Wet Detention Pond #3
1) Calculate percent impervious draining to pond.
Impervious
Drainage Area = 6.61 acres
Road/Parking
0.42
ac / sf
1&
Impervious Area = 3.13 acres
Sidewalk
0.13
ac / sf
5E
Lots
2.09
ac / sf
911
% Imperv. = 47.42 %
Driveways
0.19
ac / sf
8C
Ex. Street
0.31
ac / sf
13,
2) Find the volume of the 1.0" storm using the "Simple Method" (Schueler 1987):
1
The volume of the 1" storm must be detained in the pond above the permanent pool and must be drawn down over a
period of two to five days.
Rv = 0.05 + 0.009 (I)
Rv = runoff coefficient (ratio of runoff to rainfall in inches)
I = percent impervious
Rv = 0.477 in/in
Volume of 1.0" storm (must exceed 3630 cf):
WQv = 3630 x RD x Rv X A
WQv = volume of runoof gnerated from design storm
Ro = Design storm = 1 inch
Rv= Runoff Coef= 0.477 inch/inch
A= Drainage Area = 6.61 acre
WQrr= 11,440 ft
3) Determine Surface Area to Drainage Area Ratio & Surface of Permanent Pool (Water Quality)
Table 1: Piedmont and Mountain SAIDA Table (Adapted from Driscoll, 1986)
10% 0s1 0.43 0.37 0.30 0.27 0.25
20% 0.84 IN 0.61 0.51 0.44 0.40
30% 1.17 381 0.84 072 061 0.56
40% 1.51 1.22 1.n9 0-91 n.79 071
50% 1.70 1 47 1.31 1.13 0.95 087
60% 2.09 1.73 1.40 191 1.12 1.03
70% 2.51 2.04 180 1-66 1.34 1.17
W% 2.92 2.36 2.07 1.82 1.62 14C
90% 3.25 2.64 2.31 2.04 1.84 1.59
Desired Depth = 3 ft
Imp. % Ratio
Lower Limit = 40.00 1.51
Upper Limit = 50.00 1.79 Minimum SA Required =
4,946 ft 2
Acutal = 47.42 1.72
Project Data
Revisions
Project #k
2018-002
No
Date
Description
Project Name
Kathryn's Retreat
1
8/30/2021
NCDENR Revisions
Date
8/31/2021
Wet Detention Pond 03
Total Main Pool
Stage Level
Elevation (ft)
Area (so
StageVolume
(co
Cumulative Storage
(co
0
252.5
2412
-
-
0.5
253
2658
1,268
1,268
1.5
254
3186
2,922
4,190
2.5
255
3762
3,474
7,664
3.5
256
4385
4,074
11,737
4.5
257
5057
4,721
16,458
5
257.5
5412
2,617
19,075
5.5
258
6536
2,987
22,062
Total Forebay Volume
Stage Level
Elevation (ft)
Area (sf)
Stage Volume
(co
Uumulative Storage
(co
0
255
389
-
-
1
256
804
597
597
2
257
1414
1,109
1,706
3
258
2030
1,722
3,428
Temporary Pool Volume
Stage Level
Elevation (ft)
Area (so
rage olume
(co
Cumulative Storage
(co
0
258
8566
-
-
0.5
258.5
10052
4,655
4,655
1
259
10995
5,262
9,916
1.25
259.25
12018
2,877
12,793
Average Depth Calculation:
VPP—Vsheif
D.O= Abottomofsheif
Where: D„,, = Average depth in feet
V- = Total volume of permanent pod (feet')
V,n,n = Volume over the shelf only (feel') — see below
A.—.~ = Area of wet pond at the bottom of the shelf (feet')
V.—= 0.5' Depth_a.,r—r' Perimeterp,,,,, * Wldth„e,.,,,� ,
Where: D,,,,,,,,,,,,,,, = Depth of water at the deep side of the shelf as
measured at permanent pool (feet)
Petimeterp.,.,, - = Penmeter of permanent pool at the bottom of the
shelf (feet)
wAth,,,o,,--p,n a,na = Width from the deep side to the dry side of the
shelf as measured at permanent pool (feet)
Vsheif =
257 cf
Dma,—shelf =
0.5 ft
Pei meter =
343 ft
Width =
3 ft
Vpp = 22062 cf
Abe .f sh0f = 5412 sf
D®g = 4.03 ft
Per ject Data
Revisions
oject #
2018-002
No
Date
Description
oject Name
E
Kathryn's Retreat
te
8/31/2021
Wet Detention Pond #3
1) Input Orifice and Spillway Information
Orifice Diameter = 1.50 in
Office Coefficent = 0.60
Volume Provided = 12,793 cf
Number Orifices = 1.00
Inv Office = 258.00
Inv Primary Spillway = 259.25
2) Calculate Area, Head and Discharge Flow
Q = Co A 2gh
g= 32.2 ft/s2
h= use h/3 to simulate decreasing head
A= cross section area of orifice
Q= discharge cfs
Q= discharge cfs
Orfice Cross Section Area = 0.012 sf
Average head = 0.417 feet
Discharge = 0.038 cfs
3) Calculate Drawn Down Time
Time= Volume/Flowrate
Drawdown Time = 3.88 days
Check = OK
Per jest Data
Revisions
Project #
2018-002
No
Date
Description
Project Name
Kathryn's Retreat
Date
8/31/2021
Wet Detention Pond #3
DETERMINE BOUYANT FORCES
Volume = Depth * Area
Depth = Riser Top Elev - Riser Bottom Elev
Riser Top Elev. _
Bottom of Riser EIev. _
Riser Wall Thickness =
Diameter of Manhole =
Area = pi * diameter^2 / 4
Area (@ outside diam)=
Volume =
times wt of water
Bouyant Force =
2. DETERMINE COUNTERWEIGHT REQUIREMENTS
Riser Top
Top Elevation =
Thickness =
Outside Diam =
Volume =
Riser Walls
Inside Diam =
Wall Thickness =
Height =
Volume =
Riser Bottom - Extended Base
Bottom Elevation =
Diameter =
Thickness=
Volume =
Total Volume =
x unit weight of reinforced conc.
Counterweight =
Factor of Safety Provided (FSP) _
Additional Concrete Required (Y/N) _
Amount of Concrete Required =
3. ADD CONCRETE BELOW INVERT IN RISER
Area of Riser (@inside diam) _
Volume Required =
Calculated Depth of Concrete =
Actual Depth Used =
Backcheck Volume =
Backcheck Weight of Added Conc
(150-62.4) _
Factor of Safety =
Factor of Safety > 1.30 (Y/N) _
261 ft
257.50 ft
6.00 in
4.00 ft
19.64 sf
68.72 cf
62.4 Ibs/cf
4,288 Ibs
261
0 inches
5.00 ft
0.00 cf
4.00 ft
6.00 in
3.50 ft
24.74 cf
257.50
0.00 ft
6.00 in Summary
0.00 cf Add minimum 24 inches below invert of
pond
24.74 cf
150 Ibs/cf
3,711 Ibs
0.87
Y
1,864 Ibs
12.57 sf
21.28 cf
1.69 ft
24 in
25.13 cf
2202 lb
1.38
Y