HomeMy WebLinkAboutSW6210907_Supplement-EZ Form_20210930SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1
j Project Name
Timberland Gas Station
2
Project Area ac
4.392
3
Coastal Wetland Area ac
4
Surface Water Area (ac)
_
5
Is this ro ect High or Low Density?
High
6
Does this project use an off -site SCM?
_
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided (feet)_
Will the vegetated setback remain vegetated?
NIA
8
N/A
No
9
tf BUA is proposed in the setback, does it meet NCAC 02H_1003 4 c-d ?
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
1
0
12
I3ioretention Cell
13
Wet Pond
0
�14
_
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-F5
0
20
Disconnected Impervious Surface (DIS)0
21
Treatment Swale
_
0�
22
lDry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Elayfilter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Carlo Pardo, PE
20
Organization: _:_
Triangle Site Demon, PLLC
29
street address:
City, State, Zip:
4004 Barrett Drive. Suite 101
30
Raleigh, NC 27609
31
Phone numbers :
919-553-6570
32
Email_
cpardo@trianglesitedesign.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the
information provided in the form is, to the best of my know;edge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
!!lyy11111ftllll/1
Z' k RQ(
SEAL
051571IN
-
Signature of Designer
q 6.
Date
DRAINAGE AREAS
1
Is this a high density ro ect?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this promect have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is alllpart of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
-
Infiltration Basin
5
Total drainage area (sq ft
191320 sf
126116 sf
6
Onsite drainage area (sq ft)
191320 sf
107849 sf
7
Offsite drainage area (sg ft
18267 sf
8
Total BUA in project sq ft
77923 sf
87964 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft
10permitting)
New BUA not on subdivided lots (subject to
s
11
Offsite BUA (sq ft
18267 sf
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
Sidewalk (sq ft
2338 sf
2338 sf
Roof (sq ft
8000 sf
8000 sf
Roadway s ft
67585 sf
59359 sf
Future (sq ft
Other, please specify in the comment box
below s fi
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
16
Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
1B
Percent BUA
41%
70%
19
Desi n storm inches
1.0 in
I Design volume of SCM cu fi
7123 cf
_2D
21
Calculation method for design volume
Simple Method
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
Offsite Drainage area includes a portion of Calloway Road and the future Lot
68 in the Timberland Ranch development.
INFILTRATION SYSTEM
1 Drainage area number 1
2 1 Minimum reauired treatment volume (cu ft) _ — 712
3
is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V or enter "VerticT far
trenches)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
_9
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)7
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is an a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an 0&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensed professional?
Yes
18 1 Proposed slope of the subgrade surface (%) 0%
19 lAre terraces or baffles provided? No
20 IType of pretreatment: Forebay
Solis Data
21
Was the soil investigated in the footprint and at the elevation of the
infiltrations stem?
Yes
22
SHWT elevation (fmsl)
366.00
23
Depth to SHWT per soils report (in)
180.00
24
Ground elevation at boring in soils report (fmsl)
381.00
25
Is a detailed hydrogeologic study attached if the separation is
between 1 and 2 feet?
Yes
26
Soil infiltration rate (inlhr)
11.00
27
IlFactor of safety (FS) (2 is recommended):
2.00
I lrlevatlons
29
Bottom elevation (fmsl
378 ft
30
13torage elevation fmsl
380. ft
31
1 Bypass elevation (fmsl)
380.7 ft
For saslns only
32 Bottom surface area tt? 4975 ft
33 1 Storage elevation surface area ft 7075. ft
Fnr Trpnehes Qnlv
34
Length (ft
35
Width (ft)
36
Perforated pipe diameter, if applicable (inches)
37
Number of laterals
38
Total length of perforated piping
39
Stone type, if applicable
40
Stone porosity (%)
41
Is stone free of fines?
42
is the stone wrapped in geotextile fabric?
43
Has at least one inspection port been provided?
Vofumes/Drawdown
44 IDesign volume of SCM cu ft 7123 cf
45 1 Time to draw down hours 3 hrs
ADDITIONAL INFORMAT10N
46 Please use this space to provide any additional information about the
infiltration syslem(s):
Infiltration 1 8:06 AM 9/2/2021