Loading...
HomeMy WebLinkAboutSW6220505_Design Calculations_20220607Sformwofer Monogemenf Report April 29, 2022 Utility Improvements to Serve Shahbain Reserve —Phase 1 Rockfish Road Raeford, Hoke County, NC Prepared for: Double D Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 Prepared by: Bowman North Carolina, Ltd. 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 (919) 553-6570 Firm#F-1445 *10 1111A I u = 111 C A 1R SEAL -_ 051571 =, • � lam: ._� '•• NGINE ... E F N TABLE OF CONTENTS OVERVIEW FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP WATER SURFACE CLASSIFICATIONS HUC NOAA POINT PRECIPITATION FREQUENCY ESTIMATES SHWT REPORT WATER QUANTITY -WET POND SCM 1 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME -FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY -INFILTRATION BASIN SCM 2 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME -FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY -WET POND SCM 3 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME -FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY -WET POND SCM 4 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME -FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION OVERVIEW This report contains the storm water management overview for the residential project Utility Improvements to Serve Shahboin Reserve — Phase 1 on Rockfish Road in Hoke County. The project site is currently undeveloped. The proposed site consists of 115.32 acres. The proposed site is located in Flood Zone `X' as shown on FEMA FIRM Panel 3710947SOOK with an effective date of 1 /5/07, Flood zones are subject to change by FEMA. There are existing stream or wetland features on the proposed property. There are four proposed storm water management facilities (three wet ponds and one infiltration basin) outlined in this report and have been designed for post —development peak attenuation to treat the impervious areas of the development, The Wet Pond SCM 1 is designed to capture a drainage area of 20.29 ac with an impervious area of 8.53 oc. The Infiltration Basin SCM 2 is designed to capture a drainage area of 9.05 ac with an impervious area of 3.93 ac, The Wet Pond SCM 3 is designed to capture a drainage area of 4.06 ac with an impervious area of 1.99 ac. The Wet Pond SCM 4 is designed to capture a drainage area of 20.08 ac with an impervious area of 8,06 ac. The balance of the site is open space and will by—pass the proposed SCMs. The SCMs are designed to treat a 1.0" storm event. Im ervious Area Summary — Wet Pond SCM 1 Roadway 71,993 sf 1.65 ac Sidewalk 27,645 sf 0.64 ac Roof 68 lots @ 4,000 sf lot 272,000 sf 6.24 ac Total IA to Pond 371 638 sf 1 8.53 ac Impervious Area Summary — Infiltration Basin SCM 2 Roadway 43,779 sf 1.01 ac Sidewalk 15,376 sf 0.35 ac Roof 28 lots @ 4,000 sf lot 112,000 sf 2.57 ac Total IA to Pond 171,155 sf 3.93 ac Impervious Area mma — Wet Pond SCM 3 Roadway 17,073 sf 0.39 ac Sidewalk 5,672 sf 0.13 ac Roof 16 lots @ 4,000 sf/lot 64,000 sf 1.47 ac Total IA to Pond 86,745 sf 1 1.99 ac Impervious Area Sum maty — Wet Pond 5CM 4 Roadway 82,159 sf 1.89 ac Sidewalk 26 880 sf 0.62 ac Roof (58 lots @ 4,000 sf/lot) 232,000 sf 5.32 ac Pool Kiosk 9 920 sf 0.23 ac Total IA to Pond 350,959 sf 8.06 ac Soils The County Soils Survey indicates that Blaney Loamy Sand, Johnston Loam, Norfolk Loamy Sand and Wagram Loamy Sand soils are present on the site. FIGURES Hydrologic Soil Group —Hoke County, North Carolina 6745M 6460D 674M 674930 674a)f) 34° 5746N 1 34^ 59' 0' N 1 immomma4p 67430D 67440D 674500 674800 67470D 674ODD 674900 679000 3 o Map Sole: 1:6,810 if printed on A porb-alt (8.5' x 11") sheet Metiers N 0 100 200 400 am Feet 0 300 600 12DD 180D ► ap projection: Web Mercator Corner mordnahs: WGS84 Edge tics: UrM Zone 17N WGSN I "l L\ Natural Resources Web Soil Survey ins Conservation Service National Cooperative Soil Survey 3 3 . -934° SY 46' N .I� A i j 4r `x 1 I -{,, 8 675100 675MO 4/4/2022 Page 1 of 4 34° 59' 0' N C �g 0z 0 m � e Z � o 0 3 0 A CD z(n 0 CD O 3 N CC 0 G O (D 13 Q (D 0 O <1 Cl) O C U) O•.0 co D o• W 00 D cc z 0 n 0 o0 0o D to z O C) C) oo m D a D (o 0 O c v O O C 0 0 C)G CD m ;; 3 9 m m a D > > an � m 0 0 ED `m a d C, 0 Q CD O m c0 9 „ o © m © o d d _ m - CDN o D) o ."L1 t7i N D) A O ° C d 3 m N m O Na m N m 2 n 0) O N S � G 41 O N < N 01 N W 3 O C O C O' y O m O H O fD (D � ' O N� 3 �. 0 m W N (D 0 (D N 00 C� m 0 N d ' �� O cn C Qom cn (n 41 N N• N 9 C em CD o w � O Zn0 ov o'D ' c DZ < B ma mn�D00 mo.0 c (D m �m a m o o— CL 3 N 3 S ID 3 D cn O c N pCj 3 3 (D (n 3< O (0 3 y. (D m (A C "O `C CL O m _ _ y C 2 N C N m n (D C N ID 'O N 3 o 3 2 0 0 _ .< �ac°o - f0 l m((D m°' wCDD m �oidS� 0 (D me N `�-1. = =T obi ' N o m 0 c0 m °' 3 vm V a', o Dm 3 C Z �m Q m m m o� 3 s� a mF 0�.vmo 0 m mod Q < o �N0v o.� QQ as CDC aN�CD o 3 v (0 3 v� C N O ( 3 j fD 0' a Z N CD O m O m' Q CD ' 7 CCD n � 3 Q O to (O 3 =� O .-, 3 (D. ,< S O C 3 N O O N G N (D p NN 10 m 0 (a d a) m L 3 p CD O j .Oa m �' fD N s O' y m m Q si D m of N' o m " 4 C CO w m= m rn � 3 cNi 3£ v m n' D O < (p O� 3 O a o _ 0 N pD m c N a W Q CD Q 7 fn N m 3 g o O (p (O — � CO) �c 3� m N Z y �QZ3•p G) (D s �0m3 m N o N o m N 3 w y (D 3 3 a m w m co 3CA 0 Cr In m0 m " CfDm�fD Q (D - 3 0 °'_0� O 3 m a lD m C (p N Q N Q ((DD N 3 O pOj 0 d 3 C 0 O 00 I O 0 0 0 0 (''� O d Q(D (DC (n Q O m N O O O C (D W N S m O. O - m N N O Q D V r m 0 m z v Hydrologic Soil Group —Hoke County, North Carolina Hydrologic Soil Group �M_'P-Iit symbol Map unit name Rating Acres in AOI Percent of AOI BaD i Blaney loamy sand, 8 to 15 percent slopes C A/D 42.6 5.3 37.1 % JT Johnston loam 4.6% NoB Norfolk loamy sand, 2 to 6 percent slopes A 44.6 38.8% WaB Wagram loamy sand, 0 to 6 percent slopes A 22.4 19.5% Totals for Area of Interest 114.9 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. u= Natural Resources Web Soil Survey 4/4/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 ,w& Ln ! . BOSTIC RD k d007 N07n3 Ul L l t PAWN, utz w C d �I Q W w 0 m a a w M.14 o ~ c tj r� n a a v a m _ r cl z. 1 0 m c E m E m= E U c d x 3 3 m J 9pQ O O C X N ° C m w C 3 m E~ C N C o O w E > O N C c C X — Q C C C w N O« Y o E Q Q N— m N n W C T w w C Q 9 o Y O m V1 cl O C W p N W U U Y O rl N O C O L m O m m r W O v m LL C >+ c L O L ; C C C rmn ° O C> m l0 m E O w n V >� a �• m — O al O v 9 t C ° m c m U y LL N Y LL 3 W i�i m C N m ¢ w ✓� N L N w L C v E w O T E m 0 LL g () Y C r o x ° .. v A x .m. d N d N a�'i c LL > m w E Y¢ o'o i0 o c E w `w E v wm� LL o«v dz $ E m ? ° c cw Nw v ^ U ¢ m cwa md� of Pa°" °mc°>W ro$aY LL c O c ti s t c n m G v ova �vLL �ia and EEai =$a �il7 C :9 a dew °�L dna'nEO 'a °a d odm ¢ ° m� 3 3 `o o c w A� o m uo qp a mv.�> Na vN °m wmc _�€r 3 �$� c math m m W c ai '" :: N y _ N.g' o W Nwm NoN NwNSRcm cE cwm m haw m y> d w w m W> B m m N mCT c _� E Y,- ¢>d c�mc v °wo21 N— d w O X Y t d O m E O C T O C w ` w w N 3 3 K O m v m LL U Q J Q Q W Q U J U 3 U mf J U R x O Z O C y t W c a d N E W ry tl } n C l�6 w O E a N ° CVe o d 3wc 3a n LL E E a c H Z 9 w x m c ttt��� W W U Q W L y w C Z D m O Q 1lI nQI w F� Z a o w a .o o f w N a� �N c ai Z` uq¢ Q ZF ¢ o- mr~Nw o au w me mao J O x x w v a E m n �° -.�° o m u E E w a m Qsg wain Ew�Eo a s w p p LL v A m 3 z a w d LL ! 0 0 � N O O o a m CA LLOm 'Om O (V >« m■ � / � •:� 0 © � � �9 § k, � V tm % $ 6 . « ¥w� .p 1L ul ssnamuJOD U v LE as V ON Y N N 1 m r rg r E -10o4,f 9A4ae-g a Zp, 4/4/22, 2:43 PM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Raeford, North Carolina, USA* Latitude: 34.9904*, Longitude:-79.0855° Elevation: 223.18 ft** source: ESRI Maps '* source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration 1 ���������� 2 5 10 25 50 100 200 500 1000 5-min 0.395-0 482 {OR6G 0 569 0.544.0,t�6d 0:801-0 733 0: 6s-0 817 0- 17 p 877 0.76 -0.938 0.803.0.991 0.851..1.06 .01 0.8�11 10-min 0.695� 0.821 0.960 1.06 1.18 1.27 1,35 1.43 1.53 1.60 (0.631, 0.769 0.74&0.909] (0.871-1.06 0.961-1.17 1.07-1.30 1-14-1.40 1.21-1.49 (1.27-1.57 1.35-1-68 (1.40-1.75 }� 15-min 81.88) {0.789-0962 (0.938-13.14 1: Q?�35 1. 2-31448 1.35---1.65 (1.45--61.77) (1.531188 (1.61-51-7 1. 092.11) (1. 60.20 30-min 1.19 (1.08-1.32 1.43 1.30-1.58) 1.73 {1.57.1.91) 1,95 (1.76-2.15) 2.22 (2.00-2.44) 2,42 (2.18-2.66) 2.62 (2.34-2,88) 2.81 (Z%-108) 3.06 (2.70-3.36) 3.24 (2.84-3.57) 1A5} 60-min (1.35-41964) 1..63 1998 .2,01 2-71 (2.29 2380) (P-0-3.28 2, 5 3861) (3.23-3.96) (3.51.4.33 (3.87-4982 4. 5 5420 1.73 2.09 2.64 3.05 3.61 44 4.51 4.98 5.61 6.11 2-hr (1.55-1.95) L(1.88.2.36j 1 (2.37-2.91) 1 (2.73-3.43) (3.22-4.07) 11 (3.60-4.56) 1 (4175.59) 4.87-6.29 (5.27-6.86 3-hr 1.83 (1.65-2.081 2.22 (1.99.151) 11(2.52-117 2.81 3.27 2.93-3.69) 1 3.92 1 11 (3.48-4.42) 1] F--4.-45---)l5.00 (3.93-5.01) 1 (4.39-5.63) 5.59 1 (4.86-6.27) 6.41 (5.51-7.19) 7.07 (6.02-7.94 6-hr 1.97 2.45 2 2.39-98 3. 2 3,74] 3. 294.36 4.20 5123 (4.755695) 3. 206.70 (5.90-7 49) 1(6.72 8.63) 1(7.36 9556 12-hr 2.33 2889 .2.82.3A9 3.574.44 4. 8 520 (5.02 6528 (5. 1-7.17) 6. 138.12 7. 6-9A 8.21610.E 9.0 - 1.9 3.04 3.68 d.87 5.46 6.56 1 7.44 8.3E 1 9.31 10.6 11.7 24-hr (2.82-3.28 142-3,97 4.33-5.04) 5.05-5.89) (6.04-7.07) 11(ti,$3-8.02) (7.65-9.01) (t3448-10:0] (9.65-11.5) (10.6-12.6 3.52 455 5.3E 654 7.4E 11 8.44 F 9.45 10,5 11.9 13.1 2�lay (3.28-3.79) JI (3.96-4.58) 1 (4.98-5.76) 5.79-6.70 (6.89-8.01) ]1 (7.77-9.06) 8.a6-10.2 (9.58.71.3 10.9-12.9) 3.74 4.51 5.65 6.5E 7.81 8.81 9,85 10.9 12.4 13.6 3�lay 3.50-4.01) 3.96 (4.22-4.83) 4.77 1 (5.27-6.05) 11 5.94 (6.10-7.02) 6.88 11 (7.24-8.36) 8.1E L (8.14-9.43) 11 9.19 (9-07-10.5) 10.3 1 (1U-11.71 11.4 (11.3-13.3) 12.9 (12.3-14.6 14.1 4-day 3.71-4.23) (4.47-5.09 (5.55-6.34) 6.42-7.33 7.59-8.70 (8.51-9.80) (9.47-10.9 (10.4-12.1 11.8-13.8) 12.B-15.1 ) 7-day 4.61 (4.31-4.93) 5.51 {5.15-5.90) 6.79 6.34-7.27 7.80 7.27-8.34 9.19 8.53-9.82 1 10.3 1 9.53-11.0 F-11.4 (10.6-12.2) 12.E 1 (11.6-13.5 14.2 13.0-15.3 15.5 (14.1-16.6) 5.28 6.30 7.63 8.68 10.1 11.2 12.3 13.5 15.0 16.2 10-day (4.97-5.61) (5,92-6.70 7.17-8.11 8.14-9.21) 9 42-10.7 (10.4-11.9) (11.4-13.1 12.5-14.3 13.8.16.0) 20-day .126. 3.8 55.7 15E 7.9E 839E (9.47--10.7) 10.6- 2.0 12.2- 13.4- 5.3) 14, 15.9-182 17,6-202 18.8 21.8 30-day 8.37 9537 9.8E-141.1 11 6-110 12.9--14.4 14.b--16A 15.18-1�7.9) 171819.4 18.4-20.$ 20,0 2.9 213-24.4 11.2 13.1 15.2 16-1 18.7 20.2 21.7 23.1 2 i.0 26.5 45-day (10.611.8) 12.5-13,9 14.4-16:0) 15.8-17.6) (17.6-19.7) (19.0-21.3) (20.4-22.9) [21.7-24.5) 23.4-26.5) (2d.7.28.1) 13.4 15.7 17.9 19,E 21.8 23.4 25.0 26.E 28.E 30.1 60-day (12.7-14.1j (14.9-16-5) [17.0-18.9) 18.E-20.7 20.7-22.9 22.2-24.7) (23.6-26.4 ) (25.1-26.0 26.9-30.2 28.2-31.9 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https:llhdsc, nws.noaa.govlhdsclpfdslpfds_printpage.htm17lat=34.9904&Ion=- 79.0855&data=depth&units=engIish&series=pds 1 /4 Scott Cole, NCLSS 312 Copples Road Et Asheboro, NC 27205 (336) 460-4554 Double D Engineering, PLLC Attn: Mr. Lee Humphrey 150 S. Page Street Southern Pines, NC 28387 March 21, 2022 Re: Seasonal High -Water Table Identification and Soil Infiltration Rates: Rockfish Road site, Raeford, NC; Hoke County NC parcel 494750301009. Soil conditions and infiltration rates were evaluated and measured on the above -referenced property within the proposed stone water BMP device. Work was conducted in accordance with Parts A-2 and C-I of the North Carolina Department ol'Environmentcd Qualify Slurniwaler Design Manual. Soil samples were evaluated with a hand auger. SEASONAL HIGH WATER TABLE IDENTIFICATION Seasonal High Water Table depth is determined by field evaluation for soil wetness conditions which are indicated by the presence of redoxiniorphic (redox) features with chroma colors of 2 or less (in Munsell color notation) in mottles or the horizon matrix, and at times, saturated soil conditions and/or free water within the soil profile. Colors of chroma 2 or less due to relic minerals from parent material (underlying rock), anaerobic activity created by placement of fill material, or soil textural class transitions (perched water) are not considered as indicators for seasonal high water. Upon determination of SHWT depth, an additional 6" will be deducted from the observed depth to account for capillary fringe water movement above the SIiWT. Stormwater infiltration trenches are designed to ensure the lowest point is at least two feet above the Seasonal High Water Table (SHWT). SATURATED HYDRAULIC CONDUCTIVITY (Ksat) Soils evaluated on this property are typical of those within the Johnston and Blaney Soil series. These soils are moderately well drained soils with varying rates of permeability. Infiltration rates are measured to determine if soil conditions are suitable for the installation of storm water infiltration devices. Infiltration rates are measured using a Johnson Constant Head Permeameter. Measurements are recorded at varying intervals until equilibrium was reached. The SHWT and Infiltration rates for the stormwater BMP devices are reported for each Proposed location in the tables below. BMP Device Site #1 Test Location SHWT Munsell Color Ksat #1 Ksat #2 Ksat 43 (feet below Notation round surface 11' bgs 5Y 8/1 0-18" 18-50" 50"+ BMP Site 1 2.51' 7/1 Sandy Loam Sandy Clay Exp. Elevation 205' 8" / hour Loam (heavy) Clay/Heavy 2.5" / hour Redox Not Measured Thank you, Scott Cole North Carolina Licensed Soil Scientist Scott Cole, NCLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 BMP Device Site 42 Test Location SHWT (feet below Munsell Color Ksat #1 Ksat 02 Ksat 03 Notation round surface 10' bgs 5Y 8/1 0-24" 24-50" 5011+ BMP Site 2 2.5Y 7/1 Sandy Loam Silty Clay Exp. Elevation 189' 8" / hour 2.5" / hour Clay/Heavy Redox Not Measured BMP Device Site #3 Test Location SHWT (feet below Munsell Color Notation Ksat #1 Ksat #2 Ksat 43 round surface 9' bgs 5Y 811 0-36" 36"+ N/A BI%IP Site 3 2.5Y 7/1 Sandy Loam Exp. Elevation 184' 8" / hour Clay/Heavy Redox Not Measured BMP Device Site #4 Test Location SHWT (feet below Munsell Color Notation Ksat #I Ksat #2 Ksat #3 round surface) 9' bgs 5Y 8/1 0-24" 24-48" 4811+ BMP Site 4 2.5Y 7/1 Sandy Clay Sandy Clay Exp. Elevation 197' Loam 0.2" / hour Clay/Heavy 2.5" / hour Redox Not Measured CONCLUSION Field evaluation of hydraulic conductivity provides estimations of soil infiltration rates; however, methods used to measure these rates can influence the results. Side walls of the bore hole are "smeared" by the soil auger as the hole is prepared and loose soil in the bottom of the hole is placed in suspension when water is applied; both of these factors negatively influence water infiltration rates. To help overcome these issues, after excavation of each infiltration trench, it is recommended the trench bottom and side,'valls be raked and dusted with pulverized limestone. These are practices that have been in place within the on -site wastewater industry to help loosen the soil and aid in restoration of soil structure. 1 am pleased to be of service in this matter and can be contacted at questions concerning information within this report. ! 4k0 �r' e'-Q convenience should you have any a I `.\ f _ _ ■f * f Proposed Stormwater BMP #3 ! ti, SHWT: 9' bgs C -0 r SHWT Elevation: 184' j Ksat 0-36" SL: 8" 1 hour Ksat 36"+ SCL (heavy): Not Measured i li ��� i i a rr, - . _— - ter.. _.. ..� •f�.,�.�' ,,� 'iF-' s� _ • 11 ■ ° ; t a �t� �. Proposed Stormwater BMP #4 j 1 • p; SHWT: 9' bgs ■. w:•.0 t o SHWT Elevation: 197' r 1' ■ w y e m Ksat 0-24" SCL: 2.5" 1 hour e= {# 1 u Y Ksat 24"-48" SC:.2" I hour 1 1 r e o■ !! * �• *; • i'■ r n Ksat 48"+ Expansive Clay: Not Measured i . ■ ,� �' ,;sr- � � • a Y'�'. i�. 4. e r `., a s J�' � � a � `!1� e ■ i,4F42 r ``I w ° i •° c ,'}4{ n c. p ,•Yl1 L■ , � •dt � r ■!;+t ■ r °' 11 ► S C YI+'° r i a c , 1 . ip 1` ■ a � n. V ;Y11.•$; .. •I I,' .•�'.,1.. S. ��. � 'lti.;`._ .'�� � r `I� !I i ■ .! , Q'11* a .� �\ ' . F 1}\ r:-- � ■::I..w ° � • Ir-- ! i .��I,F I °' * °ji' tr +i 1}�_� °,�' 'y ■:� r ° Tw r t a R a b�' c u `',`' ■ i`� '} !'Y a ®1•■ ■ i� °al''.I. F Q¢ e OL ep a ! '' ' ■*`� ■ Proposed Stormwater BMP #2 a �, ° i r . .4} s� ■ SHWT: 10' bgs p SHWT Elevation: 189" ° •'' `W. Ksat 0-24" SL: 8" 1 hour ti •� � 1 t 4 s Ksat 24"-50" SCL (heavy): 2.5" / hour _ i ti= r Ksat 50"+ Expansive Clay: Not Measured � l Proposed Stormwater BMP 01 ir r�ri SHWT: 11' bgs'r SHWT Elevation: 205' ff ' Ksat 0-18" SL: 8" 1 hour Ksat 18"-50" SCL (heavy): 2.5" 1 hour _ Ksat 50"+ Expansive Clay: Not Measured f ` \ � �- a n , ---p—,Sti•■ -� 4 �ti�.1 �y I 6J.y'�• �r_�-.� ,A a a 1 inch = 300 feet •` ` WATER QUANTITY -WET POND SCM 1 U&� -1�l f) ao, aq a SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION- 1 Pro eCt Name _ 2 Project Area ac Ulilit Improvements to Serve Shabain Reserve - Phase 1 _ 115.32 3 Coastal Wetland Area ac - 4 Surface Water Area ac - 5 Is this project High or Low Density? 1 fish 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1008L4j 7 Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 I Infiltration System 1 0 12 Bioretention Cell 13 Wet Pond 3 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip (IS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 113ayTIter 0 26 Filterra 0 f4RNi5 LOADED DESIGNER CERTIFICATION 27 Name and Title: 28 Organization: 29 _ Street address: 3D City, State, Zip: 31 Phone number(s): 32 Email: Carlo Pardo, PE 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 919-553-6570 Certification Statement I certify, under penalty of law that this Supplement EZ fonn and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. . • I/// k0 . I //, � .• of E sroy. �.� SEAL 051571 �Arf c� I............rTWF� qa ``�.`A� �C) - `�\\ti g41:Y Signature of Designer q a ga Date DRAINAGE AREAS 1 Is this a high densit ro' ? Yes 2 If so, number of drainage areas/SCMs 4 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 7 1 2 3 4 4 Type of SCM - Wet Pond Infiltration Basin Wet Pond Wet Pond 5 Total drainage area (sq ft 5023339 sf 883772 394402 176822 874858 6 Onsite drainage area (sq ft 883772 394402 176822 874858 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft 980497 sf 371638 sf 171155 sf 86745 sf 350959 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10permitting) New BUA not on subdivided lots (subject to s 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 75573 sf 27645 sf 15376 sf 5672 sf 26880 sf Roof (sq ft 680000 sf 272000 sf 112000 sf 64000 sf 232000 sf Roadway s ft 215004 sf 71993 sf 43779 sf 17073 sf 82159 sf - Future (sq fib 9920 sf - Other, please specify in the comment box below (sq ft 9920 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots s ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19.52% 42.1 % 43% 49% 40% 19 Design storm inches 1.0 in 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 31555 cf 14480 cf 1 7243 cf 29967 cf 21 1 Calculation method for design volume 1 Simple Method Simple Method I Simple Method 1 Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): 12-Postal Kiosk for additional BUA WET POND 11Drainaue 2 area number Minimum required treatmentvalume eu ft 1 31555 cf 3 7243 cf 4 29967 cf ENERAL DC 0 3 Is the SCM sized to treat the SW from all suffar:es at build -cut? Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes 5 What are the side slopes of the SCM (H: ? 3:1 3:1 3:1 6 _ Does the SCM have retaining walls, gabion walls or other en ineered side slopes? No No No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump referre Pum referred Pum referred 10 If a plicable, will the SCM be cleaned out after construction? Yes Yes Yes 11 Does the maintenance access comply with General MDC 8 ? Yes Yes Yes 12 Does the drainage easement comply with General MDC 9 ? Yes Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Is there an O&M Agreement that complies with General MDC (11)? N/A N/A WA 14 Yes Yes Yes Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC 12 ? 16 Does the SCM follow the devicespecific MDC? Yes Yes Yes 17 Was the SCM designed I Yes Yes Yes 18 Sizing method used SA/DA SAIDA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl Elevation of the main pool bottom (top of sediment removal) (fmsl) 206.00 189.00 202.00 190.00 203.00 21 207.00 22 Elevation of the bottom of the vegetated shelf• fmsl 211.50 195.50 206.50 23 Elevation of the permanent pool fmsl 212.00 196.00 207.00 24 Elevation of the top of the vegetated shelf fmsl 212.50 196.50 207.50 25 Elevation of the temporary pool fmsl 213.90 197.50 208.70 26 Surface area of the main permanent pool (square feet 11390 2950 13155 27 Volume of the main permanent pool cubic feet 43138 cf 8526 cf 42764 cf 28 Average depth of the main pool feet 4.22 ft 3.66 ft 3.58 ft 29 Avera a depth euation used Equation 3 Equation 3 Equation 3 30 If using equation 3, main pool perimeter feet 423.0 ft 237.0 ft 442.0 ft 31 If using equation 3, width of submerged veg. shelf fee 3.0 ft 3.0 ft 3.0 ft 32 Volume of the foreba cubic feet 6715 cf 1583 cf 7964 cf 33 Is this 15-20% of the volume in the main ool? Yes Yes Yes 34 Clean -out depth for foreba inches 48 in 48 in 48 in 35 Design volume of SCM cu ft 31555 of 7243 cf 29967 cf 36 Is the outlet an orifice or a weir? Orifice Orifice Orifice 37 If orifice, orifice diameter inches 2.00 in 1 in 2 in 38 If weir, weir height (inches) 39 If weir, weir length inches 40 Drawdown time for the temporary pool (days) 2.44 3.61 3.71 41 Are the inlet(s) and outlet located in a manner that avoids short- circuitin ? Yes Yes Yes 42 Are berms or baffles provided to improve the flowpath? Yes Yes Yes 43 Depth of forebay at entrance inches 60 in 60 in 60 in 44 Depth of forebay at exit inches 24 in 18 in 24 in 45 Does water flow out of the forebay in anon -erosive manner? Yes Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1 r, 24-hr storm? Yes Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC 9 is met. No No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes Yes 53i Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda Hybrid Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes Yes Yes j Please use this space to provide any additional information about I 55 the wet pond(s): Wet Pond 1 9:27 AM 4/29/2022 Bowman North Carolina, Ltd. Shahbain Reserve, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions #1 Drainage Area (acres): 20.29 Sod Grouo Map Symbol Soil Description Acres Percent of DA A NoB Norfolk Loamy Sand 16.22 80% A WaB Wagram Loamy Sand 0.33 2% C Bad Blaney Loamy Sand 3.74 18% Existing Land Uses: Land Use Description Existing Soil Gmu� Acres Curve # We►ghted CN Open Space - Good Stand A 16.55 55 44.9 Wooded - Good Stand C 3.74 74 13.6 Cumulative Curve # = 58.5 Bowman North Carolina, Ltd. Shahbain Reserve, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions #1 Drainage Area (acres Z 20.29 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A NoB Norfolk Loamy Sand 16.22 80% A WaB Wagram Loamy Sand 0.33 2% C Bad Blaney Loamy Sand 3.74 18% Proposed Land Uses, Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Condition A 9.44 55 25.6 Open Space - Good Condition C 2.32 77 8.8 Impervious Area A & C 8.53 98 41.2 Cumulative Curve # = 75.6 Proposed Wet Pond #1 Project Information Project Name: Shabain Reserve Project #: Designed by: CEP Date: Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 20.29 Acres 883,772 sf Impervious Area (IA) = 8.53 Acres 371,638 sf Percent Impervious (1) = % 42.05 % Required Surface Area Permament Pool Depth: 4.22 ft SA/DA = 1.260 Min Req'd Surface Area = 11,137 sf (at Permanent Pool tequired WQv Storage Volume Design Storm = 1 inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.428 in/in Storage Volume Required = 31,555 cf (above Permanent Pool) Elevations Top of Pond Elevation = 220.00 ft Temporary Pool Elevation = 213.90 ft Permanent Pool Elevation = 212.00 ft Shelf Begining Elevation = 212.50 ft Forebay Weir = 211.50 ft Shelf Ending Elevation = 211.50 ft Bottom Elevation = 207.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 11,390 sf Volume of Temporary Storage = 32,182 cf Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 11390 > 11137) sf Volume of Storage for Design Storm = 32,182 Yes ( 32182 > 31555) cf Incremental Drawdown Time STORMWATER POND #1 INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Project Information Project Nar Shabain Reserve Project #: asigned by: CEP Date: 4/28/2022 iecked by: Date: Water Quality Orifice * Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Q3 = 0.0437 Cp * DZ (Z-D/24-Ei)n(112) Q2 = 0.372 Co * D*(Z-Ei)^(3rz) QJ=0 Orifice Diameter (D) = 2 in Cd = 0.6 Ei = 212 Orifice Inv. Zonal Range = 0.00 to 212 Zone 2 Range = 212 to 212.1 Zone 3 Range = 212.1 to 213 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cfs min 212.00 14,430 0 0.00 2.00 0.000 - 212.50 16080 7.628 0.50 3.00 0.068 1.878 213.00 17120 8.300 0.50 3.00 0.100 1.378 313.90 19000 16,254 100.90 3.00 1.058 256 Total -- 32.182 - - - 3.511 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 32,182 cf Total Time = 3,511 min Total Time = 2.44 days Between 2-5 4/29/2022 Prop Wet Pond- new design-#1 1 of 1 Project: Pond #1 Date: 4/29/2022 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 212 11,390 5,385 43,138 A2 (Perm -Pool) 211.5 10,150 4,963 37,753 Al (Bottom -Shelf) 211 9,700 9,313 32,790 210 8,925 8,553 23,478 209 8,180 7,818 14,925 208 7,455 7,108 7,108 207 6,760 0 0 A3 (Bottom -Pond) Forebay Contours -Volumes Elevation FB1 FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 212 2,805 2,805 1,333 6,715 211.5 2,525 2,525 1,193 5,383 211 2,245 2,245 1,980 4,190 210 1,715 1,715 1,460 2,210 209 1,205 1,205 750 750 208 295 295 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) Vpp permeter of shelf width of shelf Al (Bottom -Shelf): 15.6% *Between 15% & 20% 3.72 *At least 3' average depth 43,138 423 3 10,150 Average Depth = 4.22 Project Information Site Information Proposed Wet Pond #1 Project Name: Shabain Reserve Project * Designed by: CEP Date: 4/28/2022 Revised by: Date: Checked by: Date: Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) _ _20.29 Acres Impervious Area (IA) _ 8.53 Acres Percent Impervious (1) = _ 42.05 % (Drainage Area) Orifice Sizing Orifice Size = 2.00 in (Diameter) Drawdown Time = 2.44 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? des Anti -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 208.0 cf Weight: 12979 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 15,575 Ibs Volume of Concrete Req'd: 103.8 cf (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 165.5 cf (4'x4' riser x 8' = 128sf, 5'x5' footing x 1.5'=37.5cf) 3� F- cl: 0 OU = J w maw ►J L w w _ cV J \ I w f rCD Z O Y N / ME CU J g w w i ��F-- LLJZ— J J�__ c a¢w 6L-¢_acvo-1 �o / sn� ��cy- o II Q- J �/O w m GC p I 4Lj cn , �f I ■ cp C_ Z Q J w STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0.0 212.0 14430 0 0 0.5 212.5 16080 7628 7628 1.0 213.0 17120 8300 15928 1.9 213.9 19000 16254 32182 (WQV) 2.0 214.0 19160 1908 34090 3.0 215.0 20780 19970 54060 4.0 216.0 22455 21618 75677 5.0 217.0 24185 23320 98997 6.0 218.0 25970 25078 124075 7.0 219.0 27815 26893 150967 8.0 220.0 29720 28768 179735 STORMWATER MANAGEMENT DESIGN WET DETENTION POND: RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC: PROJECT COORDINATES POND DESIGN SUMMARY CAPE FEAR GULLY BRANCH 18-31-20.7 B 0303000406 34.988433°N,-79.087756°W DRAINAGE AREA TO POND: 20.29 ACRES SITE IMPERVIOUS AREA TO POND: 8.53 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 8.53 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 20.29 AC 20.29 AC CURVE NUMBER: 58.5 75.6 TIME OF CONCENTRATION: 32.5 MIN 13.6 MIN 1.0" STORM EVENT: 0.255 CFS 0.028 CFS 1-YEAR STORM EVENT: 2.507 CFS 25.13 CFS 1.222 CFS 2-YEAR STORM EVENT: 6.221 CFS 37.01 CFS 3.945 CFS 10-YEAR STORM EVENT: 22.38 CFS 73.84 CFS 22.04 CFS 100-YEAR STORM EVENT: 57.72 CFS 138.16 CFS 38.79 CFS �r i G I A _ R � sit h o� All all Hs; tj LL o Lq I �L� n Zd'W pWor N d' N U Z z 3 a�o aa" �R LL W N F5 F w �.{ O Z W a Sacli 't m to w =E O 1 C) O N m H m \l�J = m N ZN W W W N V) W a W ao o < V)oCD K m m � 0 I 1 w� J W Q� m Nj Lytz W L` II N c Z� W O� <83 a¢ zo o w� l S m _ - _ F4 N L. a� ` J W Z m N O CD PO, U U C z Q J (O G C) o z r a J (O G a ID m w cn U) Z _0 H Z w H w Z 0 CL w LL 3.1 w J 0 TOO nr QTRUCTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T.S. 113M JIKuuIumr 4" PVC SCREW CAP FOR CLEANING ACCESS 12" MIN. EXTEND 4" PVC THROUGH RISER STRUCTURE 4"x4" PVC TEE PERM. POND ELEV.=212.0 12" MIN. 2"DIA. HOLE DRILLED INTO BOTTOM CAP PVC DRAIN OUTLET SCALE: N.T.S. Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Pond No. 1 - Wet Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 212.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 000 212.00 14,430 0 0 050 212.50 16,080 7,628 7,628 1.00 213.00 17,120 8,300 15,928 1.90 213.90 19,000 16,254 32,182 2.00 214.00 19,160 1,908 34,090 3.00 215.00 20,780 19,970 54,060 4.00 216.00 22,455 21,618 75,677 5.00 217.00 24,185 23,320 98,997 6.00 218.00 25,970 25,078 124,075 7.00 219.00 27,815 26,893 150,967 8.00 220.00 29,720 28,768 179,735 Culvert / Orifice Structures [A] [B] [C] [PrfRSr] Rise (in) = 24.00 2.00 Inactive Inactive Span (in) = 24.00 2.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 212.00 212.00 0.00 0.00 Length (ft) = 42.00 0.50 0.00 0.00 Slope (%) = 1.19 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No 5 Friday, 04 / 29 / 2022 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 2.00 14.00 Inactive Inactive Crest El. (ft) = 214.20 216.60 0.00 0.00 Weir Coeff. = 3.33 260 3.33 3.33 Weir Type = Rect Broad --- --- Multi-Stage = Yes Yes No No Exfil.(Irl = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s). Stage (ft) Stage / Discharge Elev (ft) 8.00 - 220.00 6.00 218.00 4.00 - 216.00 2.00 214.00 0.00 212.00 0.00 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 40.00 Total Q Discharge (cfs) H yd rog ra p h Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2022 K Hydrograph Report HydraFlow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 20.290 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.04 in Storm duration = 24 hrs WC 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 1 Year 120 240 360 480 600 720 840 Hyd No. 1 Friday, 04 / 29 / 2022 = 2.507 cfs = 740 min = 22,489 cuft = 58.5 = Oft = 32.50 min = Type II = 484 Q (cfs) 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk a0 Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 20.290 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.04 in Storm duration = 24 hrs 24.00 20.00 16.00 12.00 M M Friday, 04 / 29 / 2022 = 25.13 cfs = 724 min = 73,237 cuft = 75.6 = Oft = 13.60 min = Type II = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed to Pond Hyd. No. 2 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 We 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used. 24.00 20.00 16.00 12.00 e 4.00 600 Hyd No. 3 Post Through Pond Hyd. No. 3 -- 1 Year Friday, 04 / 29 / 2022 = 1.222 cfs = 882 min = 63,501 cult = 214.50 ft = 43,982 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Hyd No. 2 1 Total storage used = 43,982 cult Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 5 1.0 Post -Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 20.290 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.00 in Storm duration = 6.00 hrs Q (Cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 6 Friday, 04 / 29 / 2022 Peak discharge = 0.255 cfs Time to peak = 360 min Hyd. volume = 2,519 cuft Curve number = 75.6 Hydraulic length = 0 ft Time of conc. (Tc) = 13.60 min Distribution = SCS 6-Hr Shape factor = 484 1.0 Post -Developed to Pond Hyd. No. 5 -- 1 Year 60 120 180 240 300 360 Hyd No. 5 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 420 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 04 / 29 12022 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge = 0.028 cfs Storm frequency = 1 yrs Time to peak = 378 min Time interval = 2 min Hyd. volume = 2,255 cuft Inflow hyd. No. = 5 - 1.0 Post -Developed to Pond/lax. Elevation = 212.16 ft Reservoir name = Wet Pond Max. Storage = 2,381 cuft Storage Indication method used Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 1.0inPost Through Pond Hyd. No. 6 -- 1 Year 600 1200 1800 2400 3000 3600 4200 4800 5400 Hyd No. 6 Hyd No. 5 Total storage used = 2,381 cuft Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 6000 Time (min) H yd ro g ra p h Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 20.290 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.68 in Distribution Storm duration = 24 hrs Shape factor Ma 5.00 4.00 3.00 2.00 1.00 Friday, 04 / 29 / 2022 = 6.221 cfs 736 min = 40,743 cuft = 58.5 = Oft = 32.50 min Type II 484 Pre -Developed -Overall Site Hyd. No. 1 -- 2 Year Q (cfs) 7.00 WE 5.00 4.00 3.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 31D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 20.290 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.68 in Storm duration = 24 hrs 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed to Pond Hyd. No. 2 -- 2 Year 120 240 360 480 600 720 840 Hyd No. 2 Friday, 04 / 29 / 2022 = 37.01 cfs = 722 min = 105,597 cuft = 75.6 = Oft = 13.60 min = Type II = 484 Q (cfs) 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 04 129 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 3.945 cfs Storm frequency = 2 yrs Time to peak = 766 min Time interval = 2 min Hyd. volume = 95,751 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 214.89 ft Reservoir name = Wet Pond Max. Storage = 51,799 cuft Storage Indication method used. Q (cfs) 40.00 30.00 20.00 10.00 w Post Through Pond Hyd. No. 3 -- 2 Year 600 1200 1800 2400 3000 Hyd No. 3 - Hyd No. 2 3600 4200 4800 5400 1 Total storage used = 51,799 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.00 6000 Time (min) 15 H yd rog ra p h Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 16 Hydrograph Report HydraFlow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 20.290 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.46 in Storm duration = 24 hrs Q (cfs) 24.00 20.00 16.00 12.00 WC 4.00 0.00 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 10 Year Friday, 04 / 29 / 2022 = 22.38 cfs = 734 min = 109,371 cuft = 58.5 = Oft = 32.50 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 we 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 20.290 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.46 in Storm duration = 24 hrs 70.00 50.00 40.00 20.00 10.00 Friday, 04 / 29 / 2022 Peak discharge = 73.84 cfs Time to peak = 722 min Hyd. volume = 206,981 cuft Curve number = 75.6 Hydraulic length = 0 ft Time of conc. (Tc) = 13.60 min Distribution = Type II Shape factor = 484 Post Developed to Pond Hyd. No. 2 -- 10 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 -, .1 ,g- E - - I - '-. ,- . I- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodesk& Civil 3D® by Autodesk, Inc. v2022 Friday, 04 / 29 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 22.04 cfs Storm frequency = 10 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 196,963 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 216.58 ft Reservoir name = Wet Pond Max. Storage = 89,115 cuft Storage Indication method used 70.00 50.00 40.00 30.00 20.00 10.00 Post Through Pond Hyd. No. 3 -- 10 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 3 Hyd No. 2 1 Total storage used = 89,115 cult 21 H yd rog ra p h Summary Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3D® by Autodesk, Inc. v2022 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 20.290 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.36 in Storm duration = 24 hrs 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 100 Year 120 240 360 480 600 720 Hyd No. 1 Friday, 04 / 29 / 2022 = 57.72 cfs = 734 min = 255,996 tuft = 58.5 = Oft = 32.50 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 20.00 10.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report HydraFlow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 20.290 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.36 in Storm duration = 24 hrs 120.00 100.00 .• 1 1 1, 40.00 20.00 23 Friday, 04 / 29 / 2022 = 138.16 cfs = 722 min = 390,581 cuft = 75.6 = Oft = 13.60 min = Type II = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed to Pond Hyd. No. 2 -- 100 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used Post Through Pond Hyd. No. 3 -- 100 Year 120.00 100.00 40.00 20.00 Friday, 04 / 29 / 2022 = 38.79 cfs = 738 min = 380,424 cuft = 219.60 ft = 168,212 cuft Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Hyd No. 3 Hyd No. 2 9 Time (min) Total storage used = 166,212 cult | ` !§ § )\ k �f !. 2k | 2 �+ k� ! |� | ■ kƒ!£ Jf ) �2 k § 7 2 ; ■ |�; | (!� ° (| k [` § Ew §� � f �� ■ �!5 2 k§k I ! �§ ». ! 2 �- ! |r k k f/ | .; q§ | \\ § )) � a! i|m P.2 (| m @ | }! ■ § \ k ` ® §|! E \ WE \ ` ! � WATER QUANTITY -INFILTRATION BASIN SCM 2 �s �ex 5CM *,p ^- q.osaL SUPPLEMENT-EZ COVER PAGE FDRMSLOADEti PROJECT INFORMAT_ ION 1 Pr_ oject Name 2 Project Area ac 3 Coastal Wetland Area (2c) 4 Surface Water Area (ac) 5 Is this project High or Low Density? 6 Does this proiect use an off -site SCM? 1 utility_ Improvements to Serve_Shabain Reserve - Phase 1 115.32 High No COMPLIANCE WITH 02H.100314) 7 Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration S stem 1 12 Bioretention Cell Wet Pond 0 13 3 0 14 _ Stormwater Wetland _ Permeable Pavement 15 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 IlDisconnected Impervious Surface.(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StonnFilter 0 0 24 Silva Cell _ Ba !ter ^ ^ _25 0 0 26 jlFilterra FORWlS LOADED DESIGNER CERTIFICATION 27 +Name and Title: Organization: _ Street address: Carlo Pardo, PE 28 _ i Bowman North Carolina, Ltd. 29 4006 Barrett Drive, Suite 104 30 City, State, Zip'. T Raleigh. NC 27609 919-553-6570 31 Phone numb_er(s): _ Email: 32 cpardo@bowman.com Certification Statement: I certify, under penalty of law thatthis Supplement EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the forth is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ``t��.ti�� C A R0��.,,f�f' SEAS. 051571 rrrf, . Gt'IVG I �{ .... RC/Q I E� Signature of Designer Date DRAINAGE AREAS 1 Is this a hi h density ro'ect? Yes 2 If so, number of drainage areas/SCMs 4 3 Does this project have low density areas? No 4 If so, number of low densi draina a areas 0 5 . Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 4 Type of SCM - Wet Pond Infiltration Basin Wet Pond Wet Pond 5 Total drainage area (sq ft 5023339 sf 883772 394402 176822 874858 6 Onsite drainage area (sq ft 883772 394402 176822 874858 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft 980497 sf 371638 sf 171155 sf 86745 sf 350959 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 10 New BUA not on subdivided lots (subject to ermittin s 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft - Sidewalk (sq ft 75573 sf 27645 sf 15376 sf 5672 sf 26880 sf - Roof (sq fly 680000 sf 272000 sf 112000 sf 64000 sf 232000 sf - Roadway s ft 215004 sf 71993 sf 43779 sf 17073 sf 82159 sf - Future (sq ft - Other, please specify in the comment box below (sq ft) 9920 sf 9920 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already ermitted (s ft. 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19.52% 42.1% 43% 49% 40% 19 luesign storm (inches) 1.0 in 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 31555 cf 14480 cf 7243 cf 29967 cf 21 Calculation method for design volume Simple Method Simple Method Simple Method Simple Method 1IUNAL IN1-UKMA]1UN . Please use this space to provide any additional information about the Kiosk for additional BUA INFILTRATION SYSTEM 1 IlDrainge area number 1 2 2 ,Minimum required treatment volume (cu ft) 14480 c MNERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes What are the side slopes of the SCM (H:V or enter "Vertical' for 5 trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access com I with General MDC 8 ? Yes 12 Does the drainage easement compjy with General MDC 9 ? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC 12 ? Yes 16 Does the SCM follow the devicespecific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes 18 Proposed slope of the subgrade surface (%) 0% 19 Are terraces or bafflesprovided? No 20 Type of pretreatment: Forebay cnnC nntn 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SHWT elevation fmsl 189.00 23 Depth to SHWT per soils report (in) 120 in 24 Ground elevation at borina in soils report fmsl 199.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A 26 Soil infiltration rate in/hr 4.00 27 Factor of safety FS) 2 is recommended . 2.00 I Fiovalinns 29 Bottom elevation (fmsl) 199 ft 30 Storage elevation fmsl 200.8 ft 31 Bypass elevation (fmsl) 204.5 ft For Basins Only 32 Bottom surface area(ft) 7230 ft 33 1 Storage elevation surface area ft2 9805. ft For Trenches Only 34 Length (ft) 35 Width (ft) 36 Perforated pipe diameter, if applicable inches 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone 2orosift) 41 Is stone free of fines? 42 1 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? ffolumes/Drawdown 44 1 Design volume of SCM 45 ITime to draw down (ho ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): _ 14480 c 7.8 hrs Infiltration 1 1:40 PM 4/28/2022 Bowman North Carolina, Ltd. Shahbain Reserve, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions #2 Drainage Area (acresZ' 9.05 Ln in4 Soil Groups: Soi/ Grouo Map Symbol Soil Description Acres Percent of DA A WaB Wagram Loamy Sand 1.60 18% A NoB Norfolk Loamy Sand 1.61 18% A/D JT Johnston Loam 2.28 25% C Bad Blaney Loamy Sand 3.56 39% Existing Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Wooded - Good Stand A 3.25 50 17.9 Wooded - Good Stand C 2.51 74 20.5 Open Space - Good Stand A 2.24 55 13.6 Open Space - Good Stand C 1.05 77 8.9 Cumulative Curve # = 61.0 Bowman North Carolina, Ltd. Shahbain Reserve, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions #2 Drainage Area (acres): 9.05 Fxisting Sod Groups; Soil Group Map Symbol Soil Description Acres Percent of DA A WaB Wagram Loamy Sand 1.60 18% A NoB Norfolk Loamy Sand 1.61 18% A/D JT Johnston Loam 2.28 25% C Bad Blaney Loamy Sand 3.56 39% Proposed Land Uses. Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Condition A 3.33 55 20.3 Open Space - Good Condition C 1.79 77 15.2 Impervious Area A & C 3.93 98 42.5 Cumulative Curve # = 78.0 Infiltration Basin Design Site Information Sub Area Location: Drainage To Infiltration Basin Drainage Area (DA) = 9.05 Acres 394402 sf Impervious Area (IA) = 3.93 Acres 171155 sf Percent Impervious (1) = 43.4 % Required Water Quality Volume Design Storm = 1 inch Determine Rv Value = 0.05 + .009 (1) = 0.44 in/in Water Quality Volume = 0.332 ac-ft Water Quality Volume = 14,480 cf Water Quality Volume = 0.441 inches of runoff i OAA 1- ear, 24-hour event = 3.09 inches Minimum Surface Area SA = (12"FS-DV)/(K'T) Factor of Safety (FS) = 2 Design Volume (DV) = 14480.0 cf Hydraulic Conductivity of Soil = 4.00 in/hr Max Dewatering Time = 72 hours SA = 1206.7 sf Drawdown Time T = FS " (DV"12)/(K"SA) Factor of Safety (FS) = 2 Design Volume (DV) = 14480.0 cf Hydraulic Conductivity of Soil = 4.00 in/hr Surface Area Provided = 11195 sf Drawdown Time = 7.8 hours s o r Fes-' x Z IN a� d Q U_' z cEE V ra + r r TT��� ya5 w z STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA INCREMENTAL TOTAL STORAGE (SF) STORAGE (CF) (CF) 0.0 199.0 7230 0 0 1.0 200.0 8640 7935 7935 1.8 200.8 9805 7378 15313 (WQV) 2.0 201.0 10105 1991 17304 3.0 202.0 11625 10865 28169 4.0 203.0 13205 12415 40584 5.0 204.0 14835 14020 54604 6.0 205.0 1 16530 15683 1 70287 7.0 206.0 1 18275 17403 87689 STORMWATER MANAGEMENT DESIGN INFILTRATION SYSTEM #3: RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC: PROJECT COORDINATES: POND DESIGN SUMMARY CAPE FEAR GULLY BRANCH 18-31-20.7 B 0303000406 34.988433°N,-79.087756°W DRAINAGE AREA TO POND: 9.05 ACRES SITE IMPERVIOUS AREA TO POND: 3.93 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 3.93 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 9.05 AC 9.05 AC CURVE NUMBER: 61.0 78.0 TIME OF CONCENTRATION: 11.6 MIN 7.2 MIN 1.0" STORM EVENT: 0.163 CFS 0.000 CFS 1-YEAR STORM EVENT: 3.492 CFS 17.11 CFS 0.000 CFS 2-YEAR STORM EVENT: 7.356 CFS 24.02 CFS 0.000 CFS 10-YEAR STORM EVENT: 20.84 CFS 44.61 CFS 0.000 CFS 100-YEAR STORM EVENT: 46.77 CFS 78.55 CFS 41.46 CFS 1 1 lb a. N Ul Z1 Z s Il 11� Z C��� rm � dM Am a IM z O I Ln w 4 >- Q O N J J (n F-- Z W Y Z Z O Q F= O j o LLJ W N Li J O W W O F— c-D cD z a O z O z � � J LLJ Z \ J W S z F- x z Q � Mi S U Q � O V) V7 cn (/") 0 N O m o N S O U w Z O Cl- CD r� J I� � p U O O L� U' Z O Q F— >- J Q � < J J J cn Z cn 0 CD (V FI Z w Y z a m w w 0 d O LO CD 0 N Z O Q J W r J d r a 3 J W o O J O N O w N 0 N U) V) o O z c9 a SS o J ¢ Z J CL W �o z w � } w C. F- a z 5 J J J w z EL z a U ' ^ m 1 i a M. 0 w F- O z Q m ar J w J C:, _0 V) O c� Ck:: z a Cl- F¢ aCk� :m O Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 41.46 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 61,476 cuft Inflow hyd. No. = 2 - SCM Post-Developli)&ervoir name = BMP Pond Max. Elevation = 205.36 ft Max. Storage = 76,539 cuft Storage Indication method used. EAltration extracted from Outflow. Hydrograph Discharge Table (Printed values >= 1.00% of Op) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.OT, 76.74 204.88 - -- - -- 12.41 - -- 1.512 12.41 12.03 65.78 205.22 -- -- -- ----- 32.01 - - - 1.567 32.01 12.07 50.32 205.36 << -- __-- ---- ----- 41.46 - -- - - -- 1.589 41.46 12.10 35.33 205.36 - ----- - 41.37 ....... - -- 1.588 41.37 12.13 23.66 205.28 - -- --- - - -- 36.08 -- - -- 1.576 36.08 12.17 16.15 205.18 - -- ---- ---- ---- 29.44 ----- -- - -- 1.560 29.44 12.20 12.51 205.09 --- -- ----- ----- 23.55 _ - --- ----- 1.545 23.55 12.23 11.24 205.01 - - --- ----- 19.16 -- -- - -- 1.533 19.16 12.27 10.75 204.95 - - -- 15.93 --- - - 1.523 15.93 12.30 10.27 204.91 -- - - - - ----- 13.62 -- - ----- 1.516 13.62 12.33 9.786 204.88 -- - - -- -- - 12.04 --- - - ----- 1.511 12.04 12.37 9.300 204.85 -- -- 10.84 - 1.507 10.84 12.40 8.812 204.83 -- - -- --- 9.852 ---- - - -- 1.504 9.852 12.43 8.322 204.81 -- ---- ----- 9.016 --- - --- -- 1.501 9.016 12.47 7.830 204.79 --- ----- ---- ----- 8.320 - -- - - - - 1.498 8.320 12.50 7.336 204.78 - - -- -_ .-- 7.740 -- --- ----- - - 1.496 7.740 12.53 6.857 204.77 - -- ---- -- 7.186 - - ---- -- 1.494 7.186 12.57 6.425 204.75 ----- - -- - 6.657 -- -- - ----- 1.492 6.657 12.60 6.073 204.74 ----- --- ---- - -- 6.165 1.490 6.165 12.63 5.807 204.73 -- -- -- - - - -- 5.720 - - -- - ----- 1.488 5.720 Continues on next page... 13 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation CivA CIv B CkpC PfRar WrA Wr B Wr C Wr0 ExflI Outflow (hrs) cfS ft cs ofS ofS cfS os os ds ofS cfS os 12.67 5.609 20472 --' --' --' --' 5.332 -'- --' --' 1.488 5332 12.70 5.468 204.71 --' --' --' --' 4.090 --' --' --' 1.485 4.890 12.73 5.338 204.70 --- '-- -- -- 4J17 -- --' --' 1.484 4717 12.77 5.226 204.70 --' -- --' - 4.514 --' --' -'- 1.488 4.515 12.80 5]14 204.60 --' --' --' --' 4.344 --- '-- --' 1.482 4.344 12.83 5i002 204.68 --' '-- '--' --' 4195 --' --- --- 1.401 4186 12.87 4.890 204.68 --' --' -- --' 4.037 --' -- '-- 1.480 4.037 12.90 4.777 204.67 -'- --- '-- -'- 3.806 '-- --' '-- 1.480 3.886 12.93 4.664 204.87 --- --' '--' --- 3.761 '-- --- '-- 1.479 3761 12.97 4.551 204.67 '- ' 3.630 - ' 1.478 3.630 13.00 4.438 204.66 '-- --' --' '--' 3.584 '-- --- '-- 1.477 3.504 13.03 4.326 284.66 --' -- --' --' 3.380 --' --' -- 1.477 3.380 13.07 4222 204.65 '--- --- --' '-- 3.260 --- --' '-- 1.476 3.260 1310 4128 204.65 --' --' --' --- 3144 --' --' --' 1.476 3144 13.13 4.046 304.65 '-- -'- --- '-- 3.034 -'- '-- '-- 1.475 3.034 13.17 3.974 204.64 --' --- '-- '--' 3.931 - --' --' 1.474 2.931 13.20 3.008 204.64 -- -- --' --' 2.835 --' --' --' 1.474 2.835 13.23 3.845 204.64 -- -- '-- --' 2.746 --- --' '-- 1.474 2746 1327 3.784 204.63 --' -- -- -- 2.663 -- '-- -- 1.473 3.663 13.30 3.723 204.63 - -' - -- 2.584 - - - 1,473 2.584 13.33 3.662 204£3 '- -- -' -- 2.509 -- - - 1.472 2.509 13.37 3.601 204.63 ---' --' --' --- 2.437 '-- --' --' 1.472 2.437 13.40 3.540 204.62 --' --' --' --' 2.367 --' -'- --' 1.472 2.367 13.43 3.479 204.62 --- -'- --' - 2.209 --- '-- '-- 1.471 2.290 13.47 3.417 204.62 -- '- -- - 2'233 '- - - 1.471 2.233 13.50 3.356 204.62 --' '--' --- --- 2167 '-- --- --' 1.470 2167 13.53 3.295 204.62 --' --' --' --' 2103 --' -'- --' 1'470 2103 13.57 3.236 204.61 2.030 -'- --' --- 1.470 2.040 Continues mnnext pmga' 14 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.60 3.182 204.61 ----- ----- ----- ----- 1.977 --- - -- ----- 1.470 1.978 13.63 3.131 204.61 ----- - --- - -- 1.917 --- - - -- 1.469 1.918 13.67 3.083 204.61 ----- ----- - - - 1.860 --- --- - - 1.469 1.860 13.70 3.037 204.61 ----- - - - -- - - 1.805 -_ --- 1.469 1.804 13.73 2.993 204.60 ----- - - - 1.751 -- --- ----- 1.468 1.751 13.77 2.949 204.60 ----- - - - - 1.700 - - --- ----- 1.468 1.700 13.80 2.905 204.60 ----- 1.650 - 1.468 1.650 13.83 2.860 204.60 ----- - -- - - - 1.620 -- -- --- 1.468 1.620 13.87 2.816 204.60 ----- - -- ----- ---- 1.591 - -- -- ----- 1.467 1.591 13.90 2.772 204.59 ----- 1.559 1.467 1.559 13.93 2.728 204.59 ----- - - 1.527 - - - 1.467 1.527 13.97 2.684 204.59 ----- _-___ ___ 1.493 - - -- -- 1.466 1.493 14.00 2.640 204.59 ----- - -- -- - -- 1.458 - -- --- - -- 1.466 1.457 14.03 2.596 204.59 ----- -- --- - ----- 1.421 - -- - - - 1.466 1.421 14.07 2.557 204.58 ----- - - - - 1.385 ----- - - -- 1.465 1.385 14.10 2.524 204.58 ----- --- ----- ---- 1.348 --- ---- 1.465 1.348 14.13 2.497 204.58 ----- ----- - - - -- 1.312 - - -- - --- 1.465 1.312 14.17 2.475 204.58 ----- _____ ___ __..__ 1.278 --- ___- _- 1.464 1.278 14.20 2.457 204.58 ----- ---- -- - 1.245 - - - - --- 1.464 1.245 14.23 2.441 204.57 ----- - -- --- - -- 1.214 ----- -- - - -- 1.464 1.214 14.27 2.426 204.57 ----- ----- -- -- 1.185 -- - _--- _ - 1.463 1.185 14.30 2.411 204.57 ----- - - -- --- 1.158 -- -- --- - -- 1.463 1.158 14.33 2.395 204.57 ----- - -- 1.132 - - - - ----- 1.463 1.132 14.37 2.380 204.57 ----- -- -- 1.108 ----- - - ----- 1.463 1.108 14.40 2.365 204.57 ----- ----- ----- ----- 1.084 -- - -- - --- 1.462 1.084 14.43 2.349 204.56 ----- ----- -__ - --- 1.062 -- -- --- --- 1.462 1.062 14.47 2.334 204.56 ----- ---- 1.040 _ 1.462 1.040 14.50 2.319 204.56 ----- - -- --- - 1.019 - - - - --- 1.462 1.019 Continues on next page. 15 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.53 2.304 204.56 ----- ----- -- - -- 0.999 -- - - - -- 1.462 0.999 14.57 2.288 204.56 ----- - - - -- - -- 0.980 -- - -- --- 1.461 0.980 14.60 2.273 204.56 ----- - - ----- 0.961 -- -- - 1.461 0.961 14.63 2.258 204.56 ----- -- --- - -- 0.942 ----- -- -- 1.461 0.942 14.67 2.242 204.56 ----- ----- -- -- - -- 0.924 ----- ----- ----- 1.461 0.924 14.70 2.227 204.56 ----- - --- ----- - -- 0.906 ----- ----- -- 1.461 0.906 14.73 2.212 204.55 ----- - --- -- - - 0.889 ---- --- 1.461 0.889 14.77 2.196 204.55 ----- - -- ----- ---- 0.872 - -- -- -- 1.460 0.872 14.80 2.181 204.55 ----- - - ---- - -- 0.855 - -- -- 1.460 0.855 14.83 2.165 204.55 ----- 0.838 1.460 0.838 14.87 2.150 204.55 ----- ----- 0.821 ----- 1.460 0.821 14.90 2.135 204.55 ----- ---- - 0.805 - - - ----- 1.460 0.805 14.93 2.119 204.55 ----- -- -- - -- 0.789 ---- --- - -- 1.460 0.788 14.97 2.104 204.55 ----- __-- ----- 0.772 -- - - - - - 1.459 0.772 15.00 2.088 204.55 ----- ----- 0.756 --- ---- 1.459 0.756 15.03 2.073 204.55 ----- --- -- - 0.740 -- - --- ----- 1.459 0.740 15.07 2.057 204.54 ----- - - -- --- 0.724 -- - --- - - 1.459 0.724 15.10 2.042 204.54 ----- -- - - 0.708 __-- -_- - - 1.459 0.708 15.13 2.026 204.54 ----- ----- 0.693 -- - --- 1.459 0.693 15.17 2.011 204.54 ----- -- - --- - - 0.677 --- --- 1.459 0.677 15.20 1.995 204.54 ----- -__-- ----- ----- 0.661 ---- --- - - 1.458 0.661 15.23 1.980 204.54 ----- - - -- ----- 0.646 --_-- - - - -- 1.458 0.646 15.27 1.964 204.54 ----- ----- ----- -- - 0.630 --- - - - - - 1.458 0.630 15.30 1.949 204.54 ----- - 0.615 -- - - 1.458 0.614 15.33 1.933 204.54 ----- ----- ----- - -- 0.599 ---- --- - -- 1.458 0.599 15.37 1.918 204.54 ----- ----- - - ----- 0.583 ---- - - - --- 1.458 0.583 15.40 1.902 204.53 ----- - -- -- - - -- 0.568 --- --- - 1.457 0.568 15.43 1.886 204.53 ----- - 0.552 - 1.457 0.552 Continues on next page... 16 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft afs afs cfs cfs afs cfs cfs afs afs afs 15.47 1.871 204.53 -- - - _- - - - 0.537 -- -- -- - -- 1.457 0.537 15.50 1.855 204.53 - - - - - - 0.521 -- -- - - - 1.457 0.521 15.53 1.840 204.53 ----- 0.506 --- ---- - - 1.457 0.506 15.57 1.824 204.53 - -- - - -- 0.490 --- --- - - 1.457 0.490 15.60 1.808 204.53 ----- - - -- - -- 0.475 -- --- - - 1.457 0.475 15.63 1.793 204.53 ----- - - -- - -- 0.459 - - ---- - -- 1.456 0.459 15.67 1.777 204.53 ----- - -- - -- 0.444 - 1.456 0.444 15- 70 1.762 204.53 ----- - - - - --- 0.428 - - -- - 1.456 0.428 End 1S.7� kr (J5C NORTH AMERICAN GREEN SPILLWAY ANALYSIS > > > Grass Spi Tway. Name Discharge Peak Flow Period Channel Slope Channel Bottom Width Low Flow Liner Retardence Class Vegetation Type Vegetation Density Soil Type Grass Spillway 41.46 4 0.3333 20 C 6-12 in Mix (Sod and Bunch) Very Good 80-95% Sandy Loam (GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% North American Green 5401 St. Wendel -Cynthiana Rd, Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Permissible Calculated Safe tY Stale P Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 41.46 cfs 10.94 ft/s 0.19 ft 0.026 8.5 Ibs/ft2 3.94 Ibs/ft2 2.16 STABLE F P300 Unvegetated Underlying Straight 41.46 cfs 10.94 ft/s 0.19 ft 0.026 5.68 Ibs/ft2 3.87 Ibs/ft2 1.47 STABLE F Substrate Shoremax w/ Straight 41.46 cfs 10.58 ft/s 0.2 ft 0.027 14 Ibs/ft2 4.06 Ibs/ft2 3.44 STABLE F P300 Reinforced Vegetation Underlying Straight 41.46 cfs 10.58 ft/s 0.2 ft 0.027 8.5 Ibs/ft2 3.99 Ibs/ft2 2.13 STABLE F Substrate Pond Report s Hydraflow Hydrographs Extension for AutodeskO Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Pond No. 1 - BMP Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 199.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 199.00 7,230 0 0 1.00 200.00 8,640 7,935 7,935 1.80 200.80 9,805 7,378 15,313 2.00 201.00 10,105 1,991 17,304 3.00 202.00 11,625 10,865 28,169 4.00 203.00 13,205 12,415 40,584 5.00 204.00 14,835 14,020 54,604 6.00 205.00 16,530 15,683 70,287 7.00 206.00 18,275 17,403 87,689 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRSr] [A] [B] [C] [D] Rise (in) Inactive Inactive Inactive Inactive Crest Len (ft) = 20.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 204.50 0.00 0.00 0.00 No. Barrels = 0 0 1 0 WeirCoeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multistage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 4.000 (by Contour) Multistage = n/a No Yes No TW Elev. (ft) = 0.00 Stage (ft) 8.00 6.00 4.00 2.00 0.00 0.00 10.00 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and oullet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 20.00 30.00 40.00 50.00 60.00 70.00 80.00 Elev (ft) 207.00 205.00 203.00 201.00 199.00 90.00 100.00 Discharge (cfs) H yd rog ra p h Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 9.050 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.09 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 Thursday, 04 / 28 / 2022 Peak discharge = 3.492 cfs Time to peak = 12.07 hrs Hyd. volume = 13,537 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 11.60 min Distribution = Type II Shape factor = 484 SCM Pre -Developed Hyd. No. 1 -- 1 Year 2 4 6 8 10 12 14 Hyd No. 1 Q (cfs) 4.00 3.00 2.00 1.00 0.00 16 18 20 22 24 26 Time (hrs) 3 Hydrograph Report HydraFlow Hydrographs Extension for Aulodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 9.050 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.09 in Storm duration = 24 hrs 15.00 12.00 • 11 . 81 3.00 0.00 0 2 4 — Hyd No. 2 Thursday, 04 / 28 / 2022 Peak discharge = 17.11 cfs Time to peak = 12.00 hrs Hyd. volume = 39,203 cuft Curve number = 78 Hydraulic length = 0 ft Time of conc. (Tc) = 7.20 min Distribution = Type II Shape factor = 484 SCM Post -Developed Hyd. No. 2 -- 1 Year Q (cfs) 18.00 15.00 12.00 •M ME 3.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 22.70 hrs Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 201.17 ft Reservoir name = BMP Pond Max. Storage = 19,166 cuft Storage Indication method used. Exfiltration extracted from Outflow 15.00 12.00 6.00 3.00 Post Through SCM Hyd. No. 3 -- 1 Year 4 8 12 16 20 24 28 32 Hyd No. 3 Hyd No. 2 i Total storage used = 19,166 cuft Q (cfs) 18.00 15.00 12.00 . OR .e 3.00 0.00 36 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 5 1.0 Post -Developed to SCM Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 9.050 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.00 in Storm duration = 6.00 hrs Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0.0 6 Thursday, 04 / 28 / 2022 Peak discharge = 0.163 cfs Time to peak = 4.13 hrs Hyd. volume = 1,916 cuft Curve number = 78 Hydraulic length = 0 ft Time of conc. (Tc) = 7.20 min Distribution = SCS 6-Hr Shape factor = 484 1.0 Post -Developed to SCM Hyd. No. 5 -- 1 Year 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 5 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 7.0 Time (hrs) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Hyd. No. 6 1.0inPost Through SCM Hydrograph type = Reservoir Peak scharge = 0.000 cfs Storm frequency = 1 yrs Time t peak = 5.47 hrs Time interval = 2 min Hyd. v lume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post -Developed to SCWax. evation = 199.14 ft Reservoir name = BMP Pond Max. orage = 1,091 cuft Storage Indication method used. ExFltration extracted from Outflow Q (cfs) 0.50 0.45 - 0.40 0.35 0.30 - 0.25 0.20 0.15 0.10 0.05 0.00 -- 0.0 1.0inPost Through SCM Hyd. No. 6 -- 1 Year 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Hyd No. 6 Hyd No. 5 1 Total storage used = 1,091 cuft Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 18.0 Time (hrs) Hydrograph Summary Report HydreflowHydrographsExtension for Autodesk®Civil 3D®byAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 7.356 2 722 23,013 SCM Pre -Developed 2 SCS Runoff 24.02 2 720 55,003 — -- — - SCM Post -Developed 3 Reservoir 0.000 2 1612 0 2 202.09 29,303 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 ------ ----- 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 n/a 0 Return Period: 5 199.00 0.000 1.0inPost Through SCM Infiltration#2.gpw 2 Year Thursday, 04 / 28 / 2022 10 Hydrograph Report HydraFlow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 9.050 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.73 in Storm duration = 24 hrs Q (Cfs) 8.00 . M 4.00 2.00 Thursday, 04 / 28 / 2022 Peak discharge = 7.356 cfs Time to peak = 12.03 hrs Hyd. volume = 23,013 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 11.60 min Distribution = Type II Shape factor = 484 SCM Pre -Developed Hyd. No. 1 -- 2 Year 2 4 6 8 10 12 14 Hyd No. 1 Q (cfs) 8.00 4.00 2.00 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 9.050 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.73 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0 2 4 6 Hyd No. 2 11 Thursday, 04 / 28 / 2022 Peak discharge = 24.02 cfs Time to peak = 12.00 hrs Hyd. volume = 55,003 tuft Curve number = 78 Hydraulic length = 0 ft Time of conc. (Tc) = 7.20 min Distribution = Type II Shape factor = 484 SCM Post -Developed Hyd. No. 2 -- 2 Year Q (Cfs) 28.00 24.00 20.00 16.00 12.00 M. 4.00 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 26.87 hrs Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 202.09 ft Reservoir name = BMP Pond Max. Storage = 29,303 cuft Storage Indication method used. Exfiltration extracted from Outflow Post Through SCM Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 - 4.00 0.00 — - 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) Hyd No. 3 Hyd No. 2 i Total storage used = 29,303 cult 15 H yd rog ra p h Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D(@ by Autodesk, Inc. v2022 Hyd. Hydrograph Peak Time Time to Hyd. No. type flow interval Peak volume (origin) (cis) (min) (min) (cuft) 1 SCS Runoff 20.84 2 722 I 56,226 2 SCS Runoff 44.61 2 718 102,333 3 Reservoir 0.000 2 860 0 5 SCS Runoff 0.000 2 n/a 0 6 Reservoir 0.000 2 n/a 0 Infiltration#2.gpw f Return F Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description SCM Pre -Developed ----- -- — -- ------ SCM Post -Developed 2 204.41 61,000 Post Through SCM - ----- 1.0 Post -Developed to SCM 5 199.00 0.000 1.0inPost Through SCM eriod: 10 Year Thursday, 04 / 28 / 2022 16 Hydrograph Report HydraFlow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 9.050 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 •M AM 3.00 0.00 ' ' 0 2 4 Hyd No. 1 Thursday, 04 / 28 / 2022 Peak discharge = 20.84 cfs Time to peak = 12.03 hrs Hyd. volume = 56,226 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 11.60 min Distribution = Type II Shape factor = 484 SCM Pre -Developed Hyd. No. 1 -- 10 Year Q (cfs) 21.00 18.00 15.00 12.00 M M 3.00 L _ 1 J I I I 1 I I i': 1 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 9.050 ac Basin Slope = 0.0 % Tc method = User Total precip. _ 5.47 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 " 0 Thursday, 04 / 28 / 2022 Peak discharge = 44.61 cfs Time to peak = 11.97 hrs Hyd. volume = 102,333 cuft Curve number = 78 Hydraulic length = 0 ft Time of conc. (Tc) = 7.20 min Distribution = Type II Shape factor = 484 SCM Post -Developed Hyd. No. 2 -- 10 Year 2 4 6 8 10 12 14 Hyd No. 2 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 16 18 20 22 24 26 Time (hrs) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name = BMP Pond Storage Indication method used. EAltration extracted from Outflow. 40.00 30.00 20.00 10.00 Thursday, 04 / 28 / 2022 = 0.000 cfs = 14.33 hrs = 0 cuft = 204.41 ft = 61,000 cuft Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Post Through SCM Hyd. No. 3 -- 10 Year 4 8 12 16 20 24 28 32 36 Hyd No. 3 Hyd No. 2 Total storage used = 61,000 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 40 Time (hrs) 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description SCM Pre -Developed 1 SCS Runoff 46.77 2 720 122,149 - 2 SCS Runoff 78.55 2 718 183,491 — — -- — SCM Post -Developed 3 Reservoir 41.46 2 724 61,476 2 205.36 76,539 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 - - --- 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 199.00 Year 0.000 Thursday, 04 1.OinPost Through SCM i i / 28 / 2022 Infiltration#2.gpw Return Period: 100 Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 9.050 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.21 in Storm duration = 24 hrs 40.00 20.00 10.00 0.00 0 2 4 — Hyd No. 1 Thursday, 04 / 28 / 2022 Peak discharge = 46.77 cfs Time to peak = 12.00 hrs Hyd. volume = 122,149 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 11.60 min Distribution = Type II Shape factor = 484 SCM Pre -Developed Hyd. No. 1 -- 100 Year 6 8 10 12 14 Q (cfs) 50.00 40.00 30.00 10.00 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 9.050 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.21 in Storm duration = 24 hrs 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 Hyd No. 2 C 23 Thursday, 04 / 28 / 2022 Peak discharge = 78.55 cfs Time to peak = 11.97 hrs Hyd. volume = 183,491 tuft Curve number = 78 Hydraulic length = 0 ft Time of conc. (Tc) = 7.20 min Distribution = Type II Shape factor = 484 SCM Post -Developed Hyd. No. 2 -- 100 Year Q (cfs) 80.00 70.00 961171 50.00 40.00 30.00 20.00 10.00 0.00 8 10 12 14 16 18 20 22 24 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 31)® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation Reservoir name = BMP Pond Max. Storage Storage Indication method used. EAltration extracted from Outflow Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.0 Post Through SCM Hyd. No. 3 -- 100 Year 24 Thursday, 04 / 28 / 2022 = 41.46 cfs = 12.07 hrs = 61,476 cuft = 205.36 ft = 76,539 cuft 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Hyd No. 3 Hyd No. 2 Total storage used = 76,539 cuft Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 16.0 Time (hrs) | " !( 3 >� �» �k ! 2 � f | k� E| ! ; k/ I �£ k » ; § K 2 � !: /�« ■ a! § 22 k | \! § 2 w 11 § 2 �} ) §22 o■| j M , | | E e k }! ! \( | �§ ) & � ■ ; 2 �|f 22 § k Bk� E � WATER QUANTITY -WET POND SCM 3 ZrOL:..0134LV A(-eC% -,-y.o(p ac- 1 i►�+- -6� �'c.�ceM1�'�a'0'' SUPPLEMENT-EZ COVER PAGE HORNS I.OADFD PROJECT INFORMATION 1 Pro'ect Name 2 Pro'ect Area ac 3 Coastal Wetland Area ( c 4 Surface Water Area ac 5 Is this project High or Low Density? 6 Does this proiect use an off -site SCM? Utility Improvements to Serve Sha_baln Reserve - Phase 1 115.32 No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A �N/A 8 Will the vegetated setback remain vegetated? 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? No 10 I Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 0 f 13 Wet Pond 3 14 Stormwater Wetland 0 15 1 Permeable Pavement 0 16 an Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof _ _ Level Spreader -Filter Strip LS-FS 0 19 i 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Celf 0 0 25 Bayfilter Filterra 26 1 0 FORMS LOADED ,ESIGNER CERTIFICATION 27 1Name and Title: 28 jOrganization: _ 29 Street address: 30 City, State, Zip: 31 Phone number(s): 32 Email: Carlo Pardo, PE _ Bowman North Carolina, Ltd. 4006 Barrett Drive. Suite 104 ileigh, NC 2760_9 919-553-6570 Certification Statement: I certify, under penalty of law that this Supplement EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. . rill 10I- . SEAS. _ 051571 r rfr/irS���ltt�� Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 4 3 Does this prooect have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 4 Type of SCM Wet Pond Infiltration Basin Wet Pond Wet Pond 5 Total drainage area (sq ft 5023339 sf 883772 394402 176822 874858 6 Onsite drainage area (sq ft 883772 394402 176822 874858 7 Offsite drainage area (sq ft 8 Total BUA in project (sq_ftJ 980497 sf 371638 sf 171155 sf 86745 sf 350959 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10permitting) New BUA not on subdivided lots (subject to s 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 75573 sf 27645 sf 15376 sf 5672 sf 26880 sf Roofs 680000 sf 272000 sf 112000 sf 64000 sf 232000 sf Roadway s ft 215004 sf 71993 sf 43779 sf 17073 sf 82159 sf Future (sq ft - Other, please specify in the comment box below (sq ft 9920 sf 9920 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15 Existing BUA that will remain (not subject to ermitting) (sq ft 16 1 Existinq BUA that is already permitted s ft 17 Existing.BUA that will be removed (sq ft 18 Percent BUA 19.52% 42.1% 43% 49% 40% 19 Design storm inches 1.0 in 1.0 in 1.0 in 1.0 in 20 Design volume of SCM (cu ft) 31555 cf 14480 cf 7243 cfL29967 cf 21 Calculation method for design volume Simple Method Sim le Method Simple Method le Method AUUI I IUNAL INFUKMA I IUN " Please use this space to provide any additional information about the 22 drainage area(s): 12-Postal Kiosk for additional BUA WET POND 1 Drainage area number 1 3 4 2 Minimum reg uired treatment volume. cu ft 31555 cf 7243 cf 29967 cf GENE MQC FRgM 62 3 Is the SCM sized to treat ft SW from all surfaces at bui#d=out? Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes 5 6 What are the side slopes of the SCM (H:V)? Does the SCM have retaining walls, gabion walls or other engineered side slopes? 3:1 3:1 3:1 No No No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump referred) Pump referred 10 If applicable, will the SCM be cleaned out after construction? Yes Yes Yes 11 Does the maintenance access comply with General MDC 8 ? Yes Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A WA N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Is there an O&M Plan that complies with General MDC (12)? Yes Yes Yes 15 Yes Yes Yes 16 Does the SCM follow the devicespecific MDC? Yes Yes Yes 171 Was the SCM desIg nod by an NC Ilcetrsed rofesslanal? Yes Yes Yes WET M H .1653 18 Sizing method used SA/DA Yes SA/DA Yes 189.00 SA/DA Yes 202.00 19 Has a stage/storage table been provided in the calculations? 20 Elevation of the excavated main pool depth (bottom of sediment removal) fmsl Elevation of the main pool bottom (top of sediment removal) (fmsl) 206.00 21 207.00 190.00 203.00 22 1 Elevation of the bottom of the vegetated shelf fmsl 211.50 195.50 206.50 23 Elevation of the permanent pool fmsl 212.00 196.00 207.00 24 Elevation of the top of the vegetated shelf fmsl 212.50 196.50 207.50 25 Elevation of the tem orapool fmsl 213.90 197.50 208.70 26 Surface area of the main permanent pool (square feet 11390 2950 13155 27 Volume of the main permanent pool cubic feet 43138 cf 8526 of 42764 cf 28 Average depth of the main pool feet 4.22 ft 3.66 ft 3.58 ft 29 Avera a depth euation used Equation 3 Equation 3 Equation 3 30 If using equation 3, main pool perimeter (feet) 423.0 ft 237.0 ft 442.0 ft 31 If using equation 3, width of submerged veg. shelf feet 3.0 ft 3.0 ft 3.0 ft 32 Volume of the foreba cubic feet 6715 cf 1583 cf 7964 cf 33 Is this 15-20% of the volume in the mainpool? Yes Yes Yes 34 Clean -out depth for foreba inches 48 in 48 in 48 in 351 Design volume of SCM cu 31555 cf 7243 cf 29967 cf 36 Is the outlet an orifice or a weir? Orifice Orifice Orifice 37 If orifice, orifice diameter inches 2.00 in 1 in 2 in 38 If weir, weir height inches 39 If weir, weir length inches 40 _ Drawdown time for the temporary pool (days) 2.44 3.61 3.71 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes Yes 42 Are berms or baffles provided to improve the flowpath? Yes Yes Yes 43 Depth of forebay at entrance inches 60 in 60 in 60 in 44 Depth of forebay at exit inches 24 in 18 in 24 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes Yes 46 lWidth of the vegetated shelf feet 6 ft 6 ft 6 ft 47 Slope of ve etated shelf H: 6:1 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1 r. 24-hr storm? Yes Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes Yes 53 Specie of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda Hybrid Bermuda 54 Hasa planfing plan been rovided for the vegetated shelf? Yes Yes Yes AMONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 9:27 AM 4/29/2022 Bowman North Carolina, Ltd. Shahbain Reserve, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions #3 Drainage Area (acres; 4.06 Existing Soil Groups: Soil Group Man Symbol Soil Description Acres Percent of DA A WaB Wagram Loamy Sand 3.31 82% C Bad Blaney Loamy Sand 0.75 18% ExisV1797 Land Us Land Use Description Existing Soil Group Acres Curve # Wer kited CN Wooded - Good Stand A 3.31 50 40.8 Wooded - Good Stand C 0.75 74 13.7 Cumulative Curve # = 54.4 Bowman North Carolina, Ltd. Shahbain Reserve, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions #3 Drainage Area (acres Z 4.06 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A WaB Wagram Loamy Sand 3.31 82% C Bad Blaney Loamy Sand 0.75 18% _Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Condition A 1.32 55 17.9 Open Space - Good Condition C 0.75 77 14.2 Impervious Area A & C 1.99 98 48.0 Cumulative Curve # = 80.1 Proposed Wet Pond #3 Project Information Project Name: Shahbain Reserve Project #: 048-024 Designed by: BRM Date: 4/8/2022 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 4.06 Acres 176,822 sf Impervious Area (IA) = 1.99 Acres 86,745 sf Percent Impervious (1) = % 49.06 %. Required Surface Area Permament Pool Depth: 3.66 ft SA/DA = 1.579 Min Req'd Surface Area = 2,793 sf (at Permanent Pool) I equired WQv Storage Volume Design Storm = 1 inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.492 in/in Storage Volume Required = 7,243 cf (above Permanent Pool) Elevations Top of Pond Elevation = 201.00 ft Temporary Pool Elevation = 197.50 ft Permanent Pool Elevation = 196.00 ft Shelf Begining Elevation = 196.50 ft Forebay Weir = 195.50 ft Shelf Ending Elevation = 195.50 ft Bottom Elevation = 190.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 2,950 sf Volume of Temporary Storage = 7,580 cf Is Permenant Pool Surface Area Sufficient (yes/no)? ( 2950 > 2793 ) sf Volume of Storage for Design Storm = ( 7580 > 7243 ) cf Project: Pond #1 Date: 4/28/2022 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 196 2,950 1,308 8,526 A2 (Perm —Pool) 195.5 2,280 1,089 7,219 Al (Bottom —Shelf) 195 2,075 1,883 6,130 194 1,690 1,515 4,248 193 1,340 1,185 2,733 192 1,030 898 1,548 191 765 650 650 190 535 0 0 A3 (Bottom —Pond) Forebay Contours -Volumes Elevation FB1 FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 196 810 810 375 1,583 195.5 690 690 315 1,208 195 570 570 468 893 194 365 365 283 425 193 200 200 143 143 192 85 85 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) Vpp permeter of shelf width of shelf Al (Bottom —Shelf): 18.6% *Between 15% & 20% 3.17 *At least 3' average depth 8,526 237 3 2,280 Average Depth = 3.66 Incremental Drawdown Time STORMWATER POND #3 INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Project Information Project Nar Shahbain Reserve Project #: 048-024 3signed by: BRM Date: 4/8/2022 iecked by: Date: Water Quality Orifice ` Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Qa = 0.0437 Co " D2 (Z-D/24-Ei)^(Im Q2 = 0.372 CD * D•(Z-Ei)"(312) Q, = 0 Orifice Diameter (D) = 1 in Cd = 0.6 El = 196 Orifice Inv. Zone 1 Range = 0.00 to 196 Zone 2 Range = 196 to 196.1 Zone 3 Range = 196.1 to 197 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cis min 196.00 3,855 0 0.00 2.00 0.000 -- 196.50 4810 2.166 0.50 3.00 0.018 2,034 197.00 5400 2.553 0.50 3.00 0.026 1.658 197.50 6045 2,861 0.50 3.00 0.032 1.506 Total — 7,580 -- — — 6.197 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 7,680 cf Total Time = 5,197 min Total Time = 3.61 days 2 to 5 days 4/28/2022 Prop Wet Pond- new design-#3 1 of 1 Proposed Wet Pond #3 Project Information Project Name: Shahbain Reserve Project #: 048-024 Designed by: BRM Date: Revised by: Date: Checked by: Date: Site Information 4/8/2022 Sub Area Location: Drainage to Proposed Pond _ Drainage Area (DA) = 4.06 Acres Impervious Area (IA) = 1.99 Acres Percent Impervious (1) = 49.06 % (Drainage Area) Orifice Sizing Orifice Size = Drawdown Time = less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes Anti -Flotation Device 4' x 4' Outlet Structure in (Diameter) days (Incremental Draw Down Method) Area: 16.0 sf Volume: 176.0 cf Weight: 10982 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 13,179 Ibs Volume of Concrete Req'd: 87.9 cf (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 117.5 cf (4'x4' riser x 5.0' = 80sf, 5'x5' footing x 1.5'=37.5cf) M//-z z lg�� . `¢ww mw (QUJ Q F— w cn J L�.J / ■ O W Z � O 11 O � Co L J C) ZD ¢ _ w =LLI Q N r / 0 Ln rJ� � Z , O ' QJ ' C) Lu W� J CDQ Q Q C J Q O W / 1 Z w J1 r , W 4 r _ U � � U STAG E/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0.0 196.0 3855 0 0 0.5 196.5 4810 2166 2166 1.0 197.0 5400 2553 4719 1.5 197.5 6045 2861 7580 (WQV) 2.0 198.0 6605 3163 10743 3.0 199.0 7775 7190 17933 4.0 200.0 9000 8388 26320 5.0 201.0 10280 9640 35960 STORMWATER MANAGEMENT DESIGN WET DETENTION POND: RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC: PROJECT COORDINATES POND DESIGN SUMMARY CAPE FEAR GULLY BRANCH 18-31-20.7 B 0303000406 34.988433°N,-79.087756°W DRAINAGE AREA TO POND: 4.06 ACRES SITE IMPERVIOUS AREA TO POND: 1.99 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 1.99 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 4.06 AC 4.06 AC CURVE NUMBER: 54.4 80.1 TIME OF CONCENTRATION: 16.0 MIN 5.4 MIN 1.0" STORM EVENT: 0.129 CFS 0.012 CFS 1-YEAR STORM EVENT: 0.264 CFS 8.863 CFS 0.043 CFS 2-YEAR STORM EVENT: 1.077 CFS 12.23 CFS 0.317 CFS 10-YEAR STORM EVENT: 5.241 CFS 22.37 CFS 4.427 CFS 100-YEAR STORM EVENT: 14.71 CFS 39.34 CFS 27.02 CFS 4 a F G 11 L WINA b Q E k w ~ _ r w I ryl Itl y � _O w o i3b � w Iq _g O w LL 01 A A ! § 2X§ �� k%� � ca 2i■z LU w §§ /wb / E • / § �/ i VI § LU j 22� � § IL m $} [uj E / �§ \(\ 22 \ kLD �§ §LL per LO� ° e JBE3 [ F {tL )/\ - ) Mro V) §C> §) ' © � \ � � O §QV) CL � E w U) � U) 2 O � 2 LU a � 2 O CL F- LU 3: O w —i O cr CL k rno nc C,'�UCTURE NOT SHOWN FOR CLARITY E TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T.S. RISER STRUCTURE 4" PVC SCREW CAP FOR CLEANING ACCESS 12" MIN. EXTEND 4" PVC THROUGH RISER STRUCTURE 4'x4" PVC TEE PERM. POND ELEV.=196.0 12" MIN. 1"DIA. HOLE DRILLED INTO BOTTOM CAP PVC DRAIN OUTLET SCALE: N.T.S. Pond Repot s Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Pond No. 1 - Wet Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 196.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 196.00 3,855 0 0 0.50 196.50 4,810 2,166 2,166 1.00 197.00 5,400 2,553 4,719 1.50 197.50 6,045 2,861 7,580 2.00 198.00 6,605 3,163 10,743 3.00 199.00 7,775 7,190 17,933 4.00 200.00 9,000 8,388 26,320 5.00 201.00 10,280 9,640 35,960 Thursday, 04 / 28 / 2022 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRSr] [A] [B] [C] [D] Rise (in) = 24.00 1.00 Inactive Inactive Crest Len (ft) = 2.00 14.00 Inactive Inactive Span (in) = 24.00 1.00 0.00 0.00 Crest El. (ft) = 198.80 199.60 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 196.00 196.00 0.00 0.00 Weir Type = Rect Broad --- --- Length (ft) = 33.00 0.50 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 4.55 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multistage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 5.00 4.00 3.00 2.00 1.00 0.00 0.00 3.00 Total Q Note: CulvertfOrifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) 6.00 9.00 Stage / Discharge Elev (ft) 201.00 200.00 199.00 198.00 197.00 196.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 Discharge (cfs) Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk®Civil 3D®byAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow Maximum hyd(s) elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.264 2 728 2,737 - - Pre -Developed -Overall Site 2 SCS Runoff 8.863 2 718 17,774 — ---- Post Developed to Pond 3 Reservoir 0.043 2 1444 11,208 2 198.73 15,985 Post Through Pond 5 SCS Runoff 0.129 2 152 1,170 ----- ---- 1.0 Post -Developed to Pond 6 Reservoir 0.012 2 366 1,087 5 196.25 1,075 1.OinPost Through Pond Wet Pond#3.gpw Return Period: 1 Year Thursday, 04 / 28 / 2022 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 4.060 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.04 in Storm duration = 24 hrs Q (cfs 0.50 0.50 I 0.45 — 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - - —_ _- - - - -F - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Thursday, 04 / 28 / 2022 Peak discharge = 0.264 cfs Time to peak = 728 min Hyd. volume = 2,737 cuft Curve number = 54.4 Hydraulic length = 0 ft Time of conc. (Tc) = 16.00 min Distribution = Type II Shape factor = 484 Pre -Developed -Overall Site Hyd. No. 1 -- 1 Year 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 4.060 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.04 in Storm duration = 24 hrs 1 I 4.00 2.00 we, Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed to Pond Hyd. No. 2 -- 1 Year Thursday, 04 / 28 / 2022 = 8.863 cfs = 718 min = 17,774 cult 80.1 = Oft = 5.40 min Type II = 484 Q (cfs) 10.00 WC . OM 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used 4.00 2.00 600 Hyd No. 3 Post Through Pond Hyd. No. 3 -- 1 Year Thursday, 04 / 28 / 2022 = 0.043 cfs = 1444 min = 11,208 cuft = 198.73 ft = 15,985 cuft Q (cfs) 10.00 M WC 4.00 FAR 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Hyd No. 2 i Total storage used = 15,985 cult Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for AutodesW Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 5 1.0 Post -Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 4.060 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.00 in Storm duration = 6.00 hrs Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Thursday, 04 / 28 / 2022 Peak discharge = 0.129 cfs Time to peak = 152 min Hyd. volume = 1,170 cuft Curve number = 80.1 Hydraulic length = 0 ft Time of conc. (Tc) = 5.40 min Distribution = SCS 6-Hr Shape factor = 484 1.0 Post -Developed to Pond Hyd. No. 5 -- 1 Year 60 120 180 240 300 360 Hyd No. 5 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 420 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 5 - 1.0 Post -Developed to Pond/lax. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 7 Thursday, 04 / 28 / 2022 = 0.012 cfs = 366 min = 1,087 cuft = 196.25 ft = 1,075 cuft Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Hyd No. 6 Hyd No. 5 Total storage used = 1,075 cult Time (min) 1.0inPost Through Pond Hyd. No. 6 -- 1 Year Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cis) Time interval (min) rPeak Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description Pre -Developed -Overall Site 1 SCS Runoff 1.077 2 726 5,549 -- --- - 2 SCS Runoff 12.23 2 716 24,701 ----- - - -- Post Developed to Pond 3 Reservoir 0.317 2 910 17,671 2 198.92 17,332 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ ----- ------ 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 196.00 0.000 1.0inPost Through Pond / 28 / 2022 Wet_Pond#3.gpw Return Period: 2 Year Thursday, 04 Hydrograph Report HydraFlow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.060 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.68 in Distribution Storm duration = 24 hrs Shape factor 1.00 Pre -Developed -Overall Site Hyd. No. 1 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 1 10 Thursday, 04 / 28 / 2022 = 1.077 cfs = 726 min = 5,549 cuft = 54.4 = Oft = 16.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.060 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.68 in Distribution Storm duration = 24 hrs Shape factor 12.00 10.00 WE WE 4.00 2.00 Thursday, 04 / 28 / 2022 = 12.23 cfs = 716 min = 24,701 cult = 80.1 = Oft = 5.40 min = Type II = 484 Post Developed to Pond Hyd. No. 2 -- 2 Year Q (cfs) 14.00 12.00 10.00 More ME 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.317 cfs Storm frequency = 2 yrs Time to peak = 910 min Time interval = 2 min Hyd. volume = 17,671 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 198.92 ft Reservoir name = Wet Pond Max. Storage = 17,332 cult Storage Indication method used Q (cfs) 14.00 12.00 10.00 RE MIN 4.00 2.00 600 Hyd No. 3 Post Through Pond Hyd. No. 3 -- 2 Year Q (cfs) 14.00 12.00 10.00 We WE 4.00 2.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 2 1 Total storage used = 17,332 cult 15 H yd rog ra p h Summary Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 4.060 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.46 in Storm duration = 24 hrs Q (Cfs) 6.00 5.00 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 10 Year 120 240 360 480 600 720 Hyd No. 1 Thursday, 04 / 28 / 2022 = 5.241 cfs = 724 min = 16,908 cuft = 54.4 = Oft = 16.00 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) 17 Hydrograph Report HydraFlow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 4.060 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.46 in Storm duration = 24 hrs 20.00 16.00 12.00 4.00 0.00 0 Thursday, 04 / 28 / 2022 Peak discharge = 22.37 cfs Time to peak = 716 min Hyd. volume = 45,699 cuft Curve number = 80.1 Hydraulic length = 0 ft Time of conc. (Tc) = 5.40 min Distribution = Type II Shape factor = 484 Post Developed to Pond Hyd. No. 2 -- 10 Year 120 240 360 480 600 Hyd No. 2 Q (cfs) 24.00 20.00 16.00 12.00 w 4.00 0.00 720 840 960 1080 1200 1320 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 4.427 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 38,617 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 199.56 ft Reservoir name = Wet Pond Max. Storage = 22,595 cuft Storage Indication method used Q (cfs) 24.00 20.00 16.00 12.00 II 1 4.00 Post Through Pond Hyd. No. 3 -- 10 Year Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 I Total storage used = 22,595 cult 21 Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk®Civil 3D®byAutodesk,Inc. v2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 4.060 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.36 in Storm duration = 24 hrs Q (cfs) 15.00 12.00 Me] to 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 100 Year 22 Thursday, 04 / 28 / 2022 = 14.71 cfs = 724 min = 42,604 cult 54.4 = Oft = 16.00 min = Type II = 484 Q (cfs) 15.00 12.00 3.00 0.00 —:. —L I J. — 1. i 1. 1 1 1 1 :::� .1 .. 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 -- — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 4.060 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 8.36 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 40.00 30.00 20.00 10.00 Post Developed to Pond Hyd. No. 2 -- 100 Year 120 240 360 480 600 720 840 Hyd No. 2 23 Thursday, 04 / 28 / 2022 = 39.34 cfs = 716 min = 82,558 cuft = 80.1 = Oft = 5.40 min = Type II = 484 Q (cfs) 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used. Q (cfs) 40.00 30.00 20.00 10.00 Post Through Pond Hyd. No. 3 -- 100 Year 120 240 360 480 600 720 840 Hyd No. 3 Hyd No. 2 Thursday, 04 / 28 / 2022 = 27.02 cfs = 720 min = 75,442 cuft = 200.43 ft = 30,490 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 i Total storage used = 30,490 CA Time (min) ME |� H « 75 � � !� | l2;ii|! a, ! F/ | !� ! !/ # � k ) 7 ■ /) \2` ■ !�! | f� ! 22 k (� & s � k! §�■ | � ! §|! ® | | . � ! k\ § / ƒ{ ! �$ �# � » �E i ! |£ | ® !/|, k�6� !! !E;!}■! !,_!,©� Fi m �� !/ | �_ � § 7 ■ \) Z; k�� }!` \ © f! � ! !I. | �$| ■ &�« ° (| � t § t� �2! . ; ) ® | § /!` � |�� . } \ /7\ � . � | ■ E �� WATER QUANTITY -WET POND SCM 4 -�un8 e(:M A cl Arec, a C- TZ SUPPLEMENT-EZ COVER PAGE FORMSSI-DADED PROJECT INFORMATION 1 Project Name Utility Improvements to Serve Shabain Reserve . Phase 1 2 Project Area ac 115.32 3 Coastal Wetland Area ac - 4 Surface Water Area ac 5 Is this l3roiect High or Low Density? High 6 Does this project use an off -site 5CM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? WA 9 If BUA is proposed in the setback does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 3 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 0 19 Level Spreader -Filter Strip LS-FS 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dy Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 !Name and Title: 28 Organization: _ 29 Street address: 30 City, State, Zip: 31 Phone numbers : 32 Email: Carlo Pardo, PE Bowman North Carolina, Ltd. 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the forth is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Desr�Llier ,�11111•�t: ::�d�l A..0L SEAL 051571 - ,QR�f.. . p�,```�� Signature of Designer Date Ala y/�a DRAINAGE AREAS 1 Is this a hi h densit ro'ect? Yes 2 If so, number of drainage areas/SCMs 4 Does this project have low density areas? No _3 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 4 Type of SCM - Wet Pond Infiltration Basin Wet Pond Wet Pond 5 Total drainage area (sq 11 5023339 sf 883772 394402 176822 874858 6 Onsite drainage area (sq ft 883772 394402 176822 874858 7 Offsite drainage area (sq ft 8 Total BUA in project (§q ft 980497 sf 371638 sf 171155 sf 86745 sf 350959 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10 New BUA not on subdivided lots (subject to ermittin s Offsite BUA (sq ft 11 12 Breakdown of new BUA not on subdivided lots: Parkin s ft Sidewalk (sq ft 75573 sf 27645 sf 15376 sf 5672 sf 26880 sf Roof (sq ft 680000 sf 272000 sf 112000 sf 64000 sf 232000 sf Roadway s ft 215004 sf 71993 sf 43779 sf 17073 sf 82159 sf Future (sq ft Other, please specify in the comment box below (sq ft 9920 sf 9920 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19.52% 42.1% 43% 49% 40% 19 Design storm inches 1.0 in 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 31555 cf 14480 cf 7243 cf 29967 cf 21 Calculation method for design volume Simple Method Sim le Method I Simple Method Simple Method ADDITIONAL INFORMATION _ 22 Please use this space to provide any additional information about the drainage area(s): 12-Postal Kiosk for additional BUA WET POND 1 Drainage area number I 1 1 3 1 4 2 Minimum req uired treatment volume cu ftl 1 31555 cf 7243 cf 29967 cf GENIEMO 31 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes Yes 41 Is the SCM located away from contaminated soils? Yes Yes Yes 5 What are the side slopes of the SCM H: ? 3:1 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other en ineered side slopes? Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? No No No 7 Yes Yes Yes Yes Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump referred Pump referred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes Yes 11 Does the maintenance access comply with General MDC 8 ? Yes Yes Yes 12 Does the drainage easement comply with General MDC 9 ? Yes Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A WA N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes Yes 16 Does the SCM follow the devicespecific MDC? Yes Yes Yes 17 Was the SCM designed by an NC licensedprofessional? Yes Yes Yes 18 Sizing method used SA/DA SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 206.00 189.00 190.00 195.50 202.00 203.00 206.50 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 207.00 211.50 221 Elevation of the bottom of the ve etated shelf fmsl 23 Elevation of the permanent pool fmsl 212.00 196.00 207.00 24 Elevaton of the top of the yNetated shelf qTsj Elevation of the temporary pool fmsl 212.50 196.50 207.50 25 213.90 197.50 208.70 26 Surface area of the main permanent pool (square feet 11390 2950 13155 27 Volume of the main permanent pool cubic feet) 43138 d 8526 cf 42764 cf 28 Average depth of the main pool feet 4.22 ft 3.66 ft 3.58 ft 29 Average depth euation used Equation 3 Equation 3 Equation 3 30 If using equation 3, main pool perimeter feet 423.0 ft 237.0 ft 442.0 ft 31 If using equation 3, width of submerged veg. shelf (feet 3.0 ft 3.0 ft 3.0 ft 32 Volume of the foreba cubic feet).6715 cf 1583 cf 7964 cf 33 Is this 15-20% of the volume in the mainpool? Yes Yes Yes 34 Clean -out depth for foreba (inches). 48 in 48 in 48 in 35 Design volume of SCM cu ft 31555 cf 7243 cf 29967 cf 36 Is the outlet an orifice or a weir? Orifice Orifice Orifice 37 If orifice, orifice diameter (inches) 2.00 in 1 in 2 in 38 If weir, weir height (inches) 39 If weir, weir length inches 40 Drawdown time for the temporary pool (days) 2.44 3.61 3.71 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes Yes 42 Are berms or baffles provided to improve the flowpath? Yes Yes Yes 43 Depth of foreb2y at entrance inches 60 in 60 in 60 in 44 Depth of forebay at exit inches 24 in 18 in 24 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes Yes 46 Width of the vegetated shelf feet 6 ft 6 ft 6 ft 47 Slope of vegetated shelf H: 6:1 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1 r 24-hr storm? Yes Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9)is met.) No No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda Hybrid Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes Yes Yes Please use this space to provide any additional information about I 55I the wet Dond(s): ! Wet Pond 1 9:27 AM 4/29/2022 Bowman North Carolina, Ltd. Shahbain Reserve, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions #4 Drainage Area (acres 20.08 Existing soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA C BaD Blaney Loamy Sand 1.28 6% A NoB Norfolk Loamy Sand #REF! #REF! A WaB Wagram Loamy Sand 3.03 15% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Wooded - Good Stand C 1.28 74 4.7 Wooded - Good Stand A 4.49 50 11.2 Open Space - Fair Stand A 14.31 55 39.2 Cumulative Curve # = 55.1 Bowman North Carolina, Ltd. Shahbain Reserve, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions #4 Drainage Area (acres Z 20.08 Fxistinp Soil Groups Soil Grouo Map Symbol Soil Description Acres Percent of DA C BaD Blaney Loamy Sand 1.28 6% A NoB Norfolk Loamy Sand 15.77 79% A WaB Wagram Loamy Sand 3.03 15% W_Q'5 d Land uses. Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Condition C 0.60 77 2.3 Open Space - Good Condition A 11.42 55 31.3 Impervious Area A & C 8.06 98 39.3 Cumulative Curve # = 72.9 Proposed Wet Pond #4 Project Information Project Name: Shahbain Reserve Project #: 048-024 Designed by: BRM Date: 4/6/2022 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 20.08 Acres 874,858 sf Impervious Area (IA) = 8.06 Acres 350,959 sf Percent Impervious (1) = % 40.12 % Required Surface Area Permament Pool Depth: 3.58 ft SA/DA = 1.357 Min Req'd Surface Area = 11,868 sf (at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.411 in/in Storage Volume Required = 29,967 cf (above Permanent Pool) Elevations Top of Pond Elevation = 215.00 ft Temporary Pool Elevation = 208.70 ft Permanent Pool Elevation = 207.00 ft Shelf Begining Elevation = 207.50 ft Forebay Weir = 206.00 ft Shelf Ending Elevation = 206.50 ft Bottom Elevation = 203.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 13,155 sf Volume of Temporary Storage = 31,488 cf Is Permenant Pool Surface Area Sufficient (yes/no)? ( 13155 > 11868 ) sf Volume of Storage for Design Storm = 31,488 Yes ( 31488 > 29967 ) cf Incremental Drawdown Time STORMWATER POND #4 INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Project Information Project Nar Shahbain Reserve Project #: 048-024 asigned by: BRM iecked by: Date: 4/6/2022 Date: Water Quality Orifice * Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Q3 = 0.0437 Co * D2 (Z-D/24-Ei)A(112) Q2 = 0.372 Co * D*(Z-Ei)ACMI Q,=0 Orifice Diameter (D) = 2 in Cd = 0.6 Ei = 207 Orifice Inv. Zone 1 Range = 0.00 to 207 Zone 2 Range = 207 to 207.1 Zone 3 Range = 207.1 to 208 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cis min 207.00 16,200 0 0.00 2.00 0.000 -- 207.50 17850 8.513 0.50 3.00 0.068 2.096 208.00 18860 9,178 0.50 3.00 0.100 1.523 208.70 20560 13,797 0.70 3.00 0.133 1,724 Total -- 31,488 — — 5.343 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 31,488 cf Total Time = 5,343 min Total Time = 3.71 days 2 to 5 days 4/28/2022 Prop Wet Pond- new design-#4 1 of 1 Project: Pond #1 Date: 4/28/2022 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 207 13,155 6,254 42,764 A2 (Perm -Pool) 206.5 11,860 5,825 36,510 Al (Bottom -Shelf) 206 11,440 11,030 30,685 205 10,620 10,220 19,655 204 9,820 9,435 9,435 A3 (Bottom -Pond) 203 9,050 0 0 Forebay Contours -Volumes Elevation FBI FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 207 2,860 2,860 1,373 7,964 206.5 2,630 2,630 1,259 6,591 206 2,405 2,405 2,188 5,333 205 1,970 1,970 1,768 3,145 204 1,565 1,565 1,378 1,378 203 1,190 1,190 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) Vpp permeter of shelf width of shelf Al (Bottom -Shelf): 18.6% *Between 15% & 20% 3.08 *At least 3' average depth 42,764 442 3 11,860 Average Depth = 3.58 Dct Information Proposed Wet Pond #4 Project Name: Shahbain Reserve Project #: 048-024 Designed by: BRM Date: Revised by: Date: Checked by: Date: 4/6/2022 Information Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 20.08 Acres Impervious Area (IA) = 8.06 Acres Percent Impervious (1) = 40.12 % (Drainage Area) ce Sizing Orifice Size = 2.00 in (Diameter) Drawdown Time = 3.71 days (Incremental Draw Down Method) less than 5 days (yes/no) ? fires greater than 2 day (yes/no) ? yes -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 192.0 cf Weight: 11981 Ibs Factor of Safety 1.20 /T Req'd of Anti -Flotation Device: 14,377 Ibs Volume of Concrete Req'd: 95.8 cf (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 165.5 cf (4'x4' riser x 8.0' = 128sf, 5'x5' footing x 1.5'=37.5cf) y , 1 \ \ <o , rch % t h ¢1 l 1 O t Z �, w— CD cl- 1 �� zO��w �� way ��-- ~ W U W coLL, ¢ W Z ; cn J g 1N�OZ \¢ cV LuC-3 (D ¢N J \Alkl�� .\ <r oo Norma - PA; SMV_? � �-- o wIL w a x � clf IS, w a h{ Cf) i CO 1 \ w 0 G R Z Q STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0.0 207.0 16200 0 0 0.5 207.5 17850 8513 8513 1.0 208.0 18860 9178 17690 1.7 208.7 20560 13797 31487 (WQV) 2.0 209.0 21030 6239 37726 3.0 210.0 22335 21683 59408 4.0 211.0 24300 23318 82726 5.0 212.0 26020 25160 107886 6.0 213.0 27800 26910 134796 7.0 214.0 29635 28718 163513 8.0 215.0 31525 30580 194093 RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC: PROJECT COORDINATES: aliNk implorolO ►�11T,IoI.V0 CAPE FEAR GULLY BRANCH 18-31-20.7 B 0303000406 34.988433°N,-79.087756°W DRAINAGE AREA TO POND: SITE IMPERVIOUS AREA TO POND: OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 20.08 ACRES 8.06 ACRES 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 8.06 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 20.08 AC 20.08 AC CURVE NUMBER: 55.1 72.9 TIME OF CONCENTRATION: 33.5 MIN 18.1 MIN 1.0" STORM EVENT: 0.168 CFS 0.008 CFS 1-YEAR STORM EVENT: 1.190 CFS 18.98 CFS 0.173 CFS 2-YEAR STORM EVENT: 3.764 CFS 29.07 CFS 0.990 CFS 10-YEAR STORM EVENT: 17.20 CFS 61.18 CFS 7.654 CFS 100-YEAR STORM EVENT: 49.70 CFS 119.13 CFS 37.00 CFS mix HE� o$ � Me b�e8 R 3e E woe II, �� s�" 0 O z Jill® g y g w LU CLE KB a F� w w J 0 Q a m� ;11 951.E 1. s gg 91$ uj— a8w �grs � a S lon k�R O co O N tz O > tV w II d d O r0 r r� a¢ m� W co o� CC J aNn J � i IB rJ �gV; J � J a CL o MEIN C) Zr m w C) O I ul m X CCD (D 1'M W O H H O } pON bgym Lj II CWJ N W O O m } W W Q.0 rIn �mmN a W II C,3 �ck�w C � U >O w H m X W } S m WN W Z 25 bF- r E5 12 a� o� m LU } N z O z LU LU cl Z O d F- LU LL O ui J_ LL O cc CL TAD ^C °TRUCTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T.S. MrK 31KUIlumr 4" PVC SCREW CAP FOR CLEANING ACCESS 12" MIN. EXTEND 4" PVC THROUGH RISER STRUCTURE 4"x4" PVC TEE PERM. POND ELEV.=207.0 12" MIN. 2"DIA. HOLE DRILLED INTO BOTTOM CAP PVC DRAIN OUTLET SCALE: N.T.S. Pond Report 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Pond No. 1 - Wet Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 207.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuft) 0.00 207.00 16,200 0 0 0.50 207.50 17,850 8,513 8,513 1.00 208.00 18,860 9,178 17,690 1.70 208.70 20,560 13,797 31,487 2.00 209.00 21,030 6,239 37,726 3.00 210.00 22,335 21,683 59,408 4.00 211.00 24,300 23,318 82,726 5.00 212.00 26,020 25,160 107,886 6.00 213.00 27,800 26,910 134,796 7.00 214.00 29,635 28,718 163,513 8.00 215.00 31,525 30,580 194,093 Culvert / Orifice Structures [A] [B] [C] [PrFRsr] Rise (in) = 24.00 2.00 Inactive Inactive Span (in) = 24.00 2.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 207.00 207.00 0.00 0.00 Length (ft) = 37.00 0.50 0.00 0.00 Slope (%) = 5.71 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. uu..r.: e• __ = 0.60 - . 1' 0.60 vex 0.60 ni,, 0.60 P11- Stage (ft) 8.00 - 6.00 4.00 PXrZ11I 0.00 ' '- 0.00 4.00 Total Q Weir Structures [A] IBl [C] [D] Crest Len (ft) = 1.00 15.00 Inactive Inactive Crest El. (ft) = 209.90 211.60 0.00 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = Rect Broad -- -- Multistage = Yes Yes No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culverl/Oririce outflows are analyzed under inlet (ic) and oullet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 Elev (ft) 215.00 213.00 211.00 209.00 -4 207.00 40.00 Discharge (cfs) Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) SCS Runoff Peak flow (cfs) Time interval (min) 2 Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 1.190 750 15,316 -- Pre -Developed -Overall Site 2 SCS Runoff 18.98 2 726 63,922 — - ------ Post Developed to Pond 3 Reservoir 0.173 2 1454 43,261 2 209.88 56,898 Post Through Pond 5 SCS Runoff 0.168 2 360 1,207 --- ----- - 1.0 Post -Developed to Pond 6 Reservoir 0.008 2 386 982 5 207.07 1,175 1.0inPost Through Pond / 28 / 2022 Wet_Pond#4.gpw Return Period: 1 Year Thursday, 04 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 20.080 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.04 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 Pre -Developed -Overall Site Hyd. No. 1 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 1 Thursday, 04 / 28 / 2022 = 1.190 cfs = 750 min = 15,316 cuft = 55.1 = Oft = 33.50 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 20.080 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.04 in Storm duration = 24 hrs 18.00 15.00 12.00 . 10, II 1 3.00 Thursday, 04 / 28 / 2022 Peak discharge = 18.98 cfs Time to peak = 726 min Hyd. volume = 63,922 cuft Curve number = 72.9 Hydraulic length = 0 ft Time of conc. (Tc) = 18.10 min Distribution = Type II Shape factor = 484 Post Developed to Pond Hyd. No. 2 -- 1 Year Q (cfs) 21.00 18.00 15.00 12.00 M we] 3.00 0.00 to- I I I I 1 / 1 _ 1 1 1 L. J. I 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.173 cfs Storm frequency = 1 yrs Time to peak = 1454 min Time interval = 2 min Hyd. volume = 43,261 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 209.88 ft Reservoir name = Wet Pond Max. Storage = 56,898 cuft Storage Indication method used 18.00 15.00 12.00 • 11 MOM 3.00 600 Hyd No. 3 Post Through Pond Hyd. No. 3 -- 1 Year Q (cfs) 21.00 18.00 15.00 12.00 Mt 3.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 2 1 Total storage used = 56,898 cult Hydrograph Report HydraFlow Hydrographs Extension for Autodesk@ Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Hyd. No. 5 1.0 Post -Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 0.168 cfs Storm frequency = 1 yrs Time to peak = 360 min Time interval = 2 min Hyd. volume = 1,207 cuft Drainage area = 20.080 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.10 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 1.0 Post -Developed to Pond Hyd. No. 5 -- 1 Year 60 120 180 240 300 360 Hyd No. 5 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 420 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk0 Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge = 0.008 cfs Storm frequency = 1 yrs Time to peak = 386 min Time interval = 2 min Hyd. volume = 982 cuft Inflow hyd. No. = 5 - 1.0 Post -Developed to Pond/lax. Elevation = 207.07 ft Reservoir name = Wet Pond Max. Storage = 1,175 cuft Storage Indication method used Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 1.OinPost Through Pond Hyd. No. 6 -- 1 Year 600 1200 1800 2400 3000 3600 4200 4800 5400 Hyd No. 6 Hyd No. 5 1 Total storage used = 1,175 cuft Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 6000 Time (min) H yd rog ra p h Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 20.080 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.68 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 2 Year 120 240 360 480 600 720 840 Hyd No. 1 Thursday, 04 / 28 / 2022 = 3.764 cfs = 738 min = 30,399 cuft = 55.1 = Oft = 33.50 min = Type II = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 11 Hydrograph Report HydraFlow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 20.080 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.68 in Storm duration = 24 hrs Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed to Pond Hyd. No. 2 -- 2 Year Thursday, 04 / 28 / 2022 = 29.07 cfs = 726 min = 94,462 tuft = 72.9 = Oft = 18.10 min = Type II = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used Thursday, 04 128 / 2022 = 0.990 cfs = 1036 min = 71,572 cuft = 210.29 ft = 66,162 cuft Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 — 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 1 Total storage used = 66,162 cult 15 H yd rog ra p h Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 16 Hydrograph Report HydraFlow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 20.080 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.46 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 O O i 11 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of cons. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 10 Year Thursday, 04 / 28 / 2022 = 17.20 cfs = 734 min = 90,383 cuft = 55.1 = Oft = 33.50 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 M. 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 20.080 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.46 in Storm duration = 24 hrs 50.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed to Pond Hyd. No. 2 -- 10 Year 120 240 360 480 600 720 840 Hyd No. 2 Thursday, 04 / 28 / 2022 = 61.18 cfs = 724 min = 192,257 cuft = 72.9 = Oft = 18.10 min = Type II = 484 Q (cfs) 70.00 50.00 40.00 30.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Thursday, 04 / 28 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 7.654 cfs Storm frequency = 10 yrs Time to peak = 762 min Time interval = 2 min Hyd. volume = 168,884 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 211.60 ft Reservoir name = Wet Pond Max. Storage = 97,927 cuft Storage Indication method used ra ra to 40.00 30.00 20.00 10.00 ra ra to ra 600 Hyd No. 3 Post Through Pond Hyd. No. 3 -- 10 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 2 i Total storage used = 97,927 cult 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D0 by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total Hydrograph strge used Description (cuft) 1 SCS Runoff 49.70 2 734 224,673 ------ ------ Pre -Developed -Overall Site 2 SCS Runoff 119.13 2 724 373,080 -- - -- - - Post Developed to Pond 3 Reservoir 37.00 2 742 349,336 2 214.02 164,224 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ----- — -- 1.0 Post -Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 207.00 0.000 1.0inPost Through Pond Wet_Pond#4.gpw Return Period: 100 Year Thursday, 04 / 28 / 2022 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 1 Pre -Developed -Overall Site Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 20.080 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.36 in Storm duration = 24 hrs Q (Cfs) 50.00 40.00 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Developed -Overall Site Hyd. No. 1 -- 100 Year Thursday, 04 / 28 / 2022 = 49.70 cfs 734 min = 224,673 tuft 55.1 Oft 33.50 min m Type II 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 20.080 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.36 in Storm duration = 24 hrs 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Developed to Pond Hyd. No. 2 -- 100 Year 120 240 360 480 600 720 840 Hyd No. 2 23 Thursday, 04 / 28 / 2022 = 119.13 cfs = 724 min = 373,080 cuft 72.9 = Oft 18.10 min Type II = 484 Q (Cfs) 120.00 100.00 40.00 20.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation Reservoir name = Wet Pond Max. Storage Storage Indication method used. Post Through Pond Hyd. No. 3 -- 100 Year 100.00 40.00 20.00 Thursday, 04 / 28 / 2022 = 37.00 cfs = 742 min = 349,336 cuft = 214.02 ft = 164,224 cuft Q (cfs) 120.00 100.00 :1 if 40.00 0.00 1' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 — Hyd No. 3 Hyd No. 2 i Total storage used = 164,224 cult Time (min) � - ,� ■ {j | �! !. §■ ! 2 �® > !j | §& � f/ §. § 7 m K $�Z � �|F ƒ�£ ! �| k (� § (! - m �■ § /k` § �•! o ! / �f| § | � - {\ 7 i# I 2 �! fk � k� | �| i f � ; B § ,, § � \t; ■ !!t ' ` \}� 22 § | ) n P, E! & / � ! /7( k _ § |