I - I �F--I1---I---I 11 -Runoff Depth>v.36 1 --- 8---r---------r---i---+ 7------r------,---r---I---7---r---I---r 6---------'i -----r---------r---I--- 5------i---------L------------�---L 4 ------ ------ --- ------ --- ------ 3------+------+---r------+---r---i---+ 2---'---r---'---,---r------r---r---'---' - I I I I I I I I __ �---�---'--- �---'----'---� --- ❑Runoff SL---L---1---1----------r--- ----- r------ ---r------r--- --r---r------r---I----I---r--- - - r - - - r - - - 'I - - - r - - -'I- - - -'I - - - r - - - - r - - - 'I - - - r - - -'I- - - -'I - - - r 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 116 Summary for Subcatchment DA P6: Runoff = 16.16 cfs @ 11.95 hrs, Volume= 0.732 af, Depth> 4.91" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 0.630 98 Paved roads w/curbs & sewers, HSG C 1.160 74 >75% Grass cover, Good, HSG C 1.790 82 Weighted Average 1.160 74 64.80% Pervious Area 0.630 98 35.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 17 16 15 14 13 12 11 10 3 9 O $ FL 7 Subcatchment DA P6: Hydrograph ---'---+---'---�---�---'---�---�---'---+---'---�---+---'---�---'----'---+--- ■Runoff 16.16 cfs I---L---1---1---1----1--- --- I I I I I I I I I Jype-H-241h --- --- -50-year-RainfaCl #7:35 + T - - - T - - -I- - - T - - - T - - -I- - - T - -R''tandff Ar6a=�4.7190,ac r---'---r- -RunOffYojUM1Q7_'I0.-t of --- I I I I I I I I I I R n af# ID"UT>4.911'- - - - - -------II I Lj -1---t---li--- I - - -li---I---T t --- t---II--- ------ - II - -- t ---I ----------------' T---T------T---I -- -I- - -T �---�i---II--- ill- -'i---II-- -- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 117 Summary for Subcatchment DA3 MAX: DA 3 MAX IMP Runoff = 58.22 cfs @ 11.95 hrs, Volume= 2.692 af, Depth> 5.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 3.450 74 >75% Grass cover, Good, HSG C 2.710 98 Paved roads w/curbs & sewers, HSG C 6.160 85 Weighted Average 3.450 74 56.01 % Pervious Area 2.710 98 43.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA3 MAX: DA 3 MAX IMP Hydrograph ---1---r---r--r r---r---1---r---r--r---1---r--- ------;------;---;------;---;---' ;---r------;---;------;--- ■Runoff I I I 1 58.22 cfs OV I I I I I I I I 55 50 -5-0year� Rain�aNT7.35u';-- -'ll-- Rlu n offArda-6.- SO lac - - 45 40 R'llu n Off yob u r ' e=12.6192 of -I - - - T---1------r---1------r--- 1---r 35 R'lunoff '1Depth>5.2511' ° 30 Ttc=5.0 tnih LL T I T---r- - - I- T---r---1- T 25 II---;---I1--- II---;---II---Ir 20 ---1---T---;--;-------------- -I---; 15---1--- 10 - -----T---'i-- ;--- r---'r--T--- r- -----T 5- -1 - - - T- -1 - T---I I T -- T---1--- -----1---T--- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 118 Summary for Subcatchment UD 1: Runoff = 395.14 cfs @ 12.58 hrs, Volume= 53.245 af, Depth> 3.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 4.459 30 Woods, Good, HSG A 21.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 113.857 70 Woods, Good, HSG C 29.253 77 Woods, Good, HSG D 175.189 71 Weighted Average 173.724 71 99.16% Pervious Area 1.465 98 0.84% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total Subcatchment UD 1: Hydrograph 440 ' r---1 7---�--�---r---1 +_________� � � � � � ■Runoff 420 ---'-----'---'-------'---- -'---' - 395.14 cfs -----------L------L--- 400 380 -r L L--J---L---1---1------ ----1---L------ 1---L-- --- 1 „p 11 _4- r - 360 -J ye-ar'I�ii-nf�ll �.J;Ju-----'r 340 320 ,1 ---I----'--- --------- - - - - -'---'r---'--- - --- I I 1 ,I� I� -RIunoff-A�.a-117�.1817�I�E--1---1I--- L------L------1--- IL --- --- 300 280 ---1-+---+--+---+--+---+--+---+---+-- +--+---+---I---+---+--+--- -Rlun0f-Volume-53.245-af--- r Y r 260 w 240 11- --- - IS� I -' - --'- --'---'------'---'---'---' ------ --- -�undf-De 1 W>3.{y��V5"L--1----- -'-- ----L--- 1---L- -L--L- 3 220 .-°° 200 - -1--- �I---1---+---1-----1------1---+--- -- --- - - yam- - `� -OQWLengh=`�f0� 1------;---'1-- - ---'1---;---'1---;---;--;--- 180 ae-----------------L---'-- ---'----- - -'------'--- --- = S.Q1-m�n--L--L---L------L---I'-- L---IL-- 160 - -----L------ --- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 140 ,1 - - 1------1--I---L---1---1---1-- ----1---L---1---+---L--�--- IY-74 1 1 1 1 1 120 T - 1---r---1---Y---r--Y---r---1---Y---I-- ----1---r---r--Y---r-- --- 100 ------ I------?-------------'I------'I-- ---' -------'I--- ------ --- 80 --------- - - - - -'------------- - - - - -' ---'- ---'-----------'-------'--- 60 ---1---L---1-----------L---1---+---1----�-----1---+-----�--- �1 1 NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 119 Summary for Subcatchment UD2: Runoff = 673.94 cfs @ 12.55 hrs, Volume= 89.212 af, Depth> 3.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 40.326 54 1/2 acre lots, 25% imp, HSG A 18.198 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 129.984 80 1/2 acre lots, 25% imp, HSG C 48.796 70 Woods, Good, HSG C 43.700 77 Woods, Good, HSG D 10.550 85 1/2 acre lots, 25% imp, HSG D 293.364 71 Weighted Average 248.149 67 84.59% Pervious Area 45.215 98 15.41 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total Subcatchment UD2: Hydrograph 750 ' ------------------ -- --- ■Runoff 700 673.94 cfs Type -- 5 600 year,Ra,infall=7.3,5" --- - --- - --- - --- - -- 550 Rlu-nbff-Area=293.364a1c--Y---I--- r------r------Y---'r-- --- soo Rlu-n6ff-Vo'�um-e= l 450 w / R'undf-Deoth:�3.65"-- --- - -- ----- --- - +-- 400 0 350 _F�oWLeng h='3,9,60'!--- +-- -- - --'---------+---' -- --- LL 300 Tc,=44.4-mJn- - - - - - -- - -- - -r- - ---+- - - -i-- ----r- ----+- - -- - 250 — ----------_ _ _ - 1� -CAN-7'F-� - -- --, --, ---, -- --, -- -- 200 - -----r---r-- r--- r-- r--- r--- I - - - r ---r- --- ----r---I---r---r--r--- 150 ---------i----------------i---� -- -- ---------i---- - - i --- OOL - - - - - - - 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 120 Summary for Subcatchment UD3: Runoff = 156.30 cfs @ 12.21 hrs, Volume= 12.948 af, Depth> 2.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-year Rainfall=7.35" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 46.615 70 Woods, Good, HSG C 74.030 55 Weighted Average 74.030 55 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total Subcatchment UD3: Hydrograph 170 �i ■Runoff -----------�-- ---� 156.30 cfs--�---------+-----�--- ;so rypq 1t �4-� r --- -- ------------------------------------- --------------------------- 140-5J1'�K,alf�l�=7,35��----7----- --r------r------7---r--,--- 130 I- Runoff AT`ea=74.�;30� at--- -- -- -- -- + -- -- - -- +---+- +- - +- - +- +- 120---1---L---1---1---L--J---L---'---1---'----L---1---L------1---L-- --- 110 R'unbff_Vo um'e=_'L2.9431af1---'--M-�----- ---------100 R;un6ff-beptN>2.40 TTr---90 8o ov_k Length'�2$0'rr---''------''--- ---' -- --- LL 7o T�5:4-------------'---' ---'------------'---'--------- 60 --------i - - -- ----------------- --i--- 40------+---i--- --- -----+------+---i-------+------+--- -- --- 30---1---L---1---1---L--J---L------1---'- - --'---L------1---L---1--- 20 in i/I 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 121 Summary for Reach DP 3: (new Reach) Inflow Area = 75.820 ac, 0.83% Impervious, Inflow Depth > 2.15" for 50-year event Inflow = 160.91 cfs @ 12.21 hrs, Volume= 13.607 of Outflow = 160.91 cfs @ 12.21 hrs, Volume= 13.607 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach DP 3: (new Reach) Hydrograph 180 170 160 150 140 130 120 110 100 3 90 ° 80 FL 70 60 50 40 30 20 10 0 1 ----r--t---r--t------+--- ■Inflow ■Outflow +--+---+--+---+--+--- - L - - - L - T---Ir--T--- --- t -- - L - t---I+-- - - L - - - 1 - - -I- -T- - - t---II- - - i -- IIT--- -- t --- 1 NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 122 Summary for Reach POST DP 1: POST DP1 Inflow Area = 197.099 ac, 4.90% Impervious, Inflow Depth > 3.64" for 50-year event Inflow = 419.21 cfs @ 12.57 hrs, Volume= 59.741 of Outflow = 419.21 cfs @ 12.57 hrs, Volume= 59.741 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach POST DP 1: POST DP1 Hydrograph 460 440 ��� ------�,------�,-------------�,--- -Al C1 9 1 rf---- L _ _ _L a_ 419.21 Cfs -rr�lowra-'19�OT9-ac --L--L---L--L---'---I-- ---�,- -- -- -�,- -- -- ' 420 - -r -r -r- -r-r---i- r---r--r---r--r---r--+-- 400 ---------------------------------- ------------------------ 380 --+---+--+---+--+--+---+------+--+- ---+--+---+--+---+--+-- 360 7 -- -,- --; -- 340 --J---1---L------L---'---------L---'- --L--L---L--L------+-- 320 --T---Ir-----Ir--T---li---T---Ir--r---li ---r-- ---Ir--T---Ir--T-- 300 ---------------------------------- ----------------------- _ 280 --+------+---+--+--+---+------+--+ ---+--+---+--+---+--+-- w260 ---------------------------------- ---------------------- " 240 --J---1---L------L------L------L---' TTTT --L--L---L--L------+-- 0 220 -------- ------ --- I - - - ------r -- --r--,---r--T---I---T-- a 200 180 --t------ t---li---t---li---t------r-- r -r-- ---Ir--t---Ir--T-- 160 --------------------------- - - - --- - --------------------- 140 --+------+------+--+---+------+-- + +--+---+--+---+--+-- 120 -----------------------------, -- -- ---,---, ----------,-- 100 --L------L---1---1------L------L-- L- ---L--L------+-- 80 -----Ir-----li--- t---li---t------r- r -- - -t------t-- 60 --------------------------------- ------ 40 20 000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ■ outflow NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 123 Summary for Reach POST DP 2: POST DP2 Inflow Area = 322.194 ac, 18.39% Impervious, Inflow Depth > 3.74" for 50-year event Inflow = 702.34 cfs @ 12.53 hrs, Volume= 100.450 of Outflow = 702.34 cfs @ 12.53 hrs, Volume= 100.450 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach POST DP 2: POST DP2 Hydrograph ---'�---'� ---'i ---'�----'�---'�---'� ---'�--- �---'----------'� ---'�---'I ---'� ---'� --'T --- ■Inflow -----1--- ---1---rt---1---+---1--- -r-- ---r--rt---1---+- I ❑ Outflow7so ,' "flow �rqa�2- 702.34 cfs - a 94-dC 700 650 600 'I 550 500 -- --- -- ---1---7---1---+---1---+---1 ---r-- --- --7--- --+ --- w 450 ' 1 --I-----------------+------+---I I I I I I -------------1---+--- I I I I I I I I I I 1 w 400 I I I I I I I 1 r .2 350 LL -I- - - --- - ------I- -----r---- - --- --r--,---r--4------T--- 300 250 ---1---1------1--- ---1--- 1----1------ - -I--- ---I--- - - - I--- --- 200 '1 150 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 100 1 1 r 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 124 Summary for Pond 1 P: (new Pond) Inflow Area = 21.910 ac, 37.43% Impervious, Inflow Depth > 4.14" for 50-year event Inflow = 173.01 cfs @ 11.96 hrs, Volume= 7.564 of Outflow = 151.38 cfs @ 12.01 hrs, Volume= 6.496 af, Atten= 13%, Lag= 3.1 min Primary = 37.16 cfs @ 12.01 hrs, Volume= 5.206 of Secondary = 114.22 cfs @ 12.01 hrs, Volume= 1.290 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 265.36' @ 12.01 hrs Surf.Area= 27,496 sf Storage= 109,882 cf Plug -Flow detention time= 77.1 min calculated for 6.479 of (86% of inflow) Center -of -Mass det. time= 33.6 min ( 808.5 - 774.9 ) Volume Invert Avail.Storage Storage Description #1 260.50' 127,850 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 260.50 17,090 0 0 261.00 18,913 9,001 9,001 262.00 20,793 19,853 28,854 263.00 22,729 21,761 50,615 264.00 24,721 23,725 74,340 265.00 26,711 25,716 100,056 266.00 28,877 27,794 127,850 Device Routing Invert Outlet Devices #1 Primary 260.50' 24.0" Round RCP -Round 24" L= 67.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 260.50' / 255.25' S= 0.0784 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 260.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #5 Secondary 264.61' 65.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #6 Device 1 264.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=37.05 cfs @ 12.01 hrs HW=265.34' (Free Discharge) L1=RCP_Round 24" (Inlet Controls 37.05 cfs @ 11.79 fps) 2=Orifice/Grate (Passes < 0.36 cfs potential flow) 3=Orifice/Grate (Passes < 19.77 cfs potential flow) 4=Orifice/Grate (Passes < 19.77 cfs potential flow) =Orifice/Grate (Passes < 101.27 cfs potential flow) Secondary OutFlow Max=109.00 cfs @ 12.01 hrs HW=265.34' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 109.00 cfs @ 2.30 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 125 Pond 1 P: (new Pond) Hydrograph -- -- ----------- -- -- - 173.01 CfSffl -- -- -- -- --------- M Inflow II'lr f low'Ariea�21.91 Q aC - -- - -- --T-- -- - ---- - outflow ❑ Primary 190 I I I — Secondary 180 _Peak1E1ev--265'43fiv--T 151.38 Cf170 s----'L--1--1 J----'--- 160 �+}-+--+-- r +--+-- ---I---r--+--+--+---I---I--- _ Qrag'e=�� }Q � d -- -r -T-- -- --- -- --T-- -- ------ -- 150 r - -- - - - - - - -- 140 - -L--1--J---1---1---L--L--1--1- --'---L--1--J--J------'-- - 130 114.22 cfs 120 --r--r--r---I---I---r--r--r- - --r--r--r--r--r---I---r-- w 110 100 -L- -J--J--------L--J--1-----L--1--J--J- ----'--- 0 ZZ 90 LL 80 _ --T--T--T--------- Ir--T--T- - -II---T--T--T--T---II---II--- 70 I I I I I I 60 Zz-- --------------L-- - 3 cfs--- -- - - -- - ------------- 50 - -- --------'---' -- -- - -' -- -- -- ------'-- 40 30 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 1 P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 U Surface ■ Storage 266 265 264 w w I I I I I I I I I I I I I I I I I I I I I I I I I I u I I I I I I I 0 263 w I I I I I I I I I I I u I I I I I I I W ----1----L1--J---L-J--'----1---1-1----1----"----1 ---L--1------1-J- 262 ----'--'---'------------------------------"- ---'---------'----'-- -' --'- 261 Custom Stage Data 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 126 Summary for Pond 2P: (new Pond) Inflow Area = 9.450 ac, 40.05% Impervious, Inflow Depth > 4.25" for 50-year event Inflow = 76.23 cfs @ 11.96 hrs, Volume= 3.347 of Outflow = 70.55 cfs @ 12.00 hrs, Volume= 2.970 af, Atten= 7%, Lag= 2.6 min Primary = 28.06 cfs @ 12.00 hrs, Volume= 2.563 of Secondary = 42.49 cfs @ 12.00 hrs, Volume= 0.407 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 273.92' @ 12.00 hrs Surf.Area= 14,324 sf Storage= 40,113 cf Plug -Flow detention time= 62.5 min calculated for 2.962 of (88% of inflow) Center -of -Mass det. time= 25.6 min ( 798.7 - 773.1 ) Volume Invert Avail.Storage Storage Description #1 270.50' 56,463 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 270.50 8,641 0 0 271.00 10,007 4,662 4,662 272.00 11,429 10,718 15,380 273.00 12,908 12,169 27,549 274.00 14,443 13,676 41,224 275.00 16,035 15,239 56,463 Device Routing Invert Outlet Devices #1 Primary 270.50' 24.0" Round RCP -Round 24" L= 39.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 270.50' / 270.00' S= 0.0127 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 270.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.00' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 273.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 273.50' 60.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=28.02 cfs @ 12.00 hrs HW=273.92' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 28.02 cfs @ 8.92 fps) �2=Orifice/Grate (Passes < 0.19 cfs potential flow) 3=Orifice/Grate (Passes < 24.85 cfs potential flow) 4=Orifice/G rate (Passes < 57.50 cfs potential flow) Secondary OutFlow Max=41.76 cfs @ 12.00 hrs HW=273.92' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 41.76 cfs @ 1.66 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 127 Pond 2P: (new Pond) Hydrograph --t--r---I---I---r--r--7 —I---I---r--r--r---I---I---r--r--r--r--- — —+—— r———----—— r—— r——r——-I--------——— r—— r — —r — —— MInflow --t--r---I---i---r--r--rt---i--76.23 CfS—---r--r--r--r--- iiiM Outflow � Primary 85 AJO �, Seconda ry 70.55 cfs I — 80 ----r---------r-- -- --� I� J-r---------r--r--r--r--- ea75 - t y- r ---I-- --r-I-I-rrr--r--- 70 r r I ---I --r---I---I---r--r--r--r--- - Sto rage Q -11-3 cf -- 65--+--r— —I---r —r--r——I---I-- --r---I---I---r--r--r--r--- 60--T--r------—--r--r--r—— — ---r— --4------r--r--r--r--r--- 55--+--r---------r--r--r------I-- --r---I---I---r--r--r--r--- 50--T--r---------r--r--r-------- --r---I---r--r--r--r--r--- 42.49 cfs 45- —t--r---------r--r--r --r---------r--r——r—-r--- 0 40--T--r---------r--r--r----- — --r---I---r--r--r--r--r--- a 35 trt�---�i— err--rt-- S ---- —rr------- 30-- T--T---—-----r--r--r---I—— __4 25 --t--r---------r--r--r---I-- —r---I---I---r--r--r--r--- 20 --T--— --—————— r — —r —— ----- ------r--r——r--r—-T——— 15 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 2P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,00011,000 12,00013,00014,000 15,00016,000 ❑ Surface ■ Storage 275 274 ----L-1--1---'L---JJ--J--LJ---J'---J-------J'----'--1 L - - -L -L--'- w w I ---r-I--T--- IT - - - TT--r--rr---TI--- I I I I I I I I I I I I ----rI-----r--r-- r--- rr- -T--I- I I I I I I I I I I I I I I I I I I I II I I I I I I I I I 273 o I I I I I I I I I II I I I u I I I I I I I I I w w 272 271 ---r- r---IT---TT--T--rT---Tr --T--I--I -T--r--rr---rr--r--I- Custom Stage Data 0 5,600 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 128 Summary for Pond 3P: (new Pond) Inflow Area = 6.160 ac, 43.99% Impervious, Inflow Depth > 5.25" for 50-year event Inflow = 58.22 cfs @ 11.95 hrs, Volume= 2.692 of Outflow = 45.89 cfs @ 12.01 hrs, Volume= 2.521 af, Atten= 21 %, Lag= 3.6 min Primary = 29.12 cfs @ 12.01 hrs, Volume= 2.404 of Secondary = 16.77 cfs @ 12.01 hrs, Volume= 0.117 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 300.87' @ 12.01 hrs Surf.Area= 10,289 sf Storage= 27,961 cf Plug -Flow detention time= 47.9 min calculated for 2.521 of (94% of inflow) Center -of -Mass det. time= 23.9 min ( 778.5 - 754.6 ) Volume Invert Avail.Storage Storage Description #1 297.50' 40,368 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 297.50 5,965 0 0 298.00 7,000 3,241 3,241 299.00 8,091 7,546 10,787 300.00 9,239 8,665 19,452 301.00 10,444 9,842 29,293 302.00 11,705 11,075 40,368 Device Routing Invert Outlet Devices #1 Primary 297.50' 24.0" Round RCP -Round 24" L= 74.4' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 297.50' / 296.00' S= 0.0202 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 297.50' 1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 298.50' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 300.00' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 300.50' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=28.87 cfs @ 12.01 hrs HW=300.83' (Free Discharge) L1=RCP_Round 24" (Inlet Controls 28.87 cfs @ 9.19 fps) �2=Orifice/Grate (Passes < 0.11 cfs potential flow) 3=Orifice/Grate (Passes < 27.77 cfs potential flow) 4=Orifice/G rate (Passes < 39.63 cfs potential flow) Secondary OutFlow Max=14.77 cfs @ 12.01 hrs HW=300.84' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 14.77 cfs @ 1.47 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 129 Pond 3P: (new Pond) Hydrograph --t--r---I---I---r--r--7 -I---I---r--r--r---I---I---r--r--r--r--- ___'---' -' -' --'- -' -- MInflow -- -- - --- - 58.22 Cfs �� �w� p �+ � outflow 65 ftflPrimary o llrea--6.1 V0-liac---i --------i---i --i -- -- --- OSecondar y 60 -P�e�k eIev=30,0.$7 55- 4�� �y� 11 � }'- 45.89 Cfs- �- ---,-- - -----i--- --r-- -- - 50 45 ;, -- -- ---------',I --',I ----- ---',-- -- ---------',I --',I -----',--- 40 w--T--T---------IF T_-- -- -----------T--T-- -- --- 35 29.12 cfs 6 30- LL 2s 20 --=, -- ', ---',---',---',I --',I -- 'I 16.77 Cfs -- ', ---',---',---',I --',I -- ',---',--- 1s - 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 3P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 ■ Surface ■ Storage 302 -----1--L--1----L1-----L-L-------LL-----LL--------'----'-'- -- ---' ww 301 II II -------- ---- II I- - - -- ----- I --- I I I I I 300 o I I I I I I I I I I I I I I I I I I II w 299 ------r--r----rl - ---i --- ------------I-T ---- ---I 298 Custom Stage Data 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 130 Summary for Pond 4P: (new Pond) Inflow Area = 11.220 ac, 59.98% Impervious, Inflow Depth > 5.59" for 50-year event Inflow = 110.31 cfs @ 11.95 hrs, Volume= 5.223 of Outflow = 92.56 cfs @ 12.00 hrs, Volume= 4.937 af, Atten= 16%, Lag= 3.1 min Primary = 71.00 cfs @ 12.00 hrs, Volume= 4.762 of Secondary = 21.56 cfs @ 12.00 hrs, Volume= 0.174 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 265.85' @ 12.00 hrs Surf.Area= 21,683 sf Storage= 44,418 cf Plug -Flow detention time= 45.5 min calculated for 4.937 of (95% of inflow) Center -of -Mass det. time= 24.2 min ( 771.1 - 746.9 ) Volume Invert Avail.Storage Storage Description #1 263.50' 70,810 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 263.50 15,234 0 0 264.00 17,440 8,169 8,169 265.00 19,702 18,571 26,740 266.00 22,021 20,862 47,601 267.00 24,396 23,209 70,810 Device Routing Invert Outlet Devices #1 Primary 261.00' 36.0" Round RCP -Round 36" L= 52.9' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 261.00' / 260.00' S= 0.0189 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 263.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 264.17' 60.0" W x 10.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 265.50' 60.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 266.50' 60.0" W x 60.0" H Vert. Orifice/Grate C= 0.600 #6 Secondary 265.50' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=70.63 cfs @ 12.00 hrs HW=265.85' (Free Discharge) L1=RCP_Round 36" (Passes 70.63 cfs of 77.82 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.16 cfs @ 7.24 fps) 3=Orifice/Grate (Orifice Controls 67.22 cfs @ 5.38 fps) 4=Orifice/Grate (Orifice Controls 3.26 cfs @ 1.89 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=20.77 cfs @ 12.00 hrs HW=265.85' (Free Discharge) L6= Broad -Crested Rectangular Weir (Weir Controls 20.77 cfs @ 1.50 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 131 it H 70 3 60 LL 271 w 268 0 267 w w Pond 4P: (new Pond) Hydrograph - -r--r--r---I------r--r--T--r------------r--T--r--r--- ---I--- ■ Inflow _ ---'-- -- -- - 110.31 Cfs ---- -- I',--- ---'- ❑oufflow , I i ■ Primary Ilf ow_.Arowa 11.22Q c�---'-------r--L-- --------'--- ■Secondary I I I I I I I I I I I I I I I I I Peak E1ev=2r65, 5'I 92.56 cfs Stora-ge=44,418 cf--T--n-- -- -n--n--T- -n- -n--n---n -- --r--r--r------r--r--r--T - -r --r--r--T--r--r------r-- 21.56 cfs 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 4P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 r - r - - r - - - - -I-I- - - - r - - - - n - - - - -I- - - r - r - - - - -I- T - - - r - - - - - - 1 - - - L -'- - - - - L - J - - J - - - - -'-'- - - - L - - - - LJ - - - - -'- - - L - L - - - - -'- 1 - - - IL - - 7---T-I-----r-n--n-----rl- r-- -- n- - - - -r r -r - 17---r-- 24,000 Surface ❑ Storage -- -- II-----I-- - -----I- ---� ---- �� Custom Stage Data, 10,000 20,006 30,000 40,000 50,000 60,000 70,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 132 Summary for Pond 5P: (new Pond) Inflow Area = 2.000 ac, 41.35% Impervious, Inflow Depth > 5.36" for 50-year event Inflow = 19.17 cfs @ 11.95 hrs, Volume= 0.893 of Outflow = 16.40 cfs @ 12.00 hrs, Volume= 0.809 af, Atten= 14%, Lag= 2.9 min Primary = 13.85 cfs @ 12.00 hrs, Volume= 0.794 of Secondary = 2.55 cfs @ 12.00 hrs, Volume= 0.015 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 272.88' @ 12.00 hrs Surf.Area= 7,172 sf Storage= 8,636 cf Plug -Flow detention time= 61.4 min calculated for 0.807 of (90% of inflow) Center -of -Mass det. time= 28.9 min ( 781.1 - 752.2 ) Volume Invert Avail.Storage Storage Description #1 271.50' 17,465 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 271.50 5,054 0 0 272.00 6,157 2,803 2,803 273.00 7,317 6,737 9,540 274.00 8,533 7,925 17,465 Device Routing Invert Outlet Devices #1 Primary 271.00' 24.0" Round RCP -Round 24" L= 20.6' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 271.00' / 270.00' S= 0.0485 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 271.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 273.70' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 272.77' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=13.83 cfs @ 12.00 hrs HW=272.87' (Free Discharge) L1=RCP_Round 24" (Passes 13.83 cfs of 17.82 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.56 fps) 3=Orifice/Grate (Orifice Controls 6.90 cfs @ 3.45 fps) 4=Orifice/Grate (Orifice Controls 6.90 cfs @ 3.45 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=2.50 cfs @ 12.00 hrs HW=272.87' (Free Discharge) L6= Broad -Crested Rectangular Weir (Weir Controls 2.50 cfs @ 0.80 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 133 Pond 5P: (new Pond) ..... -. •� - GiG I i • i - • • Y • • I KRUMM I i r 0 Pond 5P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 ■ Surface ■ Storage 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 134 Summary for Pond 6P: (new Pond) Inflow Area = 1.790 ac, 35.20% Impervious, Inflow Depth > 4.91" for 50-year event Inflow = 16.16 cfs @ 11.95 hrs, Volume= 0.732 of Outflow = 8.47 cfs @ 12.06 hrs, Volume= 0.659 af, Atten= 48%, Lag= 6.2 min Primary = 8.47 cfs @ 12.06 hrs, Volume= 0.659 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 307.41' @ 12.06 hrs Surf.Area= 5,572 sf Storage= 12,822 cf Plug -Flow detention time= 75.3 min calculated for 0.657 of (90% of inflow) Center -of -Mass det. time= 41.3 min ( 802.6 - 761.4 ) Volume Invert Avail.Storage Storage Description #1 304.50' 22,746 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 304.50 3,032 0 0 305.00 3,706 1,685 1,685 306.00 4,436 4,071 5,756 307.00 5,223 4,830 10,585 308.00 6,066 5,645 16,230 309.00 6,966 6,516 22,746 Device Routing Invert Outlet Devices #1 Primary 302.00' 24.0" Round RCP -Round 24" L= 55.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 302.00' / 300.00' S= 0.0362 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 304.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 305.20' 12.0" Vert. Orifice/Grate C= 0.600 #4 Secondary 307.50' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #5 Device 1 307.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=8.15 cfs @ 12.06 hrs HW=307.40' (Free Discharge) L1=RCP_Round 24" (Passes 8.15 cfs of 39.68 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.04 cfs @ 8.15 fps) 3=Orifice/Grate (Orifice Controls 4.94 cfs @ 6.29 fps) =Orifice/Grate (Weir Controls 3.17 cfs @ 1.28 fps) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=304.50' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCR201044 - Drainage Area MAX BUA- jdw - LOT 346Type 1124-hr 50-year Rainfall=7.35" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 135 Pond 6P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 Storage (cubic -feet) E Inflow f Outflow ❑ Primary Seconda ry ■ Surface ■ Storage NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 136 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDA P1: (new Subcat) Runoff Area=21.910 ac 37.43% Impervious Runoff Depth>4.88" Tc=5.0 min CN=75 Runoff=201.93 cfs 8.909 of SubcatchmentDA P2: DA 2 MAX IMP Runoff Area=9.450 ac 40.05% Impervious Runoff Depth>4.99" Tc=5.0 min CN=76 Runoff=88.74 cfs 3.933 of SubcatchmentDA P4: (new Subcat) Runoff Area=11.220 ac 59.98% Impervious Runoff Depth>6.39" Tc=5.0 min CN=88 Runoff=124.98 cfs 5.977 of SubcatchmentDA P5: Runoff Area=2.000 ac 41.35% Impervious Runoff Depth>6.16" Tc=5.0 min CN=86 Runoff=21.80 cfs 1.026 of SubcatchmentDA P6: Runoff Area=1.790 ac 35.20% Impervious Runoff Depth>5.69" Tc=5.0 min CN=82 Runoff=18.53 cfs 0.849 of SubcatchmentDA3 MAX: DA 3 MAX IMP Runoff Area=6.160 ac 43.99% Impervious Runoff Depth>6.04" Tc=5.0 min CN=85 Runoff=66.35 cfs 3.100 of SubcatchmentUD 1: Runoff Area=175.189 ac 0.84% Impervious Runoff Depth>4.34" Flow Length=6,400' Tc=55.8 min CN=71 Runoff=470.16 cfs 63.404 of SubcatchmentUD2: Runoff Area=293.364 ac 15.41% Impervious Runoff Depth>4.35" Flow Length=3,960' Tc=54.4 min CN=71 Runoff=802.36 cfs 106.232 of SubcatchmentUD3: Runoff Area=74.030 ac 0.00% Impervious Runoff Depth>2.64" Flow Length=2,280' Tc=25.4 min CN=55 Runoff=199.72 cfs 16.273 of Reach DP 3: (new Reach) Inflow=204.39 cfs 17.047 of Outflow=204.39 cfs 17.047 of Reach POST DP 1: POST DP1 Inflow=498.39 cfs 71.234 of Outflow=498.39 cfs 71.234 of Reach POST DP 2: POST DP2 Inflow=834.65 cfs 119.343 of Outflow=834.65 cfs 119.343 of Pond 1P: (new Pond) Peak EIev=265.50' Storage=113,759 cf Inflow=201.93 cfs 8.909 of Primary=37.83 cfs 5.851 of Secondary=147.16 cfs 1.979 of Outflow=184.99 cfs 7.830 of Pond 2P: (new Pond) Peak EIev=274.00' Storage=41,228 cf Inflow=88.74 cfs 3.933 of Primary=28.62 cfs 2.926 of Secondary=55.55 cfs 0.627 of Outflow=84.17 cfs 3.553 of Pond 3P: (new Pond) Peak EIev=301.00' Storage=29,279 cf Inflow=66.35 cfs 3.100 of Primary=29.89 cfs 2.695 of Secondary=27.70 cfs 0.233 of Outflow=57.59 cfs 2.928 of Pond 4P: (new Pond) Peak EIev=265.97' Storage=46,939 cf Inflow=124.98 cfs 5.977 of Primary=75.85 cfs 5.375 of Secondary=33.66 cfs 0.313 of Outflow=109.51 cfs 5.688 of NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 137 Pond 5P: (new Pond) Peak Elev=272.93' Storage=9,035 cf Inflow=21.80 cfs 1.026 of Primary=14.59 cfs 0.905 of Secondary=4.81 cfs 0.037 of Outflow=19.40 cfs 0.942 of Pond 6P: (new Pond) Peak Elev=307.52' Storage=13,398 cf Inflow=18.53 cfs 0.849 of Primary=12.29 cfs 0.774 of Secondary=0.02 cfs 0.000 of Outflow=12.31 cfs 0.774 of Total Runoff Area = 595.113 ac Runoff Volume = 209.702 of Average Runoff Depth = 4.23" 88.31% Pervious = 525.551 ac 11.69% Impervious = 69.562 ac NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 138 Summary for Subcatchment DA P1: (new Subcat) Runoff = 201.93 cfs @ 11.95 hrs, Volume= 8.909 af, Depth> 4.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 0.324 80 >75% Grass cover, Good, HSG D 8.306 74 >75% Grass cover, Good, HSG C 5.639 98 Paved roads w/curbs & sewers, HSG C 5.080 39 >75% Grass cover, Good, HSG A 2.561 98 Paved parking, HSG A 21.910 75 Weighted Average 13.710 61 62.57% Pervious Area 8.200 98 37.43% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5 minute pipe flow Subcatchment DA P1: (new Subcat) Hydrograph - r - - -1--- T - - - r - - r - - - r - - -I- - - + - - -I- - - r - - - r - - -I- - - r - - -I- - - + - - - r - - r - - - 220 i '---'---'---'---'---'--- ' - -- ■Runoff 210------------I---�L--A------��--- 201.93 cfs------------i--- �L - - �--- 200 - Type-N-'2' .4r +--+---+------+---- ---r------+------+---r--+--- 190 1 180 ,i �-�0— 7T\fal[.-22--' ---'- ---'---'---'-------' ---'---'--- 170 160-RLi��V lll��l{A �`1�VlV�I Y r r---Y---r--7--- 11 140 -Run'Off 'ii/tJlii 19.-$099af 1---1i----L------L------1---L--�--- 120 " -130 �uWra�af#@h�4�88r--- + -- ---r------r------+---r- -,--- 3 110---'----------y-',------------------' ---'-------------------'-------'--- �° 100 Tt=-5 �FF-- -- ---------+---- --- ------------+--- -- --- 90 - i--- -i---r---r--r---r---i---r---i- ---r---i---r---r--r--- r--r--- 80 -C'=5 --- - --- -- - --- - --- 70---'------'----------'------'--- ---'--------'------'------'--- --- 60T-------- - - i--- --- -- ---------+---'- ------i---------+--- -- --- 50 j--- ' 40---'i------'i----------'------'i--- -------'i------'i--- ---L-- --- 20--+---Y---+--Y---r--Y---Y--+---+--- - +---+ +---r--Y--- 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 139 Summary for Subcatchment DA P2: DA 2 MAX IMP Runoff = 88.74 cfs @ 11.95 hrs, Volume= 3.933 af, Depth> 4.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 3.624 74 >75% Grass cover, Good, HSG C 2.041 39 >75% Grass cover, Good, HSG A 2.340 98 Paved roads w/curbs & sewers, HSG C 1.445 98 Paved roads w/curbs & sewers, HSG A 9.450 76 Weighted Average 5.665 61 59.95% Pervious Area 3.785 98 40.05% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P2: DA 2 MAX IMP Hydrograph 9s ---'---'-----------'--- ------------'--- '- ------------------------ � � � � � � � � � � � � � � � ---'------'--- 1------'--- ---1 ---' 88.74 cfs-------'- ---------'---' ❑Runoff 90 85 -r�yPQ----------''--- I''---' ------' - -- I''---' ---''--- I''----------' --- 80 -100=year Rainfal1=8.22" 75 70 . - - - - -L- -----L---'----------'--- --- --- - 1 '--- -----L------1----------1 Runb## �r�a�9A�50 acL--- 66 -F�'unfour>�e=_'3.3 of -'--- -- ------'----------'--- --- 55 50 -�------'---+ -- ----- -' ----------- - - + - -- R�unof Dept[T>4.99 � 3 ----- --- ------ --- ------ -- --- ---------------- --- a45 y--- - Tt=-5.0-h1itl--+------+---+------+ --+---+------+----------+--- 40 - 1---r---i------r---i---+--1---r---i----------- - - + - -- I'i 35 - �f-�-r-----r---li---rt---r---li---r -----r---li--- ---Ir---li---r--- 30 ---li---7---Ir------- - -Ir-----r---i---r -----r---Ir-- ---Ir---li---r--- 25 20 ------7---r-----r---r--4---r---i---r r ,-------- - -r --- 15 -----r-------T ---r------r ----r---1---------- I - - -r - -- ------T- -- 10 ------T--- ----- r-------T ---r---- -----r---1---1------I- - -r - NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 140 Summary for Subcatchment DA P4: (new Subcat) Runoff = 124.98 cfs @ 11.95 hrs, Volume= 5.977 af, Depth> 6.39" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 4.490 74 >75% Grass cover, Good, HSG C 6.730 98 Paved roads w/curbs & sewers, HSG C 11.220 88 Weighted Average 4.490 74 40.02% Pervious Area 6.730 98 59.98% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P4: (new Subcat) Hydrograph ------ --------------- ■Runoff 130 124.98 cfs 120 I Ype- 11- 4yhr------- --- 110 ' i 100-year Rainfall=8.22"-! --'----'r---'---!---'---!--'r--,--- 100 ''-R�unoff 'Arda--�11.1220 alc-- ---- ---------------------------- 90-R'Wra�af#'Volume��.$77'af ' ---'- ---', --- --', --- -- -- -- -- U Runoff'Depth>6�.�9f'-- --- -- ----- --- -- -- 3 70 °-Td=5..0-wnin -- -- --- --- +-- --- ------------+--- -- --- LL 60 CN=88 T--- -----r------T---I- --- ------r------T---F--,--- ------------'--- F-- ---- -- - --- F -- ---- ---'-----'--- 40 30 20 ---i--- 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 141 Summary for Subcatchment DA P5: Runoff = 21.80 cfs @ 11.95 hrs, Volume= 1.026 af, Depth> 6.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 0.366 98 Paved roads w/curbs & sewers, HSG C 0.461 98 Paved roads w/curbs & sewers, HSG D 0.607 74 >75% Grass cover, Good, HSG C 0.566 80 >75% Grass cover, Good, HSG D 2.000 86 Weighted Average 1.173 77 58.65% Pervious Area 0.827 98 41.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P5: Hydrograph I I 24---i---+---i---+---+---i---+---+---i---+---i---+---+---i---+---i----I---+--- ❑Runoff 23 --'I-- ---------- - - - II - -- 1-- - ----I 21.80 cfs-------'I-------------'---- 22-`-,n--L-ry- �r L---1---1--- ------ - ------L---1---1---1----1--- --- 21 YPp ll LQ- - r r------r---r------r- ---r---r------r---r------r--- zo-1-00-y-ear-R--uafaal =-8.227--I---' - ------}---I----------I---' --- 19 18 l - - - -- - --- - - -- -; ---I---; - -- -- -;-- - I --- -- -;-- -I---; --- 17 Runbff Ai r6&12r00O1acL-- --- -----L---1---1---1----1---1 I I I I I I I I I I I I I I I I I 15-��r��f# �/o�UMe=Ia-.Q2f�laf - I - --L--I---L---1---1---1,---'--- --- w14-p-I-- -r ---r r---I---r---r---I - - -r --r---r------r---r------r--- u 13-FT�E}^ De�th�>C�:16��---------+ -- --- ----------------+--- °�12 11-1t�.-O eni f--'-------I---,---I---,---I---,-------I-------I---I --- 10---1---1--------- L------L---L-- -I---L ----- L - - - -------------L--- 9-EII�F- 6-Ir-----r---li---rt---r---I---r -----r---li--- ---II-------r--- 8---'------- -------------------------'- ---'---'----'----'---'----'---'---- 7------+------+---+---I--- --- ---I---+ -----+---I-------------+--- 6---- - - - - -i -- - --i---- - - - --i---I---r -----i---------i------r--- 5---1---1------L---L------L---L---I---L --L---L------L----------L--- i I 4------ r------ r--- r------ r--- r-- - I ---r --r---r------r---r------r--- 3 ---------- - - ---- - - -- -'- - -- -------------'---� --- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 142 Summary for Subcatchment DA P6: Runoff = 18.53 cfs @ 11.95 hrs, Volume= 0.849 af, Depth> 5.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 0.630 98 Paved roads w/curbs & sewers, HSG C 1.160 74 >75% Grass cover, Good, HSG C 1.790 82 Weighted Average 1.160 74 64.80% Pervious Area 0.630 98 35.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA P6: Hydrograph ■Runoff zo---�---�---�---�---�---�---�---�---� 18.53 cfs �---�---�---�--- ---- �---�--- 19 - I---+---r--y---r------rt---r---I--- - ---y---r---------r------+--- 18 -L ll- 4-hr- Jpe- 2- r r------r---r--- ---r- -------r---i-------r---i---r--- ;6 =1M"airRainfallr=& 'F---- - --- IIII-- --- IIII-- -- --- 15 R'unbf Area-1.790'ac' ------ -- --- ---------------- --- 14---1---1----------L---I---L---L---I---L ----- L- - - '----------'--- --- 13 R�n�f# VOume=�a.84�;af-',-- -- ---; -- --- -- -- --- w 12 - ---+- ---+- +------+---+------+ --+---+------+----------+--- 11 I �� -Runaf#IDepth>"9+--- -- ---+ -----+----------------+--- 3 10 --r- --I ------r---I---r ----- r- - -I------r------r--- 9 _T�c=5.0 h1ir� I - - - T - -I T - - - r - - - I - - - T - - - r - - -I- - - r - - T - - - r - - - - - - -T - - -I 8-eIN-�� I -- - -- - - -- - -- - - -- - -- - -- i I I I 6---1---1------L---L------L---L---I---L --L---L---I---L-------I---L--- I I I I I I I I I I I I I I I I I 5------ +- - -I--- - - - L- - - I ------L---I--- -----L---I----------I--- --- 4------ +--- --- -- --- L - - - - -----L---I---� -----L------ --- -----�--- 3------7---I-------r----------r---I---r -----r------I---Ir------r--- 2 ---I- - r-- -r--r-- r - - -I- r---r---I--- ---- r--- I - - -r--r---I- - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 143 Summary for Subcatchment DA3 MAX: DA 3 MAX IMP Runoff = 66.35 cfs @ 11.95 hrs, Volume= 3.100 af, Depth> 6.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 3.450 74 >75% Grass cover, Good, HSG C 2.710 98 Paved roads w/curbs & sewers, HSG C 6.160 85 Weighted Average 3.450 74 56.01 % Pervious Area 2.710 98 43.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA3 MAX: DA 3 MAX IMP Hydrograph --+---+---+--+---+------+---+--+-+---+--+---+------+---+--+---+---I ■Runoff 66.35 cfs 65 T�� II4�hr L------i---------L- 60 55 _Run WArea-6.IN lac' 50 1 1 1 45-R',unOff Vol-ue=-----'a.fOGG -f----' ------------------------------------ cNi 40 Runoff �'Depth�>6.041'___�___'�,___L a 35-i���-i--r------rt---r------r 30 -e��=------------------------'i 25------+------ --- ------ ---------+ 20 - --I--- + ---I--- r --- r---I--- r --- Lij 15 10 1-- - + - - - 5 -----L---1---1---------- --- --I---L------1-------'---L - -- --y---r------ ---I-- - -- -----+ -- -- r --- r- - - I - -- r----- - -I- -- r --- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 144 Summary for Subcatchment UD 1: Runoff = 470.16 cfs @ 12.57 hrs, Volume= 63.404 af, Depth> 4.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 1.010 54 1/2 acre lots, 25% imp, HSG A 4.459 30 Woods, Good, HSG A 21.760 74 >75% Grass cover, Good, HSG C 4.850 80 1/2 acre lots, 25% imp, HSG C 113.857 70 Woods, Good, HSG C 29.253 77 Woods, Good, HSG D 175.189 71 Weighted Average 173.724 71 99.16% Pervious Area 1.465 98 0.84% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 40.7 6,350 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 55.8 6,400 Total Subcatchment UD 1: Hydrograph 520 soo - - -1- - - L - - -1- - - 1 - - - L - - L - - - L - - -1- - - 1 - - -1- - - L - - - L - - -1- ---11--- 1,---11--- 1 ---1,---11--- 1,---11--- 1---1------1----11--- ---1------1--- ---L-- ------1--- - 470.16 cfs -II--- - - L - - -1- 1,---11--- ---II--- - - 1 - 1 ---1, ---1L-- - - L - -- - - 1--- --- ■Runoff 480 460 ---1-------------------------1---i- ---------------------- -T_ypq, ll �4-0r-Ii,--�I---�---II---�---II--- �---II---�---II---�---I�--�--- 440 42o ---- - - - - - -- - - -----1--- -100=y-ealr-Ff l`ainllfai�=$:22'1`---+---1------1--- ---1--- ---1---+--- --�--- 400 380 360 ,1 ---r -11------11-------11-------11--- -Rllunbff-�4�a=17-.-18t9a11c-- ------------; ------1----------1----1---1------------- -------1-------------;--- ---II--- ---11------ ---I�-- --- 340 320 ,1 - -------V-------------------1- Rlunbf6ur1�l+a=b`3.4ff41 of-----1---; k/ f --------- ---1--- --- w 300 w V 280 + tr--- 1---+---1-- ---1---+---1---+---+--+--- _ 11un , I - 4. 4- I---1---1---1-- - . --- - -- --- --- - - -- - - 0 240 I I I -FjoW eng t�=1F��Y10Q�---1--- ---1-- ----1--- ---1--- ---1r-- --- LL 200 i l -T--T--- T------T---I-- - ---I--- 5- 811- #�} L J L 1 ---1---L---1 T---I___7___ I L- I r - -- L - I - T- -L -- - 180 160 , 1 -/-+-1�-L--r---1---T---T--T---T---I---T---1-- ----1---T---I---T---T-- -�IY--11------1L--L1------11------11-- ----11--- --- 11------ 1L----- --- 140 120 ' ---1---r---1---T---T--T---r---I---T---1-- --- -1---r---I---T---T--T--- ---1---L---1---1---L--J---L---1---1---1-- --- 1---L---1---1---L--L--- 1 1 I I 1 100 80 ---1---r---r--T---T--T---r---1---T---1-- ---T ---1---L---1--- ---L-----L---1--- ---1- ---L- ---r--- -L---1--- r--T- ---L-- --T- -T--- --- 40 ---1---L---1----1---I----1---L---1---a - -- --- ---1-- '; 1 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 145 Summary for Subcatchment UD2: Runoff = 802.36 cfs @ 12.55 hrs, Volume= 106.232 af, Depth> 4.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 40.326 54 1/2 acre lots, 25% imp, HSG A 18.198 30 Woods, Good, HSG A 1.810 74 >75% Grass cover, Good, HSG C 129.984 80 1/2 acre lots, 25% imp, HSG C 48.796 70 Woods, Good, HSG C 43.700 77 Woods, Good, HSG D 10.550 85 1/2 acre lots, 25% imp, HSG D 293.364 71 Weighted Average 248.149 67 84.59% Pervious Area 45.215 98 15.41 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.4 50 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 28.0 3,910 0.0240 2.32 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fps 54.4 3,960 Total Subcatchment UD2: Hydrograph ------r---l---r---Ir--r---r------7------,---Ir------r------r---Ir--,--- ■Runoff 850 ---I------I+-- --- ---I--- - 802.36 cfs ---------------+------ -T---- 800 -1 a �� --I�-- --- ------ ------ ------ ---------I�-- 1 7so �I I I 700 I '100= Le— Rhin a�i=ff. 2"----1---1I--- IL --- --- L--- ---1---L-- --- ---------------------------------- ---- ------------------------- 650 _R1 npffAre47-2193.364acll--- --I--------------I--- -II--- 600 _ n ff Volume=1706: 321II of I - - - - - - - - - - - +---I--- r- +- 550 500 -Runoff Qe_Pfh>r4.3,5"_,------+---II-----II---------+---I -- --- I I I I I , ' L - - - - - - L - - - - - - - - L - - - - - - 1 - - - L - - L - - - 3 aso-F�lowr LEIi th_ 9Q0- - - -I ° 400 350 T=5'4.4Imi----- --------I- -- - - -I- - - ----------I--- - -I--- 300-t11�1��1--Ir--7---Ir-----r------7---Ir- -- -----r---Ir--7---Ir--,--- 250 ' --+---+------+---+--+---+--+---+---+- --- +---+---I---+---+--+--- 200-----------------------------I-- --- ---�----------�--- � I I 1 I 150---1---L---1---1---L--J---L---1---1---I- --- - -L----1---L-- --- 100 ---- ---- - ---i ---I- - - - - --- -- - - - - i ------------ 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 146 Summary for Subcatchment UD3: Runoff = 199.72 cfs @ 12.20 hrs, Volume= 16.273 af, Depth> 2.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.22" Area (ac) CN Description 27.415 30 Woods, Good, HSG A 46.615 70 Woods, Good, HSG C 74.030 55 Weighted Average 74.030 55 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.1 50 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.70" 10.3 2,230 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 25.4 2,280 Total 210 200 190 180 170 160 150 140 130 u 120 3 110 ° 100 a: Subcatchment UD3: Hydrograph ---�---�---�---�---�--�---�---�---�---�---�---�---�---�---�---�---�--�--- ■Runoff ,I I - -----r---I---r---r--r---r---I-- -r 199.72 cfs ------r--- I --- 7--- 'r--I--- I I I I Typg1f-�4=0r- ------ -- -100=year-Rain,fa*&22';, ---I---r---I---r---r--r---r---I---r---I- -R'Iunoff-Area=74.a30-cim--- ---- R'u-n ff-Vo ume=16.273 a -- - R'uno#f -b pth 2.1 4-1- - - - - - - -F ov teng h=' a '�80''------+---'- -�'S.4-min--' -- ---r------T---I- -� I I I I -------- ------ - ------- --- - - - ---- - - - - ,I I I I I I I I I I I -GU=5-5-I--- 1 --- L- --- L------1--- 1I- ---I--- r---I--- - --- - -- - --- r---I---+---I- ---'---' -- -- ,I I I I I I I I I I I ------L---1---L---I- --L---L---1---L- I ------'---'--------- - '--- --- -------------I------I--- --- --------; -- - ------I--- --- ---- -r----T-- I- - - - - - - - - - - - 7 - - - T - I- - - - L - - -I- - - L - - - L - - - i -- - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) L - - -I- - - L - - - L - - - i -- - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 147 Summary for Reach DP 3: (new Reach) Inflow Area = 75.820 ac, 0.83% Impervious, Inflow Depth > 2.70" for 100-year event Inflow = 204.39 cfs @ 12.20 hrs, Volume= 17.047 of Outflow = 204.39 cfs @ 12.20 hrs, Volume= 17.047 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach DP 3: (new Reach) Hydrograph -J---'------1---1------+---' +------L--J---L � -- ---L--1---1---L--- ■ Inflow 220 210 --+------+---Ir--+---li---+---Ir ----------------------------- - hjfa w ArEa - .$ 204.39 cfs --+-- -- -- ---+--+------+--- --- -- --- -- --- - - ■Outflow 200 - - + - -- --------+------+------+-- -IMF - --- --=--- -- - -- --+--- 190 -- - -- - - - - - - - - -- - - - - - -- 180 --------+------+------+------+-- - ---+--+---r--+------+--- 170 ---------------- -------------,--- --,--- ,-- -,--- , ---1,-------,--- 160 --J---'------1---1------+------+-- -J---L-- ---L--1---1---L--- 150 --+---+-----Ir--+---li---+---Ir--+-- -+---+-- ---+--+---+--+--- 140 ---, i---1------1---+---1--- w 130 ---- - -' - ----'--- - ------+------+-- - --- -- --- -- ---'--- --- V 120 I -- --- -- ------ ------+------+-- - ---r-- --- --7 - -- --T--- 3 110 -- - ' -- - - - - - - ' - - -- - - - - '- -- a100 --+---1---+---+--+--+---+------+-- +---+--+---+--+---+--+--- 90 ---1---1----1,---1----1---1---------,-- -,---, ---,---, ----1---1----,--- 80 --J---'------1---1------+------+-- J---L-- ---L--1---1---L--- 70 --+------+------+---I---+---I---+-- +---+--+---r--+------+--- 60 ---1---1------1------1---1----1---1--- ---1--- ---1--- ---1--- --- 50 -----'------'--- ------+------+-- - -- --- -- ---'--- --- 40 - - + - - - - - - - - - - - + - - - - - - + - - - - - - + - - 30 -- - -- - - - - - - ----- - 20 10 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 148 Summary for Reach POST DP 1: POST DP1 Inflow Area = 197.099 ac, 4.90% Impervious, Inflow Depth > 4.34" for 100-year event Inflow = 498.39 cfs @ 12.56 hrs, Volume= 71.234 of Outflow = 498.39 cfs @ 12.56 hrs, Volume= 71.234 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach POST DP 1: POST DP1 Hydrograph ■ Inflow 550r�i- 400:------�i-----------�I- -- ---I---- - -�i-----�i-----�i -- --- ❑Outflow _Inflow r-ppa=''197.099_ac 498.39 cfs 500 - -� -`f - +- --+-- -+---I- +---+--+---+--+---I---+--- 450--------------------------------'- ------------------'---- ------I----I---, --- ,' I I I I I I I I I I I I I I I I 350--+------+------+------+------+-- -+--+---+--+---+--+--- y I I I I I I I I I I I I I I I u300---'---------------------------'--- -------------------'---- 3 I I I I I I I I I I I I I I I i° 250 -- --- --------7------T------r-- --r-- --- --7--- --T--- ,' I I I I I I I I I I I I I I I I I 200--+---+--+---+--+--+---+------+-- + -+--+---+--+---+--+--- 150 -- - -- - - - - - --'-- - -- - - - - - -- I I 100 -- --- -----I---r - - - ---+---I--- r-- --T-- --- - -T - -- NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 149 Summary for Reach POST DP 2: POST DP2 Inflow Area = 322.194 ac, 18.39% Impervious, Inflow Depth > 4.44" for 100-year event Inflow = 834.65 cfs @ 12.53 hrs, Volume= 119.343 of Outflow = 834.65 cfs @ 12.53 hrs, Volume= 119.343 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Reach POST DP 2: POST DP2 Hydrograph ■Inflow 900 ------ - --11---1- -'--- - -'- -L -'-a _ 834.65 Cfs---------- -Cr�1owr-'32:14-ac- - -- - -L--1- -- -1---1- ------+--- ■ Outflow- 850 - - - 800 750 - ----''------''------''------''--- ---''- --- -- ---' -- ---''--- --- 700 650 ----'------'------'------'--- ---' -- -- --- -- ---'--- -- 600 550 N - ----'------'------'------'--- ---' -- -- --- -- ---'--- -- - u 500 0 450 ---- -'- -----'------'----- - - - - -- - -- --- --4------+--- LL 400 350 ----'------'------'------'--- - - -- --- -- ------+-- 300 -----'------'------'------'--- - -I----4--- -- ------+--- 250 200 150 100 50 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 Time (hours) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 150 Summary for Pond 1 P: (new Pond) Inflow Area = 21.910 ac, 37.43% Impervious, Inflow Depth > 4.88" for 100-year event Inflow = 201.93 cfs @ 11.95 hrs, Volume= 8.909 of Outflow = 184.99 cfs @ 11.99 hrs, Volume= 7.830 af, Atten= 8%, Lag= 2.3 min Primary = 37.83 cfs @ 11.99 hrs, Volume= 5.851 of Secondary = 147.16 cfs @ 11.99 hrs, Volume= 1.979 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 265.50' @ 11.99 hrs Surf.Area= 27,800 sf Storage= 113,759 cf Plug -Flow detention time= 70.5 min calculated for 7.809 of (88% of inflow) Center -of -Mass det. time= 31.5 min ( 802.7 - 771.2 ) Volume Invert Avail.Storage Storage Description #1 260.50' 127,850 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 260.50 17,090 0 0 261.00 18,913 9,001 9,001 262.00 20,793 19,853 28,854 263.00 22,729 21,761 50,615 264.00 24,721 23,725 74,340 265.00 26,711 25,716 100,056 266.00 28,877 27,794 127,850 Device Routing Invert Outlet Devices #1 Primary 260.50' 24.0" Round RCP -Round 24" L= 67.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 260.50' / 255.25' S= 0.0784 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 260.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 262.60' 33.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #5 Secondary 264.61' 65.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #6 Device 1 264.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=37.74 cfs @ 11.99 hrs HW=265.48' (Free Discharge) L1=RCP_Round 24" (Inlet Controls 37.74 cfs @ 12.01 fps) 2=Orifice/Grate (Passes < 0.36 cfs potential flow) 3=Orifice/Grate (Passes < 20.41 cfs potential flow) 4=Orifice/Grate (Passes < 20.41 cfs potential flow) =Orifice/Grate (Passes < 118.27 cfs potential flow) Secondary OutFlow Max=142.92 cfs @ 11.99 hrs HW=265.49' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 142.92 cfs @ 2.51 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 151 21 190 180 170 160 150 140 H 130 120 0 110 LL 100 261 Pond 1 P: (new Pond) Hydrograph -- T--------------,---, --,----------------------------,--- -- -- --------'--- -- -- - -- -- -- --------'--- M Inflow 201.93 CfS M outflow -T--7--T---------T--T--T---7--T--7--T---I---I - ---- ❑ Primary IffowimaT21.9 GOPL- - Secondary --T--7-- I - - - I - -- -T - -T� 184.99 Cfs T--7-- -- -- — 1-1-1---L--L--L--L-----'-- -Beak-Efev=265.50 -_ -- - -- ---1i--1-----1---L--1--L--L--- ---'-- =tQrag'e='11_}�T�J'Cf -- T 7 -i- -r-T--7-- ---i--T--T--7--T---i---i - --L--L--J---'---'---L--L--1--L- ---'---L--1--L--J---'---'--- - -r-- r-- T------I - - -r-- 147.16 cfs ---r--'T--T--r--T--- ---r-- --r--r--r---------Ir- -r - -T- ------- Ir-- T--r-- r--- ---�i--- L 1 --L--1--J---1------L----- - --'---L--1--L--J---'---'--- -- r-- r-- r---------Ir- -r- -T- ------ Ir-- T--r-- r----- - �i --- --L--1--J---1------L--L--L- - --'---L--1--L--J---'---'--- -- r-- r-- r--- ------Ir--r--t- - -----Ir--t--r--r------II--- --r--T--r---------Ir--r--? - - -----Ir--?--T--r------II--- - - L - - 1 - - L - - - - - -'- - - 1 - - L - - 1 - -'- - - 1 - - 1 - - 1 L - - - - - - - -'- - - - - - - - - - - - - - - - - -I- - - r - - r - 3 CfJ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 1 P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 --------L1------L---1----1---1-1----1-----+-----+--1----+-�- --------+------ �-T--'---------------°--------'---+------�-�- - - - -1- - - - L 1 - - - - L - L - -'- - - - 1 - - - -'- - - - L - - - -"- - - - 1 - - - L - - 1 - - - - - - 1 - 1 - ----I--II-------I-I------I--------I-- - - II - -- I -----I--I----I --I-I- Custom Stage Data 0 20,000 40,000 60,000 80,000 100,000 120,000 Storage (cubic -feet) LJ Surface ■ Storage NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 152 Summary for Pond 2P: (new Pond) Inflow Area = 9.450 ac, 40.05% Impervious, Inflow Depth > 4.99" for 100-year event Inflow = 88.74 cfs @ 11.95 hrs, Volume= 3.933 of Outflow = 84.17 cfs @ 11.98 hrs, Volume= 3.553 af, Atten= 5%, Lag= 1.8 min Primary = 28.62 cfs @ 11.98 hrs, Volume= 2.926 of Secondary = 55.55 cfs @ 11.98 hrs, Volume= 0.627 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 274.00' @ 11.98 hrs Surf.Area= 14,443 sf Storage= 41,228 cf Plug -Flow detention time= 57.4 min calculated for 3.544 of (90% of inflow) Center -of -Mass det. time= 24.5 min ( 793.9 - 769.4 ) Volume Invert Avail.Storage Storage Description #1 270.50' 56,463 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 270.50 8,641 0 0 271.00 10,007 4,662 4,662 272.00 11,429 10,718 15,380 273.00 12,908 12,169 27,549 274.00 14,443 13,676 41,224 275.00 16,035 15,239 56,463 Device Routing Invert Outlet Devices #1 Primary 270.50' 24.0" Round RCP -Round 24" L= 39.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 270.50' / 270.00' S= 0.0127 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 270.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.00' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 273.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 273.50' 60.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=28.48 cfs @ 11.98 hrs HW=273.98' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 28.48 cfs @ 9.06 fps) �2=Orifice/Grate (Passes < 0.19 cfs potential flow) 3=Orifice/Grate (Passes < 25.31 cfs potential flow) 4=Orifice/G rate (Passes < 63.50 cfs potential flow) Secondary OutFlow Max=52.39 cfs @ 11.98 hrs HW=273.98' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 52.39 cfs @ 1.81 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 153 Pond 2P: (new Pond) Hydrograph --+--+88.74 CfS I I MInflow Outflow ❑ Primary"-ffOvArea-�.450__7- Seconda ry� 95 90 [�-'+r r--- +�y* r----- --+---------+--+--+--+--- -�T�Q�4R�le��Ll �.------ -----------r--r-- -- --- 85 80 _ ----------_64� 22 &---'---'-------------------�--- -�� e-f 75 1 1 1 1 1 1 1 70 65 --T--T------i--- --T--------i-- -----------T--T-- -- --- _ 60 55.55 Cfs N V SS , i I - - t-- Y---------Y--Y--Y---I-- - --Y---I---I---Y--Y--Y--Y--- 50 ° 45 -L--J---------L--L--J- -'-- -J---'---'---L--L--J--J-- LL 40 I 35 --T--T--------- T-- T-- T - - - _ I-- ----------T--T-- -- --- 30 --------'--- 25 --------- - -'- -- -- ---'-- - - - -- -- -- -- - 20 15 , 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 2P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,00011,000 12,00013,00014,000 15,00016,000 ❑ Surface ■ Storage 275 274 ----L-1--1--- 'L---JJ--J--LJ---J'---J__'--'---J' ---- '--1 L ---L -L --'- wI w I - - - r - - - T - - -IT - - - T T - I I I I I I I I I I I - r - - r r - - - TI- - - - - - - rI- - - - - 7 - - r - - r - - - r r - - T - -I- I I I I I I I I I I I I I I I I I I I II I I I I I I I I I 273 o I I I I I I I I I 11 I I I u I I I I I I I I I w 272 271 ---r- T---IT---TT-- --rT---Tr--T--I--I - --r--rr---rr--T--I- Custom Stage Data 0 5,600 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 154 Summary for Pond 3P: (new Pond) Inflow Area = 6.160 ac, 43.99% Impervious, Inflow Depth > 6.04" for 100-year event Inflow = 66.35 cfs @ 11.95 hrs, Volume= 3.100 of Outflow = 57.59 cfs @ 12.00 hrs, Volume= 2.928 af, Atten= 13%, Lag= 3.2 min Primary = 29.89 cfs @ 12.01 hrs, Volume= 2.695 of Secondary = 27.70 cfs @ 12.00 hrs, Volume= 0.233 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 301.00' @ 12.01 hrs Surf.Area= 10,442 sf Storage= 29,279 cf Plug -Flow detention time= 44.5 min calculated for 2.928 of (94% of inflow) Center -of -Mass det. time= 23.0 min ( 774.2 - 751.2 ) Volume Invert Avail.Storage Storage Description #1 297.50' 40,368 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 297.50 5,965 0 0 298.00 7,000 3,241 3,241 299.00 8,091 7,546 10,787 300.00 9,239 8,665 19,452 301.00 10,444 9,842 29,293 302.00 11,705 11,075 40,368 Device Routing Invert Outlet Devices #1 Primary 297.50' 24.0" Round RCP -Round 24" L= 74.4' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 297.50' / 296.00' S= 0.0202 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 297.50' 1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 298.50' 48.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 300.00' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 300.50' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=29.78 cfs @ 12.01 hrs HW=300.98' (Free Discharge) L1=RCP_Round 24" (Inlet Controls 29.78 cfs @ 9.48 fps) �2=Orifice/Grate (Passes < 0.11 cfs potential flow) 3=Orifice/Grate (Passes < 28.75 cfs potential flow) 4=Orifice/G rate (Passes < 50.80 cfs potential flow) Secondary OutFlow Max=26.38 cfs @ 12.00 hrs HW=300.98' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 26.38 cfs @ 1.82 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 155 N 0 I Pond 3P: (new Pond) Hydrograph -T-_T T--r-_T rrT-_T--- El 1 1 66.35 cfs --+--------i--- -- -- ---i--------i--- --+-- --+--- 1 r.�1 y�`�� A �e.y�Q `A 6O I�^I I�IJJSl1[�[�J`l �l V[ 1 N -- --------'--- -- -- ------ I I I P!e-ak a fev=�O4 -00t- 1 I - - -I 57.59 cfs �---I---,--r--T---I--T--- -- -I I I I I I I I I _StcWage 29.279-,Gf---I-- --1---1---1---L----1--1--- .I --! -- --I I -- -- --! -- ---! -- 7-,��--- I I I I I I I I I I I I I I I -J--J--J------L--L--1-- --J---1------L--L--L--J 29.89 Cfs I I --- I I I I I --T--------I--- --r-- -- ------I--- --r-- -- --- 27.70 cfs --+------ --+-- ----- ---------- -- -- --+--- � _-1--1--J---1---L--L--1---'-- _-J------1---L--L--L--J- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 3P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 302 301 -----1--L--1----L1-----L-J-------LL-----LJ--------'----'-'- -- ---' 300 -- -- ---- ----- - -------- ------ ----- --- 299 -----1--L--L----L1---1-1---1----11-----L1-------1-1-----1-1---- ---i 298 ------r--T----rl-T---I---TT---- T---- I - - - -I- T----T---I Custom Stage Data 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Storage (cubic -feet) ■ Surface ■ Storage NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 156 Summary for Pond 4P: (new Pond) Inflow Area = 11.220 ac, 59.98% Impervious, Inflow Depth > 6.39" for 100-year event Inflow = 124.98 cfs @ 11.95 hrs, Volume= 5.977 of Outflow = 109.51 cfs @ 12.00 hrs, Volume= 5.688 af, Atten= 12%, Lag= 2.7 min Primary = 75.85 cfs @ 12.00 hrs, Volume= 5.375 of Secondary = 33.66 cfs @ 12.00 hrs, Volume= 0.313 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 265.97' @ 12.00 hrs Surf.Area= 21,951 sf Storage= 46,939 cf Plug -Flow detention time= 42.2 min calculated for 5.673 of (95% of inflow) Center -of -Mass det. time= 23.2 min ( 766.9 - 743.7 ) Volume Invert Avail.Storage Storage Description #1 263.50' 70,810 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 263.50 15,234 0 0 264.00 17,440 8,169 8,169 265.00 19,702 18,571 26,740 266.00 22,021 20,862 47,601 267.00 24,396 23,209 70,810 Device Routing Invert Outlet Devices #1 Primary 261.00' 36.0" Round RCP -Round 36" L= 52.9' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 261.00' / 260.00' S= 0.0189 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 263.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 264.17' 60.0" W x 10.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 265.50' 60.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 266.50' 60.0" W x 60.0" H Vert. Orifice/Grate C= 0.600 #6 Secondary 265.50' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=75.52 cfs @ 12.00 hrs HW=265.96' (Free Discharge) L1=RCP_Round 36" (Passes 75.52 cfs of 79.16 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.16 cfs @ 7.43 fps) 3=Orifice/Grate (Orifice Controls 70.31 cfs @ 5.62 fps) 4=Orifice/Grate (Orifice Controls 5.04 cfs @ 2.18 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=32.78 cfs @ 12.00 hrs HW=265.96' (Free Discharge) L6= Broad -Crested Rectangular Weir (Weir Controls 32.78 cfs @ 1.77 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 157 Pond 4P: (new Pond) Hydrograph -- -- ----------- -- -- - -- -- -- ----------- ■ Inflow 124.98 cfS Enoutflow rfflowlAroa: 1.22G aC -- -- - -- -- -- -- ■ Primary ■ Secondary 130 _Peak 1Elev-2_6&97'_ _ ' 109.51 cfs -I 1207-tate=4�r'$3af- - -- t�-I - --,- -'- -'- -I' 110 100- - T - - T - - T - - -I - - - - - - T - - T - - - - - - - --I - - T - - T - - T - - - - -I - - - - - 90-L--1--J--- --L- 75.85 cfs -----'L--1--1--J------'-- w 80 u --IT--------------li--Ir--,----Ir--li -- -----------Ir-- 3 70 -- -- ----------- -- -- -- ----- -- -- ----------- a 60 --r--+--+---------+-- -i---+--+--+--+---i---,--- 40 33.66 cfs --'I -- ------------'I --'I -- - ---------- ---------'I -- 30 20 10 1 A, 271 w 268 0 267 w w 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 4P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 0 T - T - - T - - - - -I-I- - - - T - - - - n - - - - -I- - - T - T - - - - -I- T - - - T - - - - - - 1 - - - L -'- - - - - L - J - - J - - - - -'-'- - - - L - - - - LJ - - - - -'- - - L - L - - - - -'- 1 - - - L - - 24,000 Surface ❑ Storage Custom Stage Data, 10,000 20,006 30,000 40,000 k000 k000 70,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 158 Summary for Pond 5P: (new Pond) Inflow Area = 2.000 ac, 41.35% Impervious, Inflow Depth > 6.16" for 100-year event Inflow = 21.80 cfs @ 11.95 hrs, Volume= 1.026 of Outflow = 19.40 cfs @ 12.00 hrs, Volume= 0.942 af, Atten= 11 %, Lag= 2.6 min Primary = 14.59 cfs @ 12.00 hrs, Volume= 0.905 of Secondary = 4.81 cfs @ 12.00 hrs, Volume= 0.037 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 272.93' @ 12.00 hrs Surf.Area= 7,237 sf Storage= 9,035 cf Plug -Flow detention time= 57.4 min calculated for 0.940 of (92% of inflow) Center -of -Mass det. time= 28.1 min ( 776.9 - 748.8 ) Volume Invert Avail.Storage Storage Description #1 271.50' 17,465 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 271.50 5,054 0 0 272.00 6,157 2,803 2,803 273.00 7,317 6,737 9,540 274.00 8,533 7,925 17,465 Device Routing Invert Outlet Devices #1 Primary 271.00' 24.0" Round RCP -Round 24" L= 20.6' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 271.00' / 270.00' S= 0.0485 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 271.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 272.10' 48.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 273.70' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 272.77' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=14.51 cfs @ 12.00 hrs HW=272.92' (Free Discharge) L1=RCP_Round 24" (Passes 14.51 cfs of 18.32 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.66 fps) 3=Orifice/Grate (Orifice Controls 7.24 cfs @ 3.62 fps) 4=Orifice/Grate (Orifice Controls 7.24 cfs @ 3.62 fps) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=4.59 cfs @ 12.00 hrs HW=272.93' (Free Discharge) L6= Broad -Crested Rectangular Weir (Weir Controls 4.59 cfs @ 0.98 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 159 Pond 5P: (new Pond) Hydrograph -- -----------.y------------------ -- -- -- --- 21.80 Cfs M Inflow (Outflow -r - -�---�---i --i-- - 1r1f10 �-AreQ�.-000-IAC-- 1 ❑ Primary 24 � I-i--y-- _Secondary -19.40 cfs -;-- --- ----r-r-7 -Fleak F,[e1-2172.-93 -- ;-- - 22 20 ito'ra eT9 03f 18 14.59 cfs 16 w 14 .... - - T - - 7 7 - - 7 - - 7- 0 FL 10 -- -- ---------,I --,I -- 7---,--- -- ---------,I --,I -----,--- g 6 4.81 cfs 4 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 0 Pond 5P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 ■ Surface ■ Storage 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 Storage (cubic -feet) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 160 Summary for Pond 6P: (new Pond) Inflow Area = 1.790 ac, 35.20% Impervious, Inflow Depth > 5.69" for 100-year event Inflow = 18.53 cfs @ 11.95 hrs, Volume= 0.849 of Outflow = 12.31 cfs @ 12.03 hrs, Volume= 0.774 af, Atten= 34%, Lag= 4.7 min Primary = 12.29 cfs @ 12.03 hrs, Volume= 0.774 of Secondary = 0.02 cfs @ 12.05 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 307.52' @ 12.03 hrs Surf.Area= 5,659 sf Storage= 13,398 cf Plug -Flow detention time= 70.2 min calculated for 0.772 of (91 % of inflow) Center -of -Mass det. time= 39.4 min ( 797.3 - 757.9 ) Volume Invert Avail.Storage Storage Description #1 304.50' 22,746 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 304.50 3,032 0 0 305.00 3,706 1,685 1,685 306.00 4,436 4,071 5,756 307.00 5,223 4,830 10,585 308.00 6,066 5,645 16,230 309.00 6,966 6,516 22,746 Device Routing Invert Outlet Devices #1 Primary 302.00' 24.0" Round RCP -Round 24" L= 55.2' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 302.00' / 300.00' S= 0.0362 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 304.50' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 305.20' 12.0" Vert. Orifice/Grate C= 0.600 #4 Secondary 307.50' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #5 Device 1 307.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=11.73 cfs @ 12.03 hrs HW=307.50' (Free Discharge) L1=RCP_Round 24" (Passes 11.73 cfs of 40.12 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.05 cfs @ 8.28 fps) 3=Orifice/Grate (Orifice Controls 5.08 cfs @ 6.46 fps) =Orifice/Grate (Weir Controls 6.61 cfs @ 1.64 fps) Secondary OutFlow Max=0.01 cfs @ 12.05 hrs HW=307.51' (Free Discharge) L4= Broad -Crested Rectangular Weir (Weir Controls 0.01 cfs @ 0.20 fps) NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 161 Pond 6P: (new Pond) Hydrograph --; --------------r-- ---,-- 18.53 cfS ------------r-- ---,--- MInflow ffl outflow y���� /� .y (� -r---................ -� loYY�-Area=4.790-ac--- ......- --------. --r--r-- --. -- --- --y- -- ❑Primary 20 19 ----- ------- - - - - --------- - - - - ---- - '--- -- F�e�k ��� 3a�.-�'--- - ----- ------'--- ----- - -- -- --L-- - ------ --J--- _Secondary 18 17 --r--r---i---r--r--r--r-- - --- -- -StoTageT13,398'1e#---,---- -- --------- --------------- -- -- -- ---,--- --- 16 -+-- - -'--- -- -- - -'- - ------'--- -- -- -- --- 15 --T-----li---Ir--T--T-- -- - 12.29 Cfs ---li---Ir--T--T-- --T--- 14 - - - - - - - -- 13 --+--+------i--- --r--------i- -- ------i--- --+-- --+--- w 12 -- T-- T--- ------ --T--------- -- ---------T--T-- -- --- 3 10 --T-----------+-- --------- -- --------- --+-- -- --- a9 --------- --- -i --i---- -i------ ---- - --- -i --i -----i--- 8 i --1--1---------L--L--1---'---' -- ------'--- i --L-- --J--- 7 --+-----------+--T-----i---i - ---------T--+-- -- --- 6 -- ----------------- ----------------------- ------ 5 --1--1---------L--L--1---'---' ------'--- --L-- --J--- 4 3 2 1 0.02 Cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Pond 6P: (new Pond) Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 Storage (cubic -feet) ■ Surface ■ Storage NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 1 Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Pond P1 F: P1 Forebay Peak EIev=0.00' Storage=0 cf Pond P1 M: P1 Main Peak EIev=0.00' Storage=0 cf Pond P2F: P2 Forebay Peak EIev=0.00' Storage=0 cf Pond P2M: P2 Main Peak EIev=0.00' Storage=0 cf Pond P3F: P3 Forebay Peak EIev=0.00' Storage=0 cf Pond P3M: P3 Main Peak EIev=0.00' Storage=0 cf Pond P4F: P4 Forebay Peak EIev=0.00' Storage=0 cf Pond P4M: P4 Main Peak EIev=0.00' Storage=0 cf Pond PSF: P5 Forebay Peak EIev=0.00' Storage=0 cf Pond PSM: P5 Main Peak EIev=0.00' Storage=0 cf Pond P6F: P6 Forebay Peak EIev=0.00' Storage=0 cf Pond P6M: (new Pond) Peak EIev=0.00' Storage=0 cf NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 2 Stage -Area -Storage for Pond P1 F: P1 Forebay Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 257.00 1,595 0 257.01 1,598 16 257.02 1,602 32 257.03 1,605 48 257.04 1,608 64 257.05 1,611 80 257.06 1,615 96 257.07 1,618 112 257.08 1,621 129 257.09 1,624 145 257.10 1,628 161 257.11 1,631 177 257.12 1,634 194 257.13 1,637 210 257.14 1,641 226 257.15 1,644 243 257.16 1,647 259 257.17 1,650 276 257.18 1,654 292 257.19 1,657 309 257.20 1,660 326 257.21 1,663 342 257.22 1,667 359 257.23 1,670 375 257.24 1,673 392 257.25 1,677 409 257.26 1,680 426 257.27 1,683 443 257.28 1,686 459 257.29 1,690 476 257.30 1,693 493 257.31 1,696 510 257.32 1,699 527 257.33 1,703 544 257.34 1,706 561 257.35 1,709 578 257.36 1,712 595 257.37 1,716 612 257.38 1,719 630 257.39 1,722 647 257.40 1,725 664 257.41 1,729 681 257.42 1,732 699 257.43 1,735 716 257.44 1,738 733 257.45 1,742 751 257.46 1,745 768 257.47 1,748 786 257.48 1,751 803 257.49 1,755 821 257.50 1,758 838 257.51 1,761 856 257.52 1,765 873 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 257.53 1,768 891 257.54 1,771 909 257.55 1,774 927 257.56 1,778 944 257.57 1,781 962 257.58 1,784 980 257.59 1,787 998 257.60 1,791 1,016 257.61 1,794 1,034 257.62 1,797 1,052 257.63 1,800 1,070 257.64 1,804 1,088 257.65 1,807 1,106 257.66 1,810 1,124 257.67 1,813 1,142 257.68 1,817 1,160 257.69 1,820 1,178 257.70 1,823 1,196 257.71 1,826 1,215 257.72 1,830 1,233 257.73 1,833 1,251 257.74 1,836 1,270 257.75 1,840 1,288 257.76 1,843 1,306 257.77 1,846 1,325 257.78 1,849 1,343 257.79 1,853 1,362 257.80 1,856 1,380 257.81 1,859 1,399 257.82 1,862 1,418 257.83 1,866 1,436 257.84 1,869 1,455 257.85 1,872 1,474 257.86 1,875 1,492 257.87 1,879 1,511 257.88 1,882 1,530 257.89 1,885 1,549 257.90 1,888 1,568 257.91 1,892 1,586 257.92 1,895 1,605 257.93 1,898 1,624 257.94 1,901 1,643 257.95 1,905 1,662 257.96 1,908 1,681 257.97 1,911 1,701 257.98 1,914 1,720 257.99 1,918 1,739 258.00 1,921 1,758 258.01 1,925 1,777 258.02 1,928 1,796 258.03 1,932 1,816 258.04 1,935 1,835 258.05 1,939 1,854 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 3 Stage -Area -Storage for Pond P1 F: P1 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 258.06 1,942 1,874 258.07 1,946 1,893 258.08 1,949 1,913 258.09 1,953 1,932 258.10 1,956 1,952 258.11 1,960 1,971 258.12 1,963 1,991 258.13 1,967 2,011 258.14 1,970 2,030 258.15 1,974 2,050 258.16 1,977 2,070 258.17 1,981 2,090 258.18 1,984 2,109 258.19 1,988 2,129 258.20 1,991 2,149 258.21 1,995 2,169 258.22 1,998 2,189 258.23 2,002 2,209 258.24 2,005 2,229 258.25 2,009 2,249 258.26 2,013 2,269 258.27 2,016 2,290 258.28 2,020 2,310 258.29 2,023 2,330 258.30 2,027 2,350 258.31 2,030 2,370 258.32 2,034 2,391 258.33 2,037 2,411 258.34 2,041 2,431 258.35 2,044 2,452 258.36 2,048 2,472 258.37 2,051 2,493 258.38 2,055 2,513 258.39 2,058 2,534 258.40 2,062 2,555 258.41 2,065 2,575 258.42 2,069 2,596 258.43 2,072 2,617 258.44 2,076 2,637 258.45 2,079 2,658 258.46 2,083 2,679 258.47 2,086 2,700 258.48 2,090 2,721 258.49 2,093 2,742 258.50 2,097 2,763 258.51 2,101 2,783 258.52 2,104 2,805 258.53 2,108 2,826 258.54 2,111 2,847 258.55 2,115 2,868 258.56 2,118 2,889 258.57 2,122 2,910 258.58 2,125 2,931 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 258.59 2,129 2,953 258.60 2,132 2,974 258.61 2,136 2,995 258.62 2,139 3,017 258.63 2,143 3,038 258.64 2,146 3,060 258.65 2,150 3,081 258.66 2,153 3,103 258.67 2,157 3,124 258.68 2,160 3,146 258.69 2,164 3,167 258.70 2,167 3,189 258.71 2,171 3,211 258.72 2,174 3,232 258.73 2,178 3,254 258.74 2,181 3,276 258.75 2,185 3,298 258.76 2,189 3,320 258.77 2,192 3,342 258.78 2,196 3,363 258.79 2,199 3,385 258.80 2,203 3,407 258.81 2,206 3,429 258.82 2,210 3,452 258.83 2,213 3,474 258.84 2,217 3,496 258.85 2,220 3,518 258.86 2,224 3,540 258.87 2,227 3,562 258.88 2,231 3,585 258.89 2,234 3,607 258.90 2,238 3,629 258.91 2,241 3,652 258.92 2,245 3,674 258.93 2,248 3,697 258.94 2,252 3,719 258.95 2,255 3,742 258.96 2,259 3,764 258.97 2,262 3,787 258.98 2,266 3,810 258.99 2,269 3,832 259.00 2,273 3,855 259.01 2,277 3,878 259.02 2,281 3,901 259.03 2,284 3,923 259.04 2,288 3,946 259.05 2,292 3,969 259.06 2,296 3,992 259.07 2,299 4,015 259.08 2,303 4,038 259.09 2,307 4,061 259.10 2,311 4,084 259.11 2,314 4,107 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 4 Stage -Area -Storage for Pond P1 F: P1 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 259.12 2,318 4,130 259.13 2,322 4,154 259.14 2,326 4,177 259.15 2,330 4,200 259.16 2,333 4,224 259.17 2,337 4,247 259.18 2,341 4,270 259.19 2,345 4,294 259.20 2,348 4,317 259.21 2,352 4,341 259.22 2,356 4,364 259.23 2,360 4,388 259.24 2,363 4,411 259.25 2,367 4,435 259.26 2,371 4,459 259.27 2,375 4,482 259.28 2,379 4,506 259.29 2,382 4,530 259.30 2,386 4,554 259.31 2,390 4,578 259.32 2,394 4,602 259.33 2,397 4,626 259.34 2,401 4,650 259.35 2,405 4,674 259.36 2,409 4,698 259.37 2,412 4,722 259.38 2,416 4,746 259.39 2,420 4,770 259.40 2,424 4,794 259.41 2,428 4,819 259.42 2,431 4,843 259.43 2,435 4,867 259.44 2,439 4,892 259.45 2,443 4,916 259.46 2,446 4,940 259.47 2,450 4,965 259.48 2,454 4,989 259.49 2,458 5,014 259.50 2,462 5,039 259.51 2,465 5,063 259.52 2,469 5,088 259.53 2,473 5,113 259.54 2,477 5,137 259.55 2,480 5,162 259.56 2,484 5,187 259.57 2,488 5,212 259.58 2,492 5,237 259.59 2,495 5,262 259.60 2,499 5,287 259.61 2,503 5,312 259.62 2,507 5,337 259.63 2,511 5,362 259.64 2,514 5,387 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 259.65 2,518 5,412 259.66 2,522 5,437 259.67 2,526 5,463 259.68 2,529 5,488 259.69 2,533 5,513 259.70 2,537 5,538 259.71 2,541 5,564 259.72 2,544 5,589 259.73 2,548 5,615 259.74 2,552 5,640 259.75 2,556 5,666 259.76 2,560 5,691 259.77 2,563 5,717 259.78 2,567 5,743 259.79 2,571 5,768 259.80 2,575 5,794 259.81 2,578 5,820 259.82 2,582 5,846 259.83 2,586 5,871 259.84 2,590 5,897 259.85 2,593 5,923 259.86 2,597 5,949 259.87 2,601 5,975 259.88 2,605 6,001 259.89 2,609 6,027 259.90 2,612 6,053 259.91 2,616 6,080 259.92 2,620 6,106 259.93 2,624 6,132 259.94 2,627 6,158 259.95 2,631 6,184 259.96 2,635 6,211 259.97 2,639 6,237 259.98 2,642 6,264 259.99 2,646 6,290 260.00 2,650 6,317 260.01 2,664 6,343 260.02 2,678 6,370 260.03 2,691 6,397 260.04 2,705 6,424 260.05 2,719 6,451 260.06 2,733 6,478 260.07 2,747 6,505 260.08 2,761 6,533 260.09 2,774 6,561 260.10 2,788 6,588 260.11 2,802 6,616 260.12 2,816 6,644 260.13 2,830 6,673 260.14 2,843 6,701 260.15 2,857 6,730 260.16 2,871 6,758 260.17 2,885 6,787 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 5 Stage -Area -Storage for Pond P1 F: P1 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 260.18 2,899 6,816 260.19 2,913 6,845 260.20 2,926 6,874 260.21 2,940 6,903 260.22 2,954 6,933 260.23 2,968 6,963 260.24 2,982 6,992 260.25 2,996 7,022 260.26 3,009 7,052 260.27 3,023 7,082 260.28 3,037 7,113 260.29 3,051 7,143 260.30 3,065 7,174 260.31 3,078 7,204 260.32 3,092 7,235 260.33 3,106 7,266 260.34 3,120 7,297 260.35 3,134 7,329 260.36 3,148 7,360 260.37 3,161 7,392 260.38 3,175 7,423 260.39 3,189 7,455 260.40 3,203 7,487 260.41 3,217 7,519 260.42 3,230 7,551 260.43 3,244 7,584 260.44 3,258 7,616 260.45 3,272 7,649 260.46 3,286 7,682 260.47 3,300 7,715 260.48 3,313 7,748 260.49 3,327 7,781 260.50 3,341 7,814 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 6 Stage -Area -Storage for Pond P1 M: P1 Main Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 256.00 8,503 0 256.01 8,512 85 256.02 8,520 170 256.03 8,529 255 256.04 8,538 341 256.05 8,547 426 256.06 8,555 512 256.07 8,564 597 256.08 8,573 683 256.09 8,582 769 256.10 8,590 855 256.11 8,599 941 256.12 8,608 1,027 256.13 8,616 1,113 256.14 8,625 1,199 256.15 8,634 1,285 256.16 8,643 1,372 256.17 8,651 1,458 256.18 8,660 1,545 256.19 8,669 1,631 256.20 8,678 1,718 256.21 8,686 1,805 256.22 8,695 1,892 256.23 8,704 1,979 256.24 8,713 2,066 256.25 8,721 2,153 256.26 8,730 2,240 256.27 8,739 2,328 256.28 8,747 2,415 256.29 8,756 2,503 256.30 8,765 2,590 256.31 8,774 2,678 256.32 8,782 2,766 256.33 8,791 2,854 256.34 8,800 2,941 256.35 8,809 3,030 256.36 8,817 3,118 256.37 8,826 3,206 256.38 8,835 3,294 256.39 8,843 3,383 256.40 8,852 3,471 256.41 8,861 3,560 256.42 8,870 3,648 256.43 8,878 3,737 256.44 8,887 3,826 256.45 8,896 3,915 256.46 8,905 4,004 256.47 8,913 4,093 256.48 8,922 4,182 256.49 8,931 4,271 256.50 8,940 4,361 256.51 8,948 4,450 256.52 8,957 4,540 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 256.53 8,966 4,629 256.54 8,974 4,719 256.55 8,983 4,809 256.56 8,992 4,899 256.57 9,001 4,989 256.58 9,009 5,079 256.59 9,018 5,169 256.60 9,027 5,259 256.61 9,036 5,349 256.62 9,044 5,440 256.63 9,053 5,530 256.64 9,062 5,621 256.65 9,070 5,711 256.66 9,079 5,802 256.67 9,088 5,893 256.68 9,097 5,984 256.69 9,105 6,075 256.70 9,114 6,166 256.71 9,123 6,257 256.72 9,132 6,348 256.73 9,140 6,440 256.74 9,149 6,531 256.75 9,158 6,623 256.76 9,166 6,714 256.77 9,175 6,806 256.78 9,184 6,898 256.79 9,193 6,990 256.80 9,201 7,082 256.81 9,210 7,174 256.82 9,219 7,266 256.83 9,228 7,358 256.84 9,236 7,451 256.85 9,245 7,543 256.86 9,254 7,635 256.87 9,263 7,728 256.88 9,271 7,821 256.89 9,280 7,913 256.90 9,289 8,006 256.91 9,297 8,099 256.92 9,306 8,192 256.93 9,315 8,285 256.94 9,324 8,379 256.95 9,332 8,472 256.96 9,341 8,565 256.97 9,350 8,659 256.98 9,359 8,752 256.99 9,367 8,846 257.00 9,376 8,940 257.01 9,385 9,033 257.02 9,394 9,127 257.03 9,403 9,221 257.04 9,412 9,315 257.05 9,421 9,409 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 7 Stage -Area -Storage for Pond P1 M: P1 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 257.06 9,430 9,504 257.07 9,439 9,598 257.08 9,448 9,692 257.09 9,457 9,787 257.10 9,466 9,882 257.11 9,475 9,976 257.12 9,484 10,071 257.13 9,493 10,166 257.14 9,502 10,261 257.15 9,511 10,356 257.16 9,520 10,451 257.17 9,529 10,546 257.18 9,538 10,642 257.19 9,547 10,737 257.20 9,556 10,833 257.21 9,565 10,928 257.22 9,574 11,024 257.23 9,583 11,120 257.24 9,592 11,216 257.25 9,601 11,312 257.26 9,610 11,408 257.27 9,619 11,504 257.28 9,628 11,600 257.29 9,637 11,696 257.30 9,646 11,793 257.31 9,655 11,889 257.32 9,664 11,986 257.33 9,673 12,083 257.34 9,682 12,179 257.35 9,691 12,276 257.36 9,700 12,373 257.37 9,709 12,470 257.38 9,718 12,567 257.39 9,727 12,665 257.40 9,736 12,762 257.41 9,745 12,859 257.42 9,754 12,957 257.43 9,763 13,054 257.44 9,772 13,152 257.45 9,781 13,250 257.46 9,790 13,348 257.47 9,799 13,446 257.48 9,808 13,544 257.49 9,817 13,642 257.50 9,826 13,740 257.51 9,834 13,838 257.52 9,843 13,937 257.53 9,852 14,035 257.54 9,861 14,134 257.55 9,870 14,232 257.56 9,879 14,331 257.57 9,888 14,430 257.58 9,897 14,529 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 257.59 9,906 14,628 257.60 9,915 14,727 257.61 9,924 14,826 257.62 9,933 14,925 257.63 9,942 15,025 257.64 9,951 15,124 257.65 9,960 15,224 257.66 9,969 15,323 257.67 9,978 15,423 257.68 9,987 15,523 257.69 9,996 15,623 257.70 10,005 15,723 257.71 10,014 15,823 257.72 10,023 15,923 257.73 10,032 16,024 257.74 10,041 16,124 257.75 10,050 16,224 257.76 10,059 16,325 257.77 10,068 16,426 257.78 10,077 16,526 257.79 10,086 16,627 257.80 10,095 16,728 257.81 10,104 16,829 257.82 10,113 16,930 257.83 10,122 17,031 257.84 10,131 17,133 257.85 10,140 17,234 257.86 10,149 17,335 257.87 10,158 17,437 257.88 10,167 17,538 257.89 10,176 17,640 257.90 10,185 17,742 257.91 10,194 17,844 257.92 10,203 17,946 257.93 10,212 18,048 257.94 10,221 18,150 257.95 10,230 18,252 257.96 10,239 18,355 257.97 10,248 18,457 257.98 10,257 18,560 257.99 10,266 18,662 258.00 10,275 18,765 258.01 10,284 18,868 258.02 10,293 18,971 258.03 10,303 19,074 258.04 10,312 19,177 258.05 10,321 19,280 258.06 10,330 19,383 258.07 10,340 19,487 258.08 10,349 19,590 258.09 10,358 19,693 258.10 10,367 19,797 258.11 10,377 19,901 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 8 Stage -Area -Storage for Pond P1 M: P1 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 258.12 10,386 20,005 258.13 10,395 20,109 258.14 10,404 20,213 258.15 10,414 20,317 258.16 10,423 20,421 258.17 10,432 20,525 258.18 10,441 20,629 258.19 10,451 20,734 258.20 10,460 20,838 258.21 10,469 20,943 258.22 10,478 21,048 258.23 10,488 21,153 258.24 10,497 21,258 258.25 10,506 21,363 258.26 10,515 21,468 258.27 10,524 21,573 258.28 10,534 21,678 258.29 10,543 21,784 258.30 10,552 21,889 258.31 10,561 21,995 258.32 10,571 22,100 258.33 10,580 22,206 258.34 10,589 22,312 258.35 10,598 22,418 258.36 10,608 22,524 258.37 10,617 22,630 258.38 10,626 22,736 258.39 10,635 22,843 258.40 10,645 22,949 258.41 10,654 23,055 258.42 10,663 23,162 258.43 10,672 23,269 258.44 10,682 23,375 258.45 10,691 23,482 258.46 10,700 23,589 258.47 10,709 23,696 258.48 10,719 23,803 258.49 10,728 23,911 258.50 10,737 24,018 258.51 10,746 24,125 258.52 10,755 24,233 258.53 10,765 24,341 258.54 10,774 24,448 258.55 10,783 24,556 258.56 10,792 24,664 258.57 10,802 24,772 258.58 10,811 24,880 258.59 10,820 24,988 258.60 10,829 25,096 258.61 10,839 25,205 258.62 10,848 25,313 258.63 10,857 25,422 258.64 10,866 25,530 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 258.65 10,876 25,639 258.66 10,885 25,748 258.67 10,894 25,857 258.68 10,903 25,966 258.69 10,913 26,075 258.70 10,922 26,184 258.71 10,931 26,293 258.72 10,940 26,403 258.73 10,950 26,512 258.74 10,959 26,621 258.75 10,968 26,731 258.76 10,977 26,841 258.77 10,986 26,951 258.78 10,996 27,061 258.79 11,005 27,171 258.80 11,014 27,281 258.81 11,023 27,391 258.82 11,033 27,501 258.83 11,042 27,612 258.84 11,051 27,722 258.85 11,060 27,833 258.86 11,070 27,943 258.87 11,079 28,054 258.88 11,088 28,165 258.89 11,097 28,276 258.90 11,107 28,387 258.91 11,116 28,498 258.92 11,125 28,609 258.93 11,134 28,720 258.94 11,144 28,832 258.95 11,153 28,943 258.96 11,162 29,055 258.97 11,171 29,166 258.98 11,181 29,278 258.99 11,190 29,390 259.00 11,199 29,502 259.01 11,208 29,614 259.02 11,218 29,726 259.03 11,227 29,838 259.04 11,237 29,951 259.05 11,247 30,063 259.06 11,256 30,176 259.07 11,265 30,288 259.08 11,275 30,401 259.09 11,284 30,514 259.10 11,294 30,627 259.11 11,304 30,740 259.12 11,313 30,853 259.13 11,322 30,966 259.14 11,332 31,079 259.15 11,341 31,193 259.16 11,351 31,306 259.17 11,361 31,420 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 9 Stage -Area -Storage for Pond P1 M: P1 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 259.18 11,370 31,533 259.19 11,379 31,647 259.20 11,389 31,761 259.21 11,398 31,875 259.22 11,408 31,989 259.23 11,418 32,103 259.24 11,427 32,217 259.25 11,437 32,331 259.26 11,446 32,446 259.27 11,455 32,560 259.28 11,465 32,675 259.29 11,475 32,790 259.30 11,484 32,904 259.31 11,494 33,019 259.32 11,503 33,134 259.33 11,512 33,249 259.34 11,522 33,365 259.35 11,532 33,480 259.36 11,541 33,595 259.37 11,551 33,711 259.38 11,560 33,826 259.39 11,569 33,942 259.40 11,579 34,058 259.41 11,589 34,173 259.42 11,598 34,289 259.43 11,608 34,405 259.44 11,617 34,522 259.45 11,626 34,638 259.46 11,636 34,754 259.47 11,646 34,870 259.48 11,655 34,987 259.49 11,665 35,104 259.50 11,674 35,220 259.51 11,683 35,337 259.52 11,693 35,454 259.53 11,702 35,571 259.54 11,712 35,688 259.55 11,722 35,805 259.56 11,731 35,922 259.57 11,740 36,040 259.58 11,750 36,157 259.59 11,759 36,275 259.60 11,769 36,392 259.61 11,779 36,510 259.62 11,788 36,628 259.63 11,797 36,746 259.64 11,807 36,864 259.65 11,816 36,982 259.66 11,826 37,100 259.67 11,836 37,219 259.68 11,845 37,337 259.69 11,854 37,455 259.70 11,864 37,574 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 259.71 11,873 37,693 259.72 11,883 37,812 259.73 11,893 37,930 259.74 11,902 38,049 259.75 11,912 38,168 259.76 11,921 38,288 259.77 11,930 38,407 259.78 11,940 38,526 259.79 11,950 38,646 259.80 11,959 38,765 259.81 11,969 38,885 259.82 11,978 39,005 259.83 11,987 39,124 259.84 11,997 39,244 259.85 12,007 39,364 259.86 12,016 39,484 259.87 12,026 39,605 259.88 12,035 39,725 259.89 12,044 39,845 259.90 12,054 39,966 259.91 12,064 40,086 259.92 12,073 40,207 259.93 12,083 40,328 259.94 12,092 40,449 259.95 12,101 40,570 259.96 12,111 40,691 259.97 12,121 40,812 259.98 12,130 40,933 259.99 12,140 41,055 260.00 12,149 41,176 260.01 12,178 41,298 260.02 12,208 41,420 260.03 12,237 41,542 260.04 12,267 41,664 260.05 12,296 41,787 260.06 12,326 41,910 260.07 12,355 42,034 260.08 12,384 42,157 260.09 12,414 42,281 260.10 12,443 42,406 260.11 12,473 42,530 260.12 12,502 42,655 260.13 12,531 42,780 260.14 12,561 42,906 260.15 12,590 43,031 260.16 12,620 43,157 260.17 12,649 43,284 260.18 12,679 43,410 260.19 12,708 43,537 260.20 12,737 43,665 260.21 12,767 43,792 260.22 12,796 43,920 260.23 12,826 44,048 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 10 Stage -Area -Storage for Pond P1 M: P1 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 260.24 12,855 44,176 260.25 12,885 44,305 260.26 12,914 44,434 260.27 12,943 44,563 260.28 12,973 44,693 260.29 13,002 44,823 260.30 13,032 44,953 260.31 13,061 45,084 260.32 13,090 45,214 260.33 13,120 45,345 260.34 13,149 45,477 260.35 13,179 45,608 260.36 13,208 45,740 260.37 13,238 45,873 260.38 13,267 46,005 260.39 13,296 46,138 260.40 13,326 46,271 260.41 13,355 46,404 260.42 13,385 46,538 260.43 13,414 46,672 260.44 13,443 46,806 260.45 13,473 46,941 260.46 13,502 47,076 260.47 13,532 47,211 260.48 13,561 47,346 260.49 13,591 47,482 260.50 13,620 47,618 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 11 Stage -Area -Storage for Pond P2F: P2 Forebay Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 266.00 405 0 266.01 407 4 266.02 409 8 266.03 412 12 266.04 414 16 266.05 416 21 266.06 418 25 266.07 421 29 266.08 423 33 266.09 425 37 266.10 427 42 266.11 429 46 266.12 432 50 266.13 434 55 266.14 436 59 266.15 438 63 266.16 441 68 266.17 443 72 266.18 445 76 266.19 447 81 266.20 449 85 266.21 452 90 266.22 454 94 266.23 456 99 266.24 458 104 266.25 461 108 266.26 463 113 266.27 465 117 266.28 467 122 266.29 469 127 266.30 472 131 266.31 474 136 266.32 476 141 266.33 478 146 266.34 480 151 266.35 483 155 266.36 485 160 266.37 487 165 266.38 489 170 266.39 492 175 266.40 494 180 266.41 496 185 266.42 498 190 266.43 500 195 266.44 503 200 266.45 505 205 266.46 507 210 266.47 509 215 266.48 512 220 266.49 514 225 266.50 516 230 266.51 518 235 266.52 520 241 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 266.53 523 246 266.54 525 251 266.55 527 256 266.56 529 262 266.57 532 267 266.58 534 272 266.59 536 278 266.60 538 283 266.61 540 288 266.62 543 294 266.63 545 299 266.64 547 305 266.65 549 310 266.66 552 316 266.67 554 321 266.68 556 327 266.69 558 332 266.70 560 338 266.71 563 344 266.72 565 349 266.73 567 355 266.74 569 360 266.75 572 366 266.76 574 372 266.77 576 378 266.78 578 383 266.79 580 389 266.80 583 395 266.81 585 401 266.82 587 407 266.83 589 413 266.84 591 419 266.85 594 424 266.86 596 430 266.87 598 436 266.88 600 442 266.89 603 448 266.90 605 454 266.91 607 460 266.92 609 467 266.93 611 473 266.94 614 479 266.95 616 485 266.96 618 491 266.97 620 497 266.98 623 504 266.99 625 510 267.00 627 516 267.01 630 522 267.02 632 529 267.03 635 535 267.04 638 541 267.05 640 548 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 12 Stage -Area -Storage for Pond P2F: P2 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 267.06 643 554 267.07 646 561 267.08 648 567 267.09 651 574 267.10 654 580 267.11 656 587 267.12 659 593 267.13 662 600 267.14 664 606 267.15 667 613 267.16 670 620 267.17 672 626 267.18 675 633 267.19 678 640 267.20 680 647 267.21 683 654 267.22 686 660 267.23 688 667 267.24 691 674 267.25 694 681 267.26 696 688 267.27 699 695 267.28 701 702 267.29 704 709 267.30 707 716 267.31 709 723 267.32 712 730 267.33 715 737 267.34 717 745 267.35 720 752 267.36 723 759 267.37 725 766 267.38 728 773 267.39 731 781 267.40 733 788 267.41 736 795 267.42 739 803 267.43 741 810 267.44 744 818 267.45 747 825 267.46 749 833 267.47 752 840 267.48 755 848 267.49 757 855 267.50 760 863 267.51 763 870 267.52 765 878 267.53 768 886 267.54 771 893 267.55 773 901 267.56 776 909 267.57 779 917 267.58 781 924 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 267.59 784 932 267.60 787 940 267.61 789 948 267.62 792 956 267.63 795 964 267.64 797 972 267.65 800 980 267.66 803 988 267.67 805 996 267.68 808 1,004 267.69 811 1,012 267.70 813 1,020 267.71 816 1,028 267.72 819 1,036 267.73 821 1,045 267.74 824 1,053 267.75 827 1,061 267.76 829 1,069 267.77 832 1,078 267.78 834 1,086 267.79 837 1,094 267.80 840 1,103 267.81 842 1,111 267.82 845 1,120 267.83 848 1,128 267.84 850 1,137 267.85 853 1,145 267.86 856 1,154 267.87 858 1,162 267.88 861 1,171 267.89 864 1,179 267.90 866 1,188 267.91 869 1,197 267.92 872 1,205 267.93 874 1,214 267.94 877 1,223 267.95 880 1,232 267.96 882 1,240 267.97 885 1,249 267.98 888 1,258 267.99 890 1,267 268.00 893 1,276 268.01 896 1,285 268.02 899 1,294 268.03 902 1,303 268.04 905 1,312 268.05 909 1,321 268.06 912 1,330 268.07 915 1,339 268.08 918 1,348 268.09 921 1,358 268.10 924 1,367 268.11 927 1,376 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 13 Stage -Area -Storage for Pond P2F: P2 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 268.12 930 1,385 268.13 933 1,395 268.14 936 1,404 268.15 939 1,413 268.16 943 1,423 268.17 946 1,432 268.18 949 1,442 268.19 952 1,451 268.20 955 1,461 268.21 958 1,470 268.22 961 1,480 268.23 964 1,490 268.24 967 1,499 268.25 971 1,509 268.26 974 1,519 268.27 977 1,528 268.28 980 1,538 268.29 983 1,548 268.30 986 1,558 268.31 989 1,568 268.32 992 1,578 268.33 995 1,588 268.34 998 1,598 268.35 1,002 1,608 268.36 1,005 1,618 268.37 1,008 1,628 268.38 1,011 1,638 268.39 1,014 1,648 268.40 1,017 1,658 268.41 1,020 1,668 268.42 1,023 1,678 268.43 1,026 1,689 268.44 1,029 1,699 268.45 1,032 1,709 268.46 1,036 1,720 268.47 1,039 1,730 268.48 1,042 1,740 268.49 1,045 1,751 268.50 1,048 1,761 268.51 1,051 1,772 268.52 1,054 1,782 268.53 1,057 1,793 268.54 1,060 1,803 268.55 1,064 1,814 268.56 1,067 1,825 268.57 1,070 1,835 268.58 1,073 1,846 268.59 1,076 1,857 268.60 1,079 1,868 268.61 1,082 1,878 268.62 1,085 1,889 268.63 1,088 1,900 268.64 1,091 1,911 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 268.65 1,094 1,922 268.66 1,098 1,933 268.67 1,101 1,944 268.68 1,104 1,955 268.69 1,107 1,966 268.70 1,110 1,977 268.71 1,113 1,988 268.72 1,116 1,999 268.73 1,119 2,010 268.74 1,122 2,022 268.75 1,126 2,033 268.76 1,129 2,044 268.77 1,132 2,056 268.78 1,135 2,067 268.79 1,138 2,078 268.80 1,141 2,090 268.81 1,144 2,101 268.82 1,147 2,112 268.83 1,150 2,124 268.84 1,153 2,135 268.85 1,157 2,147 268.86 1,160 2,159 268.87 1,163 2,170 268.88 1,166 2,182 268.89 1,169 2,194 268.90 1,172 2,205 268.91 1,175 2,217 268.92 1,178 2,229 268.93 1,181 2,241 268.94 1,184 2,252 268.95 1,187 2,264 268.96 1,191 2,276 268.97 1,194 2,288 268.98 1,197 2,300 268.99 1,200 2,312 269.00 1,203 2,324 269.01 1,206 2,336 269.02 1,210 2,348 269.03 1,213 2,360 269.04 1,217 2,372 269.05 1,220 2,385 269.06 1,224 2,397 269.07 1,227 2,409 269.08 1,231 2,421 269.09 1,234 2,434 269.10 1,238 2,446 269.11 1,241 2,458 269.12 1,245 2,471 269.13 1,248 2,483 269.14 1,251 2,496 269.15 1,255 2,508 269.16 1,258 2,521 269.17 1,262 2,534 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 14 Stage -Area -Storage for Pond P2F: P2 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 269.18 1,265 2,546 269.19 1,269 2,559 269.20 1,272 2,572 269.21 1,276 2,584 269.22 1,279 2,597 269.23 1,283 2,610 269.24 1,286 2,623 269.25 1,290 2,636 269.26 1,293 2,648 269.27 1,296 2,661 269.28 1,300 2,674 269.29 1,303 2,687 269.30 1,307 2,700 269.31 1,310 2,714 269.32 1,314 2,727 269.33 1,317 2,740 269.34 1,321 2,753 269.35 1,324 2,766 269.36 1,328 2,780 269.37 1,331 2,793 269.38 1,334 2,806 269.39 1,338 2,819 269.40 1,341 2,833 269.41 1,345 2,846 269.42 1,348 2,860 269.43 1,352 2,873 269.44 1,355 2,887 269.45 1,359 2,900 269.46 1,362 2,914 269.47 1,366 2,928 269.48 1,369 2,941 269.49 1,373 2,955 269.50 1,376 2,969 269.51 1,379 2,983 269.52 1,383 2,996 269.53 1,386 3,010 269.54 1,390 3,024 269.55 1,393 3,038 269.56 1,397 3,052 269.57 1,400 3,066 269.58 1,404 3,080 269.59 1,407 3,094 269.60 1,411 3,108 269.61 1,414 3,122 269.62 1,418 3,136 269.63 1,421 3,151 269.64 1,424 3,165 269.65 1,428 3,179 269.66 1,431 3,193 269.67 1,435 3,208 269.68 1,438 3,222 269.69 1,442 3,236 269.70 1,445 3,251 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 269.71 1,449 3,265 269.72 1,452 3,280 269.73 1,456 3,294 269.74 1,459 3,309 269.75 1,463 3,324 269.76 1,466 3,338 269.77 1,469 3,353 269.78 1,473 3,368 269.79 1,476 3,382 269.80 1,480 3,397 269.81 1,483 3,412 269.82 1,487 3,427 269.83 1,490 3,442 269.84 1,494 3,457 269.85 1,497 3,472 269.86 1,501 3,487 269.87 1,504 3,502 269.88 1,507 3,517 269.89 1,511 3,532 269.90 1,514 3,547 269.91 1,518 3,562 269.92 1,521 3,577 269.93 1,525 3,592 269.94 1,528 3,608 269.95 1,532 3,623 269.96 1,535 3,638 269.97 1,539 3,654 269.98 1,542 3,669 269.99 1,546 3,685 270.00 1,549 3,700 270.01 1,560 3,716 270.02 1,572 3,731 270.03 1,583 3,747 270.04 1,594 3,763 270.05 1,606 3,779 270.06 1,617 3,795 270.07 1,628 3,811 270.08 1,640 3,828 270.09 1,651 3,844 270.10 1,662 3,861 270.11 1,674 3,877 270.12 1,685 3,894 270.13 1,696 3,911 270.14 1,707 3,928 270.15 1,719 3,945 270.16 1,730 3,962 270.17 1,741 3,980 270.18 1,753 3,997 270.19 1,764 4,015 270.20 1,775 4,032 270.21 1,787 4,050 270.22 1,798 4,068 270.23 1,809 4,086 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 15 Stage -Area -Storage for Pond P2F: P2 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 270.24 1,821 4,104 270.25 1,832 4,123 270.26 1,843 4,141 270.27 1,855 4,159 270.28 1,866 4,178 270.29 1,877 4,197 270.30 1,889 4,216 270.31 1,900 4,235 270.32 1,911 4,254 270.33 1,923 4,273 270.34 1,934 4,292 270.35 1,945 4,311 270.36 1,957 4,331 270.37 1,968 4,351 270.38 1,979 4,370 270.39 1,990 4,390 270.40 2,002 4,410 270.41 2,013 4,430 270.42 2,024 4,450 270.43 2,036 4,471 270.44 2,047 4,491 270.45 2,058 4,512 270.46 2,070 4,532 270.47 2,081 4,553 270.48 2,092 4,574 270.49 2,104 4,595 270.50 2,115 4,616 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 16 Stage -Area -Storage for Pond P2M: P2 Main Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 265.00 2,718 0 265.02 2,727 54 265.04 2,737 109 265.06 2,746 164 265.08 2,756 219 265.10 2,765 274 265.12 2,775 330 265.14 2,784 385 265.16 2,794 441 265.18 2,803 497 265.20 2,813 553 265.22 2,822 609 265.24 2,832 666 265.26 2,841 723 265.28 2,851 780 265.30 2,860 837 265.32 2,870 894 265.34 2,879 952 265.36 2,889 1,009 265.38 2,898 1,067 265.40 2,908 1,125 265.42 2,917 1,183 265.44 2,927 1,242 265.46 2,936 1,300 265.48 2,946 1,359 265.50 2,955 1,418 265.52 2,964 1,477 265.54 2,974 1,537 265.56 2,983 1,596 265.58 2,993 1,656 265.60 3,002 1,716 265.62 3,012 1,776 265.64 3,021 1,837 265.66 3,031 1,897 265.68 3,040 1,958 265.70 3,050 2,019 265.72 3,059 2,080 265.74 3,069 2,141 265.76 3,078 2,203 265.78 3,088 2,264 265.80 3,097 2,326 265.82 3,107 2,388 265.84 3,116 2,450 265.86 3,126 2,513 265.88 3,135 2,575 265.90 3,145 2,638 265.92 3,154 2,701 265.94 3,164 2,764 265.96 3,173 2,828 265.98 3,183 2,891 266.00 3,192 2,955 266.02 3,202 3,019 266.04 3,212 3,083 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 266.06 3,223 3,147 266.08 3,233 3,212 266.10 3,243 3,277 266.12 3,253 3,342 266.14 3,263 3,407 266.16 3,274 3,472 266.18 3,284 3,538 266.20 3,294 3,604 266.22 3,304 3,670 266.24 3,314 3,736 266.26 3,325 3,802 266.28 3,335 3,869 266.30 3,345 3,936 266.32 3,355 4,003 266.34 3,365 4,070 266.36 3,376 4,137 266.38 3,386 4,205 266.40 3,396 4,273 266.42 3,406 4,341 266.44 3,416 4,409 266.46 3,427 4,477 266.48 3,437 4,546 266.50 3,447 4,615 266.52 3,457 4,684 266.54 3,467 4,753 266.56 3,478 4,822 266.58 3,488 4,892 266.60 3,498 4,962 266.62 3,508 5,032 266.64 3,518 5,102 266.66 3,529 5,173 266.68 3,539 5,243 266.70 3,549 5,314 266.72 3,559 5,385 266.74 3,569 5,457 266.76 3,580 5,528 266.78 3,590 5,600 266.80 3,600 5,672 266.82 3,610 5,744 266.84 3,620 5,816 266.86 3,631 5,889 266.88 3,641 5,961 266.90 3,651 6,034 266.92 3,661 6,107 266.94 3,671 6,181 266.96 3,682 6,254 266.98 3,692 6,328 267.00 3,702 6,402 267.02 3,713 6,476 267.04 3,723 6,551 267.06 3,734 6,625 267.08 3,745 6,700 267.10 3,756 6,775 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 17 Stage -Area -Storage for Pond P2M: P2 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 267.12 3,766 6,850 267.14 3,777 6,926 267.16 3,788 7,001 267.18 3,799 7,077 267.20 3,809 7,153 267.22 3,820 7,229 267.24 3,831 7,306 267.26 3,842 7,383 267.28 3,852 7,460 267.30 3,863 7,537 267.32 3,874 7,614 267.34 3,885 7,692 267.36 3,895 7,770 267.38 3,906 7,848 267.40 3,917 7,926 267.42 3,928 8,004 267.44 3,938 8,083 267.46 3,949 8,162 267.48 3,960 8,241 267.50 3,971 8,320 267.52 3,981 8,400 267.54 3,992 8,479 267.56 4,003 8,559 267.58 4,013 8,639 267.60 4,024 8,720 267.62 4,035 8,800 267.64 4,046 8,881 267.66 4,056 8,962 267.68 4,067 9,044 267.70 4,078 9,125 267.72 4,089 9,207 267.74 4,099 9,289 267.76 4,110 9,371 267.78 4,121 9,453 267.80 4,132 9,535 267.82 4,142 9,618 267.84 4,153 9,701 267.86 4,164 9,784 267.88 4,175 9,868 267.90 4,185 9,951 267.92 4,196 10,035 267.94 4,207 10,119 267.96 4,218 10,203 267.98 4,228 10,288 268.00 4,239 10,373 268.02 4,250 10,457 268.04 4,262 10,543 268.06 4,273 10,628 268.08 4,284 10,713 268.10 4,295 10,799 268.12 4,307 10,885 268.14 4,318 10,971 268.16 4,329 11,058 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 268.18 4,341 11,145 268.20 4,352 11,232 268.22 4,363 11,319 268.24 4,374 11,406 268.26 4,386 11,494 268.28 4,397 11,582 268.30 4,408 11,670 268.32 4,419 11,758 268.34 4,431 11,846 268.36 4,442 11,935 268.38 4,453 12,024 268.40 4,465 12,113 268.42 4,476 12,203 268.44 4,487 12,292 268.46 4,498 12,382 268.48 4,510 12,472 268.50 4,521 12,563 268.52 4,532 12,653 268.54 4,544 12,744 268.56 4,555 12,835 268.58 4,566 12,926 268.60 4,577 13,017 268.62 4,589 13,109 268.64 4,600 13,201 268.66 4,611 13,293 268.68 4,623 13,385 268.70 4,634 13,478 268.72 4,645 13,571 268.74 4,656 13,664 268.76 4,668 13,757 268.78 4,679 13,850 268.80 4,690 13,944 268.82 4,701 14,038 268.84 4,713 14,132 268.86 4,724 14,227 268.88 4,735 14,321 268.90 4,747 14,416 268.92 4,758 14,511 268.94 4,769 14,606 268.96 4,780 14,702 268.98 4,792 14,798 269.00 4,803 14,894 269.02 4,815 14,990 269.04 4,827 15,086 269.06 4,838 15,183 269.08 4,850 15,280 269.10 4,862 15,377 269.12 4,874 15,474 269.14 4,885 15,572 269.16 4,897 15,670 269.18 4,909 15,768 269.20 4,921 15,866 269.22 4,933 15,964 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 18 Stage -Area -Storage for Pond P2M: P2 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 269.24 4,944 16,063 269.26 4,956 16,162 269.28 4,968 16,261 269.30 4,980 16,361 269.32 4,991 16,461 269.34 5,003 16,561 269.36 5,015 16,661 269.38 5,027 16,761 269.40 5,039 16,862 269.42 5,050 16,963 269.44 5,062 17,064 269.46 5,074 17,165 269.48 5,086 17,267 269.50 5,098 17,369 269.52 5,109 17,471 269.54 5,121 17,573 269.56 5,133 17,676 269.58 5,145 17,778 269.60 5,156 17,881 269.62 5,168 17,985 269.64 5,180 18,088 269.66 5,192 18,192 269.68 5,204 18,296 269.70 5,215 18,400 269.72 5,227 18,504 269.74 5,239 18,609 269.76 5,251 18,714 269.78 5,262 18,819 269.80 5,274 18,924 269.82 5,286 19,030 269.84 5,298 19,136 269.86 5,310 19,242 269.88 5,321 19,348 269.90 5,333 19,455 269.92 5,345 19,562 269.94 5,357 19,669 269.96 5,368 19,776 269.98 5,380 19,883 270.00 5,392 19,991 270.02 5,429 20,099 270.04 5,466 20,208 270.06 5,504 20,318 270.08 5,541 20,428 270.10 5,578 20,540 270.12 5,615 20,651 270.14 5,653 20,764 270.16 5,690 20,878 270.18 5,727 20,992 270.20 5,764 21,107 270.22 5,802 21,222 270.24 5,839 21,339 270.26 5,876 21,456 270.28 5,913 21,574 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 270.30 5,951 21,692 270.32 5,988 21,812 270.34 6,025 21,932 270.36 6,062 22,053 270.38 6,100 22,174 270.40 6,137 22,297 270.42 6,174 22,420 270.44 6,211 22,544 270.46 6,249 22,668 270.48 6,286 22,794 270.50 6,323 22,920 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 19 Stage -Area -Storage for Pond P3F: P3 Forebay Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 293.00 165 0 293.01 166 2 293.02 167 3 293.03 169 5 293.04 170 7 293.05 171 8 293.06 172 10 293.07 174 12 293.08 175 14 293.09 176 15 293.10 177 17 293.11 178 19 293.12 180 21 293.13 181 22 293.14 182 24 293.15 183 26 293.16 185 28 293.17 186 30 293.18 187 32 293.19 188 34 293.20 189 35 293.21 191 37 293.22 192 39 293.23 193 41 293.24 194 43 293.25 196 45 293.26 197 47 293.27 198 49 293.28 199 51 293.29 200 53 293.30 202 55 293.31 203 57 293.32 204 59 293.33 205 61 293.34 206 63 293.35 208 65 293.36 209 67 293.37 210 69 293.38 211 72 293.39 213 74 293.40 214 76 293.41 215 78 293.42 216 80 293.43 217 82 293.44 219 84 293.45 220 87 293.46 221 89 293.47 222 91 293.48 224 93 293.49 225 95 293.50 226 98 293.51 227 100 293.52 228 102 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 293.53 230 105 293.54 231 107 293.55 232 109 293.56 233 112 293.57 235 114 293.58 236 116 293.59 237 119 293.60 238 121 293.61 239 123 293.62 241 126 293.63 242 128 293.64 243 131 293.65 244 133 293.66 246 135 293.67 247 138 293.68 248 140 293.69 249 143 293.70 250 145 293.71 252 148 293.72 253 150 293.73 254 153 293.74 255 156 293.75 257 158 293.76 258 161 293.77 259 163 293.78 260 166 293.79 261 168 293.80 263 171 293.81 264 174 293.82 265 176 293.83 266 179 293.84 267 182 293.85 269 184 293.86 270 187 293.87 271 190 293.88 272 192 293.89 274 195 293.90 275 198 293.91 276 201 293.92 277 203 293.93 278 206 293.94 280 209 293.95 281 212 293.96 282 215 293.97 283 217 293.98 285 220 293.99 286 223 294.00 287 226 294.01 288 229 294.02 290 232 294.03 291 235 294.04 293 238 294.05 294 241 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 20 Stage -Area -Storage for Pond P3F: P3 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 294.06 296 243 294.07 297 246 294.08 299 249 294.09 300 252 294.10 302 255 294.11 303 258 294.12 305 262 294.13 306 265 294.14 308 268 294.15 309 271 294.16 311 274 294.17 312 277 294.18 314 280 294.19 315 283 294.20 317 286 294.21 318 290 294.22 320 293 294.23 321 296 294.24 323 299 294.25 324 302 294.26 325 306 294.27 327 309 294.28 328 312 294.29 330 315 294.30 331 319 294.31 333 322 294.32 334 325 294.33 336 329 294.34 337 332 294.35 339 336 294.36 340 339 294.37 342 342 294.38 343 346 294.39 345 349 294.40 346 353 294.41 348 356 294.42 349 360 294.43 351 363 294.44 352 367 294.45 354 370 294.46 355 374 294.47 357 377 294.48 358 381 294.49 360 384 294.50 361 388 294.51 362 392 294.52 364 395 294.53 365 399 294.54 367 403 294.55 368 406 294.56 370 410 294.57 371 414 294.58 373 417 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 294.59 374 421 294.60 376 425 294.61 377 429 294.62 379 432 294.63 380 436 294.64 382 440 294.65 383 444 294.66 385 448 294.67 386 452 294.68 388 455 294.69 389 459 294.70 391 463 294.71 392 467 294.72 394 471 294.73 395 475 294.74 397 479 294.75 398 483 294.76 399 487 294.77 401 491 294.78 402 495 294.79 404 499 294.80 405 503 294.81 407 507 294.82 408 511 294.83 410 515 294.84 411 519 294.85 413 523 294.86 414 528 294.87 416 532 294.88 417 536 294.89 419 540 294.90 420 544 294.91 422 548 294.92 423 553 294.93 425 557 294.94 426 561 294.95 428 565 294.96 429 570 294.97 431 574 294.98 432 578 294.99 434 583 295.00 435 587 295.01 437 591 295.02 438 596 295.03 440 600 295.04 442 605 295.05 444 609 295.06 445 613 295.07 447 618 295.08 449 622 295.09 451 627 295.10 452 631 295.11 454 636 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 21 Stage -Area -Storage for Pond P3F: P3 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 295.12 456 640 295.13 457 645 295.14 459 650 295.15 461 654 295.16 463 659 295.17 464 663 295.18 466 668 295.19 468 673 295.20 470 677 295.21 471 682 295.22 473 687 295.23 475 692 295.24 477 696 295.25 478 701 295.26 480 706 295.27 482 711 295.28 483 716 295.29 485 720 295.30 487 725 295.31 489 730 295.32 490 735 295.33 492 740 295.34 494 745 295.35 496 750 295.36 497 755 295.37 499 760 295.38 501 765 295.39 502 770 295.40 504 775 295.41 506 780 295.42 508 785 295.43 509 790 295.44 511 795 295.45 513 800 295.46 515 805 295.47 516 811 295.48 518 816 295.49 520 821 295.50 522 826 295.51 523 831 295.52 525 837 295.53 527 842 295.54 528 847 295.55 530 852 295.56 532 858 295.57 534 863 295.58 535 868 295.59 537 874 295.60 539 879 295.61 541 885 295.62 542 890 295.63 544 895 295.64 546 901 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 295.65 547 906 295.66 549 912 295.67 551 917 295.68 553 923 295.69 554 928 295.70 556 934 295.71 558 939 295.72 560 945 295.73 561 951 295.74 563 956 295.75 565 962 295.76 566 968 295.77 568 973 295.78 570 979 295.79 572 985 295.80 573 990 295.81 575 996 295.82 577 1,002 295.83 579 1,008 295.84 580 1,013 295.85 582 1,019 295.86 584 1,025 295.87 586 1,031 295.88 587 1,037 295.89 589 1,043 295.90 591 1,049 295.91 592 1,054 295.92 594 1,060 295.93 596 1,066 295.94 598 1,072 295.95 599 1,078 295.96 601 1,084 295.97 603 1,090 295.98 605 1,096 295.99 606 1,102 296.00 608 1,109 296.01 610 1,115 296.02 612 1,121 296.03 614 1,127 296.04 616 1,133 296.05 618 1,139 296.06 620 1,145 296.07 622 1,152 296.08 624 1,158 296.09 626 1,164 296.10 628 1,170 296.11 630 1,177 296.12 632 1,183 296.13 634 1,189 296.14 636 1,196 296.15 638 1,202 296.16 640 1,208 296.17 642 1,215 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 22 Stage -Area -Storage for Pond P3F: P3 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 296.18 644 1,221 296.19 646 1,228 296.20 648 1,234 296.21 650 1,241 296.22 652 1,247 296.23 654 1,254 296.24 656 1,260 296.25 658 1,267 296.26 659 1,273 296.27 661 1,280 296.28 663 1,287 296.29 665 1,293 296.30 667 1,300 296.31 669 1,306 296.32 671 1,313 296.33 673 1,320 296.34 675 1,327 296.35 677 1,333 296.36 679 1,340 296.37 681 1,347 296.38 683 1,354 296.39 685 1,361 296.40 687 1,368 296.41 689 1,374 296.42 691 1,381 296.43 693 1,388 296.44 695 1,395 296.45 697 1,402 296.46 699 1,409 296.47 701 1,416 296.48 703 1,423 296.49 705 1,430 296.50 707 1,437 296.51 709 1,444 296.52 711 1,451 296.53 713 1,459 296.54 715 1,466 296.55 717 1,473 296.56 719 1,480 296.57 721 1,487 296.58 723 1,494 296.59 725 1,502 296.60 727 1,509 296.61 729 1,516 296.62 731 1,524 296.63 733 1,531 296.64 735 1,538 296.65 737 1,546 296.66 739 1,553 296.67 741 1,560 296.68 743 1,568 296.69 745 1,575 296.70 747 1,583 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 296.71 749 1,590 296.72 751 1,598 296.73 753 1,605 296.74 755 1,613 296.75 757 1,620 296.76 758 1,628 296.77 760 1,635 296.78 762 1,643 296.79 764 1,651 296.80 766 1,658 296.81 768 1,666 296.82 770 1,674 296.83 772 1,681 296.84 774 1,689 296.85 776 1,697 296.86 778 1,705 296.87 780 1,712 296.88 782 1,720 296.89 784 1,728 296.90 786 1,736 296.91 788 1,744 296.92 790 1,752 296.93 792 1,760 296.94 794 1,767 296.95 796 1,775 296.96 798 1,783 296.97 800 1,791 296.98 802 1,799 296.99 804 1,807 297.00 806 1,816 297.01 818 1,824 297.02 830 1,832 297.03 841 1,840 297.04 853 1,849 297.05 865 1,857 297.06 877 1,866 297.07 889 1,875 297.08 900 1,884 297.09 912 1,893 297.10 924 1,902 297.11 936 1,911 297.12 948 1,921 297.13 959 1,930 297.14 971 1,940 297.15 983 1,950 297.16 995 1,960 297.17 1,007 1,970 297.18 1,018 1,980 297.19 1,030 1,990 297.20 1,042 2,000 297.21 1,054 2,011 297.22 1,066 2,021 297.23 1,077 2,032 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 23 Stage -Area -Storage for Pond P3F: P3 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 297.24 1,089 2,043 297.25 1,101 2,054 297.26 1,113 2,065 297.27 1,125 2,076 297.28 1,136 2,087 297.29 1,148 2,099 297.30 1,160 2,110 297.31 1,172 2,122 297.32 1,184 2,134 297.33 1,195 2,146 297.34 1,207 2,158 297.35 1,219 2,170 297.36 1,231 2,182 297.37 1,243 2,194 297.38 1,254 2,207 297.39 1,266 2,220 297.40 1,278 2,232 297.41 1,290 2,245 297.42 1,302 2,258 297.43 1,313 2,271 297.44 1,325 2,284 297.45 1,337 2,298 297.46 1,349 2,311 297.47 1,361 2,325 297.48 1,372 2,338 297.49 1,384 2,352 297.50 1,396 2,366 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 24 Stage -Area -Storage for Pond P3M: P3 Main Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 291.00 827 0 291.02 834 17 291.04 840 33 291.06 847 50 291.08 853 67 291.10 860 84 291.12 867 102 291.14 873 119 291.16 880 137 291.18 887 154 291.20 893 172 291.22 900 190 291.24 906 208 291.26 913 226 291.28 920 245 291.30 926 263 291.32 933 282 291.34 940 300 291.36 946 319 291.38 953 338 291.40 959 357 291.42 966 377 291.44 973 396 291.46 979 415 291.48 986 435 291.50 993 455 291.52 999 475 291.54 1,006 495 291.56 1,012 515 291.58 1,019 535 291.60 1,026 556 291.62 1,032 576 291.64 1,039 597 291.66 1,045 618 291.68 1,052 639 291.70 1,059 660 291.72 1,065 681 291.74 1,072 703 291.76 1,079 724 291.78 1,085 746 291.80 1,092 768 291.82 1,098 789 291.84 1,105 811 291.86 1,112 834 291.88 1,118 856 291.90 1,125 878 291.92 1,132 901 291.94 1,138 924 291.96 1,145 946 291.98 1,151 969 292.00 1,158 993 292.02 1,166 1,016 292.04 1,173 1,039 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 292.06 1,181 1,063 292.08 1,188 1,086 292.10 1,196 1,110 292.12 1,203 1,134 292.14 1,211 1,158 292.16 1,219 1,183 292.18 1,226 1,207 292.20 1,234 1,232 292.22 1,241 1,256 292.24 1,249 1,281 292.26 1,257 1,306 292.28 1,264 1,332 292.30 1,272 1,357 292.32 1,279 1,382 292.34 1,287 1,408 292.36 1,294 1,434 292.38 1,302 1,460 292.40 1,310 1,486 292.42 1,317 1,512 292.44 1,325 1,539 292.46 1,332 1,565 292.48 1,340 1,592 292.50 1,348 1,619 292.52 1,355 1,646 292.54 1,363 1,673 292.56 1,370 1,700 292.58 1,378 1,728 292.60 1,385 1,756 292.62 1,393 1,783 292.64 1,401 1,811 292.66 1,408 1,839 292.68 1,416 1,868 292.70 1,423 1,896 292.72 1,431 1,924 292.74 1,438 1,953 292.76 1,446 1,982 292.78 1,454 2,011 292.80 1,461 2,040 292.82 1,469 2,069 292.84 1,476 2,099 292.86 1,484 2,129 292.88 1,492 2,158 292.90 1,499 2,188 292.92 1,507 2,218 292.94 1,514 2,248 292.96 1,522 2,279 292.98 1,529 2,309 293.00 1,537 2,340 293.02 1,546 2,371 293.04 1,554 2,402 293.06 1,563 2,433 293.08 1,571 2,464 293.10 1,580 2,496 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 25 Stage -Area -Storage for Pond P3M: P3 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 293.12 1,588 2,528 293.14 1,597 2,559 293.16 1,605 2,591 293.18 1,614 2,624 293.20 1,622 2,656 293.22 1,631 2,688 293.24 1,639 2,721 293.26 1,648 2,754 293.28 1,657 2,787 293.30 1,665 2,820 293.32 1,674 2,854 293.34 1,682 2,887 293.36 1,691 2,921 293.38 1,699 2,955 293.40 1,708 2,989 293.42 1,716 3,023 293.44 1,725 3,058 293.46 1,733 3,092 293.48 1,742 3,127 293.50 1,751 3,162 293.52 1,759 3,197 293.54 1,768 3,232 293.56 1,776 3,268 293.58 1,785 3,303 293.60 1,793 3,339 293.62 1,802 3,375 293.64 1,810 3,411 293.66 1,819 3,447 293.68 1,827 3,484 293.70 1,836 3,521 293.72 1,844 3,557 293.74 1,853 3,594 293.76 1,862 3,631 293.78 1,870 3,669 293.80 1,879 3,706 293.82 1,887 3,744 293.84 1,896 3,782 293.86 1,904 3,820 293.88 1,913 3,858 293.90 1,921 3,896 293.92 1,930 3,935 293.94 1,938 3,973 293.96 1,947 4,012 293.98 1,955 4,051 294.00 1,964 4,091 294.02 1,973 4,130 294.04 1,983 4,169 294.06 1,992 4,209 294.08 2,002 4,249 294.10 2,011 4,289 294.12 2,021 4,330 294.14 2,030 4,370 294.16 2,040 4,411 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 294.18 2,049 4,452 294.20 2,059 4,493 294.22 2,068 4,534 294.24 2,078 4,575 294.26 2,087 4,617 294.28 2,096 4,659 294.30 2,106 4,701 294.32 2,115 4,743 294.34 2,125 4,786 294.36 2,134 4,828 294.38 2,144 4,871 294.40 2,153 4,914 294.42 2,163 4,957 294.44 2,172 5,000 294.46 2,182 5,044 294.48 2,191 5,088 294.50 2,201 5,132 294.52 2,210 5,176 294.54 2,219 5,220 294.56 2,229 5,265 294.58 2,238 5,309 294.60 2,248 5,354 294.62 2,257 5,399 294.64 2,267 5,444 294.66 2,276 5,490 294.68 2,286 5,535 294.70 2,295 5,581 294.72 2,305 5,627 294.74 2,314 5,673 294.76 2,323 5,720 294.78 2,333 5,766 294.80 2,342 5,813 294.82 2,352 5,860 294.84 2,361 5,907 294.86 2,371 5,954 294.88 2,380 6,002 294.90 2,390 6,050 294.92 2,399 6,098 294.94 2,409 6,146 294.96 2,418 6,194 294.98 2,428 6,242 295.00 2,437 6,291 295.02 2,447 6,340 295.04 2,457 6,389 295.06 2,467 6,438 295.08 2,477 6,488 295.10 2,487 6,537 295.12 2,497 6,587 295.14 2,507 6,637 295.16 2,517 6,687 295.18 2,527 6,738 295.20 2,537 6,788 295.22 2,547 6,839 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 26 Stage -Area -Storage for Pond P3M: P3 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 295.24 2,557 6,890 295.26 2,567 6,942 295.28 2,577 6,993 295.30 2,587 7,045 295.32 2,597 7,096 295.34 2,607 7,148 295.36 2,617 7,201 295.38 2,627 7,253 295.40 2,637 7,306 295.42 2,647 7,359 295.44 2,657 7,412 295.46 2,667 7,465 295.48 2,677 7,518 295.50 2,687 7,572 295.52 2,697 7,626 295.54 2,707 7,680 295.56 2,717 7,734 295.58 2,727 7,789 295.60 2,737 7,843 295.62 2,747 7,898 295.64 2,757 7,953 295.66 2,767 8,008 295.68 2,777 8,064 295.70 2,787 8,119 295.72 2,797 8,175 295.74 2,807 8,231 295.76 2,817 8,288 295.78 2,827 8,344 295.80 2,837 8,401 295.82 2,847 8,457 295.84 2,857 8,514 295.86 2,867 8,572 295.88 2,877 8,629 295.90 2,887 8,687 295.92 2,897 8,745 295.94 2,907 8,803 295.96 2,917 8,861 295.98 2,927 8,919 296.00 2,937 8,978 296.02 2,947 9,037 296.04 2,958 9,096 296.06 2,969 9,155 296.08 2,979 9,215 296.10 2,990 9,274 296.12 3,000 9,334 296.14 3,010 9,394 296.16 3,021 9,455 296.18 3,032 9,515 296.20 3,042 9,576 296.22 3,053 9,637 296.24 3,063 9,698 296.26 3,073 9,759 296.28 3,084 9,821 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 296.30 3,095 9,883 296.32 3,105 9,945 296.34 3,115 10,007 296.36 3,126 10,069 296.38 3,136 10,132 296.40 3,147 10,195 296.42 3,158 10,258 296.44 3,168 10,321 296.46 3,178 10,385 296.48 3,189 10,448 296.50 3,200 10,512 296.52 3,210 10,576 296.54 3,221 10,641 296.56 3,231 10,705 296.58 3,241 10,770 296.60 3,252 10,835 296.62 3,263 10,900 296.64 3,273 10,965 296.66 3,284 11,031 296.68 3,294 11,097 296.70 3,304 11,163 296.72 3,315 11,229 296.74 3,326 11,295 296.76 3,336 11,362 296.78 3,346 11,429 296.80 3,357 11,496 296.82 3,367 11,563 296.84 3,378 11,630 296.86 3,389 11,698 296.88 3,399 11,766 296.90 3,409 11,834 296.92 3,420 11,902 296.94 3,430 11,971 296.96 3,441 12,039 296.98 3,452 12,108 297.00 3,462 12,178 297.02 3,506 12,247 297.04 3,551 12,318 297.06 3,595 12,389 297.08 3,639 12,462 297.10 3,684 12,535 297.12 3,728 12,609 297.14 3,772 12,684 297.16 3,817 12,760 297.18 3,861 12,837 297.20 3,905 12,914 297.22 3,950 12,993 297.24 3,994 13,072 297.26 4,038 13,153 297.28 4,082 13,234 297.30 4,127 13,316 297.32 4,171 13,399 297.34 4,215 13,483 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 27 Stage -Area -Storage for Pond P3M: P3 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 297.36 4,260 13,567 297.38 4,304 13,653 297.40 4,348 13,740 297.42 4,393 13,827 297.44 4,437 13,915 297.46 4,481 14,004 297.48 4,526 14,095 297.50 4,570 14,186 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 28 Stage -Area -Storage for Pond P4F: P4 Forebay Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 259.00 883 0 259.01 886 9 259.02 888 18 259.03 891 27 259.04 894 36 259.05 896 44 259.06 899 53 259.07 901 62 259.08 904 71 259.09 907 81 259.10 909 90 259.11 912 99 259.12 915 108 259.13 917 117 259.14 920 126 259.15 923 135 259.16 925 145 259.17 928 154 259.18 931 163 259.19 933 173 259.20 936 182 259.21 938 191 259.22 941 201 259.23 944 210 259.24 946 220 259.25 949 229 259.26 952 239 259.27 954 248 259.28 957 258 259.29 960 267 259.30 962 277 259.31 965 286 259.32 967 296 259.33 970 306 259.34 973 315 259.35 975 325 259.36 978 335 259.37 981 345 259.38 983 355 259.39 986 364 259.40 989 374 259.41 991 384 259.42 994 394 259.43 997 404 259.44 999 414 259.45 1,002 424 259.46 1,004 434 259.47 1,007 444 259.48 1,010 454 259.49 1,012 464 259.50 1,015 475 259.51 1,018 485 259.52 1,020 495 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 259.53 1,023 505 259.54 1,026 515 259.55 1,028 526 259.56 1,031 536 259.57 1,033 546 259.58 1,036 557 259.59 1,039 567 259.60 1,041 577 259.61 1,044 588 259.62 1,047 598 259.63 1,049 609 259.64 1,052 619 259.65 1,055 630 259.66 1,057 640 259.67 1,060 651 259.68 1,063 661 259.69 1,065 672 259.70 1,068 683 259.71 1,070 693 259.72 1,073 704 259.73 1,076 715 259.74 1,078 726 259.75 1,081 737 259.76 1,084 747 259.77 1,086 758 259.78 1,089 769 259.79 1,092 780 259.80 1,094 791 259.81 1,097 802 259.82 1,099 813 259.83 1,102 824 259.84 1,105 835 259.85 1,107 846 259.86 1,110 857 259.87 1,113 868 259.88 1,115 879 259.89 1,118 890 259.90 1,121 902 259.91 1,123 913 259.92 1,126 924 259.93 1,129 935 259.94 1,131 947 259.95 1,134 958 259.96 1,136 969 259.97 1,139 981 259.98 1,142 992 259.99 1,144 1,004 260.00 1,147 1,015 260.01 1,150 1,026 260.02 1,153 1,038 260.03 1,156 1,050 260.04 1,159 1,061 260.05 1,162 1,073 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 29 Stage -Area -Storage for Pond P4F: P4 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 260.06 1,164 1,084 260.07 1,167 1,096 260.08 1,170 1,108 260.09 1,173 1,119 260.10 1,176 1,131 260.11 1,179 1,143 260.12 1,182 1,155 260.13 1,185 1,167 260.14 1,188 1,178 260.15 1,190 1,190 260.16 1,193 1,202 260.17 1,196 1,214 260.18 1,199 1,226 260.19 1,202 1,238 260.20 1,205 1,250 260.21 1,208 1,262 260.22 1,211 1,274 260.23 1,214 1,286 260.24 1,217 1,299 260.25 1,220 1,311 260.26 1,222 1,323 260.27 1,225 1,335 260.28 1,228 1,348 260.29 1,231 1,360 260.30 1,234 1,372 260.31 1,237 1,385 260.32 1,240 1,397 260.33 1,243 1,409 260.34 1,246 1,422 260.35 1,249 1,434 260.36 1,251 1,447 260.37 1,254 1,459 260.38 1,257 1,472 260.39 1,260 1,484 260.40 1,263 1,497 260.41 1,266 1,510 260.42 1,269 1,522 260.43 1,272 1,535 260.44 1,275 1,548 260.45 1,277 1,561 260.46 1,280 1,573 260.47 1,283 1,586 260.48 1,286 1,599 260.49 1,289 1,612 260.50 1,292 1,625 260.51 1,295 1,638 260.52 1,298 1,651 260.53 1,301 1,664 260.54 1,304 1,677 260.55 1,307 1,690 260.56 1,309 1,703 260.57 1,312 1,716 260.58 1,315 1,729 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 260.59 1,318 1,742 260.60 1,321 1,755 260.61 1,324 1,769 260.62 1,327 1,782 260.63 1,330 1,795 260.64 1,333 1,808 260.65 1,335 1,822 260.66 1,338 1,835 260.67 1,341 1,849 260.68 1,344 1,862 260.69 1,347 1,875 260.70 1,350 1,889 260.71 1,353 1,902 260.72 1,356 1,916 260.73 1,359 1,930 260.74 1,362 1,943 260.75 1,365 1,957 260.76 1,367 1,970 260.77 1,370 1,984 260.78 1,373 1,998 260.79 1,376 2,012 260.80 1,379 2,025 260.81 1,382 2,039 260.82 1,385 2,053 260.83 1,388 2,067 260.84 1,391 2,081 260.85 1,394 2,095 260.86 1,396 2,109 260.87 1,399 2,123 260.88 1,402 2,137 260.89 1,405 2,151 260.90 1,408 2,165 260.91 1,411 2,179 260.92 1,414 2,193 260.93 1,417 2,207 260.94 1,420 2,221 260.95 1,422 2,236 260.96 1,425 2,250 260.97 1,428 2,264 260.98 1,431 2,278 260.99 1,434 2,293 261.00 1,437 2,307 261.01 1,440 2,321 261.02 1,443 2,336 261.03 1,446 2,350 261.04 1,450 2,365 261.05 1,453 2,379 261.06 1,456 2,394 261.07 1,459 2,408 261.08 1,462 2,423 261.09 1,465 2,438 261.10 1,469 2,452 261.11 1,472 2,467 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 30 Stage -Area -Storage for Pond P4F: P4 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 261.12 1,475 2,482 261.13 1,478 2,496 261.14 1,481 2,511 261.15 1,484 2,526 261.16 1,487 2,541 261.17 1,491 2,556 261.18 1,494 2,571 261.19 1,497 2,586 261.20 1,500 2,601 261.21 1,503 2,616 261.22 1,506 2,631 261.23 1,509 2,646 261.24 1,513 2,661 261.25 1,516 2,676 261.26 1,519 2,691 261.27 1,522 2,706 261.28 1,525 2,722 261.29 1,528 2,737 261.30 1,532 2,752 261.31 1,535 2,768 261.32 1,538 2,783 261.33 1,541 2,798 261.34 1,544 2,814 261.35 1,547 2,829 261.36 1,550 2,845 261.37 1,554 2,860 261.38 1,557 2,876 261.39 1,560 2,891 261.40 1,563 2,907 261.41 1,566 2,923 261.42 1,569 2,938 261.43 1,572 2,954 261.44 1,576 2,970 261.45 1,579 2,986 261.46 1,582 3,001 261.47 1,585 3,017 261.48 1,588 3,033 261.49 1,591 3,049 261.50 1,595 3,065 261.51 1,598 3,081 261.52 1,601 3,097 261.53 1,604 3,113 261.54 1,607 3,129 261.55 1,610 3,145 261.56 1,613 3,161 261.57 1,617 3,177 261.58 1,620 3,193 261.59 1,623 3,210 261.60 1,626 3,226 261.61 1,629 3,242 261.62 1,632 3,258 261.63 1,635 3,275 261.64 1,639 3,291 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 261.65 1,642 3,308 261.66 1,645 3,324 261.67 1,648 3,340 261.68 1,651 3,357 261.69 1,654 3,374 261.70 1,657 3,390 261.71 1,661 3,407 261.72 1,664 3,423 261.73 1,667 3,440 261.74 1,670 3,457 261.75 1,673 3,473 261.76 1,676 3,490 261.77 1,680 3,507 261.78 1,683 3,524 261.79 1,686 3,541 261.80 1,689 3,557 261.81 1,692 3,574 261.82 1,695 3,591 261.83 1,698 3,608 261.84 1,702 3,625 261.85 1,705 3,642 261.86 1,708 3,659 261.87 1,711 3,676 261.88 1,714 3,694 261.89 1,717 3,711 261.90 1,720 3,728 261.91 1,724 3,745 261.92 1,727 3,762 261.93 1,730 3,780 261.94 1,733 3,797 261.95 1,736 3,814 261.96 1,739 3,832 261.97 1,743 3,849 261.98 1,746 3,867 261.99 1,749 3,884 262.00 1,752 3,902 262.01 1,755 3,919 262.02 1,759 3,937 262.03 1,762 3,954 262.04 1,766 3,972 262.05 1,769 3,990 262.06 1,772 4,007 262.07 1,776 4,025 262.08 1,779 4,043 262.09 1,783 4,061 262.10 1,786 4,078 262.11 1,789 4,096 262.12 1,793 4,114 262.13 1,796 4,132 262.14 1,799 4,150 262.15 1,803 4,168 262.16 1,806 4,186 262.17 1,810 4,204 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 31 Stage -Area -Storage for Pond P4F: P4 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 262.18 1,813 4,222 262.19 1,816 4,240 262.20 1,820 4,259 262.21 1,823 4,277 262.22 1,827 4,295 262.23 1,830 4,313 262.24 1,833 4,332 262.25 1,837 4,350 262.26 1,840 4,368 262.27 1,844 4,387 262.28 1,847 4,405 262.29 1,850 4,424 262.30 1,854 4,442 262.31 1,857 4,461 262.32 1,860 4,479 262.33 1,864 4,498 262.34 1,867 4,517 262.35 1,871 4,535 262.36 1,874 4,554 262.37 1,877 4,573 262.38 1,881 4,592 262.39 1,884 4,611 262.40 1,888 4,629 262.41 1,891 4,648 262.42 1,894 4,667 262.43 1,898 4,686 262.44 1,901 4,705 262.45 1,905 4,724 262.46 1,908 4,743 262.47 1,911 4,762 262.48 1,915 4,782 262.49 1,918 4,801 262.50 1,922 4,820 262.51 1,925 4,839 262.52 1,928 4,858 262.53 1,932 4,878 262.54 1,935 4,897 262.55 1,938 4,916 262.56 1,942 4,936 262.57 1,945 4,955 262.58 1,949 4,975 262.59 1,952 4,994 262.60 1,955 5,014 262.61 1,959 5,033 262.62 1,962 5,053 262.63 1,966 5,073 262.64 1,969 5,092 262.65 1,972 5,112 262.66 1,976 5,132 262.67 1,979 5,151 262.68 1,983 5,171 262.69 1,986 5,191 262.70 1,989 5,211 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 262.71 1,993 5,231 262.72 1,996 5,251 262.73 1,999 5,271 262.74 2,003 5,291 262.75 2,006 5,311 262.76 2,010 5,331 262.77 2,013 5,351 262.78 2,016 5,371 262.79 2,020 5,391 262.80 2,023 5,412 262.81 2,027 5,432 262.82 2,030 5,452 262.83 2,033 5,472 262.84 2,037 5,493 262.85 2,040 5,513 262.86 2,044 5,534 262.87 2,047 5,554 262.88 2,050 5,575 262.89 2,054 5,595 262.90 2,057 5,616 262.91 2,060 5,636 262.92 2,064 5,657 262.93 2,067 5,677 262.94 2,071 5,698 262.95 2,074 5,719 262.96 2,077 5,740 262.97 2,081 5,760 262.98 2,084 5,781 262.99 2,088 5,802 263.00 2,091 5,823 263.01 2,102 5,844 263.02 2,113 5,865 263.03 2,124 5,886 263.04 2,136 5,908 263.05 2,147 5,929 263.06 2,158 5,950 263.07 2,169 5,972 263.08 2,180 5,994 263.09 2,191 6,016 263.10 2,202 6,038 263.11 2,214 6,060 263.12 2,225 6,082 263.13 2,236 6,104 263.14 2,247 6,127 263.15 2,258 6,149 263.16 2,269 6,172 263.17 2,280 6,195 263.18 2,292 6,217 263.19 2,303 6,240 263.20 2,314 6,263 263.21 2,325 6,287 263.22 2,336 6,310 263.23 2,347 6,333 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 32 Stage -Area -Storage for Pond P4F: P4 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 263.24 2,358 6,357 263.25 2,370 6,381 263.26 2,381 6,404 263.27 2,392 6,428 263.28 2,403 6,452 263.29 2,414 6,476 263.30 2,425 6,500 263.31 2,436 6,525 263.32 2,447 6,549 263.33 2,459 6,574 263.34 2,470 6,598 263.35 2,481 6,623 263.36 2,492 6,648 263.37 2,503 6,673 263.38 2,514 6,698 263.39 2,525 6,723 263.40 2,537 6,749 263.41 2,548 6,774 263.42 2,559 6,799 263.43 2,570 6,825 263.44 2,581 6,851 263.45 2,592 6,877 263.46 2,603 6,903 263.47 2,615 6,929 263.48 2,626 6,955 263.49 2,637 6,981 263.50 2,648 7,008 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 33 Stage -Area -Storage for Pond P4M: P4 Main Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 258.50 3,949 0 258.51 3,973 40 258.52 3,998 79 258.53 4,022 120 258.54 4,047 160 258.55 4,072 201 258.56 4,096 241 258.57 4,120 282 258.58 4,145 324 258.59 4,169 365 258.60 4,194 407 258.61 4,219 449 258.62 4,243 492 258.63 4,267 534 258.64 4,292 577 258.65 4,316 620 258.66 4,341 663 258.67 4,366 707 258.68 4,390 751 258.69 4,414 795 258.70 4,439 839 258.71 4,463 883 258.72 4,488 928 258.73 4,513 973 258.74 4,537 1,018 258.75 4,562 1,064 258.76 4,586 1,110 258.77 4,610 1,156 258.78 4,635 1,202 258.79 4,660 1,248 258.80 4,684 1,295 258.81 4,709 1,342 258.82 4,733 1,389 258.83 4,757 1,437 258.84 4,782 1,484 258.85 4,807 1,532 258.86 4,831 1,580 258.87 4,856 1,629 258.88 4,880 1,678 258.89 4,904 1,726 258.90 4,929 1,776 258.91 4,954 1,825 258.92 4,978 1,875 258.93 5,003 1,925 258.94 5,027 1,975 258.95 5,051 2,025 258.96 5,076 2,076 258.97 5,101 2,127 258.98 5,125 2,178 258.99 5,150 2,229 259.00 5,174 2,281 259.01 5,187 2,333 259.02 5,199 2,384 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 259.03 5,212 2,437 259.04 5,224 2,489 259.05 5,237 2,541 259.06 5,249 2,593 259.07 5,262 2,646 259.08 5,274 2,699 259.09 5,287 2,751 259.10 5,300 2,804 259.11 5,312 2,857 259.12 5,325 2,911 259.13 5,337 2,964 259.14 5,350 3,017 259.15 5,362 3,071 259.16 5,375 3,125 259.17 5,388 3,178 259.18 5,400 3,232 259.19 5,413 3,286 259.20 5,425 3,341 259.21 5,438 3,395 259.22 5,450 3,449 259.23 5,463 3,504 259.24 5,475 3,559 259.25 5,488 3,614 259.26 5,501 3,668 259.27 5,513 3,724 259.28 5,526 3,779 259.29 5,538 3,834 259.30 5,551 3,889 259.31 5,563 3,945 259.32 5,576 4,001 259.33 5,588 4,057 259.34 5,601 4,113 259.35 5,614 4,169 259.36 5,626 4,225 259.37 5,639 4,281 259.38 5,651 4,338 259.39 5,664 4,394 259.40 5,676 4,451 259.41 5,689 4,508 259.42 5,702 4,565 259.43 5,714 4,622 259.44 5,727 4,679 259.45 5,739 4,736 259.46 5,752 4,794 259.47 5,764 4,851 259.48 5,777 4,909 259.49 5,789 4,967 259.50 5,802 5,025 259.51 5,815 5,083 259.52 5,827 5,141 259.53 5,840 5,199 259.54 5,852 5,258 259.55 5,865 5,316 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 34 Stage -Area -Storage for Pond P4M: P4 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 259.56 5,877 5,375 259.57 5,890 5,434 259.58 5,902 5,493 259.59 5,915 5,552 259.60 5,928 5,611 259.61 5,940 5,671 259.62 5,953 5,730 259.63 5,965 5,790 259.64 5,978 5,849 259.65 5,990 5,909 259.66 6,003 5,969 259.67 6,016 6,029 259.68 6,028 6,089 259.69 6,041 6,150 259.70 6,053 6,210 259.71 6,066 6,271 259.72 6,078 6,332 259.73 6,091 6,392 259.74 6,103 6,453 259.75 6,116 6,515 259.76 6,129 6,576 259.77 6,141 6,637 259.78 6,154 6,699 259.79 6,166 6,760 259.80 6,179 6,822 259.81 6,191 6,884 259.82 6,204 6,946 259.83 6,216 7,008 259.84 6,229 7,070 259.85 6,242 7,132 259.86 6,254 7,195 259.87 6,267 7,257 259.88 6,279 7,320 259.89 6,292 7,383 259.90 6,304 7,446 259.91 6,317 7,509 259.92 6,330 7,572 259.93 6,342 7,636 259.94 6,355 7,699 259.95 6,367 7,763 259.96 6,380 7,827 259.97 6,392 7,890 259.98 6,405 7,954 259.99 6,417 8,019 260.00 6,430 8,083 260.01 6,443 8,147 260.02 6,456 8,212 260.03 6,469 8,276 260.04 6,481 8,341 260.05 6,494 8,406 260.06 6,507 8,471 260.07 6,520 8,536 260.08 6,533 8,601 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 260.09 6,546 8,667 260.10 6,558 8,732 260.11 6,571 8,798 260.12 6,584 8,864 260.13 6,597 8,929 260.14 6,610 8,996 260.15 6,623 9,062 260.16 6,635 9,128 260.17 6,648 9,194 260.18 6,661 9,261 260.19 6,674 9,328 260.20 6,687 9,394 260.21 6,700 9,461 260.22 6,712 9,528 260.23 6,725 9,596 260.24 6,738 9,663 260.25 6,751 9,730 260.26 6,764 9,798 260.27 6,777 9,866 260.28 6,790 9,933 260.29 6,802 10,001 260.30 6,815 10,070 260.31 6,828 10,138 260.32 6,841 10,206 260.33 6,854 10,275 260.34 6,867 10,343 260.35 6,879 10,412 260.36 6,892 10,481 260.37 6,905 10,550 260.38 6,918 10,619 260.39 6,931 10,688 260.40 6,944 10,757 260.41 6,956 10,827 260.42 6,969 10,897 260.43 6,982 10,966 260.44 6,995 11,036 260.45 7,008 11,106 260.46 7,021 11,176 260.47 7,033 11,247 260.48 7,046 11,317 260.49 7,059 11,388 260.50 7,072 11,458 260.51 7,085 11,529 260.52 7,098 11,600 260.53 7,111 11,671 260.54 7,123 11,742 260.55 7,136 11,813 260.56 7,149 11,885 260.57 7,162 11,956 260.58 7,175 12,028 260.59 7,188 12,100 260.60 7,200 12,172 260.61 7,213 12,244 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 35 Stage -Area -Storage for Pond P4M: P4 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 260.62 7,226 12,316 260.63 7,239 12,388 260.64 7,252 12,461 260.65 7,265 12,533 260.66 7,277 12,606 260.67 7,290 12,679 260.68 7,303 12,752 260.69 7,316 12,825 260.70 7,329 12,898 260.71 7,342 12,972 260.72 7,354 13,045 260.73 7,367 13,119 260.74 7,380 13,193 260.75 7,393 13,266 260.76 7,406 13,340 260.77 7,419 13,414 260.78 7,432 13,489 260.79 7,444 13,563 260.80 7,457 13,638 260.81 7,470 13,712 260.82 7,483 13,787 260.83 7,496 13,862 260.84 7,509 13,937 260.85 7,521 14,012 260.86 7,534 14,087 260.87 7,547 14,163 260.88 7,560 14,238 260.89 7,573 14,314 260.90 7,586 14,390 260.91 7,598 14,466 260.92 7,611 14,542 260.93 7,624 14,618 260.94 7,637 14,694 260.95 7,650 14,771 260.96 7,663 14,847 260.97 7,675 14,924 260.98 7,688 15,001 260.99 7,701 15,078 261.00 7,714 15,155 261.01 7,727 15,232 261.02 7,740 15,309 261.03 7,753 15,387 261.04 7,766 15,464 261.05 7,780 15,542 261.06 7,793 15,620 261.07 7,806 15,698 261.08 7,819 15,776 261.09 7,832 15,854 261.10 7,845 15,933 261.11 7,858 16,011 261.12 7,871 16,090 261.13 7,884 16,169 261.14 7,898 16,248 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 261.15 7,911 16,327 261.16 7,924 16,406 261.17 7,937 16,485 261.18 7,950 16,565 261.19 7,963 16,644 261.20 7,976 16,724 261.21 7,989 16,804 261.22 8,002 16,884 261.23 8,016 16,964 261.24 8,029 17,044 261.25 8,042 17,124 261.26 8,055 17,205 261.27 8,068 17,285 261.28 8,081 17,366 261.29 8,094 17,447 261.30 8,107 17,528 261.31 8,120 17,609 261.32 8,134 17,690 261.33 8,147 17,772 261.34 8,160 17,853 261.35 8,173 17,935 261.36 8,186 18,017 261.37 8,199 18,099 261.38 8,212 18,181 261.39 8,225 18,263 261.40 8,238 18,345 261.41 8,252 18,428 261.42 8,265 18,510 261.43 8,278 18,593 261.44 8,291 18,676 261.45 8,304 18,759 261.46 8,317 18,842 261.47 8,330 18,925 261.48 8,343 19,008 261.49 8,356 19,092 261.50 8,370 19,176 261.51 8,383 19,259 261.52 8,396 19,343 261.53 8,409 19,427 261.54 8,422 19,511 261.55 8,435 19,596 261.56 8,448 19,680 261.57 8,461 19,765 261.58 8,474 19,849 261.59 8,487 19,934 261.60 8,501 20,019 261.61 8,514 20,104 261.62 8,527 20,189 261.63 8,540 20,275 261.64 8,553 20,360 261.65 8,566 20,446 261.66 8,579 20,532 261.67 8,592 20,617 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 36 Stage -Area -Storage for Pond P4M: P4 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 261.68 8,605 20,703 261.69 8,619 20,789 261.70 8,632 20,876 261.71 8,645 20,962 261.72 8,658 21,049 261.73 8,671 21,135 261.74 8,684 21,222 261.75 8,697 21,309 261.76 8,710 21,396 261.77 8,723 21,483 261.78 8,737 21,570 261.79 8,750 21,658 261.80 8,763 21,745 261.81 8,776 21,833 261.82 8,789 21,921 261.83 8,802 22,009 261.84 8,815 22,097 261.85 8,828 22,185 261.86 8,841 22,274 261.87 8,855 22,362 261.88 8,868 22,451 261.89 8,881 22,539 261.90 8,894 22,628 261.91 8,907 22,717 261.92 8,920 22,806 261.93 8,933 22,896 261.94 8,946 22,985 261.95 8,959 23,075 261.96 8,973 23,164 261.97 8,986 23,254 261.98 8,999 23,344 261.99 9,012 23,434 262.00 9,025 23,524 262.01 9,038 23,615 262.02 9,052 23,705 262.03 9,065 23,796 262.04 9,078 23,886 262.05 9,092 23,977 262.06 9,105 24,068 262.07 9,119 24,159 262.08 9,132 24,251 262.09 9,145 24,342 262.10 9,159 24,433 262.11 9,172 24,525 262.12 9,185 24,617 262.13 9,199 24,709 262.14 9,212 24,801 262.15 9,225 24,893 262.16 9,239 24,985 262.17 9,252 25,078 262.18 9,265 25,170 262.19 9,279 25,263 262.20 9,292 25,356 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 262.21 9,306 25,449 262.22 9,319 25,542 262.23 9,332 25,635 262.24 9,346 25,729 262.25 9,359 25,822 262.26 9,372 25,916 262.27 9,386 26,010 262.28 9,399 26,104 262.29 9,412 26,198 262.30 9,426 26,292 262.31 9,439 26,386 262.32 9,453 26,481 262.33 9,466 26,575 262.34 9,479 26,670 262.35 9,493 26,765 262.36 9,506 26,860 262.37 9,519 26,955 262.38 9,533 27,050 262.39 9,546 27,146 262.40 9,559 27,241 262.41 9,573 27,337 262.42 9,586 27,433 262.43 9,599 27,529 262.44 9,613 27,625 262.45 9,626 27,721 262.46 9,640 27,817 262.47 9,653 27,914 262.48 9,666 28,010 262.49 9,680 28,107 262.50 9,693 28,204 262.51 9,706 28,301 262.52 9,720 28,398 262.53 9,733 28,495 262.54 9,746 28,593 262.55 9,760 28,690 262.56 9,773 28,788 262.57 9,787 28,886 262.58 9,800 28,983 262.59 9,813 29,082 262.60 9,827 29,180 262.61 9,840 29,278 262.62 9,853 29,377 262.63 9,867 29,475 262.64 9,880 29,574 262.65 9,893 29,673 262.66 9,907 29,772 262.67 9,920 29,871 262.68 9,933 29,970 262.69 9,947 30,070 262.70 9,960 30,169 262.71 9,974 30,269 262.72 9,987 30,369 262.73 10,000 30,468 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 37 Stage -Area -Storage for Pond P4M: P4 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 262.74 10,014 30,569 262.75 10,027 30,669 262.76 10,040 30,769 262.77 10,054 30,870 262.78 10,067 30,970 262.79 10,080 31,071 262.80 10,094 31,172 262.81 10,107 31,273 262.82 10,121 31,374 262.83 10,134 31,475 262.84 10,147 31,577 262.85 10,161 31,678 262.86 10,174 31,780 262.87 10,187 31,882 262.88 10,201 31,984 262.89 10,214 32,086 262.90 10,227 32,188 262.91 10,241 32,290 262.92 10,254 32,393 262.93 10,267 32,495 262.94 10,281 32,598 262.95 10,294 32,701 262.96 10,308 32,804 262.97 10,321 32,907 262.98 10,334 33,010 262.99 10,348 33,114 263.00 10,361 33,217 263.01 10,402 33,321 263.02 10,443 33,425 263.03 10,484 33,530 263.04 10,525 33,635 263.05 10,566 33,740 263.06 10,607 33,846 263.07 10,648 33,953 263.08 10,689 34,059 263.09 10,730 34,166 263.10 10,771 34,274 263.11 10,812 34,382 263.12 10,853 34,490 263.13 10,894 34,599 263.14 10,935 34,708 263.15 10,976 34,818 263.16 11,017 34,927 263.17 11,058 35,038 263.18 11,099 35,149 263.19 11,140 35,260 263.20 11,181 35,371 263.21 11,222 35,483 263.22 11,263 35,596 263.23 11,304 35,709 263.24 11,345 35,822 263.25 11,386 35,936 263.26 11,427 36,050 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 263.27 11,468 36,164 263.28 11,509 36,279 263.29 11,550 36,394 263.30 11,591 36,510 263.31 11,632 36,626 263.32 11,673 36,743 263.33 11,714 36,860 263.34 11,755 36,977 263.35 11,796 37,095 263.36 11,837 37,213 263.37 11,878 37,331 263.38 11,919 37,450 263.39 11,960 37,570 263.40 12,001 37,690 263.41 12,042 37,810 263.42 12,083 37,930 263.43 12,124 38,052 263.44 12,165 38,173 263.45 12,206 38,295 263.46 12,247 38,417 263.47 12,288 38,540 263.48 12,329 38,663 263.49 12,370 38,786 263.50 12,411 38,910 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 38 Stage -Area -Storage for Pond PSF: P5 Forebay Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 267.00 83 0 267.01 84 1 267.02 86 2 267.03 87 3 267.04 88 3 267.05 90 4 267.06 91 5 267.07 92 6 267.08 94 7 267.09 95 8 267.10 96 9 267.11 98 10 267.12 99 11 267.13 100 12 267.14 101 13 267.15 103 14 267.16 104 15 267.17 105 16 267.18 107 17 267.19 108 18 267.20 109 19 267.21 111 20 267.22 112 21 267.23 113 23 267.24 115 24 267.25 116 25 267.26 117 26 267.27 119 27 267.28 120 28 267.29 121 30 267.30 123 31 267.31 124 32 267.32 125 33 267.33 127 35 267.34 128 36 267.35 129 37 267.36 131 38 267.37 132 40 267.38 133 41 267.39 134 42 267.40 136 44 267.41 137 45 267.42 138 47 267.43 140 48 267.44 141 49 267.45 142 51 267.46 144 52 267.47 145 54 267.48 146 55 267.49 148 57 267.50 149 58 267.51 150 59 267.52 152 61 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 267.53 153 63 267.54 154 64 267.55 156 66 267.56 157 67 267.57 158 69 267.58 160 70 267.59 161 72 267.60 162 74 267.61 164 75 267.62 165 77 267.63 166 78 267.64 167 80 267.65 169 82 267.66 170 84 267.67 171 85 267.68 173 87 267.69 174 89 267.70 175 90 267.71 177 92 267.72 178 94 267.73 179 96 267.74 181 98 267.75 182 99 267.76 183 101 267.77 185 103 267.78 186 105 267.79 187 107 267.80 189 109 267.81 190 111 267.82 191 112 267.83 193 114 267.84 194 116 267.85 195 118 267.86 197 120 267.87 198 122 267.88 199 124 267.89 200 126 267.90 202 128 267.91 203 130 267.92 204 132 267.93 206 134 267.94 207 136 267.95 208 138 267.96 210 141 267.97 211 143 267.98 212 145 267.99 214 147 268.00 215 149 268.01 217 151 268.02 218 153 268.03 220 156 268.04 221 158 268.05 223 160 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 39 Stage -Area -Storage for Pond PSF: P5 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 268.06 225 162 268.07 226 164 268.08 228 167 268.09 229 169 268.10 231 171 268.11 232 174 268.12 234 176 268.13 236 178 268.14 237 181 268.15 239 183 268.16 240 185 268.17 242 188 268.18 244 190 268.19 245 193 268.20 247 195 268.21 248 198 268.22 250 200 268.23 252 203 268.24 253 205 268.25 255 208 268.26 256 210 268.27 258 213 268.28 260 215 268.29 261 218 268.30 263 221 268.31 264 223 268.32 266 226 268.33 267 229 268.34 269 231 268.35 271 234 268.36 272 237 268.37 274 239 268.38 275 242 268.39 277 245 268.40 279 248 268.41 280 251 268.42 282 253 268.43 283 256 268.44 285 259 268.45 287 262 268.46 288 265 268.47 290 268 268.48 291 271 268.49 293 273 268.50 295 276 268.51 296 279 268.52 298 282 268.53 299 285 268.54 301 288 268.55 302 291 268.56 304 294 268.57 306 297 268.58 307 300 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 268.59 309 304 268.60 310 307 268.61 312 310 268.62 314 313 268.63 315 316 268.64 317 319 268.65 318 322 268.66 320 326 268.67 322 329 268.68 323 332 268.69 325 335 268.70 326 338 268.71 328 342 268.72 329 345 268.73 331 348 268.74 333 352 268.75 334 355 268.76 336 358 268.77 337 362 268.78 339 365 268.79 341 368 268.80 342 372 268.81 344 375 268.82 345 379 268.83 347 382 268.84 349 386 268.85 350 389 268.86 352 393 268.87 353 396 268.88 355 400 268.89 357 403 268.90 358 407 268.91 360 410 268.92 361 414 268.93 363 418 268.94 364 421 268.95 366 425 268.96 368 429 268.97 369 432 268.98 371 436 268.99 372 440 269.00 374 444 269.01 376 447 269.02 378 451 269.03 380 455 269.04 381 459 269.05 383 462 269.06 385 466 269.07 387 470 269.08 389 474 269.09 391 478 269.10 393 482 269.11 394 486 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 40 Stage -Area -Storage for Pond PSF: P5 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 269.12 396 490 269.13 398 494 269.14 400 498 269.15 402 502 269.16 404 506 269.17 405 510 269.18 407 514 269.19 409 518 269.20 411 522 269.21 413 526 269.22 415 530 269.23 417 534 269.24 418 539 269.25 420 543 269.26 422 547 269.27 424 551 269.28 426 555 269.29 428 560 269.30 430 564 269.31 431 568 269.32 433 573 269.33 435 577 269.34 437 581 269.35 439 586 269.36 441 590 269.37 442 595 269.38 444 599 269.39 446 603 269.40 448 608 269.41 450 612 269.42 452 617 269.43 454 621 269.44 455 626 269.45 457 631 269.46 459 635 269.47 461 640 269.48 463 644 269.49 465 649 269.50 467 654 269.51 468 658 269.52 470 663 269.53 472 668 269.54 474 672 269.55 476 677 269.56 478 682 269.57 479 687 269.58 481 692 269.59 483 696 269.60 485 701 269.61 487 706 269.62 489 711 269.63 491 716 269.64 492 721 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 269.65 494 726 269.66 496 731 269.67 498 736 269.68 500 741 269.69 502 746 269.70 503 751 269.71 505 756 269.72 507 761 269.73 509 766 269.74 511 771 269.75 513 776 269.76 515 781 269.77 516 786 269.78 518 791 269.79 520 797 269.80 522 802 269.81 524 807 269.82 526 812 269.83 528 818 269.84 529 823 269.85 531 828 269.86 533 834 269.87 535 839 269.88 537 844 269.89 539 850 269.90 540 855 269.91 542 860 269.92 544 866 269.93 546 871 269.94 548 877 269.95 550 882 269.96 552 888 269.97 553 893 269.98 555 899 269.99 557 904 270.00 559 910 270.01 561 916 270.02 563 921 270.03 565 927 270.04 567 933 270.05 569 938 270.06 572 944 270.07 574 950 270.08 576 955 270.09 578 961 270.10 580 967 270.11 582 973 270.12 584 979 270.13 586 984 270.14 588 990 270.15 590 996 270.16 592 1,002 270.17 595 1,008 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 41 Stage -Area -Storage for Pond PSF: P5 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 270.18 597 1,014 270.19 599 1,020 270.20 601 1,026 270.21 603 1,032 270.22 605 1,038 270.23 607 1,044 270.24 609 1,050 270.25 611 1,056 270.26 613 1,062 270.27 615 1,069 270.28 618 1,075 270.29 620 1,081 270.30 622 1,087 270.31 624 1,093 270.32 626 1,100 270.33 628 1,106 270.34 630 1,112 270.35 632 1,118 270.36 634 1,125 270.37 636 1,131 270.38 638 1,138 270.39 641 1,144 270.40 643 1,150 270.41 645 1,157 270.42 647 1,163 270.43 649 1,170 270.44 651 1,176 270.45 653 1,183 270.46 655 1,189 270.47 657 1,196 270.48 659 1,202 270.49 661 1,209 270.50 664 1,216 270.51 666 1,222 270.52 668 1,229 270.53 670 1,236 270.54 672 1,242 270.55 674 1,249 270.56 676 1,256 270.57 678 1,263 270.58 680 1,269 270.59 682 1,276 270.60 684 1,283 270.61 686 1,290 270.62 689 1,297 270.63 691 1,304 270.64 693 1,311 270.65 695 1,318 270.66 697 1,324 270.67 699 1,331 270.68 701 1,338 270.69 703 1,345 270.70 705 1,353 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 270.71 707 1,360 270.72 709 1,367 270.73 712 1,374 270.74 714 1,381 270.75 716 1,388 270.76 718 1,395 270.77 720 1,402 270.78 722 1,410 270.79 724 1,417 270.80 726 1,424 270.81 728 1,431 270.82 730 1,439 270.83 732 1,446 270.84 735 1,453 270.85 737 1,461 270.86 739 1,468 270.87 741 1,475 270.88 743 1,483 270.89 745 1,490 270.90 747 1,498 270.91 749 1,505 270.92 751 1,513 270.93 753 1,520 270.94 755 1,528 270.95 758 1,535 270.96 760 1,543 270.97 762 1,551 270.98 764 1,558 270.99 766 1,566 271.00 768 1,574 271.01 775 1,581 271.02 782 1,589 271.03 790 1,597 271.04 797 1,605 271.05 804 1,613 271.06 811 1,621 271.07 819 1,629 271.08 826 1,637 271.09 833 1,646 271.10 840 1,654 271.11 847 1,662 271.12 855 1,671 271.13 862 1,679 271.14 869 1,688 271.15 876 1,697 271.16 884 1,706 271.17 891 1,714 271.18 898 1,723 271.19 905 1,732 271.20 912 1,742 271.21 920 1,751 271.22 927 1,760 271.23 934 1,769 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 42 Stage -Area -Storage for Pond PSF: P5 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 271.24 941 1,779 271.25 949 1,788 271.26 956 1,798 271.27 963 1,807 271.28 970 1,817 271.29 977 1,827 271.30 985 1,836 271.31 992 1,846 271.32 999 1,856 271.33 1,006 1,866 271.34 1,013 1,876 271.35 1,021 1,887 271.36 1,028 1,897 271.37 1,035 1,907 271.38 1,042 1,917 271.39 1,050 1,928 271.40 1,057 1,938 271.41 1,064 1,949 271.42 1,071 1,960 271.43 1,078 1,970 271.44 1,086 1,981 271.45 1,093 1,992 271.46 1,100 2,003 271.47 1,107 2,014 271.48 1,115 2,025 271.49 1,122 2,036 271.50 1,129 2,048 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 43 Stage -Area -Storage for Pond PSM: P5 Main Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 265.00 513 0 265.02 520 10 265.04 527 21 265.06 534 31 265.08 542 42 265.10 549 53 265.12 556 64 265.14 563 75 265.16 570 87 265.18 577 98 265.20 585 110 265.22 592 122 265.24 599 133 265.26 606 145 265.28 613 158 265.30 620 170 265.32 628 182 265.34 635 195 265.36 642 208 265.38 649 221 265.40 656 234 265.42 663 247 265.44 671 260 265.46 678 274 265.48 685 287 265.50 692 301 265.52 699 315 265.54 706 329 265.56 713 343 265.58 721 358 265.60 728 372 265.62 735 387 265.64 742 402 265.66 749 417 265.68 756 432 265.70 764 447 265.72 771 462 265.74 778 478 265.76 785 493 265.78 792 509 265.80 799 525 265.82 807 541 265.84 814 557 265.86 821 574 265.88 828 590 265.90 835 607 265.92 842 623 265.94 850 640 265.96 857 657 265.98 864 675 266.00 871 692 266.02 879 709 266.04 886 727 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 266.06 894 745 266.08 902 763 266.10 909 781 266.12 917 799 266.14 925 818 266.16 932 836 266.18 940 855 266.20 948 874 266.22 955 893 266.24 963 912 266.26 971 931 266.28 979 951 266.30 986 971 266.32 994 990 266.34 1,002 1,010 266.36 1,009 1,030 266.38 1,017 1,051 266.40 1,025 1,071 266.42 1,032 1,092 266.44 1,040 1,112 266.46 1,048 1,133 266.48 1,055 1,154 266.50 1,063 1,176 266.52 1,071 1,197 266.54 1,078 1,218 266.56 1,086 1,240 266.58 1,094 1,262 266.60 1,101 1,284 266.62 1,109 1,306 266.64 1,117 1,328 266.66 1,124 1,350 266.68 1,132 1,373 266.70 1,140 1,396 266.72 1,147 1,419 266.74 1,155 1,442 266.76 1,163 1,465 266.78 1,171 1,488 266.80 1,178 1,512 266.82 1,186 1,535 266.84 1,194 1,559 266.86 1,201 1,583 266.88 1,209 1,607 266.90 1,217 1,631 266.92 1,224 1,656 266.94 1,232 1,680 266.96 1,240 1,705 266.98 1,247 1,730 267.00 1,255 1,755 267.02 1,263 1,780 267.04 1,271 1,806 267.06 1,280 1,831 267.08 1,288 1,857 267.10 1,296 1,883 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 44 Stage -Area -Storage for Pond PSM: P5 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 267.12 1,304 1,909 267.14 1,312 1,935 267.16 1,321 1,961 267.18 1,329 1,988 267.20 1,337 2,014 267.22 1,345 2,041 267.24 1,353 2,068 267.26 1,362 2,095 267.28 1,370 2,122 267.30 1,378 2,150 267.32 1,386 2,178 267.34 1,394 2,205 267.36 1,403 2,233 267.38 1,411 2,262 267.40 1,419 2,290 267.42 1,427 2,318 267.44 1,435 2,347 267.46 1,444 2,376 267.48 1,452 2,405 267.50 1,460 2,434 267.52 1,468 2,463 267.54 1,476 2,492 267.56 1,485 2,522 267.58 1,493 2,552 267.60 1,501 2,582 267.62 1,509 2,612 267.64 1,517 2,642 267.66 1,526 2,673 267.68 1,534 2,703 267.70 1,542 2,734 267.72 1,550 2,765 267.74 1,558 2,796 267.76 1,567 2,827 267.78 1,575 2,859 267.80 1,583 2,890 267.82 1,591 2,922 267.84 1,599 2,954 267.86 1,608 2,986 267.88 1,616 3,018 267.90 1,624 3,051 267.92 1,632 3,083 267.94 1,640 3,116 267.96 1,649 3,149 267.98 1,657 3,182 268.00 1,665 3,215 268.02 1,674 3,248 268.04 1,682 3,282 268.06 1,691 3,316 268.08 1,700 3,350 268.10 1,709 3,384 268.12 1,717 3,418 268.14 1,726 3,452 268.16 1,735 3,487 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 268.18 1,743 3,522 268.20 1,752 3,557 268.22 1,761 3,592 268.24 1,769 3,627 268.26 1,778 3,663 268.28 1,787 3,698 268.30 1,796 3,734 268.32 1,804 3,770 268.34 1,813 3,806 268.36 1,822 3,843 268.38 1,830 3,879 268.40 1,839 3,916 268.42 1,848 3,953 268.44 1,856 3,990 268.46 1,865 4,027 268.48 1,874 4,064 268.50 1,883 4,102 268.52 1,891 4,140 268.54 1,900 4,178 268.56 1,909 4,216 268.58 1,917 4,254 268.60 1,926 4,292 268.62 1,935 4,331 268.64 1,943 4,370 268.66 1,952 4,409 268.68 1,961 4,448 268.70 1,969 4,487 268.72 1,978 4,527 268.74 1,987 4,566 268.76 1,996 4,606 268.78 2,004 4,646 268.80 2,013 4,686 268.82 2,022 4,727 268.84 2,030 4,767 268.86 2,039 4,808 268.88 2,048 4,849 268.90 2,056 4,890 268.92 2,065 4,931 268.94 2,074 4,972 268.96 2,083 5,014 268.98 2,091 5,056 269.00 2,100 5,098 269.02 2,109 5,140 269.04 2,118 5,182 269.06 2,128 5,224 269.08 2,137 5,267 269.10 2,146 5,310 269.12 2,155 5,353 269.14 2,164 5,396 269.16 2,174 5,439 269.18 2,183 5,483 269.20 2,192 5,527 269.22 2,201 5,571 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 45 Stage -Area -Storage for Pond PSM: P5 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 269.24 2,210 5,615 269.26 2,220 5,659 269.28 2,229 5,704 269.30 2,238 5,748 269.32 2,247 5,793 269.34 2,256 5,838 269.36 2,266 5,883 269.38 2,275 5,929 269.40 2,284 5,974 269.42 2,293 6,020 269.44 2,302 6,066 269.46 2,312 6,112 269.48 2,321 6,158 269.50 2,330 6,205 269.52 2,339 6,252 269.54 2,348 6,299 269.56 2,358 6,346 269.58 2,367 6,393 269.60 2,376 6,440 269.62 2,385 6,488 269.64 2,394 6,536 269.66 2,404 6,584 269.68 2,413 6,632 269.70 2,422 6,680 269.72 2,431 6,729 269.74 2,440 6,777 269.76 2,450 6,826 269.78 2,459 6,875 269.80 2,468 6,925 269.82 2,477 6,974 269.84 2,486 7,024 269.86 2,496 7,074 269.88 2,505 7,124 269.90 2,514 7,174 269.92 2,523 7,224 269.94 2,532 7,275 269.96 2,542 7,325 269.98 2,551 7,376 270.00 2,560 7,428 270.02 2,570 7,479 270.04 2,579 7,530 270.06 2,589 7,582 270.08 2,599 7,634 270.10 2,609 7,686 270.12 2,618 7,738 270.14 2,628 7,791 270.16 2,638 7,843 270.18 2,647 7,896 270.20 2,657 7,949 270.22 2,667 8,002 270.24 2,677 8,056 270.26 2,686 8,110 270.28 2,696 8,163 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 270.30 2,706 8,217 270.32 2,716 8,272 270.34 2,725 8,326 270.36 2,735 8,381 270.38 2,745 8,435 270.40 2,754 8,490 270.42 2,764 8,546 270.44 2,774 8,601 270.46 2,784 8,657 270.48 2,793 8,712 270.50 2,803 8,768 270.52 2,813 8,824 270.54 2,822 8,881 270.56 2,832 8,937 270.58 2,842 8,994 270.60 2,852 9,051 270.62 2,861 9,108 270.64 2,871 9,165 270.66 2,881 9,223 270.68 2,890 9,281 270.70 2,900 9,339 270.72 2,910 9,397 270.74 2,920 9,455 270.76 2,929 9,513 270.78 2,939 9,572 270.80 2,949 9,631 270.82 2,959 9,690 270.84 2,968 9,749 270.86 2,978 9,809 270.88 2,988 9,868 270.90 2,997 9,928 270.92 3,007 9,988 270.94 3,017 10,049 270.96 3,027 10,109 270.98 3,036 10,170 271.00 3,046 10,231 271.02 3,077 10,292 271.04 3,108 10,354 271.06 3,139 10,416 271.08 3,170 10,479 271.10 3,201 10,543 271.12 3,232 10,607 271.14 3,263 10,672 271.16 3,294 10,738 271.18 3,325 10,804 271.20 3,356 10,871 271.22 3,387 10,938 271.24 3,418 11,006 271.26 3,448 11,075 271.28 3,479 11,144 271.30 3,510 11,214 271.32 3,541 11,284 271.34 3,572 11,356 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 46 Stage -Area -Storage for Pond PSM: P5 Main (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 271.36 3,603 11,427 271.38 3,634 11,500 271.40 3,665 11,573 271.42 3,696 11,646 271.44 3,727 11,721 271.46 3,758 11,795 271.48 3,789 11,871 271.50 3,820 11,947 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 47 Stage -Area -Storage for Pond P6F: P6 Forebay Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 301.00 167 0 301.01 168 2 301.02 169 3 301.03 170 5 301.04 171 7 301.05 172 8 301.06 173 10 301.07 175 12 301.08 176 14 301.09 177 15 301.10 178 17 301.11 179 19 301.12 180 21 301.13 181 23 301.14 182 24 301.15 183 26 301.16 184 28 301.17 185 30 301.18 186 32 301.19 188 34 301.20 189 36 301.21 190 37 301.22 191 39 301.23 192 41 301.24 193 43 301.25 194 45 301.26 195 47 301.27 196 49 301.28 197 51 301.29 198 53 301.30 199 55 301.31 200 57 301.32 202 59 301.33 203 61 301.34 204 63 301.35 205 65 301.36 206 67 301.37 207 69 301.38 208 71 301.39 209 73 301.40 210 75 301.41 211 78 301.42 212 80 301.43 213 82 301.44 215 84 301.45 216 86 301.46 217 88 301.47 218 90 301.48 219 93 301.49 220 95 301.50 221 97 301.51 222 99 301.52 223 101 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 301.53 224 104 301.54 225 106 301.55 226 108 301.56 227 110 301.57 229 113 301.58 230 115 301.59 231 117 301.60 232 120 301.61 233 122 301.62 234 124 301.63 235 127 301.64 236 129 301.65 237 131 301.66 238 134 301.67 239 136 301.68 240 139 301.69 242 141 301.70 243 143 301.71 244 146 301.72 245 148 301.73 246 151 301.74 247 153 301.75 248 156 301.76 249 158 301.77 250 161 301.78 251 163 301.79 252 166 301.80 253 168 301.81 254 171 301.82 256 173 301.83 257 176 301.84 258 178 301.85 259 181 301.86 260 184 301.87 261 186 301.88 262 189 301.89 263 191 301.90 264 194 301.91 265 197 301.92 266 199 301.93 267 202 301.94 269 205 301.95 270 207 301.96 271 210 301.97 272 213 301.98 273 216 301.99 274 218 302.00 275 221 302.01 276 224 302.02 278 227 302.03 279 229 302.04 280 232 302.05 282 235 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 48 Stage -Area -Storage for Pond P6F: P6 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 302.06 283 238 302.07 284 241 302.08 286 243 302.09 287 246 302.10 289 249 302.11 290 252 302.12 291 255 302.13 293 258 302.14 294 261 302.15 295 264 302.16 297 267 302.17 298 270 302.18 299 273 302.19 301 276 302.20 302 279 302.21 303 282 302.22 305 285 302.23 306 288 302.24 307 291 302.25 309 294 302.26 310 297 302.27 311 300 302.28 313 303 302.29 314 306 302.30 316 310 302.31 317 313 302.32 318 316 302.33 320 319 302.34 321 322 302.35 322 326 302.36 324 329 302.37 325 332 302.38 326 335 302.39 328 339 302.40 329 342 302.41 330 345 302.42 332 348 302.43 333 352 302.44 334 355 302.45 336 358 302.46 337 362 302.47 338 365 302.48 340 369 302.49 341 372 302.50 343 375 302.51 344 379 302.52 345 382 302.53 347 386 302.54 348 389 302.55 349 393 302.56 351 396 302.57 352 400 302.58 353 403 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 302.59 355 407 302.60 356 410 302.61 357 414 302.62 359 417 302.63 360 421 302.64 361 425 302.65 363 428 302.66 364 432 302.67 365 436 302.68 367 439 302.69 368 443 302.70 369 447 302.71 371 450 302.72 372 454 302.73 374 458 302.74 375 461 302.75 376 465 302.76 378 469 302.77 379 473 302.78 380 477 302.79 382 480 302.80 383 484 302.81 384 488 302.82 386 492 302.83 387 496 302.84 388 500 302.85 390 504 302.86 391 507 302.87 392 511 302.88 394 515 302.89 395 519 302.90 396 523 302.91 398 527 302.92 399 531 302.93 401 535 302.94 402 539 302.95 403 543 302.96 405 547 302.97 406 551 302.98 407 555 302.99 409 559 303.00 410 564 303.01 412 568 303.02 413 572 303.03 415 576 303.04 416 580 303.05 418 584 303.06 420 588 303.07 421 593 303.08 423 597 303.09 424 601 303.10 426 605 303.11 427 610 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 49 Stage -Area -Storage for Pond P6F: P6 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 303.12 429 614 303.13 431 618 303.14 432 622 303.15 434 627 303.16 435 631 303.17 437 635 303.18 439 640 303.19 440 644 303.20 442 649 303.21 443 653 303.22 445 658 303.23 447 662 303.24 448 666 303.25 450 671 303.26 451 675 303.27 453 680 303.28 455 685 303.29 456 689 303.30 458 694 303.31 459 698 303.32 461 703 303.33 462 707 303.34 464 712 303.35 466 717 303.36 467 721 303.37 469 726 303.38 470 731 303.39 472 735 303.40 474 740 303.41 475 745 303.42 477 750 303.43 478 754 303.44 480 759 303.45 482 764 303.46 483 769 303.47 485 774 303.48 486 779 303.49 488 783 303.50 490 788 303.51 491 793 303.52 493 798 303.53 494 803 303.54 496 808 303.55 497 813 303.56 499 818 303.57 501 823 303.58 502 828 303.59 504 833 303.60 505 838 303.61 507 843 303.62 509 848 303.63 510 853 303.64 512 858 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 303.65 513 864 303.66 515 869 303.67 517 874 303.68 518 879 303.69 520 884 303.70 521 889 303.71 523 895 303.72 524 900 303.73 526 905 303.74 528 910 303.75 529 916 303.76 531 921 303.77 532 926 303.78 534 932 303.79 536 937 303.80 537 942 303.81 539 948 303.82 540 953 303.83 542 959 303.84 544 964 303.85 545 969 303.86 547 975 303.87 548 980 303.88 550 986 303.89 552 991 303.90 553 997 303.91 555 1,002 303.92 556 1,008 303.93 558 1,014 303.94 559 1,019 303.95 561 1,025 303.96 563 1,030 303.97 564 1,036 303.98 566 1,042 303.99 567 1,047 304.00 569 1,053 304.01 575 1,059 304.02 580 1,064 304.03 586 1,070 304.04 592 1,076 304.05 598 1,082 304.06 603 1,088 304.07 609 1,094 304.08 615 1,100 304.09 620 1,107 304.10 626 1,113 304.11 632 1,119 304.12 638 1,125 304.13 643 1,132 304.14 649 1,138 304.15 655 1,145 304.16 661 1,151 304.17 666 1,158 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 50 Stage -Area -Storage for Pond P6F: P6 Forebay (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 304.18 672 1,165 304.19 678 1,171 304.20 683 1,178 304.21 689 1,185 304.22 695 1,192 304.23 701 1,199 304.24 706 1,206 304.25 712 1,213 304.26 718 1,220 304.27 723 1,227 304.28 729 1,235 304.29 735 1,242 304.30 741 1,249 304.31 746 1,257 304.32 752 1,264 304.33 758 1,272 304.34 763 1,280 304.35 769 1,287 304.36 775 1,295 304.37 781 1,303 304.38 786 1,311 304.39 792 1,318 304.40 798 1,326 304.41 804 1,334 304.42 809 1,342 304.43 815 1,351 304.44 821 1,359 304.45 826 1,367 304.46 832 1,375 304.47 838 1,384 304.48 844 1,392 304.49 849 1,400 304.50 855 1,409 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 51 Stage -Area -Storage for Pond P6M: (new Pond) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 298.00 291 0 298.02 294 6 298.04 297 12 298.06 300 18 298.08 303 24 298.10 306 30 298.12 309 36 298.14 312 42 298.16 315 48 298.18 318 55 298.20 321 61 298.22 324 68 298.24 327 74 298.26 330 81 298.28 333 87 298.30 336 94 298.32 339 101 298.34 342 108 298.36 345 115 298.38 348 121 298.40 351 128 298.42 354 136 298.44 357 143 298.46 360 150 298.48 363 157 298.50 367 164 298.52 370 172 298.54 373 179 298.56 376 187 298.58 379 194 298.60 382 202 298.62 385 209 298.64 388 217 298.66 391 225 298.68 394 233 298.70 397 241 298.72 400 249 298.74 403 257 298.76 406 265 298.78 409 273 298.80 412 281 298.82 415 289 298.84 418 298 298.86 421 306 298.88 424 315 298.90 427 323 298.92 430 332 298.94 433 340 298.96 436 349 298.98 439 358 299.00 442 367 299.02 446 375 299.04 449 384 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 299.06 453 393 299.08 456 402 299.10 460 412 299.12 463 421 299.14 467 430 299.16 470 439 299.18 474 449 299.20 477 458 299.22 481 468 299.24 484 478 299.26 488 487 299.28 491 497 299.30 495 507 299.32 498 517 299.34 502 527 299.36 505 537 299.38 509 547 299.40 512 557 299.42 516 568 299.44 519 578 299.46 523 588 299.48 526 599 299.50 530 610 299.52 534 620 299.54 537 631 299.56 541 642 299.58 544 652 299.60 548 663 299.62 551 674 299.64 555 685 299.66 558 697 299.68 562 708 299.70 565 719 299.72 569 730 299.74 572 742 299.76 576 753 299.78 579 765 299.80 583 776 299.82 586 788 299.84 590 800 299.86 593 812 299.88 597 824 299.90 600 836 299.92 604 848 299.94 607 860 299.96 611 872 299.98 614 884 300.00 618 897 300.02 622 909 300.04 626 921 300.06 630 934 300.08 634 947 300.10 638 959 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 52 Stage -Area -Storage for Pond P6M: (new Pond) (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 300.12 642 972 300.14 646 985 300.16 650 998 300.18 654 1,011 300.20 658 1,024 300.22 662 1,037 300.24 666 1,051 300.26 670 1,064 300.28 674 1,077 300.30 678 1,091 300.32 682 1,105 300.34 686 1,118 300.36 690 1,132 300.38 694 1,146 300.40 698 1,160 300.42 702 1,174 300.44 706 1,188 300.46 710 1,202 300.48 714 1,216 300.50 719 1,231 300.52 723 1,245 300.54 727 1,260 300.56 731 1,274 300.58 735 1,289 300.60 739 1,303 300.62 743 1,318 300.64 747 1,333 300.66 751 1,348 300.68 755 1,363 300.70 759 1,378 300.72 763 1,394 300.74 767 1,409 300.76 771 1,424 300.78 775 1,440 300.80 779 1,455 300.82 783 1,471 300.84 787 1,487 300.86 791 1,502 300.88 795 1,518 300.90 799 1,534 300.92 803 1,550 300.94 807 1,566 300.96 811 1,582 300.98 815 1,599 301.00 819 1,615 301.02 824 1,631 301.04 828 1,648 301.06 833 1,665 301.08 837 1,681 301.10 842 1,698 301.12 846 1,715 301.14 851 1,732 301.16 855 1,749 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 301.18 860 1,766 301.20 864 1,783 301.22 869 1,801 301.24 873 1,818 301.26 878 1,836 301.28 883 1,853 301.30 887 1,871 301.32 892 1,889 301.34 896 1,907 301.36 901 1,925 301.38 905 1,943 301.40 910 1,961 301.42 914 1,979 301.44 919 1,997 301.46 923 2,016 301.48 928 2,034 301.50 933 2,053 301.52 937 2,072 301.54 942 2,090 301.56 946 2,109 301.58 951 2,128 301.60 955 2,147 301.62 960 2,166 301.64 964 2,186 301.66 969 2,205 301.68 973 2,224 301.70 978 2,244 301.72 982 2,264 301.74 987 2,283 301.76 992 2,303 301.78 996 2,323 301.80 1,001 2,343 301.82 1,005 2,363 301.84 1,010 2,383 301.86 1,014 2,403 301.88 1,019 2,424 301.90 1,023 2,444 301.92 1,028 2,465 301.94 1,032 2,485 301.96 1,037 2,506 301.98 1,041 2,527 302.00 1,046 2,548 302.02 1,051 2,568 302.04 1,056 2,590 302.06 1,061 2,611 302.08 1,066 2,632 302.10 1,071 2,653 302.12 1,076 2,675 302.14 1,081 2,696 302.16 1,086 2,718 302.18 1,091 2,740 302.20 1,096 2,762 302.22 1,101 2,784 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 53 Stage -Area -Storage for Pond P6M: (new Pond) (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 302.24 1,106 2,806 302.26 1,111 2,828 302.28 1,116 2,850 302.30 1,121 2,873 302.32 1,126 2,895 302.34 1,131 2,918 302.36 1,136 2,940 302.38 1,141 2,963 302.40 1,146 2,986 302.42 1,151 3,009 302.44 1,156 3,032 302.46 1,161 3,055 302.48 1,166 3,078 302.50 1,172 3,102 302.52 1,177 3,125 302.54 1,182 3,149 302.56 1,187 3,173 302.58 1,192 3,196 302.60 1,197 3,220 302.62 1,202 3,244 302.64 1,207 3,268 302.66 1,212 3,293 302.68 1,217 3,317 302.70 1,222 3,341 302.72 1,227 3,366 302.74 1,232 3,390 302.76 1,237 3,415 302.78 1,242 3,440 302.80 1,247 3,465 302.82 1,252 3,490 302.84 1,257 3,515 302.86 1,262 3,540 302.88 1,267 3,565 302.90 1,272 3,591 302.92 1,277 3,616 302.94 1,282 3,642 302.96 1,287 3,667 302.98 1,292 3,693 303.00 1,297 3,719 303.02 1,303 3,745 303.04 1,308 3,771 303.06 1,314 3,797 303.08 1,319 3,824 303.10 1,325 3,850 303.12 1,330 3,877 303.14 1,336 3,903 303.16 1,341 3,930 303.18 1,347 3,957 303.20 1,352 3,984 303.22 1,358 4,011 303.24 1,363 4,038 303.26 1,369 4,066 303.28 1,375 4,093 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 303.30 1,380 4,121 303.32 1,386 4,148 303.34 1,391 4,176 303.36 1,397 4,204 303.38 1,402 4,232 303.40 1,408 4,260 303.42 1,413 4,288 303.44 1,419 4,316 303.46 1,424 4,345 303.48 1,430 4,373 303.50 1,436 4,402 303.52 1,441 4,431 303.54 1,447 4,460 303.56 1,452 4,489 303.58 1,458 4,518 303.60 1,463 4,547 303.62 1,469 4,576 303.64 1,474 4,606 303.66 1,480 4,635 303.68 1,485 4,665 303.70 1,491 4,695 303.72 1,496 4,725 303.74 1,502 4,755 303.76 1,508 4,785 303.78 1,513 4,815 303.80 1,519 4,845 303.82 1,524 4,876 303.84 1,530 4,906 303.86 1,535 4,937 303.88 1,541 4,968 303.90 1,546 4,998 303.92 1,552 5,029 303.94 1,557 5,061 303.96 1,563 5,092 303.98 1,568 5,123 304.00 1,574 5,155 304.02 1,592 5,186 304.04 1,611 5,218 304.06 1,629 5,251 304.08 1,648 5,283 304.10 1,666 5,317 304.12 1,685 5,350 304.14 1,703 5,384 304.16 1,722 5,418 304.18 1,740 5,453 304.20 1,759 5,488 304.22 1,777 5,523 304.24 1,796 5,559 304.26 1,814 5,595 304.28 1,833 5,631 304.30 1,851 5,668 304.32 1,870 5,705 304.34 1,888 5,743 NCR201044 - Drainage Area MAX BUA- jdw - LOT 34 Type 11 24-hr 100-year Rainfall=8.22" Prepared by Bohler Engineering Printed 1/20/2023 HydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC Page 54 Stage -Area -Storage for Pond P6M: (new Pond) (continued) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 304.36 1,907 5,781 304.38 1,925 5,819 304.40 1,944 5,858 304.42 1,962 5,897 304.44 1,981 5,937 304.46 1,999 5,976 304.48 2,018 6,016 304.50 2,036 6,057 BOHLER9 BOHLER ENGINEERING NC, PLLC Project Information Wet Detention Basin Design #1 Project: Oakmont Subdivision Location: Harnett County, NC Project Number: NCR201044 Date: 6-Aug-21 Designed: JDW Checked: SK Site Information Sub Area Location: Wet Detention Basin 1 Drainage Area (DA) = 954,469 sf Impervious Area (IA) = 367,444 sf Percent Impervious (I) = 38.5 % Elevations Top of Bank Elevation = 266.50 ft Emergency Elevation = 264.61 ft Temporary Pool Elevation = 262.30 ft Permanent Pool Elevation = 260.50 ft Bottom of Pond Elevation = 256.00 ft Sediment Cleanout, Bottom Elevation = 256.50 ft Forebay ( 257.50 ft) Basin Areas/Volumes Area of Main Pool @ PPE = 13,620 sf la"ainyool ( main pool only at permanent pool elev.) Area of Bottom of Shelf (main pool) = 12,149 sf Abot shelf ( main pool only at bottom of the shelf) Perimeter of Bottom of Shelf (main pool) = 480 ft Pbot shelf ( main pool only at bottom of the shelf) Area of Permanent Pool (total) = 17,090 sf Ape -_pool (includes main pond & forebays) (Elev = 260.50 ) Area of Bottom of Shelf (total) = 15,323 sf Abot shelf (includes main pond & forebays) (Elev = 260.00 ) Area of Bottom of Pond (main pool) = 7,045 sf A bot_pond (excluding sediment storage & forebays) Area of Temporary Pool (total) = 21,718 sf Atemp_pond (includes main pond and forebays) (Elev = 262.30 ) Volume, main pool = 47,618 cf V main_pool (from Hydracad) Volume, Forebay (sum of forebays) = 7,814 cf V forebay (from Hydracad) Volume, permanent pool (total) = 55,432 cf V penn_pool (Vforebay+Vmainyool) Forebay % of permanent pool volume = 16.4 % OK Average Depth Depth of Pond = 3.5 ft Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) Average Depth = 3.89 ft Use Average Depth of = 3.50 ft Required Surface Area SA/DA = 1.3365 (85% TSS Removal via Pond) Min Req'd Surface Area = 12,756 sf (Main pool at Permanent Pool only) Required Storage Volume - Using Simple Method Design Storm = 1.0 inch (Project Does Not Drain to SA Waters) Determine Rv Value = 0.05 + 0.009 (I) = 0.40 in/in Storage Volume Required = 31,535 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 13620 > 12756) sf BOHLERd BOHILER ENGINEERING NC. PLLC Wet Detention Basin Design #1 1.0 inch Volume Elevation Required Temporary Pool Volume = 31,535 cu ft Contour Contour Area Incremental Accumulated Volume Volume, S sq ft cu ft cu ft Elev (fmsl) Area (so 260.50 17,090 0 0 Permanent Pool Elevation = 260.50 17,887 261.00 18,913 9,001 9,001 Frustrum* Bottom Elevation = 260.50 17,887 262.00 20,793 19,853 28,854 Temporary Pool = 262.30 21,374 263.00 22,729 21,761 50,615 Frustrum* Top Elevation = 262.50 21,761 264.00 24,721 23,725 74,340 265.00 26,771 25,746 100,086 Temporary Pool Volume = 35,179 cu ft 266.00 28,877 27,824 127,910 *Frustrum bounds in which Temporary Pool will ultimately reside Orifice Sizing -Wet Detention Q2 Days = 0.2036 cfs Q5 Days = 0.0814 cfs Orifice Size = 2 1/2 in Driving Head (Ho) = 0.56 ft Q Orifice = 0.123 cfs Drawdown Time = 3.3 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device Outside Length = 6.00 ft Outside Width = 6.00 ft Inside Length = 5.00 ft Inside Width = 5.00 ft Bottom Thickness = 0.50 ft Top of Riser = 264.00 ft Invert of Riser = 260.50 ft Area = 36.0 sf Volume = 144 cf Weight = 8,986 Ibs Factor of Safety = 1.50 WT Req'd of Anti -Flotation Device = 13,478 Ibs Volume of Concrete Req'd = 153.9 of Depth Provided = 3.00 ft Volume Provided = 164.5 cf WT of Anti -Flotation Device Provided = 14,410 Ibs (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Water Displaced - Top of Riser to Bottom of Riser) (Weight Water Displaced) 0.0 1.0 2.0 3.0 4.0 5.0 6.0 (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf OK Z BOHLER9 BOHLER ENGINEERING NC, PLLC Project Information Site Information Wet Detention Basin Design # 2 Project: Oakmont Subdivision Location: Harnett County, NC Project Number: NCR201044 Date: 6-Aug-21 Designed: JDW Checked: SK Sub Area Location: Wet Detention Basin 2 Drainage Area (DA) = 411,642 sf Impervious Area (IA) = 164,657 sf Percent Impervious (1) = 40.0 % Elevations Top of Bank Elevation = 275.00 ft Emergency Elevation = 273.50 ft Temporary Pool Elevation = 271.80 ft Permanent Pool Elevation = 270.50 ft Bottom of Pond Elevation = 265.00 ft Sediment Cleanout, Bottom Elevation = 265.50 ft Forebay ( 266.5 ft) Basin Areas/Volumes Area of Main Pool = 6,323 sf Area of Permanent Pool = 8,641 sf Area of Bottom of Shelf = 6,942 sf Area of Bottom of Pond = 2,718 sf Area of Temporary Pool = 7,650 sf Volume, main pool = 20,428 cf Volume, forebay (sum of forebays) = 3,951 cf Volume, permanent pool = 24,379 cf Forebay % of permanent pool volume = 19.3 % Average Depth Depth of Pond = 5 ft Average Depth = 3.23 ft Use Average Depth of = 3.00 ft Required Surface Area A main_pool (Main Pool only at Permanent Pool Elev.) Apem,_pool (includes main pond & forebays) (Elev = 270.50 ) Abot shelf (includes main pond & forebays) (Elev = 270.00 ) Abot_pond (excluding sediment storage & forebays) Atemp_pond (includes main pond and forebays) (Elev = 271.80 ) V main_pool (from Hydracad) V forebay (from Hydracad) V penn_pool (Vforebay+Vmainyool) OK Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) See Wet Basin Supplement SA/DA = 1.51 (85% TSS Removal via Pond) Min Req'd Surface Area = 6,216 sf (at Permanent Pool) Required Storage Volume - Using Simple Method uniosla Design Storm = 1.0 inch (Project Does Not Drain to SA Waters) Determine Rv Value = 0.05 + 0.009 (1) = 0.41 in/in Storage Volume Required = 14,064 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 6323 > 6216 ) sf BOH LER # gOHLER ENGINEERING NC, PLLC Wet Detention Basin Design # 2 1.0 inch Volume Elevation Required Temporary Pool Volume = 14,064 cu ft Elev (fmsl) Area (so Permanent Pool Elevation = 270.50 9,650 Frustrum* Bottom Elevation = 270.50 9,650 Temporary Pool = 271.80 11,192 Frustrum* Top Elevation = 272.00 11,429 Temporary Pool Volume = 13,123 cu ft *Frustrum bounds in which Temporary Pool will ultimately reside Orifice Sizing - Wet Detention Q2 Days = 0.0759 cfs Q5 Days = 0.0304 cfs Orifice Size = 2 in Driving Head (Ho) = 0.40 ft Q orifice = 0.067 cfs Drawdown Time = 2.3 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device Outside Length = 6.00 ft Outside Width = 6.00 ft Inside Length = 5.00 ft Inside Width = 5.00 ft Bottom Thickness = 0.50 ft Top of Riser = 273.00 ft Invert of Riser = 270.50 ft Area = 36.0 sf Volume = 108 cf Weight = 6,739 Ibs Factor of Safety = 1.50 WT Req'd of Anti -Flotation Device = 10,109 Ibs Volume of Concrete Req'd = 115.4 of Depth Provided = 2.00 ft Volume Provided = 117.5 cf WT of Anti -Flotation Device Provided = 10,293 Ibs Contour Contour Area Incremental Accumulated Volume Volume, S Stage, Z sq ft cu ft cu ft ft 270.50 9,650 0 0 0.0 271.00 10,007 4,914 4,914 1.0 272.00 11,429 10,718 15,632 2.0 273.00 12,908 12,169 27,801 3.0 274.00 14,443 13,676 41,476 4.0 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Water Displaced - Top of Riser to Bottom of Riser) (Weight Water Displaced) (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf OK BOHLER BOHLER ENGINEERING NC, PLLC Wet Detention Basin Design # 3 Project Information Project: Oakmont Subdivision Location: Harnett County, NC Project Number: NCR201044 Date: 6-Aug-21 Designed: JDW Checked: GJZ Site Information Sub Area Location: Wet Detention Basin 3 Drainage Area (DA) = 268,329 sf Impervious Area (IA) = 118,065 sf Percent Impervious (1) = 44.0 % Elevations Top of Bank Elevation = 302.00 ft Emergency Elevation = 300.50 ft Temporary Pool Elevation = 298.70 ft Permanent Pool Elevation = 297.50 ft Bottom of Pond Elevation = 291.00 ft Sediment Cleanout, Bottom Elevation = 292.50 ft Fore bay ( 293.50 ft) Basin Areas/Volumes Area of Main Pool = 4,570 sf Area of Permanent Pool = 5,965 sf Area of Bottom of Shelf = 4,986 sf Area of Bottom of Pond = 1,342 sf Area of Temporary Pool = 8,091 sf Volume, main pool = 14,157 cf Volume, fore bay (sum of forebays) = 2,360 cf Volume, permanent pool = 16,517 cf Forebay % of permanent pool volume = 16.7 % Average Depth Depth of Pond = 4.5 ft Average Depth = 3.10 ft Use Average Depth of = 3.00 ft Required Surface Area A mainyool (Main Pool only at Permanent Pool Elev.) A permyool (includes main pond & forebays) (Elev = 297.50 ) Abot shelf (includes main pond & forebays) (Elev = 297.00 ) A botJ,ond (excluding sediment storage & forebays) Atempyond (includes main pond and forebays) (Elev = 298.70 ) V main pool (from Hydracad) Vforebay (from Hydracad) V perm_pool \Vforebay+Vmain_poolj OK Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) See Wet Basin Supplement SA/DA = 1.7 (85% TSS Removal via Pond) Min Req'd Surface Area = 4,562 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.0 inch (Project Does Not Drain to SA Waters) Determine Rv Value = 0.05 + 0.009 (1) = 0.45 in/in Storage Volume Required = 9,973 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 4570 > 4562 ) sf BOHLER �• BOHLER ENGINEERING NC, PLLC Wet Detention Basin Design # 3 1.0 inch Volume Elevation Required Temporary Pool Volume = 9,973 cu ft Elev (fmsl) Area (so Permanent Pool Elevation = 297.50 5,965 Frustrum* Bottom Elevation = 297.50 5,965 Temporary Pool = 298.70 7,764 Frustrum* Top Elevation = 298.70 7,764 Temporary Pool Volume = 8,409 cu ft *Frustrum bounds in which Temporary Pool will ultimately reside Orifice Sizing -Wet Detention Q2 Days = 0.0487 cfs Q5 Days = 0.0195 cfs Orifice Size = 1 1/2 in Driving Head (Ho) = 0.37 ft Q Orifice = 0.036 cfs Drawdown Time = 2.7 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device Outside Length = 5.00 ft Outside Width = 5.00 ft Inside Length = 4.00 ft Inside Width = 4.00 ft Bottom Thickness = 0.50 ft Top of Riser = 300.00 ft Invert of Riser = 297.50 ft Area = 25.0 sf Volume = 75 cf Weight = 4,680 Ibs Factor of Safety = 1.50 WT Req'd of Anti -Flotation Device = 7,020 Ibs Volume of Concrete Req'd = 80.1 of Depth Provided = 2.00 ft Volume Provided = 85.0 cf WT of Anti -Flotation Device Provided = 7,446 Ibs Contour Contour Area Incremental Accumulated Volume Volume, S Stage, Z sq ft cu ft cu ft ft 297.50 5,965 0 0 0.0 298.00 7,000 3,241 3,241 1.0 299.00 8,091 7,546 10,787 2.0 300.00 9,239 8,665 19,452 3.0 301.00 10,444 9,842 29,293 4.0 302.00 11,705 11,075 40,368 5.0 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Water Displaced - Top of Riser to Bottom of Riser) (Weight Water Displaced) (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf OK BOHLER BOHLER ENGINEERING NC, PLLC Wet Detention Basin Design # 4 Project Information Project: Oakmont Subdivision Location: Harnett County, NC Project Number: NCR201044 Date: 6-Aug-21 Designed: JDW Checked: SK Site Information Sub Area Location: Wet Detention Basin 4 Drainage Area (DA) = 488,743 sf Impervious Area (IA) = 293,159 sf Percent Impervious (1) = 60.0 % Elevations Top of Bank Elevation = 267.00 ft Emergency Elevation = 265.50 ft Temporary Pool Elevation = 264.90 ft Permanent Pool Elevation = 263.50 ft Bottom of Pond Elevation = 255.00 ft Sediment Cleanout, Bottom Elevation = 255.50 ft Forebay(259.50 ft) Basin Areas/Volumes Area of Main Pool = 12,411 sf A mainyool (Main Pool Only at Permanent Pool Elev.) Area of Permanent Pool = 15,234 sf Apermyool (includes main pond & forebays) (Elev = 263.50 ) Area of Bottom of Shelf = 13,085 sf Abot shelf (includes main pond & forebays) (Elev = 263.00 ) Area of Bottom of Pond = 4,967 sf AbotJ,ond (excluding sediment storage & forebays) Area of Temporary Pool = 19,494 sf Atempyond (includes main pond and forebays) (Elev = 264.90 ) Volume, main pool = 38,860 cf V mainyool (from Hydracad) Volume, fore bay (sum of forebays) = 6,996 cf Vforebay (from Hydracad) Volume, permanent pool = 45,856 cf V perm_pool \Vforebay+Vmain_poolj Forebay % of permanent pool volume = 18.0 % OK Average Depth Depth of Pond = 7 ft Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) Average Depth = 3.13 ft Use Average Depth of = 3.00 ft See Wet Basin Supplement Required Surface Area SA/DA = 2.09 (85% TSS Removal via Pond) Min Req'd Surface Area = 10,215 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.0 inch (Project Does Not Drain to SA Waters) Determine Rv Value = 0.05 + 0.009 (1) = 0.59 in/in Storage Volume Required = 24,023 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 12411 > 10215 ) sf BOH LER # gOHLER ENGINEERING NC, PLLC Wet Detention Basin Design # 4 1.0 inch Volume Elevation Required Temporary Pool Volume = 24,023 cu ft Elev (fmsl) Area (so Permanent Pool Elevation = 263.50 15,234 Frustrum* Bottom Elevation = 263.50 15,234 Temporary Pool = 264.90 19,494 Frustrum* Top Elevation = 265.00 19,702 Temporary Pool Volume = 24,781 cu ft *Frustrum bounds in which Temporary Pool will ultimately reside Orifice Sizing - Wet Detention Q2 Days = 0.1434 cfs Q5 Days = 0.0574 cfs Orifice Size = 2 in Driving Head (Ho) = 0.43 ft Q orifice = 0.070 cfs Drawdown Time = 4.1 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device Outside Length = 6.00 ft Outside Width = 6.00 ft Inside Length = 5.00 ft Inside Width = 5.00 ft Bottom Thickness = 0.50 ft Top of Riser = 266.50 ft Invert of Riser = 261.00 ft Area = 36.0 sf Volume = 216 cf Weight = 13,478 Ibs Factor of Safety = 1.50 WT Req'd of Anti -Flotation Device = 20,218 Ibs Volume of Concrete Req'd = 230.8 of Depth Provided = 4.50 ft Volume Provided = 240.5 cf WT of Anti -Flotation Device Provided = 21,068 Ibs Contour Contour Area Incremental Accumulated Volume Volume, S Stage, Z sq ft cu ft cu ft ft 263.50 15,234 0 0 0.0 264.00 17,440 8,169 8,169 0.5 265.00 19,702 18,571 26,740 1.5 266.00 22,021 20,862 47,601 2.5 267.00 24,396 23,209 70,810 3.5 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Water Displaced - Top of Riser to Bottom of Riser) (Weight Water Displaced) (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf OK BOHLER BDHLER ENGINEERING NC. PLLC Wet Detention Basin Design # 5 Project Information Project: Oakmont Subdivision Location: Harnett County, NC Project Number: NCR201044 Date: 6-Aug-21 Designed: GJZ Checked: GJZ Site Information Sub Area Location: Wet Detention Basin 5 Drainage Area (DA) = 87,120 sf Impervious Area (IA) = 36,067 sf Percent Impervious (1) = 41.4 % Elevations Top of Bank Elevation = 274.00 ft Emergency Elevation = 272.77 ft Temporary Pool Elevation = 272.05 ft Permanent Pool Elevation = 271.50 ft Bottom of Pond Elevation = 265.00 ft Sediment Cleanout, Bottom Elevation = 265.50 ft Forebay( 267.50 ft) Basin Areas/Volumes Area of Main Pool = 3,820 sf Area of Permanent Pool = 5,054 sf Area of Bottom of Shelf = 4,007 sf Area of Bottom of Pond = 513 sf Area of Temporary Pool = 6,157 sf Volume, main pool = 11,621 cf Volume, fore bay (sum of forebays) = 2,032 cf Volume, permanent pool = 13,653 cf Forebay % of permanent pool volume = 17.5 % Average Depth Depth of Pond = 5.5 ft Average Depth = 3.04 ft Use Average Depth of = 3.00 ft Required Surface Area A main -pool (Main Pool Only at Permanent Pool Elev.) A permyool (includes main pond & forebays) (Elev = 271.50 ) Abot shelf (includes main pond & forebays) (Elev = 271.00 ) A botJ,ond (excluding sediment storage & forebays) Atempyond (includes main pond and forebays) (Elev = 272.05 ) V main_pool (from Hydracad) V forebay (from Hydracad) V perm_pool ( forebay+Vmain_pool) OK Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) See Wet Basin Supplement SA/DA = 1.6 (85% TSS Removal via Pond) Min Req'd Surface Area = 1,394 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.0 inch (Project Does Not Drain to SA Waters) Determine Rv Value = 0.05 + 0.009 (1) = 0.42 in/in Storage Volume Required = 3,068 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 3820 > 1394 ) sf BOHLER4 BOHLER ENGINEERING NC, PLLC Wet Detention Basin Design # 5 1.0 inch Volume Elevation Required Temporary Pool Volume = 3,068 cu ft Elev (fmsl) Area (so Permanent Pool Elevation = 271.50 5,054 Frustrum' Bottom Elevation = 271.50 5,054 Temporary Pool = 272.05 6,215 Frustrum' Top Elevation = 272.10 6,273 Temporary Pool Volume = 3,112 cu ft 'Frustrum bounds in which Temporary Pool will ultimately reside Orifice Sizing -Wet Detention Q2 Days = 0.0180 cfs Q5 Days = 0.0072 cfs Orifice Size = 1 in Driving Head (Ho) = 0.17 ft Q Orifice = 0.011 cfs Drawdown Time = 3.3 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device Outside Length = 6.00 ft Outside Width = 6.00 ft Inside Length = 5.00 ft Inside Width = 5.00 ft Bottom Thickness = 0.50 ft Top of Riser = 272.70 ft Invert of Riser = 271.50 ft Area = 36.0 sf Volume = 61 cf Weight = 3,819 Ibs Factor of Safety = 1.50 WT Req'd of Anti -Flotation Device = 5,728 Ibs Volume of Concrete Req'd = 65.4 of Depth Provided = 1.00 ft Volume Provided = 67.2 cf WT of Anti -Flotation Device Provided = 5,887 Ibs Contour Contour Area Incremental Accumulated Volume Volume, S Stage, Z sq ft cu ft cu ft ft 271.50 5,054 0 0 0.0 272.00 6,157 2,803 2,803 1.0 273.00 7,317 6,737 9,540 2.0 274.00 8,533 7,925 17,465 3.0 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Water Displaced - Top of Riser to Bottom of Riser) (Weight Water Displaced) (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf OK BOHLER BDHLER ENGINEERING NC. PLLC Wet Detention Basin Design # 6 Project Information Project: Oakmont Subdivision Location: Harnett County, NC Project Number: NCR201044 Date: 6-Aug-21 Designed: GJZ Checked: GJZ Site Information Sub Area Location: Wet Detention Basin 6 Drainage Area (DA) = 77,972 sf Impervious Area (IA) = 27,442 sf Percent Impervious (1) = 35.2 % Elevations Top of Bank Elevation = 309.00 ft Emergency Elevation = 307.50 ft Temporary Pool Elevation = 305.20 ft Permanent Pool Elevation = 304.50 ft Bottom of Pond Elevation = 298.00 ft Sediment Cleanout, Bottom Elevation = 298.50 ft Fore bay ( 301.50 ft) Basin Areas/Volumes Area of Main Pool = 2,036 sf Area of Permanent Pool = 3,032 sf Area of Bottom of Shelf = 2,415 sf Area of Bottom of Pond = 254 sf Area of Temporary Pool = 3,852 sf Volume, main pool = 6,639 cf Volume, fore bay (sum of forebays) = 1,071 cf Volume, permanent pool = 7,710 cf Forebay % of permanent pool volume = 16.1 % Average Depth Depth of Pond = 5.5 ft Average Depth = 3.26 ft Use Average Depth of = 3.00 ft Required Surface Area A main -pool (Main Pool Only at Permanent Pool Elev.) A permyool (includes main pond & forebays) (Elev = 304.50 ) Abot shelf (includes main pond & forebays) (Elev = 304.00 ) A botJ,ond (excluding sediment storage & forebays) Atempyond (includes main pond and forebays) (Elev = 305.20 ) V main_pool (from Hydracad) V forebay (from Hydracad) V perm_pool ( forebay+Vmain_pool) OK Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) See Wet Basin Supplement SA/DA = 1.3 (85% TSS Removal via Pond) Min Req'd Surface Area = 1,014 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.0 inch (Project Does Not Drain to SA Waters) Determine Rv Value = 0.05 + 0.009 (1) = 0.37 in/in Storage Volume Required = 2,383 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 2036 > 1014 ) sf BOHLER4 BOHLER ENGINEERING NC, PLLC Wet Detention Basin Design # 6 1.0 inch Volume Elevation Required Temporary Pool Volume = 2,383 cu ft Elev (fmsl) Area (so Permanent Pool Elevation = 304.50 3,032 Frustrum' Bottom Elevation = 304.50 3,032 Temporary Pool = 305.20 3,852 Frustrum' Top Elevation = 305.40 3,998 Temporary Pool Volume = 2,440 cu ft 'Frustrum bounds in which Temporary Pool will ultimately reside Orifice Sizing -Wet Detention Q2 Days = 0.0141 cfs Q5 Days = 0.0056 cfs Orifice Size = 1 in Driving Head (Ho) = 0.22 ft Q orifice = 0.012 cfs Drawdown Time = 2.3 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device Outside Length = 5.00 ft Outside Width = 5.00 ft Inside Length = 4.00 ft Inside Width = 4.00 ft Bottom Thickness = 0.50 ft Top of Riser = 307.25 ft Invert of Riser = 304.50 ft Area = 25.0 sf Volume = 81 cf Weight = 5,070 Ibs Factor of Safety = 1.50 WT Req'd of Anti -Flotation Device = 7,605 Ibs Volume of Concrete Req'd = 86.8 of Depth Provided = 2.00 ft Volume Provided = 87.3 cf WT of Anti -Flotation Device Provided = 7,643 Ibs Contour Contour Area Incremental Accumulated Volume Volume, S Stage, Z sq ft cu ft cu ft ft 304.50 3,032 0 0 0.0 305.00 3,706 1,685 1,685 1.0 306.00 4,436 4,071 5,756 2.0 307.00 5,223 4,830 10,585 3.0 308.00 6,066 5,645 16,230 4.0 309.00 6,966 6,516 22,746 5.0 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Water Displaced - Top of Riser to Bottom of Riser) (Weight Water Displaced) (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf OK BOHLER BOHLER ENGINEERING NC, PLLC Riprap Outlet Protection Design Project: Oakmont Subdivision Phase III Location: Harnett County, NC Project Number: NCR201044 Date: Jan-20-2023 Designed: AD Checked: GZ Outlet ID: SCM 1 outfall Pipe diameter= 24 inches Pipe slope= 7.76 % Roughness Coef.= 0.013 Full Flow Capacity= 69.32 cfs Includes 1.1 Factor of Safety Full flow velocity= 22.07 ft/sec 25 Figure 8.06.b.1 Zone 41 20 Zone 6 15 Z Zo 5 10 o e4 5 Z ne i Zon 3 2- 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Is grade of apron 10% or more: N Y/N Zone used = 6 Length = 20.0 ft. Outlet pipe diameter= 24 in. Width at Outlet = 6.0 ft. Outlet flowrate= 69.3 cfs Width at end of Pad= 29.1 ft. Outlet velocity= 22.07 ft/sec Stone diameter = 14 in. Material = Class II Thickness = 21 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class 1 10 15 8 x D(o) 4 Class 1 10 15 8 x D(o) 5 Class 11 14 21 10 x D(o) 6 Class 11 14 21 10 x D(o) 7 1 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual BOHLER BOHLER ENGINEERING NC, PLLC Riprap Outlet Protection Design Project: Oakmont Subdivision Phase III Location: Harnett County, NC Project Number: NCR201044 Date: Jan-20-2023 Designed: AD Checked: GZ Outlet ID: SCM 2 outfall Pipe diameter= 24 inches Pipe slope= 1.32 % Roughness Coef.= 0.013 Full Flow Capacity= 28.59 cfs Includes 1.1 Factor of Safety Full flow velocity= 9.10 ft/sec 25 Figure 8.06.b.1 Zone 20 Zone 6 ........... 15 Z Zo 5 10 o e4 _Z ne i Zon 3 7 2- 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Is grade of apron 10% or more: N Y/N Zone used = 2 Length = 12.0 ft. Outlet pipe diameter= 24 in. Width at Outlet = 6.0 ft. Outlet flowrate= 28.6 cfs Width at end of Pad= 19.9 ft. Outlet velocity= 9.10 ft/sec Stone diameter = 8 in. Material = Class B Thickness = 12 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class 1 10 15 8 x D(o) 4 Class 1 10 15 8 x D(o) 5 Class 11 14 21 10 x D(o) 6 Class 11 14 21 10 x D(o) 7 1 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual BOHLER BOHLER ENGINEERING NC, PLLC Riprap Outlet Protection Design Project: Oakmont Subdivision Phase III Location: Harnett County, NC Project Number: NCR201044 Date: Jan-20-2023 Designed: AD Checked: GZ Outlet ID: SCM 3 outfall Pipe diameter= 24 inches Pipe slope= 2 % Roughness Coef.= 0.013 Full Flow Capacity= 35.19 cfs Includes 1.1 Factor of Safety Full flow velocity= 11.20 ft/sec 25 Figure 8.06.b.1 Zone 20 Zone 6 ........... 15 Z Zo 5 ,2 10 o e4 Z e 1 : Zon 3 2 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Is grade of apron 10% or more: N Y/N Zone used = 2 Length = 12.0 ft. Outlet pipe diameter= 24 in. Width at Outlet = 6.0 ft. Outlet flowrate= 35.2 cfs Width at end of Pad= 19.9 ft. Outlet velocity= 11.20 ft/sec Stone diameter = 8 in. Material = Class B Thickness = 12 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class 1 10 15 8 x D(o) 4 Class 1 10 15 8 x D(o) 5 Class 11 14 21 10 x D(o) 6 Class 11 14 21 10 x D(o) 7 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual BOHLER BOHLER ENGINEERING NC, PLLC Riprap Outlet Protection Design Project: Oakmont Subdivision Phase III Location: Harnett County, NC Project Number: NCR201044 Date: Jan-20-2023 Designed: AD Checked: GZ Outlet ID: SCM 4 outfall Pipe diameter= 36 inches Pipe slope= 1.96 % Roughness Coef.= 0.013 Full Flow Capacity= 102.72 cfs Includes 1.1 Factor of Safety Full flow velocity= 14.53 ft/sec 25 Figure 8.06.b.1 Zone 20 Zone 6 15 w4 ec Z Zo 5 10 o e4 _Z e 1 : Zon 3 2 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Is grade of apron 10% or more: N Y/N Zone used = 3 Length = 24.0 ft. Outlet pipe diameter= 36 in. Width at Outlet = 9.0 ft. Outlet flowrate= 102.7 cfs Width at end of Pad= 36.7 ft. Outlet velocity= 14.53 ft/sec Stone diameter = 10 in. Material = Class I Thickness = 15 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class 1 10 15 8 x D(o) 4 Class 1 10 15 8 x D(o) 5 Class 11 14 21 10 x D(o) 6 Class 11 14 21 10 x D(o) 7 1 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual BOHLER BOHLER ENGINEERING NC, PLLC Riprap Outlet Protection Design Project: Oakmont Subdivision Phase III Location: Harnett County, NC Project Number: NCR201044 Date: Jan-20-2023 Designed: AD Checked: GZ Outlet ID: K-10 Outfall Pipe diameter= 24 inches Pipe slope= 5 % Roughness Coef.= 0.013 Full Flow Capacity= 55.64 cfs Includes 1.1 Factor of Safety Full flow velocity= 17.71 ft/sec 25 Figure 8.06.b.1 Zone 20 Zone 6 ........... 15 Z Zo 5 10 o e4 5 Z ne i Zon 3 2- 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Is grade of apron 10% or more: N Y/N Zone used = 3 Length = 16.0 ft. Outlet pipe diameter= 24 in. Width at Outlet = 6.0 ft. Outlet flowrate= 55.6 cfs Width at end of Pad= 24.5 ft. Outlet velocity= 17.71 ft/sec Stone diameter = 10 in. Material = Class I Thickness = 15 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class 1 10 15 8 x D(o) 4 Class 1 10 15 8 x D(o) 5 Class 11 14 21 10 x D(o) 6 Class 11 14 21 10 x D(o) 7 1 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual BOHLER BOHLER ENGINEERING NC, PLLC Riprap Outlet Protection Design Project: Oakmont Subdivision Phase III Location: Harnett County, NC Project Number: NCR201044 Date: Jan-20-2023 Designed: AD Checked: GZ Outlet ID: SCM 6 outfall Pipe diameter= 24 inches Pipe slope= 2.73 % Roughness Coef.= 0.013 Full Flow Capacity= 41.12 cfs Includes 1.1 Factor of Safety Full flow velocity= 13.09 ft/sec 25 Figure 8.06.b.1 Zone 20 Zone 6 ........... 15 Z Zo 5 10 o e4 5 Z ne i Zon 3 2- 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Is grade of apron 10% or more: N Y/N Zone used = 3 Length = 16.0 ft. Outlet pipe diameter= 24 in. Width at Outlet = 6.0 ft. Outlet flowrate= 4 1. 1 cfs Width at end of Pad= 24.5 ft. Outlet velocity= 13.09 ft/sec Stone diameter = 10 in. Material = Class I Thickness = 15 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class 1 10 15 8 x D(o) 4 Class 1 10 15 8 x D(o) 5 Class 11 14 21 10 x D(o) 6 Class 11 14 21 10 x D(o) 7 1 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual BOHLER BOHLER ENGINEERING NC, PLLC Riprap Outlet Protection Design Project: Oakmont Subdivision Phase III Location: Harnett County, NC Project Number: NCR201044 Date: Jan-20-2023 Designed: JDW Checked: SK Outlet ID: EX. SCM Outfall Pipe diameter= 42 inches Pipe slope= 0.67 % Roughness Coef.= 0.013 Full Flow Capacity= 90.59 cfs Includes 1.1 Factor of Safety Full flow velocity= 9.42 ft/sec 25 Figure 8.06.b.1 Zone 20 Zone 6 15 Z Zo 5 10 o e4 Z e 1 : Zon 3 2 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Is grade of apron 10% or more: N Y/N Zone used = 3 Length = 28.0 ft. Outlet pipe diameter= 42 in. Width at Outlet = 10.5 ft. Outlet flowrate= 90.6 cfs Width at end of Pad= 42.8 ft. Outlet velocity= 9.42 ft/sec Stone diameter = 10 in. Material = Class I Thickness = 15 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class 1 10 15 8 x D(o) 4 Class 1 10 15 8 x D(o) 5 Class 11 14 21 10 x D(o) 6 Class 11 14 21 10 x D(o) 7 1 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual BOHLER BOHLER ENGINEERING NC, PLLC Emergency Spillway Design TRAPEZOIDAL/TRIANGULAR SHAPE Channel Location: BMP #5 Estimate 25-yr Peak Runoff: Q Over Spillway 140.00 cfs Additional Flow 0.00 cfs Q25 Total, Qdesign 140.00 cfs Channel Information: Channel Bottom Width, b 65.0 ft/ft Side Slope (x:1) 3.0 Channel Slope, S 0.010 ft/ft Flow Depth, d 0.80 ft Selected Channel Lining: Selected Channel Lining I 2-inch D50 Maximum Permissible Velocity {Vmax) (fps) 5 Permissible Shear Stress {tp) (psf) 0.67 Calculations: e 2.4 ft Side Slope Length, m 2.5 ft Top Width, T 69.8 ft Channel Area, A 53.92 sq ft Wetted Perimeter, PW 70.06 ft Hydraulic Radius, Rh 0.77 ft Mannings "n" 0.041 Calculated Flow Rate, Qcaic 164.57 cfs Calculated Velocity, Vcaic 3.05 fps Calculated Shear Stress, tcaic 0.50 psf Q calc > Q design? yes V calc < V max? yes t calc e t p? yes BOHLER// BOHLER ENGINEERING NC, PLLC Emergency Spillway Design TRAPEZOIDAL/TRIANGULAR SHAPE Channel Location: BMP #5 Estimate 25-yr Peak Runoff: Q Over Spillway 55.51 cfs Additional Flow 0.00 cfs Q25 Total, Qdesign 55.51 cfs Channel Information: Channel Bottom Width, b 60.0 ft/ft Side Slope (x:1) 3.0 Channel Slope, S 0.010 ft/ft Flow Depth, d 0.50 ft 1112121 Selected Channel Lining: Selected Channel Lining 1 1-inch D50 Maximum Permissible Velocity {Vmax) (fps) 5 Permissible Shear Stress {tp) (psf) 0.33 Calculations: e 1.5 ft Side Slope Length, m 1.6 ft Top Width, T 63.0 ft Channel Area, A 30.75 sq ft Wetted Perimeter, PW 63.16 ft Hydraulic Radius, Rh 0.49 ft Mannings "n" 0.044 Calculated Flow Rate, Qcaic 64.45 cfs Calculated Velocity, Vcaic 2.10 fps Calculated Shear Stress, tcaic 0.31 psf Q calc > Q design? yes V calc < V max? yes t calc e t p? yes BOHLER// BOHLER ENGINEERING NC, PLLC Emergency Spillway Design TRAPEZOIDAL/TRIANGULAR SHAPE Channel Location: BMP #5 Estimate 25-yr Peak Runoff: Q Over Spillway 30.00 cfs Additional Flow 0.00 cfs Q25 Total, Qdesign 30.00 cfs Channel Information: Channel Bottom Width, b 30.0 ft/ft Side Slope (x:1) 3.0 Channel Slope, S 0.010 ft/ft Flow Depth, d 0.50 ft Selected Channel Lining: Selected Channel Lining 1 1-inch D50 Maximum Permissible Velocity {Vmax) (fps) 5 Permissible Shear Stress {tp) (psf) 0.33 Calculations: e 1.5 ft Side Slope Length, m 1.6 ft Top Width, T 33.0 ft Channel Area, A 15.75 sq ft Wetted Perimeter, PW 33.16 ft Hydraulic Radius, Rh 0.47 ft Mannings "n" 0.044 Calculated Flow Rate, Qcaic 32.47 cfs Calculated Velocity, Vcaic 2.06 fps Calculated Shear Stress, tcaic 0.31 psf Q calc > Q design? yes V calc < V max? yes t calc e t p? yes BOHLER// BOHLER ENGINEERING NC, PLLC Emergency Spillway Design TRAPEZOIDAL/TRIANGULAR SHAPE Channel Location: BMP #5 Estimate 25-yr Peak Runoff: Q Over Spillway 33.66 cfs Additional Flow 0.00 cfs Q25 Total, Qdesign 33.66 cfs Channel Information: Channel Bottom Width, b 40.0 ft/ft Side Slope (x:1) 3.0 Channel Slope, S 0.010 ft/ft Flow Depth, d 0.50 ft Selected Channel Lining: Selected Channel Lining 1 1-inch D50 Maximum Permissible Velocity {Vmax) (fps) 5 Permissible Shear Stress {tp) (psf) 0.33 Calculations: e 1.5 ft Side Slope Length, m 1.6 ft Top Width, T 43.0 ft Channel Area, A 20.75 sq ft Wetted Perimeter, PW 43.16 ft Hydraulic Radius, Rh 0.48 ft Mannings "n" 0.044 Calculated Flow Rate, Qcaic 43.12 cfs Calculated Velocity, Vcaic 2.08 fps Calculated Shear Stress, tcaic 0.31 psf Q calc > Q design? yes V calc < V max? yes t calc e t p? yes BOHLER// BOHLER ENGINEERING NC, PLLC Emergency Spillway Design TRAPEZOIDAL/TRIANGULAR SHAPE Channel Location: BMP #5 Estimate 25-yr Peak Runoff: Q Over Spillway 15.00 cfs Additional Flow 0.00 cfs Q25 Total, Qdesign 15.00 cfs Channel Information: Channel Bottom Width, b 30.0 ft/ft Side Slope (x:1) 3.0 Channel Slope, S 0.010 ft/ft Flow Depth, d 0.50 ft Selected Channel Lining: Selected Channel Lining 1 1-inch D50 Maximum Permissible Velocity {Vmax) (fps) 5 Permissible Shear Stress {tp) (psf) 0.33 Calculations: e 1.5 ft Side Slope Length, m 1.6 ft Top Width, T 33.0 ft Channel Area, A 15.75 sq ft Wetted Perimeter, PW 33.16 ft Hydraulic Radius, Rh 0.47 ft Mannings "n" 0.044 Calculated Flow Rate, Qcaic 32.47 cfs Calculated Velocity, Vcaic 2.06 fps Calculated Shear Stress, tcaic 0.31 psf Q calc > Q design? yes V calc < V max? yes t calc e t p? yes BOHLER// BOHLER ENGINEERING NC, PLLC Emergency Spillway Design TRAPEZOIDAL/TRIANGULAR SHAPE Channel Location: BMP #5 Estimate 25-yr Peak Runoff: Q Over Spillway 5.00 cfs Additional Flow 0.00 cfs Q25 Total, Qdesign 5.00 cfs Channel Information: Channel Bottom Width, b 10.0 ft/ft Side Slope (x:1) 3.0 Channel Slope, S 0.010 ft/ft Flow Depth, d 0.50 ft Selected Channel Lining: Selected Channel Lining 1 1-inch D50 Maximum Permissible Velocity {Vmax) (fps) 5 Permissible Shear Stress {tp) (psf) 0.33 Calculations: e 1.5 ft Side Slope Length, m 1.6 ft Top Width, T 13.0 ft Channel Area, A 5.75 sq ft Wetted Perimeter, PW 13.16 ft Hydraulic Radius, Rh 0.44 ft Mannings "n" 0.044 Calculated Flow Rate, Qcaic 11.21 cfs Calculated Velocity, Vcaic 1.95 fps Calculated Shear Stress, tcaic 0.31 psf Q calc > Q design? yes V calc < V max? yes t calc e t p? yes