Loading...
HomeMy WebLinkAboutSW4210703_Response To Comments_20210914JAMESTOWN ENGINEERING GROUP, INC. CIVIL ENGINEERS &SURVEYORS LAND PLANNING ^MUNICIPAL CONSULTING 117East Main Street ~P.O'Box 3w5^Jamestown, N.C. 27202 Telephone (336) 886-5523 Fax (.336) 886-5478 Jim Farkas NCDBQ 1612Mail Service Center Raleigh, NC 27699-1612 Subject: Stormwmt rPemnit Nn.SW421O703 Tally Pointe Davidson County Dear Mr. Farkas: Per your request for additional information, we have made the requested changes and included the requested material in this package. The following is a response to each of your concerns: 1} Vegetated svvaleshave been utilized within this development. Due tuthe size ofthe drainage areas, NCDOT required storm inlets and additional piping to provide for better long-term maintenance, less erosion, and shallower flows. Since the piping isinexcess ofwhat istypically considered incidental piping, we have added curb outlet systems at each of the storm discharge locations. As discussed on our call, the combination of the vegetated swales and the curb outlet systems should provide for equal or better -quality runoff than if the site had only incidental storm piping. 2\ The table in Section IV, 10 of the application has been revised to remove off -site drainage area and BUA. The revised Application is attached. 3) The Supplement-EZ Form and the O&M Agreement From have been executed are attached. 4) The executed Deed Restrictions are attached. These restrictions have been added tothe HOA Covenants and Restrictions which shall apply to all lots within the development. 5) The Time of Concentration calculations and rainfall intensity data are attached. 6) On -site surface waters have been identified on the attached plan sheets. 7\ AnInitial Conditions Map has been added tothe plan set and isattached. 8\ The vegetated conveyance detail has been revised on each plan sheet to indicate the 3:1 side slopes and type ofvegetation. Details for the curb outlet systems have also been added toPlan Sheet1. 9) Astream/wetland noapis attached. Itwas performed bvPilot Environmental, Inc. project number5678. 10) The drainage area to each of the swales has been added to Plan Sheet 6. 11) The required vegetated setbacks have been indicated on all of the plan sheets. 12)PDFoofall revisions have been uploaded. Two hard copies ufthe revised plans are attached and one copy ofall other documents (sincluded. If you have any questions or need any additional information, please feel free to give me a call. Thank you for your assistance in this matter. Thomas R. (Rich) Glover, Jr., PE Jamestown Engineering Group, Inc.